1 Session 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile Michael Coddington National Renewable Energy Laboratory Golden, Colorado, U.S.A.

2 DISCLAIMER ISGAN is an initiative of the Clean Energy Ministerial (CEM). It is formally organized as the Implementing Agreement for a Co-operative Programme on Smart Grids (ISGAN), operating under a framework of the International Energy Agency (IEA). The views, findings and opinions expressed herein do not necessarily state or reflect those of any of ISGAN s participants, any of their sponsoring governments or organizations, the CEM, the IEA Secretariat, or any of the IEA s member countries. No warranty is expressed or implied, no legal liability or responsibility is assumed for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, and no representation is made that its use would not infringe privately-owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring.

3 Case Study #1 5.2 MVA Located at Colorado State University (Fort Collins, CO, USA) 5.2 MW DC PV System 6.6 miles from substation Installed in 2 phases (2 MW MW) Capacity penetration - 57% (Σ DG / Peak Load)

4 Case Study #1 5.2 MVA Peak Load on Circuit 9.1 MVA Circuit Voltage 13,200 Volts

5 Details of PV System and Customer Large Conductors serving Colorado State University West Research Campus Two sets of voltage regulators on circuit and LTC at substation Voltage at campus requested to be ± 1% (per unit) The following steps are to be followed, sequentially, if there are voltage problems (next slide)

6 Planned Steps if Problems Occured 1. Adjust the voltage regulators to stabilize the voltage levels, and if necessary; 2. The inverters (10 total) will be configured to absorb 100 kvar each to reduce voltage rise, and if necessary; 3. The inverter configurations will be changed so they will absorb 150 kvar each, and if necessary; 4. Request that PV system operator disconnect part or all of the PV system and install a power factor controller or static VAR compensator (SVC)

7 WHY SMART GRIDS?

8 Staggered Start for Inverters Required Inverter No. Start-up time Inverter Size sec. 500kW sec. 500kW sec. 500kW sec. 500kW sec. 500kW sec. 500kW sec. 500kW sec. 500kW sec. 500kW sec. 500kW

9 Feeder Load Profile with PV Can you see the Duck Curve shape?

10 Common PV Penetration Metrics Capacity Penetration* Total PV System MW Peak Load MW Energy Penetration Total DG kwh Total kwh Penetration Screen Fails at 100% MDL or 15% peak load (depending on rules) * This is how Penetration is calculated in Technical Screens

11 Observations This large PV system behaved well on a typical distribution circuit This distribution feeder circuit is very stiff and has excellent capacity for absorbing DG of this size While this PV system required no system upgrades, most of this size would likely require system modifications

12 Case Study #2 20 kw Residential PV

13 Typical Voltage Drop for Utility Loads

14 Case Study #2 One-Line Diagram

15 Very High Voltage behind Transformer Volts +9.5%

16 Case Study #2 20 kw Residential PV Voltage rises with minimal local load The ANSI C84.1 (Range A) upper limit is violated at the PV system, and worst violation at the micro-inverters farthest from the service disconnect This facility experienced Volts at the utility meter and 131 Volts at the PV array (ANSI Range A upper limit 126 Volts) Local load will affect voltage levels significantly This residential system exports power during the day, which is when most residents are out or using little power. The exported power causes voltage problems locally

17 Case Study #2 20 kw Residential PV Steady-state voltage can be out of acceptable ANSI C84.1 range A (or B) with even with a small residential PV system This PV system, if only one of a few small PV systems on this feeder, means capacity penetration was <1%, yet there are localized voltage problems. In reality, this system should have failed a review and required mitigation! No other utility customers were negatively impacted by this high voltage example Would you have known there might be a problem with this interconnection application?

18 Case Study #3 10 MVA Solar PV Carlsbad, New Mexico, US

19 Case Study #3 10 MVA Solar PV Carlsbad, New Mexico, US Located near Carlsbad, New Mexico 10 MW DC PV System - 3/4 Mile from Substation Capacity Penetration of Approximately 100% based on peak annual load Minimum daytime load on feeder 3.87 MVA (Capacity Penetration ~300%)

20 Case Study #3 10 MVA Solar PV Carlsbad, New Mexico, US Interconnection with Xcel Energy Distribution voltage kv Hopi Substation transformer bank size 16.8 MVA Peak Load on feeder 10 MVA Minimum Daytime Load on feeder 3.87 MVA Circuit conductor ¾ mile 336 ACSR from PV system to substation

21 Case Study #3 Detailed Impact Studies SynerGEE modeling program utilized for Detailed Impact Studies The following issues were focused on during detailed impact study phase Fault current contribution Protection coordination Voltage profiling studies

22 Case Study #3 Mitigation Strategies 1. ¾ mile of 336 ACSR feeder conductors installed 2. Additional line protection added to address desensitized relaying 3. Voltage supervised reclosing was added to the substation breakers to address potential problems with PV system size 4. PV owner was required to regulate their output power factor to a fixed value to address possible voltage issues. 5. Additionally the PV owner was required to energize the inverters incrementally in order to avoid large voltage steps.

23 Case Study #3 Conclusions Detailed Impact Studies were required to interconnect this very large PV system This PV systems exports power to the substation, and back through the substation transformer Load Tap Changer (LTC) Large conductors, short distance to substation were key to the success of this system Mitigation strategies were required The PV system and the utility feeder and substation have operated properly since PV system installation

24 PV System Size Important Considerations for Siting Locations Distance from Substation (MW-Ω) System Impedance at PV location Distribution Circuit/Substation Design (conductor sizes, regulators, LTCs, etc.) Voltage Regulators & Capacitors Exporting vs. Non-Exporting PV systems Proximity to Other Loads on Circuit Types of Utility Customers on Circuit

25 Case Study #4 Colorado Convention Center Denver, CO, USA Facility Name: Colorado Convention Center Owner: City and County of Denver Secondary Network Type: Spot PV System Size: 300 kw p DC Type of Interconnection Minimum Facility Load greater than PV System Reverse Power Relay Dynamically Controlled Inverters Utility Company: Xcel Energy (PSCo)

26 Case Study #4 Colorado Convention Center Denver, CO, USA

27 Case Study #4 Colorado Convention Center Denver, CO, USA

28 Network System Integration Approaches Maintain minimum load (MML) Reverse power relays (RPR) Minimum import relays (MIR) Dynamically controlled inverters (DCI)

29 Maintain Minimum Load Approach Study of historical load data generally supplied by utility (interval recorder data) Evaluate minimum demand during peak PV generation hours (10 AM 2 PM) Interval data estimates demand based on energy usage over 15 minutes (typical) Is an indicator that PV system will be sized smaller than minimum daytime load

30 Reverse Power Relay Approach Opens circuit breaker tied to PV system if power flows toward utility network Technology is well-known by utility protection engineers Advantages Fairly inexpensive, fast, reliable Disadvantages Manual reset, all-or-nothing

31 Minimum Import Relay Approach Opens circuit breaker tied to PV system if power into facility drops below threshold (e.g. 25kVA) Similar to reverse power relay utility engineers are familiar with technology Advantages Inexpensive, fast, reliable Better than RPR for network reliability Disadvantages Manual reset, all-or-nothing

32 Dynamically Controlled Inverter Approach Reduces PV output by % based on actual load of facility (e.g. 25kVA) CTs tie to bus near utility metering Features Very fast response Programmable No resetting of breakers necessary Some loss of energy if activated Inexpensive (~$5k) May not be available on all inverters

33 DCI (Smart Inverter) Results

34 Case Study #4 Colorado Convention Center Denver, CO, USA NREL Technical Report NREL/TP

35 Gracias

The Effect of the Volt/Var Control of Photovoltaic Systems on the Time-Series Steady-State Analysis of a Distribution Network

The Effect of the Volt/Var Control of Photovoltaic Systems on the Time-Series Steady-State Analysis of a Distribution Network The Effect of the Volt/Var Control of Photovoltaic Systems on the Time-Series Steady-State Analysis of a Distribution Network Insu Kim, Ronald G. Harley, and Raeey Regassa Georgia Institute of Technology,

More information

Integration issues and simulation challenges of high penetration PV

Integration issues and simulation challenges of high penetration PV Integration issues and simulation challenges of high penetration PV March 6, 2014 EnerNex Capabilities Power Systems Modeling Transient Analysis Our preferred tools: EMTP RV, PSCAD Steady State & Quasi

More information

Grid Interconnection Issues for Wind Generation

Grid Interconnection Issues for Wind Generation Grid Interconnection Issues for Wind Generation NRECA APPA - DOE Teleconference December 8, 2005 By Thomas A. Wind, PE Wind Utility Consulting Jefferson, Iowa Topics I Will Cover What are the key technical

More information

Technical Requirements for Distributed Generation Connection

Technical Requirements for Distributed Generation Connection Technical Requirements for Distributed Generation Connection Distributed Generation Connection Requirements SECTION 1: INTRODUCTION 1.1 General Purpose This document defines the requirements for connecting

More information

DISTRIBUTION SYSTEM PLANNING TUTORIAL. MN Power Systems Conference November 6, 2014

DISTRIBUTION SYSTEM PLANNING TUTORIAL. MN Power Systems Conference November 6, 2014 DISTRIBUTION SYSTEM PLANNING TUTORIAL MN Power Systems Conference November 6, 2014 CONNEXUS ENERGY 128,000 customers 1,000 sq. miles territory 44 substations 8,800 miles distribution 12.47 kv Wholesale

More information

GRID CODE COMPLIANCE TESTING OF RENEWABLES NEW REQUIREMENTS AND TESTING EXPERIENCES

GRID CODE COMPLIANCE TESTING OF RENEWABLES NEW REQUIREMENTS AND TESTING EXPERIENCES GRID CODE COMPLIANCE TESTING OF RENEWABLES NEW REQUIREMENTS AND TESTING EXPERIENCES Nils Schäfer, Dr. Gunter Arnold, Wolfram Heckmann Fraunhofer Institute for Wind Energy and Energy System Technology Kassel,

More information

Slide 1. ABB August 23, 2016

Slide 1. ABB August 23, 2016 Claudio Facchin, President Power Grids division, ABB Cigré Keynote Address, Paris, August 21, 2016 Big shift in power Shaping power systems of the future Slide 1 Big shift in power Global challenges Population

More information

CERTS Microgrids. Tom Jahns Professor, University of Wisconsin-Madison. LPPC Rates Roundtable May 21, 2013

CERTS Microgrids. Tom Jahns Professor, University of Wisconsin-Madison. LPPC Rates Roundtable May 21, 2013 CERTS Microgrids Tom Jahns Professor, University of Wisconsin-Madison LPPC Rates Roundtable May 21, 2013 Wisconsin Energy Institute WEI WEI provides linkage among all organizations associated with energy

More information

NEW JERSEY BOARD OF PUBLIC UTILITIES N.J.A.C. 14:4-9 Net Metering and Interconnection Standards for Class I Renewable Energy Systems

NEW JERSEY BOARD OF PUBLIC UTILITIES N.J.A.C. 14:4-9 Net Metering and Interconnection Standards for Class I Renewable Energy Systems NEW JERSEY BOARD OF PUBLIC UTILITIES N.J.A.C. 14:4-9 Net Metering and Interconnection Standards for Class I Renewable Energy Systems SUBCHAPTER 9 NET METERING AND INTERCONNECTION STANDARDS FOR CLASS I

More information

EE 741. Load Characteristics

EE 741. Load Characteristics EE 741 Load Characteristics Overview Some definitions Relation between load and loss factors Load models Load management Rate structure Metering Load forecasting Definitions Demand curve, maximum demand,

More information

Electrification and its Implications for the California Electricity System

Electrification and its Implications for the California Electricity System Electrification and its Implications for the California Electricity System Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy EPRI-IEA Workshop: Challenges in Electricity Decarbonization

More information

SCE Distributed Energy Resource Interconnection Map (DERiM)

SCE Distributed Energy Resource Interconnection Map (DERiM) SCE Distributed Energy Resource Interconnection Map (DERiM) s Southern California Edison s Distributed Energy Resource Interconnection Map aims to connect developers with the SCE system data needed to

More information

Smart Grid Concept, Applications and Lessons Learned from Recent Deployments

Smart Grid Concept, Applications and Lessons Learned from Recent Deployments GE Energy POWERING POTENTIA L Smart Grid Concept, Applications and Lessons Learned from Recent Deployments Gagan KAKKAR General Manager India Region GE Energy What is Smart Grid P O W E R I N G P O T E

More information

2017 NEC Changes for Renewable Energy Systems Session one by Christopher LaForge

2017 NEC Changes for Renewable Energy Systems Session one by Christopher LaForge 2017 NEC Changes for Renewable Energy Systems Session one 2017 by Christopher LaForge Christopher LaForge IREC Certified Master Trainer NABCEP Certified Photovoltaic Installation Professional 30 years

More information

Integrated Volt/VAR Control

Integrated Volt/VAR Control Yukon energy automation software platform Integrated Volt/VAR Control For more efficient, higher quality and less costly power Integrated Volt/VAR Control enables smart grid power quality strategies 2

More information

DEMONSTRATIVE PROJECT ON GRID-INTERCONNECTION INTERCONNECTION OF CLUSTERED PHOTOVOLTAIC POWER GENERATION SYSTEMS

DEMONSTRATIVE PROJECT ON GRID-INTERCONNECTION INTERCONNECTION OF CLUSTERED PHOTOVOLTAIC POWER GENERATION SYSTEMS DEMONSTRATIVE PROJECT ON GRID-INTERCONNECTION INTERCONNECTION OF CLUSTERED PHOTOVOLTAIC POWER GENERATION SYSTEMS New Energy and Industrial Technology Development Organization (NEDO) Demonstrative Test

More information

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

Western Wind & Solar Integration Studies

Western Wind & Solar Integration Studies Western Wind & Solar Integration Studies Kara Clark, Greg Brinkman, NREL Nick Miller, Miaolei Shao, Slobodan Pajic, Rob D Aquila, Bruno Leonardi, GE 3/22/17 NREL is a national laboratory of the U.S. Department

More information

Managing the Distributed Solar Fleet: From Interconnection to Fleet Operations

Managing the Distributed Solar Fleet: From Interconnection to Fleet Operations Managing the Distributed Solar Fleet: From Interconnection to Fleet Operations Solar Power International 2013 Copyright 2013 Clean Power Research, L.L.C v040313 Today s Presenters Becky Campbell Senior

More information

ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES

ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES 2016 Commercial and Residential Solar Programs Kickoff Meeting November 11-12, 2015 Ken Brunkenhoefer Oncor Asset Planning OVERVIEW

More information

8 th Annual Electric Power Industry Conference

8 th Annual Electric Power Industry Conference 8 th Annual Electric Power Industry Conference STATCOM Application to Address Grid Stability and Reliability: Part I November 11 th, 2013 Authors: Donald Shoup, P.E. and Dr. Gregory Reed Support: Nick

More information

Standard TPL Transmission System Planning Performance Requirements

Standard TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

Modeling and Operation Analysis of Meshed Distribution Systems with Distributed Generation

Modeling and Operation Analysis of Meshed Distribution Systems with Distributed Generation Modeling and Operation Analysis of Meshed Distribution Systems with Distributed Generation WEN-CHIH YANG Department of Electrical Engineering Technology and Science Institute of Northern Taiwan No.2, Syueyuan

More information

Attachment B. [Note: The following new definitions inserted after the definition of Regulations ]

Attachment B. [Note: The following new definitions inserted after the definition of Regulations ] Attachment B Comparison Version of the Final Amendments to the Distribution System Code Relative to the Distribution System Code Prior to the Adoption of the Final Amendments (for information purposes

More information

A*STAR Funded IEDS Project - Microgrid Energy Management System. by H B GOOI

A*STAR Funded IEDS Project - Microgrid Energy Management System. by H B GOOI A*STAR Funded IEDS Project - Microgrid Energy Management System by H B GOOI 4 Aug 2009 Outline Introduction - Distributed Generators and Microgrids Proposed Microgrid Energy Management System (MEMS) MEMS

More information

Investigation of Impacts of Solar PV on Transmission System Voltage Stability Considering Load Characteristics and Protection

Investigation of Impacts of Solar PV on Transmission System Voltage Stability Considering Load Characteristics and Protection 7th Solar Integration Workshop, 24-25 October 2017, Berlin, Germany Investigation of Impacts of Solar PV on Transmission System Voltage Stability Considering Load Characteristics and Protection Baheej

More information

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form)

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form) SMALL GENERATOR INTERCONNECTION REQUEST (Application Form) Attachment 2 Transmission Provider: Bluestem Electric Cooperative, Inc. Designated Contact Person: Kevin Heptig Address: P.O. Box 5, Wamego, Kansas

More information

Gas Natural Fenosa s Experiences on Renewable Energy Integration

Gas Natural Fenosa s Experiences on Renewable Energy Integration Gas Natural Fenosa s Experiences on Renewable Energy Integration Julio Gonzalo García Asset Management 17 th October 2013 Outline 1.About us 2.Spanish Regulation 3.R+D projects 4.Conclusions 2 About us

More information

Business Impact of Using the Remote Disconnect Switch October, 2013

Business Impact of Using the Remote Disconnect Switch October, 2013 Business Impact of Using the Remote Disconnect Switch October, 2013 Agenda Introduction Advanced Metering System Use of the Remote Switch Benefits What s Next? 2 CenterPoint Energy (CNP) Headquartered

More information

Reference: Photovoltaic Systems, p. 229

Reference: Photovoltaic Systems, p. 229 Sizing is the basis for PV system designs, and determines the ratings for the PV array and other major components needed to produce and deliver a certain amount of energy. Different principles apply to

More information

Active Distribution Networks

Active Distribution Networks Active Distribution Networks Nikos Hatziargyriou nh@power.ece.ntua.gr NTUA, Greece Distributed Generation Technologies Examples Advanced Turbines Reciprocating Engines Fuel Cells Photovoltaics Wind Thermally

More information

Conservation Voltage Reduction: What Are the Savings?

Conservation Voltage Reduction: What Are the Savings? Conservation Voltage Reduction: What Are the Savings? Frank Stern, Navigant Consulting, Inc., Boulder, CO Nicholas DeDominicis, PECO Energy Company, Philadelphia, PA 1 ABSTRACT PECO Energy Company is conducting

More information

Virtual Power Plant Simulation

Virtual Power Plant Simulation AEP/EPRI Smart Grid Demo Virtual Power Plant Simulation Project Overview Smart Grid Advisory Meeting June 23, 2009 Tom Jones / Tom Walker Virtual Power Plant Simulation Project Virtual Power Plant (VPP)

More information

Innovation & Grid Modernization at ComEd. Laura García García Grid Strategy & Analytics Commonwealth Edison

Innovation & Grid Modernization at ComEd. Laura García García Grid Strategy & Analytics Commonwealth Edison Innovation & Grid Modernization at ComEd Laura García García Grid Strategy & Analytics Commonwealth Edison ComEd, An Exelon Company 2 Our Customers: 4 million electric customers in northern Illinois, including

More information

SMALL GENERATION SYSTEM APPLICATION (10 kw OR LESS)

SMALL GENERATION SYSTEM APPLICATION (10 kw OR LESS) SMALL GENERATION SYSTEM APPLICATION (10 kw OR LESS) This application, terms, and conditions, and Interconnection Agreement is for Xcel Energy customers requesting the installation of a small generation

More information

International ejournals

International ejournals ISSN 2249 5460 Available online at www.internationalejournals.com International ejournals International Journal of Mathematical Sciences, Technology and Humanities 21 (2011) 205 212 ENERGY CONTROL CENTER

More information

Renewables Integration and Smart Grid

Renewables Integration and Smart Grid Renewables Integration and Smart Grid Cary N. Bloyd, Ph.D. Senior Staff Scientist Electricity Infrastructure & Buildings Division Pacific Northwest National Laboratory Richland, Washington, USA APERC Annual

More information

Public Utility District Number 1 of Snohomish County

Public Utility District Number 1 of Snohomish County Public Utility District Number 1 of Snohomish County Facility Connection Requirements September 29, 2011 1 Revision History: Number Date Description Original Sept. 29, 2011 Document Origination Compilation

More information

Standard PRC-002-NPCC-01 Disturbance Monitoring

Standard PRC-002-NPCC-01 Disturbance Monitoring A. Introduction 1. Title: Disturbance Monitoring 2. Number: PRC-002-NPCC-01 3. Purpose: Ensure that adequate disturbance data is available to facilitate Bulk Electric System event analyses. All references

More information

Fringe-of-Grid PV Projects - Normanton Solar Farm

Fringe-of-Grid PV Projects - Normanton Solar Farm Fringe-of-Grid PV Projects - Normanton Solar Farm All-Energy Conference 2016 October 5, 2016 Josh Currah Project Manager, Energy Business www.canadiansolar.com Safe Harbor Statement This presentation has

More information

Integrated Capacity Analysis Working Group - Long Term Refinement Topics Scoping Document

Integrated Capacity Analysis Working Group - Long Term Refinement Topics Scoping Document Integrated Capacity Analysis Working Group - Long Term Refinement Topics Scoping Document Prepared for the ICA Working Group by More Than Smart Background: A June 7, 2017 Assigned Commissioner Ruling (ACR)

More information

MAUI SMART GRID PROJECT

MAUI SMART GRID PROJECT MANAGING DISTRIBUTION SYSTEM RESOURCES FOR IMPROVED SERVICE QUAILTY AND RELIABILTY, TRANSMISSION CONGESTION RELIEF, AND GRID SUPPORT FUNCTIONS MAUI SMART GRID PROJECT or Hawaii Natural Energy Institute

More information

Communication and Control for Microgrid Optimal Energy Efficiency

Communication and Control for Microgrid Optimal Energy Efficiency Communication and Control for Microgrid Optimal Energy Efficiency Rui Zhou, Sumit Bose, Santosh Veda Oct 10 th 2013 GE Global Research RPI Microgrid Workshop Overview Microgrid Characteristics Microgrid

More information

TRC Solutions. Cost and Feasibility Analysis of a Third Converter Station for the Champlain Hudson Power Express Project

TRC Solutions. Cost and Feasibility Analysis of a Third Converter Station for the Champlain Hudson Power Express Project TRC Solutions Cost and Feasibility Analysis of a Third Converter Station for the Champlain Hudson Power Express Project October 2013 Table of Contents: I. Executive Summary II. Cost Estimate and Physical

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Southern California Edison

Southern California Edison Southern An Edison International An Edison Company International Serving Company Customers Serving for over Customers 125 Years for over 125 Years Serves a population Serves a population of more of than

More information

MAY 1, Variable Generation Integration Costs

MAY 1, Variable Generation Integration Costs MAY 1, 2014 Variable Generation Integration Costs Executive Summary The addition of variable generation (wind and solar) to the electrical system introduces additional costs associated with unit dispatch

More information

INTERSTATE TRANSMISSION VISION FOR WIND INTEGRATION

INTERSTATE TRANSMISSION VISION FOR WIND INTEGRATION TRANSMISSION INTERSTATE TRANSMISSION VISION FOR WIND INTEGRATION American Electric Power, working at the request of, and in partnership with, the American Wind Energy Association (AWEA), presents a high-level,

More information

4301 Wilson Blvd. Arlington, VA tel:

4301 Wilson Blvd. Arlington, VA tel: To: SUNDA Project Cooperatives From: February 3, 2015 Re: Reference Block Design for Utility Scale PV Solar System Purpose: Provides a reference block design with simple, convenient features, which is

More information

Lesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System

Lesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System Lesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System Primary Interest Groups Balancing Authorities (BAs) Transmission Operators (TOPs) Generator Operators

More information

Water & Energy Consulting Lon W. House, Ph.D.

Water & Energy Consulting Lon W. House, Ph.D. Water & Energy Consulting Lon W. House, Ph.D. 530.409.9702 (cell) lonwhouse@waterandenergyconsulting.com www.waterandenergyconsulting.com 2795 East Bidwell Street 10645 N. Oracle Rd. Suite 100-176 Suite

More information

Distribution Information Exchange Code

Distribution Information Exchange Code Distribution Information Exchange Code Version 5.1 Approved September 2007 Comments to this document can be forwarded to: The RSA Grid Code Secretariat Attention: Mr. Bernard Magoro Eskom, Transmission

More information

Public Utility District Number 1 of Snohomish County. Facility Connection Requirements February 9, 2018

Public Utility District Number 1 of Snohomish County. Facility Connection Requirements February 9, 2018 Public Utility District Number 1 of Snohomish County Facility Connection Requirements February 9, 2018 1 Revision History: Number Date Description By Reviewed by Approved by: Original Sept. 29, 2011 Document

More information

Voltage and reactive power regulation by photovoltaics in distribution systems

Voltage and reactive power regulation by photovoltaics in distribution systems Graduate Theses and Dissertations Graduate College 2014 Voltage and reactive power regulation by photovoltaics in distribution systems Pedram Jahangiri Iowa State University Follow this and additional

More information

What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin?

What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin? What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin? How to compare apples-to-apples bids. By R. Dee Jones, P.E., AVO Training Institute Electrical Engineering Division Manager/Principal

More information

ENABLING EMBEDDED GENERATION

ENABLING EMBEDDED GENERATION APRIL 2014 ENABLING EMBEDDED GENERATION Turning Australian electricity on its head WHAT IS EMBEDDED GENERATION? Energy supply systems around the world are being transformed by embedded (or distributed)

More information

Circuit of the Future: Interoperability and SCE's DER Program

Circuit of the Future: Interoperability and SCE's DER Program Circuit of the Future: Interoperability and SCE's DER Program Stephanie L. Hamilton, Manager, Charles K. Vartanian (*), Michael E. Johnson Jr. Distributed Energy Resources, Southern California Edison Southern

More information

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) TOOLKIT DOCUMENT #7 Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) This document has two sections. Neither section is all-inclusive

More information

Impacts of the Decentralized Wind Energy Resources on the Grid

Impacts of the Decentralized Wind Energy Resources on the Grid 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2013 Grid of the Future Symposium Impacts of the Decentralized Wind Energy Resources on the Grid Babak Enayati, PhD, Senior

More information

Distribution System Operator (DSO) Construct as a Bridge for End-to-End Transactive Operation

Distribution System Operator (DSO) Construct as a Bridge for End-to-End Transactive Operation Distribution System Operator (DSO) Construct as a Bridge for End-to-End Transactive Operation Farrokh Rahimi, Ph.D. Senior Vice President Market Design and Consulting Ali Ipakchi, Ph.D. Senior Vice President

More information

A Study on Grid Connected PV system

A Study on Grid Connected PV system A Study on Grid Connected PV system J Sreedevi Joint Director Power System Division Central Power Research nstitute Bengaluru, ndia. sreedevi@cpri.in Ashwin N Senior Research Fellow Power Systems Division

More information

Information Document Protection System Information ID# R

Information Document Protection System Information ID# R Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between the Information Document and the related authoritative document(s)

More information

AORC Technical meeting 2014

AORC Technical meeting 2014 http : //www.cigre.org C5-1036 AORC Technical meeting 2014 Solar PV Rooftop System Connection to MEA s Distribution Network: Technic and Economic Aspects Tosak Thasananutariya Metropolitan Electricity

More information

2014 Integral Analytics, Inc.

2014 Integral Analytics, Inc. 1 2 3 4 5 6 7 Company Overview Putting Advanced Analytics into Software to Manage Utility Costs & Risks Smart Grid Solutions T&D Planning Storage & Renewable Evaluation DSM Planning & Evaluation Marketing

More information

Consumer s Guide to Solar Power

Consumer s Guide to Solar Power Consumer s Guide to Solar Power JEA Consumer s Guide to Solar Power What is Solar Energy? 3 Benefits of Solar Power 3 JEA Solar Programs 4 Types of Solar Energy Systems 6 Is Solar Right for You? 10 Installation

More information

Report on Scenario Development and Analysis

Report on Scenario Development and Analysis Report on Scenario Development and Analysis Prepared for U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Award No. DE-FC-06NT42847 Task 1. Deliverable #3 By GE Global

More information

69/12KV SUBSTATION DESIGN

69/12KV SUBSTATION DESIGN 69/12KV SUBSTATION DESIGN ISU SENIOR DESIGN GROUP: MAY 15-01 Matt Backes Faran Malik Ryan Jerve Bhargav Gouni Kiran Rane Sohail Suryavanshi Team Leader Communication Leader Communication Leader Key Concept

More information

Wind Power Grid Interconnection:

Wind Power Grid Interconnection: Wind Power Grid Interconnection: Overview for the Massachusetts Wind Working Group Hull 1: Single OptiSlip on distribution line Renewable Energy Research Sally Wright, Laboratory, PE UMass Amherst Research

More information

ANALYSIS OF THE BEHAVIOR FOR REACTIVE POWER COMPENSATION USING SVC CONTROLLED HYBRID SOLAR/WIND POWER GENERATING SYSTEMS

ANALYSIS OF THE BEHAVIOR FOR REACTIVE POWER COMPENSATION USING SVC CONTROLLED HYBRID SOLAR/WIND POWER GENERATING SYSTEMS ANALYSIS OF THE BEHAVIOR FOR REACTIVE POWER COMPENSATION USING SVC CONTROLLED HYBRID SOLAR/WIND POWER GENERATING SYSTEMS Shadab Shakeel 1, Ameenuddin Ahmed 2 1 Student, M.Tech, 2 Asst. Prof., Department

More information

Integrating Building Automation Systems with Microgrid Controls. Mingguo Hong, Associate Professor Case Western Reserve University Cleveland, OH

Integrating Building Automation Systems with Microgrid Controls. Mingguo Hong, Associate Professor Case Western Reserve University Cleveland, OH 1 Integrating Building Automation Systems with Microgrid Controls Mingguo Hong, Associate Professor Case Western Reserve University Cleveland, OH 2 The Typical Commercial Buildings Are aggregates of generation,

More information

Facility Interconnection Requirements

Facility Interconnection Requirements Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents

More information

XXXX. Bremner Trio Small Hydro Project. Interconnection System Impact Study

XXXX. Bremner Trio Small Hydro Project. Interconnection System Impact Study XXXX Bremner Trio Small Hydro Project Report No. August 2010 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2010. All rights reserved.. DISCLAIMER OF WARRANTY, LIMITATION

More information

POTOMAC ELECTRIC POWER COMPANY

POTOMAC ELECTRIC POWER COMPANY POTOMAC ELECTRIC POWER COMPANY FERC Form 715 (Part 4) - Transmission Planning Study Guidelines Transmission Reliability Guidelines 1. General Overview The reliability guidelines used to plan the transmission

More information

Impact study of PV integration in Bornholm power system

Impact study of PV integration in Bornholm power system Downloaded from orbit.dtu.dk on: Jan 31, 2018 Impact study of PV integration in Bornholm power system Korompili, Asimenia; Zimmermann, Jakob Kjær; Wu, Qiuwei Publication date: 2014 Document Version Publisher's

More information

The Challenges of Integrating Renewable and Distributed Energy Resources what we can learn from smart grid research and demonstrations

The Challenges of Integrating Renewable and Distributed Energy Resources what we can learn from smart grid research and demonstrations The Challenges of Integrating Renewable and Distributed Energy Resources what we can learn from smart grid research and demonstrations Lisa Dignard-Bailey, Program Director Natural Resources Canada Outline

More information

Facilities Study. For. XXXXXXXXXXXX Wind Park Interconnection Switching Station

Facilities Study. For. XXXXXXXXXXXX Wind Park Interconnection Switching Station Facilities Study For XXXXXXXXXXXX Wind Park Interconnection Switching Station Prepared For: Randy Harlas, Substation Manager El Paso Electric Company El Paso, TX September 2010 Table of Contents CERTIFICATION...

More information

GRID INTEGRATION OF PV

GRID INTEGRATION OF PV GRID INTEGRATION OF PV Dr.-Ing. Bernhard Wille-Haussmann Fraunhofer Institute for Solar Energy Systems ISE 6th PV Performance Modeling and Monitoring Workshop 24 th October 2016 AGENDA The Challenge Solutions

More information

DISTRIBUTION GRID PLANNING CONSIDERING SMART GRID TECHNOLOGIES

DISTRIBUTION GRID PLANNING CONSIDERING SMART GRID TECHNOLOGIES DISRIBUION GRID PLANNING CONSIDERING SMAR GRID ECHNOLOGIES Baktash NASIRI, Christian WAGNER, Ulf HÄGER and Christian REHANZ Institute of Energy Systems, Energy Efficiency and Energy Economics (ie³) U Dortmund

More information

Patrick McHugh. Vice President Con Edison

Patrick McHugh. Vice President Con Edison Patrick McHugh Vice President Con Edison Agenda BQDM overview Utility-sided storage project Customer-sided storage project Marcus Garvey Clean virtual power plant Storage demonstration portfolio DR Auction

More information

Microgrid Planning and Design MCAS Miramar, US Air Force Academy, and Fort Carson

Microgrid Planning and Design MCAS Miramar, US Air Force Academy, and Fort Carson Microgrid Planning and Design MCAS Miramar, US Air Force Academy, and Fort Carson Robert Butt, NREL Grid and Dispatchable Power Group E 2 S 2 - New Orleans May 13, 2011 NREL is a national laboratory of

More information

The Impact of Grid Connected Photovoltaic Generation System to Voltage Rise in Low Voltage Network

The Impact of Grid Connected Photovoltaic Generation System to Voltage Rise in Low Voltage Network The Impact of Grid Connected Photovoltaic Generation System to Voltage Rise in Low Voltage Network ASNAWI MOHD. BUSRAH 1, VIGNA KUMARAN R. 2 1 Energy System Group TNB Research Kajang, Selangor MALAYSIA

More information

XXXXXXXXXXX Solar (XXX) Generation Interconnection

XXXXXXXXXXX Solar (XXX) Generation Interconnection Facility Study For XXXXXXXXXXX Solar (XXX) Generation Interconnection Prepared For: Randy Harlas, Substation Manager El Paso Electric Company El Paso, TX September 2010 Table of Contents 1. GENERAL...

More information

Proposals and Process 2017 National Electrical Code

Proposals and Process 2017 National Electrical Code Proposals and Process 2017 National Electrical Code for Solar America Board for Codes and Standards Stakeholder Meeting; October 23, 2014 Ward Bower Ward Bower Innovations LLC Introduction The New NFPA

More information

WIND TURBINES IN WEAK GRIDS CONSTRAINTS AND SOLUTIONS. J O G Tande and K Uhlen. SINTEF Energy Research, Norway SUMMARY

WIND TURBINES IN WEAK GRIDS CONSTRAINTS AND SOLUTIONS. J O G Tande and K Uhlen. SINTEF Energy Research, Norway SUMMARY WIND TURBINES IN WEAK GRIDS CONSTRAINTS AND SOLUTIONS J O G Tande and K Uhlen SINTEF Energy Research, Norway SUMMARY Cost efficient utilisation of the wind energy resource requires wind farms to be located

More information

Distribution Network Planning for Mumbai

Distribution Network Planning for Mumbai Newsletter Issue 98 January 2006 Distribution Network Planning for Mumbai Carsten Böse Project Manager Siemens AG, PTD SE PT carsten.boese@siemens.com Introduction The Indian utility Reliance Energy Ltd.

More information

Micro Hydroelectricity Installer Skills Assessment

Micro Hydroelectricity Installer Skills Assessment Micro Hydroelectricity Installer Skills Assessment Philip V. Hofmeyer August 2011 Page 1 Overview: This document contains an extensive skills assessment for renewable energy professionals who intend to

More information

GEOS / ENST Problem set #Grid Due: Tues. May 18

GEOS / ENST Problem set #Grid Due: Tues. May 18 GEOS 24705 / ENST 24705 Problem set #Grid Due: Tues. May 18 Problem 1: Three-phase power transmission The standard means by which electricity is transmitted in the U.S. is as 3-phase AC power. Each of

More information

Peak Time Demand Management Using Distributed Solar Inverters

Peak Time Demand Management Using Distributed Solar Inverters Peak Time Demand Management Using Distributed Solar Inverters Authors: Shravana Musunuri, Uma Rajarathnam, Deven Patel Power Gas Water Renewables Environment Presentation Outline About Enzen Present Scenario

More information

Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System

Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System Brooks Martner Lafayette, Colorado University of Toledo Spring 2013 PHYS 4400 - Principles and Varieties

More information

WWSIS - 3: Western Frequency Response and Transient Stability Study

WWSIS - 3: Western Frequency Response and Transient Stability Study WWSIS - 3: Western Frequency Response and Transient Stability Study GE Energy Nicholas W. Miller (PM) Miaolei Shao Slobodan Pajic Rob D Aquila NREL Kara Clark (PM) NERC ERSTF Briefing Atlanta December

More information

SUBNET IoT to the PI System: A Bridge to Support Business Use Cases

SUBNET IoT to the PI System: A Bridge to Support Business Use Cases SUBNET IoT to the PI System: A Bridge to Support Business Use Cases Presented by Alan Lytz Ben Smith PPL Electric Utilities PPL Corp Parent Company of PPL EU, LGE-KU, and WPD (UK) PPL Electric Utilities

More information

IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 04, 2016 ISSN (online):

IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 04, 2016 ISSN (online): IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 04, 2016 ISSN (online): 2321-0613 Microgrid Protection using Adaptive Overcurrent Relays Narendra J. Mahala 1 Jignesh B.

More information

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT PHOTOVOLTAIC PERMITTING GUIDELINES

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT PHOTOVOLTAIC PERMITTING GUIDELINES COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT Mike Lara Building Official PHOTOVOLTAIC PERMITTING GUIDELINES PLANS AND PERMITS In order to minimize installation problems, plans must be provided that

More information

LONG ISLAND LONG ISLAND

LONG ISLAND LONG ISLAND Utility 2.0 Long Range Plan 1 The proposed Utility 2.0 investments are designed to benefit all Long Island customers. Our Utility 2.0 proposal is a component of a broader set of solutions to improve reliability

More information

DISTRIBUTION CODE OF SRI LANKA. Public Utilities Commission of Sri Lanka

DISTRIBUTION CODE OF SRI LANKA. Public Utilities Commission of Sri Lanka DISTRIBUTION CODE OF SRI LANKA Public Utilities Commission of Sri Lanka July 2012 TABLE OF CONTENTS THE DISTRIBUTION CODE OF SRI LANKA... 1 1 GENERAL CODE... 3 1.1 INTRODUCTION... 3 1.2 APPLICABILITY...

More information

TOWN OF NEWPORT SOLAR PROJECT A 2-MEGAWATT DC NET-METERED PV SYSTEM

TOWN OF NEWPORT SOLAR PROJECT A 2-MEGAWATT DC NET-METERED PV SYSTEM TOWN OF NEWPORT SOLAR PROJECT A 2-MEGAWATT DC NET-METERED PV SYSTEM AN HISTORIC PROJECT NH s Largest Municipal Solar Project Town & Schools Would Be Net-Zero 2 AN HISTORIC PROJECT The largest municipal

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

Top Five Reasons to Implement Distributed Bus Protection

Top Five Reasons to Implement Distributed Bus Protection GE Grid Solutions Top Five Reasons to Implement Distributed Bus Protection White Paper Author: JC Theron g imagination at work 1. Abstract Power systems have evolved in the past few decades due to factors

More information

DISTRIBUTION LOSS ADJUSTMENT FACTORS ESB SUBMISSION THE COMMISSION FOR ELECTRICITY REGULATION

DISTRIBUTION LOSS ADJUSTMENT FACTORS ESB SUBMISSION THE COMMISSION FOR ELECTRICITY REGULATION DISTRIBUTION LOSS ADJUSTMENT FACTORS ESB SUBMISSION TO THE COMMISSION FOR ELECTRICITY REGULATION Document No: DOC-140105-AIL 7/02/2000 Introduction: The Commission for Electricity Regulation (CER) have

More information

Development of A Comprehensive Software Suite for Stability Monitoring and Analysis Based on Synchrophasor Measurement (DOE-OE )

Development of A Comprehensive Software Suite for Stability Monitoring and Analysis Based on Synchrophasor Measurement (DOE-OE ) Development of A Comprehensive Software Suite for Stability Monitoring and Analysis Based on Synchrophasor Measurement (DOE-OE0000700) Jian Ma (Principal Investigator) Senior Electrical Engineer Burns

More information