1 What is it? How do we manage it?

2 RACS vs. Non-RACS vs. Not RACS Recently become aware of confusion between these three categories of materials

3 Is it RACS? This is now the main question that needs to be asked about any material being managed Section 5.5.1(B) - asbestos determination for suspect materials Section 5.5.1(B)(6) - RACS determination RACS can consist of either friable or nonfriable asbestos containing material, or a combination of both

4 Make a RACS Determination RACS Determination means a determination, conducted in the field by a CABI, of the friability of ACM and probability of non-friable ACM to release fibers based on the condition of the material and forces that are expected to act on it during disturbance

5 RACS Determination Cont d Determinations of the probability for non-friable ACM to release fibers during disturbance shall be based on the following: The condition of the material prior to disturbance, based on observations of weathering, the integrity of the material, historical mechanical impact, or fire damage; The potential for the material to be broken, resized or damaged during the planned disturbance,

6 RACS Determination Cont d The material shall be considered RACS if the planned disturbance includes any of the following: Augers, rotary style trenchers, driving on ACM lying on the surface (vehicles or equipment), blasting or other detonation, intentional burning Other types of direct mechanical impact which are: In direct contact with ACM or result in observation of ACM after disturbance, and Causing damage to the ACM

7

8

9

10 RACS Regulatory Definition RACS means soil, ash, or debris (plus 6 in all directions of surrounding material) containing: 1) Friable ACM

11 RACS Regulatory Definition Cont d 2) Previously non-friable ACM that is now friable

12 RACS Regulatory Definition Cont d 3) Non-friable ACM that have a high potential to release fibers based on forces expected to act on it

13 RACS Regulatory Definition Cont d 4) Deteriorated non-friable ACM in poor condition

14 RACS Regulatory Definition Cont d 5) All of the following: Asbestos cement materials Plaster Brittle caulking, glazing and sealants Powdery concrete masonry unit (CMU) sealant Powdery floor leveling compound Drywall/wallboard and assoc. joint compound Firebrick Other material as determined by the Dept. Does not contemplate friability, these materials are ALWAYS RACS

15 RACS Regulatory Definition Cont d 6) Soil or ash known to contain non-visible asbestos fibers based on documented evidence Typically from sampling results

16 So, what is non-racs? Non-RACS regulatory definition Non-RACS means soil or debris that contains only: 1) Intact non-damaged, non-friable ACM

17 Non-RACS Regulatory Definition Cont d 2) Damaged non-friable ACM(s) that do not have a high probability to release fibers based on the forces expected to act on the material Resin based materials (Bakelite) Resilient flooring (excluding friable felt backing on sheet vinyl) Tar impregnated or asphaltic materials that are not brittle

18 Non-RACS Regulatory Definition Cont d 3) Elastic, pliable, or rubberized materials Pliable materials Duct sealant, fiberglass insulation sealant, fire-stop/caulking/sealants, window or door caulking Extremely hard/durable materials Lab countertop/sinks, epoxy type CMU sealant, epoxy type panel adhesive, duct sealant, ceiling tile adhesive 4) Other ACM(s) as approved by the Dept.

19 NOT RACS Not RACS is non-asbestos material Or, soil containing material that is less than 1% asbestos (trace material) Does not include soil with non-visible fibers at any concentration Management under Section 5.5 does not apply

20 So, How do we Dispose of Each? Not RACS disposal: Solid waste disposal at a landfill under a profile OR beneficial reuse Non-RACS disposal: Does not require packaging, but this is still asbestos material, and as such, needs to be declared to the landfill accepting the waste

21 RACS Disposal RACS w/ more than 1% friable ACM in the load: Disposal in manner similar to friable asbestos Leak tight packaging Section 5.3 requires a minimum of 2 layers of 6 mil or equivalent approved by Dept.

22 RACS Disposal Cont d RACS with less than 1% friable ACM in the load or RACS with no visible ACM Disposal in a manner similar to non-friable asbestos Section specifies leak tight packaging Traditionally = at least one layer of 6 mil

23 Disposal and 1% Bed of Disposal Truck Friable ACM (>1% asbestos) Soil (<1% asbestos) The total disposal load is less than 1% asbestos = disposal in a leak tight container in a manner similar to non-friable

24 RACS Management Options Project Specific RACS Management Plan (PSRMP) Standard Operating Procedures (SOPs) Remediation plan Standard requirements of Section of the Solid Waste Regulations Risk based approach

25 Requirements of a Typical Project Specific RACS Management Plan (PSRMP) Regulated work area PPE Wetting Wind Air monitoring Work practices Loading & placement Staging, stockpiling, & storage Decontamination Spill response RACS remaining in place Documentation Training Packaging & disposal

26 Required Training Anyone in RWA needs annual awareness training provided by a CABI General asbestos awareness including health effects Overview of Section 5.5 and its implementation Overview of suspect ACM that requires CABI evaluation RACS vs. Non-RACS Worker Protection Decontamination Engineering controls for visible emissions

27 Required Training Cont d Anyone in the RWA during RACS disturbance also needs per-project site specific training provided by a CABI Tailor annual training requirements to site specific conditions if necessary Project chain-of-command and personnel w/ stop work authority Hands on training specific to the soil disturbing activities they will perform

28 Required Training Cont d Section training requirements don t address OSHA requirements There may be additional OSHA training requirements OSHA stands on its own Also additional PPE considerations Section 5.5 PPE requirements are meant to address cross contamination not respiratory protection

29 Submittals Notification Requires Map / figure / drawing

30 Submittals Cont d PSRMP submit at least 10 days prior to project SOP submit at least 30 days prior to project Remediation submit at least 45 days prior to project Risk based approach submit way before project

31 Submittals Cont d Additional submittals may be requested depending on the site specific conditions Excavation in historic landfill may require a Materials Management Plan (MMP) or a plan detailing how the cover will be replaced If reuse of solid waste is planned a beneficial use determination may be required Other submittals may be required depending on site conditions

32

33 Contact Information Brian T. Long Solid Waste Compliance Assurance Unit (303) Link to asbestos in soil regulation and notification form

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22 Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof

More information

McMaster University Asbestos Awareness

McMaster University Asbestos Awareness McMaster University Asbestos Awareness Presented by Christopher Hurley Environmental & Occupational Health Support Services Topics Covered Properties of asbestos Uses of asbestos Health hazards of asbestos

More information

DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT. Solid and Hazardous Waste Commission. Hazardous Materials and Waste Management Division 6 CCR

DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT. Solid and Hazardous Waste Commission. Hazardous Materials and Waste Management Division 6 CCR DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT Solid and Hazardous Waste Commission Hazardous Materials and Waste Management Division 6 CCR 1007-2 STATEMENT OF BASIS AND PURPOSE AND SPECIFIC STATUTORY AUTHORITY

More information

Asbestos Elevator Industry Workshop November 25, 2015

Asbestos Elevator Industry Workshop November 25, 2015 Asbestos Elevator Industry Workshop November 25, 2015 BOB SWING CONTACT INFO EMAIL: Bob.Swing@ThyssenKrupp.com Phone: 604-499-5714 SOME ASBESTOS-CONTAINING MATERIALS Cement Pipes Cement Wallboard Cement

More information

Limited Asbestos Demolition Survey

Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600

More information

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall July 3, 2007 REPORT: Full Building Survey TO: Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall FROM: Bryan

More information

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Physical Plant Division Engineering and Architectural Services Department

More information

Dale Livingston, Asbestos Group, Environmental Health and Safety, 153 U-Tech Building, 2331 University Avenue S.E., Minneapolis, MN 55414

Dale Livingston, Asbestos Group, Environmental Health and Safety, 153 U-Tech Building, 2331 University Avenue S.E., Minneapolis, MN 55414 July 5, 2007 REPORT: Full Building Survey TO: Linda McCracken-Hunt, Project Development, 400 Shops Building Fay Thompson, Department of Environmental Health and Safety, Director Tim Nelson, Facilities

More information

ARTICLE 4: ASBESTOS CONTROL STANDARDS

ARTICLE 4: ASBESTOS CONTROL STANDARDS ARTICLE 4: ASBESTOS CONTROL STANDARDS SECTION 4.01 ASBESTOS DEFINITIONS Adopted 06/08/95 (818) Revised 02/12/98 (863), 07/13/00 (918), 09/26/02 (978), 02/27/03 (987), 03/26/09 (1148) (a) AHERA BUILDING

More information

HERRON Enterprises USA, Inc.

HERRON Enterprises USA, Inc. Phone (303) 763 9639 To: City of Montrose / Mr. Mark Armstrong HERRON Project No.: 1120145 Job No.: Verbal Location: Multiple Buildings, 950 and 970 Chipeta Rd., Montrose, CO 81403 Dates of Service: November

More information

ST. LUKE CATHOLIC ELEMENTARY SCHOOL

ST. LUKE CATHOLIC ELEMENTARY SCHOOL ST. LUKE CATHOLIC ELEMENTARY SCHOOL Final 2017 ACM Re-Assessment Report Project Location: 345 Albright Road Hamilton, ON Prepared for: Hamilton Wentworth Catholic District School Board 57 Stuart Street

More information

Asbestos in Soil Update on State Approaches

Asbestos in Soil Update on State Approaches Asbestos in Soil Update on State Approaches Monica Sheets Colorado Department of Public Health And Environment Hazardous Materials and Waste Management Division Federal Facilities Remediation & Restoration

More information

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Introduction 1 Scope 1 Policy Statement

More information

OWNER S DUTIES. Designated Substances on construction projects BEFORE CONTRACTS ARE FINALIZED, THE PROJECT OWNER MUST DO THE FOLLOWING

OWNER S DUTIES. Designated Substances on construction projects BEFORE CONTRACTS ARE FINALIZED, THE PROJECT OWNER MUST DO THE FOLLOWING In Ontario, section 30 of the Occupational Health and Safety Act requires that a project owner identify designated substances on the project and provide a list to prospective constructors before contracts

More information

ASBESTOS AWARENESS. What is Asbestos? Asbestos

ASBESTOS AWARENESS. What is Asbestos? Asbestos ASBESTOS AWARENESS 1of 63 What is Asbestos? Asbestos is the name for a group of naturally occurring minerals that separate into very fine fibers that are very durable and extremely heat resistant. Because

More information

Asbestos Management Program

Asbestos Management Program ENVIRONMENTAL HEALTH & SAFETY Reed College 3203 Southeast woodstock boulevard Portland, Oregon 97202-8199 Asbestos Management Program Effective Date: 6/16/2009 Revision Dates or Last Date: 2/2016 I. Purpose...

More information

Asbestos Survey Report

Asbestos Survey Report Asbestos Survey Report Downtown Duluth Old City Hall Block Buildings for renovation 3087 Main Street, 3097 Main Street, New Dawn Theater, 3530 W. Lawrenceville Street, Old City Hall/Church Duluth, Georgia

More information

Materials Management Plan (MMP) The Source Hotel 3330 Brighton Boulevard Denver, Colorado

Materials Management Plan (MMP) The Source Hotel 3330 Brighton Boulevard Denver, Colorado Materials Management Plan (MMP) The Source Hotel 3330 Brighton Boulevard Denver, Colorado Prepared for: 3330 Brighton Blvd LLC 3455 Ringsby Court Denver, Colorado 80216 Prepared by: Thomas S. Norman, P.E.

More information

Management of PCB Bulk Product Waste. 3 rd Annual Landfill Operators Conference February 13, 2013

Management of PCB Bulk Product Waste. 3 rd Annual Landfill Operators Conference February 13, 2013 Management of PCB Bulk Product Waste 3 rd Annual Landfill Operators Conference February 13, 2013 What are PCBs? Polychlorinated Biphenyl (PCBs) are a class of 209 toxic man-made chemicals that persist

More information

APPE NDIX F TY PE 2 ASBE STOS WORK PROCEDURES

APPE NDIX F TY PE 2 ASBE STOS WORK PROCEDURES APPE NDIX F TY PE 2 ASBE STOS WORK PROCEDURES TY PE 2 WOR K PR OCE DUR ES These procedures are to be followed by all maintenance personnel and contractors performing the following work at KPDSB buildings.

More information

Final Asbestos Inspection Report and Lead Paint Survey

Final Asbestos Inspection Report and Lead Paint Survey Final Asbestos Inspection Report and Lead Paint Survey Proposed Retail Takeover, Store #3178-00 2444 East Powell Boulevard Gresham, Multnomah County, Oregon October 7, 2011 Terracon Project No. 82117017

More information

Asbestos Management Plan

Asbestos Management Plan Asbestos Management Plan Management Plan Statement The following management plan has been produced and will be implemented so that the risks associated with known or presumed asbestos containing materials

More information

Asbestos Management Policy University of Wisconsin-Platteville Reviewed 4/2016

Asbestos Management Policy University of Wisconsin-Platteville Reviewed 4/2016 Asbestos Management Policy University of Wisconsin-Platteville Reviewed 4/2016 1.0 Purpose This written program is intended to comply with both state and federal asbestos regulations. Asbestos containing

More information

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps)

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps) Los Rios Community College District Sacramento City College ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps) GENERAL This addendum forms a part

More information

Asbestos Awareness Program

Asbestos Awareness Program Safety Manual 1 of 9 Safety Manual Sect: 1.0 Purpose 2.0 Scope Rel. Date: Last Review: This program covers Ardent policy related to asbestos, either discovered or suspected in the workplace. Ardent recognizes

More information

Asbestos Awareness Training Handout For Custodial/Housekeeping Workers and Class IV Asbestos Workers

Asbestos Awareness Training Handout For Custodial/Housekeeping Workers and Class IV Asbestos Workers This handout is provided to meet the requirements of the OSHA asbestos awareness refresher training for custodial and housekeeping workers and Class IV asbestos workers. This training allows you to: HEPA

More information

Asbestos Management Program April 27, 2017

Asbestos Management Program April 27, 2017 Asbestos Management Program April 27, 2017 1. INTRODUCTION 1.1. Purpose Indiana University Environmental Health and Safety (IUEHS) has developed this Program to identify practices and procedures for the

More information

TABLE OF CONTENTS 4. PREPARATION, COMMUNICATIONS, AND CONTROLS

TABLE OF CONTENTS 4. PREPARATION, COMMUNICATIONS, AND CONTROLS TABLE OF CONTENTS SECTION PAGE NO. 1. INTRODUCTION... 1-1 1.1 Background... 1-1 1.2 Conceptual Site Model... 1-1 1.3 Plan Organization... 1-2 1.4 Certification... 1-3 2. SAMPLE COLLECTION, ANALYSIS, AND

More information

What is Asbestos? Asbestos was also used in household items, such as: oven gloves ironing board pads simmer mats for stoves fire blankets.

What is Asbestos? Asbestos was also used in household items, such as: oven gloves ironing board pads simmer mats for stoves fire blankets. All About Asbestos Read this booklet to learn more about: identifying asbestos-containing material in your home the health risks of asbestos what you can do about asbestos. What is Asbestos? Asbestos is

More information

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and Asbestos What is asbestos? Asbestos is a naturally occurring fibrous mineral that is mined from the earth and found in many parts of the world. Its composition is such that it can be separated into smaller

More information

"ASBESTOS AWARENESS IN THE WORKPLACE"

ASBESTOS AWARENESS IN THE WORKPLACE MAJOR PROGRAM POINTS "ASBESTOS AWARENESS IN THE WORKPLACE" Training For THE OSHA ASBESTOS STANDARD Quality Safety and Health Products, for Today...and Tomorrow Outline of Major Points Covered in the "Asbestos

More information

CLASS I AND II ABATEMENT PROJECT SUBMITTALS

CLASS I AND II ABATEMENT PROJECT SUBMITTALS 5.1 Pre-Work Submittals CLASS I AND II ABATEMENT PROJECT SUBMITTALS Abatement contractors shall submit the following in a bound notebook to AU or our designated representative at the mandatory pre-construction

More information

Asbestos Refresher Training (26 Mar 15) A naturally occurring fibrous mineral

Asbestos Refresher Training (26 Mar 15) A naturally occurring fibrous mineral Asbestos Refresher Training (26 Mar 15) A naturally occurring fibrous mineral References Asbestos Hazard Emergency Response Act (AHERA) AHERA Accredited Inspector Training Manuel For Asbestos Control What

More information

CHAPTER 34 ASBESTOS. Where is it Found? 34 ASBESTOS. What is Asbestos?

CHAPTER 34 ASBESTOS. Where is it Found? 34 ASBESTOS. What is Asbestos? CHAPTER 34 ASBESTOS 34 ASBESTOS This chapter provides some brief information about asbestos in construction. If you encounter asbestos on the job, you will need more information. Here are the two main

More information

APPENDIX C SAMPLE ASBESTOS ABATEMENT SPECIFICATION

APPENDIX C SAMPLE ASBESTOS ABATEMENT SPECIFICATION APPENDIX C SAMPLE ASBESTOS ABATEMENT SPECIFICATION The following appendix includes information and standard drawings that are diagrammatic and are used only to convey intent. Guidelines for Use of Sample

More information

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Project #: 13916 ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Prepared for: Sheila Miller Director, Department of Health and Safety Memorial University of Newfoundland

More information

Rowan University Asbestos Management Program

Rowan University Asbestos Management Program Rowan University Asbestos Management Program Table of Contents I. Introduction II. Regulatory Compliance III. Department Responsibilities for Asbestos A. EHS (Safety Specialist Staff) B. EHS (Asbestos

More information

Standard Operating Procedure PCB Fluorescent Light Ballast Management

Standard Operating Procedure PCB Fluorescent Light Ballast Management Page # 1 of 5 Implementation SOP Owner Devlin Piplic Approval Standard Operating Procedure PCB Management 1. Purpose This Standard Operating Procedure (SOP) outlines the work instructions for the handling

More information

Introduction to Brownfields: Site Assessment and Cleanup

Introduction to Brownfields: Site Assessment and Cleanup consulting engineers and scientists Introduction to Brownfields: Site Assessment and Cleanup Presented by: Barry Giroux, P.E., LEP, Senior Project Manager TAB Technical Assistance for Brownfields Team

More information

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION NARRATIVE REPORT 1.0 BUILDING INFORMATION Bentson Bunker Fieldhouse was originally constructed in 1931; the building has had several renovations, notably, a 1976-1980 multi-phase renovation throughout

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 8113.53 - SUSTAINABLE DESIGN REQUIREMENTS - GREEN GLOBES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control NAVSEA STANDARD ITEM ITEM NO: 009-10 DATE: 18 NOV 2016 CATEGORY: I 1. SCOPE: 1.1 Title: Asbestos-Containing Material (ACM); control 2. REFERENCES: 2.1 29 CFR 1915.1001, Occupational Safety and Health Standards

More information

Washington University Asbestos Operations and Maintenance Plan

Washington University Asbestos Operations and Maintenance Plan 1. Purpose 2. Asbestos Washington University Asbestos Operations and Maintenance Plan 1.1. The purpose of this Asbestos Operations and Maintenance (O&M) Plan is to minimize the potential for exposure to

More information

SECTION UNIT PRICES. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION UNIT PRICES. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 012200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Land Reclamation Site Siting and Application Guidelines

Land Reclamation Site Siting and Application Guidelines Department of Environment and Local Government Land Reclamation Site Siting and Application Guidelines Rationale In an effort to reduce the cost associated with the transportation of demolition wastes,

More information

Some frames show curtainwall details at the head and window at the sill. RE W-26/A732.

Some frames show curtainwall details at the head and window at the sill. RE W-26/A732. BID ADDENDUM #04 (BID # 986-13) Greenwich Public Schools District Wide Renovations WMS Curtainwall Replacement 290 Greenwich Avenue Greenwich, CT 06830 Date: December 23rd, 2013 This Addendum is to provide

More information

INTRODUCTION TO THE PROGRAM

INTRODUCTION TO THE PROGRAM INTRODUCTION TO THE PROGRAM Structure and Organization Information in this program is presented in a definite order, so that employees will see the relationships between the various groups of information

More information

SURVEY FINDINGS Building: 1101

SURVEY FINDINGS Building: 1101 SURVEY FINDINGS Building: 1101 Friable ACM identified DESCRIPTION LOCATION Date Quantity No friable ACM records found in database Non-friable ACM identified DESCRIPTION LOCATION Date Quantity ROOFING SEALANT,

More information

July 13, 2011 TTL Project No NESHAP Asbestos and Limited Hazardous Materials Survey Report 500 North Congress Street Ypsilanti, Michigan

July 13, 2011 TTL Project No NESHAP Asbestos and Limited Hazardous Materials Survey Report 500 North Congress Street Ypsilanti, Michigan July 13, 2011 TTL Project No. 7615.02 Ms. Paula Boase Downriver Community Conference Brownfield Consortium 15100 Northline Road Southgate, Michigan 48195 Dear Ms. Boase: NESHAP Asbestos and Limited Hazardous

More information

KOSTER AMERICAN CORPORATION

KOSTER AMERICAN CORPORATION Section 09699 PART 1 GENERAL Water Vapor Emission Control Systems 1.1 RELATED DOCUMENTS A. Drawings, documents, and general provisions of the Contract, including, but not necessarily limited to, General

More information

Flood / Mold Remediation (FMR) 29 CFR

Flood / Mold Remediation (FMR) 29 CFR Flood / Mold Remediation (FMR) 29 CFR 1910.141 METHODIST UNIVERSITY Environmental Health and Safety Office Flood / Mold Remediation (FMR) 29 CFR 1910.141 OSHA Workplace Sanitation and Health Hazards Revision

More information

ASBESTOS ABATEMENT AT UTILITIES SERVICES CENTER

ASBESTOS ABATEMENT AT UTILITIES SERVICES CENTER ASBESTOS ABATEMENT AT UTILITIES SERVICES CENTER Informational Presentation March 7, 2016 Matt Zoccali Chad Mapp DeEtta Carr Agenda Introductions Asbestos- What is it? Building & Project Background Abatement/Remodel

More information

National Guidance: Best Management Practices for Preparing Vessels Intended to Create Artificial Reefs

National Guidance: Best Management Practices for Preparing Vessels Intended to Create Artificial Reefs U.S. Environmental Protection Agency U.S. Maritime Administration This document is one section from the National Guidance: Best Management Practices for Preparing Vessels Intended to Create Artificial

More information

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 Department Title: Safety Department Page: 2 Department Title: Safety Department Page:

More information

Office of Design & Construction State University Plaza Albany, New York

Office of Design & Construction State University Plaza Albany, New York Instructions: Consultant should meet with the Campus and Fund at the work area(s) prior to completing this Checklist. At least two (2) meetings are required, one prior to Schematic Phase submission and

More information

Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624

Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624 Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624 Prepared for: City of Anderson Community Development Department 601 South Main Street Anderson,

More information

Health, Safety and Fire Specialists Ltd

Health, Safety and Fire Specialists Ltd 17 Chescombe Road, Yatton, North Somerset, BS49 4EE. 0784 1916 730 01934 832 851 HealthSafetyAndFire@gmail.co.uk www.healthsafetyandfire.co.uk ASBESTOS RISK MANAGEMENT : For those WORKING on buildings..

More information

PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA. Prepared for

PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA. Prepared for ENVIRONMENTAL SERVICES, LLC PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA Prepared for CITY OF OCALA REVITILIZATION STRATEGIES-CODE ENFORCEMENT DIVISION

More information

ASBESTOS MANAGEMENT PLAN PROCEDURE

ASBESTOS MANAGEMENT PLAN PROCEDURE ADMINISTRATIVE PROCEDURE Approval Date January 2011 Review Date 2016 Contact Person/Department Superintendent of Business Replacing All Previous Procedures Page 1 of 6 Identification BU-3565 ASBESTOS MANAGEMENT

More information

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction 818 S. FLORES ST. SAN ANTONIO, TEXAS 78204 www.saha.org Procurement Department ADDENDUM # 1 To: File 1601-909-62-4465 - IFB for: 24 Gus Garcia Demolition and Reconstruction Please note the following change:

More information

Asbestos-Containing Material and Hazardous Material Survey Summary Report

Asbestos-Containing Material and Hazardous Material Survey Summary Report Asbestos-Containing Material and Hazardous Material Survey Summary Report Site: Haas Park Fieldhouse PS1757 2404 North Washtenaw Street Chicago, Illinois 60647 Survey Date: January 15, 2010 PBCC Project

More information

Safety Policy and Procedure

Safety Policy and Procedure Safety Policy and Procedure Policy Number 045 Authorized By: The Cianbro Companies Alan Burton Title: Asbestos Operations Effective Date: 03/25/09 Page 1 of 10 1 Status 1.1 Update of existing policy, effective

More information

Project Monitoring & Air Sampling

Project Monitoring & Air Sampling Project Monitoring & Air Sampling 1. Qualifications of Air Sampling Personnel. The project air sampling shall be conducted by an asbestos project air sampling technician who has been trained in the selected

More information

Floor Insulation Underlayment Section Sound Control Matting

Floor Insulation Underlayment Section Sound Control Matting Floor Insulation Underlayment Section 09618 Sound Control Matting Part I General 1.1 Summary A. Section includes a sound control material for achieving an STC and IIC rating in excess of 50 to meet building

More information

Asbestos is the generic name that refers to six unique minerals: Chrysotile Amosite Crocidolite Anthophyllite Tremolite Actinolite PPT-SM-A 2018

Asbestos is the generic name that refers to six unique minerals: Chrysotile Amosite Crocidolite Anthophyllite Tremolite Actinolite PPT-SM-A 2018 Asbestos Asbestos is the generic name that refers to six unique minerals: Chrysotile Amosite Crocidolite Anthophyllite Tremolite Actinolite 2 These naturally occurring mineral fibers were widely used in

More information

DIVISION 02 SELECTIVE DEMOLITION

DIVISION 02 SELECTIVE DEMOLITION DIVISION 02 SELECTIVE DEMOLITION SECTION 02 41 19 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building.

More information

STAIR TREAD INSTALLATION

STAIR TREAD INSTALLATION Expanko Resilient Flooring 180 Gordon Drive Suite 107 Exton, PA 19341 800.345.6202 sales@expanko.com www.expanko.com STAIR TREAD INSTALLATION TECHNICAL SUPPORT 800.345.6202 A. INTRODUCTION Please read

More information

Asbestos in the Home

Asbestos in the Home Asbestos in the Home This document will help you understand asbestos: what it is, its health effects, where it is in your home, and what to do about it. What Is Asbestos? Asbestos is a mineral fiber. It

More information

Asbestos Management Plan

Asbestos Management Plan Asbestos Management Plan Prepared for Christchurch International Airport Limited April 2017 PATTLE DELAMORE PARTNERS LTD 295 Blenheim Road Upper Riccarton, Christchurch 8041 PO Box 389, Christchurch 8140,

More information

Oconee County Solid Waste

Oconee County Solid Waste C&D DEBRIS GUIDEBOOK Oconee County Solid Waste Roughly 80% of a home builder s waste stream is recyclable, and contractors are partially liable for waste generated at jobsites. Date: 07/01/04 Waste Generation

More information

ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

ASBESTOS OPERATIONS & MAINTENANCE PROGRAM NEW MEXICO MILITARY INSTITUTE 101 WEST COLLEGE BOULEVARD ROSWELL, NM 88201 ASBESTOS OPERATIONS & MAINTENANCE PROGRAM Pursuant to Asbestos standards OSHA: 29CFR1926.1101 Construction; & 1910.1001 General

More information

ENKASONIC FLOOR UNDERLAYMENT 9110

ENKASONIC FLOOR UNDERLAYMENT 9110 ENKASONIC FLOOR UNDERLAYMENT 9110 GS1197 Section 13080 SECTION 09618 SOUND CONTROL MATTING Part I General 1.1 Summary A. Section includes a sound control material for achieving an STC and IIC rating in

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

ASBESTOS CEMENT WATER MAIN REPLACEMENT

ASBESTOS CEMENT WATER MAIN REPLACEMENT ASBESTOS CEMENT WATER MAIN REPLACEMENT Presenter: Bryon Killian, PE bkillian@entecheng.com References Drinking Water Operator Certification Training Modules. Pennsylvania Department of Environmental Protection

More information

TSI SAMPLE. Asbestos Producing Countries. Asbestos Uses. Asbestos Consuming Countries. Asbestos Uses. Training Services International, Inc

TSI SAMPLE. Asbestos Producing Countries. Asbestos Uses. Asbestos Consuming Countries. Asbestos Uses. Training Services International, Inc www.training.com Operations & Maintenance (OSHA Class III) Asbestos Training Course What questions will be answered? What is? Serpentine Chrysotile Where is found? How is used? Is banned? P.1 www.training.com

More information

SURVEY REPORT FOR ASBESTOS AND LEAD-BASED PAINT

SURVEY REPORT FOR ASBESTOS AND LEAD-BASED PAINT SURVEY REPORT FOR ASBESTOS AND LEAD-BASED PAINT Prepared For: TALLEY & SMITH ARCHITECTURE, INC. 409 EAST MARION STREET SHELBY, NORTH CAROLINA 28150 Regarding: DELIVERY ORDER NO. 0051 FY 15 DEMOLISH FACILITIES,

More information

SECTION SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES

SECTION SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 01 81 13.21 SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES A. This section describes general requirements and procedures to comply with the Green Building

More information

Asbestos Management Plan. Approved by TRCA Strategy Committee: May 19, 2016

Asbestos Management Plan. Approved by TRCA Strategy Committee: May 19, 2016 Asbestos Management Plan Approved by TRCA Strategy Committee: May 19, 2016 Table of Contents 1.Objectives... 3 1.1 Purpose and Scope... 3 1.2 Elements of the Asbestos Management Plan... 4 1.3 Roles and

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Asbestos and Lead Considerations in Construction Projects. Sean Purcer Senior Consultant Anthony Price Senior Consultant

Asbestos and Lead Considerations in Construction Projects. Sean Purcer Senior Consultant Anthony Price Senior Consultant Asbestos and Lead Considerations in Construction Projects Sean Purcer Senior Consultant Anthony Price Senior Consultant Who We Are History Founded in 1990 by Environmental, Health and Safety (EHS) managers

More information

ASBESTOS PROGRAM. C. Asbestos Containing Materials (ACM) are defined as any material or product which contains more than 1% (by weight) asbestos.

ASBESTOS PROGRAM. C. Asbestos Containing Materials (ACM) are defined as any material or product which contains more than 1% (by weight) asbestos. PAGE: 1 OF 14 I. PURPOSE ASBESTOS PROGRAM The Lake Charles Asbestos Program has been developed to establish work practices, engineering controls, training programs, industrial hygiene monitoring, and medical

More information

PROJECT NO REPORT TO CITY OF STRATFORD ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY:

PROJECT NO REPORT TO CITY OF STRATFORD ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY: PROJECT NO. 1197 REPORT TO CITY OF STRATFORD ON ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY: 1099 KINGSTON ROAD, SUITE 260 PICKERING, ONTARIO L1V 1B5 Tel: (416) 410-4333

More information

NXT SUBSTRATE PREPARATION AND PRIMER GUIDE TDS 230N

NXT SUBSTRATE PREPARATION AND PRIMER GUIDE TDS 230N NXT SUBSTRATE PREPARATION AND PRIMER GUIDE TDS 230N Substrate preparation is the most important factor to successful NXT self-leveling underlayment (SLU) and NXT Vapor Reduction Coating installations.

More information

Report of. Asbestos Survey

Report of. Asbestos Survey Report of Asbestos Survey of Curtis Block and Marlowe Buildings 14501, 14505, 14509, 14511 & 14515 Detroit Avenue and 1412 Marlowe Avenue Lakewood, Ohio 44107 Prepared for City of Lakewood 12650 Detroit

More information

UNDERLAYMENT INSTALLATION INSTRUCTIONS

UNDERLAYMENT INSTALLATION INSTRUCTIONS UNDERLAYMENT INSTALLATION INSTRUCTIONS Table of Contents BASE PREPARATION I. General Information... 3 II. Job Site Conditions... 3 III. Subfloor Requirements & Preparation...3 IV. Hazards... 4 V. Material

More information

Bioscience Research Building

Bioscience Research Building Bioscience Research College Park, Maryland Presentation Agenda and Construction Features Analysis Analysis Research Features Presentation Agenda Construction Features: CM at Risk 2 year schedule (July

More information

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager Asbestos Management Plan Program originated: 02/2000 Last updated: 6/2015 Wendel Reece University Safety Manager TABLE OF CONTENTS I. Introduction II. Purpose III. Operations and Maintenance Asbestos Related

More information

MOLD REMEDIATION PROCEDURES

MOLD REMEDIATION PROCEDURES Page: 1 of 5 1.0 PROGRAM OBJECTIVE The purpose of this procedure is to define the responsibilities, methods, procedures and training required to safely and effectively remove or clean mold-contaminated

More information

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) OSHAD-SF Technical Guideline

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) OSHAD-SF Technical Guideline Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) OSHAD-SF Technical Guideline Safe Removal of Asbestos Containing Materials Version 3.0 July 2016 Table of Contents 1. Introduction...

More information

UI Procedures for Asbestos Management

UI Procedures for Asbestos Management UI Procedures for Asbestos Management The University of Iowa Rev.10/22/08, 10/15/09 These procedures apply to employees and contractors involving the identification, work on, removal, or repair of asbestos-containing

More information

Underground Exhaust System

Underground Exhaust System Operation and Maintenance Manual Underground Exhaust MONOXIVENT - SOURCE CAPTURE SYSTEMS - info@ Oct. - 2015 Underground Duct Construction Standards 1. Dig trench depth to allow for minimum distance from

More information

AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY

AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY ASBESTOS CONTROL PROGRAM September 22, 2006 Table of Contents 1.0 Introduction... 4 2.0 Purpose and Applicability... 4 3.0 Roles and Responsibilities... 5 3.1

More information

essentials Advice on non licensed work with Asbestos Why is asbestos a problem? Introduction to Asbestos essentials task sheets Non licensed tasks

essentials Advice on non licensed work with Asbestos Why is asbestos a problem? Introduction to Asbestos essentials task sheets Non licensed tasks a0 essentials Non licensed tasks Some trades likely to disturb Anyone who works on the fabric of a building, may be at risk of disturbing. This includes: electricians, joiners, plumbers, gas fitters, shop

More information

FACILITY ASBESTOS MANAGEMENT PLAN

FACILITY ASBESTOS MANAGEMENT PLAN WASHINGTON ADVENTIST UNIVERSITY DEPARTMENT OF PUBLIC SAFETY DIVISION FACILITY ASBESTOS MANAGEMENT PLAN TAKOMA PARK CAMPUS REVIEWED and APPROVED BY: Patrick Farley WAU- V.P. of Finance Steven Lapham WAU-Executive

More information

Asbestos & Lead Based Paint Assessment City of Anderson 225 Caughlin Avenue Anderson, South Carolina 29624

Asbestos & Lead Based Paint Assessment City of Anderson 225 Caughlin Avenue Anderson, South Carolina 29624 Asbestos & Lead Based Paint Assessment City of Anderson 225 Caughlin Avenue Anderson, South Carolina 29624 Prepared for: City of Anderson Community Development Department 601 South Main Street Anderson,

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

PRE-DEMOLITION ASBESTOS SURVEY Curtis Park Ballpark and Pool 1901 NW 24 Avenue Miami, FL 33125

PRE-DEMOLITION ASBESTOS SURVEY Curtis Park Ballpark and Pool 1901 NW 24 Avenue Miami, FL 33125 PRE-DEMOLITION ASBESTOS SURVEY Curtis Park Ballpark and Pool 1901 NW 24 Avenue Miami, FL 33125 Prepared For: City of Miami Capital Improvements & Transportation Program 444 SW 2 nd Avenue, 8 th Floor Miami,

More information

DIVISION 9 - SECTION QTscu Re-bonded Recycled Rubber Impact Sound Insulation Patent No. RE 41,945

DIVISION 9 - SECTION QTscu Re-bonded Recycled Rubber Impact Sound Insulation Patent No. RE 41,945 Revised on 11/17/11. Supercedes all previous versions. Check website for updates. DIVISION 9 - SECTION 09 60 00.11 QTscu Re-bonded Recycled Rubber Impact Sound Insulation Patent No. RE 41,945 PART 1.0-

More information

Report No: ACM October 29, 2012

Report No: ACM October 29, 2012 PbO3 ENVIRONMENTAL INCORPORATED TESTING & SVC. CO. Report No: ACM-0223-10-29-12-022 October 29, 2012 Client: Lunacon Construction Group 16890 South Dixie Highway Miami, Florida 33157 Attn: Ozzie Gomez

More information

DIVISION 02 EXISTING CONDITIONS

DIVISION 02 EXISTING CONDITIONS DIVISION 02 EXISTING CONDITIONS 02 00 00 EXISTING CONDITIONS 02 01 00 Maintenance of Existing Conditions 02 01 50 Maintenance of Site Remediation 02 01 65 Maintenance of Underground Storage Tank Removal

More information