1 Need For The Project
2 Supply According to the EIA s AEO 2005, natural gas consumption in the U.S. is currently about 23 trillion cubic feet (tcf ) per year and is expected to increase to about 31 tcf per year by Traditional natural gas supplies from the Gulf Coast and western Canada will meet only 75% of this increase in demand, necessitating the acquisition of additional supplies from Alaska and from other parts of the world in the form of liquefied natural gas (LNG). In order to offset the imbalance between domestic supply and consumer demand, LNG imports to the U.S. are projected to increase from 0.4 tcf in 2003 to more than 6.4 tcf by The U.S., and in particular the New York and Connecticut region, face a critical period in meeting the energy needs of consumers over the next 10 to 15 years. The New York and Connecticut region does not have its own indigenous supply of natural gas, and as a result depends on supplies that must travel through thousands of miles of pipelines from producing regions in the Gulf of Mexico and Canada. During peak periods of demand, such as cold winter or hot summer days, the lack of local supply and the extensive natural gas pipeline network already operating at capacity results in high and volatile natural gas prices. Put more simply the region faces an increasing imbalance between supply and demand. The need to address these issues of increasing price levels and volatility has been noted recently in the New York Independent System Operators recent publication Power Trends 2005: The nation in general, and the Northeast in particular, must fashion an effective fuel diversity strategy for dealing with the increasing use and dwindling domestic reserves of natural gas. The lack of local supply and gas pipelines that are operating at capacity results in high and volatile natural gas prices. Connecticut New York City SOURCE: Energy Information Administration 3
3 Broadwater Consumers would benefit in a number of ways from a new LNG import facility. First, local LNG supplies would diversify natural gas supplies that originate in Western Canada and the Gulf Coast. Currently, Western Canada and the Gulf Coast supply 85% of the gas consumed in the area. Second, a Broadwater facility would reduce the need for future natural gas pipeline expansions that have proven difficult to build into the New York and New England markets. Lack of ability to expand regional pipeline capacity has been one of the key underlying causes of volatile prices in the region. And third, Broadwater would help stop the trend of escalating energy prices by adding a volume of natural gas that would be the equivalent of 25% of the average daily natural gas consumption in the region. This additional volume would actually reduce overall energy prices from where they would otherwise be and yield cost savings to all consumers. Broadwater would help stop the trend of escalating energy prices by adding a volume of natural gas that would be the equivalent of 25% of the average daily natural gas consumption in the region. 4
4 FERC APPLICATION OVERVIEW Broadwater Energy, a joint venture between TransCanada PipeLines (TCPL USA LNG, Inc.), and Shell US Gas & Power LLC, is filing an application with the Federal Energy Regulatory Commission (FERC) seeking all of the necessary authorizations to construct and operate a marine liquefied natural gas (LNG) terminal and connecting pipeline for the importation, storage, regasification and transportation of natural gas. Broadwater began the National Environmental Policy Act (NEPA) pre-file process in November Since that time, Broadwater has met with hundreds of individuals, organizations, agencies and governments on Long Island, in Connecticut and New York City. Input from these meetings, and from substantial technical studies and research is captured in the following Resource Reports to be filed as part of the application to the FERC. Resource Report 1 General Project Description Resource Report 2 Water Use and Quality Resource Report 3 Fish, Vegetation and Wildlife Resource Report 4 Cultural Resources Resource Report 5 Socioeconomics Resource Report 6 Geological Resources Resource Report 7 Soils Resource Report 8 Land Use, Recreation and Aesthetics Resource Report 9 Air and Noise Quality Resource Report 10 Alternatives Resource Report 11 Safety and Reliability Resource Report 12 PCB Contamination (not applicable to Broadwater) Resource Report 13 Engineering and Design Material The Resource Reports are available to view and download from the FERC website at After Broadwater submits its application, the FERC will conduct an independent review of the project. During the course of this review, the FERC will release a draft Environmental Impact Statement (EIS) for public comment. Those comments will be incorporated into the final EIS. FERC will consider the findings of the final EIS and any subsequent comments in its decision on whether to approve the project. The U.S. Coast Guard will also play a major role in this review process. Concurrent with the FERC review process, the project will apply for additional state and federal permits and approvals required to site, construct and operate the project. These processes will consider many issues including the consistency of the Broadwater project with state coastal zone policies, air and water impacts, and impacts on marine habitat. Responsible agencies include the U.S. Coast Guard, U.S. Army Corps of Engineers, U.S. Fish and Wildlife Service, New York Department of Environmental Conservation, New York Department of State, and New York Office of Parks, Recreation, and Historic Preservation. 6
5 Regulatory Timeline Public Announcement Submit Application Permit Approval First Delivery Feasibility Studies (22 months) Public Consultation Regulartory Review and Permit (30-35 months) FSRU Design & Construction (30 months) Pipeline Construction (6 months) FSRU Tow/Install (6 months) Stakeholder engagement continues throughout the life of the project. Project Overview The proposed Broadwater LNG terminal will be located in the Long Island Sound, approximately 9 miles from the shore of Long Island in New York State waters. It will be designed to receive, store and regasify LNG at an average throughput of 1.0 billion cubic feet per day (bcfd) and will be capable of delivering a peak throughput of 1.25 bcfd. The average throughput is enough to meet approximately 25% of Long Island, New York City and southern Connecticut s daily demand. At peak send-out, this is enough natural gas to generate 5800 Megawatts of electricity, which is equivalent to 50% of the gas-fired electric generation in New York City, Long Island and southern Connecticut. Broadwater s proposed FSRU siting area and pipeline route. 7
6 The proposed LNG terminal will consist of a Floating Storage and Regasification Unit (FSRU) that is approximately 1,215 feet long, 200 feet wide and rises approximately 80 feet above the water line to the trunk deck. The FSRU s draft is approximately 40 feet and will float in water that is about 90 feet deep. Artist s rendition of FSRU (port side) and mooring. The FSRU will be built to conform to applicable regulations and standards, including International Maritime Organization standards. A third-party ship classification society such as the American Bureau of Shipping (ABS) will verify and certify the final design and construction. Primary FSRU components, which are discussed in greater detail in the Resource Reports, include: Yoke Mooring System LNG Storage and Vaporization Facilities LNG Receiving Facilities Power Generation Ballasting System Crew Accommodations and Command and Control Facilities Safety Systems 8
7 The FSRU will be designed with a net storage capacity of approximately 350,000 cubic meters (m 3 ) of LNG (equivalent to 8 billion cubic feet of natural gas). The LNG will be delivered to the FSRU in LNG carriers two to three times per week. A typical LNG carrier can deliver about 140,000 m 3 of LNG. The size of the LNG carriers is consistent with that of other commercial ships that regularly transit the Sound. Artist s rendition of the Broadwater FSRU with a docked LNG carrier. 9
8 The FSRU will be held in place using a yoke mooring system (YMS) that is attached to a stationary tower structure secured to the seafloor by four legs. This stationary tower serves the dual purposes of: (1) securing the FSRU so that it can pivot around the tower in response to the prevailing wind, current and wave conditions around the tower and (2) providing the support structure for connecting the FSRU to the send-out pipeline. The total open space area under the tower structure will be approximately 13,180 square feet. Underwater view of the FSRU and mooring system. Broadwater will warm the LNG back into a gas and deliver the regasified LNG to the existing Iroquois pipeline that serves both Connecticut and New York. Broadwater and the Iroquois pipeline will be linked together with a 30-inch-diameter natural gas pipeline installed beneath the seafloor and extending from the mooring system to a subsea interconnection with the Iroquois Gas Transmission System (Iroquois pipeline), approximately 22 miles west of the proposed FSRU site. 10
9 ALTERNATIVES ANALYSIS Broadwater evaluated potential alternatives to its proposed LNG terminal in Long Island Sound to determine whether there are viable, environmentally preferable alternatives that could deliver an adequate amount of safe, reliable energy to supply the New York and Connecticut region. Renewable Energy and Conservation Shell and TransCanada are both actively involved in the development of renewable sources of energy and have spent over a billion dollars in the past five years on development of these technologies. Even so, renewable energy systems cannot be expected to meet the anticipated energy needs of the region. Conservation and renewable energy initiatives will not eliminate the need for Broadwater. Projections continue to indicate that the demand for energy, and specifically natural gas, will outpace cost-effective programs designed to stimulate energy conservation. Conservation and renewable energy initiatives will not eliminate the need for Broadwater. Additional Pipeline Infrastructure The New York and Connecticut region receives natural gas from pipelines that extend over 1,000 miles from the existing natural gas producing regions in North America. For the most part, these pipelines are full and operate at capacity during peak winter conditions. The supply of natural gas from the producing regions is not projected to keep pace with the increase in demand for natural gas. Broadwater considered the feasibility of using or expanding existing natural gas pipelines to provide an additional supply of natural gas to the region. However, expansions of existing pipeline infrastructure would only access diminishing continental supplies, and not provide the additional 1 bcfd of new, reliable, long-term, and competitively priced natural gas that Broadwater would supply. Expanding the pipeline network without new gas supply would be like putting another straw into a bottle; you simply draw more liquid at a faster rate from the bottle. Broadwater would bring a new supply of natural gas to the region. It would be analogous to filling the bottle. Other Proposed LNG Terminals Other LNG terminals have been proposed within the U.S. but none would serve the New York and Connecticut markets directly. These facilities are designed to serve other markets and cannot meet the current and projected demands of the New York/Connecticut market. Even if one or more of these other facilities were permitted, the lack of excess pipeline capacity, particularly during winter demand, would prevent a significant quantity of natural gas from reaching New York and Connecticut. The construction of many miles of incremental pipeline infrastructure necessary to transport the natural gas from these other proposed LNG facilities to the New York/Connecticut region would result in significantly greater environmental impact when compared to Broadwater. 12
10 Onshore or Offshore As part of its evaluation of alternatives, Broadwater examined the feasibility of constructing an onshore LNG terminal. Broadwater considered a number of potential sites in New York and Connecticut, including Block Island and Plum Island, to deliver natural gas to the New York/Connecticut market. In selecting an offshore location, Broadwater will avoid disturbing sensitive near shore and shoreline environments. By connecting with the already existing Iroquois pipeline system, Broadwater will also avoid the need to build additional pipeline infrastructure such as compressor stations or additional pipelines that would cross the shoreline environments. Offshore Alternatives In addition to the Long Island Sound, Broadwater considered potential locations within the Atlantic Ocean and Block Island Sound. Both locations presented two significant issues: reliability of the gas supply and gas pipeline construction impacts. Weather and marine related conditions in Block Island Sound and the Atlantic Ocean would result in significant periods when LNG carriers would be unable to unload cargo. This downtime would compromise supply reliability. Furthermore, sites in the Block Island Sound and Atlantic Ocean area would require a significantly longer pipeline, compressor stations, beach crossings and onshore disruptions. After evaluating potential locations throughout Long Island Sound, Broadwater determined that from an environmental and safety standpoint, a more centralized site in the Sound is preferred because it maximizes the distance from shore, and therefore lessens impact on In selecting an offshore location, Broadwater will avoid disturbing sensitive near shore and shoreline environments. populated areas and current offshore uses of the Sound. Additionally, siting in the central Sound does not interfere with the increased recreational and commercial activities that are more prevalent in the western portion and shoreline areas within the Sound. 13
11 SAFETY AND SECURITY Safety, security and reliability are top priorities for Broadwater. The FSRU will have stringent security measures, technologies, and procedures that will meet or exceed international and federal requirements. The FSRU s remote location near the center of the Sound provides an added degree of safety beyond the stringent standards associated with onshore LNG facilities. LNG tankers will be able to approach the facility through established shipping routes, which are currently traveled annually by some 2,000 commercial vessels, including oil tankers. Broadwater is also important from a national energy security perspective, because it represents a step toward the geographic diversification of America s energy infrastructure. Currently, almost all the natural gas consumed by the New York City, Long Island and Connecticut region comes from the Gulf of Mexico and Canada. Being situated at the end of a long pipeline distribution system, this region is dependent on those pipeline systems and the extensive oil and gas production infrastructure serving these pipelines. Disruption of these systems, as in the case of the recent hurricanes in the Gulf of Mexico, negatively impacts this region s energy prices and supply. The Broadwater FSRU is unlikely to be an attractive terrorist target, based on the best available understanding of terrorist targeting priorities. Terrorist organizations seek to attack targets in major population centers, causing highly visible damage and disruption, and large numbers of casualties. Examples of these types of targets include the hotels in Amman, Jordan; the London underground and bus system; and the Madrid rail system, all of which were recently targeted by terrorists. The Broadwater FSRU, located far offshore with a small crew, does not fit this profile. Broadwater, its team of security advisors, and the relevant regulatory agencies will continue to work together to ensure that the facility is safe and secure, and to minimize any risks to the public. The Broadwater FSRU is being designed with highly-developed security and safety technology and its crew will be trained to high standards. Liquefied Natural Gas: A Strong Safety Record LNG is a colorless, odorless, and non-toxic liquid. It is transported and stored at atmospheric pressure at a very low temperature and is not compressed. If LNG is spilled on water, it floats on top of the water and vaporizes quickly there is no slick as there would be with oil. Natural gas is flammable, but does not explode if ignited in the open. Thus, if LNG is spilled on water and the resulting gas is ignited, a fast-burning pool fire can occur, leaving no residue and burning out extremely quickly, compared to other hydrocarbons. The marine transport of LNG has a strong safety and security record of approximately 80,000 carrier voyages over 40 years, covering over 100 million miles without major accidents or security incidents. Today, more than 150 LNG carriers safely transport more than 108 million tons of LNG annually to ports around the world. The LNG shipping safety record is attributable to continuously improving technology, comprehensive safety procedures, training, maintenance and effective government regulation. 16
12 Few accidents have occurred in the history of the marine transportation of LNG, and none of these accidents resulted in the failure of a cargo tank and a major release of LNG or a fatality directly attributable to LNG. Significant accidents have occurred at LNG onshore facilities, most notably at Cleveland, Ohio in 1944, which was the result of incompatible steel used for cryogenic service, and at a liquefaction plant in Skikda, Algeria in As a result of modern metallurgy and equipment, and highly-developed monitoring and safety technology and procedures, these types of incidents would not occur at the Broadwater facility. The Broadwater FSRU is being engineered specifically to survive the strong wind and wave conditions associated with storms or hurricanes. The weather conditions in this part of the Northeastern U.S. are relatively benign compared to the locations where other floating production and storage facilities typically operate or where LNG carriers transit. However, the Broadwater design criteria for the FSRU s mooring system exceeds the more typical 100-year storm event to include storm scenarios well in excess of those experienced in the history of the region. Hazard Distances and Consequences The offshore location of the proposed Broadwater facility provides the public with an additional layer of safety, in the very unlikely event of an accident or intentional incident, beyond the exacting standards applied to onshore LNG facilities. This conclusion is supported by a 2004 U.S. Department of Energy-sponsored study performed by Sandia National Laboratories. The Sandia Report provides a state-of-the-art analysis of the risks and consequences of an LNG spill over water. The Sandia Report found that risks from accidental LNG spills are small and manageable and that risks from intentional events, such as terrorist attacks, can be significantly reduced with appropriate security, planning, prevention and mitigation. The report concludes that the most significant risks from an LNG spill would exist within 1,500 feet of the event. In a worst case scenario, which the report stresses is highly unlikely, the maximum danger distance of an unignited vapor cloud is approximately 2.25 miles. The risk of such an event occurring under the Report s assumption of perfect atmospheric conditions is extremely low. Because the Broadwater facility will be located nine miles from the nearest shore, even this highly unlikely scenario does not present a threat to the general public. Local, State, and Federal Law Enforcement Under current laws, the U.S. Coast Guard will have the primary regulatory responsibility for the security of the FSRU. The U.S. Coast Guard is already involved in reviewing the results of Broadwater s ongoing analysis and modeling and has the power to implement a maritime safety and security zone around the FSRU and transiting LNG Carriers if it deems such zones necessary. The U.S. Coast Guard can also mandate various security and safety measures, and provide or support resources to protect the facility and the LNG carriers that supply it. Incoming LNG carriers, all of which must be certified according to international standards, are routinely inspected by the U.S. Coast Guard and are required to hold a valid U.S. Coast Guard issued Certificate of Compliance before operating in US waters. As part of Homeland Security requirements, the U.S. Coast Guard will determine the level of security screening required for each vessel arrival according to established internal procedures and the current Security Threat status. Careful vetting and background checks will be conducted on all FSRU employees, along with stringent training requirements in basic operations, as well as security, safety and emergency response. Broadwater is committed to working closely with local, state and federal law enforcement agencies to keep them informed and prepared, and cooperate on emergency planning. 17
13 Safety and Security Operating Standards Broadwater will have very stringent safety and security operating standards and protocols. Some of these standards and protocols are not yet finalized, as the U.S. Coast Guard will determine a number of requirements and recommendations related to security and safety. The Broadwater team will work with the U.S. Coast Guard, state and local public safety officials, as well as other security and safety experts, to employ the most appropriate and robust security and safety measures for the FSRU. A number of determinations have already been made, including: Dedicated tugboats with fire-fighting capabilities will support the FSRU. Broadwater will likely be responsible for providing its own emergency response capabilities, including fire, first aid and security resources. It is Broadwater s intention that only one LNG carrier associated with Broadwater s operations be allowed in the Sound at a time. The crew will be trained to high standards on security and safety, and will be regularly drilled in emergency response. The FSRU crew will continuously monitor all safety and security aspects of the operation, utilizing sophisticated systems. Broadwater will work with local, State and Federal law enforcement and emergency response agencies to ensure that a strong, coordinated emergency management plan exists. Engineering/Technology Although the Broadwater terminal may be among the first FSRUs in operation, each of the technologies and components involved are tried, tested, and reliable. Floating offshore facilities similar to the FSRU have been employed around the world for more than 25 years and have a proven track record of safe operation, with some operating continuously in severe weather conditions. The FSRU will incorporate many of the same safety features as an LNG carrier, particularly with regard to the double hull and containment systems, which will be constructed according to the same standards as an oceangoing vessel. The FSRU will be moored in place using a proven soft yoke mooring system that allows the FSRU to weathervane, or rotate, around the mooring tower base. This type of mooring system is used in some of the most severe-weather areas of marine operations. The FSRU s processing equipment utilizes the same types of vaporization and other equipment currently in use at onshore terminals. The LNG would be stored in a double-hulled containment system. The FSRU design will incorporate highly-developed, robust security and safety systems, including intruder detection, hazard detection, fire suppression and emergency shutdown. 18
14 ENVIRONMENTAL IMPACTS AND BENEFITS Broadwater recognizes that the project is proposed in an area of aesthetic, environmental and economic value. Broadwater can be designed, constructed and operated in a way that is consistent with these values and achieves energy reliability and security while advancing the region s environmental and economic goals. Air Broadwater will use advanced technology to ensure the FSRU attains the lowest achievable emissions rate in compliance with federal and state requirements. Natural gas is a clean-burning fossil fuel. By delivering a substantial new supply of natural gas, Broadwater will make a significant contribution in helping the region repower the older oil- and coal-power generation facilities Broadwater represents a significant step toward helping the region repower the older oil- and coal-power generation facilities with natural gas. Repowering with natural gas will considerably reduce SOx, NOx and particulate emissions into the atmosphere. Water One of Broadwater s key objectives is to avoid or minimize any potential impacts to the water quality of Long Island Sound. With careful preparation, planning and choice of technologies, impacts during construction of the pipeline are expected to be minor, localized and short term, and are related primarily to the temporary resuspension of bottom sediments in conjunction with the excavation of the pipeline trench. Impacts associated with the operations will be primarily associated with the routine intake and discharge of water from the FSRU. Any water discharge from the FSRU must meet all applicable federal and state discharge standards. Any discharge not capable of meeting the applicable standards will be held on board the FSRU and shipped to shore for disposal at an approved facility. Marine Environment and Fishing Impacts during construction are expected to be minor, localized and short-term, resulting from the installation of the pipeline and mooring. Impacts are related primarily to the temporary resuspension of bottom sediments in conjunction with the excavation of the pipeline trench and the temporary disruption to marine users during pipeline installation. The FSRU has been sited to minimize impact to the fishing community. In fact, after consultation with local fishing interests, Broadwater moved the proposed FSRU site to the west of the initial location to further minimize impacts on commercial fishing activities. Positive impacts will result from the diversification of habitat within the Sound, with the FSRU creating shaded habitat and additional structure in the central portion of the Sound in an area that is relatively homogenous in terms of habitat availability. 20
15 To avoid the most sensitive time for biological activity in the Sound, construction of the pipeline and mooring tower will be conducted during the winter months. Broadwater will maintain an open dialogue with fishermen throughout the lifetime of the project to avoid or minimize impacts. Noise Noise is not expected to be a problem either during construction or while in operation. Broadwater s construction noise will be consistent with existing noise levels that result from normal operations currently in the Sound. The noise generated by routine activities on the FSRU will be negligible, as will that of the LNG carriers. Visual The proposed FSRU has been sited near the center of the Sound at its widest point, in part, to maximize the distance from any coastal vantage point and minimize potential visual impact on coastal resources. The LNG terminal will be approximately nine miles from the nearest coastal vantage point. Broadwater has undertaken an extensive Visual Resource Assessment (VRA) that evaluates the potential visibility of the proposed project and objectively determines the difference in the visual characteristics of the water-based setting with and without the project in place. The process follows basic techniques of the New York State Department of Environmental Conservation Program Policy Assessing and Mitigating Visual Impacts in order to identify and mitigate impacts. Findings from the VRA show that the vast majority of views of the proposed FSRU will be limited to immediate shoreline locations. In most locations, views of the FSRU are reduced or eliminated by dense coastal vegetation, topography and onshore structures. While the color scheme of the FSRU and mooring has not been determined, there are options available. For example, shades of gray can be used to minimize contrast between the LNG terminal and the washed out distant blue gray colors of the background as well as the foreground waters of the Sound. These factors combine to minimize visual distinction and perceived importance of the project within the context of the regional landscape and waterscape. 21
16 CT COAST: 20 + miles (visible) - FSRU 9.2 miles CT COAST: 21 + miles (visible) - View from Long Island Photo simulation view of FSRU and Connecticut from Wading River Beach shoreline, Wading River, NY LI COAST: 20 + miles (visible) - FSRU 10.0 miles LI COAST: 19+ miles (visible) - LI COAST: 20 + miles (visible) - View from Connecticut Photo simulation view of FSRU and Long Island coastline from East Haven, CT shoreline 22
17 Pipeline construction Broadwater will install 22 miles of interconnecting pipeline from the FSRU location to the existing Iroquois system, avoiding any onshore and nearshore impacts. Broadwater s preferred pipeline installation method, subject to approval by regulatory authorities, will include the use of a slow-speed, low-energy subsea plow to lower the pipe beneath the seabed at a minimum depth of 5 feet for the first 2 miles and a minimum of 3 feet for the remainder. This method would prevent significant introduction of sediment into the water column, and avoid impact to the ecosystem outside the pipeline corridor. Unlike jetting or dredging activities, subsea plowing releases only minimal amounts of sediment into the water column. Sediment disruption attributed to anchor placements and cable sweep will also be minor, localized and short-term. Broadwater will use midline buoys to further minimize the impact from cable sweep. Broadwater proposes to use a conventional 8-point mooring lay barge, with eight anchor placements every mile along the pipeline route. The trench created by the subsea plow will be allowed to backfill naturally though sediment deposition, which is expected to occur over an approximate 36-month period. Natural backfill minimizes the need for another pass of the installation vessel and additional sediment disturbance associated with mechanical backfill techniques. It is possible, but not probable, that an alternative method may be required in the Stratford Shoal area, due to the presence of hard materials. If subsea plowing cannot be used within this area, Broadwater will dredge a trench. If this method were used, the dredged material would be captured and placed on a hopper barge rather than being cast to the side of the trench. This technique will ensure that dredged soils are disposed of in an approved dredge disposal area. After pipeline installation, the trench would be backfilled with imported clean material. LNG Carrier Traffic Broadwater expects to receive two to three deliveries of LNG cargo a week. This would result in a potential increase of some 150 vessels per year into the Sound. This is consistent with the current uses of the Sound, where there are currently over 700 large vessels, as well as 1,500 smaller commercial vessels that traverse the Sound each year. Social Investment Program Our goal is to ensure that the Long Island Sound region is healthier as a result of Broadwater s operations. One of the ways we plan to meet this goal is by establishing a social investment program that would be used to support Long Island Sound habitat enhancement. The projects will be selected in consultation with stakeholders to ensure the maximum benefit for the Long Island Sound. Projects could include marine habitat restoration, initiatives and educational programs. 23
18 Hard copies are available on request
ANTI-BROADWATER COALITION: OPPOSITION TO LNG FACILITY IN THE LONG ISLAND SOUND
ANTI-BROADWATER COALITION: OPPOSITION TO LNG FACILITY IN THE LONG ISLAND SOUND The undersigned organizations of the Anti-Broadwater Coalition (ABC) oppose the Broadwater Energy Project to install an offshore
More informationOn Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry
On Board Regasification for LNG Ships 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry New Greenfield U.S. Terminals Will Be Almost Impossible to Site Key opportunity is to solve U.S. terminalling
More informationFreeport LNG Liquefaction Project
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON 17LIQUEFIED th INTERNATIONAL NATURAL CONFERENCE GAS (LNG & EXHIBITION 17) ON LIQUEFIED NATURAL GAS (LNG 17) Freeport LNG Liquefaction Project
More informationSignificant prevention measures in place for each LNG carrier *
Safe shipping About LNG Canada LNG Canada is a joint venture company comprised of four global energy companies with substantial experience in liquefied natural gas (LNG) Shell, PetroChina, KOGAS and Mitsubishi
More informationLiquefied Natural Gas: What Is LNG? And What Is Proposed for California?
september 2008 california senate office of research Liquefied Natural Gas: What Is LNG? And What Is Proposed for California? The United States, including California, uses natural gas to heat homes and
More informationFERC PDF (Unofficial) 10/08/2014. Environmental Impact Statement ES-1 Corpus Christi LNG
EXECUTIVE SUMMARY The staff of the Federal Energy Regulatory Commission (FERC or Commission) prepared this Environmental Impact Statement (EIS) to assess the environmental issues associated with the construction
More informationAlaska LNG Outlines Issues For Next Round of Resource Reports
Alaska LNG Outlines Issues For Next Round of Resource Reports By Larry Persily lpersily@kpb.us April 26, 2016 (This update, provided by the Kenai Peninsula Borough mayor s office, is part of an ongoing
More informationProject Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate
Project Overview Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate a natural gas-tomethanol production plant and storage facilities, and a new marine terminal, in the
More informationLNG Business In India
LNG Business In India 2016 Topics Gas Demand / Supply Balance in India. Sector wise demand & sensitivity to price. Pricing of LNG ( Henry Hub, NBP, Long term ) Pipeline Infrastructure. Regasification Terminal
More informationPublic Safety Issues at the Proposed Harpswell LNG Terminal
Public Safety Issues at the Proposed Harpswell LNG Terminal James A. Fay 77 Massachusetts Avenue, Rm. 3-258 Cambridge, MA 02139 November 5, 2003 1 Introduction Fairwinds 1 has proposed to lease a site
More informationTHIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 13, 2019
THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2012-0699 February 13, 2019 Application
More informationRoanoke County Board of Supervisors. October 14, 2014
Roanoke County Board of Supervisors October 14, 2014 Who is Mountain Valley Pipeline, LLC Joint venture of EQT Corporation and NextEra Energy EQT: Leading Appalachian natural gas production and transmission
More informationB.C. TOWBOAT INDUSTRY CONFERENCE
LN G T erm inals on C ana da s W est C oast Kitimat LNG LN G T erm inals on C ana da s W est C oast Presentation to 17 th B.C. TOWBOAT INDUSTRY CONFERENCE Whistler, BC Kitimat LNG Alfred Sorensen Kitimat
More informationLNG in the United States
LNG in the United States The Institute for Regulatory Policy Studies Springfield, Illinois May 1, 2008 Presented by Bill Cooper President of CLNG What is the Center for LNG? The Center for Liquefied Natural
More informationNorth American LNG 2006
Market and technology analysis Our ability to expand our use of liquefied natural gas is limited because today we have just five receiving terminals around the United States. - George W. Bush US President
More informationAPPENDIX 1 SUMMARY OF DFO S HADD COMPENSATION PROCESS
APPENDIX 1 SUMMARY OF DFO S HADD COMPENSATION PROCESS Any project that is referred to DFO is reviewed to determine if there is likely to be a HADD to productive fish habitat as defined under Section 35
More informationState will answer most of FERC s questions by June; last items Aug. 1
State will answer most of FERC s questions by June; last items Aug. 1 By Larry Persily paper@alaskan.com April 13, 2018 The Alaska Gasline Development Corp. (AGDC) advised federal regulators on April 6
More informationHandling and Transportation of LNG
Handling and Transportation of LNG History and Examples of LNG use Whereas Liquid Petroleum Gas (LPG) is carried under pressure, Liquid Natural Gas (LNG) is carried at atmospheric pressure and has been
More informationPERP Program LNG Receiving Terminals New Report Alert
PERP Program LNG Receiving Terminals New Report Alert February 2007 Nexant s ChemSystems Process Evaluation/Research Planning program has published a new report, LNG Receiving Terminals (05/06S12). To
More informationWaterways 1 Water Transportation History
Waterways 1 Water Transportation History Water Transportation Propulsion History Human (oars, poles) - - 7,000-10,000 BC Wind (sails) - - 3,000 BC Steamboat invented - - 1787 AD First diesel-powered ship
More informationLiquefied Natural Gas (LNG) Production and Markets. By: Jay Drexler, Dino Kasparis, and Curt Knight
Liquefied Natural Gas (LNG) Production and Markets By: Jay Drexler, Dino Kasparis, and Curt Knight Outline Purpose of the presentation What is Liquefied Natural Gas? (LNG) LNG Operations Brief History
More informationIndirect and Cumulative Effects
Chapter 21: Indirect and Cumulative Effects 21-1 INTRODUCTION The federal Council on Environmental Quality s (CEQ) regulations implementing the procedural provisions of the National Environmental Policy
More information30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN THE HOUSATONIC RIVER, STRATFORD AND MILFORD, CONNECTICUT
I-~ I II I " I US Army Corps of Engineers New England District 66 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Jack Karalius nae-pn-nav@usace.army.mil Programs/Project Management
More informationFederal Outer Continental Shelf Oil and Gas Overview From the Eastern Gulf of Mexico Perspective
Federal Outer Continental Shelf Oil and Gas Overview From the Eastern Gulf of Mexico Perspective John Rodi Deputy Regional Director U.S. Minerals Management Service (MMS) Gulf of Mexico Region Presented
More informationLNG Import Facility Infrastructure Options
LNG Import Facility Infrastructure Options Mangesh Patankar (Head of Business Development Galway Group) 28 th April 2016 www.galwaygroup.com Agenda Introduction to Galway Group Types of Regas terminals
More informationStudy examines threats from spills occurring at nine key locations
Polluted habitats and beaches spanning from Kingston to New York Harbor Explosions causing significant human injury and fatalities... Toxic vapors that could pose serious health threats... A new scientific
More informationTABLE OF CONTENTS LIST OF FIGURES LIST OF ATTACHMENTS
TABLE OF CONTENTS 2.0 TRANSMISSION SYSTEM OVERVIEW... 2-1 2.1 PROPOSED PROJECT OBJECTIVES... 2-2 2.2 SAFETY, RELIABILITY AND RESILIENCY, AND OPERATIONAL FLEXIBILITY AND CAPACITY... 2-5 2.2.0 Pipeline Safety...
More informationEnvironmental and Social Impact Assessment [ESIA] for Proposed Liquefied Natural Gas (LNG) Project at Tema in the Greater Accra Region of Ghana
BACKGROUND INFORMATION DOCUMENT QUANTUM POWER OPERATIONS LIMITED Environmental and Social Impact Assessment [ESIA] for Proposed Liquefied Natural Gas (LNG) Project at Tema in the Greater Accra Region of
More informationPA-03. Honorable Mike Kelly. Pennsylvania 114th Congress. 3rd Congressional District. Miles
PA-03 Honorable Mike Kelly Pennsylvania 114th Congress 3rd Congressional District 2 3 & 1&& / 0 1, O&M, Erie Harbor 2, CG-CAP 204, Presque Isle Regional Sediment Management 3, CG, Presque Isle Shoreline
More informationNorth American Midstream Infrastructure Through 2035 A Secure Energy Future. Press Briefing June 28, 2011
North American Midstream Infrastructure Through 2035 A Secure Energy Future Press Briefing June 28, 2011 Disclaimer This presentation presents views of ICF International and the INGAA Foundation. The presentation
More informationCanaport Energy East Marine Terminal Presentation Carlos Pardo September 26 & 28, 2016
Canaport Energy East Marine Terminal Presentation Carlos Pardo September 26 & 28, 2016 Document Number Energy East Protected UNCONTROLLED IF PRINTED Canaport Marine Terminal Berths and Platforms 2 Project
More informationSTS.011 American Science: Ethical Conflicts and Political Choices Fall 2007
MIT OpenCourseWare http://ocw.mit.edu STS.011 American Science: Ethical Conflicts and Political Choices Fall 2007 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms.
More informationAppendix A. Project Description
Appendix A Project Description I. Project Summary 1. The proposed Jordan Cove LNG export terminal ( Jordan Cove ) is a facility designed to produce and export liquefied natural gas ( LNG ). Jordan Cove
More informationThe general design of a LNG-terminal. Background
The general design of a LNG-terminal Project MAGALOG (Marin Gas Logistics) is a contribution to addressing port emission problems in Europe, with a special focus on the Baltic Sea, through the establishment
More informationMARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT
MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT The health of the world s oceans and marine life is degrading rapidly as a result of excess human activities.
More informationHOUSTON OFFICE 2401 Fountain View, Suite 510 Houston, Texas Tel:
Safety in the Liquefied Natural Gas (LNG) Value Chain An AIChE Live Webinar December 12, 2012 2:00 pm SALEM OFFICE 93 Stiles Road Salem, New Hampshire 03079 Tel: 603-893-7009 HOUSTON OFFICE 2401 Fountain
More informationNew energy for Italy
New Energy for Italy Terminale GNL Adriatico Srl Terminale GNL Adriatico Srl is the company that has designed, built and will operate the LNG receiving Terminal located offshore of Porto Levante, in the
More informationWHAT IS LIQUEFIED NATURAL GAS?
WHAT IS LIQUEFIED NATURAL GAS? WHAT IS NATURAL GAS? Natural gas is a colourless and odourless gas that is created from organic matter that has decayed for millions of years. Around the world, people use
More informationOctober 23, 2018 Harrisburg, PA
Pennsylvania Public Utility Commission Annual Winter Reliability Assessment Terrance J. Fitzpatrick President & Chief Executive Officer Energy Association of Pennsylvania October 23, 2018 Harrisburg, PA
More informationRegulation Of Oil And Natural Gas Pipelines: A Legal Primer For The Layman
Pipeline & Gas Journal March 2008 Copyright 2008 ProQuest Information and Learning All Rights Reserved Copyright 2008 Oildom Publishing Company of Texas, Inc. Section: Pg. 124; Vol. 235; No. 3; ISSN: 0032-0188
More informationProperties of LNG Don Juckett US Department of Energy February 12, 2002 LNG Workshop Solomons, MD. U.S. Department of Energy
Properties of LNG Don Juckett US Department of Energy February 12, 2002 LNG Workshop Solomons, MD U.S. Department of Energy Background LNG in the US US Natural Gas imports and Exports Projections of Market
More informationMarine Facilities for LNG Carrier Transfer Alternatives
2.3.3.2 Marine Facilities for LNG Carrier Transfer Alternatives Two alternatives were considered for the marine facilities to support the transfer of LNG between the LNG carriers and onshore storage tanks.
More informationWashington State Ferries Liquefied Natural Gas Project
Overview After three- and- a- half years of analysis, evaluation and several detailed studies (WSF) will seek the U.S. Coast Guard s approval to use Liquefied Natural Gas (LNG) as propulsion fuel. WSF
More informationInnovations for the Global LNG Industry Bringing Continents of Energy Together Marine Technology Society March 22, 2007
Innovations for the Global LNG Industry Bringing Continents of Energy Together Marine Technology Society March 22, 2007 Kathleen Eisbrenner President and Chief Executive Officer Excelerate Energy Excelerate
More informationEPA Issues General Permit for Vessels
EPA Issues General Permit for Vessels Background On December 18, 2008, EPA issued its Vessel General Permit ( VGP ) for discharges incidental to the normal operation of vessels. The permit responds to
More informationOUR GOAL IS TO PREVENT SPILLS ENTIRELY
OUR GOAL IS TO PREVENT SPILLS ENTIRELY OUR GOAL IS TO NEVER HAVE AN OIL SPILL, AND THE INDUSTRY TAKES EXTENSIVE PRECAUTIONS TO PREVENT SPILLS FROM OCCURRING. TOPICS FOR DISCUSSION WHAT ARE OUR PRIMARY
More informationCFE/Save the Sound on Offshore Drilling: Gains too little, risk too high
FOR IMMEDIATE RELEASE March 9, 2018 Contact: Laura McMillan, 540-292-8429 CFE/Save the Sound on Offshore Drilling: Gains too little, risk too high New Haven, Conn. --- Connecticut Fund for the Environment/Save
More informationJordan Cove Pacific Connector
Jordan Cove Pacific Connector Supplying Essential Energy for SW Oregon s Economy co Benton Linn Pacific Ocean Eugene Lane Oregon Coos Bay Coos Douglas Coquille Roseburg Myrtle Point Myrtle Creek Shady
More informationRISKS ASSOCIATED WITH THE MARINE ASPECTS OF LNG FPSOs (FLOATING PRODUCTION, STORAGE AND OFFLOAD) UNITS. Braemar Engineering
RISKS ASSOCIATED WITH THE MARINE ASPECTS OF LNG FPSOs (FLOATING PRODUCTION, STORAGE AND OFFLOAD) UNITS Agenda Introduction to LNG what is it, what are the risks, what are the myths? Introduction to FLNG
More informationAccidents & Malfunctions Preparedness & Emergency Response
Accidents & Malfunctions Preparedness & Emergency Response 2 Erik Madsen Michael Anderson Michael Zurowski Fernand Beaulac Tim Keane Panel Members 3 Prevention Preparedness Training Exercises and Testing
More informationInland Waterway Navigation
Inland Waterway Navigation Value of Inland Navigation As the sun rises over the Mississippi River a 15-barge tow slides slowly past the St. Louis Harbor and heads south to New Orleans where its cargo of
More informationNEW HAVEN HARBOR CONNECTICUT NAVIGATION IMPROVEMENT
NEW HAVEN HARBOR CONNECTICUT NAVIGATION IMPROVEMENT 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 INTEGRATED FEASIBILITY STUDY AND ENVIRONMENTAL IMPACT STATEMENT 131 132 122 PUBLIC
More informationSmall Scale LNG From Concept to Reality. Chris Johnson, General Manager, LNG New Markets, Shell
Small Scale LNG From Concept to Reality Chris Johnson, General Manager, LNG New Markets, Shell 0 Table of Contents Table of Contents... 1 Background... 1 Aims... 4 Methods... 5 Results... 11 Conclusions...
More informationChanging Landscapes: Midstream Oil and Natural Gas Today and in the Future February 4, 2016
Changing Landscapes: Midstream Oil and Natural Gas Today and in the Future February 4, 2016 Robin Rorick Group Director, Midstream & Industry Operations American Petroleum Institute The U.S. has experienced
More informationTEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT
TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Final Scoping Report - Non-Technical Summary Introduction Quantum Ghana Gas Limited (Quantum) proposes to develop the Tema
More informationRoberts Bank Terminal 2 Project Environmental Impact Statement Comments on Completeness April 30 June 15, 2015
Participant: Susan Jones Organization (if applicable): Boundary Bay Conservation Committee General Comments: June10, 2015 The on the endangered Killer Whales needs to include increase of shipping in Georgia
More informationAppendix A: Project Characteristics
Gorgon Fourth Train Expansion Proposal Appendix A: Project Characteristics Appendices Project Characteristics A Key Characteristics table has been prepared to describe the elements of the Foundation Project
More informationLiquefied Natural Gas (LNG) for Commercial Applications. David Jaskolski Senior Account Manager Pivotal LNG September 2014
Pivotal LNG 1 Liquefied Natural Gas (LNG) for Commercial Applications David Jaskolski Senior Account Manager Pivotal LNG September 2014 Forward Looking Statements and Supplemental Information 3 Pivotal
More informationAtlantic Link: An Update. June 6, 2017
Atlantic Link: An Update June 6, 2017 About Emera Publicly traded (TSX: EMA); approximately CDN$29 billion in assets Constructing the 500 MW Maritime Link a 170-kilometre subsea HVdc cable between Newfoundland
More information1) 2) 3) 4) 5) The oil and gas cycle. Life cycle of oil and gas (time) Potential requirement on ground
The oil and gas cycle Life cycle of oil and gas (time) 1) 2) 3) 4) 5) 6) Activity Desk study and get licens: Find areas with favorable geological conditions Seismic survey: Provide detailed information
More informationUnit 4: Oil and Gas Development
Unit 4: Oil and Gas Development Overview of Unit U.N. Convention on the Law of the Sea Oil and Gas Development Framework Liquefied Natural Gas Renewable Energy Wind Energy Wave Energy U.N. Convention Law
More informationFERC approves Transco natural gas pipeline expansion
FERC approves Transco natural gas pipeline expansion HOUSTON, Nov. 22 11/22/2013 By OGJ editors Williams Partners LP has received approval from the US Federal Energy Regulatory Commission for the $300
More informationSorting Out New England s Pipeline Needs
Sorting Out New England s Pipeline Needs A Round Up of Recent Studies and What They Mean February 17, 2016 Pat Knight Elizabeth A. Stanton, PhD www.synapse-energy.com EXECUTIVE SUMMARY: THREE PIPELINE
More informationWoodfibre LNG Limited Response to SIGTTO LNG Ports and Risk Reduction Options
Woodfibre LNG Limited Response to SIGTTO LNG Ports and Risk Reduction Options Introduction: The following is in response to the Environmental Assessment Office request for the Society of International
More informationThe Energy Consortium Recent Developments and the Outlook for Natural Gas in the Northeast. John R. Bitler October 20, 2010
The Energy Consortium Recent Developments and the Outlook for Natural Gas in the Northeast John R. Bitler October 20, 2010 Northeast Overview Traditional Sources of Supply Gulf Coast Western Canada (WCSB)
More informationAbout WCC LNG Project Ltd.
About WCC LNG Project Ltd. WCC LNG Project Ltd. (WCC LNG) is a proposed project led by ExxonMobil to develop and operate a liquefied natural gas (LNG) export facility on the eastern shore of Tuck Inlet
More informationWe deliver gas infrastructure
We deliver gas infrastructure We are Uniper We are a leading international energy company with operations in more than 40 countries and around 13,000 employees. We combine a balanced portfolio of modern
More informationAtlantic Coast of NY, East Rockaway Inlet to Rockaway Inlet and Jamaica Bay APPENDIX N COASTAL ZONE MANAGEMENT
Atlantic Coast of NY, East Rockaway Inlet to Rockaway Inlet and Jamaica Bay APPENDIX N COASTAL ZONE MANAGEMENT Hurricane Sandy General Reevaluation Report August 2016 New York (and New York City Local
More informationIn Response to the New York Energy Highway RFI Spectra Energy Corp s Comments May 30, 2012
In Response to the New York Energy Highway RFI Spectra Energy Corp s Comments May 30, 2012 Spectra Energy Corp ( Spectra Energy ) appreciates the opportunity to provide comments to the New York Energy
More informationAugust 27, Jim Crandles Director of Planning Port Metro Vancouver 100 The Pointe, 999 Canada Harbour Place Vancouver, BC V6C 3T4
August 27, 2013 Jim Crandles Director of Planning Port Metro Vancouver 100 The Pointe, 999 Canada Harbour Place Vancouver, BC V6C 3T4 Re: Analysis of Options for Covering Barges Jim We remain confident
More informationLNG Facts A Primer. Presentation before US Department of Energy, Office of Fossil Energy, LNG Forums. March 10, Kristi A. R.
LNG Facts A Primer Presentation before US Department of Energy, Office of Fossil Energy, LNG Forums March 10, 2006 Kristi A. R. Darby Center for Louisiana State University Overview What is Natural Gas?
More informationTEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT
TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Final Scoping Report - Non-Technical Summary Presentation Structure of the Presentation Introduction to the Tema LNG Project
More informationDRAFT Subject to modifications
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 7 From: Date: Staff July 17, 2009 Council Meeting Subject: Florida Power and Light Company Riviera Beach Energy
More informationEnergy and Natural Resources
Energy and Natural Resources 7.1 Introduction This chapter evaluates the potential impacts of the proposed project s Technology and Marine Terminal Alternatives and a No-Action Alternative, as well as
More informationOUR CONVERSATION TODAY
OUR CONVERSATION TODAY Our goal is to raise the level of awareness around the natural gas supply chain among key stakeholders in order to facilitate positive working relationships and more informed decision
More informationNEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT
NEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT 237 217 200 80 237 217 200 119 FEASIBILITY 237 217 200 STUDY 27 255 0 163 131 239 110 112 62 102 130 National Environmental Policy
More informationUNDERSTANDING NATURAL GAS MARKETS. Mohammad Naserifard MSc student of Oil & Gas Economics at PUT Fall 2015
UNDERSTANDING NATURAL GAS MARKETS Mohammad Naserifard MSc student of Oil & Gas Economics at PUT Fall 2015 Table of Contents 3 Overview Natural Gas is an Important Source of Energy for the United States.
More informationRail Service at Brookley Aeroplex
WHAT The Mobile Airport Authority, hopes to attain improved rail infrastructure to advance economic performance and job growth. I. Background The Mobile Airport Authority s goal for Brookley Aeroplex is
More informationECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL
International Gas Union Research Conference 2011 ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL Youngchul.Eum Seunghyuk.Kim Kyoungmin.Doh MunKeun.Ha SAMSUNG HEAVY INDUSTRIES, Geoje-Si, Gyeongsangnam-do,
More informationIntroduction. FLNG: Costs and Cost Drivers. What is FLNG (and what isn t) FLNG Project Costs
Introduction With the LNG sector set for unprecedented growth, but with gas prices globally under pressure from both low oil prices and a very competitive supply situation, project developers are looking
More informationThe overall objectives of the monitoring activities are to:
7 MONITORING PLAN 7.1 INTRODUCTION A detailed environmental and social monitoring plan will be developed for the Jubilee Phase 1 Development project and implemented by Tullow and its contractors. This
More informationOverview of LNG in the United States
Overview of LNG in the United States Dan McGinnis, Vice President of Gas Infrastructure Tractebel Project Development Inc. Natural Gas Conference Louisiana State University October 27, 2003 What Is Liquefied
More informationREVIEW OF ISO-NE OPERATIONAL FUEL SECURITY ANALYSIS
REVIEW OF ISO-NE OPERATIONAL FUEL SECURITY ANALYSIS January 30, 2018 www.poweradvisoryllc.com To: Clients and Colleagues From: John Dalton, President and Tyler Sellner, Researcher, Power Advisory LLC Earlier
More informationmember of the TSAKOS GROUP of companies
member of the TSAKOS GROUP of companies The Tsakos Group - Preview and History Group Structure Range of Activities Global Presence Our Office Locations Our Fleet Profile CYnergy Action Connecting Europe
More information2030 Power System Study Report to the New England Governors 2009 Economic Study: Scenario Analysis of Renewable Resource Development
2030 Power System Study Report to the New England Governors 2009 Economic Study: Scenario Analysis of Renewable Resource Development New England Governors Adopt Long-term Renewable Energy Vision States
More informationLars Odeskaug - TORP CEO
Lars Odeskaug - TORP CEO Agenda Introduction TORP s EasyLNG Regas Terminal Solution LNG Vaporizers Compliance Alternative Klaipeda Lay-Outs Schedule LNG Ship Bunker Station & Road Depots 2 30 Years of
More informationMay 4, Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602
2011 Environmental Excellence Award Application May 4, 2011 Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602 Contact: Mr. Channing Hayden, Jr. Director
More informationRampion Offshore Wind Farm Frequently Asked Questions (FAQs)
Rampion Offshore Wind Farm Frequently Asked Questions (FAQs) February 2012 Q: Why renewable energy? A: Renewable energy involves generating electricity from natural sustainable energy sources, which do
More informationMember of DP World Group
Member of DP World Group P&O Repasa is a member of the Maritime Services Division of the diversified global marine group, the Dubai based DP World. As a group, we operate multiple yet related businesses
More informationAlaska LNG Concept Information. Alaska LNG. Overview. October
Overview October December 3, 2013 Project Overview Project Team BP, ConocoPhillips, ExxonMobil and TransCanada are working together to progress an project: 300+ people involved in project planning and
More informationProposed Enhancements to the Mineral Management Service Commercial Marine Vessel Emission Inventory for the Gulf of Mexico
Proposed Enhancements to the Mineral Management Service Commercial Marine Vessel Emission Inventory for the Gulf of Mexico Richard Billings, Roger Chang, and Heather Perez, ERG, Research Triangle Park,
More informationCanaport TM LNG Project Update
Canaport TM LNG Project Update FERC Technical Conference Regarding Maritimes & Northeast Pipeline Gas Quality Specifications Vince Morrissette Vice President of Origination and Regulatory Affairs Repsol
More informationChapter 4 ALTERNATIVES COMPARISON
Chapter 4 ALTERNATES COMPARSON 4.1 NTRODUCTON This chapter presents a comparison of the alternatives that were considered during preparation of this Draft ES/ER. Section 1.6 of this Draft ES/ER presents
More informationTAPS Highlights. December 8, Alyeska Pipeline Service Company
TAPS Highlights December 8, 2016 Alyeska Pipeline Service Company 1 TAPS background Incorporated August 14, 1970 to design, build, operate and maintain the pipeline, pump stations and the Valdez Marine
More informationLNG as a Marine Fuel Environmental Impact of LNG in Emergency Scenarios
LNG as a Marine Fuel Environmental Impact of LNG in Emergency Scenarios Marcel LaRoche, Lloyd s Register Canada Greentech 2013 Vancouver, BC May 30 th, 2013 Agenda Characteristic s and Hazards of LNG What
More informationAGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality
DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P. O. BOX 1229 GALVESTON, TEXAS 77553-1229 April 11, 2017 AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental
More informationOffshore Wind Delivers Energy Where it s Needed
BBl Block Island 40% of Land In Conservation State of the Art Water and Sewer Plants No Discharge Harbor and Pump Out Program Protection of Sole Source Aquifer Historic District Commission Environmental
More informationDistribution Restriction Statement Approved for public release; distribution is unlimited.
CECW-EH-D Regulation No. 1110-2-1404 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDRAULIC DESIGN OF DEEP-DRAFT NAVIGATION PROJECTS Distribution
More informationLiquefied natural gas
Liquefied natural gas Liquefied natural gas or LNG is natural gas, consisting primarily of methane (CH 4 ), that has been converted into liquid form for ease of transport and storage. More simply put,
More informationPorts and LNG as Maritime Fuel
Ports and LNG as Maritime Fuel Presented at the The American Association of Port Authorities Maritime Economic Development Workshop Dr. Richard Stewart, Co-Director-GLMRI Chicago, IL June 27, 2013 Presentation
More information