1 ENVIRONMENTAL STATEMENT FOR THE YEAR Sponsor SITAPURAM POWER LIMITED HYDERABAD Prepared By VISON LABS Analytical Service & Environmental Consultants Recognised by MoEF, GOI, Sr.no.2728 (E), ISO 9001:2008 H.No /37/A, 2 nd Floor, Sagar Hotel Building, Opp: R.T.A Office, Musaarambagh, Hyderabad. Tel Fax No : , Website: info@visonlabs.com & vison.labs@gmail.com September-2011

2 R E P O R T SITAPURAM POWER LIMITED, NALGONDA DISTRICT, ANDHRA PRADESH Environmental Statement For and on behalf of Vison Labs Approved by : T. Laxmikanth Reddy Signed : Position : Chief Executive Date : September, 2011 This Report has been prepared by Vison Labs with all reasonable skills, care and diligence within the terms of the contract with the client, incorporating our General Terms and Conditions of business and taking account of the resources devoted to it by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. This report is confidential to the client and we accept no responsibility of whatsoever nature to third parties to whom this report, or any part thereof, is made known, any such party relies on the report at their own risk. Vison Labs, Hyderabad. 2

3 Index of the Audit Report: The environmental statement report is based on data generated for twelve months during the period April 2010 to March The report consists of the following chapters: Chapter 1.0 Introduction This chapter provides background information, location of the plant, process being adopted and scope of the study. It also provides the information about climatic conditions in general in the project area. Chapter 2.0 Form V Ministry of Environment and Forest has made it mandatory to all industries which require authorization under Environmental (protection) act to submit an environment statement, for each financial year to the concerned state pollution control board. This chapter presents filled in form-v along with the supporting documents. Chapter 3.0 Pollution Audit This chapter presents detailed studies on Air Quality, Noise Quality in the 10 km radius taking the plant as a center. 3 sampling locations have been identified in 10 km radius in different directions and ambient air quality has been studied extensively for twelve months during the period April 2010 to March 2011, subsequently. The noise levels have been measured both in the plant for various equipments and at various human settlements within the 10 km radius. This chapter provides an insight of the existing pollution levels and provides the overall description of the existing environmental status during the operation of the plant. Chapter Safety and Energy Aspects This chapter provides information about various safety measures under taken by M/s. Sitapuram Power Limited. In view to safe guard manpower from the occupational health problems. This chapter also depicts the energy consumption for the captive power plant during Chapter 5.0 Auditor s Comments This chapter presents the exclusive comments on the existing pollution levels, measures taken for abatement of pollution and recurring Investment on operational maintenance of pollution control equipment. Vison Labs, Hyderabad. 3

4 Chapter 1.0 Introduction Vison Labs, Hyderabad. 4

5 1.0 INTRODUCTION: Industrial pollution in our country is on increase and is creating a high-risk environment. Various legislations viz. The water (Prevention & Control of Pollution) Act, 1974 and Environment (Protection) Act, 1986 have come into force and organization created to combat pollution. Gone are the days when industrialization meant profit making and environment was grossly neglected. It is being realized that industry and environment should go hand in hand so as to achieve sustainable development. Also over the years, awareness has brought in realization to consider environmental protection a bare necessity. Yet, the investments for such a protection are still considered a liability by many industrialists mainly due to lack of up-to-date scientific practices of environmental management. Consideration of environmental factors at par with production helps in minimizing material loses and also in reduction of liabilities in the long run. Environmental Audit is a technique being introduced for integrating the interest of the industry and the environment so that these could be mutually supportive. This technique is basically a part of industry s internal procedures in meeting their responsibilities towards better environment. Also the policy statement for abatement of pollution by the Govt. of India provides for submission of environmental statement by all concerned industries, which would subsequently evolve into an environmental audit. A notification under the Environment (Protection) Rules, 1986 has been issued on 1991, requiring industries to submit an environmental statement for the financial Year ending on March 31 in Form V to the concerned State Pollution Control Boards on or before September 30 every Year beginning 1993.The Department of Company Affairs also agreed to include this requirement as a part of the Director s Annual Report. The submission of an environmental statement is applicable to the following. i) Those who require consent under the water (Prevention & Control of Pollution) Act, 1974; ii) Those who require consent under the Air (Prevention & Control of Pollution) Act, 1986 and iii) Those who require authorization under Hazardous wastes (Management & Handling) Rules, In order to comply with the statutory requirement as well as to maintain corporate image in the region, recognizing the importance of comprehensive structural mechanism to ensure that the industrial activities do not cause any effects on environment, M/s. Sitapuram Power Limited, Nalgonda Dist., A.P. entrusted Vison Labs, Hyderabad the job of studying the various factors to prepare environmental statement. The enclosed report details about the environmental statement for the M/s.Sitapuram Power Limited, Nalgonda Dist., A. P. for the year of Vison Labs, Hyderabad. 5

6 1.1 PHILOSOPHY OF ENVIRONMENTAL AUDIT: Definition: Environmental auditing is a management tool comprising a systematic, documented, periodic and objective evaluation of how well the management systems are performing with the aim of: i) Waste prevention and reduction; ii) Assessing compliance with regulatory requirements; iii) Facilitating control of environmental practices by a company s management; and iv) Placing environmental information in the public domain. In the industries, especially the chemical industries, raw materials are used in excess of the tachometric requirements because of the limitations on practically achievable operational efficiencies and the raw materials purity. These excess usages of raw materials, unless recovered, find their way include non-product discharges in gaseous, liquid and solid phases. End-of the-pipe waste treatment techniques, wherein all the wastes are carried to a common facility for treatment, is proving to be ineffective and uneconomical due to the complexity of problems associated with waste generation, their quantity and characteristics. The waste generation may vary hourly, daily and seasonally, especially in case of the multiplicity of manufacturing product in the same premises. The wastewater characteristics also widely vary from stream to stream discharged from various unit operations of a particular product. In this growing complexity of problems, the concept of waste prevention and reduction can workout to be more effective. It is important to find out whether the industry is complying with environmental standards and other regulatory requirements. It is also very essential to periodically monitor this aspect, determine the gaps and workout action plans for implementation with in a reasonable time frame keeping in view the financial and other considerations of a company. In cases of gaps for compliance with the regulatory requirements, the regulatory bodies could be apprised of these action plans and time obtained for implementation. Thus the regulatory risk can overcome and effective steps taken for pollution control. Many times, the top management of a company or an industry may not be aware of the factual situation of their industry from environmental angle. Such unknown facts form hidden liabilities more often than not expose an industry to regulatory risks. The management should be able to periodically review those environmental practices of the company to formulate / modify the company s environmental policy accordingly. Vison Labs, Hyderabad. 6

7 It is also imperative that the management of a company should have a clear picture of attitudes and technical capabilities of their organizational set-up for protecting environment, pollution control status, and their bounden social obligation related to environment so as to decide on the future mode of actions. Public are to be made aware of the environmental information of the company, especially to those who are shareholders, so as to build in among them confidence. Environmental auditing can be viewed as a management tool internally, and liaison externally with the public and regulatory bodies. 1.2 BENEFITS OF ENVIRONMENTAL AUDIT Environmental auditing has far reaching benefits to the industry, to the society and the nation at large. The benefits of environmental audit are, i) Determines how well the process systems and pollution control systems are performing and identifies the operations of poor performance; ii) ii) iii) iv) Identifies potential cost savings which can be accrued through reduction in raw material consumption by way of waste minimization, and adoption of recycle / recovery/ reduction in pollution load; Increases awareness of environmental requirements, policies and responsibilities; Helps in understanding the technical capabilities and attitude of the environmental organization in a company; Provides up-to-date environmental data base for use in plant modification, emergencies etc; v) Unravels surprises and hidden liabilities due to which regulatory risk and exposure to litigation can be reduced; vi) vii) Ensures independent verification identifies matters needing attention, and provides timely warning to management on potential future problems and Helps to safeguard environment, and assists in complying with local, regional and national laws and regulations, with the company s policy and with the environmental standards. Vison Labs, Hyderabad. 7

8 1.3 OBJECTIVES: The environmental audit helps in pollution control, improving production, safety and health and conservation of natural resources. Hence overall objective can be stated as achieving of sustainable development. However for conducting environmental audit, objectives are to be defined clearly or else the audit procedure will be subject to varying interpretations, which may yield and contribute to differences in approach thereby influencing the end results. The objectives of environmental audit in an industry are: i) To determine the mass balance of various materials used and the performance of various process equipment so as to identify usage of materials in excess than required, to review to conversion efficiencies of process equipment and accordingly fix up norms for equipment / operations performance and minimization of the wastes. ii) (a) To identify the areas of water usage and wastewater generation and Determine the Characteristics of wastewater; (b) To determine the emissions, there sources, quantities and Characteristics and (c) To determine the solid wastes and hazardous wastes generated, their Sources, Quantities and characteristics iii) To identify the possibilities of waste minimization, and recovery and Recycling of wastes; iv) To determine the performance of the existing waste treatment / control systems so as to modify or install additional or alternative control equipment accordingly; v) To determine the impact on the surrounding environment ` (groundwater, stream, residential area, agricultural area, sensitive zone, etc.) vi) due to the disposal of wastewater, emissions and solid wastes from the industry and accordingly identify suitable preventive measures, if necessary; vii) To verify compliance with the standards and conditions prescribed by the regulatory bodies under the Water Act, the Air Act and the Environmental (Protection) Act; and viii) To check the effectiveness of (a) organizational set-up of the industry for decision making and environmental management with special reference to their technical view point, attitudinal view point and training, and (b) environmental policy of the company. Recognizing the importance of the structured and comprehensive mechanism for ensuring that the activities and products do not have any adverse affects on environment, M/s. SITAPURAM POWER LIMITED retained M/s.VISON LABS to under take the Environment Statement Studies. Vison Labs, Hyderabad. 8

9 1.4 Project Setting: VS Lignite Power private Limited has been promoted by the KSK Energy Ventures Limited (KSK), a company engaged in development of power generation projects. KSK has successfully implemented and operating power generation plants in the country. KSK is currently implementing many projects, with an installed capacity of over 800 MW in various states of AP, Tamil Nadu, Chhattisgarh, Maharashtra and Kerala. Some of the projects are listed below: Arasmeta Captive Power Company Pvt. Ltd. 2 X 43 MW (Phase-I & II ) coal based power plant for Lafarge India Pvt. Ltd at Janjgir-Champa District of Chhattisgarh; Sitapuram Power Limited - 43 MW coal based power plant for Zuari Cements, Andhra Pradesh; Kasorgod Power Company Limited (KPCL) 21 MW Independent Power Plant (IPP) based on LSHS at Kasorgod, Kerala; Sai Regency Power Company Private Limited - 58 MW Gas Based Power Plant at Ramanathapuram, Tamil Nadu; VS Lignite Power Private Limited (VSLP) - 1 X 135 MW Lignite Based Power Plant, Village Gurha, District Bikaner, Rajastan; Wardha Power Company Limted (WPCL) 4 x 135 MW coal based power plant at MIDC, Warora, Dist Chandrapur, Maharastra; The coal based thermal power plant is located near Dondapadu Village, Mellacheruvu Mandal, Nalgonda District, Andhra Pradesh. The index map of the Power plant 10 km radius study area map shown in figure-1 and figure-2 Respectively. The 96 m high stack is the main source of air pollution from the power plant. Fugitive emissions are expected from coal handling area, coal storage area and ash handling area. Vison Labs, Hyderabad. 9

10 1.5 Process Description : The Sitapuram Power Limited is a unit with configuration of 2 x 21.5 MW units, with one steam turbine and two boilers. The project involves two AFBC boilers, generating steam at 89 bars at 515 o C with one condensing turbo generator set having generating capacity of 43 MW of power. The salient features of the power plant are given in Table-1. TABLE - 1 SALIENT FEATURES OF SITAPURAM POWER LTD. S. N. Parameter Description 1 Plant capacity 43 MW (2 X 21.5 MW) 2 Capacity of steam generator 90 TPH AFBC type Boiler 3 Generator 43 MW 4 Fuel 30 MT/hr. sourced from SCCL 5 Ash Generation 280 TPD 6 Water requirement and 6000 KLD from river Krishna source 7 Total waste water generation 1569 KLD with total recycle and reuse 8 Waste water treatment Neutralization pond Guard pond RO plant 9 Fire fighting system Adequate fire fighting systems as per tariff Advisory Committee(TAC) and OISD Guidelines 10 Stack height and diameter at top (m) 96 m and 4.0 m 11 Air pollution control equipments Source: Sitapuram Power Limited. ESP s with four fields for each boiler outlet Vison Labs, Hyderabad. 10

11 Sitapuram Power Limited SOURCE: MAPS OF INDIA FIGURE -1 INDEX MAP Vison Labs, Hyderabad. 11

12 FIGURE-2 STUDY AREA MAP OF 10 KM RADIUS SHOWING SAMPLING LOCATIONS Vison Labs, Hyderabad. 12

13 1.6 Scope of the study: The study covers core area of 5 km radius circle with the plant site as the center. The scope of study broadly includes: To conduct liter rate review and to collect data relevant to the study area; To undertake environmental monitoring so as to establish the baseline environmental status of the study area; To identify various existing Pollution loads due to various activities in the Ambient Levels; and To identify critical environmental attributes required to be monitored. 1.7 Methodology of the study: The consultants conducted reconnaissance survey and sampling locations were identified on the basis of: Predominant wind directions in the study area as record by Indian meteorological department (IMD) station at khammam. Existing topography; location of surface water bodies like ponds, canals and rivers. Location of villagers / towns/ sensitive areas; Accessibility, power availability and security of monitoring equipment; pollution Packets in the area; Areas which represent baseline conditions; and Collection, collation and analysis of baseline data for various environmental Attributes. The field observations area used to: Identify extent of negative impacts on community/ natural resources, and Identify mitigation measures and monitoring requirements. Field studies have been conducted during April 2009 to March2010, which will determine existing conditions of various Environmental attributes. Vison Labs, Hyderabad. 13

14 CHAPTER 2.0 Form V Vison Labs, Hyderabad. 14

15 FORM - V (See Rule 14) Environmental Statement Report for the financial year ending the 31 st March PART-A (i) Name and adders of the Owner/Occupier of the Industry, Operation or process : Mr. K. A. Sastry Director M/s. Sitapuram Power Limited, Dondapadu Village, Mellacheruvu Mandal, Nalgonda District Andhra Pradesh Tel. & Fax No.: (ii) Industry Category (iii) Production capacity : Red Category Hazardous Coal based power plant : 43MW (iv) Year of Establishment : 2008 (v) Date of the last environmental : September 2010 Audit report submitted. PART B Water and Raw Material Consumption (i) Water consumption, m 3 /day : Please refer Annexure 1A Previous Year Current Year ( ) ( ) DM Plant Cooling Tower Domestic Name of Product Water Consumption per unit of product During the During the Previous current Financial year financial year ( ) ( ) Electricity 4.97 lit/ KWH 3.52 lit/ KWH Vison Labs, Hyderabad. 15

16 Raw Material consumption: Name of raw Name of Consumption of raw material per unit of output Material. Products. (Tons/KWH, Lit. /KWH of Electricity) During the During the previous current financial year financial year ( ) ( ) Coal Electricity LDO Oil Electricity PART C Pollution Generated (Parameters as specified in the consent issued) Pollution discharged to Environment/ Unit of output (i) Pollutant Quantity of Percentage of Pollution variation from Generated Prescribed standards a) Water Please refer Annexure I B & I C b) Air Please refer Annexure I D PART D Hazardous Wastes (As specified under Hazardous wastes / management and handling rules, 1989) Hazardous Wastes Total Quantity During the During the Previous current Financial year financial year ( ) ( ) (a) From process 49 lit. 11 lit. Waste oil (b) From pollution control Nil Nil Facility (c) Quantity recycled or Re-utilized Nil Nil Waste oil generated in the process will be sold to APPCB authorized waste recycler. Vison Labs, Hyderabad. 16

17 PART-E Solid Wastes Total Quantity During the During the previous current financial year financial year ( ) ( ) (a) From process Fly ash 1.23 Lac MT Lac MT Bottom ash 0.15 Lac MT Lac MT (b) From Pollution Control facility Nil Nil (c) Quality recycled or re-utilized i) Bottom ash and Fly Ash The total generated (i.e., 100%) fly ash was sent to M/s. Italcementi Group (Zuari Cement Limited) for use in Portland Pozzolona Cement manufacturing. PART F Please specify the characteristics in terms of composition and quantum of hazardous as well as solid wastes and indicate disposal practice adopted for both these categories of wastes. The generated waste oil will be sold to APPCB authorized waste recyclers after having adequate quantity of it. The total generated fly ash was sent to M/s. Italcementi Group (Zuari Cement Limited) for use in Portland Pozzolona Cement manufacturing. Also the generated bottom ash was sent to M/s. Italcementi Group for further disposal. Vison Labs, Hyderabad. 17

18 PART G Impact of the pollution control measures on conservation of natural resources and on the cost of production. Regular monitoring of ambient air quality, stack emissions and effluent quality have been taken up to evaluate the efficiency of the pollution control systems and control measures on the overall emissions from stack and ambient air. Cost details of pollution control equipment & environmental monitoring for the financial year are follows: I. Revenue nature (Rs. in Lacs) a) Air pollution control Department Expense (including stores & spares) b) Waste water treatment plant c) Solid waste disposal d) Noise assessment Rs. 63,58,000/- e) Environmental Monitoring f) Fire protection/fire fighting f) Greenbelt Development/Maintenance h) Water cess Total quality of products Cost per unit of product MU Rs per KWH Vison Labs, Hyderabad. 18

19 PART H Additional measures investment proposal for environmental protection including abatement of pollution, prevention of pollution. 1. All internal roads are either concreted or black topped to reduce the fugitive dust emission inside the plant premises. 2. A massive tree plantation is in progress inside as well as outside of the Plant premises. Also small patches of gardens are developed inside of the plant premises wherever the open space is available to improve the plant beautification. 3. A guard pond is constructed in the plant for storage of generated waste water and the same is recycled for plantation and coal dust suppression in the plant area. The remaining waste water from guard pond is sent to M/s. Italcementi Group (Zuari Cement Limited) for recycle/ reuse. Hence there is no discharge of waste water from the plant area and the unit is zero discharge unit. 4. A water sprinkling arrangement is provided in the coal handling area to reduce the fugitive dust emission in the plant. 5. Housekeeping is taking on top priority and engaged 20 no. of manpower for maintaining neat and clean environment in the plant premises. As already adequate measures have been taken for pollution control, no further capital investment is planned for the next financial year PART I Miscellaneous Any other particulars for improving environment protection and abatement of pollution plants have been planted inside & all along the periphery of the plant boundary as on 31 st march The no. of saplings proposed for next financial year is 2000 no. Mr. M. Venukumar (Plant Head) M/s. Sitapuram Power Limited, Dondapadu Village, Mellacheruvu Mandal, Nalgonda District, Andhra Pradesh Vison Labs, Hyderabad. 19

20 ANNEXURE I A WATER BALANCE STATEMENT (m 3 /day) (April 2010 March 2011) 1. Water drawn from river Utilization Requirement Effluent Losses Recycle A} Industrial DM Plant Cooling Towers/Boiler Blow down B} Domestic Canteen Sanitation C} Miscellaneous Fire Practice Green belt Development Total Note: The generated effluent is reused for green belt development and coal dust suppression in the plant. The remaining wastewater from the guard pond is sent to M/s. Italcementi Group (Zuari Cement Limited) for recycle/reuse. Vison Labs, Hyderabad. 20

21 ANNEXURE- I B DATA OF INDUSTRIAL EFFLUENT (Guard Pond), (APRIL MARCH 2011) Month ph Suspended solids mg/l Oil & Grease mg/l April <1.0 May <1.0 June <1.0 July <1.0 August <1.0 September <1.0 October <1.0 November <1.0 December <1.0 January <1.0 February <1.0 March <1.0 ANNEXURE I C WASTE WATER GENERATION AND POLLUTANT DISCHARGE MAIN DRAIN EFFLUENT Parameter Quantity of Pollution Generated, TPA Quantity of Pollution Generated, Kgs/ Lac MU Electricity Total Suspended Solids (TSS) Oil & Grease (O.&G.) - - Average flow considered (Effluent) is m 3 /d. Total quantity of wastewater generated during April 2010 to March 2011 is m 3. Vison Labs, Hyderabad. 21

22 ANNEXURE I D AIR [Source Emissions] (April 2010 March 2011) Stack Attached to Coal fired Boiler Stack Height (m) Stack Diamet er (m) Average Velocity (m/s) Average Temp ( 0 C) Dust Concentration (mg/nm 3 ) SO 2 (mg/nm 3 ) NOx (mg/nm 3 ) Max. Min. Max. Min. Max. Min. Max CO (PPM) Min Dust Control Equipme nt ESP s Pollutants Discharged POLLUTION GENERATED AND QUANTITY OF POLLUTION Quantity of pollution Generated in the period April 2010 to March 2011 (In tones) Percentage variation from Prescribed Standards Particulate Matter 26.7 < 34 Sulphur Dioxide (SO 2 ) Oxides of Nitrogen (NOx) ve = Above the APPCB prescribed Limit - ve = Below the APPCB prescribed Limit Vison Labs, Hyderabad. 22

23 Chapter 3.0 Pollution Audit Vison Labs, Hyderabad. 23

24 3.0 Pollution Audit The basic objective of pollution audit is to investigative the status/ efficiency of environmental management system and equipment vis-à-vis the regulatory requirements. The environmental quality can be assessed by studying the following: 3.1 Ambient Air Quality 3.2 Noise Monitoring 3.3 Water and Waste Water Quality 3.1 Ambient Air Quality The ambient air quality monitoring was carried out in there locations during April - 10 to March 2010 covering to the baseline details of ambient air quality monitoring locations are given in Table 3.1 TABLE-3.1 DETAILS OF AMBIENT AIR QUALITY MONITORING LOCATIONS Location code Location Name Direction w.r.t Plant Distance from plant (km) Inside the Premises AAQ 1 Top of ENMAS Building Within the plant Within the plant AAQ 2 Top of security office Within the plant Within the plant AAQ 3 Top of Administrative Building Within the plant Within the plant Outside the Premises AAQ 4 Dondapadu Village SW 1.5 AAQ 5 Ramapuram Village NW 5.0 AAQ 6 Muktishwarpuram Village E Sampling and Analytical Techniques: Whatman GF/A filter paper was used in PM10 & PM 2.5 and weighed in Mettler electronic balance and computed as per standard methods. Ambient Air samples were analyzed for SO2 concentration levels using Improved West Gaeke method using preprogrammed HACH spectrophotometer at a wavelength of 560nm. NOx concentration levels were estimated using Jacob and Hocheiser modified (Na-As) method using preprogrammed HACH spectrophotometer at a wavelength of 540 nm. Ozone (O3) concentration levels, using Improved IS 5182 (Part IX) Ammonia (NH3) concentration levels using Improved APHA-401. Lead(Pb), Arsenic(As), Nickel(Ni) concentration levels using improved ASTMD Benzene(C6H6) concentration levels using Improved APHA-401. Benzo(a)Pyrene (BaP) concentration levels using Improved APHA-401 and Carbon Monoxide concentration levels using indicator tub method. The details are given below in Table-3.1.1: Vison Labs, Hyderabad. 24

25 Calibration Calibration charts have been prepared for all gaseous pollutants. The calibration is carried out whenever new absorbing solutions are prepared. The following techniques have been used for ambient air quality monitoring: TABLE TECHNIQUES USED FOR AMBIENT AIR QUALITY MONITORING S.No Parameter Testing Method to be Followed Minimum detectable 1 PM 10 IS:5182 (Part IV) µg/m 3 2 PM 2.5 IS:5182 (Part IV) µg/m 3 3 SO 2 (Sulfur Dioxide) IS:5182 (Part II) 1969, with Improved West & Gaeke Method 4.0 µg/m 3 4 NO 2 (Nitrogen Dioxide) Modified Jacobs Hochheiser Method / Arsenite Method 5.0 µg/m 3 5 Ozone (O 3 ) IS:5182 (Part IX) µg/m 3 6 Ammonia NH 3, APHA µg/m 3 7 Lead (Pb), ASTMD µg/m 3 8 Arsenic(As), ASTMD ng/m 3 9 Nickel (Ni) ASTMD ng/m 3 10 Benzene (C 6 H 6 ) 1005 OSHA 0.01µg/m 3 11 Benzo(α)Pyrene (BαP) 58 OSHA 0.01 ng/m 3 12 Carbon Monoxide Indicator tub Method 1 mg/m Presentation of Primary Data The various statistical parameters like 98 th percentile, average, maximum and minimum concentrations for the study period have been computed from the observed raw data for all the AAQ monitoring stations. The summary of these results is presented in Table Observations on Primary Data Inside The Plant PM10: The 98 th percentile of maximum and minimum PM 10 concentrations during the study period were observed to be 89.0 µg/m 3 and 82.7 µg/m 3 respectively. PM2.5: The 98 th percentile of maximum and minimum PM 2.5 concentrations during the study period were observed to be 27.9 µg/m 3 and 24.5 µg/m 3 respectively. SO 2 : The 98 th percentile of maximum and minimum SO 2 concentrations during the study period were observed to be 15.8 µg/m 3 and 13.6 µg/m 3 respectively. NO2: The 98 th percentile of maximum and minimum NO2 concentrations during the study period were observed to be 21.3 µg/m 3 and 19.7 µg/m 3 respectively. Vison Labs, Hyderabad. 25

26 O3 The 98 th percentile of maximum and minimum O3 concentrations during the study period were observed to be 34.2 µg/m 3 and 28.5 µg/m 3 respectively. NH3: The 98 th percentile of maximum and minimum NH3 concentrations during the study period were observed to be 17.7 µg/m 3 and 14.1 µg/m 3 respectively. Pb: The value of Pb observed in all locations are Below Detectable Limit respectively. As: The value of AS observed in all locations are Below Detectable Limit respectively. Ni: The value of Ni observed in all locations are Below Detectable Limit respectively. C 6 H 6 : The value of C 6 H 6 observed in all locations are Below Detectable Limit respectively. Benzo(α)Pyrene (BaP): The values of BαP observed in all locations are Below Detectable Limit respectively. CO: The 98 th percentile of maximum and minimum CO concentrations during the study period were observed to be 2.1 mg/m 3 and 1.9 mg/m 3 respectively Observations on Primary Data Outside the Premises PM10: The 98 th percentile of maximum and minimum PM 10 concentrations during the study period were observed to be 36.6 µg/m 3 and 33.5 µg/m 3 respectively. PM2.5: The 98 th percentile of maximum and minimum PM 2.5 concentrations during the study period were observed to be 13.4 µg/m 3 and 12.3 µg/m 3 respectively. SO 2 : The 98 th percentile of maximum and minimum SO 2 concentrations during the study period were observed to be 13.0 µg/m 3 and 11.5 µg/m 3 respectively. NO2: The 98 th percentile of maximum and minimum NO2 concentrations during the study period were observed to be 15.2 µg/m 3 and 14.1 µg/m 3 respectively. O3: The 98 th percentile of maximum and minimum O3 concentrations during the study period were observed to be 23.4 µg/m 3 and 21.9 µg/m 3 respectively. NH3: The 98 th percentile of maximum and minimum NH3 concentrations during the study period were observed to be 12.9 µg/m 3 and 11.8 µg/m 3 respectively. Pb: The value of Pb observed in all locations are Below Detectable Limit respectively. Vison Labs, Hyderabad. 26

27 As: The value of AS observed in all locations are Below Detectable Limit respectively. Ni: The value of Ni observed in all locations are Below Detectable Limit respectively. C 6 H 6 : The value of C 6 H 6 observed in all locations are Below Detectable Limit respectively. Benzo(α)Pyrene (BaP): The values of BαP observed in all locations are Below Detectable Limit respectively. CO: The 98 th percentile of maximum and minimum CO concentrations during the study period were observed to be 1.8 mg/m 3 and 1.4 mg/m 3 respectively. TABLE Ambient Air quality Results per the year Inside Plant Area Station PM10 PM2.5 SO 2 NO 2 Code 98 th 98 th Min. Max. Avg. Min. Max. Avg. %tile %tile Min. Max. Avg. 98 th 98 th Min. Max. Avg. %tile %tile AAQ AAQ AAQ Station Code O3 NH 2 CO 98 th Min. Max. Avg. %tile Min. Max. Avg. %tile Min. Max. Avg. AAQ AAQ AAQ Note: 1. The values of Pb, As, Ni, C 6 H 6, BaP are in Below Detectable Limit. 2. The concentrations (PM 10, PM 2.5, SO 2, NO 2, O 3, Pb, NH 3 and C 6 H 6 ) are expressed in µg/m 3, Concentrations (As, Ni and BaP) are expressed in ng/m 3 and Concentrations CO is expressed in mg/m 3. Location Code and Name: 1. AAQ-1 : Top of ENMAS Building 2. AAQ-2 : Top of Security Office 3. AAQ-3 : Top of Administrative Building 98 th 98 th %tile Vison Labs, Hyderabad. 27

28 Ambient Air Quality Results for the year Outside the Premises Station PM10 PM2.5 SO 2 NO 2 Code 98 th 98 th 98 th 98 th Min. Max. Avg. Min. Max. Avg. Min. Max. Avg. Min. Max. Avg. %tile %tile %tile %tile AAQ AAQ AAQ Station Code O3 NH 2 CO 98 th Min. Max. Avg. %tile Min. Max. Avg. %tile Min. Max. Avg. AAQ AAQ AAQ Note: 1. The values of Pb, As, Ni, C 6 H 6, BaP are in Below Detectable Limit. 2.The concentrations (PM 10, PM 2.5, SO 2, NO 2, O 3, Pb, NH 3 and C 6 H 6 ) are expressed in µg/m 3, Concentrations (As, Ni and BaP) are expressed in ng/m 3 and Concentrations CO is expressed in mg/m 3. Location Code and Name: 4. AAQ-4 : Dondapadu Village 5. AAQ-5 : Ramapuram Village 6. AAQ-6 : Muktishwarapuram Village 98 th 98 th %tile 3.2 Noise Level Monitoring The Ambient noise levels monitoring were carried out in 12 different locations identified inside of the plant area to find out the day time and night time noise levels Method of monitoring Sound pressure level (SPL) measurements were measured at all locations; one reading for every hour was taken for 24 hours. The day noise levels have been monitored during 6 am to 10 pm and night levels during 10 pm to 6 am at all the locations in the plant area. The details of sampling locations along with the monitoring results are presented in the Table Vison Labs, Hyderabad. 28

29 TABLE DETAILS OF NOISE MONITORING LOCATIONS AND MONITORING RESULTS Ld Ln S. N. Locations [db(a)] [db(a)] 1 Turbine area Compressors room Near feed pump Near id fan Near FD fan Near MCW Pump Near martial gate Near main gate Near administrative building Near crushers PFV system Near garden The day time levels in the study area are ranged from 48.1 db(a) to 74.6 db (A), where as the night time noise levels are observed to be in the range of 40.8 db (A) to 69.7 db (A) it is observed that, noise levels in the study area are well within the prescribed standards. 3.3 Water Quality One water sample in the plant area was collected and analyzed at a frequency of once in a month during the study period i.e. April to March The result of the water sample is given Table Vison Labs, Hyderabad. 29

30 TABLE Water Analysis Results (April 2010 to March 2011) S. N. Parameter UOM Range 1 ph Turbidity (NTU) mg/l Total Dissolve solids mg/l Dissolved Oxygen mg/l Total Suspended Solids mg/l Total Hardness as CaCO 3 mg/l Residual Free Chlorine mg/l < < Chloride as Cl mg/l Sulphate as SO 4 mg/l Copper as Cu mg/l < Iron as Fe mg/l Chromium as Cr 6+ mg/l < Zinc as Zn mg/l < Phosphates as PO 4 mg/l < Chemical oxygen Demand mg/l Biochemical Oxygen Demand (3days 27 0 C) mg/l Oil & Grease mg/l < 1.0 Vison Labs, Hyderabad. 30

31 Chapter Safety and Energy Aspects Vison Labs, Hyderabad. 31

32 4.0 Safety Aspects The following are the identified fire/ accident-prone areas in captive power plant are coal yard, LDO oil storage area, ESP and boiler area etc. 4.1 Fire Fighting Equipment Sitapuram power limited has taken up adequate measure to safeguard the worked and property with the following steps. I. Approx. 34 nos. of different types of portable fire extinguishers are available in the plant premises II. III. Fire hydrant system consisting of 24 nos of hydrant posts, 13 nos of fire escape points and 3 nos of water monitoring systems are installed in the plant premises Fire direction cum alarm system and manual call points installed in the TG building and electrical control points. 4.2 Safety function Some of the important safety related activities viz. plant safety audits, safety training, conducting safety meetings, testing of lifting equipments/ tickles, procurement & inventory control of various personal protective equipments &maintaining of safety statistics etc are looked by the SED. 4.3 Specific Energy Consumption Sitapuram Power Limited is commissioned in January 2008 and planning to set up an energy conservation cell to monitor and implement various conservation measures to reduce the specific energy consumption per unit of electricity generated. Vison Labs, Hyderabad. 32

33 Chapter 5.0 Auditor s Comments Vison Labs, Hyderabad. 33

34 5.0 Auditor s Comments. This report presents the findings of study carried out to prepare the Environmental Statement for the year , for M/s.Sitapuram Power Limited, Nalgonda District, Andhra Pradesh. 1. The present air quality concentration in the plant and out side the plant area shows that the PM 10, PM 2.5, SO 2, NO 2, O 3, Pb, NH 3, C 6 H 6, As, Ni and BaP are well within the permissible limits prescribed by CPCB. 2. Good house keeping is in practice to reduce the fugitive emissions from the operations. 3. The total of the fly ash generated in the process is being sent to M/s.Italcementi Group (Zuari Cement Limited) for use in Portland Pozzolona Cement manufacturing. 4. The water quality is observed to be without any significant change that can cause damage to the existing biotic systems. 5. SPL has established an RO plant to treat the waste water generated in the process to recycle/reuse back in the process to reduce the water consumption. 6. The waste oil generated from the plant machinery will be sold to APPCB authorized recyclers. 7. The SPL has taken up the plantation program to develop the green belt around the periphery of the plant area. As on 31 st March 2010, the total of plants have been planted and about 2000 samplings are proposed for plantation in The project authorities have spent Rs lakhs for Operation and Maintenance of the Air Pollution Control equipment and other pollution control activities and for safety aspects. Findings reviewed & passed T.Laxmikanth Reddy Chief Executive Vison Labs; Vison Labs, Hyderabad. 34

Point wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II)

Point wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II) SIX MONTHLY ENVIRONMENTAL COMPLIANCE STATUS REPORT (PERIOD : OCT, 2017 to MARCH, 2018) Ref: J-13011/23/2007-IA-II (T) Dated: 17/07/2007 (as amended in the Year, 2013 & 2014) and J-13011/46/2007-IA-II (T)

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under

More information

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

M/S. HETERO INFRASTRUCTURE SEZ LIMITED ENVIRONMENTAL STATEMENT (FORM - V) FOR THE FINANCIAL YEAR ENDING MARCH-2016. M/S. HETERO INFRASTRUCTURE SEZ LIMITED N.NARASAPURAM(V),NAKKAPALLI(M) VISAKHAPATNAM DISTRICT. SUBMITTED TO : ANDHRA PRADESH

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM OCTOBER 2016 MARCH 2017 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

ENVIRONMENTAL AUDIT REPORT [STATEMENT] CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK

ENVIRONMENTAL AUDIT REPORT [STATEMENT] CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK ENVIRONMENTAL AUDIT REPORT [STATEMENT] ON CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK HOULI BAGAN, RANIHATI AMTA ROAD, HOWRAH Prepared by: FOUNDRY CLUSTER DEVELOPMENT

More information

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION Page 1 of 8 Environmental Statement for Clinker Grinding Unit of M/s Bihar Cement Plant (A Unit of Shree Cement Ltd.), situated at Jasoia Mor, BIADA, Industrial Growth Centre, Aurangabad, Tehsil & Dist.

More information

ENVIRONMENTAL MONITORING REPORT

ENVIRONMENTAL MONITORING REPORT ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM APRIL 2018 SEPTEMBER 2018 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT

More information

.,~) si.j Encl.: As above W ~Z. CIN No,-U40104TG2001PTC Ref.: MoE&F, LKN/KPBK/l040124/340 Date:

.,~) si.j Encl.: As above W ~Z. CIN No,-U40104TG2001PTC Ref.: MoE&F, LKN/KPBK/l040124/340 Date: Ref.: MoE&F, LKN/KPBK/l040124/340 Date: 27.04.2018 VS Works Registered Office Village Gurha, 8-2-293182/N431/A, l'ehsil Kolayal, Road No. 22, Jubilee Hills, Dis!. Bikaner, Hyderabad - 500033 Rajilslhan.

More information

Mars Power & Steel Ltd.

Mars Power & Steel Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

Submitted by: M/s Panasonic India Ltd

Submitted by: M/s Panasonic India Ltd Environmental Monitoring Report (June-2014) FOR Industrial Building of Panasonic India Ltd At Jhajjar, Haryana Submitted by: M/s Panasonic India Ltd INDUSTRIAL PLOT NO-1, VILLAGE- BID DADRI JHAJJAR (HARYANA)

More information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A Company Information Company Name : Facility Name : Person Name * : Designation * : Premise Name

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola 0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for

More information

Panasonic India Pvt. Ltd.

Panasonic India Pvt. Ltd. Panasonic India Pvt. Ltd. December-2014 FOR Industrial Building of Panasonic India Ltd At Jhajjar, Haryana 1 Details of Environmental Monitoring INTRODUCTION M/s Panasonic India Pvt Ltd granted its Environmental

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,

More information

Dheeru Powergen Private Limited.

Dheeru Powergen Private Limited. Executive Summary Of The Proposed 2 x 300 MW Dhanras Thermal Power Station At Dhanras Village Katgora Taluk, Korba District, Chhattisgarh. Implemented By Dheeru Powergen Private Limited. Submitted to CHHATTISGARH

More information

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana Last Amended on - Page 1 of 7 I. AIR, GASES & ATMOSPHERE 1. Ambient Air Monitoring RSPM ( PM 10) IS 5182 (Part 23): 2006 (RA ) 5 µg/m 3 to 750 µg/m 3 PM 2.5 SOP 11 dated 17.11.2014 12.5 µg/m 3 to 500 µg/m

More information

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~' 'Its ~s 71 66 CIN No. : L26943RJ1979PLC001935 Phone : 01462228101-6 Toll Free : 18001806003/6004 Fax: 01462228117/228119 E-Mail: shreebwr@shreecementltd.com (I." Website : www.shreecement.in SHREE CEMENT LTD..~..~..~

More information

2 x 300 MW (STAGE-I)

2 x 300 MW (STAGE-I) ENVIRONMENTAL STATEMENT OF Rosa Power Supply Company Ltd. Shahjahanpur (U.P.) 2 x 300 MW (STAGE-I) FINANCIAL YEAR ENDING THE 31 st MARCH, 2017 Prepared by: Rosa Power Supply Company Ltd. Shahjahanpur (U.P.)

More information

ENVIRONMENTAL STATEMENT FOR THE YEAR

ENVIRONMENTAL STATEMENT FOR THE YEAR ENVIRONMENTAL STATEMENT FOR THE YEAR 2016-17 6 MTPA STEEL PLANT OF TATA STEEL AT KLAINGANAGAR INDUSTRIAL COMPLEX, ODISHA ENVIRONMENTAL DEPARTMENT TATA STEEL KALINGANAGAR Kalinga Nagar Industrial Complex,

More information

GLOBAL TECH. ENVIRO EXPERTS PVT. LTD. (FORMERLY GLOBAL EXPERTS) An ISO-9001:2008 Certified Company

GLOBAL TECH. ENVIRO EXPERTS PVT. LTD. (FORMERLY GLOBAL EXPERTS) An ISO-9001:2008 Certified Company STACK MONITORING RESULT Name of Industry & Address Date of Monitoring 08-11-17 Date of Analysis 12-11-17 Reference No Stk-05/11/17 M/s SHIVA CEMENT LIMITED: Sl. No. Parameters Cement Mill 1 Kiln (Result)

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

JAYPEE NIGRIE SUPER THERMAL POWER PLANT

JAYPEE NIGRIE SUPER THERMAL POWER PLANT JAYPEE NIGRIE SUPER THERMAL POWER PLANT (A Division of M/s Jaiprakash Power Ventures Limited) Village: Nigrie, Tehsil: Sarai District: Singrauli 2015 2016 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Environment Statement

Environment Statement Paradeep Phosphates Limited Environment Statement 2017-18 ENVIRONMENT MANAGEMENT DEPARTMENT M/s PARADEEP PHOSPHATES LIMITED PPL TOWNSHIP PARADEEP-754145 JAGATSINGHPUR (ODISHA) Page 1 of 14 Environment

More information

. 0.:'. e:. :'} BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA Jji'665~" 1tS8;0 b AiS77..c,b

. 0.:'. e:. :'} BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA Jji'665~ 1tS8;0 b AiS77..c,b CIN No. : L26943RJ1979PLC001935 Phone : 01462228101-6 Toll Free: 18001806003/6004 Fax: 0146222811'71228119 E-Mail: shreebwr@shreecementltd.com Website : www.shreecement.in,-:,0 900, ~s}.s18(),9>01400,

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

FORM-V (See Rule - 14) Part-A

FORM-V (See Rule - 14) Part-A FORM-V (See Rule - 14) Environmental Statement for the financial year ending 31 st March, 2016 Part-A Name and address of the owner / occupier : K. Rahul Raju of the Industry Managing Director Nagarjuna

More information

Simran Industries Pvt. Ltd.

Simran Industries Pvt. Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Patharra Village Bemetara Tehsil Durg District Chhattisgarh Submitted to: CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh 1.0 INTRODUCTION

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

We are sending herewith the following for the month of September 2016.

We are sending herewith the following for the month of September 2016. ZZJ/CLAB-KSPCB/04/6499 07-10-2016 Environmental Officer, Regional Office, Karnataka State Pollution Control Board, Parisara Bhavan, LIG II, B 217, B-1, Main Road, A-16th Cross, Near Hari Om Trust, Habbuwada,

More information

ENVIRONMENTAL MONITORING REPORT

ENVIRONMENTAL MONITORING REPORT ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM APRIL 2014 SEPTEMBER 2014 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT

More information

MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA ORISSA MINING CORPORATION LIMITED BANGUR CHROMITE MINING PROJECT POST CLEARANCE ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF JULY 2011 MECON LIMITED RANCHI 834 002, INDIA 11.S2.2011 SEPTEMBER, 2011

More information

Excerpt of Thermal Power Guidelines for New Plants

Excerpt of Thermal Power Guidelines for New Plants Excerpt of Thermal Power Guidelines for New Plants The following is an excerpt of the Thermal Power guidelines for New Plants, a complete version of which is found in the Pollution Prevention and Abatement

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam

More information

ZZL/CLAB-KSPCB/17/ Environmental Officer,

ZZL/CLAB-KSPCB/17/ Environmental Officer, ZZL/CLAB-KSPCB/17/ 3657 10-10-2018 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16th Cross Near Hari Om Trust, Habbuwada

More information

TABLE OF CONTENTS. Chapter # Title Page # Table of Contents Environmental Compliance Status Report 03-12

TABLE OF CONTENTS. Chapter # Title Page # Table of Contents Environmental Compliance Status Report 03-12 P.O.: GOPAL NAGAR DIST.: JANJGIR - CHAMPA (C. G.) January to June 2012 TABLE OF CONTENTS Chapter # Title Page # Table of Contents 01-02 Environmental Compliance Status Report 03-12 1.0 Introduction 13-13

More information

Executive Summary. Vizianagaram District, Andhra Pradesh. Season : December 2016 to February 2017 File no.: J-11011/1129/2007-IA-II(I)

Executive Summary. Vizianagaram District, Andhra Pradesh. Season : December 2016 to February 2017 File no.: J-11011/1129/2007-IA-II(I) Executive Summary Environmental Impact Assessment for Expansion of Ferro Alloys unit Production (Addition of 2 x 9 MVA Submerged Electric Arc Furnace) at Plot No.368, APIIC Growth Centre, Bobbili Village

More information

Mahabal Enviro Engineers Pvt. Ltd. Pollution monitoring, Engineers & Contractors in Environmental Management

Mahabal Enviro Engineers Pvt. Ltd. Pollution monitoring, Engineers & Contractors in Environmental Management PROPOSED RESIDENTIAL CUM COMMERCIAL PROJECT WITH MCGM PARKING LOT, AT LOWER PAREL, MUMBAI, MAHARASHTRA GROUND WATER ANALYSIS October, 2017 Parameter Units Sample 1 Source Location Date of collection of

More information

ZZM/CLAB-KSPCB/17/ Environmental Officer,

ZZM/CLAB-KSPCB/17/ Environmental Officer, ZZM/CLAB-KSPCB/17/ 399 08-02-2019 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16th Cross Near Hari Om Trust, Habbuwada

More information

MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA ORISSA MINING CORPORATION LIMITED BANGUR CHROMITE MINING PROJECT POST CLEARANCE ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF SEPTEMBER 2011 MECON LIMITED RANCHI 834 002, INDIA 11.S2.2011 OCTOBER, 2011

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10

More information

EXECUTIVE SUMMARY 1. INTRODUCTION

EXECUTIVE SUMMARY 1. INTRODUCTION EXECUTIVE SUMMARY 1. INTRODUCTION M/s. Indsil Energy & Electro Chemical Ltd plant is situated in Urla Industrial Estate, Raipur, Chhattisgarh. The company is manufacturing Ferro Alloys. Due to massive

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

BMM Ispat Ltd., Danapura Village, Hospet Taluk, Bellary District, PIN , Karnataka. ENVIRONMENT MONITORING REPORT. Stage I units. For.

BMM Ispat Ltd., Danapura Village, Hospet Taluk, Bellary District, PIN , Karnataka. ENVIRONMENT MONITORING REPORT. Stage I units. For. BMM Ispat Ltd., Danapura Village, Hospet Taluk, Bellary District, PIN 583222, Karnataka. ENVIRONMENT MONITORING REPORT Stage I units For Nov 2015 Prepared by: M/s. Premier Analytical Laboratories, Near

More information

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) 1. PROJECT DESCRIPTION: Ambuja Cement Eastern Ltd. (ACEL) has the cement

More information

Superintendence Company of India Private Limited, Plot Y-23, Block-EP, Sector-V, Salt Lake City, Kolkata, West Bengal

Superintendence Company of India Private Limited, Plot Y-23, Block-EP, Sector-V, Salt Lake City, Kolkata, West Bengal Last Amended on - Page 1 of 16 I. WATER 1. Drinking Water ph IS 3025 (Part 2): 2004, Colour APHA (22 nd Edition) 2120 B: Turbidity (NTU) IS 3025 (Part 10): 1984 Residual, Free Chlorine IS 3025 Part 26/1986

More information

Environmental statement for the financial year ending the 31 st March 2012

Environmental statement for the financial year ending the 31 st March 2012 FORM V (See rule 14) Environmental statement for the ending the 31 st March 2012 1. Name and address of the Owner/Occupier of the Industry, operation of the process. PART A : BINANI CEMENT LIMITED, VILLAGE:

More information

ANACON LABORATORIES PVT. LTD. 1

ANACON LABORATORIES PVT. LTD. 1 1.1 HINDALCO INDUSTRIES LIMITED (Hindalco) is one among the flagship companies of the Aditya Birla Group of Industries and is one of the largest corporate groups in India. This group is a leading manufacturer

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

3. Up stream & Downstream water quality monitoring report of Kali River. ZZM/CLAB-KSPCB/17/ Environmental Officer,

3. Up stream & Downstream water quality monitoring report of Kali River. ZZM/CLAB-KSPCB/17/ Environmental Officer, ZZM/CLAB-KSPCB/17/ 724 12-03-2019 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16th Cross Near Hari Om Trust, Habbuwada

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

V.S LIGNITE POWER Pvt. Ltd. [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd. [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 Name of the Project : Gurha East

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER 2011 1 CONTENTS 1.0 Project Description Page 3 2.0 Description

More information

Questionnaire (Conventional Energy)

Questionnaire (Conventional Energy) Questionnaire (Conventional Energy) QUESTIONNAIRE FOR CONVENTIONAL ENERGY (SECTOR-RELATED QUESTIONS) The completion of this questionnaire is voluntary. However, replying to the relevant questions as completely

More information

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana 1 D.V.S. Praneeth, 2 Arghajeet Saha 1,2 M.Tech. Scholar 1 Environmental Engineering, Department

More information

Environmental statement for the financial year ending the 31 st March 2014

Environmental statement for the financial year ending the 31 st March 2014 FORM V (See rule 14) Environmental statement for the ending the 31 st March 2014 1. Name and address of the Owner/Occupier of the Industry, operation of the process. PART A : BINANI CEMENT LIMITED, 2.

More information

Cement Grinding Plant, Madhukunda P.O. Sunuri Dist. - Purulia West Bengal

Cement Grinding Plant, Madhukunda P.O. Sunuri Dist. - Purulia West Bengal ENVIIRONMENTAL AUDIIT STATEMENT M//s.. ACC LIIMIITED Damodhar Cement Works Cement Grinding Plant, Madhukunda P.O. Sunuri 723 121 Dist. - Purulia West Bengal FOR THE YEAR 2015-2016 1 L I S T O F C O N T

More information

Prakruti Environmental Engineers (Environmental Laboratory), 1, Utkanth Society, B/H Alkapuri Club, Alkapuri, Vadodara, Gujarat

Prakruti Environmental Engineers (Environmental Laboratory), 1, Utkanth Society, B/H Alkapuri Club, Alkapuri, Vadodara, Gujarat Prakruti Environmental Engineers (Environmental ), Last Amended on - Page 1 of 7 I. WATER 1. Water (Ground Water/ Surface Water/ Drinking Water/ Treated Water) ph APHA 4500-H + B, Temperature APHA 2550

More information

Discipline Chemical Testing Issue Date Certificate Number T-3617 Valid Until Last Amended on

Discipline Chemical Testing Issue Date Certificate Number T-3617 Valid Until Last Amended on Last Amended on 18.01.2016 Page 1 of 8 I. WATER 1. Potable, Domestic and Bore-well Water ph IS 3025 (Part 11): 1983 Electrometric Method Colour IS 3025 (Part 4): 1983 Specific Conductance IS 3025 (Part

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

The data for the period, April 2016 September 2016, is enclosed at Annexure III (1 nos. of pages)

The data for the period, April 2016 September 2016, is enclosed at Annexure III (1 nos. of pages) 1.0 Treated Liquid Effluent Data The data for the period, April 2016 September 2016, is enclosed at Annexure III (1 nos. of pages) 2.0 Ambient Air Quality The data for the period, April 2016 September

More information

ANNEXURE- II Proposed TOR

ANNEXURE- II Proposed TOR ANNEXURE- II Proposed TOR Annexure II Terms of Reference for EIA for Setting up of Ligno-Cellulosic Biomass based second generation (2G) Ethanol Bio-Refinery with capacity of 100 KLPD at village-sainjani,

More information

REVISED NATIONAL ENVIRONMENTAL QUALITY STANDARDS (NEQS)

REVISED NATIONAL ENVIRONMENTAL QUALITY STANDARDS (NEQS) REVISED NATIONAL ENVIRONMENTAL QUALITY STANDARDS (NEQS) Background PEPC in its first meeting held on 10 th May 1993 approved the NEQS. The approved NEQS were uniform standards applicable to all kind of

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A 1. Name and address of the Owner / Occupier of the Industry

More information

ZZJ/CLAB-KSPCB/04/ Environmental Officer,

ZZJ/CLAB-KSPCB/04/ Environmental Officer, ZZJ/CLAB-KSPCB/04/ 07-07-2016 4133 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16th Cross Near Hari Om Trust, Habbuwada

More information

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION

More information

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I DATA SHEET 01 Project type : Cement Date: 24.11.2015 02

More information

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division) To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

More information

ZZL/CLAB-KSPCB/17/ Environmental Officer,

ZZL/CLAB-KSPCB/17/ Environmental Officer, ZZL/CLAB-KSPCB/17/ 160 08-01-2018 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16th Cross Near Hari Om Trust, Habbuwadaa

More information

ZZH/CLAB-KSPCB/04/ Environmental Officer,

ZZH/CLAB-KSPCB/04/ Environmental Officer, ZZH/CLAB-KSPCB/04/ 21273 08-12-2014 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16 th Cross Near Hari Om Trust, Habbuwada

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

ZZK/CLAB-KSPCB/04/ Environmental Officer,

ZZK/CLAB-KSPCB/04/ Environmental Officer, ZZK/CLAB-KSPCB/04/ 5491 09-10-2017 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16th Cross Near Hari Om Trust, Habbuwadaa

More information

The following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S.

The following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S. Proceeding of the Public Hearing conducted on 27.01.2009 for grant of environmental clearance to M/s Universal Bio-Mass Energy Pvt. Ltd. for setting up of 14.5 MW capacity Biomass based Independent power

More information

APPENDIX I. LAMPIRAN I - RKL DAN RPL KEGIATAN TERPADU PROYEK PENGEMBANGAN TANGGUH LNG i

APPENDIX I. LAMPIRAN I - RKL DAN RPL KEGIATAN TERPADU PROYEK PENGEMBANGAN TANGGUH LNG i APPENDIX I Table 1 Emission Standards from Flare, Gas Turbine, Boiler, Acid Gas Incinerator and Internal Combustion Engine... 1 Table 2 n-hazardous Waste Incinerator Standard... 3 Table 3 Hazardous Waste

More information

CHAPTER-10 SUMMARY AND CONCLUSION

CHAPTER-10 SUMMARY AND CONCLUSION CHAPTER-10 SUMMARY AND CONCLUSION 10.1 INTRODUCTION M/s. Shree Warad Alloys (P) Ltd., Nagpur a private limited company having its registered office at Plot No. C-1, Sharvari Apartments, 8/B, Trimurty Nagar,

More information

Shri Girija Alloy & Power (I) Pvt. Ltd.

Shri Girija Alloy & Power (I) Pvt. Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Shri Girija Alloy & Power (I) Expansion of Ferro Alloys unit at Submitted to ANDHRA PRADESH POLLUTION CONTROL BOARD 0 1.0 PROJECT DESCRIPTION Shri Girija

More information

Roquette Riddhi Siddhi Private Limited

Roquette Riddhi Siddhi Private Limited SUMMARY ON DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Roquette Riddhi Siddhi Private Limited (Expansion of co-generation power plant from 6MW to 18 MW) at Gokak Village & Taluk, Belagavi District,

More information

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated 1 Status of Environmental Clearances received from MOEF vide MoEF No.J- 1101/572/2007-IA II(I) dated 27.12.2007- Cement Plant and CPP, April - 2017. i) Compliance report is enclosed herewith for all the

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

19 th Compliance Report to EC No: F. No. J-11011/946/2007-IA-II(I)

19 th Compliance Report to EC No: F. No. J-11011/946/2007-IA-II(I) 19 th Compliance Report to EC No: F. No. J-11011/946/2007-IA-II(I) (Period: April 2018 to September 2018) 6 Monthly Compliance Report to Conditions Of Environmental Clearance Issued By MOEF, Govt. of India,

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

(Period April 2017 ~ Sept. 2017)

(Period April 2017 ~ Sept. 2017) CHAMBAL FERTILIZERS AND CHEMICALS LIMITED, GADEPAN MOEF ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT [PHASE- I] (Period April 2017 ~ Sept. 2017) Letter No.J-11011 / 8 / 87-IA DT.15.11.88 01. The Project Proponent

More information