European State Questionnaire on Hydropower and the WFD

Size: px
Start display at page:

Download "European State Questionnaire on Hydropower and the WFD"

Transcription

1 Water management, Water Framework Directive & Hydropower Common Implementation Strategy Workshop Brussels, September 2011 European State Questionnaire on Hydropower and the WFD 1. Context The 2 nd European CIS workshop on Water Management, WFD & Hydropower will be organised on September 2011 in Brussels by Germany, the UK and the European Commission. The 2011 workshop is practice and measures-oriented. It is based on the discussions initiated at the 1 st workshop on WFD & Hydropower (4-5 June 2007, Berlin) 1 and should be used as a forum to exchange information, experiences gained in the meantime and case studies on: 1. Options and tools of European States in order to implement measures for the improvement and achievement of GES or GEP: a. Legal tools and legal requirements b. Technical standards and requirements c. Incentives 2. Strategic planning tools on the catchment scale for the designation of appropriate, less appropriate and not appropriate areas for new hydropower plants. 3. Approaches for the implementation of WFD Article 4.7. An issue paper will be prepared for the workshop. In order to collect background information for the workshop issue paper, European States are kindly asked to fill in the present questionnaire on Hydropower and the WFD. Please fill in one questionnaire per European State and return to eleftheria.kampa@ecologic.eu and stephan.naumann@uba.de at the latest by 17 June General information Name of European State Slovakia Name and contact details of person to be contacted if any clarifications on the reply to this questionnaire are needed: Kelnarová Zdena 1 See Key Conclusions, Common Implementation Strategy Workshop on WFD & Hydropower, Berlin, 4-5 June Available online: 1

2 3. Key figures on hydropower Note: For each answer below, please use the most recent and reliable data if available, to the extent possible. GWh/year Reference year of data: Comments Q3.1 What is the total amount of electricity production in your country? Q3.2 What is the total amount of electricity production from renewable energy sources 2 in your country? Source: Ministry of Economy of SR (ME SR) Source_ME SR Q3.3 What is the total amount of electricity production from hydropower in your country? Total including electricity generated from pumped storage schemes Total excluding electricity generated from pumped storage schemes Sorce ME SR Source: ME SR Q3.4 What is the currently installed hydropower capacity in your country? MW GWh Reference year of data: Total hydropower capacity From run-off river HP-plants From storage HP-plants From pumping storage HP-plants Does the figure of total installed capacity include pumping storage? Yes No 2 For the purposes of this questionnaire, electricity production from pumped storage hydropower schemes should be excluded. 2

3 Data provided by Ministry of Economy of SR Q3.5 How many hydropower plants exist in your country and what is the installed capacity? Nr. MW GWh Reference year of data: P< 1 MW MW < P < 10 MW P > 10 MW Data provided by Ministry of Economy of SR Regarding the planned electricity production from hydropower in 2020 according to the 2020 objectives of the Renewable Energy Directive as set in your National Renewable Energy Action Plan (Questions ): Q3.6 Have targets been set for electricity production from hydropower (excl. pumped storage) for 2020? Yes No Comment If yes, please answer also questions Q3.9 and Q3.10 below, which deal specifically with hydropower targets. GWh/ year Reference year of data: Comments Q3.7 What is the total amount of electricity production expected to be in your country in 2020? Q3.8 What is the total amount of electricity production from renewable energy sources expected to be in your country in 2020? Q3.9 What is the total amount of electricity production from hydropower expected to be in your country in 2020? excluded pump. stor. HP 3

4 Q3.10 What is the installed hydropower capacity expected to be in your country in 2020? MW GWh Reference year of data: Total hydropower capacity From run-off river HP-plants From storage HP-plants From pumping storage HP-plants Does the figure of total installed capacity include pumping storage? Yes No Data provided by Ministry of Economy of SR Q3.11 How do you estimate the following to contribute to the achievement of the 2020 objectives set for the contribution of hydropower to the renewable energy targets? Main source of contribution Minor source of contribution Negligible source of contribution Construction of new hydropower plants 134 Refurbishment of plants 3 0 Modernisation and maintenance of plants 4 NA Data provided by Ministry of Economy of SR 4. Use of hydropower, designation of HMWB and determination of GEP 3 Refurbishment refers to measures which increase installed capacity in existing hydropower plants. 4 Modernisation refers to measures which increase electricity production and in the same time contribute to ecological improvement, e.g. new turbines according to best available techniques/good environmental practice. 4

5 Q4.1 What is the % of heavily modified water bodies (HWMB) in relation to the total number of water bodies in your country? 3 % of total water bodies Q4.2 What is the % of HMWB designated due to hydropower use in relation to the total number of HMWB? 35 % in relation to total HMWB Yes No Comment Q4.3 Are you planning to make improvements to any water bodies affected by hydropower schemes by 2015? improvements of hydrological condition below certain dams Q4.4 Have you agreed national or local criteria for determining what impact on hydropower generation is acceptable (i.e. not a significant adverse effect)? If "yes", what are the criteria being used (e.g. limit on the effect on generation)? If no, what process are you using to make such decisions and what factors does that process take into account (e.g. scheme-level impacts; cumulative impacts on regional/national generation; or both)? both - scheme level and cumulative impacts 5. Strategic planning tools Q5.1 Are pre-planning instruments for the strategic development of new hydropower generation used in your country? Yes No If yes, on which level? (e.g. regional level / sub-catchments, national level) Please briefly describe national Slovak government adopted Conception on hydropower potential utilization of Slovak water courses by its resolution No.178/2011. Its aim is to secure an increase in hydro energy utilization for energy production from renewable energy sources - in harmony with EU and national Strategic energy targets and other relevant strategic documents of EU and SR. The Conception passed through SEA process (in harmony with Act No.24/2006 Coll. ) Q5.2 If yes, which overall planning process are they part of? River Basin Management Planning 5

6 National Renewable Energy Action Plan Hydropower Sector planning Designation of areas for new hydropower use: - Appropriate areas - Less appropriate areas - Not appropriate areas - No-go areas Other (please describe) Q5.3 Please briefly describe the criteria used for pre-planning; if different pre-planning instruments exist, please reply for each separately Criteria of valid legislation and International Conventions Q5.4 Does the pre-planning instrument foster the dialogue with the water users? If different pre-planning instruments exist, please reply for each separately yes Q5.5 Do you consider your approach as state-of-the-art in Europe, which should be presented at the workshop? Yes No 6. Approaches for the implementation of WFD Article 4.7 Q6.1 Has the procedure of Art. 4.7 been applied for new hydropower plants? If yes, for how many plants? Yes No Unknown Comments For how many plants was a deterioration of good ecological status accepted? If no, are there plans to implement the procedure of Art. 4.7 for new hydropower plants? Q6.2 Is it generally considered in your country that new hydropower plants will lead to a deterioration of good ecological status? If yes, is the procedure of Art. 4.7 for new hydropower plants generally followed? Q6.3 How have the steps of Art. 4.7 been implemented: 6

7 (a) Which practicable steps have been taken to mitigate the adverse impacts on the status of the affected water body(s)? Please give some information about your national experiences (e.g. which instruments/methods are especially suitable and successful?) (b) How is the overriding public interest of a new hydropower plant or the fact that the benefits of a new plant outweigh the benefits of achieving the WFD environmental objectives judged (e.g. benefit of increased renewable electricity production)? Please give some information about your national experiences (e.g. which instruments/methods are especially suitable and successful?) (c) Which methods are used to assess if the beneficial objectives served by those modifications or alterations of the water body cannot for reasons of technical feasibility or disproportionate cost be achieved by other means, which are a significantly better environmental option? Please give some information about your national experiences (e.g. which instruments/methods are especially suitable and successful, what other means are considered?) Q6.4 Do you consider your approach as state-of-the-art in Europe, which should be presented at the workshop? Yes Comments 7. Incentives No Q7.1 Are there incentives in your country which combine support to hydropower (existing & new) and targets to improve water status/potential? Yes No Under development Please fill-in the following table Please fill-in the following table Types of incentives Feed-in tariffs Support schemes for new plants Support schemes for modernisation Ecolabelling Presence in your country Yes No Under development Explanation of relevance and criteria for ecological improvement 7

8 Tradable certificates Simplified authorisation and licensing procedure Compensation for energy production loss (monetary or other) Other / Comments Q7.2 Do you consider your approach as state-of-the-art in Europe, which should be presented at the workshop? Yes Comments No 8. Legal and technical requirements for the achievement of GES/GEP 5 8.a Hydropower permits Q8.1 What is the duration of permits for hydropower plants in your country? Duration of licence for construction-technical part is unlimited. Duration of licence for utilization of water - could be limited. Q8.2 Has the duration of hydropower permits been changed at any point? In case, that condition are changed, permits could be changed as well. Q8.3 What types of changes are possible to existing permits? Please give detailed information on how far the change to an existing permit could go. Under existing permit there are possible only minimum changes described in issued permit. Changes above conditions set in permit ( e.g. legislative change, change of operation, construction changes, fish pass etc ) require revision of permit. Q8.4 Is the permit duration for all hydropower plants the same? If no, which criteria define the duration of a permit? (e.g. size of hydropower plant) Duration of permit is individual. Criteria: change of conditions 8.b Minimum ecological flow requirements 6 (a) Legal requirements Q8.5 How are legal requirements for minimum ecological flow set in your country? There is relevant legislation requirement but there is a relevant requirement or recommendation There is generally no legislative means of ensuring 5 Even though a legal requirement exists, measures will not always (have to) be applied to all hydropower stations. 6 The term ecological minimum flow follows the terms used in the CIS Guidance document Nr. 20 and the notes from the Informal meeting of Water and Marine Directors in Segovia in May

9 recommendation but minimum ecological flow is defined in individual cases minimum ecological flow Q8.6 Does a minimum ecological flow requirement exist for every hydropower plant in your country? New hydropower plants Existing hydropower plants No complete information Yes No Yes No available Q8.7 What types of minimum ecological flow requirements are differentiated? Minimum ecological flow through turbines (to prevent total stop of river water flow in daily or seasonal regulation) Minimum ecological flow to old dry river channels (to maintain ecology/landscape) Minimum ecological flow through fish passes or bypass channels through the year or a part of the year (for migration) Q8.8 Are the legal requirements related to a specific goal? Choose any of the following or add a new goal Ensure sustainable fish populations Ensure ecological continuum Other / Comments Q8.9 Do you see possibilities or the need for improvement of their enforcement and implementation? (b) Technical requirements 9

10 Q8.10 Is there an agreed method/approach in your country, which should be followed for setting minimum ecological flow? There is a technical standard set by law There is a recommendation Set on case-bycase basis There is no relevant method defined Q8.11 What method/methods is (are) applied to define minimum ecological flow in your country? Static definition (e.g. 5% of annual mean flow) Dynamic definition 7 Determination by modeling Other, please mention (if any of the methods in Q8.7 apply, please list them here) Please briefly explain the method/methods applied (criteria and/or formula) Q355 - Average daily water discharge during the reference period, achieved or exceeded during 355 days in the year Comments 8.c Facilities to ensure upstream continuity (a) Legal requirements Q8.12 How are legal requirements for facilities to ensure upstream continuity (via fish pass) set in your country? There is relevant legislation requirement but there is a relevant recommendation requirement or recommendation but measures to ensure upstream continuity are defined in individual cases There is generally no legislative means of ensuring upstream continuity 7 Different fixed minimum flow values distributed over the year. 10

11 The Water Act no. 364/ water management authority has to follow requirement to ensure preservation of water ecosystems at issuing of permit for water use. The Construction Act no. 50/ structure has to be designed in such way - which corresponds with requirements of nature protection and does not have negative impact on environment. Law no. 24/2006 about EIA requires measures to mitigate impact to environment. The law distinguishes among preliminary assessment (hydropower plants of capacity in rage 5 50 MW) and/or mandatory assessment (hydropower plants above 50MW). MoE can order environmental impact assessment even for activities below 5 MW. Q8.13 Is every hydropower plant in your country required to have a fish pass? New hydropower plants Existing hydropower plants No complete information Yes No Yes No available New structures see comment under Q8.12 Existing structures Governmental Decree on Program of Measures developed in the frame of RBM plan (at present under approval Q8.14 Are the legal requirements related to a specific goal? Choose any of the following or add a new goal: i. Ensure sustainable fish populations ii. Ensure ecological continuum iii. Other, please specify Q8.15 Do you see possibilities or the need for improvement of their enforcement and implementation? (b) Technical requirements Q8.16 Is there an agreed method/approach in your country on how to ensure upstream continuity? There is a technical standard set by law There is a recommendation Set on case-by- There is no relevant 11

12 case basis method defined Q8.17 Do the methods/ approaches mentioned above include requirements regarding: Type of fish pass (technical or bypass channel) Special type of fish pass (e.g. denil, vertical slot fish pass) Hydraulic design (E.g. discharge, flow velocity) Recommendations/requirements on duration of time for passabilty (e.g. 300 days/year) Recommendations/requirements that fishes can locate the fish pass in the river Other / Comments Please explain: 8.d Facilities to ensure downstream continuity (a) Legal requirements Q8.18 How are legal requirements for facilities to ensure downstream continuity (for fish) set in your country? There is relevant legislation requirement but there is a relevant recommendation requirement or recommendation but measures to ensure downstream continuity are defined in individual cases There is generally no legislative means of ensuring downstream continuity 12

13 Q8.19 Is every hydropower plant in your country required to ensure downstream continuity? New hydropower plants Existing hydropower plants No complete information Yes No Yes No available Q8.20 Are the legal requirements related to a specific goal? Choose any of the following or add a new goal: i. Ensure sustainable fish populations ii. Ensure ecological continuum iii. Other, please specify Q8.21 Do other legal requirements exist to compensate for loss of fish stock? (e,g. fish stocking, payments etc.) Yes No If yes, please explain in Q8.24 Q8.22 Do you see possibilities or the need for improvement of their enforcement and implementation? (b) Technical requirements Q8.23 Is there an agreed method/approach in your country on how to ensure downstream continuity? There is a technical standard set by law There is a recommendation Set on case-bycase basis There is no relevant method defined Q8.24 Are the following tools used in your country? If necessary to specify how the tool is used in your country, please give relevant short explanation 8 8 E.g. Mechanical fish protection combined with early warning system 13

14 Are these tools used? Explain Yes No Don t know Physical barriers to protect fish from turbine intake channels (screens) Bypasses and sluiceways Plant operation management - Spill flow (water releases independent of power generation) Fish-friendly turbines Catch and carry / Trap and truck Monetary compensation for restoration measures for land owners, fishermen, environment / fishery authorities (single or annual payment) Compensation according to fish stocking (e.g. smolts and fingerlings) Compensation for measures taken to reproduce habitats (construction of spawning and rearing channels, restoration of habitats) Other / Comments 8.e Mitigation of hydropeaking effects (a) Legal requirements Q8.25 How are legal requirements for the mitigation of hydropeaking effects set in your country? There is relevant legislation There is a no legal requirement but there is a relevant recommendation requirement or recommendation but mitigation measures are defined in individual cases There is generally no legislative means of mitigating hydropeaking effects 14

15 Q8.26 Do you see possibilities or the need for improvement of their enforcement and implementation? Technical standardisation (b) Technical requirements Q8.27 Is there an agreed method/approach in your country for the mitigation of hydropeaking effects? There is a technical standard set by law There is a recommendation Set on case-bycase basis There is no approach Q8.28 Do the recommendations/ standards mentioned above include requirements regarding: Please explain: Amplitude of flow fluctuation Frequency of hydropeaking Due to mitigation of flow fluctuation all large capacity reservoirs with hydropower plants have balance (buffer?) reservoir. Frequency of hydropeaking depends on connection into network according to energy diagram. Duration of rising and falling of hydropeaking Other options to mitigate impacts of hydropeaking Compensation basins Improvement of hydromorphological structures Coordination of different plants operation coordination of hydropower plants at the system focuses to energy efficiency of hydropower potential utilization regarding to other aspects Other / Comments 15

16 8.f Improvement of sediment/bedload transport (a) Legal requirements Q8.29 How are legal requirements for the mitigation of disruption of sediment/bedload transport set in your country? There is relevant legislation requirement but there is a relevant recommendation requirement or recommendation but mitigation measures are defined in individual cases There is generally no legislative means for mitigating the disruption of sediment/bedload transport Q8.30 Does a specific ecological goal relate to the improvement of sediment/bedload transport? (e.g improvement of hydromorphology) (b) Technical requirements Q8.31 Is there an agreed method/approach in your country for the mitigation of disruption of sediment/bedload transport set in your country? There is a technical standard set by law There is a recommendation Set on case-bycase basis There is no approach Q8.32 Do the recommendations/ standards mentioned above include: Technical solutions for the transfer of sediment/bedload Addition of sediment/bedload Other / Comments Please explain: 16

17 8.g Other domains for hydromorphological improvement Q8.33 Are there other domains, which you consider important for the improvement of ecological status/potential in hydropower-affected water bodies? 8.h Cumulative effects Yes No Please explain how this is done Comments Q8.34 Are cumulative effects taken into account in the definition of measures set for individual hydropower plants? Q8.35 Are cumulative effects taken into account in the pre-planning of hydropower plants as a strategic instrument of management of the catchment area? 8.i Suggestions for workshop Q8.36 Do you consider your approaches on legal and technical requirements as state-of-theart in Europe, which should be presented at the workshop? Yes Comments No 17

Strategic planning approach for new hydropower development in Austria

Strategic planning approach for new hydropower development in Austria Hydropower and Fish, 29-30 May 2017, Brussels Strategic planning approach for new hydropower development in Austria Dr. Veronika Koller-Kreimel Ministry of Agriculture, Forestry, Environment & Water Management,

More information

Guiding Principles on Sustainable Hydropower Development in the Danube River Basin

Guiding Principles on Sustainable Hydropower Development in the Danube River Basin Guiding Principles on Sustainable Hydropower Development in the Danube River Basin Lead Countries : Austria, Romania, Slovenia in the frame of the International Commission for the Danube River Protection

More information

These potential changes and their implications are outlined in Annex 1.

These potential changes and their implications are outlined in Annex 1. Guidance Note Hydropower Guidance Note: This Guidance Note has been prepared by Natural Resources Wales (NRW) to provide applicants for abstraction and impoundment licences for hydropower schemes with

More information

COMMON IMPLEMENTATION STRATEGY FOR THE WATER FRAMEWORK DIRECTIVE (2000/60/EC)

COMMON IMPLEMENTATION STRATEGY FOR THE WATER FRAMEWORK DIRECTIVE (2000/60/EC) COMMON IMPLEMENTATION STRATEGY FOR THE WATER FRAMEWORK DIRECTIVE (2000/60/EC) POLICY SUMMARY to Guidance Document No. 4 Produced by Working Group 2.2 - HMWB EXPLANATORY NOTE This policy summary gives an

More information

Hydropower and heavily modified water bodies in Norway

Hydropower and heavily modified water bodies in Norway Nordic workshop on WFD implementation Sigtuna, Sweden, 20-22 September 2010 Hydropower and heavily modified water bodies in Norway Anja Skiple Ibrekk Norwegian Water Resources and Energy Directorate Overview

More information

River Basin Management of the Meuse

River Basin Management of the Meuse River Basin Management of the Meuse The IMC Masterplan for Migratory Fish Willem L.M. Schreurs Secretary General EC IEA Hydropower Workshop, Brussels 29 30 May 2017 River Basin Management of the Meuse

More information

STRATEGIC PLANNING IN AUSTRIA

STRATEGIC PLANNING IN AUSTRIA Art. 4.7 Workshop, 13/14 Dec 2016,, Brussels STRATEGIC PLANNING IN AUSTRIA Veronika Koller-Kreimel Austrian Ministry of Agriculture, Forestry, Environment & Water Management, Dep. for National and International

More information

Spoil and Water. Irish Ports Association Conference Ciaran Callan Dublin Port Company. 26 th September 2008

Spoil and Water. Irish Ports Association Conference Ciaran Callan Dublin Port Company. 26 th September 2008 Spoil and Water Ciaran Callan Dublin Port Company Irish Ports Association Conference 2008 26 th September 2008 Disposal of Dredge Material: Regulation and Process of Application Requirement for disposal

More information

European Union Strategy for Danube Region and the implementation of the Water Framework Directive

European Union Strategy for Danube Region and the implementation of the Water Framework Directive COST 869 Mitigation options for Nutrient Reduction in Surface Water and Groundwaters Final Meeting, Keszthely, 12-14 October 2011 European Union Strategy for Danube Region and the implementation of the

More information

Challenge Water Framework Directive Impact on hydropower

Challenge Water Framework Directive Impact on hydropower Challenge Water Framework Directive Impact on hydropower by Karin Seelos Vice President International Affaires Statkraft Energi AS - Power Generation Main challenges Example illustrating challenges and

More information

Introducing the WBG Guidelines for selecting EFlow assessment methods. Cate Brown

Introducing the WBG Guidelines for selecting EFlow assessment methods. Cate Brown Introducing the WBG Guidelines for selecting EFlow assessment methods Cate Brown This presentation Factors affected potential impacts Level of detail in EFlows assessments: Magnitude and complexity of

More information

EU Water Framework Directive

EU Water Framework Directive EU Water Framework Directive Overview and state of implementation TAIEX Seminar on the Water Framework and Urban Waste Water Directive Zagreb, 25-26 September 2008 Jorge Rodríguez Romero European Commission,

More information

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify) PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:

More information

Union Priority. Specific Objective. Output indicator name

Union Priority. Specific Objective. Output indicator name List of output s proposed to be used in the national database structure according 1 1 I.14 Article 37 Support for the design and implementation of conservation measures and regional co-operation 1 1 I.15

More information

Common Implementation Strategy for the Water Framework Directive (2000/60/EC)

Common Implementation Strategy for the Water Framework Directive (2000/60/EC) European Commission Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Guidance document n. o 4 Identification and Designation of Heavily Modified and Artificial Water Bodies

More information

Hydropeaking Mitigation Measures Impacts on Use

Hydropeaking Mitigation Measures Impacts on Use Hydropeaking Mitigation Measures Impacts on Use Markus Pfleger, Verbund Hydro Power GmbH - Austria Peter Matt, Vorarlberger Illwerke - Austria IEA Brussels, May 2017 Hydropower and Fish Partnership of

More information

Improving the condition of Solway Tweed s water environment Tweed area management plan

Improving the condition of Solway Tweed s water environment Tweed area management plan Improving the condition of Solway Tweed s water environment Tweed area management plan 2010 2015 Supplementary to the river basin management plan for the Solway Tweed river basin district Page 1 of 20

More information

Supporting Guidance (WAT-SG-85)

Supporting Guidance (WAT-SG-85) Water Use Supporting Guidance (WAT-SG-85) Application of Standards to Thermal Discharges Version: v3.0 Released: Aug 2016 Copyright and Legal Information Copyright 2016 Scottish Environment Protection

More information

A Strategic Research and Innovation Agenda for the Water in the EU

A Strategic Research and Innovation Agenda for the Water in the EU A Strategic Research and Innovation Agenda for the Water in the EU Antonio Lo Porto Water Research Institute (IRSA-CNR) Italy EU and the Water Framework Directive In the E.U., the Water Framework Directive

More information

The implementation of the WFD in Norway - Mitigating hydropower effects on fish stocks. Roy M. Langåker, Norwegian Environment Agency

The implementation of the WFD in Norway - Mitigating hydropower effects on fish stocks. Roy M. Langåker, Norwegian Environment Agency The implementation of the WFD in Norway - Mitigating hydropower effects on fish stocks Roy M. Langåker, Norwegian Environment Agency Main pressures in Norway - from regional plans Water storage - hydropower

More information

CONVENTION ON THE CONSERVATION OF EUROPEAN WILDLIFE AND NATURAL HABITATS. Standing Committee. 37 th meeting Strasbourg, 5-8 December 2017

CONVENTION ON THE CONSERVATION OF EUROPEAN WILDLIFE AND NATURAL HABITATS. Standing Committee. 37 th meeting Strasbourg, 5-8 December 2017 Strasbourg, 7 November 2017 T-PVS/Inf (2017) 22 [Inf22e_2016.docx] CONVENTION ON THE CONSERVATION OF EUROPEAN WILDLIFE AND NATURAL HABITATS Standing Committee 37 th meeting Strasbourg, 5-8 December 2017

More information

Session: For more information:

Session: For more information: Session: For more information: www.hydropower.org/congress General Institute of Water Resources and Hydropower Planning and Design, Ministry of Water Resource Regulation of Downstream Flows in China Li

More information

Maximum admissible mortality of salmonids and silver eel per river stretch by hydropower stations Dutch approach

Maximum admissible mortality of salmonids and silver eel per river stretch by hydropower stations Dutch approach Maximum admissible mortality of salmonids and silver eel per river stretch by hydropower stations Dutch approach Tim Vriese (ATKB) Commissioned by RWS WVL Content of the presentation 1). Introduction;

More information

The Elbe River Basin: Preliminary evaluation of the answers. Janos J. Bogardi Executive Officer of GWSP

The Elbe River Basin: Preliminary evaluation of the answers. Janos J. Bogardi Executive Officer of GWSP GWSP-GCI II Workshop on the Water-Energy-Food Security Nexus The Elbe River Basin: Preliminary evaluation of the answers Janos J. Bogardi Executive Officer of GWSP Winnipeg, Canada, 3-4 May 2012 The Elbe

More information

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

Some aspects of the sediment transit on the Mekong river in relation with hydropower development Some aspects of the sediment transit on the Mekong river in relation with hydropower development Daniel Loudière Société Hydrotechnique de France A presentation in three parts - the situation when starting

More information

The Economics of Ecosystems and Biodiversity (TEEB): Water and Wetlands Policy instruments to progress towards wise use

The Economics of Ecosystems and Biodiversity (TEEB): Water and Wetlands Policy instruments to progress towards wise use The Economics of Ecosystems and Biodiversity (TEEB): Water and Wetlands Policy instruments to progress towards wise use Daniela Russi Senior Policy Analyst Institute for European Environmental Policy,

More information

THE AUSTRIAN DRAVA MANAGEMENT IN THE RELATION TO THE INTERNATIONAL RIVER CORRIDOR

THE AUSTRIAN DRAVA MANAGEMENT IN THE RELATION TO THE INTERNATIONAL RIVER CORRIDOR THE AUSTRIAN DRAVA MANAGEMENT IN THE RELATION TO THE INTERNATIONAL RIVER CORRIDOR ALEXANDER ZINKE, Environment Consultant and External Project Expert of BMLFUW (Federal Ministry for Agriculture, Forestry,

More information

Hydropower Guidance Note: HGN 7 Competing Schemes

Hydropower Guidance Note: HGN 7 Competing Schemes Guidance Note Hydropower Guidance Note: HGN 7 Competing Schemes This guidance is not intended as a statement of law and should be read in combination with and in the context of the relevant enactments

More information

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013 World Small Hydropower Development Report 2013 www.smallhydroworld.org SPAIN Disclaimer Published in 2013 by United Nations Industrial Development Organization (UNIDO) and International Center on Small

More information

Using Climate Science in Hydropower Planning

Using Climate Science in Hydropower Planning Using Climate Science in Hydropower Planning Susan Walker, NOAA- Fisheries Alaska Hydropower Coordinator Andrea J. Ray, Ph.D., NOAA Earth System Research Lab, Physical Sciences Division, Boulder, CO Joseph

More information

Windfarm Impacts on South Galway Flooding

Windfarm Impacts on South Galway Flooding Windfarm Impacts on South Galway Flooding Letter of Complaint to ESB 7 th April 2017 South Galway Flood Relief Committee Overview South Galway over the past 20 years has suffered a number of severe flooding

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

Technical and economic comparison of Taivalkoski, Ossauskoski, Petäjäskoski and Valajaskoskifish pass alternatives

Technical and economic comparison of Taivalkoski, Ossauskoski, Petäjäskoski and Valajaskoskifish pass alternatives MIGRATORY FISH AND FISHWAY SYMPOSIUM OF THE NORTH 8 9 October 2013 Technical and economic comparison of Taivalkoski, Ossauskoski, Petäjäskoski and Valajaskoskifish pass alternatives Dr. Kenneth MacDougall

More information

A Risky Climate for Southern African Hydro: Assessing hydrological risks and consequences for Zambezi River Basin dams

A Risky Climate for Southern African Hydro: Assessing hydrological risks and consequences for Zambezi River Basin dams A Risky Climate for Southern African Hydro: Assessing hydrological risks and consequences for Zambezi River Basin dams Executive summary Africa is highly vulnerable to the impacts of climate change. Numerous

More information

Baltic Marine Environment Protection Commission

Baltic Marine Environment Protection Commission Baltic Marine Environment Protection Commission HELCOM RECOMMENDATION 37/3 Adopted 11 March 2016, having regard to Article 20, Paragraph 1 b) of the Helsinki Convention SUSTAINABLE AQUACULTURE IN THE BALTIC

More information

Welcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016

Welcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016 Welcome to the Boulevard Lake Dam Class Environmental Assessment Public Information Session #1 June 14, 2016 Boulevard Dam - Overview Built approximately 100 years ago Owned and operated by the City of

More information

Water management in Sweden an introduction

Water management in Sweden an introduction Water management in Sweden an introduction Andreas Aronsson Inland Water Management Coordinator Five Water Scientifically based borders Five Marine Basins Main Drainage Areas Five out of 21 County Administrations

More information

ENNS Catchment area. Upper Austria. Lower Austria. S t yria. Inn. Linz. Erlau. Ybb. Enns. Traun. Age. Enns

ENNS Catchment area. Upper Austria. Lower Austria. S t yria. Inn. Linz. Erlau. Ybb. Enns. Traun. Age. Enns TSCHECHIEN ENNS Catchment area Do na u Inn Upper Austria s Ybb Enns n Lower Austria Traun Ste yr Age r au Tr Erlau f Linz Enns S t yria 229 Measures in the Enns catchment area ERMANY Inn Donau Upper Austria

More information

Morava River Basin - Slovakia

Morava River Basin - Slovakia Morava River Basin - Slovakia Pavel Hucko 1 General description of the basin Slovak territory Morava river basin is bounded River basin districts of the Slovak Republic and their sub-basins White Carpathians

More information

WFD implementation : some feedback from France

WFD implementation : some feedback from France WFD implementation : some feedback from France Nicolas ROUYER Euro INBO conference Bucharest, 13 November 2014 Crédit photo : Thierry DEGEN/METL-MEDDE Ministère de l'écologie, du Développement durable

More information

Implementation of the Water Framework Directive in the Czech Republic

Implementation of the Water Framework Directive in the Czech Republic Towards Integrated River Basin Management Bratislava 29 May 2006 2 June 2006 Implementation of the Water Framework Directive in the Czech Republic Lubomír Petružela T.G. Masaryk Water Research Institute,

More information

Guidelines for balancing different water uses: navigation and environment, sustainable hydropower development

Guidelines for balancing different water uses: navigation and environment, sustainable hydropower development 2 nd UNECE Workshop River Basin Commissions and other Joint Bodies for Transboundary Water Cooperation: Technical Aspects, Geneva, 9-10 April 2014 Guidelines for balancing different water uses: navigation

More information

The value of storage. Chris Elliott Senior Hydropower Engineer. 8 th November 2016

The value of storage. Chris Elliott Senior Hydropower Engineer. 8 th November 2016 The value of storage Chris Elliott Senior Hydropower Engineer 8 th November 2016 Overview Stroud, Gloucestershire Hydro is largest part of the business High and Low head systems Design Install Maintain

More information

UNEP Principles 1. Integration of Tourism into Overall Policy for Sustainable Development

UNEP Principles 1. Integration of Tourism into Overall Policy for Sustainable Development UNEP Principles The principles cover: 1. Integration of Tourism into Overall Policy for Sustainable Development 2. Development of Sustainable Tourism 3. Management of Tourism 4. Conditions for Success

More information

Chehalis Basin Strategy Programmatic SEPA Draft EIS

Chehalis Basin Strategy Programmatic SEPA Draft EIS Chehalis Basin Strategy Programmatic SEPA Draft EIS History of Flooding I-5 closed in 1990, 1996, 2007, 2009 Five largest flood events occurred since 1986 2 History of Habitat Degradation Harvest has been

More information

IEA-DSM Task XVII: Country Report Austria

IEA-DSM Task XVII: Country Report Austria IEA-DSM Task XVII: Country Report Austria Matthias Stifter, arsenal research 30. April 2008 AUSTRIA Facts and Figures (2005) 1 Energy consumption in Austria Figure 1 depicts the evolution of gross domestic

More information

MEKONG SITE VISIT TO LAOS FIRST TWO MAINSTREAM DAM PROJECTS. Letters from the EXECUTIVE SUMMARY OF THE SECOND LETTERS FROM THE MEKONG ISSUE BRIEF

MEKONG SITE VISIT TO LAOS FIRST TWO MAINSTREAM DAM PROJECTS. Letters from the EXECUTIVE SUMMARY OF THE SECOND LETTERS FROM THE MEKONG ISSUE BRIEF Letters from the MEKONG SITE VISIT TO LAOS FIRST TWO MAINSTREAM DAM PROJECTS EXECUTIVE SUMMARY OF THE SECOND LETTERS FROM THE MEKONG ISSUE BRIEF by Richard Cronin and Courtney Weatherby JANUARY 2015 1

More information

Integrative water resource management with a focus on semiarid and arid regions

Integrative water resource management with a focus on semiarid and arid regions Integrative water resource management with a focus on semiarid and arid regions Prof. Dr. Uwe Tröger Technische Universität Berlin Uwe.troeger@tu-berlin.de Where there is water there is life. Where there

More information

Basin-Scale Hydropower and Environmental Opportunity Assessments

Basin-Scale Hydropower and Environmental Opportunity Assessments Basin-Scale Hydropower and Environmental Opportunity Assessments A framework for identifying and evaluating hydropower and environmental opportunities and linkages Simon Geerlofs, Jerry Tagestad, Kyle

More information

Estimation of rearing habitat requirements of San Joaquin River Chinook salmon using the Emigrating Salmonid Habitat Estimation (ESHE) Model

Estimation of rearing habitat requirements of San Joaquin River Chinook salmon using the Emigrating Salmonid Habitat Estimation (ESHE) Model Estimation of rearing habitat requirements of San Joaquin River Chinook salmon using the Emigrating Salmonid Habitat Estimation (ESHE) Model California Central Valley Cramer Fish Sciences *Draft conceptual

More information

Development of Dalälven Hydropower Scheme in Sweden

Development of Dalälven Hydropower Scheme in Sweden Development of Dalälven Hydropower Scheme in Sweden by Voitto Kokko, Peter Hjerthén, Arne Sjögren, Karl-Erik Löwén and Hans Ingfält. Société Hydrotechnique de France Enhancing Hydro Powerplant facilities

More information

Report. Setting environmental flows in regulated rivers. Implementing the EU Water Framework Directive (EU WFD) in Norway

Report. Setting environmental flows in regulated rivers. Implementing the EU Water Framework Directive (EU WFD) in Norway - Unrestricted Report Setting environmental flows in regulated rivers Implementing the EU Water Framework Directive (EU WFD) in Norway Author(s) Tor Haakon Bakken (SINTEF Energy Research), Peggy Zinke

More information

Site 15: Gresgarth Hall, Caton

Site 15: Gresgarth Hall, Caton Site 15: Gresgarth Hall, Caton Site Assessment Report Title Figure 1 Map showing general layout This mill is thought to have been built between 1770 and 1790 as a corn mill, becoming a threshing mill in

More information

Environmental and social impacts of smallscale. Issues and Challenges. Glenn Morgan (LCSEN) World Bank Water Week February 18, 2009

Environmental and social impacts of smallscale. Issues and Challenges. Glenn Morgan (LCSEN) World Bank Water Week February 18, 2009 Environmental and social impacts of smallscale hydropower: Issues and Challenges Glenn Morgan (LCSEN) World Bank Water Week February 18, 2009 Presentation objectives Review the nature and scale of environmental

More information

A. EXECUTIVE SUMMARY. 1. Water status management. 1.1 Water status

A. EXECUTIVE SUMMARY. 1. Water status management. 1.1 Water status A. EXECUTIVE SUMMARY 1. Water status management 1.1 Water status Data and analyses of water status indicators suggest that the water resources in Croatia are subject to the impact of human activities.

More information

HYDROPOWER FOR ENERGY STORAGE AND BALANCING RENEWABLES

HYDROPOWER FOR ENERGY STORAGE AND BALANCING RENEWABLES HYDROPOWER FOR ENERGY STORAGE AND BALANCING RENEWABLES Atle Harby 1,2, Julian Sauterleute 1,2, Ånund Killingtveit 2,3, Eivind Solvang 1,2 1 SINTEF Energy Research, P.O. Box 4761 Sluppen, 7465 Trondheim,

More information

Hydropower as Flexibility Provider: Modeling Approaches and Numerical Analysis

Hydropower as Flexibility Provider: Modeling Approaches and Numerical Analysis Hydropower as Flexibility Provider: Modeling Approaches and Numerical Analysis Andrew Hamann, Prof. Gabriela Hug Power Systems Laboratory, ETH Zürich February 8, 2017 Future Electric Power Systems and

More information

The Teifi and North Ceredigion Abstraction Licensing Strategy May A licensing strategy to manage water resources sustainably

The Teifi and North Ceredigion Abstraction Licensing Strategy May A licensing strategy to manage water resources sustainably The Teifi and North Ceredigion Abstraction Licensing Strategy May 2014 A to manage water resources sustainably On 1 April 2013 Natural Resources Wales brought together the work of the Countryside Council

More information

8. Risk Assessment Process

8. Risk Assessment Process 134 Browse FLNG Development Draft Environmental Impact Statement 8. Risk Assessment Process This section provides an overview of the EIA process undertaken for the Browse FLNG Development, from identification

More information

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012 PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC SEPTEMBER 19, 2012 PARR AND FAIRFIELD LOCATIONS Lockhart Neal Shoals Monticello

More information

Hydropower - a sustainable European asset

Hydropower - a sustainable European asset Hydropower - a sustainable European asset Karl Heinz Gruber CC Hydro Power Content 1 VGB PowerTech 2 Hydropower Generation and Potential in EU 27 3 Impact of Water Framework Directive 4 Continuous Strategic

More information

Impacts of mainstream dams on fisheries and mitigation options - Current status of knowledge

Impacts of mainstream dams on fisheries and mitigation options - Current status of knowledge Mekong Fisheries Impacts of mainstream dams on fisheries and mitigation options - Current status of knowledge Chris Barlow Fisheries Programme Mekong River Commission Three parts to this presentation 1.

More information

Swedish environmental legislation and how it is implemented. Malin Hemmingsson

Swedish environmental legislation and how it is implemented. Malin Hemmingsson Swedish environmental legislation and how it is implemented Malin Hemmingsson Malin.Hemmingsson@havochvatten.se Swedish Agency for Marine and Water Management (SwAM) Started its operations on July,1 2011

More information

Guidance on the Classification of Ecological Potential for Heavily Modified Water Bodies and Artificial Water Bodies

Guidance on the Classification of Ecological Potential for Heavily Modified Water Bodies and Artificial Water Bodies Guidance on the Classification of Ecological Potential for Heavily Modified Water Bodies and Artificial Water Bodies UKTAG Guidance 31st March 2008 Document title UKTAG Guidance on the Classification of

More information

Speech of Mr. Petru LIFICIU Minister of Ministry of Waters and Environmental Protection

Speech of Mr. Petru LIFICIU Minister of Ministry of Waters and Environmental Protection R O M A N I A MINISTRYof WATERS and ENVIRONMENTAL PROTECTION Speech of Mr. Petru LIFICIU Minister of Ministry of Waters and Environmental Protection At the third World Water Forum INBO OFFICIAL SESSION

More information

Common Implementation Strategy for the Water Framework Directive (2000/60/EC)

Common Implementation Strategy for the Water Framework Directive (2000/60/EC) European Commission Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Guidance document n. o 6 Towards a guidance on establishment of the intercalibration network and the process

More information

Coupling SWAT with land cover and hydropower models for sustainable development in the Mekong Basin

Coupling SWAT with land cover and hydropower models for sustainable development in the Mekong Basin Coupling SWAT with land cover and hydropower models for sustainable development in the Mekong Basin Mauricio E. Arias 1 Tom A. Cochrane 1, Thanapon Piman 1,2, Ornanorg Vonnarart 2, Thomas B. Wild 3, Daniel

More information

Flow-ecology relationships. Flow-ecology relationships Susitna case study

Flow-ecology relationships. Flow-ecology relationships Susitna case study Flow-ecology relationships Flow-ecology relationships Susitna case study Flow regime Ecologically-Relevant Flow Regime Characteristics Seasonal or typical conditions Annual extreme conditions High and

More information

Benefit sharing in hydropower development. Initiative on Sustainable Hydropower

Benefit sharing in hydropower development. Initiative on Sustainable Hydropower Benefit sharing in hydropower development Initiative on Sustainable Hydropower Benefit sharing Hydropower projects can tap into the Mekong River s natural source of energy and contribute to economic growth

More information

The Nitrates Directive Implementation

The Nitrates Directive Implementation The Nitrates Directive Implementation Marco Bonetti DG Environment, European Commission ENV B1-Agriculture, Forests & Soil BFFE Conference on Agricultural Water Protection and Sustainable Food Production

More information

Definitions and outcomes of NWRM EU project

Definitions and outcomes of NWRM EU project Definitions and outcomes of NWRM EU project DG Environment Water Unit Lucia Bernal Saukkonen BUCHAREST 12 TH NOVEMBER 2014, WORKSHOP ON RIVER RESTORATION AND NWRM Overview Policy background Blueprint and

More information

Workshop Hydropower and Fish Existing hydropower facilities: Strategic planning for ecological restoration

Workshop Hydropower and Fish Existing hydropower facilities: Strategic planning for ecological restoration Workshop Hydropower and Fish Existing hydropower facilities: Strategic planning for ecological restoration Verbund Hydro Power Gmbh, Gerd Frik, Brussels, 30.05.2017 Existing hydropower facilities: Strategic

More information

Voith s StreamDiver solution for decentralized low head hydropower plant operations

Voith s StreamDiver solution for decentralized low head hydropower plant operations Voith s StreamDiver solution for decentralized low head hydropower plant operations Stefan Reich Joerg Lochschmidt, Mandar Pachegaokar Voith Hydro Holding GmbH & Co. KG Voith Hydro Holding GmbH & Co. Voith

More information

Implementing Party & Period - Project: Oslo Lysverker (Preparation and Application), (Construction), (in Operation)

Implementing Party & Period - Project: Oslo Lysverker (Preparation and Application), (Construction), (in Operation) IEA Hydropower Implementing Agreement Annex VIII Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 10-04: Landscape and Cultural Heritage Aurland Hydropower Development,

More information

Overcoming RES Permitting and Grid Access Barriers in Greece

Overcoming RES Permitting and Grid Access Barriers in Greece GREEK ASSOCIATION OF RES ELECTRICITY PRODUCERS Overcoming RES Permitting and Grid Access Barriers in Greece A short presentation for the 9 th Workshop of the International Feed-In Cooperation Friday, 27

More information

The EU Water Framework Directive

The EU Water Framework Directive The EU Water Framework Directive Why is it important to the recreational boating industry? SEPTEMBER 2004 The EU Water Framework Directive: why is it important to the recreational boating industry? The

More information

We have great news. Danish National Institute of Aquatic Resources uses drones for survey

We have great news. Danish National Institute of Aquatic Resources uses drones for survey We have great news From drone surveys to social attitudes towards dams, new projects in the Allier river and much more. You can read it all in this new AMBER newsletter. Danish National Institute of Aquatic

More information

TEEB processesin Europe in the contextof the EU Biodiversity Strategy to 2020

TEEB processesin Europe in the contextof the EU Biodiversity Strategy to 2020 TEEB processesin Europe in the contextof the EU Biodiversity Strategy to 2020 Laure Ledoux, Biodiversity Unit, DG ENV 1 Exchange on TEEB processes in EU countries International Expert workshop, 11-15 October,

More information

Revised 8-4. Board of Directors Water Planning and Stewardship Committee. September 11, 2007 Board Meeting. Subject. Description

Revised 8-4. Board of Directors Water Planning and Stewardship Committee. September 11, 2007 Board Meeting. Subject. Description Board of Directors Water Planning and Stewardship Committee September 11, 2007 Board Meeting Subject Adopt criteria for conveyance options in implementation of Long Term Delta Plan Description Revised

More information

Site 16: Slaidburn Saw Mill

Site 16: Slaidburn Saw Mill Site 16: Slaidburn Saw Mill Site Assessment Report Title Figure 1 Map showing general layout Mill House in Slaidburn is a former water-powered corn mill, disused in 1850, rebuilt in 1912 as a saw mill.

More information

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental

More information

British Columbia s. VVater Act. Modernization. Policy Proposal on British Columbia s new Water Sustainability Act. December 2010

British Columbia s. VVater Act. Modernization. Policy Proposal on British Columbia s new Water Sustainability Act. December 2010 British Columbia s VVater Act Modernization Policy Proposal on British Columbia s new Water Sustainability Act December 2010 British Columbia has a rich heritage in our lakes, rivers and streams. Linked

More information

Avista Dam Relicensing Factsheet Commenting on the Draft License Application

Avista Dam Relicensing Factsheet Commenting on the Draft License Application Avista Dam Relicensing Factsheet Commenting on the Draft License Application Please Note: This is intended for informational purposes only and does not constitute legal advice. The life of every river

More information

Water framework directive Implementation in Schleswig-Holstein. Michael Trepel

Water framework directive Implementation in Schleswig-Holstein. Michael Trepel Water framework directive Implementation in Schleswig-Holstein Michael Trepel Vision of Water Framework Directive General principal is a natural water status - Common legal frame - European wide comparable

More information

Update of Recommendations for Hydropower and the Environment. BRIEFING DOCUMENT October 2010

Update of Recommendations for Hydropower and the Environment. BRIEFING DOCUMENT October 2010 Update of Recommendations for Hydropower and the Environment BRIEFING DOCUMENT October 2010 The IEA Hydropower Implementing Agreement (IEA Hydro) is a group of IEA and non-iea member countries working

More information

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013 PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC JANUARY 2013 PARR Relicensing Project PARR AND FAIRFIELD LOCATIONS FFPS PARR

More information

Framework Directive (MSFD):

Framework Directive (MSFD): SEA and EU Marine Strategy Framework Directive (MSFD): Introduction of MSFD: relationship with SEA Andrea Weiß MSFD-Secretariat Function for the Federal Ministry of the Environment Espoo Seminar Berlin,

More information

Methodologies to predict stranding potential during hydropeaking operations

Methodologies to predict stranding potential during hydropeaking operations Methodologies to predict stranding potential during hydropeaking operations Casas-Mulet R (1), Alfredsen K (1), Ruther N (1), Killingtveit Å (1), Bakken TH (2) (1) Institut for vann og-miljøteknikk, NTNU,

More information

USE OF PERCOLATION WATER IN TRACTEBEL ENERGIA HYDROELECTRIC PLANTS REPLACING WATER TREATMENT STATIONS

USE OF PERCOLATION WATER IN TRACTEBEL ENERGIA HYDROELECTRIC PLANTS REPLACING WATER TREATMENT STATIONS USE OF PERCOLATION WATER IN TRACTEBEL ENERGIA HYDROELECTRIC PLANTS REPLACING WATER TREATMENT STATIONS Tractebel Energia S.A. GDF SUEZ 1 Contents Introduction 3 Objectives 5 Development 6 Methodology 8

More information

Integrated Coastal Zone Management

Integrated Coastal Zone Management Integrated Coastal Zone Management Steve Collins Marine Planning & Coastal Integration Team Date: 05 November 2014 Overview To cover ICZM History and context MSP Directive MPS How marine planning contributes

More information

Key Components and Best Practices for Environmental Impact Assessments

Key Components and Best Practices for Environmental Impact Assessments Key Components and Best Practices for Environmental Impact Assessments Introduction 1 The immense technological advances since the adoption of UN Convention on the Law of the Sea (UNCLOS) have exponentially

More information

Sediment management of hydropower cascade: example of CNR run-of-river developments, French Rhone River, France

Sediment management of hydropower cascade: example of CNR run-of-river developments, French Rhone River, France Sediment management of hydropower cascade: example of CNR run-of-river developments, French Rhone River, France Christophe PETEUIL Compagnie Nationale du Rhone Engineering Department, River Systems and

More information

LIFE Project Number LIFE06 ENV/D/ Layman s Report. Covering the project activities from to Reporting Date

LIFE Project Number LIFE06 ENV/D/ Layman s Report. Covering the project activities from to Reporting Date LIFE Project Number Layman s Report Covering the project activities from 01.10.2006 to 30.06.2011 Reporting Date 30.06.2011 1 Introduction In the European Union, hydropower accounts for approx. 10 % of

More information

Water Issues in Cyprus

Water Issues in Cyprus Water Issues in Cyprus Sofoclis Aletraris Minister of Agriculture, Natural Resources and Environment 7 July, 2012 Water scarcity and droughts in Cyprus Severe water scarcity problem in Cyprus for centuries

More information

RIVER HEALTH, ENVIRONMENTAL FLOWS AND CASCADE MANAGEMENT IN LAO PDR

RIVER HEALTH, ENVIRONMENTAL FLOWS AND CASCADE MANAGEMENT IN LAO PDR RIVER HEALTH, ENVIRONMENTAL FLOWS AND CASCADE MANAGEMENT IN LAO PDR December 7, 2012, Mercure Hotel, Vientiane, Lao PDR Introduction The IFC recently approved a five year Advisory Services Program to help

More information

Options for integrating principles & criteria of sustainable bioenergy production and use into policy

Options for integrating principles & criteria of sustainable bioenergy production and use into policy Options for integrating principles & criteria of sustainable bioenergy production and use into policy Michael Krug (Freie Universität Berlin) Bioenergy Promotion/4Biomass Joint Workshop Berlin, March 11,

More information

Council of the European Union Brussels, 3 March 2017 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union

Council of the European Union Brussels, 3 March 2017 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union Council of the European Union Brussels, 3 March 2017 (OR. en) 6932/17 PECHE 87 DELACT 42 COVER NOTE From: date of receipt: 2 March 2017 To: No. Cion doc.: Subject: Secretary-General of the European Commission,

More information

Riverine obstacles to fish movement: a rapid assessment tool

Riverine obstacles to fish movement: a rapid assessment tool Riverine obstacles to fish movement: a rapid assessment tool Colin Bull Centre for River Ecosystem Science University of Stirling c.d.bull@stir.ac.uk The issue: What is a obstacle to fish migration? Anything

More information

Table 1: Member States with charges/taxes for the provision/use of freshwater for aquaculture

Table 1: Member States with charges/taxes for the provision/use of freshwater for aquaculture NB: the information presented in this document has been collected on a voluntary basis to facilitate discussions and exchange of experiences. This document cannot under any circumstances be regarded as

More information