1 SEAC, Gujarat: Page 1 of 12 For TOR Expansion Case 1. Basic Information of the Project: i. Name & Address of the Project site (Complete details with plot no. /Survey no., Landmark etc.) Sanhi Chemicals Plot No: 1712, Phase III, Notified Industrial Area, GIDC-Vapi, , Tal.: Pardi, Dist.: Valsad (Gujarat) ii. Name of the Applicant Mr. Sanjay Desai (Partner) iii. Address for correspondence Plot No: 1712, Phase III, Notified Industrial Area, GIDC-Vapi, , Tal.: Pardi, Dist.: Valsad (Gujarat) iv. Contact no. and ID of the Applicant Mob. No.: sales@apurvachem.in v. Aerial distance of nearest Habitat (KM) Chhiri 0.80 km in N direction vi. Longitude & Latitude of the Project Site: (4 corners of the site) vii. Category as per the Schedule to the EIA Notification 2006 i.e. 1(d), 2(b), 5(f) etc. viii. Applicability of General Conditions of EIA Notification 2006: i.e. Ensure that I. Protected areas notified under the Wildlife (Protection) Act, 1972; II. CEPI areas III. Eco-sensitive areas and IV. Inter-state boundaries and international boundaries; are not located within 5 km or 10 km (as the case may be) area from the boundary of the proposed site. Corner Latitude Longitude A 20 o N 72 o E B 20 o N 72 o E C 20 o N 72 o E D 20 o N 72 o E 5(f) -B as per EIA Notification 2006 General conditions are Not Applicable.

2 SEAC, Gujarat: Page 2 of Online application proposal No. : SIA/GJ/IND2/25878/ Date of application for TOR: 21/04/ Project status: Expansion 5. Product profile: # Product Name CAS Number Qty. MT/Month Existing Proposed Total Naphthylamine 4,6,8 tri Sulfonic acid (Sulpho G Acid) Nitro 2 amino phenol 6 Sulfonic acid (4 NAPSA) Nitro 2 amino phenol 4 Sulfonic acid (6 NAPSA) Amino Phenol 4- Sulfonamide (OPSAMIDE) Naphthyl amine 3,6,8 tri Sulfonic acid (KOCH ACID) M-Amino Phenol (MAP) Naphthol 3,6 di Sulfonic Acid (Violet Acid) Naphthol 3,8 di Sulfonic acid (EPSILONE ACID) Amino 8 Naphthol 4,6 Di Sulfonic Acid (European K Acid) Naphthylamine 4,8 Di Sulfonic Acid (C Acid) Chloro 5 - Toludine 4 - Sulphonic Acid (CLT Acid) Naphthylamine 8- Hydroxy 2,4 Di Sulfonic Acid (Chicago Acid) Amino Benzene Sulphonic Acid (Metanilic Acid) ,3 Di Nitro Di Phenyl Sulphone (3 3 DDS) Meta Nitro Benzene Sulphonic acid (Resist Salt) OR ,3 Di Nitro Di phenyl Sulphone Nitro 1-Di-Azo 2-Napthol 4-sulfonic Acid (6 Nitro 1,2,4 Diazo) Amino 5- Hydroxy Naphthalene-1,7 Di Sulphonic Acid (K Acid) Nitro Benzene Meta di Nitro Benzene N-Ethyl-N-Benzyl Aniline m-sulphonic Acid (EBAMSA) Para Phenylene Di Amine (PPD) Meta Nitro Para Toludine (MNPT) Di phenyl Epsilon Acid Naphthol 8- Sulfonic Acid

3 SEAC, Gujarat: Page 3 of Naphthol 4, 8 sulfonic Acid , 5 Di Nitro Benzoic Acid (3,5 DNBA) ,5 Di Amino Benzoic Acid (3,5 DABA) ,4,5 Tri Chloro Aniline Ortho Amino Phenol Meta Nitro Chloro Benzene (MNCB) N-N Di Ethyl -m- Amino Phenol (DEMAP) P-AMINO BENZOIC ACID DI Calcium Phosphate Total The project falls under Category B of project activity 5(f) as per the schedule of EIA Notification Product wise Raw Material Consumption: Consumption in MT # Raw Materials CAS No. After MT/Tone Existing Proposed Expansion 1.0 For 2- Naphthylamine 4,6,8 tri Sulfonic acid (Sulpho G Acid) 1.1 Sulphuric Acid Oleum (65%) G-Acid Salt For 4-Nitro 2 amino phenol 6 Sulfonic acid (4 NAPSA) 2.1 Oleum (23%) PNCB Nitric Acid Caustic soda Salt NaHS For 6-Nitro 2 amino phenol 4 Sulfonic acid (6 NAPSA) 3.1 Oleum (23%) ONCB Nitric Acid Salt Caustic NaHS For 2- Amino Phenol 4- Sulfonamide (OPSAMIDE) 4.1 Chloro Sulfonic acid ONCB ONCB PSA Ammonia Caustic lye Iron Powder HCI For 1 Naphthyl amine 3,6,8 tri Sulfonic acid (KOCH ACID) 5.1 Naphthalene Sulphuric acid (98%) Oleum Nitric Acid

4 SEAC, Gujarat: Page 4 of Lime Stone Soda Ash Caustic Iron powder HCI For M-Amino Phenol (MAP) 6.1 Metanilic acid Caustic lye For 1-Naphthol 3,6 di Sulfonic acid (Violet Acid) 7.1 Naphthalene Sulphuric Acid 98% Oleum 65 % Lime Stone Sodium sulphate Caustic Flaks HCI Caustic lye For 1-Naphthol 3,8 di Sulfonic acid (EPSILONE ACID) 8.1 Oleum 65 % Sulphuric Acid (98%) Naphthalene Nitric Acid (98%) Lime Stone MgO Iron powder HCI Caustic lye Sodium Nitrite For 1- amino 8 naphthol 4,6 di sulfonic acid (European K Acid) 9.1 Naphthalene Sulphuric Acid (98%) Oleum 65 % Nitric Acid Lime stone Soda ash HCl Iron Caustic lye For 2- Naphthylamine 4,8 di Sulfonic acid (C Acid) 10.1 Naphthalene Sulphuric acid Oleum Nitric acid MgO HCl Iron Powder Caustic lye For 2 - Chloro 5 - Toludine 4 - Sulphonic acid (CLT acid) 11.1 Toluene Sulphuric acid Chlorine gas Ferric chloride Nitric acid

5 SEAC, Gujarat: Page 5 of % Dedanol OT Common salt Soda ash Iron HCl (30%) Caustic lye For 1- naphthylamine 8- hydroxy 2,4 di sulfonic acid (Chicago Acid) 12.1 Peri acid Oleum 65 % Sulphuric Acid (98%) Oleum (23%) Lime Soda Ash Caustic flaks Caustic lye HCI For 3- Amino Benzene Sulphonic acid (Metanilic Acid) 13.1 Nitro Benzene Oleum 65% Hydrated lime Soda ash CI Powder HCl Sulphuric acid For 3,3 Di Nitro Phenyl Sulphone (3 3 DDS) 14.1 Wet cake of 3,3 DDS For Meta Nitro Benzene Sulphonic acid (Resist salt) 15.1 Nitro Benzene Oleum 65% Hydrated lime Soda ash For 6-Nitro 1-Di-Azo 2-Napthol 4-sulfonic acid (6 Nitro 1,2,4 Diazo) 16.1 Caustic Lye Beta Naphthol Sodium Nitrate Sodium bi-sulfite Sulphuric acid Ice Oleum 23% Nitric acid For 4- Amino 5- Hydroxy Naphthalene-1,7 Di Sulphonic acid (K Acid) 17.1 B Naphthol Sulphuric Acid (98%) Oleum (65%) Ice Sodium Sulphate % Ammonia Sodium Bicarbonate Caustic lye For Nitro Benzene 18.1 Sulphuric acid Nitric acid Benzene

6 SEAC, Gujarat: Page 6 of Caustic soda For Meta di Nitro Benzene 19.1 Nitro Benzene , Nitric Acid Sulphuric acid Caustic lye For EBAMSA 20.1 EBA Oleum Sulphuric Acid Caustic lye For Para Phenylene Di amine (PPD) 21.1 PNA Iron HCl For Meta Nitro Para Toludine (MNPT) 22.1 P- Toluene Acetic Acid Nitric Acid Caustic lye For Di phenyl Epsilon Acid 23.1 Epsilon Acid Aniline Sulphuric Acid Naphthol 8- Sulfonic acid 24.1 Peri acid Sulphuric Acid NaNO Caustic lye For 1 Naphthol 4, 8 sulfonic acid 25.1 Peri acid Sulphuric Acid NaNO Caustic lye For 3, 5 Di Nitro Benzoic Acid (3,5 DNBA) 26.1 Benzoic Acid Sulphuric acid (98%) Nitric Acid (63%) Oleum (23%) For 3,5 Di Amino Benzoic Acid (3,5 DABA) 27.1 DNBA Iron HCl For 2,4,5 Tri Chloro Aniline 28.1 TCB Sulphuric acid Nitric acid Soda ash Iron HCl Sodium Nitrite Caustic lye

7 SEAC, Gujarat: Page 7 of For Ortho Amino Phenol 29.1 PNCB Caustic Fe HCI For Meta Nitro Chloro Benzene (MNCB) 30.1 Nitrobenzene , Chlorine Ferric Chloride Lime N-N Di Ethyl -m- Amino Phenol (DEMAP) 31.1 Matanilic acid Caustic Flakes Di Ethyl Sulphate ; Sulphuric acid For P-Amino Benzoic acid Nitro Benzoic acid Pd/C NaOH HCl H N For DI Calcium Phosphate 33.1 Rock Phosphate Spent Sulphuric Acid Lime Compliance Status of the Existing Project: S. No. Particulars Brief Information/Details Remarks 1. Earlier EC details Not Applicable Sanhi Chemicals was started in 2. Compliance of EC the year of 2010.Earlier the unit 3. Status of inspection by RO- MoEFCC, Bhopal. was known as M/S Solar Dyestuff Pvt. Limited and manufactured 4. Status of submission of half Dyes intermediates which was yearly return to concern started before We have authorities. purchased said premises in the year of 2010 along with land, plant, building and machineries and amend the existing CCA of the board. Hence, Environmental Clearance is not applicable for Existing Plant. 5. Compliance of existing CC&A We are complying with all CC&A Conditions Legal actions/closure No legal or closure order directions/scn etc. Issued issued by the board for last -- by GPCB. two years. 7. Any Public Complaints No Public Complaints Is there any litigation pending No Court Cases are before any court of Law against the Project? pending against the project --

8 SEAC, Gujarat: Page 8 of Water, Air and Hazardous Waste Management: S. No. Particulars A. Total cost of Proposed Project (Rs. in Crores): Capital cost for EMS: B. Total Plot Area (sq. meter) Existing: 4.08 Crores Proposed: 3.50 Crores Total: 7.58 Crores Existing: 0.10 Crores Proposed: 0.65 Crores Total: 0.75 Crores Details Recurring cost towards the environmental protection measures 4.10 Crores per Annum Existing: 5,000 m 2 Proposed: 0 m 2 Total: 5,000 m 2 Green belt area,/tree Plantation area (sq. meter) Existing: m 2 Proposed: m 2 Total: m 2 C. Employment Generation 1. Direct Existing: 20 Nos. Proposed: 30 Nos. Total:50 Nos. 2. Indirect Existing: Nos. Proposed: Nos. Total: Nos. D. Water i ii Source of Water Supply GIDC, Vapi Water Supply (GIDC, Bore Well, Surface water etc.) Status of permission from the concern authority. Permission issued by GIDC Vapi vide letter No. GIDC/DEE(W/S)/NA/VAPI/1285 on 09/04/2018 Water Consumption (KL/day) # Particulars Water Consumption, KLD Existing Proposed Total Remark Treated in A. Domestic septic tank/soak pit B. Industrial 1. Processing Cooling Boiler Washing Others C. Total Industrial D. Total (A+B+C) E. Condensate from MEE Net Fresh Water (D-E) ) Total water requirement for the project: 150 KLD 2) Quantity to be recycle: KLD 3) Total fresh water requirement: KLD Recycled in process iii Waste Water Generation (KL/day)

9 SEAC, Gujarat: Page 9 of 12 # Particulars Effluent generation, M 3 /day Existing Proposed Total Low High Low High Low High TDS/COD TDS/COD TDS/COD TDS/COD TDS/COD TDS/COD A. Domestic B. Industrial 1. Processing, product washing and scrubber Cooling Boiler Floor/container/equipment washing Total Industrial Total (A+B) Mode of treatment ETP - ETP MEE ETP MEE Net Discharge to CETP iv Treatment facility with capacity (ETP, CETP, MEE, STP etc) KLD ETP for Normal effluent KLD ETP for Concentrated effluent. v Mode of Disposal & Final meeting point Domestic: Domestic waste water (5.00 KLD) will be disposed-off through Septic Tank. Industrial: Total industrial Waste Water Generation will be 45.5 KLD, out of which 27.5 KLD of process water will be evaporated in proposed multi effect evaporator and balance 18 KLD of industrial effluent will be treated in existing primary & tertiary effluent treatment plant and finally treated effluent will be disposed off into CETP Vapi for further treatment and disposal into Arabian Sea. vi Reuse/Recycle details (KL/day) KLD vii Details of Rain water harvesting Shall be continued after proposed expansion B Air (Existing and Proposed) i Flue gas emission details No. of Boilers/TFH/Furnaces/DG sets etc. with capacities viz. TPH, Kcal/h, MT/h, KVA etc. - # Type of Source of Emission Stack Quantity of Name of the emissions Emission With Capacity e.g. Height Fuel MT/h & APCM fuel i.e. Air Standard Boiler (8 TPH) (meter) MT/Day Pollutants EXISTING <PM: Thermopak: I (20 Lacs K Cal) PROPOSED Steam Boiler: II 1. (2 TPH) 2. Thermopak: II (25 Lacs K Cal) 30 Coal 500 kg/h 30 Coal 400 kg/h 30 Coal 550 kg/h PM SOx NOx PM SOx NOx Multi Cyclone & Bag Filter MDC & Bag Filter Multi Cyclone & Bag Filter 3. DG Set 11 HSD 115 kg/h Adequate Stack mg/nm 3, <SOx:100 ppm <NOx: 50 ppm <PM: 150 mg/nm 3, <SOx:100 ppm <NOx: 50

10 SEAC, Gujarat: Page 10 of 12 ii v C i (500 KVA) Height ppm Process gas i.e. Type of pollutant gases (SO 2, HCl, NH 3, Cl 2, NO x etc.) (Existing and Proposed) # Particulars Existing After Proposed Expansion Remarks 1.0 Expected Pollutants from Sulphonation Reaction & Sulphonation Reaction & Oleum Storage Oleum Storage 1.1 Pollutants SO 2, SO 3 SO 2 Existing will be utilized 1.2 APC Provided Two Stage Acid followed by Two Stage Acid followed by Alkali Alkali Scrubber Scrubber 1.3 Height of vent 11 m 11 m 2.0 Expected Pollutants from --- Chlorination Reactor Two Stage Water followed by 2.1 APC Provided 0 Alkali Scrubber Proposed 2.2 Height of Vent 0 11 m 2.3 Expected Emission 0 HCl: <20 mg/m 3 Cl2: < 5 mg/m Stack attached to --- Nitrator 3.1 Pollutant 0 Nox 3.2 APC Provided 0 Two Stage Alkali Scrubber Proposed 3.3 Height of Vent 0 11 m 3.4 Expected Emission 0 NOx: <25 mg/m Stack attached to --- Amidator 4.1 Pollutant 0 NH APC Provided 0 Two Stage Water Scrubber followed by Acid Scrubber Proposed 4.3 Height of Vent 0 11 m 4.4 Expected Emission 0 NH3: <175 mg/m 3 Fugitive emission details with its mitigation measures. (Existing and Proposed) Concrete road is already developed within plot premises to avoid fugitive dust due to vehicle movement. Manufacturing activity is being/will be carried out in closed reactors/vessels and Regular checking and maintenance of the same is being/will be carried out to avoid any leakages. All the raw materials are being /will be stored in closed containers and in sealed bags and will be handled through closed system to avoid the handling losses. Hazardous Waste (As per the Hazardous and Other Wastes (Management and Tran s boundary Movement) Rules (Existing and Proposed) # Type Quantity, TPA Existing Proposed Total Disposal 1. Used Oil (Sch: I /5.1) Discarded Containers (Sch: I /33.1) Sell to registered recycler 3. Waste from ETP (Sch: I/ 35.3) Dispose off into TSDF, Vapi 4. Process Waste Sell to cement industries or (Sch: I/26.1) dispose off into TSDF, Vapi Utilize for manufacturing of 5. in-house di calcium Spent Acid (45-78%) phosphate or sell to actual (Sch: I/26.3) users under hazardous waste rules Hydro Chloric Acid (30%) Recycle in the process or sell

11 SEAC, Gujarat: Page 11 of (Sch: I/26.3) Sodium Bi Sulphite Soln. (48%) (Sch: II/B23) Ammonium Sulphite (40%) Soln. (Sch: II/B1) Sludge from Wet Scrubber (Sch: (I/37.1) Salt from MEE (Sch: I/35.3) to actual users under hazardous waste rules 2016 Sell to actual users under hazardous waste rules 2016 Sell to actual users under hazardous waste rules 2016 Dispose off into ETP/MEE for treatment Dispose off into TSDF, Vapi 11. Fly Ash Sell to Brick manufacturers Quantity of discarded containers must be in MT/Annum. ii Membership details of CETP, TSDF, CHWIF, VWEMCL certificate for CETP for acceptance of additional Common MEE etc. effluent vide letter No. CETP_Member.Certi/1944/17486 dated:21/04/2012 & Common Solid waste disposal membership No. 516 dated 21/04/2012 ii Details of Non-Hazardous waste & its disposal (MSW and others) Fly Ash 1160 TPA will be generated after expansion and sold to brick manufacturer. D i Spent Solvent Management (If any) No use of Solvent ii VOC emission sources and its mitigation measures Source: Process Reactor Raw material Handling & Storage Mitigation Measures: The raw materials will be stored in closed containers and will be handled through closed system to avoid the handling losses Reactor and solvent handling pumps will have mechanical seals to prevent leakages. Reactors shall also be provided with breather valve to prevent losses. Details of Environmental Consultants: S. No. Particulars Details i. Name of the Consultant Eco Chem Sales and Services ii. Validity of Certificate of accreditation issued by the NABET, QCI The accreditation certificate number NABET/EIA/1720/RA 051 is valid up to 3 rd February 2020 iii. Accreditation for the categories 22 sectors including 5(f) - A iv. Any other details -- Name & Designation of the Applicant: Mr. Sanjay Desai (Partner) Stamp & Signature of the Applicant:

12 SEAC, Gujarat: Page 12 of 12 Date: 20/04/2018 General Instructions: Format shall be in WORD Format (Page size-a4, Font type- Arial, Font size- 11) Provide authenticated (with stamp & Signature) hard copy during presentation. Kindly mail to: and copy to all members. Above data should be as per application Form-1 & PFR. Incorporate relevant details in respective column of the above format. Do not attach as Annexure in Format.

Kana Aroma Industries. Pre-Feasibility Report

Kana Aroma Industries. Pre-Feasibility Report Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,

More information

M/s.Aarti Industries Limited (Apple Organics Division), Vapi.

M/s.Aarti Industries Limited (Apple Organics Division), Vapi. EXECUTIVE SUMMARY M/s. Aarti Industries Limited (Apple Organics Division) first obtained CCA order 3431, issued on 16/08/2004. Further it was extended by CCA order no. AWH-73091 dated 14/09/2015 for manufacturing

More information

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month)

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month) LIST OF PRODUCTS (PROPOSED) Sr.No. Name of Product Existing Total after expansion 1 Benzyl Acetate 20 50 2 Benzyl Benzoate 20 50 3 Benzyl Alcohol 20 50 4 Benzyl Cyanide 20 50 5 Phenyl Acetic Acid 20 50

More information

SEAC, Gujarat: Page 1 of 5 SEAC, Gujarat [TOR New Projects] For TOR New Projects

SEAC, Gujarat: Page 1 of 5 SEAC, Gujarat [TOR New Projects] For TOR New Projects For TOR New Projects i 1. Basic Information of the Project: Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) SEAC, Gujarat: Page 1 of 5 SEAC, Gujarat [TOR

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

Annexure I LIST OF PRODUCTS TO BE MANUFACTURED

Annexure I LIST OF PRODUCTS TO BE MANUFACTURED Sr. No. Annexure I LIST OF PRODUCTS TO BE MANUFACTURED Name Of Product Proposed Quantity (MT/Month) 01 Allyl iso thiocynate 5.0 02 Benzhydrol 5.0 03 4-methyl cyclohexanol 5.0 04 4- methyl cyclohexanone

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

ANNEXURE-1 TERMS OF REFERENCES. TOR prescribed by MoEF & CC for this sector will be taken into account. M/s. RAMDEV CHEMICAL INDUSTRIES UNIT-(II)

ANNEXURE-1 TERMS OF REFERENCES. TOR prescribed by MoEF & CC for this sector will be taken into account. M/s. RAMDEV CHEMICAL INDUSTRIES UNIT-(II) ANNEXURE-1 TERMS OF REFERENCES TOR prescribed by MoEF & CC for this sector will be taken into account. M/s. RAMDEV CHEMICAL INDUSTRIES UNIT-(II) ANNEXURE-2 Sr. Products No. LIST OF PRODUCTS Existing Quantity

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

Telefax : 011: Dated 1 st March, 2013

Telefax : 011: Dated 1 st March, 2013 F. No. J-11011/263/2012- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 To, Shri Jigar Shah, Director M/s

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

INTRODUCTION. Installed Capacity: The total installed capacity of the plant for the product will be as per details given below:- PRODUCT:

INTRODUCTION. Installed Capacity: The total installed capacity of the plant for the product will be as per details given below:- PRODUCT: INTRODUCTION Himalaya Alkalies& Chemicals ltd will setup Caustic soda Plant of 400 MTPD. The Plant site is situated in Village Johron, Kala Amb, Tehsil Nahan, District Sirmaur, Himachal Pradesh. It is

More information

Compliance Report of EC : Compliance Status

Compliance Report of EC : Compliance Status Report of EC : S. i. Permission/recommendation shall be obtained from State Forest Department regarding Banni area, which is declared as a protected forest land ii. iii iv v GPCB vide letter no. GPCB/Unit-I/FT-

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized

More information

NATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.)

NATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.) Half yearly compliance report for the period July 2016 to Dec 2016 on the conditions specified in Environmental Clearance issued by Ministry of Environment and Forests & Climate Change. Ref: Ministry s

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report Status of Compliance of stipulated conditions of the Environment Clearance J- 01 It is noted that total water consumption will increase from 1000-1200 m 3 /day to 1200-1300 m 3 /day. Fresh water requirement

More information

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai.

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai. To, Maharashtra Maritime Board at Ferry Wharf (Bhaucha Dhakka), Nerul and Mandwa Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:April 10, 2017 Subject: Sir,

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016) Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated 06.09.2012 (Period April 2016 to September 2016) Sr. No. Conditions Compliance status A. Specific Conditions A.1 Water 1. The fresh

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

ANNEXURE I LIST OF PRODUCTS

ANNEXURE I LIST OF PRODUCTS Sr. No. ANNEXURE I LIST OF PRODUCTS Name of Products Proposed (MT/Month) 1 Dibasic Lead Phthalate 100 100 2 Lead Stearate 200 200 3 Dibasic Lead Stearate 100 100 4 Calcium Stearate 500 500 5 Zinc Stearate

More information

Subject: An application for EC amendment for (a) Reduced Production qty. & (b) Change the name of unit from Spectrum Ether Ltd to Xenon Chem LLP.

Subject: An application for EC amendment for (a) Reduced Production qty. & (b) Change the name of unit from Spectrum Ether Ltd to Xenon Chem LLP. Date: 15-09-2017 To, The Director, Ministry of Environment, forest and climate change, Indira Paryavaran Bhavan, Jor Bagh Road, New Delhi. Subject: An application for EC amendment for (a) Reduced Production

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

ZZH/CLAB-KSPCB/04/ Environmental Officer,

ZZH/CLAB-KSPCB/04/ Environmental Officer, ZZH/CLAB-KSPCB/04/ 21273 08-12-2014 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16 th Cross Near Hari Om Trust, Habbuwada

More information

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 i) Name and address of the owner / Occupier ii) Industry category Primary (STC Code) Secondary (SIC Code) PART

More information

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A 1. Name and address of the Owner / Occupier of the Industry

More information

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016 Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016 Introduction Flue Gas Desulfurization is a process of removing

More information

August 11, 2016 Unit # 02 Plot # 3405 / 3406 / 3460-A, GIDC, Ankleshwar

August 11, 2016 Unit # 02 Plot # 3405 / 3406 / 3460-A, GIDC, Ankleshwar August 11, 2016 Unit # 02 Plot # 3405 / 3406 / 3460-A, GIDC, Ankleshwar 393 002 The Director Ministry of Environment, Forests & Climate Change Western Region Office Kendriya Paryavaran Bhavan Link Road

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

FOR SPECTRUM DYES AND CHEMICALS PVT.LTD.

FOR SPECTRUM DYES AND CHEMICALS PVT.LTD. TECHNO ECONOMIC FEASIBILITY REPORT FOR EXPANSION OF DYES AND CHEMICALS MANUFACTURING UNIT AT SPECTRUM DYES AND CHEMICALS PVT.LTD. BLOCK NO-484, 502, 503-A, 504 & 505, N.H.NO.8, PALSANA-394315, DIST.: SURAT,

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

Soda Ash ( Sodium carbonate) Manufacture

Soda Ash ( Sodium carbonate) Manufacture Soda Ash ( Sodium carbonate) Manufacture Pertinent properties Mol. Wt. 106 M.P. 851deg.C. B.P. Decomposes Soluble in water 8.9 gm/100gm at 20 deg.cel. Grade s: 99% sodium carbonate washing soda ( Na 2

More information

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA)

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) Email: sv.patil@vsisugar.org.in AIDA Technical Seminar www.vsisugar.com

More information

Environment Management System in Chemical Unit-II (Pyridine & its Derivatives and Speciality Chemicals)

Environment Management System in Chemical Unit-II (Pyridine & its Derivatives and Speciality Chemicals) Environment Management System in Chemical Unit-II (Pyridine & its Derivatives and Speciality Chemicals) 1. Air Emission Management: Odour Management There will not be any specific source of air emission

More information

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION

More information

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014 COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014 S. N. Conditions Remarks 2 The Ministry of Environment and Forests has

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

The Chemical Industry and Climate Change. A Snapshot from India

The Chemical Industry and Climate Change. A Snapshot from India The Chemical Industry and Climate Change A Snapshot from India B.H. Rahill Lead Environmental Specialist South Asia Environment June 14, 2006 Presentation Outline The Indian Situation (Part of) LBNL Benchmarking

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

TiO 2 Chloride Process. Ti-Cons. Dr. Jendro and Partner - Jendro, Weiland and Partner Management Consultants

TiO 2 Chloride Process. Ti-Cons. Dr. Jendro and Partner - Jendro, Weiland and Partner Management Consultants Ti-Cons Dr. Jendro and Partner - Jendro, Weiland and Partner Management Consultants General Process Chloride Process (Base Material) Post-Treatment (TiO 2 Pigment) Page 2 Recycled Chlorine Ore, Coke Oxygen,

More information

CHLOR-ALKALI INDUSTRY

CHLOR-ALKALI INDUSTRY CHLOR-ALKALI INDUSTRY The chlor-alkali industry represents of three major industrial chemicals: Soda ash (sodium carbonate-na 2 CO 3 ) Caustic soda (sodium hydroxide-naoh) Chlorine (Cl 2 ) These chemicals

More information

FORM V Environmental Audit Report for the financial Year ending the 31st March 2016 Company Information

FORM V Environmental Audit Report for the financial Year ending the 31st March 2016 Company Information FORM V Environmental Audit Report for the financial Year ending the 3st March 206 Company Information Company Name Century Rayon Application UAN number NA Address P B. No. 22, Murbad Road Plot no Taluka

More information

INDIA PRIVATE LIMITED

INDIA PRIVATE LIMITED INDIA PRIVATE LIMITED WELCOMES YOU. An overview Since 2004. Client base of more than 600 industries in India. Working as Environmental Management partners for industries from concept to commissioning (END

More information

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division) To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

More information

Nadeem Shakir Qatar Petroleum. The 2nd Joint Qatar Japan Environmental Symposium, QP JCCP The 21st Joint GCC Japan Environmental Symposium

Nadeem Shakir Qatar Petroleum. The 2nd Joint Qatar Japan Environmental Symposium, QP JCCP The 21st Joint GCC Japan Environmental Symposium Nadeem Shakir Qatar Petroleum Scheme of Presentation General Overview of QP Refinery, Mesaieed. Challenges in Treatment Existing Waste Water Treatment Facilities Capacity Expansion and Upgradation of WWTP

More information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A Company Information Company Name : Facility Name : Person Name * : Designation * : Premise Name

More information

REVISED NATIONAL ENVIRONMENTAL QUALITY STANDARDS (NEQS)

REVISED NATIONAL ENVIRONMENTAL QUALITY STANDARDS (NEQS) REVISED NATIONAL ENVIRONMENTAL QUALITY STANDARDS (NEQS) Background PEPC in its first meeting held on 10 th May 1993 approved the NEQS. The approved NEQS were uniform standards applicable to all kind of

More information

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY S1014-0340-0008MPW NTS Rev1.doc Print Date 19 February 2009 ISSUE NUMBER 1 DATE 19/02/09 AUTHOR CHECKED MPW SMO Title Page

More information

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.) JAYPEE REWA PLANT (A Unit of Jaiprakash Associates Limited) JAYPEE NAGAR REWA (M.P.) 2012 2013 SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Rewa Plant (A unit of Jaiprakash Associates

More information

Sustainability and Environmental Issues in the Kraft Pulp Industry. Celso Foelkel

Sustainability and Environmental Issues in the Kraft Pulp Industry. Celso Foelkel Sustainability and Environmental Issues in the Kraft Pulp Industry Celso Foelkel www.celso-foelkel.com.br www.eucalyptus.com.br Sustainability Sustainability Anthropocentric-oriented concept Long term

More information

M/S HERCULES PIGMENTS PVT. LIMITED

M/S HERCULES PIGMENTS PVT. LIMITED ON PROPOSED PROJECT FOR THE MANUFACTURE OF ORGANIC AZO PIGMENTS Category 5 (f) By M/S HERCULES PIGMENTS PVT. LIMITED Located at: Plot No. 1704, Chemical Zone GIDC Notified Industrial Area, GIDC Sarigam,

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

Best Practices Adopted By Shriram Alkali & Chemicals Jhagadia To improve Energy Efficiency. Navin Jaiswal Addl General Manager DCM Shriram Ltd

Best Practices Adopted By Shriram Alkali & Chemicals Jhagadia To improve Energy Efficiency. Navin Jaiswal Addl General Manager DCM Shriram Ltd Best Practices Adopted By Shriram Alkali & Chemicals Jhagadia To improve Energy Efficiency Navin Jaiswal Addl General Manager DCM Shriram Ltd 1 The Company DCM Shriram Ltd. DCM Shriram Limited is formed

More information

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The groups cement facilities are located

More information

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure

More information

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement

More information

dated to our Unit#2 located at Plot no 3405/3406, GIDC Estate, Ankleshwar , Dist - Bharuch, Gujarat. F(.--'" ?

dated to our Unit#2 located at Plot no 3405/3406, GIDC Estate, Ankleshwar , Dist - Bharuch, Gujarat. F(.--' ? 3 t t J "..t,,. D ) \ f \ f \ - \! \Eftzvc'2ototrr 6 Aug, 2Ol2 United Phosphorus Limited 3l{t5tl4c. GrDG-.AEr 3fit 002, Guiaat (lndia) Ptut : (1116,5125O5ilA 2flXtdl Fax : (02646) 25143'f Dr. A Mehrotra,

More information

Pre Feasibility Report

Pre Feasibility Report Pre Feasibility Report For 20 MLD Common Effluent Treatment Plant (ZLD) With Recycling of Treated Waste Water For Textile Processing Industries At TDK Green Enviro Private Limited Village Tadkeshwar, Taluka

More information

Bhushan Steel Limited 1. Name & Address of the owner/occupier of the industry, operation or process

Bhushan Steel Limited 1. Name & Address of the owner/occupier of the industry, operation or process Environment Audit Statement FORM V (See rule 14 of The Environment Protection Act, 1986) Environmental Audit Report for the financial year ending the 31st March 2017. PART A General Information Name of

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct 2016 to March 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/472/2010- IA II (I) dated 11 th September,

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

(Period Apr. 17 to Sept. 17) No. A.1 SPECIFIC CONDITION. Agreed

(Period Apr. 17 to Sept. 17) No. A.1 SPECIFIC CONDITION. Agreed COMPLIANCE OF CONDITIONS GIVEN IN ENVIRONMENT CLEARANCE (No. : SEIAA/GUJ/EC/5(f)/228/2016 dated 31/03/2016) FOR SETTING UP NEW 40000 MTPA MELAMINE PLANT WITHIN THE EXISTING COMPLEX Sr. Conditions No. A.1

More information

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics Multilateral Investment Guarantee Agency Environmental Guidelines for Coke Manufacturing Industry Description and Practices Coke and coke by-products (including coke oven gas) are produced by the pyrolysis

More information

Module: 9 Lecture: 39

Module: 9 Lecture: 39 Module: 9 Lecture: 39 AMMONIUM CHLORIDE INTRODUCTION Ammonium chloride (NH4Cl) is white crystalline salt highly soluble in water. Solutions of ammonium chloride are mildly acidic. Sal ammoniac is a name

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

NOx processing experiences for removal in the CO 2 plant for the Oxyfuel combustion process

NOx processing experiences for removal in the CO 2 plant for the Oxyfuel combustion process NOx processing experiences for removal in the CO 2 plant for the Oxyfuel combustion process Roland Ritter, Torsten Stoffregen, Linde Engineering Dresden GmbH Nicole Schödel, Florian Winkler, Linde Engineering

More information

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE EC letter no. J-11011/79/2007-IA II (I) Dated 16.04.2009 A. Specific Conditions : SN Condition Compliance 1. Continuous stack monitoring facilities to monitor

More information

technical information

technical information CHEMICAL RESISTANCE TABLES Version: 19-08-10 ADD Resins and Chemicals (Pty) Ltd Distribute a comprehensive range of unsaturated polyester resins for chemical resistance applications. The resins recommended

More information

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29) 1 By: Speed-Post State Level Expert Appraisal Committee (Formed as per S.O. no. 1533 dated 14 th Sept 2006 of Government of India, Ministry of Environment & Forests) PARYAWARAN PARISAR, E-5, ARERA COLONY,

More information

Himachal Pradesh State Pollution Control Board,

Himachal Pradesh State Pollution Control Board, Cost of Form Rs.15/ (To be paid along with Consent Fee) Himachal Pradesh State Pollution Control Board Him Parivesh, Phase III, New Shimla 171009, HP. Form I [See Rule 27] Application for Consent to Establish/Operate/Renewal

More information

GENERAL COMPANY FOR CHEMICAL INDUSTRIES

GENERAL COMPANY FOR CHEMICAL INDUSTRIES GENERAL COMPANY FOR CHEMICAL INDUSTRIES A PANORAMIC VIEW OF GCCI INTRODUCTION TO GCCI The construction of the GCCI at Abu Kammash is one of the largest industrial projects carried out in the LIBYAN Jamahiriya.

More information

Improvements in Pollution Management Vapi Industrial Estate

Improvements in Pollution Management Vapi Industrial Estate Improvements in Pollution Management Vapi Industrial Estate August 2009 Background Vapi is a highly successful industrial estate in Gujarat, India. Developed by Gujarat Industrial Development Corporation

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (BUILT UP AREA: 77420.15 SQ. M) BY AMC EWS HOUSING PROJECT RESIDENTIAL BUILDING & COMMERCIAL PROJECT F. P. NO. 174, T.P. NO. 32, GOTA,

More information