A CASE STUDY OF A RESIDENTIAL PHOTOVOLTAIC SYSTEM WITH MICROINVERTERS

Size: px
Start display at page:

Download "A CASE STUDY OF A RESIDENTIAL PHOTOVOLTAIC SYSTEM WITH MICROINVERTERS"

Transcription

1 A CASE STUDY OF A RESIDENTIAL PHOTOVOLTAIC SYSTEM WITH MICROINVERTERS Clifford K. Ho Sandia National Laboratories P.O. Box 5800 Albuquerque, NM ckho@sandia.gov ABSTRACT This paper presents a case study of a 3 kw photovoltaic system with Enphase microinverters. A brief introduction to microinverters and central inverters is first presented, followed by an overview of the installation, features, operation, monitoring, and costs of the system. The monthly and annual energy production during the first three years is presented and compared against modeled results using the System Advisor Model. Various factors that have impacted the performance (e.g., shading, weather, temperature, wind, tilt, orientation) are discussed, and the performance of the system is compared against a simulated optimized system. The optimal sizing of microinverters is also discussed to explain why the power rating of the microinverter may be less than the power rating of the module to achieve maximum energy production. 1. INTRODUCTION Solar inverters convert direct current (DC) electricity generated from photovoltaic (PV) modules to alternating current (AC) electricity that can be used by devices and appliances. A conventional central inverter is connected to a string of multiple PV modules, whereas a microinverter is connected to a single PV module. Some pros and cons associated with microinverters relative to central inverters that have been marketed and discussed include the following (1),(2): Pros More energy produced with partial shading Greater reliability (e.g., 25 year vs. 5 year warranty) Ease of installation Safety (no high-voltage DC lines) Monitoring of individual modules Cons Higher capital cost Placement is difficult to access (behind module) This paper presents a 3-year case study of the first commercial PV system installed in New Mexico employing Enphase microinverters (see Fig. 1). The installation, operation, and features of the system are first discussed. The energy production of this system during the first three years is then presented and compared to model predictions using the System Advisor Model (3). Optimized designs of the modules and microinverters are then presented, followed by a discussion of the costs and return on investment. Fig. 1: Enphase microinverter (from Enphase.com). 1

2 2. INSTALLATION, OPERATION, AND FEATURES 1.1. Materials The 3 kw grid-tied PV system consists of the following components and features: 15 PV modules o 200 W Sanyo HIP- 200BA3 o Each module oriented 22 degrees west of true south o Tilt ~27 deg (top array), ~30 deg (bottom array) Enphase Microinverter o 200 W (M ) o 15 year warranty Fig. 3: 200 W Sanyo HIP-200BA3 modules mounted on racks over each microinverter Installation The 3 kw PV system was installed by Sunergy (now CleanSwitch) and commissioned with the Public Service Company of New Mexico (PNM) in December Ten 200-W modules and microinverters were installed on the second-floor roof, and five 200-W modules and microinverters were installed on the first-floor roof (Fig. 2- Fig. 4). The Spanish tiles had to first be removed so that the racks could be mounted to the roof trusses. The microinverters were then mounted to the racks at locations corresponding to the position of each module (Fig. 2). The modules were then mounted to the racks and connected to each microinverter. Note that a chimney to the east of the modules shades several of the modules during the morning hours at different times during the year (Fig. 3-Fig. 4). The microinverters are connected to a disconnect switch, a renewable energy credit (REC) meter, and a net meter on the south side of the house to monitor energy production. Fig. 4: Completed 3 kw PV system with 15 modules and microinverters (10 on the 2 nd -floor roof and 5 on the 1 st -floor roof) Operation and Monitoring The operation of the 3 kw PV system with microinverters is summarized in Fig. 5. AC power produced by each module is monitored via AC wiring in the house and transmitted through the internet to an Enphase Enlighted website. Fig. 2: Enphase M microinverters (one per module) mounted to racks. 2

3 Fig. 5: Operation and monitoring of system performance (from Enphase.com). Fig. 6 shows an image of the entire 3 kw system, with 10 modules on the second-floor roof and five modules on the first floor roof. The current power production and energy production produced over various intervals (day, week, month, lifetime, or user-specified) are also displayed. The power production of each module is displayed on each module (Fig. 7), and energy produced, DC current, DC voltage, and temperature can also be displayed for each module. The luminance of each module also conforms to the power being produced (modules producing more watts appear brighter). Fig. 7: Individual module performance can be monitored including power, energy produced, DC current, DC voltage, and temperature. Fig. 8 shows the system web page when several of the modules were shaded in the morning. The modules that were shaded show a power production of less than 20 W (from diffuse lighting) while the modules exposed to sunlight show a power production of W. This illustrates the ability for modules to produce power independently of each other when using microinverters connected to each module. With central inverters, if a single module is shaded, all of the modules connected on that string would be negatively impacted. Fig. 6: Website to monitor system performance. 3

4 Fig. 8: Shading of individual modules does not impact the performance of other modules. Automated alerts are also sent by if anomalous conditions are recorded. After a PNM power outage, an automated alert was sent to me with the title AC Voltage Out Of Range. The message stated that the microinverter detected that the AC voltage coming from the utility was either too low or too high as specified by applicable regional standards and that the microinverter would remain offline until the utility had been within acceptable limits for a period of time. The condition was self-correcting. I received another alert in which I had to call Enphase to report the error, and technical support was able to reset the microinverter remotely and get it working again. 3. ENERGY PRODUCTION The energy production of the 3 kw PV system was monitored and recorded from January 2009 to December Comparisons between the energy production reported on the Enphase website and the energy production recorded from our REC meter revealed that the Enphase-reported energy production was consistently ~4% higher than that recorded from the REC meter. I spoke with a technical support representative from Enphase on the phone and he stated that the accuracy of the monitoring system was ±5% while the REC meter was ±2%. He also stated that it was common for the Enphase monitoring system to report on the high side. Fig. 9 and Fig. 10 show the monthly and annual energy produced from the system in 2009, 2010, and Predictions from the System Advisor Model (SAM) (3), which used built-in weather and solar irradiance data from a typical meteorological year (TMY2) in Albuquerque, NM (Latitude = 35, Longitude = , Elevation = 1619 m), are also shown for the 3 kw system. Results show that while there is considerable monthly variability in the energy production, the annual energy production was consistent with an average of 5,270 kwh and a standard deviation of 65 kwh. The SAM predictions yielded an annual energy production of 5,230 kwh, just 0.93% above the measured average annual energy production. It should be noted that the SAM model did not include partial shading impacts from the chimney. Fig. 9 shows that there is a trend in the measured monthly energy production during the first three years. The greatest energy production is in the spring (April May) and late summer (August September). During these times, the maximum solar irradiance is received by the modules based on their tilt and orientation. In addition, the temperature is cooler, which increases the power production of the modules. The wind is also stronger in April/May in Albuquerque, which also helps to keep the modules cooler. The SAM models predicts similar trends. Monthly Energy Produced (kwh) SAM Model Data Data Data Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Fig. 9: Monthly energy production during the first three years of the 3 kw PV system compared to predicted energy production using SAM. 4

5 Annual Energy Produced (kwh) In addition to the module tilt and orientation, the size of the microinverter was also investigated. Fig. 12 shows that the inverter efficiency decreases as the power output decreases relative to its rated (nameplate) rating. Therefore, it is desirable to have the inverter operating near its rated output power. 0 SAM Model Fig. 10: Annual energy production and SAM predictions during the first three years. 4. OPTIMIZATION The orientation and tilt of the 3 kw system was varied in SAM to determine an optimal configuration using the TMY2 weather file for Albuquerque, NM. Results of the parameterization showed that a tilt of 35 and an orientation of 10 east of true south yielded the greatest annual energy production of 5,390 kwh (Fig. 11). However, this is only ~3% greater than that predicted using the existing configuration. A reason for the optimal orientation being faced slightly to the east may be because of the significant cloud cover in the afternoons during the monsoon season (July through August). True South Existing System (22 deg west of true south, <30 deg tilt) Optimized System (10 deg east of true south, 35 deg tilt) Fig. 11: Illustration of existing and optimized module configuration for Albuquerque, NM, using SAM predictions. Fig. 12: Plot of inverter efficiency as a function of percent rated output power (3). While it may seem logical to combine a 200-W microinverter with a 200-W module, the overall efficiency of the microinverter may not be optimized since the power production in the morning, evenings, and during cloud cover can be significantly lower than the rated output power. Thus, the efficiency of a 200-W microinverter connected to a 200-W module may be lower than that of a, say, 175-W microinverter. Fig. 13 illustrates this concept by showing the hypothetical power produced from a 200-W module using either a 175-W (red plot) or 200-W (black plot) microinverter. During the mornings and evenings when the solar irradiance is less, the efficiency of the 175-W microinverter is greater, yielding greater power output. However, when the solar irradiance is high around solar noon, the power produced may be greater than 175 W, and power production will be clipped by the 175-W microinverter. Since the total energy production is equal to the area under the power production curve, if the additional area gained by the 175-W microinverter in the mornings and evenings is greater than the area lost due to clipping relative to the area generated by the 200-W microinverter, the total energy produced will be greater. Fig. 14 shows a comparison of simulated monthly energy production from the 3 kw system using different sized microinverters in SAM. Although similar, the use of the 175-W microinverters actually produced slightly more 5

6 energy (5,232 kwh vs. 5,225 kwh) over the course of a year than the 200-W microinverter when paired with the 200-W modules for the 3 kw system. Fig. 13: Illustration of hypothetical power produced from a 200-W module using a 175-W and 200-W rated microinverter over the course of a sunny day. Energy Produced (kwh) Power Produced Fig. 14: Comparison of monthly energy production from the 3 kw system using different sized microinverters. 5. COSTS morning noon afternoon 175 W Time M200 Enphase microinverter with 200 W module M175 Enphase microinverter with 200 W module SAM Model - M200 Enphase Microinverter SAM Model - M175 Enphase Microinverter Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec The cost of inverters depends on size, technology, brand, etc. One of the disadvantages of microinverters is that they are currently more expensive than central inverters for given system requirements. Costs of traditional central inverters range have been reported to range between $ $0.50 per watt, while the costs of microinverters have been reported to range between $ $0.90 per watt (2),(4). The total cost of our 3 kw system (including installation) in 2008 was ~$23,000 after a 30% tax credit (~$33,000 before the tax credit). PNM pays me 13 cents for every kwh generated by my PV system (to receive credit towards the Renewable Energy Act requirement of generating 20% of their electricity from renewable sources by 2020). This amounts to a payment of nearly $700 per year (using the average annual energy produced from my system for the first three years). In addition, because our household uses about 5,000 kwh of electricity per year, we save about 5,000 kwh x $0.08/kWh = $400/year. In total, our savings/revenue is about $1,100 year. Therefore, it will take roughly $23,000 $1,100/year = 21 years to recover the cost of our system. It should be noted, however, that the total installed cost of my system before tax credits was over ~$10/W. Colleagues who have recently installed similar systems paid just ~$5/W - $6/W (before tax credits), nearly half the cost of my system installed just three years ago. In addition, tax credits in New Mexico are now at 40% (30% federal and 10% state). This increased in 2009 from a 30% combined tax credit, just days after my system was commissioned on December 19, 2008! 6. CONCLUSIONS A case study of the first commercial PV system employing Enphase microinverters in New Mexico has been presented. The installation, features, operation, performance, and costs have been discussed. During the first three years from January 2009 to December 2011, the 3 kw system produced an average of ~5,270 kwh per year. Predictions using the System Advisor Model, which used the same system configuration and a typical meteorological year (TMY2) weather file for Albuquerque, NM, yielded very similar results. Monitoring revealed that shading of individual modules from a nearby chimney did not impact the power produced from adjacent modules, illustrating one of the benefits touted for microinverters. A parametric analysis using SAM revealed that an optimized system configuration with a different module tilt and orientation yielded an increase in annual energy production of ~3% relative to the existing system. A 6

7 discussion of optimal microinverter sizing was also presented that illustrated the efficiency dependence of inverters on output power. Finally, the costs of microinverters vs. central inverters was briefly discussed, followed by an economic assessment of the 3 kw PV system. ACKNOWLEDGEMENTS Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy s National Nuclear Security Administration under contract DE-AC04-94AL This manuscript has been authored by Sandia Corporation under Contract No. DE-AC04-94AL85000 with the U.S. Department of Energy. The United States Government retains and the publisher, by accepting the article for publication, acknowledges that the United States Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce the published form of this manuscript, or allow others to do so, for United States Government purposes. REFERENCES (1) Enphase Brochure, 2011, (2) Solar micro-inverter, 2011, Wikipedia website: (3) System Advisor Model, National Renewable Energy Laboratory, Golden, CO ( (4) Solar Central Grid Tie Inverters vs. Microinverters Advantages and Disadvantages, Green World Investor, April 14, 2011, 7

Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System

Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System Brooks Martner Lafayette, Colorado University of Toledo Spring 2013 PHYS 4400 - Principles and Varieties

More information

Home PV System Design

Home PV System Design Home PV System Design Step #1 Evaluate Home Energy Needs (based on 2007 & 2008 PG&E bill) Averaged annual electricity usage is around 4,500kWh Step #2 Determine System Requirements (Grid-tied, Fixed tilt)

More information

SOLARPVSYSTEM INFORMATIONPACK FIT PROGRAM

SOLARPVSYSTEM INFORMATIONPACK FIT PROGRAM SOLARPVSYSTEM INFORMATIONPACK FIT PROGRAM (Thailand, July 2013) The Thai government has recently introduced a generous subsidy scheme involving Feed in Tariffs. This means that you get paid a premium rate

More information

6KW Grid Interactive Photovoltaic System

6KW Grid Interactive Photovoltaic System 6KW Grid Interactive Photovoltaic System System Summary Provided by Ben Nelson Account Project: Nelson Residence Solar Garage Verdiseno, Inc., its subsidiaries, officers, directors, employees and its suppliers

More information

Roof mounted solar panels on Bldg L, Verde Valley Campus. 1. One developed Acre can produce approx 100 KW of peak solar power.

Roof mounted solar panels on Bldg L, Verde Valley Campus. 1. One developed Acre can produce approx 100 KW of peak solar power. SOLAR OPPORTUNITIES Roof mounted solar panels on Bldg L, Verde Valley Campus There is a growing national commitment to the utilization of sustainable energy sources. Solar, wind, and bio- mass systems

More information

LEAST COST ANALYSIS FOR SOLAR PHOTOVOLTAIC MAINTENANCE at the WMU Miller Array

LEAST COST ANALYSIS FOR SOLAR PHOTOVOLTAIC MAINTENANCE at the WMU Miller Array LEAST COST ANALYSIS FOR SOLAR PHOTOVOLTAIC MAINTENANCE at the WMU Miller Array Kelsey Pitschel Mechanical Engineering Dr. Harold Glasser Western Michigan University Thesis Defense Lee Honors College Spring

More information

WEATHER-ADJUSTED PERFORMANCE GUARANTEES

WEATHER-ADJUSTED PERFORMANCE GUARANTEES WEATHER-ADJUSTED PERFORMANCE GUARANTEES Matt Hollingsworth Clean Power Research Napa, CA 94559 matthol@cleanpower.com Jeff Ressler Clean Power Research Napa, CA 94559 jressler@cleanpower.com Richard Perez

More information

Solar Energy 101 What You Need to Know to Go Solar

Solar Energy 101 What You Need to Know to Go Solar Solar Energy 101 What You Need to Know to Go Solar Cathy Redson Sarah Raymer SolPowerPeople, Inc. October 6, 2012 The data, analysis, views, and commentary that follow have been provided by the presenter

More information

PI as a Utility- Scale PV Monitoring Platform

PI as a Utility- Scale PV Monitoring Platform PI as a Utility- Scale PV Monitoring Platform Presented by Steve Hanawalt, President Outline State of the Market Issues and Challenges Potential Solutions Benefits Summary and Q&A 2 Outline State of the

More information

Solar Cell Optimization: Cutting Costs and Driving Performance

Solar Cell Optimization: Cutting Costs and Driving Performance Solar Cell Optimization: Cutting Costs and Driving Performance 1 Executive Summary Over the past several years, DC optimizers have become an important technological ingredient in many residential, commercial

More information

Alternative Energy Pros and Cons and How to Teach

Alternative Energy Pros and Cons and How to Teach Alternative Energy Pros and Cons and How to Teach Masoud Fathizadeh, PhD, PE Purdue University Northwest, fthizad@pnw.edu Abstract Wind and solar energies are becoming viable alternatives for electrical

More information

2011 UC Solar Research Symposium

2011 UC Solar Research Symposium 2011 UC Solar Research Symposium Lowering the LCOE of Photovoltaic Systems Yong Sin Shon Kim Dec. 09 2011 School of Natural Science, University of California at Merced skim73@ucmerced.edu http://ucsolar.org

More information

13-PV System Design. ECEGR 452 Renewable Energy Systems

13-PV System Design. ECEGR 452 Renewable Energy Systems 13-PV System Design ECEGR 452 Renewable Energy Systems Design Example Overview Other PV Considerations Dr. Louie 2 Stand Alone PV System Design Consider a simple design approach Part art, part science

More information

APVI Solar Potential Tool Data and Calculations

APVI Solar Potential Tool Data and Calculations APVI Solar Potential Tool Data and Calculations J. K Copper and A. G Bruce (2014), School of Photovoltaic and Renewable Energy Engineering, University of New South Wales. The APVI Solar Potential Tool

More information

Environmental concerns/reduce carbon emissions Save money on electric bills General interest in new technologies Increase in building value

Environmental concerns/reduce carbon emissions Save money on electric bills General interest in new technologies Increase in building value Environmental concerns/reduce carbon emissions Save money on electric bills General interest in new technologies Increase in building value 1 Does solar work in Palestine? PV costs and benefits Other uses

More information

ESCI-61 Introduction to Photovoltaic Technology

ESCI-61 Introduction to Photovoltaic Technology April 7, 2010 1 ESCI-61 Introduction to Photovoltaic Technology Lecture #1 Ridha Hamidi, Ph.D. April 7, 2010 2 Today s Agenda 3:30-4:00 - Green sheet review and introductions 4:00-4:45 - Group Research

More information

FY2017 SREC Registration Program (SRP) Final As-Built Technical Worksheet Instructions Page 1

FY2017 SREC Registration Program (SRP) Final As-Built Technical Worksheet Instructions Page 1 If the SRP Registration was submitted in paper form, the Final As Built Packet must be submitted in paper. If the SRP Registration was submitted via the online portal, the Final As Built documents must

More information

COST ANALYSIS OF RENEWABLE ENERGY FOR POWER SUPPLY FOR REMOTE AREA IN YEMEN : A CASE STUDY FOR SOCOTRA ISLAND

COST ANALYSIS OF RENEWABLE ENERGY FOR POWER SUPPLY FOR REMOTE AREA IN YEMEN : A CASE STUDY FOR SOCOTRA ISLAND COST ANALYSIS OF RENEWABLE ENERGY FOR POWER SUPPLY FOR REMOTE AREA IN YEMEN : A CASE STUDY FOR SOCOTRA ISLAND Saqqaf A. Alkaf, Mohammed A. Muqbel and Salem M. Bin Qadhi + Mechanical Engineering Department,

More information

We ve cracked the code to harness the sun

We ve cracked the code to harness the sun We ve cracked the code to harness the sun FUSION 3.3 ft. 6.6 ft. Wire mesh fall protection. FUSION photovoltaic panel requires only one 0.5 diameter opening inside the sealed boot. That s smaller than

More information

AC : RESIDENTIAL RENEWABLE ENERGY SOURCES CASE STUDIES OF RETURN ON INVESTMENT

AC : RESIDENTIAL RENEWABLE ENERGY SOURCES CASE STUDIES OF RETURN ON INVESTMENT AC 2011-496: RESIDENTIAL RENEWABLE ENERGY SOURCES CASE STUDIES OF RETURN ON INVESTMENT Louis Reifschneider, Illinois State University Associate Professor Registered Professional Engineer Research interests

More information

SOLAR FOR HOMES TYLER HUEBNER, RENEW WISCONSIN BETTER BUILDINGS BETTER BUSINESS CONFERENCE, WI DELLS FEBRUARY 16, 2018

SOLAR FOR HOMES TYLER HUEBNER, RENEW WISCONSIN BETTER BUILDINGS BETTER BUSINESS CONFERENCE, WI DELLS FEBRUARY 16, 2018 SOLAR FOR HOMES TYLER HUEBNER, RENEW WISCONSIN BETTER BUILDINGS BETTER BUSINESS CONFERENCE, WI DELLS FEBRUARY 16, 2018 ABOUT RENEW WISCONSIN: FOUNDED 1991 SUPPORT FOR: - SOLAR - WIND - BIOMASS & BIOGAS

More information

Photovoltaic Energy Systems A Feasibility Study

Photovoltaic Energy Systems A Feasibility Study Photovoltaic Energy Systems A Feasibility Study William Nichols Georgia Southern University wtn918@gmail.com Dr. Youakim Kalaani Georgia Southern University yalkalaani@georgiasouthern.edu Paper 105, ENG

More information

Demystifying Rooftop Solar

Demystifying Rooftop Solar Demystifying Rooftop Solar Week 4 : Economics OLLI at Illinois Study Group Fall 2017 1:30 pm Tuesdays Blue Room Proposed Session Outline 1. Overview of solar power in general. How PV works with demos.

More information

Power Saver TM Program

Power Saver TM Program Power Saver TM Program COMMERCIAL SOLAR PHOTOVOLTAIC PERFORMANCE-BASED INCENTIVE PROGRAM GUIDELINES These guidelines govern the procedures and qualifications for incentives under the Austin Energy Commercial

More information

Field Performance of. Forrest Collins juwi solar Inc. February 2 nd, 2010

Field Performance of. Forrest Collins juwi solar Inc. February 2 nd, 2010 Field Performance of Thin-Film Forrest Collins juwi solar Inc. PHOTON 2nd Thin Film Conference February 2 nd, 2010 Overview Background on juwi Organization juwi Exprience with Thin-Film Data from the Field

More information

MARKET PRICES FOR SOLAR ELECTRICITY IN ONTARIO

MARKET PRICES FOR SOLAR ELECTRICITY IN ONTARIO Montreal, 2-24, 24 MARKET PRICES FOR SOLAR ELECTRICITY IN ONTARIO Ian H. Rowlands Faculty of Environmental Studies University of Waterloo Email: irowland@fes.uwaterloo.ca Tel: (519) 888-4567, ext. 2574

More information

International Journal of Applied Science and Technology Vol. 2 No. 3; March 2012

International Journal of Applied Science and Technology Vol. 2 No. 3; March 2012 nternational Journal of Applied Science and Technology ol. No. 3; March Performance Assessment of Polycrystalline Silicon Pv Modules in Low Latitude Regions as A Function of Temperature Abstract P.E. Ugwuoke,

More information

AR No. # - Install Photovoltaic Array

AR No. # - Install Photovoltaic Array AR No. # - Install Photovoltaic Array Recommendation Install a photovoltaic array on the building roof. This will provide an alternative energy production source for 2% of the facility's energy consumption

More information

Analysis of Solar Capacity Equivalent Values for the South Carolina Electric and Gas System

Analysis of Solar Capacity Equivalent Values for the South Carolina Electric and Gas System Analysis of Solar Capacity Equivalent Values for the South Carolina Electric and Gas System John D. Wilson, Southern Alliance for Clean Energy March 21, 2017 The assessment of solar energy s contribution

More information

Design of Grid Connected PV System Using Pvsyst

Design of Grid Connected PV System Using Pvsyst African Journal of Basic & Applied Sciences 9 (): 9-96, 017 ISSN 079-034 IDOSI Publications, 017 DOI: 10.589/idosi.ajbas.017.9.96 Design of Grid Connected PV System Using Pvsyst Rachit Srivastava and Vinod

More information

FLORIDA PHOTOVOLTAIC BUILDINGS PROGRAM

FLORIDA PHOTOVOLTAIC BUILDINGS PROGRAM FLORIDA PHOTOVOLTAIC BUILDINGS PROGRAM Mounting Methods for Rooftop Photovoltaic Arrays Shingle, Tile, and Metal Roofing Systems Florida Solar Energy Center 1679 Clearlake Road Cocoa, Florida 32922 February

More information

Running on Renewables (Lesson Plan) (Utilizing HOMER: Modeling Software for Hybrid Electric Power Systems)

Running on Renewables (Lesson Plan) (Utilizing HOMER: Modeling Software for Hybrid Electric Power Systems) Running on Renewables (Lesson Plan) (Utilizing HOMER: Modeling Software for Hybrid Electric Power Systems) Suggested Grade Level 9-12 Overview Students utilize software developed by the National Renewable

More information

Anchorage Alaska Solar Tour: Saturday, June 17th, 2017 Tour Starts At 10am

Anchorage Alaska Solar Tour: Saturday, June 17th, 2017 Tour Starts At 10am Please visit alaskasolartour.org for updates on this tour Anchorage Alaska Solar Tour: Saturday, June 17th, 2017 Tour Starts At 10am Sites Times Building Address Area of town Site #1 10 10:45am CIRI Office

More information

What is a solar water pump? 3-4. Smart Solar Water 5-6. Small Centrifugal Pump Systems 7. MPPT Diaphragm Pump Systems 8

What is a solar water pump? 3-4. Smart Solar Water 5-6. Small Centrifugal Pump Systems 7. MPPT Diaphragm Pump Systems 8 Solar Water Systems Contents Pages What is a solar water pump? 3-4 Smart Solar Water 5-6 Small Centrifugal Pump Systems 7 MPPT Diaphragm Pump Systems 8 Large Centrifugal Pump Systems 9 Pump Price List

More information

Contents. What is a solar water pump? 3-4. Smart Solar Water 5-6. Small Centrifugal Pump Systems 7. MPPT Diaphragm Pump Systems 8

Contents. What is a solar water pump? 3-4. Smart Solar Water 5-6. Small Centrifugal Pump Systems 7. MPPT Diaphragm Pump Systems 8 Solar Water Systems Contents Pages What is a solar water pump? 3-4 Smart Solar Water 5-6 Small Centrifugal Pump Systems 7 MPPT Diaphragm Pump Systems 8 Large Centrifugal Pump Systems 9 Pump Price List

More information

Optimisation and Cost Analysis of a Lithium Bromide Absorption Solar Cooling System

Optimisation and Cost Analysis of a Lithium Bromide Absorption Solar Cooling System Optimisation and Cost Analysis of a Lithium Bromide Absorption Solar Cooling System Georgios A. Florides and Soteris A. Kalogirou Mechanical Engineering Department, Higher Technical Institute, Nicosia,

More information

Solar Energy Generation Potential on National Highways

Solar Energy Generation Potential on National Highways Solar Energy Generation Potential on National Highways Anurag Swain Sr. Deputy General Manager (Electrical & Instrumentation), My Home Power Consultancy Services Pvt. Ltd My Home Hub, 3 rd Block, 5 th

More information

Ohio. Market Guide. AEP Columbus Southern Power AEP Ohio Power Dayton Power & Light. Residential Customers:

Ohio. Market Guide. AEP Columbus Southern Power AEP Ohio Power Dayton Power & Light. Residential Customers: Market Guide Ohio ELECTRIC Duke Energy Ohio Cleveland Electric Illuminating Toledo Edison Ohio Power Dayton Power & Light Ohio Edison Columbus Southern Power NATURAL GAS Duke Energy Ohio UTILITIES SERVED

More information

Electric Forward Market Report

Electric Forward Market Report Mar-01 Mar-02 Jun-02 Sep-02 Dec-02 Mar-03 Jun-03 Sep-03 Dec-03 Mar-04 Jun-04 Sep-04 Dec-04 Mar-05 May-05 Aug-05 Nov-05 Feb-06 Jun-06 Sep-06 Dec-06 Mar-07 Jun-07 Sep-07 Dec-07 Apr-08 Jun-08 Sep-08 Dec-08

More information

Solar Photovoltaic Electricity Generation for Dairy Farms

Solar Photovoltaic Electricity Generation for Dairy Farms Improving the Welsh Dairy Supply Chain Solar Photovoltaic Electricity Generation for Dairy Farms www.ddc-wales.co.uk Dairy Development Centre Gelli Aur Carmarthen Carmarthenshire SA32 8NJ Telephone: 01554

More information

Solar Electric Systems Safety for Firefighters

Solar Electric Systems Safety for Firefighters Solar Electric Systems Safety for Firefighters AUTHOR: Ted Spooner Chair of the Australian standards committee responsible for PV systems Co-convener of the International Electrical Commission (IEC) working

More information

Measured Performance of a High-Efficiency Solar-Assisted Heat Pump Water Heater

Measured Performance of a High-Efficiency Solar-Assisted Heat Pump Water Heater Measured Performance of a High-Efficiency Solar-Assisted Heat Pump Water Heater FSEC-PF-471-17 September 13, 2017 Published in: Proceedings of the 9 th Annual International Conference on Energy Efficiency

More information

MODELING AND SIMULATION OF WIND-SOLAR HYBRID ENERGY SYSTEM FOR POWER SUPPLY TO FACULTY OF ENGINEERING TEACHING WORKSHOP IN UNIVERSITY OF MAIDUGURI

MODELING AND SIMULATION OF WIND-SOLAR HYBRID ENERGY SYSTEM FOR POWER SUPPLY TO FACULTY OF ENGINEERING TEACHING WORKSHOP IN UNIVERSITY OF MAIDUGURI MODELING AND SIMULATION OF WIND-SOLAR HYBRID ENERGY SYSTEM FOR POWER SUPPLY TO FACULTY OF ENGINEERING TEACHING WORKSHOP IN UNIVERSITY OF MAIDUGURI A.B. Muhammad 1*, G. M. Ngala 2, S. Shodiya 3, M. Shuwa

More information

Compactness ratio : 1.2. Openings ratio : 26% (thermic envelope / inhabitable area) Smaller is better 1.9 = bad < 0.8 = good

Compactness ratio : 1.2. Openings ratio : 26% (thermic envelope / inhabitable area) Smaller is better 1.9 = bad < 0.8 = good ENERGIZED CANOPY Compactness ratio : 1.2 (thermic envelope / inhabitable area) Smaller is better 1.9 = bad < 0.8 = good A good compactness ratio lets to need less material and energy to build the buildings

More information

Optimum Design of Biomass Gasifier Integrated Hybrid Energy Systems

Optimum Design of Biomass Gasifier Integrated Hybrid Energy Systems Optimum Design of Biomass Gasifier Integrated Hybrid Energy Systems Arun P* * Department of Mechanical Engineering, National institute of Technology Calicut, NIT Campus (PO), Kozhikode, Kerala, India 673601.

More information

AN AC COUPLED PV/WIND/DIESEL MICROGRID SYSTEM IMPLEMENTED IN A REMOTE ISLAND IN THE REPUBLIC OF MALDIVES

AN AC COUPLED PV/WIND/DIESEL MICROGRID SYSTEM IMPLEMENTED IN A REMOTE ISLAND IN THE REPUBLIC OF MALDIVES AN AC COUPLED PV/WIND/DIESEL MICROGRID SYSTEM IMPLEMENTED IN A REMOTE ISLAND IN THE REPUBLIC OF MALDIVES 1 The President inaugurates the Hybrid Renewable Energy Pilot Project implemented at North Thiladhunmathi

More information

Appendix 22. Copyright 2011 Surmount Energy Solutions Pvt. Ltd. Copyright 2011 Surmount Energy Solutions Pvt. Ltd

Appendix 22. Copyright 2011 Surmount Energy Solutions Pvt. Ltd. Copyright 2011 Surmount Energy Solutions Pvt. Ltd Appendix 22 1 Table of Contents 22.0 SOLAR PV ANALYSIS... 4 22.1 EXECUTIVE SUMMARY... 4 22.1.1 Project Features... 4 PROPOSED SITE DETAILS... 5 Solar Radiation Resource Assessment... 6 Solar Radiation

More information

Charles D. Corbin & Gregor P. Henze

Charles D. Corbin & Gregor P. Henze Assessing Impact of Large-Scale Distributed Residential HVAC Control Optimization on Electricity Grid Operation and Renewable Energy Integration May 11, 2015 Charles D. Corbin & Gregor P. Henze Department

More information

Solar Energy Technologies

Solar Energy Technologies 1 Solar Energy Technologies ME 430 Queen s University The Solar Energy Resource Varies over day and year, (i.e., intermittent) Generally non-dispatchable Ottawa average for year ~4 kwh/m 2 per day e.g.,

More information

Strong US market growth PV capacity increases by 70 percent in 2008

Strong US market growth PV capacity increases by 70 percent in 2008 www.photon-international.com The Photovoltaic Magazine International 2-2009 Washers for glass and foils Market survey on cleaners for crystalline and thin-film module production Presented by Solar modules

More information

Consumer s Guide to Solar Power

Consumer s Guide to Solar Power Consumer s Guide to Solar Power JEA Consumer s Guide to Solar Power What is Solar Energy? 3 Benefits of Solar Power 3 JEA Solar Programs 4 Types of Solar Energy Systems 6 Is Solar Right for You? 10 Installation

More information

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Administration Division Public Works Department Anchorage: Performance. Value. Results. Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,

More information

Basic technical information on solar PV. Welcome and introduction.

Basic technical information on solar PV. Welcome and introduction. Basic technical information on solar PV Welcome and introduction. 1 Agenda 1. Solar Thermal Systems 2. How Does Solar PV Work? 3. What are the Main Components of a PV System? 4. What are the Solar PV Mounting

More information

Basic technical information on solar PV. Welcome and introduction.

Basic technical information on solar PV. Welcome and introduction. Basic technical information on solar PV Welcome and introduction. 1 Agenda 1. Solar Thermal Systems 2. How Does Solar PV Work? 3. What are the Main Components of a PV System? 4. What are the Solar PV Mounting

More information

Solar Power Realities

Solar Power Realities Solar Power Realities Supply-Demand Characteristics, Storage and Capital Costs by Peter Lang Abstract This paper provides a simple analysis of the capital cost of solar power and energy storage sufficient

More information

Performance of PV systems under real conditions

Performance of PV systems under real conditions Abstract European Workshop on Life Cycle Analysis and Recycling of Solar Modules The Waste Challenge, Brussels 18/19 March 24 Title : Authors: Performance of PV systems under real conditions Thomas Nordmann,

More information

Microturbine CHP for Microgrids Microgrid2017

Microturbine CHP for Microgrids Microgrid2017 Microturbine CHP for Microgrids Microgrid2017 Why Microturbines for Microgrids? Proven: Over 3,000 sites operating in Stand Alone and Dual Mode One Moving Part; Air Bearings Invertor Based Power Electronics

More information

Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS GENERAL INFORMATION ABOUT SOLAR PHOTOVOLTAIC SYSTEMS...2 RESOURCES...3 GENERAL 3 1.0 MARKING...5 1.1 MAIN

More information

Integrates with the Energence rooftop unit, providing effective efficiency levels of 34 SEER* and beyond. Solar power for an HVAC system and beyond

Integrates with the Energence rooftop unit, providing effective efficiency levels of 34 SEER* and beyond. Solar power for an HVAC system and beyond Integrates with the nergence rooftop unit, providing effective efficiency levels of 34 SR* and beyond Solar power for an HVAC system and beyond Technology whose time has come SunSource Commercial nergy

More information

Course Title: Advanced PV Design (PV201) (NRG 220) 5 credits (55 hours)

Course Title: Advanced PV Design (PV201) (NRG 220) 5 credits (55 hours) Course Title: Advanced PV Design (PV201) (NRG 220) 5 credits (55 hours) Prepared by: Larry Owens Date: August 31, 2012 New course (Proposed), Clean Energy Technology/Science Department, Shoreline Community

More information

Optimal replacement strategy for residential solar panels using monte carlo simulations and nonlinear optimization methods

Optimal replacement strategy for residential solar panels using monte carlo simulations and nonlinear optimization methods The InsTITuTe for systems research Isr TechnIcal report 2017-2 Optimal replacement strategy for residential solar panels using monte carlo simulations and nonlinear optimization methods Andrew Poissant

More information

Residential Energy Consumption: Longer Term Response to Climate Change

Residential Energy Consumption: Longer Term Response to Climate Change 24 th USAEE/IAEE North American Conference July 8-10, 2004, Washington, DC Residential Energy Consumption: Longer Term Response to Climate Change Christian Crowley and Frederick L. Joutz GWU Department

More information

Reference: Photovoltaic Systems, p. 229

Reference: Photovoltaic Systems, p. 229 Sizing is the basis for PV system designs, and determines the ratings for the PV array and other major components needed to produce and deliver a certain amount of energy. Different principles apply to

More information

Appendix T Renewable Energy Applications on the Green Deck

Appendix T Renewable Energy Applications on the Green Deck Appendix T Renewable Energy Applications on the Green Deck (Final Report) By Prof. Yang Hong-xing Co-investigators: Dr Ma Tao, Dr Lu Lin & Dr Qi Ronghui Renewable Energy Research Group Department of Building

More information

Schedule 2 TECHNICAL INFORMATION

Schedule 2 TECHNICAL INFORMATION Schedule 2 TECHNICAL INFORMATION This document is intended to provide context to the Haida Gwaii Request for Expressions of Interest (RFEOI) for the potential electricity supply opportunity for clean electricity

More information

optimization Redefined

optimization Redefined optimization Redefined Don t just optimize a module. Optimize your bottom line. SMA Power+ Solution TRUE OPTIMIZATION Module-level power electronics provide many benefits, and have proven popular with

More information

Fleet Performance of Large Scale PV in Australia

Fleet Performance of Large Scale PV in Australia Nicole Ghiotto & Nick Morley Fleet Performance of Large Scale PV in Australia Nicole Ghiotto 1, Nick Morley 1, Sravanthi Boppana 2, James Frederick 2, Mitchell Lee 2 and Chris Simpson 2 1 First Solar Australia

More information

ANNUAL ENERGY PERFORMANCE OF SOLAR THERMAL SYSTEMS IN BRAŞOV, ROMANIA

ANNUAL ENERGY PERFORMANCE OF SOLAR THERMAL SYSTEMS IN BRAŞOV, ROMANIA Bulletin of the Transilvania University of Braşov Series I: Engineering Sciences Vol. 5 (54) No. 2-212 ANNUAL ENERGY PERFORMANCE OF SOLAR THERMAL SYSTEMS IN BRAŞOV, ROMANIA C. ŞERBAN 1 E. EFTIMIE 1 Abstract:

More information

CSI Incentive Calculator User Guide

CSI Incentive Calculator User Guide CSI Incentive Calculator User Guide CSI Calculator v5 User Guide.doc 1. Guide Overview This User Guide provides background on the California Solar Initiative (CSI) Incentive Calculator, describes how the

More information

Performance Parameters for Grid-Connected PV Systems

Performance Parameters for Grid-Connected PV Systems Performance Parameters for Grid-Connected PV Systems B. Marion, 1 J. Adelstein, 1 K. Boyle, 1 H. Hayden, 2 B. Hammond, 2 T. Fletcher, 2 B. Canada, 2 D. Narang, 2 A. Kimber, 3 L. Mitchell, 3 G. Rich, 4

More information

Payback & Return Analysis for Solar in Mueller - Revision 1

Payback & Return Analysis for Solar in Mueller - Revision 1 Payback & Return Analysis for Solar in Mueller - Revision 1 This document should serve to help residents of the Mueller Community understand the financial implications of the solar system proposals they

More information

Summary of Net Metered Projects as of June 30, Small Net Metered Projects as of 6/30/2016 Small Group Host Projects as of 6/30/2016

Summary of Net Metered Projects as of June 30, Small Net Metered Projects as of 6/30/2016 Small Group Host Projects as of 6/30/2016 Page 1 of 6 Summary of Net Metered Projects as of June 30, 2016 Small Net Metered Projects as of 6/30/2016 Small Group Host Projects as of 6/30/2016 Class # of Projects Capacity (kw) Annual Energy (kwh)

More information

Optimal Rural Microgrid Energy Management Using HOMER

Optimal Rural Microgrid Energy Management Using HOMER Optimal Rural Microgrid Energy Management Using HOMER Gerry Department of Electrical and Instrumentation Engineering Thapar university, Patiala, Punjab, India Sonia Department of Electrical and Instrumentation

More information

Session 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile

Session 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile Session 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile Michael Coddington National Renewable Energy Laboratory Golden, Colorado, U.S.A.

More information

Solar Resource and. PV Systems Performance at Selected Test Sites

Solar Resource and. PV Systems Performance at Selected Test Sites Solar Resource and PV Systems Performance at Selected Test Sites Prepared for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Cooperative Agreement No. DE-FC26-06NT42847

More information

Performance Evaluation of Solar Parabolic Trough for Cloths Laundry application

Performance Evaluation of Solar Parabolic Trough for Cloths Laundry application Performance Evaluation of Solar Parabolic Trough for Cloths Laundry application Shubham Gupta*, Prof. R. S. Mishra Department of Mechanical Engineering Delhi Technological University, Delhi-110042. guptashubham@outlook.in,

More information

Analysis 2: Alternative Thermal Window Design

Analysis 2: Alternative Thermal Window Design Analysis 2: Alternative Thermal Window Design (8.1) Problem Statement: In the first analysis, the cost and environmental impacts of the addition of solar PV panels to the roof of GrandView was determined.

More information

Final Flexible Capacity Needs Assessment for 2018

Final Flexible Capacity Needs Assessment for 2018 Final Flexible Capacity Needs Assessment for 2018 April 28, 2017 1 Table of Contents 1. Introduction... 3 2. Summary... 3 3. Defining the ISO System-Wide Flexible Capacity Need... 5 4. Forecasting Minute-by-Minute

More information

Hot water persons. Map section

Hot water persons. Map section Project Hot water 4-160 persons Location of the system Rapperswil SG Longitude: 8.82 Latitude: 47.23 Elevation: 417 m Map section "Current report item is not supported in this report format." This report

More information

Colorado Energy Masters: Solar Energy. Kurt M. Jones County Extension Director Chaffee County

Colorado Energy Masters: Solar Energy. Kurt M. Jones County Extension Director Chaffee County Colorado Energy Masters: Solar Energy Kurt M. Jones County Extension Director Chaffee County Learning Objectives Evaluating the Solar Resource Technical feasibility, permitting & zoning considerations

More information

Available online at ScienceDirect. Energy Procedia 48 (2014 )

Available online at  ScienceDirect. Energy Procedia 48 (2014 ) Available online at www.sciencedirect.com ScienceDirect Energy Procedia 48 (2014 ) 1412 1418 SHC 2013, International Conference on Solar Heating and Cooling for Buildings and Industry September 23-25,

More information

Importance of balance of system in a solar PV application

Importance of balance of system in a solar PV application Importance of balance of system in a solar PV application Abstract- The solar PV technology in Nepalese market has seen a tremendous growth in the recent years; approximately 16MWp of solar PV has been

More information

Financial Analysis of a Grid-connected Photovoltaic System in South Florida

Financial Analysis of a Grid-connected Photovoltaic System in South Florida Financial Analysis of a Grid-connected Photovoltaic System in South Florida Hadis Moradi, Amir Abtahi, and Ali Zilouchian Florida Atlantic University, Boca Raton, FL, 33431, USA Abstract In this paper

More information

Toronto & Region Conservation Authority. July 30, The Drake Landing Solar Community

Toronto & Region Conservation Authority. July 30, The Drake Landing Solar Community Toronto & Region Conservation Authority July 30, 2008 The Drake Landing Solar Community - Seasonal Energy Storage in Action Okotoks, Alberta Bill Wong, P.Eng. SAIC Canada 7/31/2008 1 No leveling off in

More information

Solar and Wind Energy

Solar and Wind Energy Jerry Hudgins Solar and Wind Energy Department of Electrical Engineering 1 Average Irradiation Data (Annual) from Solarex. The units on the map are in kwh/m 2 /day and represent the minimum case values

More information

Project Report: SunMaxx Commercial Case Studies

Project Report: SunMaxx Commercial Case Studies Project Report: 14 x ThermoPower-VHP30 Total Gross Surface Area: 738.50 sq.ft Azimuth: 10 Incl.: 37 2100 gal/day 130 F Gas Boiler - 9 150 kbtu/hr StorMaxx NP Vol:2500 gal Existing Hot Water Heater Vol:1000

More information

AORC Technical meeting 2014

AORC Technical meeting 2014 http : //www.cigre.org C5-1036 AORC Technical meeting 2014 Solar PV Rooftop System Connection to MEA s Distribution Network: Technic and Economic Aspects Tosak Thasananutariya Metropolitan Electricity

More information

SOLAR PUMPING GUIDELINES FOR SUDAN DRAFT 1-MARCH 2017

SOLAR PUMPING GUIDELINES FOR SUDAN DRAFT 1-MARCH 2017 SOLAR PUMPING GUIDELINES FOR SUDAN DRAFT 1-MARCH 2017 Global Solar & Water Initiative 1 Index. 1 Why Solar Pumping.3 2 Solar Pumping-What is it? 4 3 System Design..4 4 Components of a Solar Photovoltaic

More information

Renewable Energy Systems

Renewable Energy Systems Renewable Energy Systems Phil Brodhagen Companies El Paso Green Energies LLC Peak View Solar NABCEP Certified PV Installation Professional NABCEP Certified Sales Professional www.elpasogreenenergies.com

More information

Solar heating system sizing Solar storage tank size (volume) Solar collector array size (area)

Solar heating system sizing Solar storage tank size (volume) Solar collector array size (area) Information Jo Sheet 4 System Sizing Solar heating system sizing To determine the size requirements for each system component in a solar heating system, it is necessary to estimate the system load. The

More information

Renewable Energy in The Netherlands

Renewable Energy in The Netherlands Renewable Energy in The Netherlands Dr. Martien Visser Professor Energy Transition & Network Integration Hanze University of Applied Sciences Groningen Partner of the Energy Academy Europe E-mail: b.m.visser@pl.hanze.nl

More information

APPLICATION FOR SOLAR PERMIT

APPLICATION FOR SOLAR PERMIT APPLICATION FOR SOLAR PERMIT Permit Application Application Checklist o New York State Unified Solar Permit Application for Roof Mounted Systems 12kW or less. (Includes Electrical Permit Application) o

More information

Viability of Micro Wind Turbines in the Urban Environment

Viability of Micro Wind Turbines in the Urban Environment Viability of Micro Wind Turbines in the Urban Environment World Renewable Energy Forum WREF/WREN May 13-17, 2012, Denver, Colorado Ghanim Putrus Reader in Electrical Power Engineering Power and Wind Energy

More information

Ground-Coupled Heat Pump And Energy Storage

Ground-Coupled Heat Pump And Energy Storage Ground-Coupled Heat Pump And Energy Storage By Ed Lohrenz, Member ASHRAE; and Sergio Almeida, P.Eng., Member ASHRAE Ground-coupled heat pump (GCHP) systems consume less purchased energy than an HVAC system

More information

THERMAL ANALYSIS OF A FACADE-MOUNTED PV ARRAY

THERMAL ANALYSIS OF A FACADE-MOUNTED PV ARRAY SESCI 23 CONFERENCE Queen's University Kingston, Ontario, Canada August 18 to 2, 23 THERMAL ANALYSIS OF A FACADE-MOUNTED PV ARRAY S. J. Harrison 1, A. Driesse 2, Q. Lin 1 1 Queen's University, Solar Calorimetry

More information

EXAMPLE TARIFF MID-SIZE COMMERCIAL

EXAMPLE TARIFF MID-SIZE COMMERCIAL SOLAR PV EXAMPLE TARIFF MID-SIZE COMMERCIAL CONTENTS 1 Contents 2 Introduction 3 Examples 4 Important 5 How to proceed Approved Installer Telephone 01843 855 019 1 INTRODUCTION A LITTLE ABOUT TARIFFS The

More information

Buildings sector: Energy Productivity in the GCC. Kankana Dubey KAPSARC

Buildings sector: Energy Productivity in the GCC. Kankana Dubey KAPSARC Buildings sector: Energy Productivity in the GCC Kankana Dubey KAPSARC 7 th International Forum on energy for Sustainable Development in Baku, 18 October 2016 1980 1981 1982 1983 1984 1985 1986 1987 1988

More information

Life cycle analysis of thermosyphon solar water heaters

Life cycle analysis of thermosyphon solar water heaters Life cycle analysis of thermosyphon solar water heaters Soteris A. KALOGIROU Department of Mechanical Engineering and Materials Sciences and Engineering Cyprus University of Technology, P. O. Box 50329,

More information

Modeling using HOMER Practice & Grid-Connected System. Course Contents. On SWERA

Modeling using HOMER Practice & Grid-Connected System. Course Contents. On SWERA 20161013 Modeling using HOMER Practice & GridConnected System AGH University of Science & Technology Faculty of Energy and Fuels (WEiP) Course Contents Modeling Grid Data Details GridConnected System Design

More information