PRE-FEASIBILITY REPORT

Size: px
Start display at page:

Download "PRE-FEASIBILITY REPORT"

Transcription

1 PRE-FEASIBILITY REPORT Consultant-Ascenso Enviro Pvt. Ltd. Page 19 of 32

2 1.0 EXECUTIVE SUMMARY S.No. Information Details 1. Project name Sand Mining Project on Ganga River at Kallu-GangajalGhat of District - Saran, State-Bihar 2. Mining Lease Area 23 Ha. 3. Location of mine Village District : State : Kallu-Gangajal Ghat, Mauza- Rasulpur Kasmer Block- Sonepur, District- Saran Saran Bihar 4. River/Nalla/Nadi GangaRiver 5. Minerals of mine Sand 6. Proposed Production tonnes/annum. 7. Bulk Density Method of mining Open Cast manual Method 8. Drilling or Blasting No 9. No of working days 270 days 10. Mining Period 3 Years 11. Water demand Domestic Water :2.4 KLD 12. Man Power 80 Dust Suppression: 1.5KLD Green Belt Development :0.9KLD Total Water Requirement:4.8KLD 13. Nearest railway station Sonepur railway station, approx. 5.5 Km towards East 14. Nearest state highway/national highway NH-19, approx. 3.5 Km towards NE. 15. Nearest air port Jay Prakash Narayan International Airport, Patna, approx Km towards South. Consultant-Ascenso Enviro Pvt. Ltd. Page 20 of 32

3 2. INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 2.1 Identification of Project and Project Proponent Name of the Project:Sand Mining Project atkallu-gangajal Ghat on Ganga River of District- Saran of State-Bihar. Kallu-Gangajal Ghat, Mauza- Rasulpur Kasmer Block- Sonepur, District- Saran Khasra no- 13,14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37,38,103, 104,101,102,105,127,128,129,124,97,98,90,86,87,88,82,83,84,85,89,90,91,92,93,94,95,96,98,99,10 0,106,107,108,109,110,76,77,78,2063,2064,2093,2094,2095,2096,2097,2098,2099,2100,2101,2102, 2103,2104,2105,2106,2107,2108,2109,2092,2065,2070,2071,2072,2079,2077,2078,2080,2081,2082,2088,2089,2090,2091,2040,2039,2136,2135,2134,2133,2137,2138,2145,2146,2147,2144,2087,208 6,2141,2142,2143,2085,2084,2083,2076,2075,2074,2067,2068,2069,2073,1992,1993,1994,1995,19 96,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2151,2152,2153,2154,2148,2149,2150,2 007,2008,2009,2010,2011,2012,2013,2014,2015,2016,2017,2018,2019,2020,2021,2022,2023,2024, 2025,2026,2027,2028,2029,2030,2031,2032,2033,2034,2035,2036,2384, Location details of the stretch wise along with co-ordinates are as:- Kallu-Gangajal Ghat: A '11.90"N85 6'40.86"E B '11.86"N 85 6'50.46"E C '45.90"N 85 6'37.50"E D '45.68"N 85 6'48.20"E Village- Kallu-Gangajal Ghat, District- Saran 2.2 Brief description of nature of the project The project is open cast mining of minor mineral in the form of Sand tonnes/annum. Sand will be excavated by Open cast manual Method. The project has been proposed bym/s. Broad-Son Commodities Pvt. Ltd. The project proponent had obtained mining permission for District- Saran. 2.3 Need for the Project and Its Importance to the Country or Region Consultant-Ascenso Enviro Pvt. Ltd. Page 21 of 32

4 Sand is used widely in the construction industry. It is mixed with cement and other ingredients to create mortar for building. It is also used in agriculture, as sandy soils are ideal for crops such as watermelons, peaches and peanuts. Sand is also used in Aquaria as it makes a low cost aquarium base material. 2.4 Demands-Supply Gap Creation of huge infrastructure as being envisaged by Government of India particularly in road and housing sector requires basic building raw materials. Thus the demand for Sandis ever growing with the growth of the infrastructure sector in our country. The requirement for the mineral is always high in the nearby cities and towns. Therefore there is always a good demand of the mineral in the domestic market. 2.5 Imports vs. Indigenous Production The demand in the domestic market is high for Sand. Mineral is available in abundant quantity in allotted area and can be excavated indigenously. Vast quantities of sand are available in various river ghats of the respective the river stretches. Therefore import of sand is not required. 2.6 Export Possibility There is no proposal to export the mineral as the minerals excavated, caterto the indigenous demand and the development is a never ending process. 2.7 Domestic/ Export Markets a) DOMESTIC MARKET There is always an ever increasing demand of these minerals in the domestic market. b) EXPORT MARKET The proposed mining activity is for indigenous consumption only for real state, road making etc. So no export will be envisaged. 2.8 Employment Generation (Direct and indirect) due to the project The total direct manpower requirement for the proposed mining operation will be around 80. Significant Indirect employment is also expected due to the associated activities. 3 PROJECT DESCRIPTION 3.1 Type of Project Including Interlinked and Interdependent Projects, If Any. Consultant-Ascenso Enviro Pvt. Ltd. Page 22 of 32

5 The proposed project for excavationofsandis an independent project in which minerals excavated will be directly sold in the local markets. It does not involve interlinked and interdependent project. 3.2 Location The mining lease area is located at,kallu-gangajal Ghat on Ganga River of District- Saranof State- Bihar Site Coordinates:- A '11.90"N85 6'40.86"E B '11.86"N 85 6'50.46"E C '45.90"N 85 6'37.50"E D '45.68"N 85 6'48.20"E 1 Km and 500 m radius google map, 10 km Topographic map attached asannexure IV and Annexure V respectively.the vicinity map of the mine location is given below: Consultant-Ascenso Enviro Pvt. Ltd. Page 23 of 32

6 Project Site Consultant-Ascenso Enviro Pvt. Ltd. Page 24 of 31

7 PFR for Proposed Sand Mining Project of Area 23 Ha. at Kallu-Gangajal Ghat on Ganga River of 3.3 Details of alternate sites considered and the basis of selecting the proposed site, Particularly the environment considerations gone into should be highlighted. Mineral location is site specific as well as the lease has been allotted in the particular sand bearing area. Hence no alternative site is examined for mining. The land has been allocated by government for the mining only. As there is potential of Sand in large amount, so the mining will help to use a resource for beneficial purposes. 3.4 Size or magnitude of operation The proposed mine has lease over an area of 23 Ha. The maximum rated capacity of the project wills approx tonnes/annum. 3.5 Project description with process details This is an open-cast mining project, confined to excavation of Sand from the proposed site. The mineral- sand will be collected in its existing form. Excavation will be carried out only up to a depth of 2 m (Maximum) below ground level or above water level, whichever comes first. Excavation of Sand material will be done only during the day time and completely stopped during the monsoon season. 3.6 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of Final Product/s, Mode of Transport of Raw Material and Finished Product No raw material will be required in the proposed project. The operation involves only the excavation of Sandin its existing form and transported to the end users/ market. 3.7 RESOURCE OPTIMIZATION/ RECYCLING AND REUSE Minerals are generally depleting asset once mined; but minerals like Sandwill be replenished naturally. Thus a scientific approach will be taken up for excavation of mineral with systematic method. 3.8 AVAILABILITY OF WATER, ITS SOURCE, ENERGY/ POWER REQUIREMENT AND SOURCE Water Requirement Activity Water requirement (KLD) Dust suppression 1.5 Domestic 2.4 Green Belt Development 0.9 Total 4.8 Thus total water requirement will be 4.8KLD. This water will be supplied by private tankers. Consultant-Ascenso Enviro Pvt. Ltd. Page 25 of 31

8 3.8.2 POWER The material will be excavated by open cast manual method and loaded directly into tractors by the workers themselves. The operation will be done only from sun rise to sun set. So there is no power requirement for the mining activity. 3.9 QUANTITY OF WASTES TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT/ DISPOSAL 3.9.1Solid Waste Generation& its Disposal No Municipal solid waste will be generated Liquid Effluent No liquid effluent will be generated at the mine site due to the mineral excavation. 4 SITE ANALYSIS 4.1 Connectivity The Kallu-Gangajal Ghat is well connected to the nearest Village metalled road (mirapur road.) via an approach road of approx. 250 m towards East.Haul Route Map is attached as Annexure VI. 4.2 LANDFORM, LANDUSE AND LAND OWNERSHIP The proposed activity is to take place in thedry river bed of concerned rivers. The land form is mostly river bed and non-forest land. The entire land is Government land. Moreover there will be no change in land use as the mining will be confined to the river bed, which will get replenished naturally with the continuous flow of water. 4.3 TOPOGRAPHY This district is situated between and North latitude and and East longitude. The geographical area of the district is2641 km2. It comprises of 3 civil sub-division, 20 community development blocks, and 1783villages. The total population of the district is (Rural & Urban ).The river Ganga constitutes the southern boundary of the district beyond which Patnaand Bhojpur district lies. Siwan and Gopalganj district forms the northern and westernboundaries of the district. The River Gandak forms the boundary in the east beyond whichvaishali and Muzaffarpur districts lies. There are 5 statutory towns in the district. These are Chapra, Revelganj, Sonepur, Dighwara and Marhaura. Chapra is the main town in the district. Source: - Consultant-Ascenso Enviro Pvt. Ltd. Page 26 of 32

9 4.4 EXISTING LAND USE PATTERN AND SHORTEST DISTANCES FROM FORESTS, WATER BODIES, ECO-SENSITIVE AREAS, ETC. The mine lease area is flat. There is no forest land or agriculture land in the mine lease area. The entire mining lease lies within the inactive channel of the bed of rivers, The existing landuse pattern is dominated by agriculture followed by barren lands. 4.5 EXISTING INFRASTRUCTURE The site has no existing infrastructure, except for connecting road for transportation. 4.6 SOIL CLASSIFICATION The two types of soils dominant in the district are as follows: 1) Younger alluvial soil (sub type of Entisols) is restricted in the North Gangetic plain. It is generally deficient of nitrogen and phosphoric acid but not of lime and potash. The generaltexture of the soil in the area is sandy to loamy sand. High soil moisture and regular flooding are causing water-logging condition in this soil type area. These are most fertile soils and eminently suitable for extensive cultivation of Paddy and Sugarcane. 2) Calcareous alluvial soils (sub type of Inceptisols) occur mostly in the central part of the area. This soil is generally enrich edinpotas hand phosphoric acid. The calcareous material brought by Gandak and its tribute arise is causing this soil type. 4.7 CLIMATIC DATA FROM SECONDARY SOURCES The westerly wind accompanied by dust storms around middle March marks the beginning of the summer season. May is the hottest month of the year when ambient temperature shoots upto 46 C. The summer continues up to June before onset of monsoon. The winter starts towards the middle of October and ambient temperature dips down to about7 C during the month of January, which is the coldest month of the year. The humidity is lowest in April and highest in August. The monsoon is active from June mid to the end of September.The average annual rainfallin the district is 837 mm for year The monsoon rainfall is about 80 % of the annualrainfall. Source: SOCIAL INFRASTRUCTURE AVAILABLE Consultant-Ascenso Enviro Pvt. Ltd. Page 27 of 32

10 S.No. Items Distance and Direction (Approx.) 1. Nearest School Primary School,MirzapurApprox. 1.5 Km towards North 2. Nearest Hospital Primary health center, Sonpur,Approx. 5.5 Km towards East 3. Nearest Worship Mata mandir, Approx. 1.5 Km towards North 4. Nearest Railway Station Sonepur railway station, approx. 5.5 Km towards East 5. Nearest Airport Jay Prakash Narayan International Airport, Patna, approx Km towards South 6. Nearest Highway NH- 19, Approx. 3.5 Km towards NE. 5 PLANNING BRIEF 5.1 Planning Concept Mining will be done as per the guidelines of Bihar Mineral Policy, and guidelines of Bihar Minor Mineral Concession Rules (amended thereof) This is an open-cast mining project. Excavation of minerals will be carried out only up to a depth of 2 meter. Safety distance of 3 meter or 1/10th of the width of the river whichever is more will be maintained from both the banks of river. Mining will be confined to the dry bed of the river within allotted area. 5.2 Population projection The project will employ most of the workers from nearby villages except for supervisory staff. Thus there will no increase in population due to the project. However, few people from other area may migrate in this area for employment directly and indirectly for business opportunities. 5.3 Land use planning (Break up along with green belt, etc.) Mining will be done in slices starting from the topmost level progressivelyadvancing downwards. The area so excavated will get filled up due to sediment inflow during monsoon. Plantation will be done near the civic amenities or road sides in consultation with the local authorities/government body.it is not feasible to plant trees in the lease area. Native plant / tree species will be planted in consultation with grampanchayat and local forest officials. List of Green Belt Consultant-Ascenso Enviro Pvt. Ltd. Page 28 of 32

11 S. No. Scientific Name Hindiname 1 Azadirachta indica Nim 2 Tectona grandis Teak 3 Terminalia arjuna Arjun 4 Tuti Tut 5 Syzygium cumini Jamun 6 Ficus religiosaa Pipal 7 The castor Erandi 8 Neolamarckia cadamba Kadamb 9 Dalbergia sissoo Shisham 10 Madhuca longifolia Mahua 5.4 Assessment of Infrastructure Demand (Physical & Social) Infrastructure like evacuation road, site services will only be required. Only local villagers from nearby villages will be employed for the mining activity. Thus no housing facility is proposed. 5.5 Amenities/Facilities The following facilities/amenities will be extended by the mine management: Direct and indirect Employment, most of which most will be from nearby villages depending upon the suitability of persons required for the job. Arrangements for safe and healthy working conditions& temporary rest shelters. Provision of Drinking water. Provision of PPE. Consultant-Ascenso Enviro Pvt. Ltd. Page 29 of 32

12 First-Aid facilities and Health check-up camps for the workers. Conducting medical camps for workers and nearby villagers at regular interval. Mobile toilets will be provided for sanitation purposes. 6 PROPOSED INFRASTRUCTURE 6.1 Industrial Area (Processing Area) No industrial area is proposed. 6.2 Residential Area (Non Processing Area) As the local people will be given employment, no residential area/ housing are proposed. 6.3 Green Belt It is proposed to plant local trees and bushes along the river banks and along haul road in consultation with the local authority/ Govt. body. Approx. 300 trees will be planted at the river bank and the haul roads.tree plantation programmes are as:- S. No No of Year No of Trees 1 1 st Year nd Year rd Year Maintenance 6.4 Social infrastructure Road facility (existing roads will be maintained regularly) Employment opportunity Medical camps Social awareness camps, Donations to schools Secondary employment opportunities Formation of self-help groups for the women in nearby villages 6.5 Connectivity The Kallu-Gangajal Ghat is well connected to the nearest Village metalled road (mirapur road.) via an approach road of approx. 250 m towards East.Haul Route Map is attached as Annexure VI. 6.6 Drinking Water Management Water required for drinkingpurposewill be obtainedthrough tankers/or by private tankers. Consultant-Ascenso Enviro Pvt. Ltd. Page 30 of 32

13 6.7 Sewerage System No sewerage system is proposed. 6.8 Industrial Waste Management Not applicable 6.9 Solid Waste management No solid waste will be generated from the proposed project Power Requirement & Supply/Source. The mining activity will be done Open Cast Method and the operation will be done only during the day hours from sun rise to sun set. So there is no power requirement for the mining activity. 7.REHABILITATION AND RESETTLEMENT (R&R) PLAN The mine area is inactive channel of river bed, so rehabilitation and resettlement plan is not required. 8 PROJECT SCHEDULE & COST ESTIMATES 8.1 Likely date of start of construction and likely date of completion. The project will commence once Environmental Clearance and other necessary certificates are obtained from the respective departments. 8.2 Estimated project cost along with analysis in terms of economic viability of the project Sr. No. Description Cost in Lakhs(in Rs.) 1 Auction cost Labour & Equipment s cost Site facilities Environnemental Protection cost Miscellaneous 1.0 TOTAL The total cost of project would be around Rs Lakhs Lakhs Consultant-Ascenso Enviro Pvt. Ltd. Page 31 of 32

14 Environment Management Cost S. No Description Cost Rs.in Lakhs 1 Dust suppression Haul road maintenance Green belt & Maintenance Monitoring cost 4.0 Corporate Social Responsibility Cost:- CSR cost will be 2% of total project cost i.e209.2lakh X 2 % = Approx. Rs.4.1 Lakhs The CSR cost will be used for the welfare of people residing nearby the lease area with consultation with the Local Authority. 9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) The Project will bring economic benefits to the state by the way of Royalty for mineral. Achieving a huge infrastructure as being envisaged by Government of India particularly in road and housing sector requires basic building materials. Sandis one of primary building material required for the purpose. The mining activities as proposed are the backbone of all construction and infrastructure projects as the raw material for construction is available only from such mining. Sandexcavated is in high demand at the local market for real estate industry. This project operation will provide livelihood to the poorest section of the society/economically backward population and tribal in the area. It provides employment to the people residing in vicinity directly or indirectly.the mine management will also help nearby villages by providing aid to school, conducting medical and social awareness camps, helping in formation of self-help groups, etc. Thus the project will bring about socio-economic improvement of the area and will prove beneficial to the area. ********** Consultant-Ascenso Enviro Pvt. Ltd. Page 32 of 32

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

PRE FEASIBILITY REPORT FOR. Mining of Riverbed Sand. From Darakeswar River. Area : 8.09 Ha ( 20 Acres )

PRE FEASIBILITY REPORT FOR. Mining of Riverbed Sand. From Darakeswar River. Area : 8.09 Ha ( 20 Acres ) PRE FEASIBILITY REPORT FOR Mining of Riverbed Sand From Darakeswar River Area : 8.09 Ha ( 20 Acres ) AT Mouza: Kunjapur, Plot No: 2227 (P), 2269 (P), 2603 (P),JL: 112, Village: Kunjapur, Block : Indus,,

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

PRE-FEASIBILITY REPORT. 5.0 Hectare sand mine under bhu-jal

PRE-FEASIBILITY REPORT. 5.0 Hectare sand mine under bhu-jal 1.0 SUMMARY OF THE PROJECT PRE-FEASIBILITY REPORT Project Name of Company / Mine Location Village Taluka District State Sand mine Gram Panchayat Tarrighat, Sand mine Tarrighat Tarrighat Patan Durg Chhattisgarh

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

PRE FEASIBILITY REPORT (PFR)

PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 27 PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 28 INDEX S. No. Contents Page No. 1.0 EXECUTIVE SUMMARY 30 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

KL) Proposed capacity of the. No change similar as existing i.e KL (MS KL, HSD KL & SKO KL) Terminal

KL) Proposed capacity of the. No change similar as existing i.e KL (MS KL, HSD KL & SKO KL) Terminal 1.0 EXECUTIVE SUMMARY Hindustan Petroleum Corporation Limited (HPCL) is one of the major Public Sector Navratna Oil Company engaged in refining, marketing and distribution of Petroleum Products in India.

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (I) Basic Information S.No. Particulates Details 1. Name of the Mining Lease site

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For EXISTING MINING ACTIVITY CATEGARY B2 UNDER THE EIA NOTIFICATION 2006 AMENDED ON 31/05/2012 TO PIRABHAI VALABHAI NANDASANIYA LOCATED

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

RURAL LIVING AREAS Rural Living Areas Rural Lifestyle and Rural Residential 8.1 Issues, Objectives and Policies

RURAL LIVING AREAS Rural Living Areas Rural Lifestyle and Rural Residential 8.1 Issues, Objectives and Policies . Rural Living Areas Rural Lifestyle and Rural Residential.1 Issues, Objectives and Policies.1.1 Resource Management Issues Discussion of additional relevant issues is found in the following Parts of the

More information

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal 1.0 EXECUTIVE SUMMARY Hindustan Petroleum Corporation Limited (HPCL) is one of the major Public Sector Navratna Oil Company engaged in refining, marketing and distribution of Petroleum Products in India.

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Pre-Feasibility Report. for. Proposed Construction project of Santnagari

Pre-Feasibility Report. for. Proposed Construction project of Santnagari Pre-Feasibility Report for Proposed Construction project of Santnagari at Survey No. 1439, Near Dharoi Dam, Village Mahor, Taluka Vadali, District Sabarkantha, Gujarat By Gujarat Pavitra Yatradham Vikas

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR Near Village Tehsil District State Capacity Lease Area Category of Project Project Cost KANTBARA BIJOLIYA Bhilwara Rajasthan 36561 TPA of

More information

A 'N 'E B 'N 'E C 'N 'E D 'N 'E

A 'N 'E B 'N 'E C 'N 'E D 'N 'E Gata. 12, Gata. 164, 352 & 1295/5 Basic Information FORM- 1 S.. Item Details 1. Name of the project/s Sand/Moram Mining 2. S.. in the schedule 1(a)i 3. Proposed capacity/area/length/tonnage to be handled

More information

Project Proponent: Shri Kuldeep Pratap Singh Bhati Page - 11

Project Proponent: Shri Kuldeep Pratap Singh Bhati Page - 11 1.0 EXECUTIVE SUMMARY This is a new mining lease of Ball Clay Silica Sand, M.L. No.- 48/2011, located near Village- Indo Ka Bala, Tehsil-Kolayati, District Bikaner (Rajasthan) over an area of 4.2464 hectares.

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

FACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods.

FACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods. 1 FACTSHEET INTRODUCTION World Water Day, on 22 March every year, is about focusing attention on the importance of water. This year s theme, Nature for Water, explores nature-based solutions (NBS) to the

More information

CONTENTS CHAPTER : ONE. 1-9 CHAPTER : TWO.10-16

CONTENTS CHAPTER : ONE. 1-9 CHAPTER : TWO.10-16 CONTENTS LIST OF TABLES Page No. CHAPTER : ONE. 1-9 ENVIRONMENT STATISTICS: FRAME WORK AND INDICATORS. 1 1.3.1 Framework for Development of Environment Statistics (FDES) Information categories 3 1.3.2

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

KALYAN DOMBIVLI MUNICIPAL CORPORATION PRE FEASIBILITY REPORT

KALYAN DOMBIVLI MUNICIPAL CORPORATION PRE FEASIBILITY REPORT KALYAN DOMBIVLI MUNICIPAL CORPORATION PRE FEASIBILITY REPORT For Proposed Integrated Solid Waste Management Facility at Barave, Kalyan Prepared By ABC Techno Labs India Pvt. Ltd. QCI NABET Accredited (Certificate

More information

Table 1 Population in MBMC

Table 1 Population in MBMC EXECUTIVE SUMMARY 1.1 Existing status of physical infrastructure Mira Bhayandar which is part of Thane district is located at the northern threshold of greater Mumbai between 18 2'N 20 20'N latitude and

More information

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The groups cement facilities are located

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Table of Contents 1 EXECUTIVE SUMMARY:... 1 2 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION:... 1 2.1 Identification of the Project:... 1 2.2 Details of the Project Proponent:...

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

Production of fresh and dry fruits, a district wise analysis in Jammu and Kashmir

Production of fresh and dry fruits, a district wise analysis in Jammu and Kashmir 2017; 3(7): 336-340 ISSN Print: 2394-7500 ISSN Online: 2394-5869 Impact Factor: 5.2 IJAR 2017; 3(7): 336-340 www.allresearchjournal.com Received: 28-05-2017 Accepted: 29-06-2017 Asst. Lect. Department

More information

WATER AWARENESS PROGRAM (WAP) FOR FARMERS (Moga, Punjab)

WATER AWARENESS PROGRAM (WAP) FOR FARMERS (Moga, Punjab) WATER AWARENESS PROGRAM (WAP) FOR FARMERS (Moga, Punjab) Understand Conserve Protect Nestlé India OBJECTIVE OF THIS PROGRAM This program has been specially designed by Nestlé to create awareness amongst

More information

Infrastructure Development and Environment

Infrastructure Development and Environment Infrastructure Development and Environment Few Stories Lift irrigation from Chambal River No Development Zone around Numaligarh Refinery NH - 31 C passing through Jaldapara, Mahananda and Buxa Nh-72 cutting

More information

Torpa Small Hydro Power Project

Torpa Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (BUILT UP AREA: 77420.15 SQ. M) BY AMC EWS HOUSING PROJECT RESIDENTIAL BUILDING & COMMERCIAL PROJECT F. P. NO. 174, T.P. NO. 32, GOTA,

More information

Bio-Based Eco Industrial Clustering in Dambulla Sri Lanka

Bio-Based Eco Industrial Clustering in Dambulla Sri Lanka Bio-Based Eco Industrial Clustering in Dambulla Sri Lanka Gemunu Herath and Uditha Ratnayake Department of Civil Engineering University of Peradeniya Sri Lanka Gemunu 1 Country Profile Sri Lanka Population

More information

ANNEX 11 WATER SUPPLY, SANITATION AND SOLID WASTE MANAGEMENT

ANNEX 11 WATER SUPPLY, SANITATION AND SOLID WASTE MANAGEMENT ANNEX 11 WATER SUPPLY, SANITATION AND SOLID WASTE MANAGEMENT A. Introduction 1. The South Asia earthquake disaster significantly affected the water and sanitation sector in five districts of North West

More information

THE CONCEPT OF ORGANIC FARMING:

THE CONCEPT OF ORGANIC FARMING: INTRODUCTION : Agriculture is one of the oldest and most fundamental primary occupation of all human beings since stone age. It is a foundation of all social Cultural and Economical condition of mankind.

More information

PRE FEASIBILITY REPORT. This is a proposal of running mining lease for which CTO has been issued by Regional officer, Jaipur.

PRE FEASIBILITY REPORT. This is a proposal of running mining lease for which CTO has been issued by Regional officer, Jaipur. Masonry Stone Mining Project (2,11,000 TPA), M.L. No. 82/97, ML Area 1.0 ha Near Village: Beri Tehsil Kotputali District 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT This is a proposal of running mining

More information

PROMOTION OF DRY LAND MANGO CULTIVATION FOR INCOME SECURITY

PROMOTION OF DRY LAND MANGO CULTIVATION FOR INCOME SECURITY PROMOTION OF DRY LAND MANGO CULTIVATION FOR INCOME SECURITY A CASE STUDY K.H.PATIL KRISHI VIGYAN KENDAR HULKOTI-582205 GADAG DISTRICT KARNATAKA STATE Impact/Case study series: No.8 Promotion of dry land

More information

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002 (18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002 (Gazette No. 23922, Notice No. 1273 dated 10 October 2002. Commencement date: 1 May 2004 [Proc. No. R25, Gazette No. 26264])

More information

Agricultural Productivity of the Baramati Tahsil, Pune District (Maharashtra).

Agricultural Productivity of the Baramati Tahsil, Pune District (Maharashtra). IOSR Journal of Agriculture and Veterinary Science (IOSR-JAVS) e-issn: 2319-2380, p-issn: 2319-2372. Volume 7, Issue 5 Ver. II (May. 2014), PP 25-30 Agricultural of the Baramati Tahsil, Pune District (Maharashtra).

More information

Bishunpur Small Hydro Power Project

Bishunpur Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

Fig: Alignment of a ridge or watershed canal (Head reach of a main canal in plains)

Fig: Alignment of a ridge or watershed canal (Head reach of a main canal in plains) SYSTEM OF IRRIGATION CANAL CHAPTER 6 Alluvial Soil and Non-Alluvial Soil The soil which is formed by transportation and deposition of silt through the agency of water, over a course of time, is called

More information

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning) Page: 1 Date: May 27, 2014 Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full Title of the Project 2. Type of the study (e.g. Master

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Stone Quarry (Area 1.00 ha) Survey No: - 526, 527 & 528 (Part) Village Raimoha, Taluka Shirur (Kasar), Dist - Beed (M.S). Owner & Lessee Shri. Chakradhar Subhash Dhakane Prepared

More information

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

Demand Potential of Indian Spun Pipes

Demand Potential of Indian Spun Pipes Demand Potential of Indian Spun Pipes An Analytical Review uctile iron spun pipes and cast iron spun pipes both find Dusages in water supply, sanitation and housing. Cast iron spun pipes have traditionally

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

APPLICATION OF RAPID IMPACT ASSESSMENT MATRIX (RIAM) METHOD FOR THE FEASIBILITY STUDY OF A MOBILITY HUB IN KOTTAYAM

APPLICATION OF RAPID IMPACT ASSESSMENT MATRIX (RIAM) METHOD FOR THE FEASIBILITY STUDY OF A MOBILITY HUB IN KOTTAYAM ISSN (Online) : 2319-8753 ISSN (Print) : 2347-6710 International Journal of Innovative Research in Science, Engineering and Technology An ISO 3297: 2007 Certified Organization, Volume 2, Special Issue

More information

CONCEPTUAL PLAN. M/s. APOLLO HOSPITALS ENTERPRISE LTD., (Construction of Oncology Block)

CONCEPTUAL PLAN. M/s. APOLLO HOSPITALS ENTERPRISE LTD., (Construction of Oncology Block) CONCEPTUAL PLAN of M/s. APOLLO HOSPITALS ENTERPRISE LTD., (Construction of Oncology Block) Sy. No. 68P & 76, Health City, Chinagadila (V), Visakhapatnam District Andhra Pradesh Prepared by SV ENVIRO LABS

More information

STANDARD OPERATING PROCEDURE

STANDARD OPERATING PROCEDURE STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame

More information

- 1 S. NO. PARTICULARS DETAILS

- 1 S. NO. PARTICULARS DETAILS 1.0 INTRODUCTION EXECUTIVE SUMMARY M/s. Lafarge India Private Ltd. (LIPL) is a subsidiary of French building materials major Lafarge. Lafarge entered in the Indian market in 1999 with acquisition of cement

More information

For. Coal Washery. Promoter. : Budbud & Kerajharia. Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012

For. Coal Washery. Promoter. : Budbud & Kerajharia. Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012 Pre-feasibility Report For Coal Washery at Village Tehsil District : Budbud & Kerajharia : Pali : Korba [C.G.] Promoter Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012 Contents 1.0 Executive

More information

DEVELOPMENT of. LPG Storage & Bottling Plant. Haldia. Project Feasibility Report

DEVELOPMENT of. LPG Storage & Bottling Plant. Haldia. Project Feasibility Report Hindustan Aegis LPG Limited DEVELOPMENT of LPG Storage & Bottling Plant Haldia Project Feasibility Report August 2017 1 Amendment Record: Amendment Inserted by (Name printed) Date Signature Remarks 2 Table

More information

Provincial Policy Statement 2014 Training Aid

Provincial Policy Statement 2014 Training Aid This job aid has been developed for education and training purposes as a high-level summary of the policy changes in the PPS 2014. It should not be relied upon as a substitute for specialized legal or

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

Thethaitangar Small Hydro Power Project

Thethaitangar Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

SPECIAL CONDITIONS OF CONTRACT

SPECIAL CONDITIONS OF CONTRACT Annexure 16 SPECIAL CONDITIONS OF CONTRACT 1.0 General The Special conditions of contract shall be read in conjunction with the General Conditions of Contract, Specifications, Pre-amble to Bill of Quantities,

More information

SITE PRIORITIZATION FOR IBFI

SITE PRIORITIZATION FOR IBFI SITE PRIORITIZATION FOR IBFI Rajesh K Pandey, Giriraj Amarnath, Niranga Alahacoon, Karthikeyan Matheswaran IWMI, Colombo Inception Workshop on Index Based Flood Insurance (IBFI) for Agriculture Risk Management

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

Unit A: Introduction to Forestry. Lesson 3: Recognizing the Importance of Forests

Unit A: Introduction to Forestry. Lesson 3: Recognizing the Importance of Forests Unit A: Introduction to Forestry Lesson 3: Recognizing the Importance of Forests 1 Terms Forest Forest canopy Piling Pulpwood Timberland Total forest land Urban forestry Veneer Reserved forest land 2 What

More information

Hybrid-Annuity based Public Private Partnership (PPP) model for creation of sewage treatment infrastructure

Hybrid-Annuity based Public Private Partnership (PPP) model for creation of sewage treatment infrastructure Hybrid-Annuity based Public Private Partnership (PPP) model for creation of sewage treatment infrastructure 24 th February 2016 Namami Gange Programme NATIONAL MISSION FOR CLEAN GANGA MINISTRY OF WATER

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT 1 MCDR INSPECTION REPORT General SN Particulars Details Date of Inspection 18.10.2016 1 Name of the Mine Dhobitola Titaniferous Iron Ore Mine 2 Total Lease Area (Ha) 2.61 Ha (Entire Forest Land) with breakup

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Impact of Air-Pollution on ph of soil of Saran, Bihar, India

Impact of Air-Pollution on ph of soil of Saran, Bihar, India Abstract Research Journal of Recent Sciences ISSN 2277-2502 Res.J.Recent Sci. Impact of Air-Pollution on ph of soil of Saran, Bihar, India Srivastava K.P.* and Singh Vikash Kumar Ganga Singh College, Jai

More information

STATE OF ENVIRONMENT ATLAS OF INDIA-OUTLINE

STATE OF ENVIRONMENT ATLAS OF INDIA-OUTLINE STATE OF ENVIRONMENT ATLAS OF INDIA-OUTLINE Sl. No. Maps Themes Features Data Source I: GENERAL CHARACTERISTICS I. Administrative Divisions International, States, Districts Survey of Boundaries with State

More information

M/s ARYAN ENERGY (P) LTD.

M/s ARYAN ENERGY (P) LTD. Application for Environmental Clearance (EC) PRE-FEASIBILITY REPORT For Expansion of Coal Washery Plant from 2.34 Million TPA to 5.00 Million TPA M/s ARYAN ENERGY (P) LTD. at IDCO s Industrial Estate at

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Title Action Plan toward Effective Flood Hazard Mapping in My Country

Title Action Plan toward Effective Flood Hazard Mapping in My Country Title Action Plan toward Effective Flood Hazard Mapping in My Country JICA region focused training course on flood hazard mapping Sep 2006 LAI TUAN ANH Division of Geodesy Department of Planning and Management

More information

Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi CONCEPTUAL PLAN

Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi CONCEPTUAL PLAN Proposed Redevelopment of Anand Vihar Railway Station, Anand Vihar, East Delhi CONCEPTUAL PLAN 1. INTRODUCTION Proposed project is for "Redevelopment of Anand Vihar Railway Station by Indian Railway Station

More information

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update Research Compendium Coal Sector in India 2013 A comprehensive data and information update Release Date : August 2013 Background About the report Coal is the only major conventional source of energy that

More information

Bench terraces on loess soil China - 土坎梯田, 梯地

Bench terraces on loess soil China - 土坎梯田, 梯地 Bench terraces on loess soil China - 土坎梯田, 梯地 A Terrace is a structural SLM practice with a raised flat platform built on the slope to reduce soil loss and runoff on the slope, increase the rainfall infiltration

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

Research Article. Abdul Rauf 1 *, S. A. Saraf 1, P. A. Khan 2, and Q. J. A. Peer 3

Research Article. Abdul Rauf 1 *, S. A. Saraf 1, P. A. Khan 2, and Q. J. A. Peer 3 Research Article A Comparative Analysis of Managerial Approach in Small and Large Apple Orchards of Himachal Pradesh and Jammu & Kashmir States of India an Economic Perspective Abdul Rauf 1 *, S. A. Saraf

More information

Socio-Environmental Impacts of Mining Social Impact Key Issues

Socio-Environmental Impacts of Mining Social Impact Key Issues MEA 2006 V 1.0 08/2006 Socio-Environmental Impacts of Mining Social Impact Key Issues David Brereton Social Impact Key Issues What are social impacts? The term social impacts refers to the effects positive

More information

Intended Nationally Determined Contributions

Intended Nationally Determined Contributions Intended Nationally Determined Contributions Objective: The State of Kuwait - November 2015 In accordance with Decision 1/CP.19 and based on the information mentioned in decision 1/CP.20 which invites

More information

PRESENTATION ON MANGANESE ORE DEPOSITS OF SMIORE FOR THE WORK SHOP ON REVISION OF THRESHOLD VALUES OF MINERALS AT GOA

PRESENTATION ON MANGANESE ORE DEPOSITS OF SMIORE FOR THE WORK SHOP ON REVISION OF THRESHOLD VALUES OF MINERALS AT GOA PRESENTATION ON MANGANESE ORE DEPOSITS OF SMIORE FOR THE WORK SHOP ON REVISION OF THRESHOLD VALUES OF MINERALS AT GOA 21-07-2107 INTRODUCTION The Sandur Manganese & Iron Ores Ltd. (SMIORE) are operating

More information

Using the Online Database

Using the Online Database Toxic Site Identification Program Using the Online Database If you ever have a question about a section of the online database, please click on the red question mark [?] next to that section. If that does

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

M/S Overseas Min-Tech Consultants, Jaipur. Pre-Feasibility Report Index INDEX 1 EXECUTIVE SUMMARY... 1

M/S Overseas Min-Tech Consultants, Jaipur. Pre-Feasibility Report Index INDEX 1 EXECUTIVE SUMMARY... 1 White Clay/China Clay Mining Project (3,250 TPA), M.L. No.3/01, ML Area 4.80 ha, Index INDEX 1 EXECUTIVE SUMMARY... 1 2 INTRODUCTION OF THE OBJECT/ BACKGROUND INFORMATION... 4 2.1 IDENTIFICATION OF PROJECT

More information

Dying fisheries in a changing environment: A study on livelihood strategies of fishery communities in Mumbai, India.

Dying fisheries in a changing environment: A study on livelihood strategies of fishery communities in Mumbai, India. Dying fisheries in a changing environment: A study on livelihood strategies of fishery communities in Mumbai, India. Sibananda Senapati and Vijaya Gupta National Institute of Industrial Engineering (NITIE)

More information

Galiuro Exploration Drilling Project

Galiuro Exploration Drilling Project Galiuro Exploration Drilling Project Range and Noxious Weeds Report Prepared by: Gwen Dominguez Range Staff for: Safford Ranger District Coronado National Forest Date September 2, 2016 Forest Plan/Policy

More information

The Impact of Rural Water Supply Systems on Property Values

The Impact of Rural Water Supply Systems on Property Values Southern Illinois University Carbondale OpenSIUC 2007 Conference Proceedings 7-24-2007 The Impact of Rural Water Supply Systems on Property Values Steven Shultz University of Nebraska at Omaha Nick Schmitz

More information