1 , pp Snyder Unit Hydrograph Parameters for Malasian Catchments Hazalizah bt Hamzah¹, Jer Lang Hong² and Kee An Hong 3 ¹ Drainage and Irrigation Department, Malaysia ² Evault Technologies 3 Hong & Associates Abstract. Synthetic unit hydrograph models such as the Snyder unit hydrograph usually used lag time and peaking coefficient as input to estimate flood peaks and flood hydrographs for the design of water structures. As not all the streams are gauged lag time for ungauged catchments has to be estimated using relationships of the physical characteristics of the gauged catchments and the lag time derived from streamflow and rainfall data. In this study, a lag time formula using data from 30 rural catchments in Peninsular Malaysia ranging from 20 to 1450 km² was derived. 15 minutes interval rainfall and runoff data formed the basis for this study. In addition, daily read rainfall data were also used in aiding the estimation of catchment rainfall. A total of more than 500 significant storm events were chosen for lag time study. Stepwise multiple regression analysis was performed to relate average lag time to the catchment characteristics. The formula derived is: t p = A L S Where t p is the lag time in hours, L is the main stream length in km and S is the weighted slope in m/km. The peaking coefficients for the gauged catchments range from 0.43 to 0.67, with a mean value of The peaking coefficient is not significantly related to any of the catchment characteristics, therefore a mean value of 0.59 is recommended for use for ungauged catchments in the peninsula. 1 Introduction The objective of this study is to use local rainfall and runoff data from gauged stations operated and maintained by the Drainage and Irrigation Department to derive the Snyder lag time and peaking coefficient for use for ungauged catchments in Peninsular Malaysia. As the study area covered the whole peninsula, data available from autographic rainfall and streamflow stations and daily rainfall stations throughout the State are obtained from the Department of Drainage and Irrigation. In parallel with the expansion of the data base, there have been advances in hydrological methods and computer modeling, especially the powerful HEC-HMS model, which made this study simpler and time saving. ISSN: ASTL Copyright 2017 SERSC
2 2 Literature Review 2.1 Time Parameters in Flood Hydrology Lag time is the time parameter which is an essential input to common flood discharge models. This stream flow response time is related to physical features of the catchment such as drainage area, stream slope and stream length. Estimated catchment lag time is needed to develop a synthetic unit hydrograph (UH) by the methods of Snyder and the Natural Resources Conservation Services(formally known as Soil Conservation Services (SCS). Lag time (t p ) has been defined in several different ways. In this study, lag time is defined as the time difference from the centroid of the net(excess) rainfall to the peak discharge of the catchment outlet. This definition is the one used in Snyder and SCS synthetic UH models. 2.2 Unit Hydrograph Peaking Coefficient A description of the shape of a unit hydrograph is the peaking coefficient Cp. The peaking coefficient is a dimensionless parameter represented by the formula: Q p = C p U A t p (1) In which Qp is the peak discharge, U is the unit depth of net rainfall, A is the catchment area and tp is the lag time. The value of Cp is usually between 0.4 and 0.8(McEnroe and Zhao 1999). In the SCS synthetic UH method, Cp is assigned a constamt value of Snyder gave Cp value in the range 0.56 to 0.69 (Ponce 1989). The Snyder synthetic UH method requires Cp as an input. The peak discharge of the synthetic UH is directly proportional to Cp. 2.3 Previous Studies In flood hydrology, the lag time of a catchment is normally considered as constant, independent of the magnitude of the flood. Lag time is related to the travel time for the flood wave. In this section, some well-known formulas for lag time are presented. The SCS formula(1972) is: t p = ( 100 CN 9)0.7 L0.8 S In which t p is catchment lag time in hours,l is the longest flow path in km, S is the catchment slope in m/m, and CN is the SCS runoff curve number. This formula was developed from rainfall and streamflow data of agricultural catchments (SCS 1972) Snyder s formula(1938) is: t p = C t (L ca L) 0.3 (3) (2) Copyright 2017 SERSC 89
3 In which t p is catchment lag time in hours, L ca is the distance along the main stream from the outlet to the point nearest the centroid of the catchment in km, L is the total length in km of the main stream, and Ct is a coefficient that varies geographically.. Snyder applied the synthetic UH relationships to catchments ranging from 10 to mi²(30 to km²) [Chow 1988]. Carter s formula (1961) is: t p = ( L S )0.6 (4) In which tp is the catchment lag time in hours, L is the main stream length in km, S is the average slope of the main stream length. This formula was developed from urban catchments in Washington D. C. with storm sewers and natural channels. The Kansas formula (McEnroe and Zhao,1999) is: t p = ( L S )0.64 (5) In which t p is the lag time in hours, L is the main stream slope in Km,and S is the main channel slope in m/m. It is applicable for rural catchments up to 50 km² in Kansas Kum river formula (Jeong S. et al (2001)) is t p = ( L S ) (6) Where t p is the lag time in hours, L is the main stream slope in Km,and S is the main channel slope in m/m. In using the method of McEnroe and Zhao (1999) for the Kum river in Korea, Jeong et. al., (2001) derived the above equation for catchment area ranging from 134 to 902 km². 3 Hydrological and Geospatial Data There are 30 autographic gauged catchments in Peninsular Malaysia. Data at 15 minutes interval for all the stations in the peninsula (including rainfall data) were obtained from the Drainage and Irrigation Department. Figure 1 show the locations of the gauging stations and the periods of record for the stations are generally ranging from 1970 to For recorded flows at stations regulated by upstream storage, only pre dam data were be used for analysis. The catchment parameters adopted are catchment area, stream length, stream slope for this study. The catchment characteristics were measured for the catchments studied using geo-spatial method. 90 Copyright 2017 SERSC
4 4 Method of Approach 4.1 Selection of Rainfall runoff Events Floods with estimated return periods of 2 years or greater were identified and used for further study. Some smaller floods were also considered if the record is of acceptable quality. Single storm and multi-period storm events were selected provided that the Copyright 2017 SERSC 91
5 resulting hydrographs are well defined. There are no fixed rules in choosing the rainfall runoff events and the choice depends also on data availability. The quality of hydrograph data can be evaluated and selected using graphic printout and visual inspection. The rainfall runoff events were discarded if.the hydrographs were multipeaked.. the hydrographs started before the hyetographs..the hydrograph started after the hyetograph ended..the events presented a negative lag time.. direct runoff is greater than total rainfall for a storm event. 4.2 Computation of Lag Times and Peaking Coefficients The calibration feature in the HEC-HMS(2016) flood hydrograph program was used to determine the lag times for the individual events. Each catchment was modeled as a single basin. catchment rainfall was estimated using records from the catchments. The computation of lag times from rainfall and flow data requires the separation of base flow and the computation of net or excess rainfall. We use the exponential recession module of HEC-HMS to calculate base flow and direct runoff of the catchments. The initial and uniform loss model was used to compute the excess rainfall. 4.3 Parameter Estimation in HEC-HMS HEC-HMS used a numerical index to measure the closeness of fit of the computed and observed hydrographs. The objective function that is minimized by optimization routine is a discharge weighted root-mean square error. This objective function is: STDER= 1 n (Q n i=1 o Q c ) 2 WT i (7) In which Qo and Qc are observed and computed discharges at time index i, WT i is the weighting factor for time index i, and n is the number of ordinates of the hydrograph. The weighting factor,wt i (Qo+Qc)/2*Qave, in which Qave is the average observed discharge. This objective function provides an index of how closely the observed hydrograph is replicated. 4.4 Catchment Average Lag Time The lag time from the individual events were averaged to obtain a single lag time for each catchment. The average peaking coefficients were also calculated. Table 1 shows the average lag time and peaking coefficients for the 30 catchments. Lag time that differs greatly from the median value for the catchment were not used to compute the average lag time. Only minority of these events are excluded for individual catchments. 92 Copyright 2017 SERSC
6 Table 1. Average lag time and peak coefficient for selected catchments Basin ID Name Area Stream Length Stream Slope Lag time Peaking coeff. 1 Sg Arau at Ldg Tebu Sg Kulim at Ara Kuda Sg Krian at Selama Sg Kinta at Tg Rambutan Sg Raia at Sg Bidor at Malayan Tin Bhd Sg sungkai at Sungkai Sg Bernam at TG Malim Sg Selangor Rasa Sg Selangor at R. Panjang Sg Batu at sentul Sg Semenyih at Kg Rinching Sg Langat at Dengkil Sg Linggi at Sua Betong Sg Kepis at Jam Kepis Sg Melaka at Pantai Belimbing Sg Durian Tunggal at Air Resam Sg Kesang at Chin Chin Sg Sayong at Jam Johor Tenggara Sg Johor at R Panjang Sg Kahang at Sg Bentong at Kg Marong Sg Lepar at Gelugor Sg Kuantan at Bt Kenau Sg Cherul at Kg Ban Ho Sg Berang Sg Telemong at Sg Nerus at Sg Chalok at Chalok Sg Kemasin at Peringat Copyright 2017 SERSC 93
7 4.5 Regression Analysis Regression analysis was carried out to quantify the relationship of lag time and catchment characteristics. This is to derive synthetic UH for ungauged catchments. A multiple linear regression analysis shows that lag time is highly correlated to catchment area, stream length and stream slope in the form of Equation 8: t p = A L S (8) R= R²= And in the form tp= (l/ S) (9) R= R²= Where R is the correlation coefficient and R²is the coefficient of determination. Regression analysis was also performed to correlate lag time with catchment,slope and L/ S but no better correlation coefficients can be obtained. The results are: R=0.668 for tp ~ L in log form R= for tp~s in log form R=0.909 for tp~ L S in log form As equation 8 gives a higher R²,it is recommended for use to estimate the lag time for ungauged catchments 4.6 Analysis of Peaking Coefficients Correlation analysis shows that Cp is not strongly related to any catchment characteristics. In other words when plotted against any catchment parameter, a flat slope exists and shows only a small amount of scatter for the regression line, therefore use of an average value for Cp may be just as reliable as the use of a regression equation. A Cp value of 0.59 is recommended for use for ungauged catchments. 5 Conclusion Synthetic unit hydrograph models such as the Snyder unit hydrograph usually used lag time and peaking coefficient as input to estimate flood peaks and flood hydrographs for the design of water structures. As not all the streams are gauged, lag time for ungauged catchments has to be estimated using relationships of the physical characteristics of the gauged catchments and the lag time derived from streamflow and rainfall data. In this study, a lag time formula using data from 30 rural catchments in Peninsular Malaysia ranging from 20 to 1450 km² was derived. 15 minutes interval rainfall and runoff data formed the basis for this study. In addition, daily read rainfall data were also used in aiding the estimation of catchment rainfall. A total of more than 500 significant storm events were chosen for lag time study. Stepwise multiple regression analysis was performed to relate average lag time to the catchment characteristics. 94 Copyright 2017 SERSC
8 The formula derived is: t p = A L S Where t p is the lag time in hours, L is the main stream length in km and S is the weighted slope in m/km. The peaking coefficients for the gauged catchments range from 0.43 to 0.67, with a mean value of 0.59.The peaking coefficient is not significantly related to any of the catchment characteristics, therefore a mean value of 0.59 is recommended for use for ungauged catchments in the peninsula. Acknowledgement: The permission of the Drainage and Irrigation Department to use the data for this study is gratefully acknowledged. References 1. Carter R. W. (1961) Magnitude and frequency of floods in suburban area USGS prof paper 424-B 2. Chow V. T. Maidment D. R. and Mays L. W (1988) Applied hydrology McGraw Hill 3. Hydrology Engineering Centre (2016) Hydrologic modeling system version user manual 4. Jeong S Park S. C. and Lee J H (2001) A study on the parameter estimation of Snyder-type synthetic unit hydrograph development in Kum river basin Water engineering research vol 2 No 4 5. McEnroe B. M and Zhao H(1999) Lag time and peak coefficients for rural watersheds in Kansa Kansas 6. University 7. Ponce V. M. (1989) Engineering hydrology, principles and practice Prentice Hall Englewood Cliff, New Jersey 8. Snyder F. F. (1938) Synthetic unit hydrograph Trans AGU Soil Conservation Services (1972) national Engineering Handbook 10. Viessman Warren Jr. and Levis G L (1995) Introduction to hydrology Copyright 2017 SERSC 95
Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area
Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Bruce McEnroe, Bryan Young, Ricardo Gamarra and Ryan Pohl Department of Civil, Environmental, and Architectural
More informationRainfall - runoff: Unit Hydrograph. Manuel Gómez Valentín E.T.S. Ing. Caminos, Canales y Puertos de Barcelona
Rainfall - runoff: Unit Hydrograph Manuel Gómez Valentín E.T.S. ng. Caminos, Canales y Puertos de Barcelona Options in many commercial codes,, HMS and others HMS Menu Transform method, User specified,
More information1 n. Flow direction Raster DEM. Spatial analyst slope DEM (%) slope DEM / 100 (actual slope) Flow accumulation
1 v= R S n 2/3 1/2 DEM Flow direction Raster Spatial analyst slope DEM (%) Flow accumulation slope DEM / 100 (actual slope) 0 = no cell contributing 215 = 215 cell contributing towards that cell sqrt (actual
More informationCalibration of the Soil Conservation Services (SCS) Method in Peninsular Malaysia Using Sungai Tasoh Catchment, Negeri Perlis
Calibration of the Soil Conservation Services (SCS) Method in Peninsular Malaysia Using Sungai Tasoh Catchment, Negeri Perlis ROZI ABDULLAH, Lecturer, School of Civil Engineering, Universiti Sains Malaysia,
More informationRunoff Hydrographs. The Unit Hydrograph Approach
Runoff Hydrographs The Unit Hydrograph Approach Announcements HW#6 assigned Storm Water Hydrographs Graphically represent runoff rates vs. time Peak runoff rates Volume of runoff Measured hydrographs are
More informationHydrologic Calibration:
Hydrologic Calibration: UPDATE OF EFFECTIVE HYDROLOGY FOR MARYS CREEK October 2010 Agenda Background Hydrologic model Calibrated rainfall Hydrologic calibration 100 year discharges, Existing Conditions
More informationHYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE
HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE by James C.Y. Guo. Professor, Civil Engineering, U. Of Colorado at Denver, James.Guo@cudenver.edu.. And Eric Hsu, Project Engineer, Parson
More informationDEVELOPMENT OF PEAK RUNOFF HYDROGRAPHS FOR OBA AND OTIN RIVERS IN OSUN STATE, NIGERIA
DEVELOPMENT OF PEAK RUNOFF HYDROGRAPHS FOR OBA AND OTIN RIVERS IN OSUN STATE, NIGERIA 1 Adejumo, L. A., 1 Adeniran, K. A., 2 Salami, A.W., 3 Abioye Tunde., and 4 Adebayo, K. R 1 Department of Agricultural
More informationModule 3. Lecture 4: Introduction to unit hydrograph
Lecture 4: Introduction to unit hydrograph (UH) The unit hydrograph is the unit pulse response function of a linear hydrologic system. First proposed by Sherman (1932), the unit hydrograph (originally
More informationComputation of Hydrographs in Evros River Basin
European Water 31: 33-42, 2010. 2010 E.W. Publications Computation of Hydrographs in Evros River Basin P. Angelidis 1, G. Mystakidis 2, S. Lalikidou 2, V. Hrissanthou 2 and N. Kotsovinos 3 Department of
More informationUNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH
UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH INTRODUCTION Water is a common chemical substance essential for the existence of life and exhibits many notable and unique
More informationI(n)Kn. A Qp = (PRF) --- (8) tp Where A is the watershed area in square miles and PRF is the unit hydrograph peak rate factor.
AN ALTERNATE APPROACH FOR ESTIMATING SCS UNIT HYDROGRAPH PEAK RATE FACTORS (PRFS) IN SOUTHWEST FLORIDA Himat Solanki Southwest Florida Water Management District 115 Corporation Way, Venice, Florida 34292
More information1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952).
1. Stream Network The most common approach to quantitatively describing stream networks was postulated by Strahler (1952). First Order Streams streams with no tributaries. Second Order Streams begin at
More informationEngineering Hydrology. Class 16: Direct Runoff (DRO) and Unit Hydrographs
Engineering Hydrology Class 16: and s Topics and Goals: 1. Calculate volume of DRO from a hydrograph; 2. Complete all steps to develop a. Class 14: s? HG? Develop Ocean Class 14: s? HG? Develop Timing
More informationFLOOD FORECASTING MODEL USING EMPIRICAL METHOD FOR A SMALL CATCHMENT AREA
Journal of Engineering Science and Technology Vol. 11, No. 5 (2016) 666-672 School of Engineering, Taylor s University FLOOD FORECASTING MODEL USING EMPIRICAL METHOD FOR A SMALL CATCHMENT AREA CHANG L.
More informationHydrologic Engineering Center. Training Course on. Hydrologic Modeling with HEC-HMS. Davis, CA. Course Description
Hydrologic Engineering Center Training Course on Hydrologic Modeling with HEC-HMS Davis, CA Course Description The course provides an introduction to HEC-HMS for new users, focusing both on using the program
More informationDerivation of Unit Hydrograph (UH) Module Objectives. Unit Hydrograph. Assumptions in Unit Hydrograph theory. Derivation of Unit Hydrograph
PRINT VERSION MODULE Derivation of Unit Hydrograph (UH) Module Objectives References Unit Hydrograph Assumptions in Unit Hydrograph theory Derivation of Unit Hydrograph Unit Hydrograph from a Hydrograph
More informationRAINFALL-RUNOFF STUDY FOR SINGAPORE RIVER CATCHMENT
10 th International Conference on Hydroinformatics HIC 2012, Hamburg, GERMANY RAINFALL-RUNOFF STUDY FOR SINGAPORE RIVER CATCHMENT CHI DUNG DOAN (1)(3), JIANDONG LIU (1), SHIE-YUI LIONG (1), ADRI VERWEY
More informationTHE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED
THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED Mark Pennington, Engineer, Pattle Delamore Partners Ltd, Tauranga ABSTRACT The Rational Method has been in use in some form or another at least since
More informationSoftware Applications for Runoff Hydrological Assessment
Bulletin UASVM Horticulture, 67(2)/2010 Print ISSN 1843-5254; Electronic ISSN 1843-5394 Software Applications for Runoff Hydrological Assessment Severin CAZANESCU 1), Sorin CIMPEANU 1), Oana GUI 2), Dana
More informationPeak discharge computation
Ia/P 4 Peak Dischage Method Graphical Peak Discharge Method This chapter presents the Graphical Peak Discharge method for computing peak discharge from rural and urban areas. The Graphical method was developed
More informationRiver Flood Forecasting Using Complementary Muskingum Rating Equations
River Flood Forecasting Using Complementary Muskingum Rating Equations Parthasarathi Choudhury 1 and A. Sankarasubramanian 2 Abstract: A model for real-time flood forecasting in river systems with large
More information2
1 2 3 4 5 6 The program is designed for surface water hydrology simulation. It includes components for representing precipitation, evaporation, and snowmelt; the atmospheric conditions over a watershed.
More informationImpacts of Rainfall Event Pattern and Land-Use Change on River Basin Hydrological Response: a Case in Malaysia
International Proceedings of Chemical, Biological and Environmental Engineering, Vol. 93 (2016) DOI: 10.7763/IPCBEE. 2016. V93. 23 Impacts of Rainfall Event Pattern and Land-Use Change on River Basin Hydrological
More informationSurabaya 60111, Indonesia *Corresponding author
2017 2nd International Conference on Applied Mathematics, Simulation and Modelling (AMSM 2017) ISBN: 978-1-60595-480-6 Parameters Estimation of Synthetic Unit Hydrograph Model Using Multiple Linear and
More informationA comparative study of the methods for estimating streamflow at ungauged sites
22nd International Congress on Modelling and Simulation, Hobart, Tasmania, Australia, 3 to 8 December 2017 mssanz.org.au/modsim2017 A comparative study of the methods for estimating streamflow at ungauged
More informationTECHNICAL MEMORANDUM. SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design
TECHNICAL MEMORANDUM FROM: Ken MacKenzie and Ryan Taylor SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design DATE: June 7, 2012 The purpose of this memorandum
More informationA Study on Design-Flood Discharge of Tello River in Makassar-Indonesia
International Journal of Science and Engineering Investigations vol. 2, issue 20, September 2013 ISSN: 2251-8843 A Study on Design-Flood Discharge of Tello River in Makassar-Indonesia Johannes Patanduk
More informationChapter 4 "Hydrology"
Chapter 4 "Hydrology" Revised TxDOT Hydraulics Manual Jorge A. Millan, P.E., CFM TxDOT Design Division/Hydraulics 2012 Transportation Short Course October 17, 2012 Chapter 4 Sections 1 Hydrology s Role
More informationThe Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire
The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire May 4, 2010 Name of Model, Date, Version Number Dynamic Watershed Simulation Model (DWSM) 2002
More informationNorman Maclean Snowmelt Flow rate Storm flows fs (c flow m a tre S
Eventually, all things merge into one, and a river runs through it. Norman Maclean Understanding Streamflow ADEQ SW Short Course June 13, 213 Phoenix, AZ Hydrographs Discharge (Q) USGS flow data & plots
More informationChapter H. Introduction to Surface Water Hydrology and Drainage for Engineering Purposes
Chapter H. Introduction to Surface Water Hydrology and Drainage for Engineering Purposes As seen in Figure H.1, hydrology is a complex science that deals with the movement of water between various stages
More informationNASH IUH PARAMETERS ESTIMATION USING METHOD OF MOMENTS- A CASE STUDY
INTRODUCTION Empirical models for flood estimation are based on observational data and calibrated input-output relationship without description of individual processes. Inglis and DeSouza formula, hosla
More informationANALYSIS OF HYDRAULIC FLOOD CONTROL STRUCTURE AT PUTAT BORO RIVER
Civil Engineering Forum Volume XXII/ - May 03 ANALYSIS OF HYDRAULIC FLOOD CONTROL STRUCTURE AT PUTAT BORO RIVER Ruhban Ruzziyatno Directorate General of Water Resources, Ministry of Public Works, Republic
More informationEngineering Hydrology Class 3
Engineering Hydrology Class 3 Topics and Goals: I.Develop s (estimate precipitation) II.Develop simple constant intensity design storm III.Develop SCS design storm Ocean s Why do we want to derive the?
More informationHydrology and Water Management. Dr. Mujahid Khan, UET Peshawar
Hydrology and Water Management Dr. Mujahid Khan, UET Peshawar Course Outline Hydrologic Cycle and its Processes Water Balance Approach Estimation and Analysis of Precipitation Data Infiltration and Runoff
More information5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview
WinTR-55 for Plan Reviews Small Watershed Hydrology Overview 1 Overview Course Outline Historical Background Program Description Model Capabilities and Limitations This is the Overview portion of the training.
More informationRAINFALL - RUNOFF MODELING IN AN EXPERIMENTAL WATERSHED IN GREECE
Proceedings of the 14 th International Conference on Environmental Science and Technology Rhodes, Greece, 3-5 September 2015 RAINFALL - RUNOFF MODELING IN AN EXPERIMENTAL WATERSHED IN GREECE KOTSIFAKIS
More informationCHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow
Engineering Hydrology (ECIV 4323) CHAPTER FIVE Runoff Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib Overland flow interflow Base flow Saturated overland flow ١ ٢ 5.1 Introduction To Runoff Runoff
More informationiswm TM Technical Manual Hydrology:
: 1.0 2.0 Downstream Assessment 3.0 Streambank Protection 4.0 Water Balance 5.0 Rainfall Tables 6.0 Hydrologic Soils Data Table of Contents 1.0... HO-1 1.1 Estimating Runoff... HO-1 1.1.1 Introduction
More informationCIMAHI RIVER BENCHMARKING FLOOD ANALYSIS BASED ON THRESHOLD OF TOTAL RAINFALL
CIMAHI RIVER BENCHMARKING FLOOD ANALYSIS BASED ON THRESHOLD OF TOTAL RAINFALL Safarina Ariani Budi 1, Ramli 2 1 Doctor of philosophy, Civil Engineering Department, Jenderal Achmad Yani University, Cimahi,
More informationFlood forecasting model based on geographical information system
doi:10.5194/piahs-368-192-2015 192 Remote Sensing and GIS for Hydrology and Water Resources (IAHS Publ. 368, 2015) (Proceedings RSHS14 and ICGRHWE14, Guangzhou, China, August 2014). Flood forecasting model
More informationSection 600 Runoff Table of Contents
Section 600 Runoff Table of Contents 601 INTRODUCTION...600-1 602 RATIONAL METHOD...600-1 602.1 Rational Method Formula...600-2 602.2 Time of Concentration...600-2 602.3 Intensity...600-4 602.4 Runoff
More informationAPPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)
APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) Hydromodification design criteria for the North Orange County permit area are based on the 2- yr, 24-hr
More informationStream Reaches and Hydrologic Units
Chapter United States 6 Department of Agriculture Natural Resources Conservation Service Chapter 6 Stream Reaches and Hydrologic Units Rain clouds Cloud formation Precipitation Surface runoff Evaporation
More informationEvent and Continuous Hydrological Modeling with HEC- HMS: A Review Study
Event and Continuous Hydrological Modeling with HEC- HMS: A Review Study Sonu Duhan *, Mohit Kumar # * M.E (Water Resources Engineering) Civil Engineering Student, PEC University Of Technology, Chandigarh,
More informationSuspended Sediment Discharges in Streams
US Army Corps of Engineers Hydrologic Engineering Center Suspended Sediment Discharges in Streams April 1969 Approved for Public Release. Distribution Unlimited. TP-19 REPORT DOCUMENTATION PAGE Form Approved
More informationINTEGRATION OF MONTE CARLO SIMULATION TECHNIQUE WITH URBS MODEL FOR DESIGN FLOOD ESTIMATION
INTEGRATION OF MONTE CARLO SIMULATION TECHNIQUE WITH URBS MODEL FOR DESIGN FLOOD ESTIMATION Ataur Rahman 1, Don Carroll 2, Erwin Weinmann 3 1 Physical Infrastructure Centre, School of Civil Engineering,
More informationCIVE22 BASIC HYDROLOGY Jorge A. Ramírez Homework No 7
Hydrologic Science and Engineering Civil and Environmental Engineering Department Fort Collins, CO 80523-1372 (970) 491-7621 CIVE22 BASIC HYDROLOGY Jorge A. Ramírez Homework No 7 1. Obtain a Unit Hydrograph
More informationGraphical Calculation of First-Flush Flow Rates for Storm-Water Quality Control
Graphical Calculation of First-Flush Flow Rates for Storm-Water Quality Control David C. Froehlich, Ph.D., P.E., D.WRE, M.ASCE 1 Abstract: Regulations for mitigating nonpoint source pollution from small
More information1.6 Influence of Human Activities and Land use Changes on Hydrologic Cycle
1.6 Influence of Human Activities and Land use Changes on Hydrologic Cycle Watersheds are subjected to many types of changes, major or minor, for various reasons. Some of these are natural changes and
More informationOverview of NRCS (SCS) TR-20 By Dr. R.M. Ragan
Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan TR-20 is a computer program for the simulation of runoff occurring from a single storm event. The program develops flood hydrographs from runoff and routes
More informationOTHA Omaha Tools for Hydrologic Analysis - Time-Series/Statistical Analysis Programs for Water Resources
Hydrology Days 004 OTHA Omaha Tools for Hydrologic Analysis - Time-Series/Statistical Analysis Programs for Water Resources William Doan, P.E. Hydraulic Engineer, U.S. Army Corps of Engineers, Omaha District,
More informationHydrologic Study Report for Single Lot Detention Basin Analysis
Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page
More informationRunoff Processes. Daene C. McKinney
CE 374 K Hydrology Runoff Processes Daene C. McKinney Watershed Watershed Area draining to a stream Streamflow generated by water entering surface channels Affected by Physical, vegetative, and climatic
More informationCLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL
CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL SECTION 600 STORM RUNOFF TABLE OF CONTENTS 601 INTRODUCTION 603 601.1 - Basin Characteristics 603 602 TIME OF
More informationA Review on Flood Events for Kelantan River Watershed in Malaysia for Last Decade ( )
IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS A Review on Flood Events for Kelantan River Watershed in Malaysia for Last Decade (2001-2010) To cite this article: J Aminah Shakirah
More informationNRCS Hydrology methodology review Minnesota NRCS recommendation MnDOT recommendation Using Atlas 14 with HydroCAD
Dec, 2015 NRCS Hydrology methodology review Minnesota NRCS recommendation MnDOT recommendation Using Atlas 14 with HydroCAD NRCS - Natural Resource Conservation Service (formerly known as SCS Soil Conservation
More informationDRAINAGE & DESIGN OF DRAINAGE SYSTEM
Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means
More informationRelationships between low-flow characteristics of South African streams
Relationships between low-flow characteristics of South African streams VY Smakhtin * and M Toulouse Institute for Water Research, Rhodes University, PO Box 94, Grahamstown, 64, South Africa Ecole Nationale
More informationEVALUATION OF THE CHANGES BETWEEN THE FIRST AND SECOND EDITIONS OF THE URBAN STORMWATER MANAGEMENT MANUAL FOR MALAYSIA (MSMA)
EVALUATION OF THE CHANGES BETWEEN THE FIRST AND SECOND EDITIONS OF THE URBAN STORMWATER MANAGEMENT MANUAL FOR MALAYSIA (MSMA) Ir. Dr. Quek Keng Hong B.E. (civil), M.Eng.Sc, Ph.D. (NSW), PE Managing Director,
More informationCHAPTER 11 1 PREDICTION AND MODELING OF FLOOD HYDROLOGY AND HYDRAULICS
CHAPTER 11 1 PREDICTION AND MODELING OF FLOOD HYDROLOGY AND HYDRAULICS JORGE A. RAMÍREZ Water Resources, Hydrologic and Environmental Sciences Civil Engineering Department Colorado State University Fort
More informationADDIS ABABA INSTITUTE OF TECHNOLOGY MASTER S THESIS RUNOFF ESTIMATION BY GIUH BASED CLARK AND NASH MODELS FOR SHAYA RIVER MULUGETA MUSSIE
ADDIS ABABA INSTITUTE OF TECHNOLOGY MASTER S THESIS RUNOFF ESTIMATION BY GIUH BASED CLARK AND NASH MODELS FOR SHAYA RIVER By MULUGETA MUSSIE Thesis Advisor PROFESSOR Dr. P. SREENIVASULU June, 2013 i ADDIS
More informationURBAN FLOODING: HEC-HMS
1.0 Introduction URBAN FLOODING: HEC-HMS -Sunil Kumar, Director, NWA All major ancient civilisations were developed in the river valleys because river served as source of water, food, transportation and
More informationA NEW SEMI-ANALYTICAL LAG-TIME EQUATION FOR APPLICATIONS IN THE KANSAS CITY METROPOLITAN AREA. Ricardo A. Gamarra Zapata
A NEW SEMI-ANALYTICAL LAG-TIME EQUATION FOR APPLICATIONS IN THE KANSAS CITY METROPOLITAN AREA By Ricardo A. Gamarra Zapata Submitted to the graduate degree program in Civil, Environmental and Architectural
More informationAssessment of the Climate Change Impact on a Dry Detention Pond at Kota Damansara, Malaysia
Assessment of the Climate Change Impact on a Dry Detention Pond at Kota Damansara, Malaysia Yuk San LIEW 1*, Fang Yenn TEO 1,2, Aminudin AB. GHANI 3 1 National Hydraulic Research Institute of Malaysia
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationWMS Tools For Computing Hydrologic Modeling Parameters
WMS Tools For Computing Hydrologic Modeling Parameters Lesson 9 9-1 Objectives Use the drainage coverage as a basis for geometric parameters as well as overlaying coverages to compute important hydrologic
More informationvisual otthymo version 2.0
2 visual otthymo version 2.0 R E F E R E N C E M A N U A L Visual OTTHYMO v2.0 Reference Manual July 2002 Table of Contents PROGRAM REFERENCE...1 INTRODUCTION...1 VISUAL OTTHYMO FILES...1 Project Files...1
More informationEffects of Antecedent Precipitation Index on the Rainfall-Runoff Relationship
35 Bulgarian Journal of Agricultural Science, 12 (2006), 35-42 National Centre for Agrarian Sciences Effects of Antecedent Precipitation Index on the Rainfall-Runoff Relationship Ahmet ISTANBULLUOGLU 1,2,
More informationA simple model for low flow forecasting in Mediterranean streams
European Water 57: 337-343, 2017. 2017 E.W. Publications A simple model for low flow forecasting in Mediterranean streams K. Risva 1, D. Nikolopoulos 2, A. Efstratiadis 2 and I. Nalbantis 1* 1 School of
More informationWhat s so hard about Stormwater Modelling?
What s so hard about Stormwater Modelling? A Pugh 1 1 Wallingford Software Pty Ltd, ann.pugh@wallingfordsoftware.com Abstract A common misconception of stormwater modelling is that it is simple. While
More informationThe Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management
The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives
More informationUrban Drainage Introduction. A.Ramachandra Rao. C.B. Burke. T.T. Burke, Jr.
32 Urban Drainage A.Ramachandra Rao Purdue University C.B. Burke Christopher B. Burke Engineering, Ltd. T.T. Burke, Jr. Christopher B. Burke Engineering, Ltd. 32.1 Introduction 32.2 The Rational Method
More informationGIS Applications in Water Resources Engineering
King Fahd University of Petroleum & Minerals City & Regional Planning Department Introduction to Geographic Information Systems Term Paper Presentation GIS Applications in Water Resources Engineering Prepared
More informationReferences 25/05/2012
Climatology and Hydrology Hydrological cycle Hydrometeorology (wind and storm, flood, and drought) Surface hydrology/river hydrology (flood, drought, and pollution) Ground water hydrology (flood, drought,
More informationEvent and Continuous Hydrologic Modeling with HEC-HMS
Event and Continuous Hydrologic Modeling with HEC-HMS Xuefeng Chu, A.M.ASCE 1 ; and Alan Steinman 2 Abstract: Event hydrologic modeling reveals how a basin responds to an individual rainfall event e.g.,
More informationCHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF
CHAPTER 3 STORMWATER HYDROLOGY Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF 3.1.1 Introduction to Hydrologic Methods...3.1-1 3.1.2 Symbols and Definitions...3.1-3 3.1.3 Rainfall
More informationShital Dhakal (Kathmandu University, Nepal) (Now-Boise State University, USA) Dennis M. Fox (University of Nice Sophia Antipolis, France)
Shital Dhakal (Kathmandu University, Nepal) (Now-Boise State University, USA) Dennis M. Fox (University of Nice Sophia Antipolis, France) Mediterranean forest fires and impacts on hydrology HEC-HMS model
More informationUrbanization effects on the hydrology of the Atlanta area, Georgia (USA)
14/06/01 Impact of Human Activity on Groundwater Dynamics (Proceedings of a symposium held during the Sixth IAHS Scientific Assembly at Maastricht, The Netherlands, July 2001). IAHS Publ. no. 269, 2001.
More informationSTORMWATER MANAGEMENT: Emerging Planning Approaches and Control Technologies
STORMWATER MANAGEMENT: Emerging Planning Approaches and Control Technologies Chapter 5 " HYDROLOGIC SYSTEMS " CHAPTER 5 5.1 INTRODUCTION 5.1.1 Training Objectives The objectives of this module are:! to
More informationChapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall
6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures
More informationHYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR
HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed
More informationA GEOGRAPHIC INFORMATION SYSTEM BASED SPATIALLY DISTRIBUTED RAINFALL RUNOFF MODEL
A GEOGRAPHIC INFORMATION SYSTEM BASED SPATIALLY DISTRIBUTED RAINFALL RUNOFF MODEL by Khalid Naseem Khan B.E. in Civil Engineering, University of Roorkee, 1998 Submitted to the Graduate Faculty of School
More informationJuly, International SWAT Conference & Workshops
Analysis of the impact of water conservation measures on the hydrological response of a medium-sized watershed July, 212 212 International SWAT Conference & Workshops ANALYSIS OF THE IMPACT OF WATER CONSERVATION
More informationHistory of Model Development at Temple, Texas. J. R. Williams and J. G. Arnold
History of Model Development at Temple, Texas J. R. Williams and J. G. Arnold INTRODUCTION Then Model development at Temple A long history (1937-present) Many scientists participating in: Data collection
More informationHypothetical Flood Computation for a Stream System
US Army Corps of Engineers Hydrologic Engineering Center Hypothetical Flood Computation for a Stream System December 1968 Approved for Public Release. Distribution Unlimited. TP-12 REPORT DOCUMENTATION
More informationAta Amini, Thamer Mohammad Ali, Abdul Halim B. Ghazali, Azlan A. Aziz & Shatirah Mohd. Akib
Impacts of Land-Use Change on Streamflows in the Damansara Watershed, Malaysia Ata Amini, Thamer Mohammad Ali, Abdul Halim B. Ghazali, Azlan A. Aziz & Shatirah Mohd. Akib Arabian Journal for Science and
More informationRiver Modelling for Flood Risk Map Prediction: A Case Study of Kayu Ara River Basin, Malaysia
River Modelling for Flood Risk Map Prediction: A Case Study of Kayu Ara River Basin, Malaysia Sina Alaghmand* 1, Rozi b. Abdullah 2, and Ismail Abustan 2 Abstract This paper presents a simple methodology
More informationChapter 6 Hydrology TABLE OF CONTENTS CHAPTER 6 - HYDROLOGY
Chapter 6 Hydrology TABLE OF CONTENTS CHAPTER 6 - HYDROLOGY... 6-1 6.1 Introduction... 6-1 6.1.1 Objective... 6-1 6.1.2 Definition... 6-1 6.1.3 Factors Affecting Floods... 6-1 6.1.4 Sources of Information...
More informationABSTRACT UNCERTAINTY AND SENSITIVITY ANALYSES OF THE MUSKINGUM-CUNGE CHANNEL ROUTING MODEL. Stephen Scott Reid, Master of Science, 2008
ABSTRACT Title of Thesis: UNCERTAINTY AND SENSITIVITY ANALYSES OF THE MUSKINGUM-CUNGE CHANNEL ROUTING MODEL Stephen Scott Reid, Master of Science, 2008 Thesis directed by: Professor Richard H. McCuen Department
More informationUpdated Rainfall Coefficients for Texas The EBDLKUP-NEW.XLS Tool
442 Updated Rainfall Coefficients for Texas The EBDLKUP-NEW.XLS Tool Cristal C. Tay 1, Caroline M. Neale 1, George R. Herrmann 2, and Theodore G. Cleveland 3 1 Graduate Research Assistant, 2 Postdoctoral
More informationPERFORMANCE OF REPRESENTATIVE UNIT HYDROGRAPH DERIVED FROM DIFFERENT NUMBER OF CASES
Civil Engineering Forum Volume XXI/2 - May 2012 PERFORMANCE OF REPRESENTATIVE UNIT HYDROGRAPH DERIVED FROM DIFFERENT NUMBER OF CASES Sri Harto Br Department of Civil and Environmental Engineering, Faculty
More informationAlternative Approaches to Water Resource System Simulation
US Army Corps of Engineers Hydrologic Engineering Center Alternative Approaches to Water Resource System Simulation May 1972 Approved for Public Release. Distribution Unlimited. TP-32 REPORT DOCUMENTATION
More informationIndex. Page numbers followed by f indicate figures.
Index Aerodynamic method, 103, 110 111 Algae, 131, 173, 175 Alternate depth, 88 Alternating block method, 132, 140 141 Attenuation, 106, 107f, 118, 120 Page numbers followed by f indicate figures. Baseflow
More informationFlood Frequency Analysis of River Subernarekha, India, Using Gumbel s Extreme Value Distribution
International Journal of Computational Engineering Research Vol, 03 Issue, 7 Flood Frequency Analysis of River Subernarekha, India, Using Gumbel s Extreme Value Distribution Dr. Manas Kumar Mukherjee 1,
More informationUncertainty in Hydrologic Modelling for PMF Estimation
Uncertainty in Hydrologic Modelling for PMF Estimation Introduction Estimation of the Probable Maximum Flood (PMF) has become a core component of the hydrotechnical design of dam structures 1. There is
More informationApplication of HEC-HMS for Flood Forecasting in Kabkian Basin and Delibajak Subbasin in Iran
IOSR Journal of Engineering (IOSRJE) e-iss: 2250-3021, p-iss: 2278-8719 Vol. 3, Issue 9 (September. 2013), V3 PP 10-16 Application of HEC-HMS for Flood Forecasting in Kabkian Basin and Delibajak Subbasin
More information4.1 General Methodology and Data Base Development
Chapter 4 METHODOLOGY 4.1 General and Data Base Development This report project utilized several computer software models and analysis techniques to create the numeric data on which decisions for this
More informationH. THOMAS & T.R. NISBET Centre for Ecosystems, Society & Biosecurity, Forest Research, UK.
H. Thomas & T.R. Nisbet, Int. J. of Safety and Security Eng., Vol. 6, No. 3 (2016) 466 474 SLOWING THE FLOW IN PICKERING: QUANTIFYING THE EFFECT OF CATCHMENT WOODLAND PLANTING ON FLOODING USING THE SOIL
More information