1 ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK for the Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT May 2011

2 INTRODUCTION The World Bank, through IDA funding, is proposing a series of Partial Risk Guarantees (PRGs) provided in support of payment obligations of Kenya Power and Lighting Company (KPLC) under individual Power Purchase Agreements (PPAs) with Independent Power Producers (IPPs) that are being considered by the Government of Kenya. The proposed Bank project (Partial Risk Guarantees for IPPs in Kenya) would support, among other possible investments, the installation of up to three MW capacity Medium Speed Diesel (MSD) Power Plants. These power plants would be constructed by IPPs under a 20-year Build Own Operate (BOO) arrangement. Each IPP also will be responsible for the construction of a fuel storage facility at each plant site as well as interconnection facilities (switchyards) to allow for the transmission of power by KPLC to the national grid. This Environmental and Social Management Framework (ESMF) is prepared for the three MSD power plants. KPLC initially identified a parcel of land in an Export Processing Zone (EPZ) on the southwest side of the town of Athi River for three proposed MSD thermal power plants. Due to the potential cumulative environmental impacts of siting three such power plants within the same parcel of land, KPLC sought to acquire land in three separate locations. Key selection criteria included: sites with minimal environmental and social impacts; sites from which power could be easily evacuated; sites available for sale immediately; and sites adequate in size. KPLC used print media, estate agents, local authorities, and the public to identify suitable candidate sites. The three sites selected and purchased by KPLC are: the initial site within an unused part of the EPZ southwest of Athi River town, a site near Thika town, and a site along the Nairobi- Mombasa highway to the east of Athi River. Given their respective generating capacities, prevailing winds, and distances from each other, the airsheds of the three projects are not expected to overlap such that cumulative adverse impacts occur on ambient air quality. KPLC conducted preliminary environmental and social assessment work for each of the three sites and was able to determine that there were likely to be no significant environmental and social risks associated with the three sites in terms of natural habitat, land use, or other characteristics associated with the site itself. Rather, the likely impacts would be associated with the construction and operation of the proposed thermal power plant at each site, e.g., construction-related impacts; air emissions and impacts on ambient air quality; solid and liquid waste management; noise; the transport, handling, and storage of fuel; etc. The responsibility, however, for preparing an Environmental and Social Impact Assessment (ESIA) relies with each of the IPPs that successfully wins the bid for building and operating a power plant on the designated site. The ESIA for each project would likely have very similar issues and impacts to address, but the details of the impact analysis would depend on the specifics of the proposed design and management of each facility. ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK In preparing the proposed project, the Bank recognized that an Environmental and Social Management Framework (ESMF) would be required to meet the requirements of Bank Policy OP 4.01 (Environmental Assessment) for the three MSD thermal power plants. An ESMF is

3 prepared during project preparation as per OP 4.01 when the nature of the proposed investments is well understood, but details (either locations, designs, or both) of the specific investments in the project are not yet known, and therefore a detailed ESIA cannot be prepared. The purpose of the ESMF is: (i) to provide as much information as possible about environmental and social impacts (including possible land acquisition and resettlement) at the project s current state of preparation; (ii) to inform project planning and design process by comparing potential impacts of alternative locations, configurations, and construction techniques that are under consideration; and (iii) to describe procedures for subsequent assessment of impacts and development of appropriate impact management instruments when the details of the project become available. The scope and coverage of an ESMF generally includes the following key tasks: Task 1: Screening and Scoping of Issues Task 2: Environmental Policy and Regulatory Framework Task 3: Identification of Key Environmental and Social Issues Task 4: Description of Typical Mitigation Measures to Avoid or Minimize Impacts Task 5: Outlines of Environmental and Social Management Plans Task 6: Public Consultation and Disclosure Process The preparation of an ESMF is designed to provide stakeholders and decisionmakers with a broad understanding of what are likely to be the key issues and impacts, and how they can be addressed. It also serves as a guide to the preparation of subsequent site-specific Safeguards documents such as an Environmental and Social Impact Assessment, Environmental Management Plan, Emergency Response Plan, or similar documents that are appropriate to the nature of the project, once specific sites and project designs are selected and can be subject to detailed impact assessment. The limitation of an ESMF, however, is that it often tends to be a more generic analysis and assessment of impacts, since details of project design, or location (or both), are not yet known. In the case of the current project in Kenya to provide PRGs to IPPs that will build MSD thermal power plants at the three sites purchased for this purpose by KPLC, progress is being made in preparing ESIAs for all three projects by the respective IPPs. The first draft ESIA has been received by the Bank for one of the projects, located east of Athi River. The Bank has determined that the Draft ESIA dated April 2011, prepared by Nutek Solutions for Gulf Power Ltd. (the IPP for the proposed MSD power plant at Athi River), is of sufficient quality to be disclosed as a draft ESIA in accordance with Bank practice, and this has now been done by the Bank both locally in the Bank s Public Information Center in Kenya, and in the Bank s InfoShop. Moreover, the timely preparation of this Draft ESIA also provides the level of detail and analysis that is typically expected in an ESMF for investments of this type in this region of Kenya. Therefore, with the permission of the responsible IPP, Gulf Power Ltd., and their consultants, Nutek Solutions, the Bank is taking the innovative approach of disclosing their

4 document not only as an ESIA for their specific investment, but also as the ESMF for the Bank s Partial Risk Guarantees for IPPs in Kenya Project because their document reflects the scope and coverage of an ESMF as indicated above, but on the basis of a real case study, rather than the more generic approach normally taken in preparation of an ESMF. This innovative approach is being taken because the attached draft ESIA provides a broad understanding of what are likely to be the key issues and impacts, and how they can be addressed, in the construction and operation of an MSD thermal power plant of approximately MW capacity in this region of Kenya. KEY ENVIRONMENTAL ISSUES INMSD THERMAL POWER PLANT OPERATIONS Key environmental issues typically of concern in the operations of a MSD thermal power plant, which typically use reciprocating engines and burn various forms of diesel fuel, primarily include the following: Air emissions Noise Water consumption Solid wastes Hazardous materials and oil In thermal power plants of the proposed size range (80-90 MW) using heavy fuel oil, the primary air emission parameters of concern is SO 2, and to a lesser extent, NO x. Installation of pollution control equipment, such as scrubbers, is generally not economical on such power plants at that scale; rather, other measures, such as choice of fuel quality and use of engines that increase energy conversion efficiency, are recognized as Good International Industry Practice (GIIP) to most effectively reduce emissions of multiple air pollutants. Limiting sulfur content of the fuel to 2 percent sulfur or less in such a power plant is generally recognized as an effective measure to comply with World Bank Group Environmental Health and Safety Guidelines for air emissions from thermal power plants. Designing stack heights according to GIIP also can be used to avoid excessive ground level concentrations and minimize impacts. Principal sources of noise in thermal power plants include the turbine generators and auxiliaries; boilers and auxiliaries; reciprocating engines; fans and ductwork; pumps; compressors; condensers; piping and valves; motors; transformers; and cooling towers. Use of noise control techniques is normal practice, and GIIP techniques may include as appropriate: using acoustic machine enclosures; selecting structures according to their noise isolation effect to envelop the building; using mufflers or silencers in intake and exhaust channels; using sound-absorptive materials in walls and ceilings; using vibration isolators and flexible connections; and applying a carefully detailed design to prevent possible noise leakage through openings or to minimize pressure variations in piping. All of these measures can be considered in ensuring that the engines will be located within a power house that will be acoustically designed. Modification of the plant layout, or use of noise barriers such as berms and vegetation to limit ambient noise at plant property lines, especially where sensitive noise receptors may be present, is also a common noise attenuation measure. Noise levels from the facility must meet the requirements of Kenyan legislation on noise and ISO 15664:2001. Noise impacts shall not exceed the World Bank guideline levels or result in a maximum increase in background levels of 3 db(a) at the nearest

5 receptor off-site. The Proponent will ensure compliance with the requirements of Kenyan legislation on noise, specifically L.N. 25: The Factories and Other Places of Work (Noise Prevention and Control) Regulations, 2005 and L.N. 61: Environmental Management and Coordination (Noise and Vibration Pollution Control) Regulations, There will be minimal water requirements during the operational phase for drinking and sanitation. An on-site water tank will hold water for cooling and sufficient for fire-fighting purposes. A standalone fire protection system will be provided for the power plant with all of the requisite fire-fighting equipment in accordance with relevant local and international codes. Sewage and waste will be dealt with in accordance with local by-laws and other relevant Kenyan legislation. It is normal practice to store oily sludges from the fuel cleaning process and return them to either the fuel supplier or directly to a refinery for reprocessing into other usable products. The bulk liquid storage tanks will be bunded and provided with a closed system drain where the water will be treated prior to release. ACKNOWLEDGEMENTS The Bank wishes to acknowledge the generous agreement of Gulf Power Ltd. and Nutek Solutions to allow the Bank and Borrower to use their document not only as the ESIA for their project, but also as an innovative approach to development of an Environmental and Social Management Framework for the Bank s project.

ENVIRONMENTAL NOISE CONTROL FOR SEMICONDUCTOR MANUFACTURING FACILITIES

ENVIRONMENTAL NOISE CONTROL FOR SEMICONDUCTOR MANUFACTURING FACILITIES Presented at Inter-Noise 99 The 1999 Congress and Exposition on Noise Control Engineering December 8, 1999, Fort Lauderdale, Florida ENVIRONMENTAL NOISE CONTROL FOR SEMICONDUCTOR MANUFACTURING FACILITIES

More information

Applied Noise Control. D. W. Herrin, Ph.D., P.E. University of Kentucky Department of Mechanical Engineering

Applied Noise Control. D. W. Herrin, Ph.D., P.E. University of Kentucky Department of Mechanical Engineering D. W. Herrin, Ph.D., P.E. Department of Mechanical Engineering Outline of Topics 1. Introduction 2. Noise Control at Source 3. Noise Control of Transmission Path 4. Protection at Receiver 5. Summary 2

More information

9 October Town of Medway 155 Village Street Medway, MA Chair, Medway Board of Selectmen

9 October Town of Medway 155 Village Street Medway, MA Chair, Medway Board of Selectmen Town of Medway 155 Village Street Medway, MA 02053 Attention: Subject: John Foresto Chair, Medway Board of Selectmen Acoustical Consulting Services Application Review for Two 100 MWe Combustion Turbine

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

Your partner for the right solution

Your partner for the right solution Your partner for the right solution Project engineering of power stations Environment protection in energy sector Equipment supplying Supervision of installation of the equipment supplied Commissioning

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sectors Project ID Borrower Responsible Agency Report No. PID6537

More information

A proposed new gas-fired power station on the Wilton International site

A proposed new gas-fired power station on the Wilton International site TEES CCPP PROJECT A proposed new gas-fired power station on the Wilton International site Welcome This event is intended to provide you with information about the proposed Tees Combined Cycle Power Plant

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

Renewable energy: Investing in Africa

Renewable energy: Investing in Africa 1. Who is responsible for energy policy? 2. To what extent have generation, transmission and distribution activities been unbundled? 3. Who owns and operates the (grid-connected) generation, transmission

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Jul-2014

More information

Environmental and Social Review Summary. Kribi and Dibamba Operations

Environmental and Social Review Summary. Kribi and Dibamba Operations Environmental and Social Review Summary Kribi and Dibamba Operations This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed prior to the date on which MIGA s Board

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

NaturEner Wild Rose 1 Energy Inc.

NaturEner Wild Rose 1 Energy Inc. Decision 2013-348 Amendment to Wild Rose 1 Wind Power Plant September 13, 2013 The Alberta Utilities Commission Decision 2013-348: Amendment to Wild Rose 1 Wind Power Plant Application No. 1609685 Proceeding

More information

Cogeneration. Thermal Chillers. and. .. ASHRAE National Capital Chapter. Arlington, VA 10/10/2012

Cogeneration. Thermal Chillers. and. .. ASHRAE National Capital Chapter. Arlington, VA 10/10/2012 Cogeneration and Thermal Chillers.. ASHRAE National Capital Chapter. Arlington, VA 10/10/2012 Agenda Cogeneration Interest and Application Basics Equipment Matching Thermal Chiller Overview Steam Components

More information

NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING FOR BLUEWATER RIVER CROSSING REPLACEMENT PROJECT

NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING FOR BLUEWATER RIVER CROSSING REPLACEMENT PROJECT Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889 August 9, 2012 File: 160960699 NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING

More information

Noise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES

Noise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES Noise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES A bit about your speaker Presentation Overview 1. Some Case Studies 2. Mystery 3. Drama 4. Danger Environmental Noise Impact an Overview

More information

2. TECHNICAL DESCRIPTION OF THE PROJECT

2. TECHNICAL DESCRIPTION OF THE PROJECT 2. TECHNICAL DESCRIPTION OF THE PROJECT 2.1. What is a Combined Cycle Gas Turbine (CCGT) Plant? A CCGT power plant uses a cycle configuration of gas turbines, heat recovery steam generators (HRSGs) and

More information

Moduline. Acoustic Enclosure System. Rugged Noise Control Structures Using Acoustically Rated & Field Proven Demountable Components

Moduline. Acoustic Enclosure System. Rugged Noise Control Structures Using Acoustically Rated & Field Proven Demountable Components Moduline Acoustic Enclosure System Rugged Noise Control Structures Using Acoustically Rated & Field Proven Demountable Components Lab certified acoustic ratings Broad range of performance levels 63 Hz

More information

Acoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332

Acoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332 Pg 'P. Acoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332 Heidelberg i#i..wr. David, u.,0 Victoria 3054 Phone 0412 375 234 Email: acausteblgpond.corn ABN 49 095 932 092

More information

Advances in Dry Cooling Deployed at South African Power Stations

Advances in Dry Cooling Deployed at South African Power Stations Advances in Dry Cooling Deployed at South African Power Stations Steve Lennon Divisional Executive Eskom 2011 Summer Seminar August 1, 2011 Eskom s Move to Dry-Cooling Eskom historically utilized wet-cooled

More information

Appendix I Noise Impact Assessment

Appendix I Noise Impact Assessment Appendix I Noise Impact Assessment Genesee Generating Station Units 4 & 5 Project Noise Impact Assessment Project #: 123510975 Prepared for: Capital Power Corporation 1200 10423 101 St. N.W. Edmonton,

More information

SANY ASPHALT BATCHING PLANT

SANY ASPHALT BATCHING PLANT SANY ASPHALT BATCHING SANY Industry Town, Changsha Economic and Technological Development Zone, Hunan Province, China Service Line: +86 4006 098 318 E-mail: crd@sany.com.cn www.sanygroup.com Date: MAR

More information

Japanese ODA Loan. Ex-Ante evaluation

Japanese ODA Loan. Ex-Ante evaluation Japanese ODA Loan Ex-Ante evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Matarbari Ultra Super Critical Coal-Fired Power Project (I) Loan Agreement: June 16, 2014 Loan

More information

AN INTEGRATED VIRTUAL PIPELINE SYSTEM Proven Clean Energy Compression technology harmonized to deliver optimal return on investment.

AN INTEGRATED VIRTUAL PIPELINE SYSTEM Proven Clean Energy Compression technology harmonized to deliver optimal return on investment. OffgridCNG AN INTEGRATED VIRTUAL PIPELINE SYSTEM Proven Clean Energy Compression technology harmonized to deliver optimal return on investment. FULLFILL AND MAXOFFLOAD TECHNOLOGY Up to 10% more fuel being

More information

1.0. Introduction. Environmental Impact Assessment Prepared for Egnedol Wales Limited

1.0. Introduction. Environmental Impact Assessment Prepared for Egnedol Wales Limited 3 1.0 Introduction 4 1.0 Introduction 1.1 Overview 1.2 The Environmental Impact Assessment and the Environmental Statement 1.3 Environmental Permit 1.4 Availability of the Environmental Statement 04 07

More information

Noise Control. Commercial, Industrial, and Environmental Products and Solutions.

Noise Control. Commercial, Industrial, and Environmental Products and Solutions. Noise Control Commercial, Industrial, and Environmental Products and Solutions www.kineticsnoise.com Commercial Duct Silencers Kinetics Noise Control offers the design and engineering assistance to integrate

More information

A COMPLICATED PROJECT FOR POWER AND WATER CO- GENERATION: THE RAF SITE

A COMPLICATED PROJECT FOR POWER AND WATER CO- GENERATION: THE RAF SITE A COMPLICATED PROJECT FOR POWER AND WATER CO- GENERATION: THE RAF SITE Authors: Presenter: M. Garzoglio, L. Riccardo M. Garzoglio [Process Senior Eng. Fisia Italimpianti Italy] Abstract The Ras Abu Fontas

More information

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS To Wit: To see if the Town will vote to amend the Town of Westborough Zoning Bylaws, Article 2, District Regulations, Section 2300, Use Regulations Schedule; and to amend Article 4, Special Regulations

More information

DESIGN BASIS FOR AIR CONDITIONING AND VENTILATION SYSTEM FOR SUBSTATION AND CONTROL BUILDING HINDUSTAN PETROLEUM CORPORATION LTD.

DESIGN BASIS FOR AIR CONDITIONING AND VENTILATION SYSTEM FOR SUBSTATION AND CONTROL BUILDING HINDUSTAN PETROLEUM CORPORATION LTD. CONDITIONING AND VENTILATION FOR SUBSTATION AND CONTROL BUILDING HINDUSTAN PETROLEUM CORPORATION LTD. VISAKH REFINERY DHT PROJECT TEIL JOB NO.: 6261 DOCUMENT NO.: 6261-HVAC-PKG-300 TEIL SPECIFICATION NO.:---

More information

Emergency Engine and Turbine Requirements

Emergency Engine and Turbine Requirements 1.0 Purpose and Applicability 1.1 The purpose of these guidelines is to identify the processes and requirements that must be followed to ensure compliance with the Massachusetts Department of Environmental

More information

Indonesia - Lahendong II Geothermal Power Project (P096677) Environmental and Social Due Diligence

Indonesia - Lahendong II Geothermal Power Project (P096677) Environmental and Social Due Diligence Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Indonesia - Lahendong II Geothermal Power Project (P096677) and Social Due Diligence

More information

The H-25/H-15 Gas Turbine A Product of Hitachi Quality

The H-25/H-15 Gas Turbine A Product of Hitachi Quality DMLieferant www.dmliefer.ru The H-25/H-15 Gas Turbine A Product of Hitachi Quality The H-25 s fuel savings will repay your investment within a few years while allowing you a range of fuels from distillate

More information

GOLD STANDARD PASSPORT

GOLD STANDARD PASSPORT GOLD STANDARD PASSPORT CONTENTS A. Project title B. Project description C. Proof of project eligibility D. Unique Project Identification E. Outcome stakeholder consultation process F. Outcome sustainability

More information

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental

More information

West County Treatment Plant Noise and Odor Control Project Update. June 29, 2004

West County Treatment Plant Noise and Odor Control Project Update. June 29, 2004 West County Treatment Plant Noise and Odor Control Project Update June 29, 2004 West County Meeting Purpose 1. Brief history of odor and noise control project 2. Describe odor and noise control systems

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

NEC Acostix. Sound Attenuation Calculations and Design Software. General Information

NEC Acostix. Sound Attenuation Calculations and Design Software. General Information NEC Acostix Sound Attenuation Calculations and Design Software General Information NEC Acostix TM is an Excel-Based programmable sheets to help engineers and manufacturers design acoustic enclosures, rectangular

More information

PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017

PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017 PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017 Prepared by System Planning Department PJM 2017 Table of Contents Table of Contents

More information

Packaged AHR (Advanced Heat Recovery) Systems for Engines, Gas Turbines, & Industrial Waste Heat. Tom Pierson

Packaged AHR (Advanced Heat Recovery) Systems for Engines, Gas Turbines, & Industrial Waste Heat. Tom Pierson Packaged AHR (Advanced Heat Recovery) Systems for Engines, Gas Turbines, & Industrial Waste Heat Tom Pierson Last Field Erected CHP Project- Calpine Clear Lake, TX 1999 Evolution of Packaged Concept 500,000+

More information

Environmental Governance in Myanmar. U Than Aye Director Environmental Conservation Department

Environmental Governance in Myanmar. U Than Aye Director Environmental Conservation Department Environmental Governance in Myanmar U Than Aye Director Environmental Conservation Department 1 Strategy for Environmental Safeguards To work for Economic Development in Parallel with Environmental Conservation

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Environmental and social impacts of smallscale. Issues and Challenges. Glenn Morgan (LCSEN) World Bank Water Week February 18, 2009

Environmental and social impacts of smallscale. Issues and Challenges. Glenn Morgan (LCSEN) World Bank Water Week February 18, 2009 Environmental and social impacts of smallscale hydropower: Issues and Challenges Glenn Morgan (LCSEN) World Bank Water Week February 18, 2009 Presentation objectives Review the nature and scale of environmental

More information

Pengrowth Lindbergh SAGD Project

Pengrowth Lindbergh SAGD Project aci Acoustical Consultants Inc. 5031 210 Street Edmonton, Alberta, Canada T6M 0A8 Phone: (780) 414-6373, Fax: (780) 414-6376 www.aciacoustical.com Environmental Noise Impact Assessment For Pengrowth Lindbergh

More information

Questionnaire (Conventional Energy)

Questionnaire (Conventional Energy) Questionnaire (Conventional Energy) QUESTIONNAIRE FOR CONVENTIONAL ENERGY (SECTOR-RELATED QUESTIONS) The completion of this questionnaire is voluntary. However, replying to the relevant questions as completely

More information

Overview of cogeneration technology and application

Overview of cogeneration technology and application Overview of cogeneration technology and application Cogeneration Week Hanoi, 6 April 2004 Melia Hotel, Hanoi Leif Mortensen, Coal Expert Cogeneration or Combined Heat and Power (CHP) Sequential generation

More information

Environmental and Social Data Sheet

Environmental and Social Data Sheet Environmental and Social Data Sheet Overview Project Name: Project Number: 2013-0342 OUARZAZATE II (PARABOLIC) Country: MOROCCO Project Description: Construction and operation of a 200 MW CSP Parabolic

More information

High Bridge Combined Cycle Plant

High Bridge Combined Cycle Plant High Bridge Combined Cycle Plant Location: Down town St. Paul, on the Mississippi River Plant Description: High Bridge is a combined cycle generating facility. A combined cycle plant produces electricity

More information

Power Plant Near-Field Noise Considerations

Power Plant Near-Field Noise Considerations Power Plant Near-Field Noise Considerations Authored by: Charles Powers Program Manager Environmental and Acoustic Engineering GE Energy Andrew Dicke Senior Acoustic Engineer Environmental and Acoustic

More information

Noise Impact Assessment

Noise Impact Assessment APPENDIX C Noise Impact Assessment CBCL Limited Appendices NOISE IMPACT ASSESSMENT PUGWASH WIND FARM, NOVA SCOTIA Client Pugwash Wind Farm Inc. Contact Charles Demond Document No Issue B Status Classification

More information

Request for Quotations Acoustic Consultant Services

Request for Quotations Acoustic Consultant Services Request for Quotations Acoustic Consultant Services DESCRIPTION The Cape Cod Commission is seeking an experienced, qualified acoustic consultant to assist the Commission in developing a methodology for

More information

Barilla Cogeneration Power Plant main tips

Barilla Cogeneration Power Plant main tips main tips Client Location Total contract Scope of work Fenice SpA Contract value 13.3 M$ Contract period 2007-2010 The Plant has been built within the premises of the Barilla factory in Parma (IT), at

More information

Combined Cooling, Heating and Power (CCHP) in Distributed Generation (DG)

Combined Cooling, Heating and Power (CCHP) in Distributed Generation (DG) Combined Cooling, Heating and Power (CCHP) in Distributed Generation (DG) Ruhai Hao Department of Electrical Engineering Michigan Technological University EE5250 Term Project April 21, 2006 Introduction

More information

Syllabus Cogeneration: Definition, Need, Application, Advantages, Classification, Saving potentials

Syllabus Cogeneration: Definition, Need, Application, Advantages, Classification, Saving potentials 7. COGENERATION Syllabus Cogeneration: Definition, Need, Application, Advantages, Classification, Saving potentials 7.1 Need for cogeneration Thermal power plants are a major source of electricity supply

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/29/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

Post Combustion CO 2 Capture Scale Up Study

Post Combustion CO 2 Capture Scale Up Study Post Combustion CO 2 Capture Scale Up Study Prachi Singh and Mike Haines International Greenhouse Gas R&D programme 6 th International Conference on Clean Coal Technologies (CCT 2013) 12-16 th May 2013

More information

Geothermal Power Plant

Geothermal Power Plant Geothermal Power Plant Star Energy Geothermal (Wayang Windu) Ltd., Indonesia Wayang Windu Geothermal Power Plant 1 110MW and 1 117MW 01A3-E-0020 14 Outline Wayang Windu Geothermal Power Plant is located

More information

5.2 MW Solar Mobile Power Unit

5.2 MW Solar Mobile Power Unit 5.2 MW Solar Mobile Power Unit Ventilation air intake Ventilation air exhaust Air inlet & silencer Exhaust Silencer Power Control Room & Trailer -13.8 KV switchgear -CO2 fire system -480 VAC MCCC for turbine

More information

NOTE: Some guidance on a performance approach to natural ventilation systems design is provided in the Supplement to this Standard.

NOTE: Some guidance on a performance approach to natural ventilation systems design is provided in the Supplement to this Standard. 19 SECTION 3 NATURAL VENTILATION 3.1 SCOPE OF SECTION This Section specifies the means of achieving the quantity of outdoor air required in a naturally ventilated enclosure. The provisions described include

More information

INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati

INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati Introduction Indonesian power sector is one of the business sectors in Indonesia which is strictly regulated. For the

More information

Welcome to our Open House!

Welcome to our Open House! Welcome to our Open House! Please sign in at the front desk and provide your contact information if you would like to receive project updates. We invite you to walk around and look at the displays. If

More information

ADVANCED PUMP TECHNOLOGY.

ADVANCED PUMP TECHNOLOGY. FAIRBANKS NIJHUIS ADVANCED PUMP TECHNOLOGY www.fairbanksnijhuis.com A worldwide service organization Downtime is Money Our service department offers financially attractive service and maintenance contracts

More information

Pratt & Whitney. Power Systems MOBILEPAC. Gas Turbine Package. It s in our power.

Pratt & Whitney. Power Systems MOBILEPAC. Gas Turbine Package. It s in our power. Power Systems Pratt & Whitney Power Systems MOBILEPAC Gas Turbine Package TM It s in our power. Pratt & Whitney FT8 MOBILEPAC Gas Turbine Package The MOBILEPAC gas turbine package requires the smallest

More information

Steam Power Station (Thermal Station)

Steam Power Station (Thermal Station) Steam Power Station (Thermal Station) A generating station which converts heat energy into electrical energy through turning water into heated steam is known as a steam power station. A steam power station

More information

Controlling noise on offshore installation during design and commissioning West Elara case

Controlling noise on offshore installation during design and commissioning West Elara case Controlling noise on offshore installation during design and commissioning West Elara case Philippe Loustau engineering manager October 18, 2012 Offshore noise control What are the challenges for offshore

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

SUNDANCE 7 January 2014

SUNDANCE 7 January 2014 Artist rendering of a combined-cycle natural gas power plant. SUNDANCE 7 January 2014 Project Information Booklet Table of Contents Introduction to Sundance 7 1 TransAlta and MidAmerican 1 Project location

More information

Blackstone: flexible and environmentally friendly power plant

Blackstone: flexible and environmentally friendly power plant May-June 2002 Turbomachinery Blackstone: flexible and environmentally friendly power plant INTERNATIONAL Two single shaft combined cycle blocks - each with centrally-mounted generator and SSS Clutch Blackstone:

More information

Guangdong Provincial Green Freight Demonstration Project by Grant of GEF

Guangdong Provincial Green Freight Demonstration Project by Grant of GEF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Grant Project of Global Environment Facility (GEF) Guangdong Provincial Green Freight

More information

AUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS. Steag Energy Training Center EEC WORKSHOP to

AUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS. Steag Energy Training Center EEC WORKSHOP to AUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS Steag Energy Training Center EEC WORKSHOP-25.09.2013 to 27.09.2013 Heat Input into a Large Coal Fueled Power Plant- Sub Critical design. 3% Stack Clean-up

More information

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management WESTINGHOUSE PLASMA GASIFICATION Hazardous Waste Management Hazardous waste is just that hazardous. Medical, industrial and petrochemical wastes are all types of hazardous waste and pose threats to human

More information

Hitachi H-25 & H-80 Gas Turbine. Bucharest, Apr.23, 2013

Hitachi H-25 & H-80 Gas Turbine. Bucharest, Apr.23, 2013 Hitachi H-25 & H-80 Gas Turbine Bucharest, Apr.23, 2013 Doc No. : GKKP-13-009 Rev.0 Hitachi, Ltd. 2013. All rights reserved. 1 Table of Contents Hitachi Gas Turbine Business H-25 Performance and Applications

More information

T U R B O B L O W E R S

T U R B O B L O W E R S A e r z e n T U R B O B L O W E R S New Aerzen Turbo Blower Units Volume Flow Intakes from 1,000 m³/h to 13,200 m³/h A E R Z E N E R M A S C H I N E N F A B R I K G M B H GODREJ & Boyce Mfg. Co. Ltd. -

More information

Kawasaki Gas Turbines-Americas Gas Turbines Power Generation Technology & Applications

Kawasaki Gas Turbines-Americas Gas Turbines Power Generation Technology & Applications Kawasaki Gas Turbines-Americas Gas Turbines Power Generation Technology & Applications Gas Turbine (GT) Technology Overview Gas Turbine Theory GT - Centrifugal Compressor FUEL INLET COMBUSTION CHAMBER

More information

Summary of Environmental Impacts associated with the Vlore Thermal Power Station

Summary of Environmental Impacts associated with the Vlore Thermal Power Station Summary of Environmental Impacts associated with the Vlore Thermal Power Station 0. Background The European Bank for Reconstruction and Development (EBRD) has been requested by Korporata Elektroenergjetike

More information

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes MINISTRY OF ENVIRONMENT AND NDU ENVIRONMENTAL GUIDELINE No. 31 Asphalt Plant Set Up Temporarily For The Purposes Of A Project By A Public Department 1.0 Purpose of guideline This environmental guideline

More information

COOLING TOWER DESIGN FOR CENTRAL GENERATORS OF CUET, BANGLADESH. Mohammad Sharif Khan, Golam Mainuddin, Abu Sadat Mohammad Sayem, Nadeem Nafis

COOLING TOWER DESIGN FOR CENTRAL GENERATORS OF CUET, BANGLADESH. Mohammad Sharif Khan, Golam Mainuddin, Abu Sadat Mohammad Sayem, Nadeem Nafis Proceedings of the 4 th BSME-ASME International Conference on Thermal Engineering 7-9 December, 008, Dhaka, Bangladesh COOLING TOWER DESIGN FOR CENTRAL GENERATORS OF CUET, BANGLADESH. Mohammad Sharif Khan,

More information

Addition to Section 4 - Special Use Regulations

Addition to Section 4 - Special Use Regulations Large-Scale Ground-Mounted Solar Photovoltaic Installations Addition to Section 4 - Special Use Regulations 4.4 Large Scale Ground-Mounted Solar Photovoltaic Installations 4.4.1 Purpose The purpose of

More information

The rezoning application and proposed transportation facility warrants consideration.

The rezoning application and proposed transportation facility warrants consideration. Date: November 11, 2014 To: Re: Chair and Members Planning & Development Committee PDE File Number: REZ1400020 275 Conception Bay South Bypass Road, Ward 5 Application to Rezone Land to Industrial General

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.:51272 Project Name CBF Sidi

More information

Chapter 2.7: Cogeneration

Chapter 2.7: Cogeneration Chapter 2.7: Cogeneration Part-I: Objective type questions and answers 1. In cogeneration, the system efficiencies can go up to ------ a) 70% b) 80% c) 90% d) 60% 2. Cogeneration is the simultaneous generation

More information

SIPAPER Reject Power. Environmental Product Declaration. Pulp and Paper Technologies

SIPAPER Reject Power. Environmental Product Declaration. Pulp and Paper Technologies SIPAPER Reject Power Environmental Product Declaration Pulp and Paper Technologies Environmental mission statement Design for environment Our knowledge and our solutions are helping to create a better

More information

Noise Control Solutions For Power Generation, Oil and Gas Applications

Noise Control Solutions For Power Generation, Oil and Gas Applications Noise Control Solutions For Power Generation, Oil and Gas Applications Power Generation Solutions IAC Acoustics, your leading partner in providing noise control solutions for the power generation, oil

More information

7. Electrical Facility Ratings

7. Electrical Facility Ratings 7. Electrical Facility Ratings 7.1 Accredited Net Generating Capacity This Section shall be used to determine the annual and seasonal accredited net generating capacity of generators in calculating the

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Content. Cooling Tower Water Treatment...1. Maintaining Water Quality...1. Startup Conditions...1. Blowdown...1. Chemical Treatment...

Content. Cooling Tower Water Treatment...1. Maintaining Water Quality...1. Startup Conditions...1. Blowdown...1. Chemical Treatment... Content Cooling Tower Water Treatment...1 Maintaining Water Quality...1 Startup Conditions...1 Blowdown...1 Chemical Treatment...2 Cooling Tower Water Filtration...4 Layout Guidelines...5 Introduction...5

More information

Dyno Test Rooms Professional Chassis, Engine & Specialty Test Rooms for the PowerSports & Product Testing Market

Dyno Test Rooms Professional Chassis, Engine & Specialty Test Rooms for the PowerSports & Product Testing Market INC s Professional Chassis, Engine & Specialty Test Rooms for the PowerSports & Product Testing Market Proven performance Contains noise and removes exhaust Rugged modular steel panel construction Safe

More information

Equipment Design. Detailed Plant Conceptual Design. Version 9.0

Equipment Design.  Detailed Plant Conceptual Design. Version 9.0 Equipment Design Version 9.0 Detailed Plant Conceptual Design SOAPP CT sizes all major plant equipment, based on your Project Input, the process configuration derived from this input, and the results of

More information

VTU Energy concentrates on consultancy and software systems for the power and energy-intensive process industries.

VTU Energy concentrates on consultancy and software systems for the power and energy-intensive process industries. VTU Energy is part of the VTU Group with headquarters in Grambach, Austria. VTU is the abbreviation for the German words Verfahren (process) Technologie (technology) Umwelt (environment) which actually

More information

GE Energy H SYSTEM WORLD S MOST ADVANCED COMBINED CYCLE TECHNOLOGY

GE Energy H SYSTEM WORLD S MOST ADVANCED COMBINED CYCLE TECHNOLOGY GE Energy H SYSTEM WORLD S MOST ADVANCED COMBINED CYCLE TECHNOLOGY World s Most Advanced Combined Cycle Gas Turbine Technology GE s H System the world s most advanced combined cycle system and the first

More information

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN (EXECUTIVE SESSION) November, 2007 JAPAN EXTERNAL TRADE ORGANIZATION JAPAN CONSULTING INSTITUTE SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN 1. Power Generation

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

Environmental Conditions Laboratories (for commercial use) Group

Environmental Conditions Laboratories (for commercial use) Group GBR No. 20 Environmental Conditions Laboratories (for commercial use) Group ERA regulates the environmental impact of enterprises through two key mechanisms. Smaller scale activities are regulated through

More information

KEPCO KEPRI Kim eui hwan

KEPCO KEPRI Kim eui hwan 2015 KEPIC PERFORMANCE TEST SEMINAR New Start! Open Soft Speed AGAIN KEPCO! 2015. 9. 22 KEPCO KEPRI Kim eui hwan 1 2 3 test Steam turbine test 2/42 3/42 Thermal analysis of Power Plant Cycle Grasp of the

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

Building & Ductwork Airtightness Standards

Building & Ductwork Airtightness Standards Building & Ductwork Airtightness Standards Version 1.02, August 2013 Standard Reference Technical Body Title ICS (International Classification for Standards) Scope Door and Windows EN 12207:1999 Windows

More information

ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND

ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND APPROVAL FOR THE CONSTRUCTION AND MAINTENANCE OF WIND ENERGY

More information

VFDs driving the boiler feed water pump of #11-13 Combined Cycled Generation Unit in Yangpu Thermal Power Plant by Bin Li

VFDs driving the boiler feed water pump of #11-13 Combined Cycled Generation Unit in Yangpu Thermal Power Plant by Bin Li VFDs driving the boiler feed water pump of #11-13 Combined Cycled Generation Unit in Yangpu Thermal Power Plant by Bin Li Brief introduction to Author: Li Bin, born in 1969, graduated from Beihang University

More information

TransPacific Energy Advantage: Case Studies

TransPacific Energy Advantage: Case Studies TransPacific Energy Advantage: Case Studies Typical Power Plant TPE-ORC 0.60 KWh ORC 2.3 KWh LP steam 0.35 KWh 30% (maximum) 2.05 KWh CHP Typical Power Generated 1.1 KWh Typical Power Wasted 2.31 KWh Typical

More information