SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

Size: px
Start display at page:

Download "SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at"

Transcription

1 SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER

2 CONTENTS 1.0 Project Description Page Description of Environment Page Anticipated Environmental Impact & Mitigation Measures Page Environmental Monitoring Plan Page Additional Studies Page Project Benefits Page Environmental Management Plan Page 11 2

3 1.0 Project Description GAIL India Limited has proposed to establish 380 MW Combined Cycle Power Plant at Vijaypur, District Guna in the State of Madhya Pradesh. The proposed project will be located within the existing premises of GAIL s LPG Manufacturing Facility cum Compressor station. The latitude and longitude of the four corners of project site are (A) 24 28'1.18''N 77 8'40.96''E (B) 24 27'52.46''N 77 9'28.55 ''E (C) 24 29'3.88''N 77 9'34.72''E (D) 24 29'14.28''N 77 8'44.66''E. The elevation of the site is 420 m above the mean sea level. The proposed site is close to NH-3 (Agra-Mumbai highway) which is 1.0 km away from the site. Guna Ujjain railway line passes about 500 m away from GAIL premises in East direction. The nearest railway station is Raghogarh located about 800 m away from the plant site. Ruthiyai railway station is located about 10 km from the proposed site in north direction. Raghogarh is located 4.0 km in east direction. Parbati river is located 5.0 km from plant site in west direction. Ruthyai River is about 4.5 km from plant site in north direction. Gopi Krishna Sagar Dam is located about 12 km from the site. Ruthyai river generates from Gopi Krishna Sagar Dam and meets Parbati river at 17 km in west direction. Raghogarh protected forest is located about 4.5 km from the plant site in south east to north east direction, Ajronra protected forest is about 5.5 km North direction and Donger proptected forest is about 3.5 km North west direction. Guna city is located more than 25 km from plant site in north east direction. Very small portion of Rajasthan State boundary is located within 10 kms boundary of project site. The Terms of Reference was approved by Ministry of Environment and Forests, GOI (MoEF) vide letter No. J-13012/53/2011 IA. II (T) dated 15 th June, This Draft EIA report has been prepared as per the TOR for Public Hearing. Project Cost: The estimated cost of 380 MW CCPP is Rs 1209 Crores. 200 people will be employed under the contractor during the construction phase of 3

4 the project. About 100 people will be employed during the operational phase of the project. Land Requirement: 128 acres of land is available with in the existing GAIL Campus at Vijaypur. Out of this, only 45 acres of land shall be utilized to establish the proposed CCPP. The land is in GAIL s possession. Hence no additional land will be required for the project. No R & R issues are involved in this project. Water Requirement: Total water requirement for the plant is about KLD (455 m 3 /hr). Water will be sourced from the Gopi Krishna Sagar Dam. Gopi Krishna Sagar Dam is located about 12 km away from proposed project site. Water for the proposed project will be transported by pipe linel. Water Resource Department Madhya Pradesh (WRD) has been allotted the required quantity of water to the expansion project vide letter no. 222/ 2010/31 dated April Fuel Requirement: Natural Gas will be used as fuel for the plant. Gas requirement is 530 MSCMA. The fuel shall be transported to the power Plant site through pipelines from the GAIL compressor station located with in the same premises. Process Description: Best Available Technology in International market has been selected for this power plant. Gas and air is fired in Gas Turbine to generate electricity. Hot gas coming out of the Gas Turbine is used to produce steam in the Heat Recovery Steam Generator (HRSG). The steam is used to run Steam Turbine to generate electricity. The efficiency of the plant is about 56-58%. The project will use cleanest fuel available that is Natural Gas for power generation. The plant efficiency would be higher compared to other power plants. Emission of greenhouse gases will be much lower than that from other power plants. There will be no emission of particulate matter and SO 2 or any toxic 4

5 pollutants from the plant. Hence the global warming potential of the project is significantly lower. No toxic chemicals will be handled inside the plant. No solid wastes like ash or dust will be generated. The project is entitled for carbon credits and application will be submitted to National Designated Authority after preparing the Project Design Document. 2.0 Description of Environment Baseline environmental data generation was carried out during the period from 1 st April to 30 th June Data has been generated by following the approved procedures of the Ministry of Environment & Forests and the Central Pollution Control Board. Study area of 10 km radial distance around the site has been considered for the EIA study. Meteorology: Meteorological data for Pre-monsoon season has been generated at Vijaypur. Historical meteorological data were obtained from climatological tables, pertaining to nearest representative IMD Station located at Guna. The predominant wind direction is from West during summer season. During winter the wind flows from East direction. The predominant wind direction during the study period was from west and North West direction. The average wind speed ranges from m/s. Daily mean temperature varied from 20.8 o C to 41.3 o C. The relative humidity varied from 15 to 59 %. The annual rainfall is mm. Ambient Air Quality: The PM 2.5, PM 10, SO 2, NO 2 and O 3 levels were monitored at four locations during the pre monsoon season. Project site, predominant upwind, downwind direction and densely populated zone have been selected for air quality measurement. The 24-hour average PM 2.5 level in the study area was found to vary from 19 to 44 µg/m 3, PM 10 level from 40 to 74 µg/m 3, SO 2 level from 4.0 to 14.8 μg/m 3 and NO 2 level from 9.0 to 24.2 μg/m 3. Concentration of ground level ozone (8-hour average) varied from 34 to 58μg/m 3. The ambient air quality 5

6 of the study area is well within the prescribed National Ambient Air Quality Standards- 2009; (PM , PM µg/m 3 ; SO 2-80 µg/m 3, NO 2-80 µg/m 3 and O µg/m 3 ) Ambient Noise Quality: Noise quality has been monitored at six locations within the study area. The observed noise level (Leq) in the study area ranges from 47.4 db (A) to 49.2 db (A) during day time and 40.8 db (A) to 41.6 db (A) during the night time. The ambient noise level of the study area is within the prescribed standard of residential area that is 55 dba during day time and 45 dba during night time. The noise level at Raghogarh is below the commercial area standard that is 65 dba during day time and 55 dba during night time. Water Quality: Eight samples of ground water and four samples of surface water have been collected from the study area. The water quality is found to be satisfactory. No metallic contamination or significant pollutants has been found in the surface and ground water samples. Soil Quality: Soil samples from surrounding agriculture fields were collected for analysis. The soil texture is Clay loam type. The soil contains moderate amount of organic matter, nitrogen, potassium and phosphorus. Sensitive Ecosystem:- No ecologically sensitive area like national park, wildlife sanctuary, wetland, archaeological monuments, etc are present within 10 km radius of the project site. Raghogarh protected forest is located about 4.5 km from the plant site in south east to north east direction, Donger and Ajrora protected forest are located in north direction of the plant site. No species of plants and animals in the study area were found to be endangered. Land use: 53.6%, of land is covered by agriculture, 12.3% land is forest, 11.5% land is settlement, 7.1% land is under water bodies and rest of the land comes under other uses. Bajara, wheat, jowar, gram and maize cultivation is done in 6

7 most of the agriculture land. Other crops grown in nearby villages are pulses, soybean, vegetables, coriander, chilly and fruits. Socioeconomics: The proposed site is located in Raghogarh tehsil of Guna district. According to census 2001 the total population of Raghogarh Tehsil is Population density of Raghogarh Tehsil is 187 person/ km 2 and literacy rate is 52.15%. Wheat, paddy, Jowar, maize, soyabean, black gram, pulses, sugarcane, potato, fruits and vegetables are the main crops of the study area. Due to lack of irrigation sources, the productivity of crops is low compared to other parts of the state. The basic infrastructure facility of the study area is moderately developed. 3.0 Anticipated Environmental Impact and Mitigation Measures KLD water will be required during operation phase for condenser cooling, boiler feed, other service and potable purpose KLD water will be generated in the form of blow down from cooling tower, boiler and backwash. All wastewater will be taken to guard pond. Total 2184 KLD treated water will be used for watering the garden and lawns inside plant premises and township. The treated water will comply the water quality for irrigation and would be given to local farmers for irrigation. During monsoon, runoff shall be disposed off into nearby nalla. Such measures are adequate to mitigate the adverse environmental impacts on water environment. Air Environment: Natural Gas is a clean fuel. No Particulate Matter, sulphur dioxide or other toxic pollutants shall be emitted. Dry Low NOx burners shall be used to limit the NOx emission levels to 50 ppm. The flue gas will be discharged through 60 m tall stacks. 7

8 Mathematical modeling studies proved that the ambient air quality will remain within the National Ambient Air Quality Standards (NAAQS) after the operation of the project, as shown below. Parameter. Maximum incremental glc from expansion unit Baseline NOx (as NO 2 max) in downwind direction of glc* Baseline plus max glc NAAQS NOx SO 2 Nil PM 10 Nil PM 2.5 Nil Noise Quality: Movement of trucks and dumpers will be properly scheduled to minimize construction noise. Turbines, compressors, pumps, fans, etc are the main sources of noise. Turbine will be provided with acoustic enclosure. Sound absorbing materials will be provided in the room. In noisy work areas soundproof duty rooms will be provided. Workers working in noisy areas will be given ear plugs. Mathematical modeling studies proved that the ambient noise quality will remain within the National Noise Quality Standards. Greenbelt on 33% land area will further reduce the noise level. Solid Wastes Disposal: No solid waste will be generated from the plant. Sludge from water treatment plant shall be mixed with poor quality soil and used as soil conditioner. Commercial garbage will be segregated and recyclable materials will be given to kabadis. Spent oil and lubricants will be collected in drums and given to authorized recyclers. Occupational Health: Exposure to noise, heat, mechanical injury, fire in gas station, etc are the hazards identified from the plant. Workers will be given ear plugs, goggles, gloves, boots, etc. Workers health will be checked at routine 8

9 intervals. Workers will be provided clean drinking water and toilets. Regular training and awareness programs will be conducted. 4.0 Environmental Monitoring Plan Environmental Management Department (EMD), under the direct control of Chief Executive with full-fledged environmental laboratory and qualified scientists and engineers will be established. Continuous monitoring instruments for stack emission, ambient air quality and wastewater quality shall be installed to check the environmental quality. EMD will be responsible for the following functions: 1. Monitoring of stack emissions and work environment and report any abnormalities for immediate corrective measures. 2. Ambient air quality monitoring at upwind and downwind direction (at three locations 120 degree to each other). 3. Online monitoring of meteorological parameters like wind speed, wind direction, relative humidity, ambient temperature and rainfall. 4. Monitoring of treated wastewater quality at the outlet of guard pond for flow, ph, conductivity and temperature using online instruments. 5. Monitoring and testing of groundwater quality inside the plant and nearby villages. 6. Monitoring and testing of water quality of Parbati river and other surface water stream, at upstream and downstream points. 7. Noise monitoring at the plant boundary, work areas and surrounding habitation on monthly basis. 8. Quantity and quality of spent oil and lubricants would be disposed and records kept as per authorization obtained from SPCB. 9

10 9. Development and maintenance of greenbelt and greenery development within the plant boundary. 5.0 Risk Mitigation Plan The Natural Gas shall be transported to the power station through pipelines. All necessary standard risk management and mitigation measures have been considered. Elaborate fire fighting system with fire extinguishers, hydrant system, sprinkler system, pumps and pipeline network has been considered as per rules. Water for fire fighting will be taken from the water reservoir. Onsite emergency response plan has been prepared. Approval of Chief Controller of Explosives will be taken for the layout and design of Gas Metering Station. Chemicals like sodium hydroxide and hydrochloric acid are stored for use in the DM plant. Personnel involved are properly trained about the safety and first- aid measures. Water taps would be installed near the DM plant. Workers will be provided with personal protective equipment. By adopting good engineering design, installation of superior equipment, undertaking regular maintenance and creating awareness among the operating staff, accidental risks has been minimized. 6.0 Project Benefits During the construction phase, 200 people on an average will be employed for 22 months. The plant will create direct employment for 100 people during the operation phase. About 20 people will be deployed for greenery and horticulture development, housekeeping and related logistical work. The GAIL has earmark Rs. 225 lakhs for under taking CSR activities. This money will spend in various socio-economic and community development activities for next 10 years. The activities cover education, health, infrastructure, culture and sports, skill 10

11 development & training and women empowerment. Rs. 20 lakhs per year has been earmarked as annual recurring cost for various CSR activities. Details are provided in the EIA report Environmental Management Plan Environment Management Department will implement the EMP of this project. All recommendations given in the EIA report including that of occupational health, risk mitigation and safety will be complied with. The capital cost required to implement the EMP is Rs.20 crores. The annual recurring expenses will be Rs.2.0 crores. EMD will ensure that all air pollution control devices, effluent treatment plant and water re-circulating systems function effectively. Schemes for resource conservation (raw materials, water, etc), rainwater harvesting and social forestry development will be taken up by EMD. Environmental awareness programs for the employees will be conducted. Greenbelt and greenery development inside and outside the plant premises will be intensified by the EMD. Greenbelt on 33% land area will be developed. EMD will also ensure cleanliness inside the plant. All records shall be submitted to the regulatory authorities, displayed at relevant places like company gate and website and maintained by the EMD. 11

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT of

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT of SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT of 2 x 300 MW THERMAL POWER PLANT at villages Jobra & Hamirpur, Tehsil Gharghoda District Raigarh (Chhattisgarh) BY RAIGARH ENERGY LIMITED By Raigarh Energy

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala-147001. No. SEAC/80/37967 Dated 15/10/2008 Speed Post To M/s Green Planet Energy Pvt.

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

(Period April 2017 ~ Sept. 2017)

(Period April 2017 ~ Sept. 2017) CHAMBAL FERTILIZERS AND CHEMICALS LIMITED, GADEPAN MOEF ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT [PHASE- I] (Period April 2017 ~ Sept. 2017) Letter No.J-11011 / 8 / 87-IA DT.15.11.88 01. The Project Proponent

More information

Dheeru Powergen Private Limited.

Dheeru Powergen Private Limited. Executive Summary Of The Proposed 2 x 300 MW Dhanras Thermal Power Station At Dhanras Village Katgora Taluk, Korba District, Chhattisgarh. Implemented By Dheeru Powergen Private Limited. Submitted to CHHATTISGARH

More information

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES Maton Rock Phosphate Mine of M/s HZL is proposing

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE For PROPOSED RESIDENTIAL AND COMMERCIAL DEVELOPMENT AT Plot bearing survey no. 86/1, 86/2, 86/3 (pt), 86/4 (pt), 86/5 (pt), 115/1 (pt), 115/2 (pt), 115/3 (pt), 115/4 (pt), 115/5

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802

More information

SUMMARY ENVIRONMENT IMPACT ASSESSMENT REPORT

SUMMARY ENVIRONMENT IMPACT ASSESSMENT REPORT SUMMARY ENVIRONMENT IMPACT ASSESSMENT REPORT Expansion of Steel Plant village Taraimal, Tehsil Ghargoda District Raigarh (Chhattisgarh) PROJECT PROMOTER NALWA STEEL & POWER LIMITED RAIGARH, CHHATTISGARH

More information

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1. INTRODUCTION Executive Summary 1.1 Background: M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1.2 Proposed Project:

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

Mars Power & Steel Ltd.

Mars Power & Steel Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

EXECUTIVE SUMMARY OF THE PROPOSED FERTILISER UNIT OF M/s. SUMAN PHOSPHATES & CHEMICAL LTD., MATRALA, MADHYA PRADESH

EXECUTIVE SUMMARY OF THE PROPOSED FERTILISER UNIT OF M/s. SUMAN PHOSPHATES & CHEMICAL LTD., MATRALA, MADHYA PRADESH EXECUTIVE SUMMARY OF THE PROPOSED FERTILISER UNIT OF M/s. SUMAN PHOSPHATES & CHEMICAL LTD., MATRALA, MADHYA PRADESH 1.0 INTRODUCTION M/s. Suman Phosphates and Chemical Ltd., has proposed to set-up a Single

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

ENVIRONMENTAL MONITORING PROGRAMME

ENVIRONMENTAL MONITORING PROGRAMME Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.

More information

CHAPTER-10 SUMMARY AND CONCLUSION

CHAPTER-10 SUMMARY AND CONCLUSION CHAPTER-10 SUMMARY AND CONCLUSION 10.1 INTRODUCTION M/s. Shree Warad Alloys (P) Ltd., Nagpur a private limited company having its registered office at Plot No. C-1, Sharvari Apartments, 8/B, Trimurty Nagar,

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

EXECUTIVE SUMMARY. (Approved Consultant)

EXECUTIVE SUMMARY. (Approved Consultant) ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CAPTIVE RESIN PLANT OF 100000 TPA PRODUCTION CAPACITY AT ROUTHUSURAMALA VILLAGE, THOTTAMBEDU MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

GRAVEL & ROUGH STONE QUARRY

GRAVEL & ROUGH STONE QUARRY ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760

More information

GREENCINDIA Consulting Pvt. Limited

GREENCINDIA Consulting Pvt. Limited Expansion of Tamar Bauxite Mine from 10,000 TPA to 40,000 TPA in Tamar & Kirkiran Villages, Majhgawan Tehsil, Satna District, Madhya Pradesh : The M.P. State Mining : GREENCINDIA Consulting Pvt. Limited

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017 Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017 PART A : SPECIFIC CONDITIONS 1. CONSTRUCTION PHASE S. 1

More information

EXECUTIVE SUMMARY TABLE - 1

EXECUTIVE SUMMARY TABLE - 1 EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Dwarkesh Energy Limited (DEL) proposes to set up a 1320 MW (2 x 660 MW) Super Critical Coal Based Thermal Power Plant at Villages Torniya, Chhippipura

More information

The following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S.

The following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S. Proceeding of the Public Hearing conducted on 27.01.2009 for grant of environmental clearance to M/s Universal Bio-Mass Energy Pvt. Ltd. for setting up of 14.5 MW capacity Biomass based Independent power

More information

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Reference: Environment clearance to CFG3 Project vides MOEF letter.no. J-11011/664/2008-IAII

More information

2 NECESSITY OF THE PROPOSED PROJECT

2 NECESSITY OF THE PROPOSED PROJECT Executive Summary 1 INTRODUCTION M/s. Prosperous Energy Private Limited (PEPL), a wholly owned subsidiary of Videocon Industries Limited has proposed the 2X660MW Coal based supercritical Thermal Power

More information

Roquette Riddhi Siddhi Private Limited

Roquette Riddhi Siddhi Private Limited SUMMARY ON DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Roquette Riddhi Siddhi Private Limited (Expansion of co-generation power plant from 6MW to 18 MW) at Gokak Village & Taluk, Belagavi District,

More information

DRAFT TERMS OF REFERENCE FOR EIA STUDY

DRAFT TERMS OF REFERENCE FOR EIA STUDY Four laning of Balaghat - Gondia Section of NH 54 from km 0.000 to km 48.070 (Package-1A & Package-1B) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra DRAFT TERMS OF REFERENCE

More information

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous chemicals may include, but not limited to the following

More information

EXECUTIVE SUMMARY 1. INTRODUCTION

EXECUTIVE SUMMARY 1. INTRODUCTION EXECUTIVE SUMMARY 1. INTRODUCTION M/s. Indsil Energy & Electro Chemical Ltd plant is situated in Urla Industrial Estate, Raipur, Chhattisgarh. The company is manufacturing Ferro Alloys. Due to massive

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

Proposed TOR Calix Industries

Proposed TOR Calix Industries 1 A tabular with index for point-wise compliance of below mentioned TORs. 2 Executive summary of the project giving a prima facie idea of the objectives of the proposal, use of resources, justification,

More information

Executive Summary in English

Executive Summary in English for Proposed Cement Plant with a capacity of Clinker 3 MTPA, Cement 7 MTPA (0.70 MTPA OPC, 3.50 MTPA PSC & 2.80 MTPA PPC) at Bhimnagar village, Sedam taluka, Gulbarga district, Karnataka in English Project

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan)

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan) (i) (ii) (iii) (iv) (v) SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan) ENVIRONMENT CLEARANCE LETTER

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd 1. Executive Summary 2. Introduction STANDARD TERMS OF REFERENCE I. Details of the EIA Consultant including

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the, operation and the

More information

PROPOSED TERMS OF REFERENCE (TOR) FOR

PROPOSED TERMS OF REFERENCE (TOR) FOR PROPOSED TERMS OF REFERENCE (TOR) FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR PROPOSED NEW NATIONAL HIGHWAY -NH-754K GREENFIELD ALIGNMENT SANCHORE-SANTALPUR SECTION

More information

Environmental Assessment Report

Environmental Assessment Report TE-TO AD SKOPJE Combined Cycle Co-Generation Power Plant Project Skopje Environmental Assessment Report ENVIRONMENTAL MANAGEMENT PLAN Thermal Energy Plants Department Combined Cycle Co-Generation Power

More information

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi - 416108, Taluka - Shirol, Dist Kolhapur, Maharashtra Compliance of Conditions Stipulated in environmental clearance granted

More information

Telefax: 011: Dated:10 th May, 2013

Telefax: 011: Dated:10 th May, 2013 F. No. J-11011/41/2011-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax: 011:

More information

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) 1. PROJECT DESCRIPTION: Ambuja Cement Eastern Ltd. (ACEL) has the cement

More information

Non-Technical Summary

Non-Technical Summary Construction of a 410 MW Combined Cycle Gas Turbine Power Unit at the existing Combined Heat and Power Plant in Krasnodar (Subsidiary of OAO UGK TGK-8 ), Russian Federation Non-Technical Summary February

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

ANNEXURE- II Proposed TOR

ANNEXURE- II Proposed TOR ANNEXURE- II Proposed TOR Annexure II Terms of Reference for EIA for Setting up of Ligno-Cellulosic Biomass based second generation (2G) Ethanol Bio-Refinery with capacity of 100 KLPD at village-sainjani,

More information

Simran Industries Pvt. Ltd.

Simran Industries Pvt. Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Patharra Village Bemetara Tehsil Durg District Chhattisgarh Submitted to: CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh 1.0 INTRODUCTION

More information

EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT

EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT EXECUTIVE SUMMARY of ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT For PROPOSED 60 KLPD MOLASSES BASED DISTILLERY AND 3 MW CO-GENERATION POWER PROJECT Located at VILLAGE YERAGAL, TALUKA - MUDDEBIHAL, DISTRICT

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I)

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I) COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER-2016 F. No. J-11011/309/2011-IA-ll (I) SUBMITTED BY- M/S. GASGEN FERRO ALLOYS LLP LOHIA HOUSE, 2ND FLOOR M.G.ROAD,

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Pannageshwar Sugar Mills Ltd. (PSML), At: Pangaon, Tal.: Renapur, Dist.: Latur, Maharashtra was registered vide registration no. 11-130803 dated 01.01.2001.

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

Dead Sea Works new Power Plant: Environmental Statement Non Technical Summary

Dead Sea Works new Power Plant: Environmental Statement Non Technical Summary Dead Sea Works new Power Plant: Environmental Statement Non Technical Summary Introduction Dead Sea Works steam and electricity demand has grown during last decade and will continue to grow in the coming

More information

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29) 1 By: Speed-Post State Level Expert Appraisal Committee (Formed as per S.O. no. 1533 dated 14 th Sept 2006 of Government of India, Ministry of Environment & Forests) PARYAWARAN PARISAR, E-5, ARERA COLONY,

More information

Shri Girija Alloy & Power (I) Pvt. Ltd.

Shri Girija Alloy & Power (I) Pvt. Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Shri Girija Alloy & Power (I) Expansion of Ferro Alloys unit at Submitted to ANDHRA PRADESH POLLUTION CONTROL BOARD 0 1.0 PROJECT DESCRIPTION Shri Girija

More information

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and

More information

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola 0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

During the discussions, the Committee finalized the following additional TOR for further study:

During the discussions, the Committee finalized the following additional TOR for further study: Finalization of ToR for development of Visakhapatnam?Kakinada Corridor for the Establishment of Petroleum, Chemicals and Petrochemicals Investment Region (VK- PCPIR), Andhra Pradesh by M/s VK- PCPIR Special

More information

The study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows:

The study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows: 1.0 EXECUTIVE SUMMARY 1.1 Introduction M/s Mahavir Benefication Pvt. Ltd. (MBPL) proposes expansion of its coal washery from 1.0 MTPA to 5.0 MTPA capacity at Dhiroul Village, Anuppur District, Madhya Pradesh

More information

Executive Summary. Vizianagaram District, Andhra Pradesh. Season : December 2016 to February 2017 File no.: J-11011/1129/2007-IA-II(I)

Executive Summary. Vizianagaram District, Andhra Pradesh. Season : December 2016 to February 2017 File no.: J-11011/1129/2007-IA-II(I) Executive Summary Environmental Impact Assessment for Expansion of Ferro Alloys unit Production (Addition of 2 x 9 MVA Submerged Electric Arc Furnace) at Plot No.368, APIIC Growth Centre, Bobbili Village

More information

Calcom Cement India Limited

Calcom Cement India Limited Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam 782446 Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I)

More information

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I DATA SHEET 01 Project type : Cement Date: 24.11.2015 02

More information

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Ref.: Environmental Clearance no. J-11011/754/2007-IA II

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY M/s Merino Industries Limited has proposed for manufacturing Phenol Formaldehyde Resin, Melamine Formaldehyde Resin at Plot No D2 CH 36, Dahej Phase II, Dist. Bharuch, Gujarat. The

More information

Hope you will find the same in order. Thanking You, For EMAMI PAPER MILLS LTD. Authorized Signatory

Hope you will find the same in order. Thanking You, For EMAMI PAPER MILLS LTD. Authorized Signatory To 13 th August, 2018 The Director Government of India Ministry of Environment & Forest (I.A. Division) Paryavarn Bhavan, CGO COMPLEX, Lodhi Road New Delhi- 110 003 Sub: Compliance status of conditions

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given. PROPOSED TERMS OF REFERENCES (A) Suggested by the Applicant 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED

More information

CLEARANCE LETTER NO.: 21/15/84-EN-I issued on PERIOD OF COMPLIANCE LETTER April -16 September -16

CLEARANCE LETTER NO.: 21/15/84-EN-I issued on PERIOD OF COMPLIANCE LETTER April -16 September -16 Project Code : UP-2-37-90 NAME OF PROJECT Indo Gulf Fertilisers (A Unit of Aditya Birla Nuvo Ltd) CLEARANCE LETTER NO.: 21/15/84-EN-I issued on 8.1.1985 PERIOD OF COMPLIANCE LETTER April -16 September

More information