1 DEPARTMENT OF ENERGY ENERGY UTILIZATION MANAGEMENT BUREAU Manuals and Guidelines for Solar Photovoltaic Development in Rural Electrification June 2009

2 Through the Project on Sustainability Improvement of Renewable Energy Development for Village Electrification in the Philippines under technical assistance of Japan International Cooperation Agency (JICA), this manual was developed by the Department of Energy (DOE) reviewing the Manual for Microhydropower Development in March 2003.

3 Manuals and Guidelines for Solar Photovoltaic Development in Rural Electrification PV-1 Guideline for PV Project Evaluation PV-2 Manual for Solar PV Training PV-3 Guideline for Application of Photovoltaic Power Generation System PV-4 Manual for User Training of Solar PV System

4 1

5 PV 1 DEPARTMENT OF ENERGY RENEWABLE ENERGY MANAGEMENT BUREAU GUIDELINE for PV Project Evaluation June 2009

6 This guideline was developed by the Department of Energy (DOE) through the technical assistance under the Project on Sustainability Improvement of Renewable Energy Development for Village Electrification in the Philippines which was provided by the Japan International Cooperation Agency (JICA).

7 TABLE OF CONTENTS 1 OBJECTIVE 1 2 KEY POINTS FOR PROJECT EVALUATION 1 3 TECHNICAL EVALUATION SYSTEM INSTALLATION INSPECTION AND MAINTENANCE MANAGEMENT STATUS EVALUATION MANAGEMENT METHODS MANAGEMENT ORGANIZATION EVALUATION OF THE SOCIAL ENVIRONMENT EFFECT ON THE LIVES OF THE RESIDENTS EFFECT ON COMMUNITIES EFFECT ON THE NATURAL ENVIRONMENT ECONOMIC EVALUATION 9 7 AMENDMENT OF THE MANUAL 10 i

8 1 OBJECTIVE The PV project executes installation, tariff collection, maintenance and technical education, among others. To manage PV systems appropriately, various works are required. Without completing the appropriate work, the PV project will not be successful. Project evaluation will study whether a project is planned and implemented properly according to its objectives, how the project affects the surrounding environment, and judges whether a project is successful or not based on the results of the study. It is important to evaluate the project during implementation and reconsider the implementation plan accordingly. Evaluated items are technology, management, the social environment and economics. This guideline explains the content of the evaluation items and methods. 2 KEY POINTS FOR PROJECT EVALUATION (1) Clarifying Evaluation Objectives It is important to define the evaluation objectives and subjects before evaluation, and to select appropriate survey methods and evaluation standards, in order to make an efficient evaluation. (2) Establishment of Consistent Evaluation System For exact analysis and evaluation of the project, it is necessary for one group to carry out the evaluation from the beginning of the process to the end. It is important to evaluate changes in the condition before and after implementation of the project based on the objective indicators. Collection of basic planning data is useful for the survey and evaluation to be carried out later. (3) Fair Investigation and Evaluation Fair surveying of project data and residents opinion is necessary for evaluation of the project. Commissioning of the project evaluation to a third party not included in the project is desirable for keeping the investigation impartial. (4) Lessons Learned from the Evaluation It is important to reflect on the lessons learned from the evaluation of current and future projects. This information should be released to the users to keep the project fair and open. 3 TECHNICAL EVALUATION Evaluation of PV system suitability, appropriate construction work, and the status of maintenance, from the technical aspect is necessary. This section reviews evaluation data collection methods and evaluation items, and reflects on the evaluation results according to each evaluation objective. 1

9 3.1 System System evaluation identifies performance and characteristics of system components and the system itself, and studies system problems and points to be improved via operation of the system. System suitability is evaluated based on these factors. (1) Evaluation Items (a) System Capacity: Are the capacities of the PV arrays and batteries appropriate? (b) Charging and Discharging of Batteries: Are batteries charged and discharged properly? (c) Protective Functions: Do protective functions work properly in case of system troubles? (d) System Components: Are specifications of system components appropriate? Are there any problems with the lifespan of the components? (e) System Configuration: Is the layout and combination of components appropriate? (f) Power Loss and Voltage Drop: What is the power loss and voltage drop of the PV arrays, components and wiring? (g) Future Demand: Will power consumption and use of electric appliances increase according the assumption in the plan? (2) Investigation Items and Methods Items to be investigated are as follows: Investigation of items (a) to (d) can be conducted easily by visiting the project sites or collecting records. Item (e) is costly and requires measuring instruments, but provides detailed data on the characteristics and performance of a system. However, as there are differences among users, so it is necessary to know the conditions of use and make a comparison using design data. (a) Problems: Through interviews with engineers and record collection, the situation regarding problems with the system and the effect can be discovered. (b) Maintenance Data : Collect recorded data of daily and periodic inspections. (c) Use of Electrical Appliances: Investigate the use of electrical appliances through questionnaires or interviews. (d) Performance Test: Test system performance similar to those tested in a completion inspection. 2

10 (e) System Operation Characteristics: Install measurement instruments on a system and record the power generation status of the PV array, charge and discharge of the batteries, and power supply to the loads. (3) Analysis and Evaluation Discover system problems on the basis of the investigation results and solve problems by improving systems or through inspection and maintenance. Review system design, manual and engineer training in regard to proposed solutions to the problems. 3.2 Installation Installation methods and the aptitude of contractors are evaluated through installation itself. (1) Evaluation Items Evaluation items for installation are as follows: (a) Installation Method: Are the methods for installing components and wiring appropriate? (b) Schedule: Is the installation proceeding according to schedule? (c) Quality of Work: How is the quality of the work? Are the workers skilled? (d) Work Management: Is management of work, the schedule, and material being properly carried out? (2) Investigation Items and Methods It is desirable to investigate (a) and (b) to verify a state progress and the quality of work on the installation. (a) Inspection of Work: Inspection items such as work progress and wiring are periodically checked according to the item inspection list. Interviews, visual inspection, or measurements are used for the inspection. (b) Collection of Work Records: Installation records describing the content of daily work, trouble experienced, and countermeasures are collected. (c) Monitoring Survey: By witnessing installation work, and inspection and monitoring each process, the content of work, and engineering skills are checked. 3

11 (3) Analysis and Evaluation The quality of installation work and engineering skills are evaluated on the basis of survey results. If there are scheduling problems, they are reviewed so that work can be conducted within a sufficient margin. Countermeasures are taken when problems with the work level or management occur. 3.3 Inspection and Maintenance Daily and periodic inspections are used to evaluate the appropriateness of inspection items for engineer and user inspections. (1) Evaluation Items Evaluation items concerning inspection and maintenance are as follows: (a) Inspection and Maintenance Are maintenance items and methods appropriate? (b) Inspector Level Is the knowledge and technical capability of the inspector appropriate? (2) Survey Items Data concerning inspection and maintenance can be collected via methods (a) to (c). Engineer follow-up via investigation of (d) is effective. (a) Problems: Problems with system operation, countermeasures, and their effects are collected by interviews with engineers and from maintenance records. (b) Maintenance Items: Maintenance items, daily inspection methods, and periodic inspections designated in manuals, and engineer s training programs are investigated. (c) The Status of Maintenance: Actual maintenance items and inspection methods are investigated through interviews and questionnaires with users and engineers. (d) Monitoring Survey: Maintenance and inspection conducted by the users and/or engineers is observed at the site and the content of maintenance is verified. (3) Analysis and Evaluation Appropriateness of current inspection and maintenance is analyzed and evaluated on the basis of survey results, and addition or deletion of maintenance items is considered. If any problems exist with maintenance, the maintenance items are reviewed and the results are reflected in the manuals and engineer training programs. Simplification or deletion of maintenance items that are not important are considered from the viewpoint of cost reduction. 4

12 4 MANAGEMENT STATUS EVALUATION Management items, methods, and organization are evaluated from the viewpoint of sustainable management of the PV system. 4.1 Management Methods Regarding fee collection, maintenance, engineer training, project management, etc, executed by the managing organization, its content and methods are evaluated for suitability. (1) Evaluation Items Evaluation items are as follows: (a) Fee Collection: *Are the current fees appropriate? [Fee setting] *Are the method and period of collection appropriate? [Collection method] (b) Maintenance Management *Are all the items needed for management included? [Items] *Are methods appropriate for system management? [Management method] (c) Engineer Training *Is training program content appropriate? [Training program] *Is engineer education appropriate? [Engineer education] (d) Project Management *Is the plan for implementation and funding appropriate? [Planning] *Is material procurement managed properly without delay? [Material procurement] *Is management of installation work appropriate? [Work management] *Are funds used properly? Is income and expenditure being properly managed? [Fund management] *Are enlightenment activities properly carried out to promote project and PV system expansion? [Enlightenment] (2) Survey Items and Methods Management data can be collected via method (a) to (c). (a) Management Items Management item content and methods for the project are examined. (b) Management Status The status of management is investigated through interviews and questionnaires with personnel in charge, engineers, and users. Data is recorded and the records are collected. (c) Problems Problems, countermeasures, and their effect are investigated in relation to management activity. 5

13 (3) Analysis and Evaluation The appropriateness of management methods is analyzed and evaluated on the basis of survey results. If management is not conducted properly, users will be dissatisfied. Hence, it is necessary to consider acceptance levels and the satisfaction of the users. If there are problems with the management method, it is reviewed and the results are reflected in the manuals and engineer training programs. 4.2 Management Organization The configuration of project management organization, allocation of engineers, appropriateness of roles, and business conditions of related organizations is evaluated. (1) Evaluation Items Evaluation items of management organization are as follows: (a) Management Organization Are the organization and engineers in charge of the PV project properly arranged? Are there appropriate information network and management systems? (b) Roles of the Members: Are the roles of the organization and engineers appropriate? (c) Business Conditions: Are the business condition of the organization and related bodies good? (2) Evaluation Items and Methods Management organization data can be collected via method (a) to (c). (a) Management Organization The configuration of an organization and member allocation used for a project are investigated. (b) Management Status The management status is investigated through interviews or questionnaires given to personnel in charge, engineers, and users, and the stored data is collected. (c) Business Conditions Income and expenditure of the related organizations is investigated. (3) Analysis and Evaluation The appropriateness of management methods are analyzed and evaluated on the basis of survey results. If management is not conducted properly, users will be dissatisfied. Hence, it is necessary to consider acceptance levels and the satisfaction of the users. If there are problems with the management method, it is reviewed, and the results are reflected in the manuals and engineer training programs. 6

14 5 EVALUATION OF THE SOCIAL ENVIRONMENT User s living environment, social environment of villages and the surroundings, and natural environment is evaluated with respect to the change by the introduction of PV system. There are two kinds of effect on social environment. One appears immediately after installation and another one appears gradually over many years. In evaluating such effects, it is necessary to make surveys before and after introduction of PV system project. 5.1 Effect on the Lives of the Residents Direct or indirect effects on the lives of the residents caused by the project are evaluated. (1) Evaluation Items Evaluation items are as follows: (a) Improvement of Living Standard: Will electrification improve the living standard? (b) Systems Appropriateness: Are the systems useful for users? (2) Evaluation Items and Methods To evaluate the effect on the lives of the residents, data is normally collected directly through interviews or questionnaires. As resident life may change due to various factors, such as economic growth or changes of neighborhood villages, investigation and evaluation may be conducted in comparison with other villages without PV projects. Examples of evaluation items are as follows: (a) Life: General pattern of daily living, usage of electric appliances. (b) Income and Expenditure: Income, expenditure, saving, expenses of heat and light. (c) Electric Appliances: The condition of electric appliances owned, the price of newly purchased electric appliances, and the procurement method. (d) Lifestyle Changes: (e) User Comments and Requests: (3) Analysis and Evaluation Effects of the project are analyzed on the basis of survey results, and the PV project is evaluated on its contribution towards improving the livelihood of the residents. 7

15 5.2 Effect on Communities Effects on the social environment of the users and on the communities is evaluated by execution of the PV project. (1) Evaluation Items Evaluation items are as follows: (a) Community Development: Have the communities developed from electrification? (b) New Problems: Have any new problems developed in the communities? (2) Investigation Items and Methods For assessing the effects on communities, necessary data is normally collected through interviews or questionnaires with residents directly. Trend changes are revealed through the statistical data. (a) Regional Industries: Existing industries, new industries content, average wages, and working hours (b) Education: Education hours, literacy ratio, and ratio of higher grade students. (c) Movement of the Population: Rate of drain from a village, rate of influx to a village, population. (d) Healthcare and Medicine: The incidence of disease, the birthrate, mortality, and average lifespan are investigated. (e) Nighttime Security: Crime-related details and the crime rate (3) Analysis and Evaluation The condition of community development and newly generated problems are analyzed and evaluated on the basis of survey results. If new problems develop, reasons such as urbanization or living improvement, or the character of the project, are analyzed and appropriate countermeasures are taken. 5.3 Effect on the Natural Environment The effect on the natural environment is evaluated. (1) Evaluation Items Evaluation items regarding the effect on the environment are as follows. (a) Reduction of Greenhouse Gas Emissions: What is the amount of greenhouse gas emission that will be reduced? 8

16 (b) Damage to the Natural Environment: How does the project damage the natural environment? (2) Investigation Items and Methods Necessary data is normally collected through interviews or questionnaires with personnel in charge of management and residents, and the effect on the natural environment is evaluated. (a) Fuel Use: The state of conventional fuel use for lighting and housekeeping. (b) Waste Disposal: The condition of toxic waste disposal, such as batteries and fluorescent lamps. (c) Tree-felling The state of tree felling in relation to PV project installation. (3) Analysis and Evaluation The effect of the reduction of greenhouse gas emissions and damage to the natural environment are analyzed and evaluated on the basis of survey results. If the project negatively impacts the natural environment, improvement of the plan is considered. 6 ECONOMIC EVALUATION Economic evaluation determines the economical feasibility of a project by comparing the costs and the benefits of a project, and can be divided into financial evaluation and economic evaluation. (1) Financial Evaluation Financial evaluation investigates the income and expenditure of a project and assesses the economy of a project in terms of money. Financial evaluation items are as follows: (a) Economic Evaluation of the Project Economic feasibility of the executed project is evaluated by investigating the funding plan and of the balance of income and expenditure. (b) Review of Electricity Fees When a project cost is reduced due to system price reduction or maintenance cost reduction, or when a project cost changes significantly due to the effects of inflation or exchange rate change, etc, electricity fees are reviewed to preserve the economic range of the project. (2) Economic Evaluation For economic evaluation, both the costs and the benefits of the project are evaluated. The benefits of a project are evaluated based on the income of a project and the value of the implementation effects are estimated and counted. 9

17 by the incomes from a project and project implementation effects that are estimated in value and counted. Items for economic evaluation are as follows: (a) Cost Comparison with Alternative Power Sources When all power sources are assumed to give a same benefit, the cost of a PV project with diesel, the distribution system, and other natural energy sources are compared, and the advantages of the executed project is verified. (b) Effects of Fuel Expense Reduction The reduction of expenses for conventional fuel through the introduction of a PV system is calculated and evaluated. (c) Evaluation of the Effects on the Regional Economy The effects on the regional economy such as a job creation and increased consumption of electrical appliances are evaluated. 7 AMENDMENT OF THE MANUAL The DOE shall review this guideline annually, and amend it, if necessary, according to the surrounding circumstances in rural electrification of the country. The amended manual shall be fully authorized among the DOE and approved by Director of Renewable Energy Management Bureau of the DOE. 10

18 Department of Energy Energy Complex Merritt Road, Fort Bonifacio, Taguig City, Metro Manila TEL: FAX:

Manuals and Guidelines. for. Micro-hydropower Development. in Rural Electrification. Volume II

Manuals and Guidelines. for. Micro-hydropower Development. in Rural Electrification. Volume II DEPARTMENT OF ENERGY ENERGY UTILIZATION MANAGEMENT BUREAU Manuals and Guidelines for Micro-hydropower Development in Rural Electrification Volume II June 2009 Through the Project on Sustainability Improvement

More information

Project Evaluation Guideline. for. Micro Hydropower Development

Project Evaluation Guideline. for. Micro Hydropower Development MHP-3 DEPARTMENT OF ENERGY ENERGY UTILIZATION MANAGEMENT BUREAU Project Evaluation Guideline for Micro Hydropower Developent June 2009 This guideline was developed by the Departent of Energy (DOE) through

More information

TAKING ONE LEVEL UP THE QUALITY AND PERFORMANCE OF SOLAR PV MINI- GRIDS: THE MSP INSTRUMENT

TAKING ONE LEVEL UP THE QUALITY AND PERFORMANCE OF SOLAR PV MINI- GRIDS: THE MSP INSTRUMENT TAKING ONE LEVEL UP THE QUALITY AND PERFORMANCE OF SOLAR PV MINI- GRIDS: THE MSP INSTRUMENT BACKGROUND In Indonesia, since 2012 the Directorate General for New and Renewable Energy and Energy Conservation

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan 1. Name of the Project Ex-Ante Evaluation (for Japanese ODA Loan) Country: Arab Republic of Egypt Project: Hurghada Photovoltaic Power Plant Project Loan Agreement: February 29, 2016

More information

Costs of Renewables in Pacific Island Countries (PICs)

Costs of Renewables in Pacific Island Countries (PICs) IRENA Workshop Accelerated Renewable Energy Deployment in Islands with Emphasis on the Pacific Islands Costs of Renewables in Pacific Island Countries (PICs) Katerina Syngellakis Senior Engineer IT Power

More information

Ex post evaluation People's Republic of China

Ex post evaluation People's Republic of China Ex post evaluation People's Republic of China Sector: 23230 Solar energy Programme/Project: Solar energy Xinjiang (BMZ No. 200066381)*; Qinghai (200265736, CP), Yunnan (200166439)**, Gansu (200365916,

More information

ACHIEVING ENERGY CONSERVATION GOALS WITHOUT THE BROAD APPLICATION OF SMART METERS ONTARIO FEDERATION OF AGRICULTURE

ACHIEVING ENERGY CONSERVATION GOALS WITHOUT THE BROAD APPLICATION OF SMART METERS ONTARIO FEDERATION OF AGRICULTURE ACHIEVING ENERGY CONSERVATION GOALS WITHOUT THE BROAD APPLICATION OF SMART METERS Background ONTARIO FEDERATION OF AGRICULTURE The Ontario Federation of Agriculture is a voluntary membership organization.

More information

Design and life cycle cost analysis of a SAPV system to electrify a rural area household in India

Design and life cycle cost analysis of a SAPV system to electrify a rural area household in India Current World Environment Vol. 5(1), 101-106 (2010) Design and life cycle cost analysis of a SAPV system to electrify a rural area household in India MOHD. ARIF* and M. EMRAN KHAN *Mechanical Engineering,

More information

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities.

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities. Transit Systems NSW Environmental Management Plan GOAL 1: REDUCE THE GREENHOUSE IMPACT OF ENERGY USE To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems

More information

Key words: Carbon sequestration, LED lamps, Solar Energy, Paraffin Use

Key words: Carbon sequestration, LED lamps, Solar Energy, Paraffin Use Small Scale Carbon Sequestration using Solar Powered LED Lanterns in Uganda Dr. Izael Pereira Da Silva, Al-Mas Sendegeya, Geofrey Bakkabulindi Makerere University- Kampala idasilva@tech.mak.ac.ug, al_mas@tech.mak.ac.ug,

More information

NORTH COUNTRY LIBRARY SYSTEM County Route 190 Watertown, NY 13601

NORTH COUNTRY LIBRARY SYSTEM County Route 190 Watertown, NY 13601 22072 County Route 190 Watertown, NY 13601 REQUEST FOR PROPOSAL DESIGN/BUILD OF SOLAR PHOTOVOLTAIC ARRAY Solicitation The North Country Library System (NCLS), Watertown NY is soliciting proposals from

More information

Consumer s Guide to Solar Power

Consumer s Guide to Solar Power Consumer s Guide to Solar Power JEA Consumer s Guide to Solar Power What is Solar Energy? 3 Benefits of Solar Power 3 JEA Solar Programs 4 Types of Solar Energy Systems 6 Is Solar Right for You? 10 Installation

More information

COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA DEVELOPMENT POLICIES

COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA DEVELOPMENT POLICIES COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA DEVELOPMENT POLICIES TABLE OF CONTENTS DEFINITIONS WATER POLICIES Water System Extensions.... W88001 Water System Activation / Service

More information

Journal of Asian Scientific Research

Journal of Asian Scientific Research Journal of Asian Scientific Research journal homepage: http://aessweb.com/journal-detail.php?id=5003 DESIGN OF A PV/DIESEL STAND ALONE HYBRID SYSTEM FOR A REMOTE COMMUNITY IN PALESTINE M.S. Ismail 1 M.

More information

Climate Change Policy in Tokyo. Yuko Nishida Bureau of Environment Tokyo Metropolitan Government

Climate Change Policy in Tokyo. Yuko Nishida Bureau of Environment Tokyo Metropolitan Government Climate Change Policy and Science in Tokyo Yuko Nishida Bureau of Environment Tokyo Metropolitan Government Tokyo Climate Change Strategy Basic points of a strategy Make the best use of environmental technology

More information

U.S. Department of Energy, in conjunction with the U.S. Environmental Protection Agency. Home Performance with ENERGY STAR

U.S. Department of Energy, in conjunction with the U.S. Environmental Protection Agency. Home Performance with ENERGY STAR U.S. Department of Energy, in conjunction with the U.S. Environmental Protection Agency Home Performance with ENERGY STAR HOME PERFORMANCE WITH ENERGY STAR: A WHOLE-HOUSE APPROACH If you re considering

More information

ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY

ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY DRAFT Report ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY Navajo Tribal Utility Authority August 2007 DRAFT NAVAJO TRIBAL UTILITY AUTHORITY ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY Table of Contents

More information

solar photovoltaics (PV)

solar photovoltaics (PV) Home electricity generation fact sheet 1 A guide to solar photovoltaics (PV) SevernWye energy advice Types of solar panels There are two main types of solar panels. Solar PV (photovoltaic) panels produce

More information

Identification of (Materiality) The identified key issues were classified as "the impact of the Mitsui Chemicals Group s business on society," "social

Identification of (Materiality) The identified key issues were classified as the impact of the Mitsui Chemicals Group s business on society, social The Mitsui Chemicals Group adopts a long-term management perspective based on the triple bottom line management approach outlined in its Long-term Business Plan. Against this backdrop, the Group is actively

More information

How Energy Harvest Controls Can Increase the Benefits of Solar Direct-Drive Refrigerators

How Energy Harvest Controls Can Increase the Benefits of Solar Direct-Drive Refrigerators How Energy Harvest Controls Can Increase the Benefits of Solar Direct-Drive Refrigerators December 2016 MAILING ADDRESS PO Box 900922 Seattle, WA 98109 USA ADDRESS 2201 Westlake Avenue Suite 200 Seattle,

More information

Staff Report. Staff believes that this second meeting provides that opportunity.

Staff Report. Staff believes that this second meeting provides that opportunity. Staff Report DATE: May 28, 2014 TO: FROM: SUBJECT: Natural Resources Commission Mitch Sears, Sustainability Programs Manager Eric Lee, Assistant Planner Draft Renewable Energy Ordinance Recommendation

More information

Christine Lins Executive Secretary Tokyo, 27 October 2017

Christine Lins Executive Secretary Tokyo, 27 October 2017 1 Christine Lins Executive Secretary christine.lins@ren21.net Tokyo, 27 October 2017 REN21 Renewables 2017 Global Status Report 2 The report features: Global Overview Market & Industry Trends Distributed

More information

CITY OF NAPERVILLE, ILLINOIS TREE REMOVAL PERMIT APPLICATION LOCATION: PROJECT CONTACT: VARIETY NUMBER SIZE CONDITION

CITY OF NAPERVILLE, ILLINOIS TREE REMOVAL PERMIT APPLICATION LOCATION: PROJECT CONTACT: VARIETY NUMBER SIZE CONDITION CITY OF NAPERVILLE, ILLINOIS TREE REMOVAL PERMIT APPLICATION NAME ADDRESS _ CITY ZIP PHONE Residence Business Fax Please indicate all trees to be removed: DATE PROJECT: LOCATION: PROJECT CONTACT: VARIETY

More information

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd Company Trading Address 242 Fort Austin Avenue Crownhill Plymouth PL6 5NZ Tel: 01752 657227 Fax: 01752 657227 Email: enquiries@jmc-sw.com

More information

CERTIFICATION OF OFF-GRID RENEWABLE ENERGY SYSTEMS September 29, 2001

CERTIFICATION OF OFF-GRID RENEWABLE ENERGY SYSTEMS September 29, 2001 CERTIFICATION OF OFF-GRID RENEWABLE ENERGY SYSTEMS September 29, 2001 Written by JP Ross, Consultant to Center for Resource Solutions Introduction The rate of dissemination of off-grid renewable energy

More information

Republic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Tarahan Coal Fired Steam Power Plant Project External Evaluator: Masumi

Republic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Tarahan Coal Fired Steam Power Plant Project External Evaluator: Masumi Republic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Tarahan Coal Fired Steam Power Plant Project External Evaluator: Masumi Shimamura, Mitsubishi UFJ Research and Consulting Co.,

More information

AORC Technical meeting 2014

AORC Technical meeting 2014 http : //www.cigre.org C5-1036 AORC Technical meeting 2014 Solar PV Rooftop System Connection to MEA s Distribution Network: Technic and Economic Aspects Tosak Thasananutariya Metropolitan Electricity

More information

Addition to Section 4 - Special Use Regulations

Addition to Section 4 - Special Use Regulations Large-Scale Ground-Mounted Solar Photovoltaic Installations Addition to Section 4 - Special Use Regulations 4.4 Large Scale Ground-Mounted Solar Photovoltaic Installations 4.4.1 Purpose The purpose of

More information

HANDBOOK OF PUBLIC SECTOR PROCUREMENT PROCEDURES (MAY, 2001)

HANDBOOK OF PUBLIC SECTOR PROCUREMENT PROCEDURES (MAY, 2001) GOVERNMENT OF JAMAICA HANDBOOK OF PUBLIC SECTOR PROCUREMENT PROCEDURES (MAY, 2001) National Contracts Commission 17 Knutsford Boulevard Kingston 5 Jamaica, West Indies http://www.ocg.gov.jm Acknowledgements

More information

Reliance Group CSR Policy

Reliance Group CSR Policy Reliance Group CSR Policy Page 1 of 8 Contents 1. Introduction... 3 2. CSR Policy... 4 2.1 Guiding Charter 4 2.2 Objective 5 2.3 Scope 5 2.4 The CSR Approach 6 Page 2 of 8 1. Introduction 1.1 Reliance

More information

Insights from Germany s Energy Transition (Energiewende)

Insights from Germany s Energy Transition (Energiewende) Insights from Germany s Energy Transition (Energiewende) 06 December, 2016 Seite 1 Support to the Philippines in Shaping and Implementing the International CC Regime (SupportCCC II) Objective: The Climate

More information

National Water Demand Management Policy

National Water Demand Management Policy National Water Demand Management Policy Introduction In 1997, the Ministry of Water and Irrigation developed Jordan s Water Strategy and the following four policies, which include: Water Utility Policy;

More information

Vietnam Renewable Energy development project to 2030 with outlook to 2050

Vietnam Renewable Energy development project to 2030 with outlook to 2050 Vietnam Renewable Energy development project to 2030 with outlook to 2050 Pham Trong Thuc Director, Department of Renewable Energy The General Directorate of Energy Ministry of Industry and Trade 1 CONTENTS

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION IEC TS 63049 Edition 1.0 2017-09 Terrestrial photovoltaic (PV) systems Guidelines for effective quality assurance in PV systems installation, operation and maintenance INTERNATIONAL

More information

Improving the way we price our network services. Consultation paper

Improving the way we price our network services. Consultation paper Improving the way we price our network services Consultation paper October 2015 Table of Contents 1 Overview... 4 2 Background... 6 3 Purpose... 7 4 Network tariff strategy... 7 4.1 Network tariff reform

More information

ENVIRONMENTAL AUDITING GUIDE TD 16/16/E

ENVIRONMENTAL AUDITING GUIDE TD 16/16/E ENVIRONMENTAL AUDITING GUIDE MIDDLE EAST GASES ASSOCIATION (MEGA) European Business Center, Office BC 25 Dubai Investments Park, PO Box: 166 Dubai-UAE Tel: +971-4-8135525 / Fax: +971-4-8135575 / E-mail:

More information

The ambitious rural electrification programs initiated by the State are major and structuring vehicles of socioeconomic

The ambitious rural electrification programs initiated by the State are major and structuring vehicles of socioeconomic Rural Electrification in Algeria: Experience and Socio-Economic Impact Ms. Hamza Nadia / DGDT/ SONELGAZ n.hamza@sonelgaz.dz SUMMARY The ambitious rural electrification programs initiated by the State are

More information

Intelligent Microgrid for Renewable Energy Technologies Test- Bedding

Intelligent Microgrid for Renewable Energy Technologies Test- Bedding Intelligent Microgrid for Renewable Energy Technologies Test- Bedding Er. Kang Seng Seow Keywords: Intelligent microgrid, Pulau Ubin, renewable energy technologies, test-bedding ABSTRACT: The Energy Market

More information

Power Saver TM Program

Power Saver TM Program Power Saver TM Program COMMERCIAL SOLAR PHOTOVOLTAIC PERFORMANCE-BASED INCENTIVE PROGRAM GUIDELINES These guidelines govern the procedures and qualifications for incentives under the Austin Energy Commercial

More information

Minipe and Nagadeepa Irrigation Rehabilitation Project

Minipe and Nagadeepa Irrigation Rehabilitation Project Sri Lanka Minipe and Nagadeepa Irrigation Rehabilitation Project 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September 2000 The Philippines Manila Cebu Project Site Map

More information

Optimum Design of Biomass Gasifier Integrated Hybrid Energy Systems

Optimum Design of Biomass Gasifier Integrated Hybrid Energy Systems Optimum Design of Biomass Gasifier Integrated Hybrid Energy Systems Arun P* * Department of Mechanical Engineering, National institute of Technology Calicut, NIT Campus (PO), Kozhikode, Kerala, India 673601.

More information

CONTACT INFORMATION. PV System will require a separate Electrical Permit.

CONTACT INFORMATION. PV System will require a separate Electrical Permit. SOLAR APPLICATION P. O. Box 72 Mountlake Terrace, WA 98043 Phone 425.744.6267 Fax 425.778.6421 PermitSpecialist@ci.mlt.wa.us www.cityofmlt.com Application # Job Site Address Single-Family Residential Multi-Family

More information

International Journal of Modern Chemistry and Applied Science

International Journal of Modern Chemistry and Applied Science Available at www.ijcasonline.com ISSN 2349 0594 International Journal of Modern Chemistry and Applied Science Page No.143 International Journal of Modern Chemistry and Applied Science 2015, 2(3), 143-147

More information

Renewable Energy Free & Forever Energy!

Renewable Energy Free & Forever Energy! Nexcel Solar Products & Services Solar Energy - Wind Energy - Solar Water Pump - Bio Gas - Micro Hydropower System - Street Lighting - Energy Audit Free & Forever Energy! ONLY UNIQUE AND INNOVATIVE PRODUCTS

More information

City of Burlington Renewable Energy Protocol Section 1: Background and Context

City of Burlington Renewable Energy Protocol Section 1: Background and Context City of Burlington Renewable Energy Protocol Section 1: Background and Context The Green Energy Act came into effect in 2009. It was created to expand renewable energy generation, encourage energy conservation

More information

Summary of Evaluation Results

Summary of Evaluation Results Summary of Evaluation Results I. Outline of the Project Country: Mongolia Issue/Sector: Environmental Management-Urban Solid W astes Division in Charge: JICA Mongolian Office Period of Cooperation Record

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 11.12.2010 Official Journal of the European Union L 327/13 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 1169/2010 of 10 December 2010 on a common safety method for assessing conformity

More information

Quality Assurance Policies and Procedures. Residential Existing Homes

Quality Assurance Policies and Procedures. Residential Existing Homes Quality Assurance Policies and Procedures Residential Existing Homes As a public benefit corporation, NYSERDA strives to deliver the most effective residential energy efficiency Programs possible and to

More information

Handbook of Operating Procedures. for the use of IFIA Member Companies providing Social Auditing Services. Page 1

Handbook of Operating Procedures. for the use of IFIA Member Companies providing Social Auditing Services. Page 1 Handbook of Operating Procedures for the use of IFIA Member Companies providing Social Auditing Services Page 1 IFIA Handbook of Operating Procedures: Social Auditing Services Table of Contents Page Introduction...3

More information

1.4 Borrower/Executing Agency The Government of the Republic of the Philippines / The Department of Public Works and Highways (DPWH).

1.4 Borrower/Executing Agency The Government of the Republic of the Philippines / The Department of Public Works and Highways (DPWH). Philippines Second Mandaue Mactan Bridge Construction Project Report Date September, 2002 Field Survey June, 2001 1. Project Profile and Japan s ODA Loan Project Location Map Second Mandaue-Mactan Bridge

More information

STATE OF NORTH CAROLINA

STATE OF NORTH CAROLINA STATE OF NORTH CAROLINA DEPARTMENT OF PUBLIC SAFETY DIVISION OF ADULT CORRECTION AND JUVENILE JUSTICE SHIFT PREMIUM PAY FINANCIAL RELATED AUDIT NOVEMBER 2013 OFFICE OF THE STATE AUDITOR BETH A. WOOD, CPA

More information

IX. ADDITION OF SOLYNDRA SOLAR PANELS (ELECTRICAL BREADTH)

IX. ADDITION OF SOLYNDRA SOLAR PANELS (ELECTRICAL BREADTH) IX. ADDITION OF SOLYNDRA SOLAR PANELS (ELECTRICAL BREADTH) BACKGROUND Carderock Springs Elementary is striving to achieve a LEED Silver rating from the USGBC. The school s design is part of the Montgomery

More information

14. Sewerage / Urban Drainage Sub-sector. Guideline:

14. Sewerage / Urban Drainage Sub-sector. Guideline: Sub-sector Guideline: (1) Sewerage (Adaptation Project) (2) Sewerage (BAU Development with Adaptation Options) (3) Urban Drainage (Adaptation Project) (4) Urban Drainage (BAU Development with Adaptation

More information

APWA Congress Solar Feed-in Tariff the Gainesville Way

APWA Congress Solar Feed-in Tariff the Gainesville Way APWA Congress 2011 Solar Feed-in Tariff the Gainesville Way 1 City population of 124,354 City area: 62 square miles County population of 247,336 County area: 930 square miles Employment Center for the

More information

Act on Promoting Green Procurement

Act on Promoting Green Procurement Act on Promoting Green The Act on Promotion of of Eco-Friendly Goods and Services by the State and Other Entities (Act No.100 of May 31, 2000, promulgated on May 31, 2000 and enforced on April 1, 2001)

More information

Scaling Public Concerns of Electromagnetic Fields Produced by Solar Photovoltaic Arrays

Scaling Public Concerns of Electromagnetic Fields Produced by Solar Photovoltaic Arrays Scaling Public Concerns of Electromagnetic Fields Produced by Solar Photovoltaic Arrays Introduction In our modern society electricity is vital to our health, safety, comfort and well-being. While our

More information

Ex-Post Monitoring for Completed ODA Loan Projects

Ex-Post Monitoring for Completed ODA Loan Projects (Onsite evaluation: July 2006) ExPost Monitoring for Completed ODA Loan Projects Evaluator: Kenji Momota (IC Net, Ltd.) Project Name: Indonesia: Bila Irrigation Project Phases (I) (II) (L/A No. IP364,

More information

Renewable Energy Development in Cambodia. Institute of Technology of Cambodia

Renewable Energy Development in Cambodia. Institute of Technology of Cambodia Renewable Energy Development in Cambodia Institute of Technology of Cambodia 1 BACKGROUND Cambodia, situated in Southeast Asia, shares borders with Vietnam, Laos and Thailand. Land area : 181 035 sq. km

More information

City of Santa Monica Building and Safety Division Submittal Requirements Expedited Solar Photovoltaic (10 kw or Less)

City of Santa Monica Building and Safety Division Submittal Requirements Expedited Solar Photovoltaic (10 kw or Less) City of Santa Monica Building and Safety Division Submittal Requirements Expedited Solar Photovoltaic (10 kw or Less) Permits for One- and Two-Family Dwellings This following information is to guide applicants

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Lahendong II Geothermal

More information

MANITOBA HYDRO Power Smart Load Displacement Program. Engineering Cost Estimate Study Guide (Version 3)

MANITOBA HYDRO Power Smart Load Displacement Program. Engineering Cost Estimate Study Guide (Version 3) MANITOBA HYDRO Power Smart Load Displacement Program Engineering Cost Estimate Study Guide (Version 3) September, 2014 * Manitoba Hydro is a licensee of the Trademark and Official Mark Load Displacement

More information

Questions and Answers for RFP No. 010 for the provision of prefabricated pharmacy storage units

Questions and Answers for RFP No. 010 for the provision of prefabricated pharmacy storage units December 6, 2017 Questions and Answers for RFP No. 010 for the provision of prefabricated pharmacy storage units 1. Question: In the site annex attachments mention is made of distance from the DHO What

More information

SOLAR PV STC ASSIGNMENT FORM

SOLAR PV STC ASSIGNMENT FORM Company / Agent / Installer Logo SOLAR PV STC ASSIGNMENT FORM MANDATORY FORM FIELDS 1 OWNER S DETAILS First Surname: Postal Address: State Postcode Telephone: (w) (h) Fax: (w) (h) Mobile: Email: 2 INSTALLATION

More information

The Green Purchasing Law, and Promoting Green Procurement in Japan

The Green Purchasing Law, and Promoting Green Procurement in Japan The Green Purchasing Law, and Promoting Green Procurement in Japan November 2, 2006 Presentation by Hideki Onizaki Ministry of the Environment, Japan 1. Law Concerning the Promotion of Eco-Friendly Goods

More information

Tackling Tariff Design. Making distribution network costs work for consumers

Tackling Tariff Design. Making distribution network costs work for consumers Tackling Tariff Design Making distribution network costs work for consumers Contents Introduction 02 What s driving change? 05 Alternative tariff designs 07 Impacts on consumers bills 11 Reflections and

More information

The draft Opinion was sent to the DPO for comments on 24 November These were received on 16 January 2012.

The draft Opinion was sent to the DPO for comments on 24 November These were received on 16 January 2012. Opinion on the notification for prior checking from the Data Protection Officer of the European Centre for the Development of Vocational Training (CEDEFOP) concerning public procurement and grant award

More information

Developing business with a focus on Energy creation : 1Solar cell business (1)

Developing business with a focus on Energy creation : 1Solar cell business (1) Special Feature: Sharp pioneers the future with environment and health business Developing business with a focus on Energy creation : 1Solar cell business (1) Earth s energy budget Reflected by atmosphere

More information

RURAL ELECTRIFICATION USING RENEWABLE ENERGY SOURCES

RURAL ELECTRIFICATION USING RENEWABLE ENERGY SOURCES RURAL ELECTRIFICATION USING RENEWABLE ENERGY SOURCES Devesh M.Imade 1, Dr. Mangesh S.Thakare 2 1 Student, 2 Professor, 1,2, Department of Electrical Engineering Pune VidyarthiGriha s College of Engg. &

More information

OVERVIEW OF MUNICIPAL ROOFTOP PV INSTALLATION. Local Government Energy Support NETWORK MEETING October 2014

OVERVIEW OF MUNICIPAL ROOFTOP PV INSTALLATION. Local Government Energy Support NETWORK MEETING October 2014 OVERVIEW OF MUNICIPAL ROOFTOP PV INSTALLATION Local Government Energy Support NETWORK MEETING 30 31 October 2014 Background Rising electricity prices and fast reducing solar PV panels makes PV generation

More information

STATE OF NEW JERSEY. ASSEMBLY RESOLUTION No th LEGISLATURE

STATE OF NEW JERSEY. ASSEMBLY RESOLUTION No th LEGISLATURE ASSEMBLY RESOLUTION No. STATE OF NEW JERSEY th LEGISLATURE INTRODUCED DECEMBER, 0 Sponsored by: Assemblyman GARY S. SCHAER District (Bergen and Passaic) Assemblyman ERIC HOUGHTALING District (Monmouth)

More information

Access to Sustainable Energy Programme: Contributing to impact reduction and energy resilience for the off grid areas

Access to Sustainable Energy Programme: Contributing to impact reduction and energy resilience for the off grid areas Access to Sustainable Energy Programme: Contributing to impact reduction and energy resilience for the off grid areas Simone Rolfe Programme manager Energy EU Delegation to the Philippines EU Philippines

More information

The Each Leim Microgrid Energy Storage

The Each Leim Microgrid Energy Storage The Each Leim Microgrid Energy Storage Introduction This project was a demonstration project under the GREAT Project (Growing Renewable Energy Applications and Technologies) which is an EU funded project

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment Ministère de l Environnement AMENDMENT TO RENEWABLE ENERGY APPROVAL NUMBER 0017-8YGJJM Issue Date: July 31, 2014 SunE Taylor Kidd GP Corp. as general

More information

Al-Ammar: Application of Using Hybrid Renewable Energy in Saudi Arabia

Al-Ammar: Application of Using Hybrid Renewable Energy in Saudi Arabia ETASR - Engineering, Technology & Applied Science Research Vol. 1, o. 4, 2011, 84-89 84 Application of Using Hybrid Renewable Energy in Essam A. Al-Ammar Department of Electrical Engineering King Saud

More information

Grade Six: Energy Lesson 6.8: Solar Energy

Grade Six: Energy Lesson 6.8: Solar Energy Grade Six: Energy Lesson 6.8: Solar Energy Lesson Concept Link Time Energy sources to run motors can be energy from the sun (solar) or energy stored in batteries (chemical). In the previous lesson, students

More information

Japanese ODA Loan. Ex-Ante evaluation

Japanese ODA Loan. Ex-Ante evaluation Japanese ODA Loan Ex-Ante evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Matarbari Ultra Super Critical Coal-Fired Power Project (I) Loan Agreement: June 16, 2014 Loan

More information

Automated Solar Powered Irrigation System

Automated Solar Powered Irrigation System Automated Solar Powered Irrigation System Abstract: Lokhanadam Varaprasad M.Tech Student (Embedded System), Department of ECE, Miracle Educational Group Of Society. The projected population of India being

More information

ELECTRICAL SYSTEMS. TEST YOURSELF QUESTIONS: Answer Key. CHAPTER 1: Sustainability in Electrical Systems

ELECTRICAL SYSTEMS. TEST YOURSELF QUESTIONS: Answer Key. CHAPTER 1: Sustainability in Electrical Systems ELECTRICAL SYSTEMS TEST YOURSELF QUESTIONS: Answer Key CHAPTER 1: Sustainability in Electrical Systems 1. What are the benefits of sustainability in green building design? The benefits of sustainability

More information

Choosing Delivery Method

Choosing Delivery Method Page 1 of 12 Advancing Professional Construction and Program Management Worldwide home contact us site map Search Find-A-CM/PM My Account Sign In Bookstore Career Center Home Choosing Delivery Method Choosing

More information

[Company] [Company Address] [Project Name] [Sub-Project, phase, etc.]

[Company] [Company Address] [Project Name] [Sub-Project, phase, etc.] This template is downloaded from project-management.magt.biz [Company] [Company Address] Tel: Fax: [Company Phone] [Company Fax] [Company E-mail] May 16, 2015 [Ref. number] Marc Arnecke, PMP [Project Name]

More information

COUNTY OF RIVERSIDE, CALIFORNIA BOARD OF SUPERVISORS POLICY. Policy Subject: Number Page SOLAR POWER PLANTS B-29 1 of 7

COUNTY OF RIVERSIDE, CALIFORNIA BOARD OF SUPERVISORS POLICY. Policy Subject: Number Page SOLAR POWER PLANTS B-29 1 of 7 SOLAR POWER PLANTS B-29 1 of 7 Purpose: The Board supports solar energy and acknowledges its benefits. The benefits of solar power plants, however, occur on a national, statewide and regional level. The

More information

ACTIVITY 6: Series and Parallel Wiring

ACTIVITY 6: Series and Parallel Wiring Section 2 Activities Activity 6: Series and Parallel Wiring ACTIVITY TYPE: Worksheet Overview: Students understand the effects of building electrical circuits to increase voltage and amperage. Goal: Students

More information

EEF Guidance on Cost Evaluation April 2015

EEF Guidance on Cost Evaluation April 2015 EEF Guidance on Cost Evaluation April 2015 CONTENTS 1. Introduction...1 2. Planning for cost evaluation...1 3. Basic principles of cost evaluation...1 4. Different types of cost data...2 5. Data collection

More information

ON THE EXECUTIVE BRANCH OF THE PROVISIONAL INSTITUTIONS OF SELF-GOVERNMENT IN KOSOVO

ON THE EXECUTIVE BRANCH OF THE PROVISIONAL INSTITUTIONS OF SELF-GOVERNMENT IN KOSOVO REGULATION NO. 2001/19 UNMIK/REG/2001/19 13 September 2001 ON THE EXECUTIVE BRANCH OF THE PROVISIONAL INSTITUTIONS OF SELF-GOVERNMENT IN KOSOVO The Special Representative of the Secretary-General, Pursuant

More information

Measures on Open Environmental Information (for Trial Implementation)

Measures on Open Environmental Information (for Trial Implementation) Measures on Open Environmental Information (for Trial Implementation) (Adopted by the State Environmental Protection Administration of China on February 8, 2007; Effective May 1, 2008) Chapter I. General

More information

SYSTEM DEVELOPMENT EXTENSIVE RURAL ELECTRIFICATION PROGRAMS - EGYPT CASE

SYSTEM DEVELOPMENT EXTENSIVE RURAL ELECTRIFICATION PROGRAMS - EGYPT CASE SYSTEM DEVELOPMENT EXTENSIVE RURAL ELECTRIFICATION PROGRAMS - EGYPT CASE ENG. EL DESOUKI M. ALI ENG. AHMED HASSAN ENG. LAILA MOHY RURAL ELECTRIFICATION AUTHORITY MINISTRY OF ELECTRICITY & ENERGY Egyptian

More information

DEMONSTRATIVE PROJECT ON GRID-INTERCONNECTION INTERCONNECTION OF CLUSTERED PHOTOVOLTAIC POWER GENERATION SYSTEMS

DEMONSTRATIVE PROJECT ON GRID-INTERCONNECTION INTERCONNECTION OF CLUSTERED PHOTOVOLTAIC POWER GENERATION SYSTEMS DEMONSTRATIVE PROJECT ON GRID-INTERCONNECTION INTERCONNECTION OF CLUSTERED PHOTOVOLTAIC POWER GENERATION SYSTEMS New Energy and Industrial Technology Development Organization (NEDO) Demonstrative Test

More information

Date of Request for Comment: April 7, 2017 Period of Comment: April 7, 2017 through May 5, 2017

Date of Request for Comment: April 7, 2017 Period of Comment: April 7, 2017 through May 5, 2017 Market Participant Comments and AESO Replies Matrix Proposed Amended Section 304.3, Wind and Solar Power Ramp Up Management ( amended Section 304.3 ) Date of Request for Comment: April 7, 2017 Period of

More information

Energy Savings at Military Installations: A Case Study

Energy Savings at Military Installations: A Case Study Energy Savings at Military Installations: A Case Study *Stavropoulos, G.G 1 1, 2, 3 and Skodras, G. 1 Lab of Chemical Process Engineering, Aristotle University of Thessaloniki, Thessaloniki, Greece 2 Laboratory

More information

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK January 2004

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK January 2004 ALAN G. HEVESI COMPTROLLER STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 ANTHONY R. NANULA DEPUTY COMPTROLLER DIVISION OF LOCAL GOVERNMENT SERVICES AND ECONOMIC

More information

RENEWABLE ENERGY. Mandate

RENEWABLE ENERGY. Mandate RENEWABLE ENERGY Mandate To develop and promote the sustainable use of renewable energy resources and technologies (solar, wind, mini-hydro and biomass) in the country through establishment of a conducive

More information

Integrated Communities for the Sustainability of Renewable Energy Application: Solar Water Pumping System in Banyumeneng Village, Indonesia

Integrated Communities for the Sustainability of Renewable Energy Application: Solar Water Pumping System in Banyumeneng Village, Indonesia Available online at www.sciencedirect.com ScienceDirect Energy Procedia 79 (2015 ) 1027 1032 2015 International Conference on Alternative Energy in Developing Countries and Emerging Economies Integrated

More information

Optimal integrated diesel grid-renewable energy system for hot water devices

Optimal integrated diesel grid-renewable energy system for hot water devices Available online at www.sciencedirect.com ScienceDirect Energy Procedia 103 (2016 ) 117 122 Applied Energy Symposium and Forum, REM2016: Renewable Energy Integration with Mini/Microgrid, 19-21 April 2016,

More information

NS Green Procurement Guidelines NIPPON SEIKI CO., LTD.

NS Green Procurement Guidelines NIPPON SEIKI CO., LTD. NS Green Procurement Guidelines NIPPON SEIKI CO., LTD. July, 2005 March, 2010 First Edition Second Edition (Fully Revised) Table of Content 1. Introduction P.1 2. Request List of "NS Green Procurement

More information

The Green Purchasing Law, and Promoting Green Procurement In Japan. Presentation by Shohei Yamada Ministry of the Environment, Japan

The Green Purchasing Law, and Promoting Green Procurement In Japan. Presentation by Shohei Yamada Ministry of the Environment, Japan The Green Purchasing Law, and Promoting Green Procurement In Japan Presentation by Shohei Yamada Ministry of the Environment, Japan 1. Law Concerning the Promotion of Eco-Friendly Goods and Services by

More information

Pico Hydro Project Presentation. MASCHINEN & TECHNIK, INC. Since 1979

Pico Hydro Project Presentation. MASCHINEN & TECHNIK, INC. Since 1979 Pico Hydro Project Presentation MASCHINEN & TECHNIK, INC. Since 1979 COUNTRYSIDE SITUATION Source: ArtPetron 2005 Source: ArtPetron 2005 Future leaders study with kerosene lamp KEROSENE STREETLAMP Renewable

More information

Utilities Department Capital Projects Contract Audit

Utilities Department Capital Projects Contract Audit City Auditor s Office Utilities Department Capital Projects Contract Audit Report Issued: March 3, 2017 Audit Report No. # 16 A 2 P O Box 150027 815 Nicholas Pkwy. Cape Coral, FL 33915-0027 Phone 239-242-3383

More information

Law of the People's Republic of China on Conserving Energy

Law of the People's Republic of China on Conserving Energy Law of the People's Republic of China on Conserving Energy (Adopted at the 28th Meeting of the Standing Committee of the Eighth National People's Congress on November 1, 1997, promulgated by Order No.

More information

Experimental study of using renewable energy in Yemen

Experimental study of using renewable energy in Yemen University of Wollongong Research Online Faculty of Engineering and Information Sciences - Papers Faculty of Engineering and Information Sciences 2009 Experimental study of using renewable energy in Yemen

More information

Hybrid Energy Systems

Hybrid Energy Systems Hybrid Systems ABO Wind develops and builds energy systems combining wind turbines, photovoltaic plants and storage units to help stabilise grids and reduce carbon emissions in developing countries. Grid

More information