1 TOWNSHIP OF SPRINGWATER MIDHURST - WATER, WASTEWATER & TRANSPORTATION CLASS ENVIRONMENTAL ASSESSMENT PHASE 3 & 4 January 7, 2015 Education Meeting 1

2 Overview of Presentation Overview of the Class Environmental Assessment Process (Slides 3 to 7) Summary of the Phase 1 & 2 Master Plan (Slides 7 to 14) Overview of the Phase 3 & 4 Class EA (Slides 15 16) Update on Water (Slides 17 19) Update on Wastewater (Slides 20 24) Update on Transportation (Slides 25 30) Future Steps within the Class EA (Slides 31 34) Overview of Stormwater Drainage Study (Slide 35 37) Questions 2

3 Overview of the Class EA Process Infrastructure Projects undertaken by a Proponent (Municipality or Developer) vary in their environmental impacts and are classified into one of the four (4) different Schedules within the Class EA process as follows: Schedule A Generally includes normal or emergency operational and maintenance activities; The environmental effects are usually minimal and they are therefore, are pre-approved; Schedule A+ These projects are pre-approved, however, the public is to be advised prior to project implementation. The manner in which the public is advised is determined by the proponent; Schedule B Generally includes improvements and minor expansions to existing facilities where is the potential for little adverse environmental impacts and therefore the proponent is required to proceed through a screening process including consultation with those who may be affected; Schedule B projects are required to follow Phase 1 & 2 of the Class EA process; Schedule C Generally includes new facilities and major expansions to existing facilities and these projects proceed through Phase 1, 2, 3 & 4 of the Class EA process; 3

4 Overview of the Class EA Process Key milestones throughout the Class EA process Phase 1 is identification and definition of the Problem; Phase 2 is identification and evaluation of Alternative Solutions and the recommendation of a Preferred Solution and involves a minimum of one Public Meeting; Alternative Solutions must consider a reasonable range of alternatives and must fully address the Problem; Public Contact involves Consultation with Review Agencies, First Nations & the Public and are held at strategic points in the process; The Class EA process also provides for completion of Master Plans which complete all or part of the Class EA process for specific projects; 4

5 Overview of the Class EA Process Key milestones throughout the Class EA process (Contd.) Phase 3 involves the identification and evaluation of Design Alternatives for the Preferred Solution and involves a minimum of one Public Meeting; Phase 4 involves documenting the outcome of the project in an Environmental Study Report (ESR), and involves Public Contact and a 30 day Public Review period. The ESR must present a systematic evaluation of all identified alternatives and detailed documentation of all decisions and all public contacts; During the 30 day Public Review period if an interested party has a concern with the Class EA, that cannot be resolved with the proponent, they can request the Minister of the Environment (MOE) for a Part II Order (formerly called a Bump-Up Request); 5

6 Overview of the Class EA Process Key milestones throughout the Class EA process (Contd.) When a Part II Order is received, MOE take control of the process and MOE staff will conduct a comprehensive review of the concerns raised by the interested party; Subsequent to the comprehensive review by MOE Staff the Minister will render a decision on the Class EA, that is binding on all parties; 6

7 Overview of the Class EA Process 7

8 Phase 1 & 2 Master Plan In 2008 the Township initiated the Phase 1 & 2 Master Plan for the Midhurst Secondary Plan Area. The purpose of this study was to identify water, wastewater and transportation solutions to accommodate the existing development and proposed growth as identified in the Midhurst Secondary Plan; A Notice of Study Commencement was published in the local newspapers on June 14 and June 21, 2008 and sent to appropriate review Agencies; A Notice of Public Information Centre (PIC) was advertised on August 15, 2008 and held on August 28, 2008 at the Midhurst United Church, in conjunction with the Secondary Plan Public Meeting; The Phase 1 & 2 Master Plan document was available for the 30 day Public review period from July 9, 2009 to August 10, 2009; 8

9 Phase 1 & 2 Master Plan PREFERRED - WASTEWATER COLLECTION, TREATMENT & DISPOSAL SOLUTION New Wastewater Treatment facility in the vicinity of Carson Road & Wilson Drive with a discharge to Willow Creek on Golf Course Road (north of Hwy 26) (OPTION G) Schedule C Projects One Wastewater Treatment Plant to be located in the vicinity of the Carson Rd & Wilson Drive area. The treatment process is to be determined in Phase 3 & 4; Proposed Wastewater Treatment Plant to be modular, allowing for phased development and servicing of existing Midhurst area; Sewage Pump Stations as required with Manifolded forcemain connections; The effluent will be discharged to Willow Creek in the area of Golf Course Road and Hwy 26; Infrastructure can be phased with development. 9

10 Phase 1 & 2 Master Plan PREFERRED - WATER TREATMENT, STORAGE & DISTRIBUTION SOLUTION Develop New Municipal Wells along Russell Road with two (2) inground storage reservoirs within proposed Developments (OPTION F) Due to the new regulations since 2008/09, (the Clean Water Act and in particular the Source Water Protection Guidelines) the six wells that were proposed along Russell Road in Phase 1 & 2 have been reevaluated as part of the Phase 3 and these will be discussed in more detail later in this presentation. 10

11 Phase 1 & 2 Master Plan PREFERRED TRANSPORTATION SOLUTION This option includes new infrastructure and reconstruction/upgrade of existing two-lane roads to provide auxiliary lanes (Option 6) Schedule C Projects A new partial interchange at Pooles Road on Highway 400 providing movements to and from south; A new extension of Craig Road to County Road 27 as a two-lane road with auxiliary turn lanes, as required; Widening of Wilson Drive (from Snow Valley Road to City of Barrie) to a four-lane road (as identified by Simcoe County). Schedule B Projects A new extension of St. Vincent Street to Wattie Rd to Doran Rd; Widening of St. Vincent Street (south of Pooles Road) with an auxiliary turn lane, as required; Widening of Snow Valley Road between Hwy 26 & Wilson Drive with auxiliary turn lanes, as required; Widening of County Road 27 (from north of Highway 26 to Horseshoe Valley Road) to a fourlane road (as identified by Simcoe County); and Reconstruction of the following existing Roads (to two lanes) Walt Road, Old Second Road (between Walt Road and Pooles Road), Pooles Road, Doran Road, Finlay Mill Road, Carson Road and Anne Street 11

12 Phase 1 & 2 Master Plan PREFERRED - TRANSPORTATION SOLUTION 12

13 Phase 1 & 2 Master Plan The Master Plan was made available for the mandatory 30 day Public Review Period from July 9 to August 10, 2009; During this 30 day Review Period no Part II Orders (Bump Ups) were received and therefore the Phase 1 & 2 Master Plan was completed. With the completion of the Phase 1 & 2 Master Plan the following is a summary of the Schedule B projects that are complete and the Schedule C projects that require additional study through Phases 3 & 4 of the Class EA process: SCHEDULE B PROJECTS that are now Approved and could proceed to Construction: 2-lane re-construction of Gill Road from Craig Road to Doran Road 2-lane new construction of St Vincent Street from Doran Rd to Wattie Rd 2-lane re-construction of Forbes Road from Old Second Rd to Russell Rd 4-lane new construction of County Road 27, from existing 4-lane to new Craig Road extension 13

14 Phase 1 & 2 Master Plan SCHEDULE C PROJECTS that require additional study through Phases 3 & 4 of the Municipal Class EA process: New water system including new wells, treatment works and water distribution system; New sewage system including sewers, treatment plant and outfall to Willow Creek; New interchange at Pooles Road with Highway 400; 2-lane new construction of Craig Road from Russell Road to County Road 27; 4-lane new construction of Wilson Drive from Snow Valley Road to Barrie City Limits. 14

15 Class EA Phase 3 & 4 In 2013 the Township initiated the Phases 3 & 4 Class EA associated with the Midhurst Secondary Plan Area; Recognizing that public consultation would be a key component of this Class EA, the Township requested that an enhanced public consultation process be arranged including the formation of a Resident Liaison Group, hosting two Open Houses, a Public Information Centre and Newspaper advertisements throughout the completion of the Class EA; The Notice of Study Commencement, which formally advises interested parties that the Township was initiating Phase 3 & 4 Class EA process, was advertised in the local newspapers, posted on the Township website and ed to interested parties. This Notice also invited interested parties to advise the Township if they wish to be added to the mailing list for all future Class EA Notices; 15

16 Class EA Phase 3 & 4 The first Open House was held on May 29, 2013 at the Township Administration Centre. This Open House, attended by approximately 70 members of the public, was an informal drop in format during which time the applicable documentation from the Phase 1 & 2 Class EA (Master Plan) was on display along with representatives of the Project Team to answer questions in small groups or in a one-on-one format. Subsequent to the Open House a number of the detailed background Studies continue to be worked on and will be discussed in more later in this presentation. 16

17 Water Update Class EA Phase 3 & 4 To accommodate the full build-out of the Midhurst Secondary Plan, approximately 200 Litres per second (2,640 Igpm) of new Municipal Well capacity will be required; As a result of the Clean Water Act and in particular the Source Water Protection Guidelines, the potential Wells sites identified in the Phase 1 & 2 have been re-evaluated to ensure that they do not conflict with these; The latest well drilling program, which has been ongoing since early 2014 is nearing completion and identifies four potential well sites, with sufficient capacity for the MSP, as noted below, whereby 1 or 2 municipal wells could be developed at each site: The Alliance property north of Dobson Rd; The Coutts property south of Pooles Rd and east of Russell Rd; The McColgen pit on Snow Valley Rd, east of Wilson Dr; The Snow Valley area, west of the ski resort; 17

18 Class EA Phase 3 & 4 Water Update (Contd.) Following the completion the well drilling program, we will be reevaluating alternatives for the location(s) for the Water Treatment Facility, Storage Reservoirs, Pumping Stations and Trunk Watermains; These evaluations will include social and environmental impacts as well as estimated capital and operating costs; After the completion of these evaluations, Recommended Design Solutions will be identified, along with Staging Plans, for the: Water Treatment Facility (including the treatment process). Storage Reservoirs & Water Pumping Stations. Trunk Watermains (including specific routes). This information will then be presented at the Phase 3 Public Information Centre (PIC) for review and comment. 18

19 Class EA Phase 3 & 4 Wastewater Update The Wastewater Treatment Plant required to accommodate the full build out of the Midhurst Secondary Plan will have an Average Daily Flow of 12,314 m 3 /day (142 Litres per second); During the development of the Draft Plan Conditions in 2014, an extensive number of meetings were held with the Nottawasaga Valley Conservation Authority (NVCA) on key items that impact both Stormwater and Wastewater; Subsequent to these meetings the NVCA and the Township confirmed detailed criteria relating to the approval of the proposed Developments. One of these criteria states that: There shall be no cumulative net-increase in nutrient loading (Phosphorus) downstream of both the land development and the Wastewater Treatment Plant (WWTP). 19

20 Class EA Phase 3 & 4 Wastewater Update (Contd.) To ensure that there will be no net-increase in Phosphorus loading to Willow Creek, will require the implementation of the following: Extensive Low Impact Development (LID) measures throughout the proposed Developments that will aim to infiltrate the first 25 mm of stormwater runoff; Application of Best Available Technology (BAT) at the Wastewater Treatment Plant to achieve ultra low levels of Phosphorus (0.03 to 0.05mg/L) in the effluent discharge; Phosphorus Offsetting programs, administrated by the NVCA, whereby improvements would be undertaken, throughout the watershed, to reduce the Phosphorus loading to the creek. A similar program has recently been approved by the Ministry of Environment in the Town of New Tecumseth for the Tottenham Wastewater Treatment Plant and will be administrated by the NVCA. 20

21 Class EA Phase 3 & 4 Wastewater (Contd.) Willow Creek has a Total Phosphorus concentration of mg/l and is therefore considered a Policy 2 receiver as the Total Phosphorus exceeds MOE s Provincial Water Quality Objective (PWQO) of 0.03 mg/l; Between 2007 & 2013 the average yearly Total Phosphorus load for this section of Willow Creek was 2,710kg with a high of 3,433kg in 2008; For the proposed Effluent discharge point (Willow Creek at Golf Course Rd & Hwy 26) extensive flow monitoring has been completed over the past 9 years to determine the 7Q20 flow (the 7 day average low flow with an expected 20 year return period); Based on the 9 years of available flow data and meetings with the Ministry of Environment and NVCA, a value for 460 Litres per second has been determined as the 7Q20 flow for this section of Willow Creek; 21

22 Class EA Phase 3 & 4 Wastewater Update (Contd.) A Preliminary Phosphorus Budget for the Midhurst Secondary Plan Area has been prepared and identifies that: The proposed development lands within the MSP, in their Pre- Development condition, discharge approximately 144kg of Phosphorus annually to Willow Creek; The proposed development lands within the MSP, in their Post- Development condition, with the implementation of Low impact Development measure s will discharge approximately 69kg of Phosphorus annually to Willow Creek (excluding the Wastewater Treatment Plant); The Wastewater Treatment Plant, at full build-out, will discharge a maximum of 135kg of Phosphorus to Willow Creek (assuming a 0.03mg/L concentration); 22

23 Class EA Phase 3 & 4 Wastewater Update (Contd.) The Preliminary Phosphorus Budget also notes that: After full build out of the MSP, there will be an annual discharge of approximately 204 kg ( ). This is approximately 60kg more than currently being discharged ( ). Therefore it is proposed to implement an offset program with approximately 60kg of phosphorus offsetting. In other jurisdictions the offsetting has been at a between at 2:1 or 4:1 ratio. If that was the case for Midhurst, the required offsetting would need to be between 120 kg and 240 kg. Preliminary Studies show there are Offsetting opportunities within the Willow/Matheson Creek watershed for the removal of up to 560kg of Phosphorus annually. 23

24 Class EA Phase 3 & 4 Wastewater Update (Contd.) Following the completion the assimilative capacity report and recommendations for effluent requirements, we will be evaluating design alternatives for the Wastewater Treatment Plant, Pumping Stations and Trunk Forcemains; These evaluations will include social and environmental impacts and estimated capital and operational costs; After the completion of these evaluations, Recommended Design Solutions will be identified, along with Staging Plans, for the: Wastewater Treatment Plant (including proposed treatment processes and effluent discharge criteria). Pumping Stations & Trunk Forcemains (including specific routes). Effluent Discharge point on Willow Creek. This information will then be presented at the Phase 3 Public Information Centre (PIC) for review and comment. 24

25 Transportation Update Craig Road Extension Class EA Phase 3 & 4 The Phase 1 & 2 Class EA identified the need for the extension of Craig Road from Russell Road to County Road 27; 25

26 Transportation Update Craig Road Extension Class EA Phase 3 & 4 A number of alternative alignments have been developed for Craig Road and subject to further refinement these will be presented at the Phase 3 PIC; All alternatives will require the purchase of property from the end of the existing unopened road allowance to County Rd 27 (approximately 600m); Unlike the other Water, Wastewater and Transportation infrastructure required by the Midhurst Secondary Plan, the extension of Craig Road has been included in the current Township s Development Charges, therefore the Township will have full control over the timing of Craig Road Extension. 26

27 Class EA Phase 3 & 4 Transportation Update (Contd.) Hwy 400/Pooles Road Partial Interchange During meetings with Ministry of Transportation (MTO) regarding the Hwy 400/Pooles Road Partial Interchange in 2014, the MTO requested that a Needs and Justification Traffic Analysis, specifically related to the Interchange, be prepared and submitted to MTO; This report was prepared and submitted to MTO in the fall of 2014; Follow-up meetings and discussions will be held with MTO in the coming weeks/months regarding this report and other pertinent issues related to the EA; Wilson Drive (Snow Valley Road to Barrie City Limits) A number of alternative cross-sections have been developed for Wilson Drive (Snow Valley Road to Barrie City Limits) and subject to their further refinement and meetings with the County of Simcoe these will be presented at the Phase 3 PIC; 27

28 Transportation Update (Contd.) Class EA Phase 3 & 4 Roundabouts A Study is ongoing regarding the evaluation of potential locations for the implementation of Roundabouts within the Midhurst Secondary Plan area; Roundabouts, in certain situations, have been shown to effectively improve safety, reduce traffic speeds and delay times, increase traffic capacity, mitigate environmental impacts associated with idling and stopand-go traffic movements, have lower maintenance costs, and can be aesthetically pleasing; A total of 11 intersections external to the proposed development areas are being analyzed for possible roundabouts, based on locations that were identified in the Phase 1 & 2 Class EA as requiring signal or intersection improvements; 28

29 Class EA Phase 3 & 4 Transportation Update (Contd.) Diagram showing the 11 Intersections being analyzed for possible roundabouts 29

30 Transportation Update (Contd.) Class EA Phase 3 & 4 Following the completion the background reports we will be evaluating the details associated with the alternatives for each required section of road; These evaluations will include social and environmental impacts and estimated capital and operational costs; After the completion of these evaluations, Recommended Alternatives will be identified, along with Staging Plans; This information will then be presented at the Phase 3 Public Information Centre (PIC) for review and comment. 30

31 Future Class EA Steps Class EA Phase 3 & 4 Arrange future EA Steering Committee and Resident Liaison Committee Meetings, to keep all parties informed; Continue preparing and finalizing the background studies and the evaluations of all Water, Wastewater & Transportation Alternatives; Host the Phase 3 Public Information Centre. A formal Notice would be advertised in the local newspapers and posted on the Township website, advising of the Public Information Centre. At this Public Information Centre, the Project Team will present the findings of the Phase 3 including the evaluation criteria along with the Recommended Water, Wastewater & Transportation Alternatives. It is currently anticipated that this Public Information Centre could be held in late spring / early summer of Review and respond to comments received after the Public Information Centre; 31

32 Class EA Phase 3 & 4 Future Class EA Steps (Contd.) Continue with the evaluations of all Alternatives, taking in consideration any comments received as a result of the Phase 3 Public Information Centre; Prepare a Draft of the Environmental Study Report (ESR) and submit to the Ministry of the Environment for their internal review; Subsequent to receipt of comments from the MOE, update the Environmental Study Report (ESR); Publish a Notice of Study Completion - This Notice which would be advertised in the local newspapers and posted on the Township website, will advise interested parties that the DRAFT Environmental Study Report (ESR) is being placed in the public record for the formal 30 day public review period and invite interested parties to submit comments during the 30 days. 32

33 Class EA Phase 3 & 4 Future Class EA Steps (Contd.) In conjunction with the Notice of Study Completion and the 30 day public review period, an Open House will be held, whereby the Project Team will present the findings of the DRAFT Environmental Study Report (ESR). It is currently anticipated that this Open House and the associated 30 day Public Review period will be held in late 2015 / early If any requests for Part II Orders (Bump Ups) are received during the 30 day public review period, that cannot be resolved, the Ministry of the Environment become involved and take over the process until a decision is issued by the Minister. 33

34 Class EA Phase 3 & 4 Estimated Schedule for Completion of EA Note: All dates are approximately only and subject to change. 34

35 Overview of the Stormwater Drainage Study Independent of the Class EA process, in 2014 the Township in conjunction with the Nottawasaga Valley Conservation Authority (NVCA) initiated the completion of a Stormwater Drainage Study associated with the proposed developments within the Midhurst Secondary Plan area. The purpose of the Stormwater Drainage Study is to assist in achieving protection of natural features and protection from natural hazards, for the proposed development. It will develop performance benchmarks to ensure the Stormwater Drainage Study is sustainable throughout the life cycle of the development, resulting in a project, which can meet Township servicing needs with minimal disruption to the existing residents, business owners and to the natural environment; 35

36 Overview of the Stormwater Drainage Study In the initial stages of the Stormwater Drainage Study the following criteria were developed. These criteria would have to be met for all developments within the Midhurst Secondary Plan area. 1. There shall be no net-increase in nutrient loading downstream from both the land development and the Wastewater Treatment Plant (WWTP). The loading from the WWTP is to be prorated back to each of the development lands for mitigation; 2. At each outlet there would be no increase in peak flow for all storms event from the 2 year through the 100 year, 4 hour Chicago and 24 hour SCS storms; 3. At each outlet there would be no increase in the volume of post development runoff from the pre development runoff; 4. Demonstrate the ability of the Stormwater Management system to hold back the 25 mm storm runoff for 48 hours; 36

37 Overview of the Stormwater Drainage Study 5) Infiltrate as much water back into the ground as possible aiming for the first 25 mm of runoff; 6) Provide conceptual information on how each Stormwater Management Pond outlet is conveyed to a suitable outlet assessing the impacts of diversions; 7) Through the ecological review, develop temperature standards for Stormwater Management Pond discharges based on the existing aquatic ecosystem or improvements to the aquatic systems; 8) Present an adaptive management plan and how the results of the monitoring are implemented. The anticipated timeline for the completion of the Stormwater Drainage Study is by late 2015/early

38 QUESTIONS? 38

Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan

Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan Public Meeting and Open-House March 27, 2013 Agenda The Master Plan Process History of the Area Draft Servicing Strategy

More information

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights

More information

Ottawa-Trussler Area Sewage Facility Class Environmental Assessment

Ottawa-Trussler Area Sewage Facility Class Environmental Assessment Welcome to the Ottawa-Trussler Area Sewage Facility Class Environmental Assessment Public Open House May 7, 2013 September 25, 2013 Welcome The purpose of this second Public Open House is to: Present the

More information

Sewer System Flood Reduction Measures in the Rockcliffe Area

Sewer System Flood Reduction Measures in the Rockcliffe Area PW28.6 REPORT FOR ACTION Sewer System Flood Reduction Measures in the Rockcliffe Area Date: March 26, 2018 To: Public Works and Infrastructure Committee From: General Manager, Toronto Water Wards: Ward

More information

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services)

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services) DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services) FEBRUARY, 2005 PLANNING AND TRANSPORTATION SERVICES PLANNING AND PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS Introduction 1 Application Review 1.1

More information

Ministry of the Environment and Climate Change. Transfer of Review. Presentation for Wastewater Practitioners Group.

Ministry of the Environment and Climate Change. Transfer of Review. Presentation for Wastewater Practitioners Group. Ministry of the Environment and Climate Change Transfer of Review Presentation for Wastewater Practitioners Group November 29, 2017 Outline of Presentation Transfer of Review (TOR) Program Context TOR

More information

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto.

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto. This document was put together following the fourth round of public consultation for the Class Environmental Assessment study for this Project. In June 2011, the Project Team consulted with stakeholders

More information

Master Environmental Servicing Plan and Secondary Plan

Master Environmental Servicing Plan and Secondary Plan East Side Lands Stage 2 Master Environmental Servicing Plan and Secondary Plan Public Consultation Centre (PCC) December 5, 2016 Today s Agenda 6:00 pm 6:30 pm: Open House 6:30 pm 7:00 pm: Presentation

More information

WELCOME! Please sign in so we can keep you updated on the study

WELCOME! Please sign in so we can keep you updated on the study The City of Peterborough Chemong Road/Reid Street Widening Class Environmental Assessment (Schedule C) Public Information Centre #2 March 20, 2012 Northminster United Church WELCOME! Please sign in so

More information

GRAND NIAGARA Proposed Secondary Plan

GRAND NIAGARA Proposed Secondary Plan GRAND NIAGARA Proposed Secondary Plan Public Open House #3 January 17. 2017 scope + process BUILT Grand Niagara Secondary Plan The Grand Niagara Secondary Plan will establish a framework for the future

More information

Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study

Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study Welcome to the Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study September 23, 2009 Please Sign In and take an Information Brief

More information

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1 Municipal Class Environmental Assessment Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1 Date: Thursday, June 20, 2013 Time: 6:30 p.m. 8:30 p.m.

More information

OFFICIAL PLAN AMENDMENT AND SCHEDULE C CLASS ENVIRONMENTAL ASSESSMENT

OFFICIAL PLAN AMENDMENT AND SCHEDULE C CLASS ENVIRONMENTAL ASSESSMENT ROBERT FERRIE DRIVE OFFICIAL PLAN AMENDMENT AND SCHEDULE C CLASS ENVIRONMENTAL ASSESSMENT Presentation to Planning and Strategic Initiatives Committee June 9 th, 2014 1 Background Official Plan requires

More information

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System Welcome to the NIAGARA REGION Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Please

More information

COLE ENGINEERING GROUP LTD.

COLE ENGINEERING GROUP LTD. CITY OF MARKHAM PROJECT FILE Stormwater Management Facilities Retrofit Municipal Class EA ES12-0316 COLE ENGINEERING GROUP LTD SEPTEMBER 2015 [ Month Year ] HEAD OFFICE 70 Valleywood Drive Markham, ON

More information

Proposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report

Proposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report 453211 Ontario Ltd. Proposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report Prepared by: AECOM 55 Cedar Pointe Drive, Suite 620 705 721

More information

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

APPENDIX L Hydrology and Stormwater Pond Analysis

APPENDIX L Hydrology and Stormwater Pond Analysis APPENDIX L Hydrology and Stormwater Pond Analysis This page is left intentionally blank. Hydrology and Stormwater Pond Analysis Liesch Associates, Inc. June 1, 2012 Minneapolis-St. Paul International Airport

More information

STORMWATER POLLUTION PREVENTION PLAN

STORMWATER POLLUTION PREVENTION PLAN STORMWATER POLLUTION PREVENTION PLAN TOWN OF WHITE BEAR, MINNESOTA Date: May 31, 2006 Project No. 13597.000 White Bear Township Storm Water Pollution Prevention Plan BMPS Following are the BMPs included

More information

DEVELOPMENT AND INTERFERENCE WITH WETLANDS AND WATERCOURSES REGULATION - POLICIES AND PROCEDURES MANUAL For Planning Act Applications

DEVELOPMENT AND INTERFERENCE WITH WETLANDS AND WATERCOURSES REGULATION - POLICIES AND PROCEDURES MANUAL For Planning Act Applications DEVELOPMENT AND INTERFERENCE WITH WETLANDS AND WATERCOURSES REGULATION - POLICIES AND PROCEDURES MANUAL For Planning Act Applications REVISED JANUARY, 2017 (administrative edits) Executive Board Motions

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF Mutchmor Public School Addition 185 Fifth Avenue Ottawa, Ontario Report No. 12073-SB February 15, 2013 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage

More information

CITY OF POWELL RIVER LIQUID WASTE MANAGEMENT PLAN - STAGE 3

CITY OF POWELL RIVER LIQUID WASTE MANAGEMENT PLAN - STAGE 3 CITY OF POWELL RIVER LIQUID WASTE MANAGEMENT PLAN - STAGE 3 DRAFT 8 APRIL 2015 D-21300.84 LIMITATIONS AND DISCLOSURE This document has been prepared by Opus DaytonKnight Consultants Ltd. ( Opus DK ) for

More information

WELCOME. Please sign in Representatives are available to answer questions Please complete a comment sheet

WELCOME. Please sign in Representatives are available to answer questions Please complete a comment sheet WELCOME Please sign in Representatives are available to answer questions Please complete a comment sheet Place it in the box or send it to the Consultant undertaking the study or to the Town of Wasaga

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

MOUNTVIEW WASTEWATER TREATMENT PLANT AND HUNTSVILLE SEWAGE WORKS UPGRADES

MOUNTVIEW WASTEWATER TREATMENT PLANT AND HUNTSVILLE SEWAGE WORKS UPGRADES Schedule C Municipal Class Environmental Assessment ` MOUNTVIEW WASTEWATER TREATMENT PLANT AND HUNTSVILLE SEWAGE WORKS UPGRADES PUBLIC INFORMATION CENTRE #1 February 24, 2014 Welcome Please sign in, review

More information

City of Brantford Water Pressure District #1 Storage Class Environmental Assessment Study. Council Presentation - April 19, 2016

City of Brantford Water Pressure District #1 Storage Class Environmental Assessment Study. Council Presentation - April 19, 2016 City of Brantford Water Pressure District #1 Storage Class Environmental Assessment Study Council Presentation - April 19, 2016 Project Chronology Class EA Process Schedule B Timing Phase 1 Problem or

More information

Sustainable Halton Water & Wastewater Master Plan. Public Information Centre #1

Sustainable Halton Water & Wastewater Master Plan. Public Information Centre #1 Sustainable Halton Water & Wastewater Master Plan Public Information Centre #1 Welcome to Public Information Centre #1 Please sign in on the sheet provided. Our representatives will be pleased to discuss

More information

The Effluent Permitting Process under the Environmental Management Act. An Overview for Mine Project Applicants

The Effluent Permitting Process under the Environmental Management Act. An Overview for Mine Project Applicants The Effluent Permitting Process under the Environmental Management Act An Overview for Mine Project Applicants APRIL 2013 Disclaimer This document does not replace the Environmental Management Act or its

More information

INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE. Needs and Potential Solutions Public Information Centre No. 1 November 14, 2017

INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE. Needs and Potential Solutions Public Information Centre No. 1 November 14, 2017 INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE Needs and Potential Solutions Public Information Centre No. 1 November 14, 2017 1 MSP Update Key Objectives Short and long-term strategies to

More information

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1 TRANSPORTATION IMPACT STUDY (TIS) GUIDELINES FOR DEVELOPMENT APPLICATIONS Transportation and Works Department The Regional Municipality of York 17250 Yonge Street Newmarket, Ontario L3Y 6Z1 August, 2007

More information

3.0 Planning and Submittal Requirements

3.0 Planning and Submittal Requirements October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)

More information

10 Inflow and Infiltration Reduction Strategy Update

10 Inflow and Infiltration Reduction Strategy Update Clause 10 in Report No. 4 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on March 24, 2016. 10 Inflow and Infiltration

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

New Castle County, DE. Floodplain Regulations

New Castle County, DE. Floodplain Regulations New Castle County, DE Floodplain Regulations John J. Gysling, PE CFM Department of Land Use New Castle County, DE February 26, 2009 Today s Presentation Floodplain Protection and Uses Terms and Definitions

More information

Public Information Centre No. 2

Public Information Centre No. 2 Public Information Centre No. 2 Wednesday April 20, 2011 4:00 pm to 7:00 pm City of Welland City Hall Area 2 Welland, Pelham, and Port Colborne Welcome to Public Information Centre No. 2 Please sign in

More information

Ten Steps to Implementing ROW LID

Ten Steps to Implementing ROW LID connecting drops the Ten Steps to Implementing ROW LID UTRCA Symposium Low Impact Development: Opportunities for Municipalities Implementing LID on a Watershed Basis and Making a Difference: A 10 Step

More information

Interchange Workshop Report (August 2004)

Interchange Workshop Report (August 2004) U.S. Highway 14 Corridor Study New Ulm to North Mankato Table of Contents Section Interchange Workshop Report (August 2004) Page 1. Introduction and Next Steps 1 2. Interchange Workshop Participants &

More information

Kanata West Overall Monitoring Plan

Kanata West Overall Monitoring Plan Kanata West Overall Monitoring Plan Background On November 24, 2009 the Ministry of Environment advised that the City of Ottawa (City) and the Kanata West Owner s Group (KWOG) had satisfied the requirements

More information

SPRINGBANK Phase 1 Background Report

SPRINGBANK Phase 1 Background Report Phase 1 Background Report Table of Contents 1.0 CONTEXT... 4 CENTRAL ASP... 4 NORTH ASP... 4 MODDLE ASP... 5 2.0 PROJECT SCOPE... 5 3.0 PLANNING POLICY FRAMEWORK... 6 COUNTY PLAN (BYLAW C-7280-2013)...

More information

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM I-15 South, MP 0 to MP 16 Environmental Assessment Public Hearing August 7, 2012 5:00 PM to 7:00 PM 1 PROJECT OVERVIEW The Federal Highway Administration (FHWA) and the Utah Department of Transportation

More information

Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation

Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation Ohio Water Environment Association 2016 Technical Conference & Expo June 29, 2016 Objective To create a Stormwater

More information

Cork Lower Harbour Main Drainage Project March 2017

Cork Lower Harbour Main Drainage Project March 2017 IW/BK/CLH/V3/0317 Cork Lower Harbour Main Drainage Project March 2017 If you have any questions or wish to register for updates you can contact the project team in the following ways: Post: Web: Email:

More information

KNL Lands Proposed Drainage Diversion to the Kizell Municipal Drain, City of Ottawa, Kanata North Ward

KNL Lands Proposed Drainage Diversion to the Kizell Municipal Drain, City of Ottawa, Kanata North Ward KNL Lands Proposed Drainage Diversion to the Kizell Municipal Drain, City of Ottawa, Kanata North Ward Drainage Act, RSO 1990 Chapter D. 17, Section 65 Prepared for: City of Ottawa Prepared by: Stantec

More information

Downtown Estes Loop Project Frequently Asked Questions

Downtown Estes Loop Project Frequently Asked Questions May 15 th, 2015 Project Status 1) Has Alternative 1 already been selected? Is it a done deal? Response: The NEPA process will proceed with environmental analysis of both the No Action and Alternative 1.

More information

Town of Petawawa Infrastructure Study Update 2013

Town of Petawawa Infrastructure Study Update 2013 2013 TABLE OF CONTENTS Chapter 1 Overview Chapter 2 Sanitary Sewer System Chapter 3 Storm Drainage System Chapter 4 Road System Chapter 5 Water Distribution System Chapter 6 Comprehensive Plan Appendix

More information

INFRASTRUCTURE ELEMENT

INFRASTRUCTURE ELEMENT Goals, Objectives and Policies INFRASTRUCTURE ELEMENT SANITARY SEWER GOAL 4.A.1.: PROVIDE ADEQUATE CENTRAL SANITARY SEWAGE FACILITIES FOR RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT AND REDEVELOPMENT IN

More information

ACT 537 SPECIAL STUDY WASTEWATER CONVEYANCE SYSTEM CAPACITY ANALYSIS WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY

ACT 537 SPECIAL STUDY WASTEWATER CONVEYANCE SYSTEM CAPACITY ANALYSIS WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY ACT 537 SPECIAL STUDY WASTEWATER CONVEYANCE SYSTEM CAPACITY ANALYSIS for WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY WASHINGTON TOWNSHIP, FRANKLIN COUNTY, PENNSYLVANIA Prepared by: CET Engineering Services

More information

Problem Screening Guideline January, 2016

Problem Screening Guideline January, 2016 Problem Screening Guideline January, 2016 Check the Capital Project Delivery website to ensure this is the current version Table of Contents Purpose... 1 Introduction... 1 The following are the major work

More information

Appendix B. Commitments made in the Approved Terms of Reference

Appendix B. Commitments made in the Approved Terms of Reference Appendix B Commitments made in the Approved Terms of Reference Approved Terms of Reference Requirements and How They Were in the 1. The study area considered for the new landfill footprint at the West

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

Final Design Guideline

Final Design Guideline Final Design Guideline May, 2016 July, 2011 Check the Capital Project Delivery website to ensure this is the current version Table of Contents Purpose... 1 Introduction... 1 FD Support... 1 Roadway and

More information

Welcome to the Public Information Centre. Red Hill Business Park South Transportation Master Plan Addendum. June 25, :00 p.m. to 8:00 p.m.

Welcome to the Public Information Centre. Red Hill Business Park South Transportation Master Plan Addendum. June 25, :00 p.m. to 8:00 p.m. Welcome Welcome to the Transportation Master Plan Addendum June 25, 2012 6:00 p.m. to 8:00 p.m. Please sign-in Background In 2006 the City of Hamilton completed the North Glanbrook Industrial Business

More information

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008 ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6 BEST PRACTICE SUMMARY REPORT February, 2008 Water and Wastewater PROJECT APPROACH The focus of the

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

PRESENTATION OUTLINE. Stormwater Program Update Stormwater Overview. Education Program Discussion. Sources and consequences of pollutants

PRESENTATION OUTLINE. Stormwater Program Update Stormwater Overview. Education Program Discussion. Sources and consequences of pollutants PRESENTATION OUTLINE Stormwater Program Update Stormwater Overview Sources and consequences of pollutants Education Program Discussion Why Stormwater? 1972 Clean Water Act Established permitting program

More information

Overview of Truckee Meadows Water Resources

Overview of Truckee Meadows Water Resources Overview of Truckee Meadows Water Resources SB487 Legislative Committee February 25, 2008 EXHIBIT D WESTERN WATER Document consists of 21 pages. Entire Exhibit provided. Meeting Date: 2-25-08 Total Water

More information

Presentation to Council July 13 th, July 13, 2009 Slide 1

Presentation to Council July 13 th, July 13, 2009 Slide 1 Salt Management Plan & Snow Disposal Facility Presentation to Council July 13 th, 2009 July 13, 2009 Slide 1 Salt Management Plan Why? Late 90 s Environment Canada became concerned with the environmental

More information

The Lakes District and Schooner Cove Integrated Stormwater Management Plan Kerr Wood Leidal, Draft Report, July 2012 (revised October 2013)

The Lakes District and Schooner Cove Integrated Stormwater Management Plan Kerr Wood Leidal, Draft Report, July 2012 (revised October 2013) To: Jeremy Holm, Regional District of Nanaimo cc: Geoff Garbutt, Regional District of Nanaimo From: Dan Huang / Ehren Lee 1.0 INTRODUCTION Urban Systems has been asked to assist the Regional District of

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Virginia Stormwater Management Program SPECIFIC SUBJECT: Application of the

More information

Northwest State Route 138 Corridor Improvement Project

Northwest State Route 138 Corridor Improvement Project Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816

More information

MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS

MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS ILLINOIS ENVIRONMENTAL PROTECTION AGENCY ANNUAL FACILITY INSPECTION REPORT NPDES PERMIT FOR STORM WATER DISCHARGES FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4) MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING

More information

The rezoning application and proposed transportation facility warrants consideration.

The rezoning application and proposed transportation facility warrants consideration. Date: November 11, 2014 To: Re: Chair and Members Planning & Development Committee PDE File Number: REZ1400020 275 Conception Bay South Bypass Road, Ward 5 Application to Rezone Land to Industrial General

More information

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS CEE BS, Fulltime (3 positions) Posted 1/30/2017 COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS SUFFOLK COUNTY IS AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER

More information

OF CONTENTS 14.0 COUNTY OF BRANT...

OF CONTENTS 14.0 COUNTY OF BRANT... TABLE OF CONTENTS 14.0 COUNTY OF BRANT... 14-1 14.1 Definitions... 14-1 14.2 County Of Brant Source Protection Plan Policies... 14-2 14.3 Policies Addressing Prescribed Drinking Water Threats... 14-6 14.4

More information

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

Municipal Servicing Class Environmental Assessment Master Plan

Municipal Servicing Class Environmental Assessment Master Plan VAUGHAN METROPOLITAN CENTRE Municipal Servicing Class Environmental Assessment Master Plan CITY OF VAUGHAN NOVEMBER 2012 TMIG The Municipal Infrastructure Group Ltd 8800 Dufferin Street, Suite 200 Vaughan

More information

Chapter 9 Wetlands Park Study Team

Chapter 9 Wetlands Park Study Team Chapter 9 Wetlands Park Study Team Objective How can we help Clark County facilitate implementation of the Clark County Wetlands Park Master Plan, and provide for the management of various ecosystems within

More information

Potable Water Supply, Wastewater & Reuse Element

Potable Water Supply, Wastewater & Reuse Element Potable Water Supply, Wastewater & Reuse Element GOAL ONE: HIGH QUALITY AND AFFORDABLE POTABLE WATER WILL BE AVAILABLE TO MEET THE EXISTING AND PROJECTED DEMANDS OF PINELLAS COUNTY UTILITY CUSTOMERS. 1.1.

More information

Engineering Department

Engineering Department Engineering Department Stormwater Mission: To provide for the efficient and effective cleaning and repair of the stormwater collection system and implement the federally mandated Stormwater Pollution Prevention

More information

Checklist for 2013 Draft NH Small MS4 General Permit Requirements

Checklist for 2013 Draft NH Small MS4 General Permit Requirements Checklist for 2013 Draft NH Small MS4 General Permit Requirements TASK DEADLINE (in relation to permit effective date) OVERLAPS WITH AOC REQUIREMENTS ASSISTANCE FROM WISE PROJECT 1. Submit Notice of Intent

More information

CITY OF HAMILTON STORM DRAINAGE POLICY. May Philips Engineering Ltd North Service Road P. O. Box 220 Burlington, Ontario L7R 3Y2

CITY OF HAMILTON STORM DRAINAGE POLICY. May Philips Engineering Ltd North Service Road P. O. Box 220 Burlington, Ontario L7R 3Y2 CITY OF HAMILTON STORM DRAINAGE POLICY May 2004 Philips Engineering Ltd. 3215 North Service Road P. O. Box 220 Burlington, Ontario L7R 3Y2 Telephone: (905) 335-2353 Facsimile: (905) 335-1414 E-Mail Address:

More information

407 TRANSITWAY. Planning & Preliminary Design

407 TRANSITWAY. Planning & Preliminary Design FROM EAST OF HIGHWAY 400 TO KENNEDY ROAD GWP #252-96-00 Public Information Centre #2 June 24 th and 29 th, 2010 Purpose of Public Information Centre #2 The first Public Information Centre (PIC #1) was

More information

Julia Bahen, Urban Strategies Inc.

Julia Bahen, Urban Strategies Inc. THE MUNICIPAL INFRASTRUCTURE GROUP LTD. 8800 Dufferin Street, Suite 200 Vaughan, Ontario L4K 0C5 T 905.738.5700 F 905.738.0065 www.tmig.ca TECHNICAL MEMORANDUM DATE June 13, 2017 TO CC SUBJECT FROM PROJECT

More information

ORANGE WATER AND SEWER AUTHORITY Quality Service Since 1977

ORANGE WATER AND SEWER AUTHORITY Quality Service Since 1977 ORANGE WATER AND SEWER AUTHORITY Quality Service Since 1977 Mayor Kevin Foy Town of Chapel Hill 306 North Columbia Street Chapel Hill, NC 27516 Chairman Barry Jacobs Orange County Board of Commissioners

More information

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that

More information

Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria

Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria INTERIM PROTOCOL Authority Meeting #10/07, Res. #A293/07, January 4, 2008 1. The works outlined in Table 1 must classify

More information

Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility Plans

Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility Plans Maine State Library Maine State Documents Land and Water Quality Documents Environmental Protection 9-1-1994 Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility

More information

US-101 CORRIDOR ADVISOR S UPDATE

US-101 CORRIDOR ADVISOR S UPDATE US-101 CORRIDOR ADVISOR S UPDATE MONTECITO ASSOCIATION BOARD OF DIRECTORS 12 MAY 2015 1 SCOPE OF SERVICES Identify & evaluate innovative project delivery strategies: Avoid & minimize delays / expedite

More information

5. RECORDS REVIEW RESULTS

5. RECORDS REVIEW RESULTS Dufferin Wind Power Inc. 5. RECORDS REVIEW RESULTS As stated in Section 3, the wind turbines are located entirely within the Township of Melancthon, approximately 14 kilometres from the Town of Shelburne

More information

LID Treatment Train Tool Overview

LID Treatment Train Tool Overview LID Treatment Train Tool Overview LSRCA Board of Directors July 28, 2017 Steve Auger Manager, Urban Restoration Member of Conservation Ontario Direction Going forward, the Ministry expects that stormwater

More information

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: Comprehensive Study Scoping Document for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: 07-03-26302 Prepared pursuant to Subsection 21(1) of the Canadian Environmental Assessment

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 17, 2014 Comment Deadline: July 17, 2014 Corps Action ID#: SAW-2009-00655 NC DOT TIP: R-4903 The Wilmington District, Corps

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

Northfield Township WWTP Capacity Evaluation Report

Northfield Township WWTP Capacity Evaluation Report Northfield Township WWTP Capacity Evaluation Report March 18, 2015 PRESENTED TO PRESENTED BY Northfield Township 8350 Main Street Suite A Whitmore Lake, Michigan 48189 Tetra Tech 710 Avis Drive Suite 100

More information

US-101 CORRIDOR ADVISOR S UPDATE 19 MARCH 2015

US-101 CORRIDOR ADVISOR S UPDATE 19 MARCH 2015 US-101 CORRIDOR ADVISOR S UPDATE 19 MARCH 2015 1 DELIVERY RECOMMENDATION GOALS Project Readiness: Enhance Funding pursuits Corridor Related Projects Coordination Develop Information to: Resolve Questions

More information

Location Drainage Study

Location Drainage Study Location Drainage Study PROJECT ROUTE: LIMITS: MUNICIPALITY/COUNTY: JOB NUMBER: IL 47 at Burlington Road 750ft NW to 750ft SE of IL 47(Burlington), & 1000ft S to 1000ft N of Burlington (IL47) Kane County

More information

CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Hamilton Water Division

CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Hamilton Water Division CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Hamilton Water Division TO: Chair and Members Public Works Committee COMMITTEE DATE: March 17, 2014 SUBJECT/REPORT NO: Accelerated Remediation of Illegal Sewer

More information

Information Requirements Table for Liquid Waste

Information Requirements Table for Liquid Waste Applicant Summary Tracking # Authorization # Applicant / Facility Name Ministry of Environment Prepared by: Title Date The Information Requirements Table (IRT) for Liquid Waste is a tool used by Ministry

More information

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Welcome Public Information Event Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Please sign in to be added to the study mailing list and receive

More information

GOALS, OBJECTIVES, & POLICIES

GOALS, OBJECTIVES, & POLICIES ELEMENT 9 INFRASTRUCTURE ELEMENT STORM WATER MANAGEMENT SUB-ELEMENT Goal 1 To provide adequate stormwater management facilities and services to meet the present and future needs of the University and to

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-44b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED RANDY S SANITATION TRANSFER FACILITY PROPOSED

More information

Preferred Elevated Tank Site

Preferred Elevated Tank Site Preferred Elevated Tank Site Preferred Site No. 3 is on private property owned by Hopewell Developments. Approximately 5 acres of land will be required, including lands required for a permanent access

More information

Alexandria Sewage Lagoon Treatment Facility Municipal Class C Environmental Assessment Public Information Centre #2 Welcome!

Alexandria Sewage Lagoon Treatment Facility Municipal Class C Environmental Assessment Public Information Centre #2 Welcome! Alexandria Sewage Lagoon Treatment Facility Municipal Class C Environmental Assessment Public Information Centre #2 Welcome! Municipal Class Environmental Assessment Status We are Here Study Overview The

More information

C Fish Lake C Rice Lake C Mud Lake C Weaver Lake C Elm Creek*

C Fish Lake C Rice Lake C Mud Lake C Weaver Lake C Elm Creek* IV. PROBLEMS AND CORRECTIVE ACTIONS Outlined below is an assessment of existing and potential water resource-related issues that are known at this time. These issues have been identified based on Commission

More information

c: Don Labossiere, Director, Environmental Compliance and Enforcement Public Registries

c: Don Labossiere, Director, Environmental Compliance and Enforcement Public Registries Climate Change and Environmental Protection Division Environmental Approvals Branch 123 Main Street, Suite 160, Winnipeg, Manitoba R3C 1A5 T 204 945-8321 F 204 945-5229 www.gov.mb.ca/conservation/eal CLIENT

More information

CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION

CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION SECTION 2B 1 - GROUND SURVEYS Survey Authorization... 2B-1 Interstate... 2B-1 Principal / Minor Arterial... 2B-1 Urban...

More information

Municipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection

Municipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection Montgomery County Maryland Municipal Separate Storm Sewer Systems (MS4) Implementation Craig Carson Montgomery County Department of Environmental Protection Montgomery County, Maryland 500 sq. miles 970,000

More information