1 February 2012 Tweneboa, Enyenra, Ntomme T.E.N. Development Project Environmental Impact Assessment Scoping Report and Terms of Reference (ToR) Project Overview: Background Exploration and appraisal drilling in the DWT block during 2009 and Discovery of the Tweneboa, Enyenra (originally named Owo) and Ntomme (T.E.N.) oil and gas fields. Located ca. 30 km to the west of the Jubilee Field and in water depths from 1,000 m to 1,800 m. Expected peak oil production rate of 100,000 barrels per day by Total oil recovery of approximately 216 million barrels is expected. Gas production rate of 176 million standard cubic feet per day expected by FPSO construction is planned for Q and first oil by Q Slide 2 1
2 Project Overview: Locality Map Slide 3 Project Overview: Components Base case: 33 wells (15 oil production, 15 water injection, 1 gas production and 2 gas injection) Subsea equipment: subsea manifolds; production and injection trees (one per well); riser bases, jumpers, risers, flowlines, umbilicals; and import/export pipeline. Spread-moored FPSO (designed for a maximum production rate of 127,000 barrels of oil per day) with Oil Offloading Buoy (OOB) Support from Takoradi Port and Naval Base Slide 4 2
3 Project Overview: Example FPSO and OOB Slide 5 Project Overview: Field Layout Slide 6 3
4 EIA Process (to date) EIA team: Environmental Resources Management, SRC consulting (Accra) and ESL consulting (Accra). Initiated Environmental Impact Assessment in August Registered project with EPA on 4 March 2011 (EPA-CE ). Scoping consultations October/November Secondary data collection, legislation review and compilation of Scoping Report. Scoping Report and Terms of Reference submitted to EPA on 25 January Slide 7 Scoping Consultations: Summary 26 consultations meetings with 28 stakeholder groups or organisations (in Table 5.1). National, regional and district authorities, traditional leadership, NGOs, the media, international organisations and fisher association. Key issues in Table 5.2 and detailed records in Annex C. Issues trail provided in Annex D. Key issues raised by consultees included comments relevant to the TEN EIA and those that may have wider and longer term implications to TGL s operations. Slide 8 4
5 Key Issues from Scoping Consultations Request for local consultations during EIA prior to Public Hearings Communication to communities in simple format Concern that CLOs had not been appointed since Jubilee Concern over impact of oil and gas activities on fishermen s livelihoods and exclusion of fishermen from safety zone Request for a Fisheries Impact Assessment Capacity of waste facilities Effect of flaring on human health Slide 9 Key Issues from Scoping Consultations (continued ) Increased traffic in Takoradi and effects on road infrastructure Increased pressure on infrastructure eg port facilities and water supply Perception of lack of benefits for Western Region and effects preference people from the Western Region for employment and scholarships Incremental uncontrolled development in the Western Region and secondary social effects eg increased cost of living Transboundary impacts that could affect Cote d Ivoire Slide 10 5
6 EIA ToR Environmental Baseline Studies Environmental Baseline Study (CSA 2011) physio-chemical water and sediment quality and benthic ecology data Drill Cuttings Study (CSA 2011) drill cuttings dispersion and physico-chemical effects at Jubilee Fisheries Study (ERM and ESL 2011) - primary and secondary baseline data on fish and fisheries Marine Mammal and Turtle Observation Report (Gardline 2011) sightings data on marine mammals and turtles Geotechnical and Geophysical surveys (Gardline 2011) site specific data on physical conditions Slide 11 EIA ToR Proposed Quantitative Studies Modelling of oil spills potentially resulting from accidental events (ie collisions, ruptures, blowout, etc). Aquatic dispersion modelling of operational discharges, including drill cuttings discharges and produced water discharges. Atmospheric dispersion modelling of project emissions to air to determine the extent of possible impacts on air quality. Slide 12 6
7 EIA ToR Proposed Socio-Economic Baseline Review of secondary data, supplemented with primary data collection Face-to-face meetings with a representative group of target communities Focus on influential communities in Western Region Consultation meetings and focus groups discussions within communities eg, community leaders, fishermen and women Slide 13 EIA ToR Provisional Schedule for the EIA Process Provisional schedule for the EIA process Slide 14 7
8 Way Forward Disclosure of Scoping Report Finalise project description based on FEED studies. Complete baseline data collection and specialist studies. Impact assessment (Methodology in Annex E). Mitigation and monitoring measures will be developed. Compile EIS (EIS structure in Annex F). Draft EIS Disclosure, Public Hearings and Final EIS Disclosure Slide 15 8
GHANA OFFSHORE CAPE THREE POINTS OIL BLOCK DEVELOPMENT
GHANA OFFSHORE CAPE THREE POINTS OIL BLOCK DEVELOPMENT PHASE 1 FINAL ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT DOC Eni S.p.A. JULY, 2015 1 of 279 Ghana OCTP Block Phase 1 ESHIA ABSTRACT This report outlines
More informationTEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT
TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Final Scoping Report - Non-Technical Summary Presentation Structure of the Presentation Introduction to the Tema LNG Project
More informationIndependent Study of Marine Environmental Conditions and Influence of Oil and Gas Activities in Ghana
Independent Study of Marine Environmental Conditions and Influence of Oil and Gas Activities in Ghana Launch of Final Report and Next Steps February 25, 2015 Accra Performed in collaboration with: Acorn
More informationAbate on Site This involves adding something to the design to abate the impact eg pollution controls.
6 MITIGATION AND MANAGEMENT MEASURES 6.1 INTRODUCTION A key objective of the EIA is to develop and describe practical, commensurate and cost effective mitigation measures that avoid, reduce, control, remedy
More informationMauritania a model response planning process
Mauritania a model response planning process Chinguetti Project An Operator s Perspective Dr. Jeremy Colman Manager Environmental & Social Affairs (Africa) Woodside Energy Ltd Dr. Rob Holland Senior Consultant
More information9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction
9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE 9.1.1 Introduction This chapter is the provisional Environmental Management Plan (EMP) for the Jubilee Phase 1 Development project. The elements of
More information8. Risk Assessment Process
134 Browse FLNG Development Draft Environmental Impact Statement 8. Risk Assessment Process This section provides an overview of the EIA process undertaken for the Browse FLNG Development, from identification
More informationB6/27 Exploration Drilling
Environmental Impact Assessment Study for B6/27 Exploration Drilling February 2010 Project Location Project Egypt IRAN Australia Near shoreline of Chumphon and Suratthani Covers an area of 1,307 sq.km.
More informationBASICS OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA)
BASICS OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) HSE specialists, environmental engineers, design engineers, project managers and senior project managers involved in conceptual design, Front-End
More informationMAERSK OIL ESIA-16 NON-TECHNICAL SUMMARY ESIS DAN
Intended for Maersk Oil Document type Non-Technical Summary (NTS) Date August, 2015 MAERSK OIL ESIA-16 NON-TECHNICAL SUMMARY ESIS DAN Non-Technical Summary ESIS DAN 1 of 11 PREFACE This document is the
More informationNON-TECHNICAL SUMMARY
NON-TECHNICAL SUMMARY S1 INTRODUCTION This Environmental Statement (ES) Addendum presents the findings of the Environment Impact Assessment (EIA) conducted by TOTAL E&P UK Limited (TOTAL) for the development
More informationOn Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry
On Board Regasification for LNG Ships 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry New Greenfield U.S. Terminals Will Be Almost Impossible to Site Key opportunity is to solve U.S. terminalling
More informationESIA MAERSK OIL DBU NON-TECHNICAL SUMMARY ESIS TYRA
Intended for Maersk Oil Document type Non-Technical Summary (NTS) Date May 2017 ESIA MAERSK OIL DBU NON-TECHNICAL SUMMARY ESIS TYRA Non-Technical Summary ESIS Tyra 1 of 11 PREFACE This document is the
More informationBackground Information Document
Environmental Impact Assessment (EIA) of the Proposed Development of Phosphate Deposits off the Coast of Namibia Background Information Document Note 1. This BID addresses the proposed activities within
More informationProject Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate
Project Overview Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate a natural gas-tomethanol production plant and storage facilities, and a new marine terminal, in the
More informationScoping Document for the Environmental Assessment. BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey
Scoping Document for the Environmental Assessment BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey Exploration Licenses 2431, 2432, 2433, and 2434 August 2013 Contents 1.0 Purpose... 2 2.0 Regulatory
More information6 Risk assessment methodology
Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management
More informationCorallian Colter Offshore Exploration Well - EIA Scoping Report
Corallian Colter Offshore Exploration Well - EIA Scoping Report Bournemouth Borough Council comments on the potential scope of the Environmental Statement and the identification of sources of information.
More informationa. Use of environmental information in the coastal EIA process
THE INDONESIAN LOCAL GOVERNMENT, THE ICZM, AND THE DECENTRALIZATION OF THE EIA PROCESS Dwi Abad Tiwi (dwiabadtiwi@yahoo.com), the Indonesian Agency for the Assessment and Application of Technology, Jakarta,
More informationFrom: D. McDonald, Project Manager, Canadian Environmental Assessment Agency To: A. Perry, Regional Manager, Nova Scotia, BP Canada Energy Group ULC
From: D. McDonald, Project Manager, Canadian Environmental Assessment Agency To: A. Perry, Regional Manager, Nova Scotia, BP Canada Energy Group ULC Dear Ms. Perry, The Canadian Environmental Assessment
More information1) 2) 3) 4) 5) The oil and gas cycle. Life cycle of oil and gas (time) Potential requirement on ground
The oil and gas cycle Life cycle of oil and gas (time) 1) 2) 3) 4) 5) 6) Activity Desk study and get licens: Find areas with favorable geological conditions Seismic survey: Provide detailed information
More informationDeliverable 2: Procedural guidelines as a recommendation to the national competent authorities
Deliverable 2: Procedural guidelines as a recommendation to the national competent authorities Content Introduction... 2 Procedural Guidelines... 2 1. Scope of recommended procedural guidelines... 3 2.
More informationSpoil and Water. Irish Ports Association Conference Ciaran Callan Dublin Port Company. 26 th September 2008
Spoil and Water Ciaran Callan Dublin Port Company Irish Ports Association Conference 2008 26 th September 2008 Disposal of Dredge Material: Regulation and Process of Application Requirement for disposal
More information1 PROJECT OVERVIEW. Quantum Power Ghana Gas Limited 1 Knight Piésold Consulting GMF
1 PROJECT OVERVIEW Quantum Power Ghana Gas Limited (hereinafter referred to as Quantum Power) is a developer, owner and operator of electricity generation assets and power-related infrastructure throughout
More informationOil Spill Preparedness and Response
Oil Spill Preparedness and Response Purpose To plan and prepare for effective Oil Spill Response 1 that mitigates potential consequences of an Incident, including identification and fulfilment of requirements
More informationBOEM Gulf of Mexico Region
BOEM Gulf of Mexico Region 1 Gulf of Mexico OCS Region Conducts all oil and gas leasing and resource management functions on the Outer Continental Shelf (OCS) for the Gulf of Mexico and the Atlantic. Responsible
More information5 PUBLIC PARTICIPATION PROCESS 5.1 INTRODUCTION
5 PUBLIC PARTICIPATION PROCESS 5.1 INTRODUCTION This Chapter presents a summary of the stakeholder engagement activities planned as part of the EIA process. It serves as a summary of a more detailed Stakeholder
More informationProcessing unit (fish products)
EXECUTIVE SUMMARY E1. INTRODUCTION The Proponent, Ferme Marine de Mahebourg Ltd (FMM), is involved in the Fish Farming sector in Mauritius since 2000. To date, FMM manages two declared Fish Farm Zones
More informationENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR Overview of Presentation 1. Objectives of the Consultancy 2. Hydropower in Myanmar 3. Draft Table of Contents 4.
More informationEnvironmental Impact Assessment Report (Final Report Executive Summary)
Environmental Impact Assessment Report (Final Report Executive Summary) Table of Content 1. Introduction... - 1-1.1 Background of the Project...- 1-1.2 Objectives of EIA Report...- 2-1.3 Guideline of Environmental
More informationSPE Seminar on Introduction to E&P Projects, 17 November 2016, London
SPE Seminar on Introduction to E&P Projects, 17 November 2016, London Managing E&P Projects by Prabhat Garga, Senior Advisor, Upstream Advisors Ltd. T: +44 (0)203 617 7020 E: info@upstream-advisors.com
More informationPresented by Joe Ferris, PhD 6 June 2014 BMT Cordah Limited Aberdeen Scotland
Environmental Considerations in Offshore Decommissioning and Removal Presented by Joe Ferris, PhD 6 June 2014 BMT Cordah Limited Aberdeen Scotland Presentation Content Introduction Supporting Studies Selection
More informationThe Business of Oil & Gas in Alaska Joshua Kindred, Alaska Oil and Gas Association. November 12, 2015
The Business of Oil & Gas in Alaska Joshua Kindred, Alaska Oil and Gas Association November 12, 2015 Brief History First discovery of commercial quantities of oil in Alaska (1902) Richfield discovered
More informationThe challenges and complexities of impact assessment for a seismic survey in a remote coral reef environment
The challenges and complexities of impact assessment for a seismic survey in a remote coral reef environment J.G. Colman 1,2, C.C. Grebe 1 & R.L. Hearn 1 1 Woodside Energy Ltd (cameron.grebe@woodside.com.au,
More informationAnn A4 Installation Decommissioning Environmental Impact Assessment
Ann A4 Installation Decommissioning Environmental Impact Assessment DOCUMENT CONTROL Document ID: Document Classification: Document Ownership: CEU-DCM-SNS0096-REP-0002 PUBLIC Projects, Wells and Decommissioning
More informationWhat should be done to heal the Baltic Sea?
What should be done to heal the Baltic Sea? Mr. Mikhail Durkin, HELCOM Professional Secretary Towards a cleaner and healthier Baltic Sea Public hearing of the Committee on the Environment, Public Health
More informationCAPABILITY STATEMENT INTERNATIONAL PROJECTS GROUP IN AFRICA.
CAPABILITY STATEMENT INTERNATIONAL PROJECTS GROUP IN AFRICA www.rsk.co.uk RSK IS A FULLY INTEGRATED, ENVIRONMENTAL, SOCIAL, HEALTH, SAFETY AND ENGINEERING SERVICES COMPANY EMPLOYING MORE THAN 1000 STAFF
More informationPotential hydrocarbon and chemical spill
Potential hydrocarbon and chemical spill Table of Contents 20 POTENTIAL HYDROCARBON AND CHEMICAL SPILL 20-3 20.1 Introduction 20-3 20.2 Legislative framework and relevant guidance 20-3 20.3 Scoping and
More informationTelephone Lake project
Telephone Lake project Cenovus Energy Inc. is a Canadian oil company. We re committed to applying fresh, progressive thinking to safely and responsibly unlock energy resources the world needs. Our operations
More informationANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:
ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not
More informationPollution Control and Other Measures to Protect Biodiversity in Lake Tanganyika
Pollution Control and Other Measures to Protect Biodiversity in Lake Tanganyika Strategic Action Plan Tanzania Conclusions of the National Working Group Planning Meeting Preparation for the National Sectoral
More informationPrelude Floating LNG Project Draft Environmental Impact Statement. Shell Development (Australia) Proprietary Limited EPBC 2008/4146
Prelude Floating LNG Project Draft Environmental Impact Statement Shell Development (Australia) Proprietary Limited EPBC 2008/4146 October 2009 Disclaimer This draft Environmental Impact Statement (EIS)
More informationINPEX Ichthys LNG Project
INPEX Ichthys LNG Project INPEX Ichthys LNG Project McDermott is delivering an engineering, procurement, construction and installation (EPCI) solution for one of the world s largest subsea gas field developments
More informationGMR Holdings Private Limited
GMR Holdings Private Limited Development of LNG Facility at Kakinada Deep Water Port PROPOSED TERMS OF REFERENCE April 2016 Submitted By: L&T Infrastructure Engineering Limited (formerly known as L&T-Ramboll
More informationWHITE ROSE ENVIRONMENTAL EFFECTS MONITORING DESIGN REPORT
WHITE ROSE ENVIRONMENTAL EFFECTS MONITORING DESIGN REPORT SUBMITTED BY: HUSKY OIL OPERATIONS LIMITED (AS OPERATOR) SUITE 801, SCOTIA CENTRE 235 WATER STREET ST. JOHN S, NL, AIC 1B6 TEL: (709) 724-3900
More informationMARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT
MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT The health of the world s oceans and marine life is degrading rapidly as a result of excess human activities.
More informationA. Project Description
Environmental and Social Review Summary Block CI-27 Expansion program This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed prior to the date on which MIGA s Board
More informationSand extraction Maasvlakte 2 Project: License, Environmental Impact Assessment and Monitoring.
Sand extraction Maasvlakte 2 Project: License, Environmental Impact Assessment and Monitoring. Ad Stolk and Chris Dijkshoorn Ministry of Transport, Public Works and Water Management Rijkswaterstaat North
More information17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)
More informationINLAND WATERWAYS AUTHORITY OF INDIA (Ministry of Shipping, Government of India) Head Office : A-13, Sector 1, Noida
Project Management Unit (World Bank Assisted Development Project for NW-1) INLAND WATERWAYS AUTHORITY OF INDIA (Ministry of Shipping, Government of India) Head Office : A-13, Sector 1, Noida - 201301 Phone
More informationEIA implementation and Follow-up
EIA implementation and follow up: a case study of Koga irrigation and watershed management project- Ethiopia By: W.B. Abebe, W.J.A.M. Douven, M.McCartney, J. Leentvaar This research was done for the partial
More informationINTEGRATED COASTAL MANAGEMENT ACTION PLAN
BAGAMOYO DISTRICT COUNCIL INTEGRATED COASTAL MANAGEMENT ACTION PLAN Prepared by: The District Executive Director P.O. BOX 59 BAGAMOYO NOVEMBER 2001 APPROVAL Approved by: Required TCMP Date. IMCIC Date.
More informationPUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME. 2 Objective of the Phase II Environmental and Social Programme
PUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME 1 Introduction and Background To meet its environmental and social obligations and commitments, the Lesotho Highlands Development
More informationOverview of Permitting Framework Alaska North Slope Oil and Gas Activities
Overview of Permitting Framework Alaska North Slope Oil and Gas Activities Karen Wuestenfeld Regulatory Compliance and Environmental Manager BP Exploration (Alaska) Inc. January 6, 2011 Objectives and
More informationPRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD
PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD Presentation By N.K.Srivastava General Manager (Engg. Services & R&M) 20.04.2012 PROJECT DEVELOPMENT AT NTPC PROJECT IS DEVELOPED
More informationCOASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS
COASTAL PROTECTION, LANDSCAPING AND INFRASTRUCTURAL WORKS IN MAURITIUS CASE NOYALE SITE ENVIRONMENTAL IMPACT ASSESSMENT REPORT CONTENTS Chapter Description Page EXECUTIVE SUMMARY 1 INTRODUCTION 1-1 1.1
More informationRegional Seas Indicators Working Group
18 th Global Meeting of the Regional Seas Conventions and Action Plans 30 September 1 October 2016, Incheon, the Republic of Korea Regional Seas Indicators Working Group Black Sea Commission Irina Makarenko
More informationOttawa-Trussler Area Sewage Facility Class Environmental Assessment
Welcome to the Ottawa-Trussler Area Sewage Facility Class Environmental Assessment Public Open House May 7, 2013 September 25, 2013 Welcome The purpose of this second Public Open House is to: Present the
More informationMitigating Environmental Impacts in the Offshore Oil and Gas Industry
Mitigating Environmental Impacts in the Offshore Oil and Gas Industry Paul Barnes, Manager - Atlantic Canada & Arctic NOTES 2015 St. John s, NL April 27, 2015 Overview Who is CAPP? Oil and Gas Lifecycle
More informationWhat are the problems? Pressures are greatest in the North Sea and expected to increase in the Arctic
7 Offshore Oil and Gas industry Oil discharges with produced water have fallen on average by 2 % in the area and most countries have met the 15 % reduction target, but volumes of produced water are expected
More informationTitle: Environmental Impact Study for the Block 38 Exploratory Drilling Project.
Technical Sheet Title: Environmental Impact Study for the Block 38 Exploratory Drilling Project. Client: Statoil Angola Block 38 AS Belas Business Park, Edifício Luanda 3º e 4º andar, Talatona, Belas Telefone:
More informationGood afternoon ladies and gentlemen, my name is Desmond Greene. I m a Simulation Designer and Project Manager with GRI Simulations Inc.
Good afternoon ladies and gentlemen, my name is Desmond Greene. I m a Simulation Designer and Project Manager with GRI Simulations Inc., a software development company based locally in Mount Pearl, Newfoundland.
More information10. Impact Assessment and Risk Significance
Browse Section FLNG Development 10 IMPACT ASSESSMENT Draft Environmental AND RISK Impact SIGNIFICANCE Statement 159 10. Impact Assessment and Risk Significance 10.1 Introduction This section describes
More informationNoront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017
Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach October 2017 (Simulated FPF) INTRODUCTION Noront is proposing to develop a Ferrochrome Production Facility (FPF) in Northern
More informationJackfish 2 Project. Public Disclosure Document. August 2005
Jackfish 2 Project Public Disclosure Document August 2005 Table of Contents Introduction...1 Company Profile...2 Preliminary Project Description...2 The Plan...2 The Process...3 Facilities...3 Physical
More informationSummary of Environmental and Social Consideration in Development Study (Preparatory Study)
Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 1. Project Title: The Feasibility Study on Development of Toamasina Port in the Republic of Madagascar 2. Type
More informationFULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Agricultural Expansion on Portion 2 of Farm 92, Tregaron, known as Sylvania, Sundays River Valley Municipality BACKGROUND INFORMATION DOCUMENT,
More informationLorelei H. Oviatt, Director, AICP Kern County Planning and Community Development Department
Lorelei H. Oviatt, Director, AICP Kern County Planning and Community Development Department Sept. 16, 2013, Lost Hills Recreation Building, Lost Hills Park, Highway 46, Lost Hills, CA 1. To Introduce the
More informationStakeholder Engagement Plan
Stakeholder Engagement Plan South Stream Offshore Pipeline Bulgarian Sector, July 2014 Abbreviations Abbreviation EEZ EIA ESIA ESMP ESMS IFC IFC PSs MoEW NGO PAC NTS SCD SEP ToR Description Exclusive
More information10.0 AIR QUALITY AND CLIMATIC FACTORS
.0 AIR QUALITY AND CLIMATIC FACTORS.1 ASSESSMENT METHODOLOGY.1.1 General Section 39 (2) (b) (ii) of the Transport (Railway Infrastructure) Act 2001, requires that proposed developments are examined in
More informationFRAMEWORK FOR AQUACULTURE DEVELOPMENT ON THE VOLTA LAKE. Implementation Guidelines Document
FRAMEWORK FOR AQUACULTURE DEVELOPMENT ON THE VOLTA LAKE Implementation Guidelines Document APRIL 2017 INTERPRETATIONS: In these Guidelines, unless the context otherwise requires: Applicant: Company or
More informationMassawa Port Authority State of Eritrea. Petroleum Jetty ESIA
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Massawa Port Authority State of Eritrea Petroleum Jetty ESIA E150 v.2 Petroleum Jetty
More informationPROPOSED TERM OF REFERENCE
PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0
More informationDetailed methodology for TDA finalisation and SAP development
Detailed methodology for TDA finalisation and SAP development Project Number: 53885 Final report December, 2008 First published in Ghana in 2008 By the UNEP-GEF Volta Project. Copyright 2008, United Nations
More informationTERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;
TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various
More informationChatham Rock Phosphate. Chatham Islands. April 2013
Chatham Rock Phosphate Chatham Islands April 03 Who we are Chatham Rock Phosphate Golden Bay co started by us 006 Chris Castle - CEO Linda Sanders Comms director Toko Kapea and Adrian Wilson stakeholder
More informationThe Technical & Practical challenges of FLNG
SUT Evening Technical Meeting: On the Fringes of FLNG, Perth 19/08/2015 Jeff Baker Energy Compliance Technical Manager, Australasia Working together for a safer world Agenda Introduction Acknowledgement
More informationEnvironmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)
Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water
More informationExploration Drilling within Block ER236, off the East Coast of South Africa. Draft Scoping Report: Executive Summary. The business of sustainability
Exploration Drilling within Block ER236, off the East Coast of South Africa Draft Scoping Report: Executive Summary Version 2 January 2018 www.erm.com The business of sustainability Exploration Drilling
More informationNOTIFICATION ABOUT CONSTRUCTION OF ONE NEW LATEST GENERATION NUCLEAR UNIT IN THE REPUBLIC OF BULGARIA. Yes.
NOTIFICATION TO AN AFFECTED PARTY OF A PROPOSED ACTIVITY UNDER ARTICLE 3 OF THE CONVENTION ON ENVIRONMENTAL IMPACT ASSESSMENT IN A TRANSBOUNDARY CONTEXT ABOUT CONSTRUCTION OF ONE NEW LATEST GENERATION
More informationBaltic Marine Environment Protection Commission
Baltic Marine Environment Protection Commission HELCOM RECOMMENDATION 37/3 Adopted 11 March 2016, having regard to Article 20, Paragraph 1 b) of the Helsinki Convention SUSTAINABLE AQUACULTURE IN THE BALTIC
More informationShell Quest Carbon Capture and Storage Project. Shell Canada Limited
SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries
More informationStewardship. Expectations. SE-01 Joint Venture Hub Strategy Implementation Guide
Stewardship Expectations SE-01 Joint Venture Hub Strategy Implementation Guide March 2017 2 SE-01 Joint Venture Hub Strategy Implementation Guide 1. Objectives The objectives of this Stewardship Expectation
More informationOPERATIONS REPORT FIRST-QUARTER 2012 April 30, 2012
Cautionary Note 2 OPERATIONS REPORT April 30, 2012 Overview 2 Drilling Efficiencies 4 Rockies 5 Southern & Appalachia 8 Gulf of Mexico 11 International/Frontier 15 1 OVERVIEW This presentation contains
More informationSUMMARY 2013 EDITION
SUMMARY 2013 EDITION RSAT Joint Initiative on Rapid Basin-wide Hydropower Sustainability Assessment Tool PART 1: OVERVIEW OF THE RSAT The RSAT is designed as an integrative tool to assess hydropower development
More informationRevised mapping of the CITES Strategic Vision: objectives and the Aichi Targets in the Strategic Plan for Biodiversity
Revised mapping of the CITES Strategic Vision: 2008 2020 objectives and the Aichi Targets in the Strategic Plan for Biodiversity 2010-2020. Analysis of how CITES Strategic Vision objectives contribute
More informationEnvironmental Governance in Myanmar. U Than Aye Director Environmental Conservation Department
Environmental Governance in Myanmar U Than Aye Director Environmental Conservation Department 1 Strategy for Environmental Safeguards To work for Economic Development in Parallel with Environmental Conservation
More informationInnovation for Green Blue Economies
Innovation for Green Blue Economies Community Leadership for a Green Economy Presentation to Company name Kesaia Tabunakawai WWF South Pacific Programme August 2013 21-Aug-13 / 1 Presentation Outline 1.The
More informationSOUTH AFRICAN COUNCIL FOR PLANNERS. Guidelines for Job Profiling of Planners
SOUTH AFRICAN COUNCIL FOR PLANNERS Guidelines for Job Profiling of Planners November 2016 0 REPORT GUIDELINES FOR JOB PROFILING OF PLANNERS Document number 8/4/1/C&S/Job/11-2016 File Number 8/4/1 SACPLAN
More informationFor PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra
Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech
More informationOUR GOAL IS TO PREVENT SPILLS ENTIRELY
OUR GOAL IS TO PREVENT SPILLS ENTIRELY OUR GOAL IS TO NEVER HAVE AN OIL SPILL, AND THE INDUSTRY TAKES EXTENSIVE PRECAUTIONS TO PREVENT SPILLS FROM OCCURRING. TOPICS FOR DISCUSSION WHAT ARE OUR PRIMARY
More informationEnvironmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning)
Date: March 16, 2015 Environmental and Social onsiderations in Detailed Planning Survey (Technical ooperation for Development Planning) 1. Full title of the Project THE PROJET ON THE ORRIDOR DEVELOPMENT
More informationEnvironmental Impact Assessment (EIA) for Oil & Gas and Power Projects
Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects Insert then choose Picture select your picture. Right click your picture and Send to back. August 6-8 th, 2014 Craig A. Reid Partner,
More informationFloating LNG: The Challenges of production systems and well fluids management By: Frederic MOLLARD, TECHNIP France 04/19/2013
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) Floating LNG: The Challenges of production systems and well fluids management By: Frederic MOLLARD, TECHNIP France 04/19/2013
More informationSwedish environmental legislation and how it is implemented. Malin Hemmingsson
Swedish environmental legislation and how it is implemented Malin Hemmingsson Malin.Hemmingsson@havochvatten.se Swedish Agency for Marine and Water Management (SwAM) Started its operations on July,1 2011
More informationEnvironmental and Social Management Plan Çanakkale Bridge and Malkara - Çanakkale Motorway Project Final Draft. December 2017.
ERM Environmental Resources Management SRL Environmental and Social Management Plan - 1915 Çanakkale Bridge and Malkara - Çanakkale Motorway Project Final Draft December 2017 Prepared by: ERM Prepared
More informationTITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS
TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS SERIES 1 MISCELLANEOUS WATER POLLUTION CONTROL RULES 35-1. General. 1.1. Scope. -- This legislative
More informationNearshore Regasification Terminals and FSRUs
Nearshore Regasification Terminals and FSRUs Results for our customers As the worldwide demand for natural gas imports increases, the technical and regulatory challenges and the scale of the investment
More information/ Production.
/ Production www.exprogroup.com A global leader in fast-track, cost-effective and enhanced production solutions. The production solutions we provide allow our customers to plan the optimal exploitation
More informationEnvironmental Impact Assessment for Drilling of Three Exploration Wells in the Mayaro-Guayaguayare Block, Offshore Trinidad
Environmental Impact Assessment for Drilling of Three Exploration Wells in the Mayaro-Guayaguayare Block, Offshore Trinidad February 2013 Prepared for: Voyager Energy (Trinidad) Ltd. Princes Court, Level
More information