1 Developing the complete PDD: Using Ob/Ob project as a case study Craig Ebert Executive Vice President ICF Consulting 3rd Stakeholders Workshop Lagos, Nigeria 4 May 2006

2 Contents Project description Assessment of additionality Baseline methodology Defining Project Boundaries Calculation of emission reductions Addressing Nigerian policies/regulations

3 Do Not Hesitate To Raise Your Questions/Issues Ob/Ob being used only to illustrate issues important to flareout projects in Nigeria If you have any questions or issues that are not being raised, share them with the rest of us! Ultimate objective is to improve prospects for all projects that reduce gas flaring

4 Project description: Ob/Ob project in Nigeria Purpose of the project: gas flare reduction and use of associated gas (AG) for: Re-injection into oil reservoir for enhanced oil recovery (EOR), replacing use of water for EOR Some AG used for internal consumption Location: Obiafu/Obrikom (OB/OB) oil field North West of Port Harcourt, in Rivers State in Nigeria. Project proponents: NAOC (ENI) 20%, NNPC/NAPIMS 60%, PONL 20%

5 Ob/Ob project in Nigeria Project involves: installation of new turbo compressor, increasing capacity of reinjection facility to 350 MMscfd from previous 270 MMscfd. Re-injection began in 1984 Emission reductions are achieved by gas flare reduction and utilization Estimated CERs: 2.46 million tonnes CO2e/year Project start date: 2003 Status: PDD under development

6 Assessment of Additionality Additionality. Emission reductions have to be additional to what would have happened in the absence of the project. For example, in a flare reduction project, without the existence of the project, the business as usual situation would be continuation of flaring. Ob/Ob: additionality approach based on Rang Dong in Vietnam methodology (AM0009) was applied

7 Additionality Ob/Ob Additionality is addressed by determining the most likely course of action, taking into account economic attractiveness and barriers. Gas at oil fields could be treated in following ways: Option 1: Release to the atmosphere at the oil production site (venting) Option 2: Flaring at the oil production site Option 3: On-site consumption Option 4: Injection into the oil reservoir Option 5: Recovery, transportation, processing and distribution to end-users (domestic or export) Project participants should assess and compare the economic attractiveness and legal/market aspects of these options. CE1

8 Slide 7 CE1 What was used at Rang Dong to demonstrate additionality? This looks like a good list but generic. Craig Ebert, 19/01/2006

9 Additionality - Alternatives Option 1: Release to the atmosphere at the oil production site (venting) - Prohibited by law; not possible and not safe Option 2: Flaring at the oil production site Common practice; most economically attractive course of action; it presents lower capital risk than other options; penalties are unsubstantial Option 3: On-site consumption No additional power requirement needs at site system is optimized for current power demand. Option 4: Injection into the oil reservoir Desirable option; it makes rational use of the recovered gas and enhances oil production. In the absence of the CER credits, this option would be unattractive. There is currently no law that requires recovery and re-injection of AG. Therefore, the project is beyond policy requirements Option 5: Recovery, transportation, processing and distribution to endusers (domestic or export) Little demand near the project, commercially unfeasible to collect/ sell amount of AG involved in project

10 Additionality: Enforcement of applicable laws and regulations Laws to regulate volumes of associated gas sent for flaring in Nigeria have largely been unsuccessful because of the inherently financially riskier alternatives associated with utilisation of associated gas, relative to flaring and the payment of penalties. The recent Nigerian Federal High Court that ruled against the burning of natural gas by oil firms in the Niger Delta cannot be considered to be effectively binding. Oil companies in Nigeria flare 40% of total associated gas they produce (World Bank, GGFR, 2005). There is currently no law that requires recovery and re-injection of AG. Therefore, the Ob/Ob project is beyond policy requirements

11 Project start date Ob/Ob started operations in 2003; re-injection began 1984: challenge to demonstrate additionality Early started projects: it is crucial to provide sound evidence that CDM has played a role in the decision to actually start the project (e.g. business plan, CERs in cash flow analysis) Additionality Ob/Ob: the project was part of Zero gas flaring program of ENI CDM projects could claim credits retroactively for emission reductions that were generated before registration of the project under the CDM. Applies to Projects that started between 1 January 2000 and 18 November 2004 (the date of the first registration of a CDM project) Projects need to be submitted for validation by 31/12/05 and registered with CDM EB by 31/12/06 to claim credits retroactively Otherwise, they can just claim credits from the moment they are registered (and lose chance for any previous credits)

12 Baseline approach Baseline methodology identify alternatives; baseline is most conservative of remaining alternatives (after project has been successfully excluded) From Article 48b of the Marrakech agreement Emissions from a technology that represents an economically attractive course of action, taking into account barriers to investment. It applies to the Ob/Ob project as significant investments are involved that would only generate unacceptable financial returns without CER revenue.

13 Baseline Methodology Ob/Ob Baseline: the scenario that reasonably represents greenhouse gases (GHG) emission sources that would occur in the absence of the proposed project activity. Ob/Ob in Nigeria - baseline: continuation of flaring of associated gas. But you need to demonstrate why the baseline option has been selected, not assert it Baseline requires selection of approach and methodology Options are: Use an approved baseline methodology (AM) if there is one fully applicable to project Develop a new methodology (NMB)

14 Baseline Methodology Ob/Ob NM for Ob-Ob: Re-injection of associated gas (AG) from oil wells that would otherwise be flared Based on Rang Dong Vietnam approved methodology (AM0009). Also incorporates aspects of NMB0167 and NMB0168 (White Tiger Oil Field Carbon Capture and Storage (CCS) project in Vietnam and Capture of CO2 from Liquefied Natural Gas (LNG) complex and its geological storage in aquifer in Malaysia) How applicable is it to project activities involving the re-injection of associated gas at oil wells that would otherwise be flared? The methodology can only be used if the business as usual scenario (total/partial flaring of associated gas) is the only plausible baseline scenario, e.g., >50% of the AG Demonstrating Additionality. Because without carbon credits re-injection of the gas into oil reservoir is not economically attractive, the baseline scenario is flaring the gas The methodology provides the formulae to calculate the baseline and project emission reductions

15 Applicability conditions The Ob/Ob methodology is applicable under the following conditions: Energy required for transport and processing of the recovered gas is generated by using the recovered AG; In the absence of the project activity, the AG is mainly flared; Current/historical data (quantity/fraction of carbon) is accessible for AG, regarding release to atmosphere at site (venting); flaring at the oil production site; on-site consumption; and recovery, transportation, processing and distribution to end-users; The AG is transported to the injection site via pipeline systems; The project meets the conditions in regards to the integrity of the storage (geological) formation: The reservoir must be geologically sound maintain injected AG; geological site report has been prepared and sufficient data has been collected, etc

16 Project Boundaries Project boundary: encompass all GHG emissions at the Eni site: under the control of the project participants; that are significant, and reasonably attributable to the CDM project activity The project boundary reflects: The physical/geographical location of the project activities, and The sources and gases included in the project calculations. Ob/Ob project boundary: physical, geographical site where the associated gas is generated and reinjected

17 Ob/Ob Project Boundaries CO 2 CO 2 CH 4 CO 2 On-site consumption Flaring Venting Off-site consumption B A C Project oil wells Reinjection

18 Baseline: Project boundaries - Emission from Gas flaring Baseline Most of the flared gas will be combusted into CO 2. Potential CH 4 emissions not considered Assume combustion flare is 100% efficient. Conservative assumption, since usually not all gas is combusted efficiently and there is some CH 4 involved, which is not accounted for as CH 4 but as CO 2

19 Project Project boundaries - Project Energy use for AG capture and re-injection CO 2 - Fuel used for transporting and processing the associated gas CH 4 Minor leakage amounts From the reservoir CO 2 is stored along with AG and may consequently escape from the reservoir (is CO 2 present in AG?) CH 4 escape from the reservoir Leaks from Compression, transportation and injection CH 4 - It should be small but to be conservative it will be accounted for

20 Calculation of Emission Reductions Emissions GHG Emission level without project -Baseline Emission level with project Project commencement Emission Reductions = Carbon Credits Time

21 Calculation - Emission Reductions Emission Reductions = ΣBaselineEmissions ΣProjectEmissions ΣLeakages Baseline Emissions: flaring at oil production site Project Emissions: include emissions from: venting, flaring, on-site consumption, recovery, transportation, processing and distribution to end-users, in project scenario; the energy consumption due to the reinjection process; transportation and re-injection of AG, and any escape from the pipeline, the injection well and the reservoir Leakages: all possible leaks from the process due to downstream use of the AG as LNG, power production, and/or domestic use.

22 Baseline Emissions Baseline emissions are calculated as follows: BE y = V AG,y * ρ c,y * W carbon y * 44/12 Where: BE y Baseline emissions during year y in tonnes of CO 2 equivalent V AG,y Volume of associated gas from oil field during year y in m 3 ρ c,y Associated gas combusted ratio in baseline W carbon y Average carbon content of AG from oil field during year y in tonnes C/m 3

23 Project Emissions The project emissions in year y are expressed as: PE y = PE CO2,other fuels,y +PE CO2,elec,y + PE CH4,fugitive,y + PE CH4,pipeline, accident + PE reservoir For Ob/Ob project, emission reductions estimated to be 2.46 million tons annually

24 Addressing Nigerian policies/regulations Important to assess the host country s policies and regulations to: Assess that the project is beyond regulatory requirement (additionality) Assess if the project complies with the sustainability criteria of the country Nigeria is one of the top countries in volume of gas flared worldwide (oil companies in Nigeria flare almost 40% of the total associated gas they produce) Government of Nigeria - making efforts to discourage gas flaring - Call to phase out gas flaring by the end of 2008 Government promotes CDM as an incentive to achieve Flare-Out goals

25 Nigerian policies/regulations Nigeria has introduced various laws designed to regulate the volumes of associated gas sent for flaring; Petroleum Amendment Decree: Associated Gas Re-injection Decree Associated Gas Re-injection Amendment Decree Associated Gas Framework Agreement (AGFA) However these have been unsuccessful and laws not fully enforced Penalties for flaring are insignificant (oil companies continue to flare less financial risk than other options) Recent Nigerian Federal High Court that ruled on the flaring of gas by oil firms in the Niger Delta cannot be considered to be effectively binding There is currently no regulation in Nigeria that obliges companies to re-inject the AG into oil reservoir - Ob/Ob project is beyond regulatory requirements (additionality)

26 Nigerian policies/regulations Sustainable Development in Nigeria CDM projects must comply with sustainable development objectives of Nigeria Criteria and indicators for sustainable development - articulated in the National Economic Empowerment and Development Strategy (NEEDS) document Presidential Implementation Committee on Clean Development Mechanism (PIC CDM) national structure in place (Designated National Authority) PIC CDM grants Letter of Approval for CDM process - determines if project complies with sustainable development criteria of Nigeria

27 Sustainable development The Ob/Ob project contributes to sustainable development in Nigeria Gas stored for potential future use The elimination of flaring and the re-injection of the gas result in reduced atmospheric pollution. AG better alternative than water for EOR, increasing overall productivity of Nigerian oil resources, thereby enhancing the economic development of Nigeria. Nigeria: economy heavily dependent on oil sector, which accounts for some 90 percent of export revenues and approx. 40 percent of its gross domestic product (GDP)

28 Methodology -aims The methodology aims to: be transparent and conservative by referring to real, verifiable data to be monitored during the process; use default data from internationally recognized institutions like the Intergovernmental Panel on Climate Change; apply the guidance from the EB and other Approved Methodologies on the issue of Additionality.

29 Strengths Potential strengths of proposed new methodology: The use of monitoring data during the operation of the project will ensure high accuracy of the monitored variables and relating emission calculations; Data needs are reasonably low and manageable; Only a few assumptions are required. These will be approached in a conservative manner; The methodology uses the Tool for the demonstration and assessment of additionality ; It uses a large part of the approach from AM0009.

30 Weaknesses Potential weaknesses of new methodology: The project activities depend on the participants being able to accurately measure gas output and to know the carbon content of that gas through regular monitoring. Uncertainties similar to those in CO 2 CCS (AG storage permanence, leakages, migration, etc) Plus need to address any unique factors stemming from storage of CH 4 rather than CO 2 At active production site compared to perpetual storage

31 Additionality Ob/Ob - Challenges Nigerian regulations Potential enforcement of AG flare reduction laws that could affect additionality High court ruling against flaring Project implemented in 2003 demonstrate that carbon credits were considered in the decision to undertake project Uses of AG: not only re-injection but also other uses (LNG, on site consumption) difficulty of demonstrating project case against other options of AG use. Difficulty to obtain financial data of project activity and alternatives - to demonstrate that other options are more financially attractive CE2

32 Slide 30 CE2 What was used at Rang Dong to demonstrate additionality? This looks like a good list but generic. Craig Ebert, 19/01/2006

33 Key Discussion Questions How do we persuasively define a baseline in Nigeria, specifically the flaring of associated gas? What are the key arguments for proving project additionality, e.g., gas re-injection? What is the best way to define appropriate project boundaries? Other questions? Ob/Ob is used to highlight key issues; do your company s projects highlight other issues?

CDM Guide Book for Oil & Gas Sector. Ariesta Ningrum GGFR Workshop September 19-20, 2006 Jakarta - Indonesia

CDM Guide Book for Oil & Gas Sector. Ariesta Ningrum GGFR Workshop September 19-20, 2006 Jakarta - Indonesia CDM Guide Book for Oil & Gas Sector Ariesta Ningrum GGFR Workshop September 19-20, 2006 Jakarta - Indonesia Background Context Purpose one-stop document for project developers in oil & gas sector Guide

More information

CCS-CDM: Methodology proposal

CCS-CDM: Methodology proposal Classification: Statoil internal Status: Draft CCS-CDM: Methodology proposal Based on preparation of PDD for CO2-EOR project London 19-20.04.2006 Table of contents 1. Proposed principles for new Baseline

More information

Overview of CDM Documentation and Procedures

Overview of CDM Documentation and Procedures Overview of CDM Documentation and Procedures 19-20 April 2006 London, England John Kessels CDM Documentation Project Design Document CDM Institutions CDM New Methodology Baseline (CDM NMB) CDM New Monitoring

More information

Large-scale Consolidated Methodology Waste energy recovery

Large-scale Consolidated Methodology Waste energy recovery CLEAN DEVELOPMENT MECHANISM ACM0012 Large-scale Consolidated Methodology Waste energy recovery TABLE OF CONTENTS Page 1. INTRODUCTION... 4 2. SCOPE, APPLICABILITY, AND ENTRY INTO FORCE... 4 2.1. Scope...

More information

We think the word Professional scepticism needs to be defined in detail to avoid individual interpretation leading to confusion.

We think the word Professional scepticism needs to be defined in detail to avoid individual interpretation leading to confusion. The CDM Executive Board (EB) has call for public comment on the draft of the Validation and Verification Manual (VVM). This document represents the main views of the CantorCO2e with regards to the current

More information

III.P. Recovery and utilization of waste gas in refinery facilities

III.P. Recovery and utilization of waste gas in refinery facilities TYPE III - OTHER PROJECT ACTIVITIES Project participants shall take into account the general guidance to the methodologies, information on additionality, abbreviations and general guidance on leakage provided

More information

SUBMISSION TO THE UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE (UNFCCC) SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE (SBSTA)

SUBMISSION TO THE UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE (UNFCCC) SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE (SBSTA) SUBMISSION TO THE UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE (UNFCCC) SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE (SBSTA) Decisions arising from the 36 th Meeting of the SBSTA (Bonn,

More information

Estimation of Emissions from CO 2 Capture and Storage: the 2006 IPCC Guidelines for National Greenhouse Gas Inventories

Estimation of Emissions from CO 2 Capture and Storage: the 2006 IPCC Guidelines for National Greenhouse Gas Inventories Estimation of Emissions from CO 2 Capture and Storage: the 2006 IPCC Guidelines for National Greenhouse Gas Inventories HS Eggleston, Head, Technical Support Unit IPCC National Greenhouse Gas Inventories

More information

Yes, is attached. Yes, is attached.

Yes, is attached. Yes, is attached. CDM: Form for submission of requests for revisions of approved methodologies to the Methodologies Panel (version 01) (To be used by project participants, through the DOE/AE, for requesting revisions of

More information

Criteria Catalogue: VER+

Criteria Catalogue: VER+ Criteria Catalogue: VER+ Prepared / changed: IS-CMS-MUC approved: IS-CMS-MUC page 1 of 10 CONTENTS Acronyms...3 Definitions...3 A. CRITERIA CATALOGUE... 4 1. Eligibility Criteria...4 2. Additionality...4

More information

IPCC Guidance on Developing and Applying CCS Emission Estimation Methodologies in National Inventories of GHGs

IPCC Guidance on Developing and Applying CCS Emission Estimation Methodologies in National Inventories of GHGs MO INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE UNEP IPCC Guidance on Developing and Applying CCS Emission Estimation Methodologies in National Inventories of GHGs Simon Eggleston Acknowledgements CCS Chapter

More information

A/R Methodological tool. (Version 01)

A/R Methodological tool. (Version 01) Page 1 A/R Methodological tool Combined tool to identify the baseline scenario and demonstrate additionality in A/R CDM project activities (Version 01) I. SCOPE AND APPLICABILITY AND PARAMETERS Scope 1.

More information

Small-Scale CDM & Bundling: Criteria, Advantages & Status

Small-Scale CDM & Bundling: Criteria, Advantages & Status Small-Scale CDM & Bundling: Criteria, Advantages & Status Need for Small-Scale CDM introduced by CDM EB to encourage the development of smaller CDM projects typically would have been less attractive in

More information

Carbon capture and storage The Pembina Institute s position

Carbon capture and storage The Pembina Institute s position Carbon capture and storage The Pembina Institute s position Tom Marr-Laing, Matthew Bramley and Mary Griffiths with input by Marlo Raynolds and Roger Peters November 2005 Photo: Ontario Clean Air Alliance/Jesse

More information

Quantification Protocols and GHG Monitoring for CO 2 -EOR Operations

Quantification Protocols and GHG Monitoring for CO 2 -EOR Operations Quantification Protocols and GHG Monitoring for CO 2 -EOR Operations Brent Lakeman and Stephanie Trottier Presentation to IEA GHG Monitoring Network November 7, 2007 Edmonton, Alberta Outline Setting the

More information

A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL

A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL Fordham University School of Law February 22nd, 2010 A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL Agostino Re Rebaudengo President arr@asja.biz INDEX KYOTO PROTOCOL AND EMISSION

More information

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN Sindicatum Carbon Capital Limited & PT. Odira Energy Persada Tambun LPG Associated Gas Recovery and Utilization Project UNFCCC Ref. No. 1144

More information

IPCC Special Report on

IPCC Special Report on IPCC Special Report on Carbon Dioxide Capture and Storage Edward S. Rubin Carnegie Mellon University, Pittsburgh, PA Presentation to the U.S. Climate Change Science Program Workshop Washington, DC November

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 14064-2 First edition 2006-03-01 Greenhouse gases Part 2: Specification with guidance at the project level for quantification, monitoring and reporting of greenhouse gas emission

More information

Validation Report. Matrix Power Pvt. Ltd. (MPPL)

Validation Report. Matrix Power Pvt. Ltd. (MPPL) Validation Report Matrix Power Pvt. Ltd. (MPPL) Validation of the 4.5 MW Biomass (Agricultural Residues) Based Power Generation Unit of M/s Matrix Power Pvt. Ltd. (MPPL) project Report No. 6589 Revision

More information

San Joaquin Valley Unified Air Pollution Control District. Best Performance Standard (BPS) x.x.xx

San Joaquin Valley Unified Air Pollution Control District. Best Performance Standard (BPS) x.x.xx San Joaquin Valley Unified Air Pollution Control District Best Performance Standard (BPS) x.x.xx Date: 1/20/2011 Class Front-line Organic Liquid Storage Tanks Category Subcategories: 1) Fixed Roof Tanks

More information

European Investment Bank (EIB) Guidelines for the Climate Change Technical Assistance Facility (CCTAF) Operations

European Investment Bank (EIB) Guidelines for the Climate Change Technical Assistance Facility (CCTAF) Operations European Investment Bank (EIB) Guidelines for the Climate Change Technical Assistance Facility (CCTAF) Operations March 2006 CONTENTS CONTENTS...2 INTRODUCTION...3 1 BACKGROUND...4 1.1 The concept of CDM

More information

The Project Design Document

The Project Design Document Downloaded from orbit.dtu.dk on: Feb 11, 2018 The Project Design Document Olsen, Karen Holm Publication date: 2012 Link back to DTU Orbit Citation (APA): Olsen, K. H. (2012). The Project Design Document

More information

Annex 27 GENERAL GUIDELINES FOR SSC CDM METHODOLOGIES. (Version 19.0) CONTENTS

Annex 27 GENERAL GUIDELINES FOR SSC CDM METHODOLOGIES. (Version 19.0) CONTENTS Page 1 GENERAL GUIDELINES FOR SSC CDM METHODOLOGIES (Version 19.0) CONTENTS Paragraphs I. Introduction... 1 3 2 A. Background... 1 2 2 B. Objectives... 3 2 II. Scope and applicability... 4 5 2 III. Terms

More information

Sarbari II hydro power project by DSL Hydrowatt Limited in Kullu, Himachal Pradesh

Sarbari II hydro power project by DSL Hydrowatt Limited in Kullu, Himachal Pradesh Sarbari II hydro power project by DSL Hydrowatt Limited in Kullu, Himachal Pradesh Document Prepared By (DSL Hydrowatt Limited) Project Title Sarbari II hydro power project by DSL Hydrowatt Limited in

More information

Accounting standards for methane emissions: taking stock of existing offset programs

Accounting standards for methane emissions: taking stock of existing offset programs Accounting standards for methane emissions: taking stock of existing offset programs Methane finance study group meeting Washington, DC February 7, 2013 Today s main focus Critical features for delivering

More information

APG Flaring Reduction Opportunities in the EBRD s Region. Brussels, 8 th July 2013 Cristian Carraretto, Energy Efficiency and Climate Change

APG Flaring Reduction Opportunities in the EBRD s Region. Brussels, 8 th July 2013 Cristian Carraretto, Energy Efficiency and Climate Change APG Flaring Reduction Opportunities in the EBRD s Region Brussels, 8 th July 2013 Cristian Carraretto, Energy Efficiency and Climate Change AGENDA 1. The EBRD and its Sustainable Energy Initiative 2. The

More information

CDM Feasibility Study on Ventilation Air Methane Power Generation Project at Dafosi Coal Mine in China

CDM Feasibility Study on Ventilation Air Methane Power Generation Project at Dafosi Coal Mine in China Title of Feasibility Study: CDM Feasibility Study on Ventilation Air Methane Power Generation Project at Dafosi Coal Mine in China Main Implementing Entity: PEAR Carbon Offset Initiative, Ltd. 1. Implementation

More information

Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant

Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant International Journal of Engineering and Technology Volume 3 No. 1, January, 2013 Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant Wordu, A. A, Peterside, B Department

More information

CDM Module 1. Introduction to Programmatic CDM (PoA) Lesson 2. How does the Programmatic CDM Work? Select Next to begin. Menu November 2011.

CDM Module 1. Introduction to Programmatic CDM (PoA) Lesson 2. How does the Programmatic CDM Work? Select Next to begin. Menu November 2011. CDM Module 1 Introduction to Programmatic CDM (PoA) Lesson 2 How does the Programmatic CDM Work? November 2011 Select Next to begin Next> Lesson Partners and Collaborators How does the Programmatic CDM

More information

National Carbon Offset Standard. Version 2

National Carbon Offset Standard. Version 2 National Carbon Offset Standard Version 2 1 March 2012 Contents 1. Introduction... 1 1.1 Carbon offsetting in the context of a carbon price... 1 1.2 Objectives of the Standard... 1 2. Normative reference...

More information

Legal barriers to CCS

Legal barriers to CCS Legal barriers to CCS Mette Karine Gravdahl Agerup Assistant Director General Norwegian Bali, 19 March 2009 The world needs energy Global energy demand will increase by 55% by 2030 84% of global energy

More information

Climate Financing CDM and NAMA in Rwanda

Climate Financing CDM and NAMA in Rwanda Climate Financing CDM and NAMA in Rwanda Kigali, 7th October 2014 Faustin MUNYAZIKWIYE Director of Climate Change and International Obligations Dpt / REMA Outlines Introduction to Climate Change Mapping

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council ECE/ENERGY/2014/5/Rev.1 Distr.: General 28 November 2014 Original: English only Economic Commission for Europe Committee on Sustainable Energy Twenty-third session

More information

Life-Cycle Assessment of Greenhouse Gas Emissions from Shale Gas Extraction in Scotland. Clare Bond, University of Aberdeen.

Life-Cycle Assessment of Greenhouse Gas Emissions from Shale Gas Extraction in Scotland. Clare Bond, University of Aberdeen. Life-Cycle Assessment of Greenhouse Gas Emissions from Shale Gas Extraction in Scotland Clare Bond, University of Aberdeen Life Cycle Assessment of Shale Gas in Scotland Life-Cycle Assessment of Greenhouse

More information

UK CCS Programme and CCS Transboundary Developments

UK CCS Programme and CCS Transboundary Developments UK CCS Programme and CCS Transboundary Developments Tim Dixon IETA 04 Dec 2012 COP 18, Doha CCS Roadmap: Supporting Deployment of CCS in the UK CCS Roadmap contains 5 key interventions to help deliver

More information

CCS under UNFCCC and related capacity building needs

CCS under UNFCCC and related capacity building needs CCS under UNFCCC and related capacity building needs CCS capacity building and technology development: needs and opportunities in developing countries 14 September 2009, Washington, USA Dr. Iulian Florin

More information

Reporting System for Lake Kivu Gas Resources Operations

Reporting System for Lake Kivu Gas Resources Operations REPUBLIC OF RWANDA RWANDA UTILITIES REGULATORY AGENCY Reporting System for Lake Kivu Gas Resources Operations 1 1. INTRODUCTION Pursuant to the Law n o 39/2011 of 13/09/2001 establishing the Rwanda Utilities

More information

CLEAN DEVELOPMENT MECHANISM PROPOSED NEW METHODOLOGY: BASELINE (CDM-NMB) Version 02 - in effect as of: 15 July 2005

CLEAN DEVELOPMENT MECHANISM PROPOSED NEW METHODOLOGY: BASELINE (CDM-NMB) Version 02 - in effect as of: 15 July 2005 CDM Executive Board page 1 CLEAN DEVELOPMENT MECHANISM PROPOSED NEW METHODOLOGY: BASELINE (CDM-NMB) Version 02 - in effect as of: 15 July 2005 CONTENTS PROPOSED NEW METHODOLOGY: BASELINE (CDM-NMB) A. Methodology

More information

PETROTRIN OIL FIELDS ASSOCIATED GAS RECOVERY AND UTILIZATION PROGRAMME OF ACTIVITIES JUNE 15, 2012

PETROTRIN OIL FIELDS ASSOCIATED GAS RECOVERY AND UTILIZATION PROGRAMME OF ACTIVITIES JUNE 15, 2012 PETROTRIN OIL FIELDS ASSOCIATED GAS RECOVERY AND UTILIZATION PROGRAMME OF ACTIVITIES JUNE 15, 2012 A. GENERAL PROGRAM DESCRIPTION PROGRAM TITLE PETROTRIN Oil Fields Associated Gas Recovery and Utilization

More information

" Working Paper Guidance on Criteria for Baseline Setting and Monitoring "

 Working Paper Guidance on Criteria for Baseline Setting and Monitoring Att.: JI Supervisory Committee Your ref. Our ref. Place Oslo, 15 August 2006 " Working Paper Guidance on Criteria for Baseline Setting and Monitoring " ECON is pleased to submit its comments on the JI

More information

An Introduction to Offsets

An Introduction to Offsets An Introduction to Offsets Janet Peace PMR Technical Workshop on Domestic Emission Trading (ETS) Shenzhen, China March 13, 2012 Outline Brief introduction to GHG offsets Offsets what are they? Quality

More information

EUROPEAN UNION. Brussels, 26 March 2009 (OR. en) 2008/0015 (COD) PE-CONS 3739/08 ENV 1044 ENER 482 IND 240 CODEC 1908

EUROPEAN UNION. Brussels, 26 March 2009 (OR. en) 2008/0015 (COD) PE-CONS 3739/08 ENV 1044 ENER 482 IND 240 CODEC 1908 EUROPEAN UNION THE EUROPEAN PARLIAMT THE COUNCIL Brussels, 26 March 2009 (OR. en) 2008/0015 (COD) PE-CONS 3739/08 V 1044 ER 482 IND 240 CODEC 1908 LEGISLATIVE ACTS AND OTHER INSTRUMTS Subject: DIRECTIVE

More information

Introduction. Reducing Gas Flaring and Venting: How a Partnership can help achieve success

Introduction. Reducing Gas Flaring and Venting: How a Partnership can help achieve success Reducing Gas Flaring and Venting: How a Partnership can help achieve success Sascha T. Djumena 1 Energy Specialist, Global Gas Flaring Reduction Partnership (GGFR) World Bank/IFC Oil, Gas, Mining and Chemicals

More information

Analysis and Evaluation of CDM Potential of Biomethanation Sector in India

Analysis and Evaluation of CDM Potential of Biomethanation Sector in India Analysis and Evaluation of CDM Potential of Biomethanation Sector in India Srikanth Subbarao 1,* and Butchaiah Gadde 2 1 Energy Engineer, IT Power India Pvt. Ltd, # 6 & 8, Romain Rolland Street, Pondicherry

More information

JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM - Version 01

JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM - Version 01 Joint Implementation Supervisory Committee page 1 JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM Version 01 in effect as of 15 June 2006 CONTENTS A. General the project B. Baseline C. Duration of the

More information

Validation Report. Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited

Validation Report. Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited Validation Report Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited Report No. 806970, Revision 01 2006, April 12 TÜV ndustrie Service

More information

GUIDANCE ON CRITERIA FOR BASELINE SETTING AND MONITORING. Version 03. Revision history of the document

GUIDANCE ON CRITERIA FOR BASELINE SETTING AND MONITORING. Version 03. Revision history of the document UNFCCC/CCNUCC Page 1 GUIDANCE ON CRITERIA FOR BASELINE SETTING AND MONITORING Version 03 Document version Adoption Revision Revision history of the document Version 01 Version 02 JISC 04 Annex 6 15 September

More information

Validation Report. Report No , Revision April 2007

Validation Report. Report No , Revision April 2007 Validation Report BIRLA PLUS CEMENT Validation of the Optimum utilisation of clinker for Pozzolana Portland Cement (PPC) production at Birla Plus Cement in Bathinda, Punjab, India project Report No. 869837,

More information

Energy Procedia 4 (2011) Energy Procedia 00 (2010) GHGT-10. Status of CCS Development in Indonesia

Energy Procedia 4 (2011) Energy Procedia 00 (2010) GHGT-10. Status of CCS Development in Indonesia Energy Procedia 4 (2011) 6152 6156 Energy Procedia 00 (2010) 000 000 Energy Procedia www.elsevier.com/locate/procedia www.elsevier.com/locate/xxx GHGT-10 Status of CCS Development in Indonesia Dennis Best

More information

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM FOR SSC A/R (CDM-PoA-DD-SSC-AR) - Version 01. CDM Executive Board Page 1

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM FOR SSC A/R (CDM-PoA-DD-SSC-AR) - Version 01. CDM Executive Board Page 1 Page 1 CLEAN DEVELOPMENT MECHANISM PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM FOR SMALL-SCALE AFFORESTATION AND REFORESTATION PROJECT ACTIVITIES (CDM-PoA-DD-SSC-AR) (Version 01) CONTENTS A. General description

More information

Identifying and Monitoring of Sustainable Development Benefits on CDM Projects and PoAs

Identifying and Monitoring of Sustainable Development Benefits on CDM Projects and PoAs Identifying and Monitoring of Sustainable Development Benefits on CDM Projects and PoAs Presented by: Albert Altarejos MAGALANG Climate Change Office-Environmental Management Bureau Department of Environment

More information

WORKSHOP BIO-ENERGY, CCS & BECCS : OPTIONS FOR INDONESIA

WORKSHOP BIO-ENERGY, CCS & BECCS : OPTIONS FOR INDONESIA WORKSHOP BIO-ENERGY, CCS & BECCS : OPTIONS FOR INDONESIA Financing Bioenergy and CCS-Challenges and Opportunities Hardiv H. Situmeang ASEAN CENTRE FOR ENERGY (ACE) 21-22 September 2012 Le Meredien, Jakarta

More information

-SUBMISSION BY MEXICO REDUCING GREENHOUSE GAS EMISSIONS FROM DEFORESTATION IN DEVELOPING COUNTRIES

-SUBMISSION BY MEXICO REDUCING GREENHOUSE GAS EMISSIONS FROM DEFORESTATION IN DEVELOPING COUNTRIES -SUBMISSION BY MEXICO REDUCING GREENHOUSE GAS EMISSIONS FROM DEFORESTATION IN DEVELOPING COUNTRIES I. Mandate The Subsidiary Body for Scientific and Technological Advice (SBSTA), at its twenty-fifth session

More information

CO2 Transport via Pipeline and Ship

CO2 Transport via Pipeline and Ship CO2 Transport via Pipeline and Ship Stanley Santos IEA Greenhouse Gas R&D Programme Cheltenham, UK CCOP EPPM Workshop on CCS September 2012 CO 2 Transport Pipeline Mode of Transport Motor Trucks Rail Ships

More information

American Carbon Registry

American Carbon Registry American Carbon Registry EPRI Greenhouse Gas Emissions Offset Policy Dialogue Workshop 8 Offset Project Development and Approval Processes June 24, 2010 Washington, DC Outline About Winrock and ACR Methodology

More information

POME Treatment Co-benefits CDM, Malaysia Summary of the Study March, 2008 Pacific Consultants

POME Treatment Co-benefits CDM, Malaysia Summary of the Study March, 2008 Pacific Consultants POME Treatment Co-benefits CDM, Malaysia Summary of the Study March, 2008 Pacific Consultants 1. Project Information 1-1 Background Information Current feasibility study aims at the evaluation of feasibility

More information

VALIDATION REPORT. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO REVISION NO.

VALIDATION REPORT. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO REVISION NO. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO. 2007-1142 REVISION NO. 02 Date of first issue: Project No.: 2007-07-09 44410005-08 Approved by: Organisational

More information

Mr. Rajesh Kumar Sethi Chair, CDM Executive Board UNFCCC Secretariat 16 th December 2008

Mr. Rajesh Kumar Sethi Chair, CDM Executive Board UNFCCC Secretariat 16 th December 2008 Mr. Rajesh Kumar Sethi Chair, CDM Executive Board UNFCCC Secretariat CDMinfo@unfccc.int 16 th December 2008 Dear Mr. R. K. Sethi, Re: Request for review for request for registration of Ceran's 14 de Julho

More information

Opportunities and challenges created for JI and CDM by the EU ETS Directive

Opportunities and challenges created for JI and CDM by the EU ETS Directive Opportunities and challenges created for JI and CDM by the EU ETS Directive 4th ECCP meeting on EU ETS review 15 June 2007 Thomas Bernheim Market-based instruments including EU ETS European Commission

More information

AmCham EU Position on Shale Gas Development in the EU

AmCham EU Position on Shale Gas Development in the EU AmCham EU Position on Shale Gas Development in the EU Page 1 of 5 4 January 2013 AmCham EU Position on Shale Gas Development in the EU Shale gas could play an important role in the EU energy mix and policymakers

More information

Climate Commitments and Conundrums: Introduction to the Kyoto Protocol

Climate Commitments and Conundrums: Introduction to the Kyoto Protocol Climate Commitments and Conundrums: Introduction to the Kyoto Protocol Prof. Tracy Hester Climate Change Law Fall 2013 Houston, Texas Nov. 4, 2013 Canada pulls out of Kyoto Protocol CBC News Posted: Dec

More information

Monitoring Requirements Objectives, technologies and predictive modelling

Monitoring Requirements Objectives, technologies and predictive modelling Monitoring Requirements Objectives, technologies and predictive modelling UNFCC Technical Workshop for CCS and the CDM Abu Dhabi 7-8 September 2011 Andy Chadwick Head CO 2 Storage Research (BGS) Regulatory

More information

The World Bank s Carbon Finance Business Options for Thailand. September 29, 2004

The World Bank s Carbon Finance Business Options for Thailand. September 29, 2004 The World Bank s Carbon Finance Business Options for Thailand September 29, 2004 Climate Change and the World Bank The Bank s mission: poverty alleviation, sustainable development The Bank accepts IPCC

More information

Validation Report. Beijing Guotou Energy Conservation Company. Validation of The 30 MW Tuoli Wind Farm Project in Urumqi, Xinjiang of China

Validation Report. Beijing Guotou Energy Conservation Company. Validation of The 30 MW Tuoli Wind Farm Project in Urumqi, Xinjiang of China Validation Report Beijing Guotou Energy Conservation Company Validation of The 30 MW Tuoli Wind Farm Project in Urumqi, Xinjiang of China Report No. 712740 rev. 1 17 July 2006 TÜV SÜD ndustrie Service

More information

Energy Sector March 2016, Maseru, Lesotho Pavel Shermanau, IPCC TFI TSU

Energy Sector March 2016, Maseru, Lesotho Pavel Shermanau, IPCC TFI TSU Energy Sector Africa Regional Workshop on the Building of Sustainable National Greenhouse Gas Inventory Management Systems, and the Use of the 2006 IPCC Guidelines for National Greenhouse Gas Inventories

More information

The recording of losses in the SEEA Central Framework. Carl Obst

The recording of losses in the SEEA Central Framework. Carl Obst The recording of losses in the SEEA Central Framework Carl Obst Consultant, Environmental-economic accounting Associate, Melbourne Sustainable Society Institute, University of Melbourne Paper prepared

More information

Carbon Capture and Storage. in the EU Climate Change Programme:- Incentivisation and Regulation

Carbon Capture and Storage. in the EU Climate Change Programme:- Incentivisation and Regulation Carbon Capture and Storage. in the EU Climate Change Programme:- Incentivisation and Regulation Tim Dixon IEA Greenhouse Gas R&D Programme ENERTECH October 2009 Regulation: IPCC GHG Inventory Guidelines

More information

ADDRESSING ADDITIONALITY IN THE TRANSPORT SECTOR:

ADDRESSING ADDITIONALITY IN THE TRANSPORT SECTOR: ADDRESSING ADDITIONALITY IN THE TRANSPORT SECTOR: PRESENTATION AT UNFCCC STANDARDISATION WORKSHOP JUNE 2011 BY FELICITY SPORS (FSPORS@WORLDBANK.ORG) THANKS TO INPUTS FROM: ZHUYU JERRY CHEN (ZCHEN1@WORLDBANK.ORG)

More information

NRRI Colloquium July 11, 2015 Answering Questions about Methane Emissions from the Natural Gas Sector

NRRI Colloquium July 11, 2015 Answering Questions about Methane Emissions from the Natural Gas Sector NRRI Colloquium July 11, 2015 Answering Questions about Methane Emissions from the Natural Gas Sector Ken Costello Principal Researcher National Regulatory Research Institute kcostello@nrri.org Methane

More information

Clean Development Mechanism

Clean Development Mechanism Climate Change Policy 4118 ENV Clean Development Mechanism Assignment 1 Karolina Szenczi 9/2/2013 s2798348 Table of Contents Table of Figures... 1 List of Abbreviations... 2 Introduction... 3 The CDM in

More information

Framework on various approaches Managing possible risks: Double counting

Framework on various approaches Managing possible risks: Double counting Framework on various approaches Managing possible risks: Double counting P.O.Box: 14 5472, Beirut, Lebanon Phone: +961.1.447192 Fax: +961.1.448649 E mail: administration@climatenetwork.org web: www.climatenetwork.org

More information

CDM Regulations. 2.1 Introduction. 2.2 Regulatory Process

CDM Regulations. 2.1 Introduction. 2.2 Regulatory Process CDM Regulations 2.1 Introduction 2.1 Regulatory issues pertain to rules and procedures that CDM A/R projects need to follow for registration and credit issuance. On average, BioCF projects have spent close

More information

Zafarana Wind Power Plants AS CDM Projects. Eng. Rafik Youssef Georgy Consultant, NREA

Zafarana Wind Power Plants AS CDM Projects. Eng. Rafik Youssef Georgy Consultant, NREA Zafarana Wind Power Plants AS CDM Projects Eng. Rafik Youssef Georgy Consultant, NREA ا ORGANIZATION CHART OF MINISTRY OF ELECTRICITY & ENERGY Egyptian Electricity Holding Company Nuclear Materials Authority

More information

Identifying General and Specific Risks Inherent in Project Development and Credit Generation from N 2 O Reduction Methodologies

Identifying General and Specific Risks Inherent in Project Development and Credit Generation from N 2 O Reduction Methodologies Identifying General and Specific Risks Inherent in Project Development and Credit Generation from N 2 O Reduction Methodologies Introduction December 2015 C-AGG Project Implementation Working Group The

More information

An Overview of Offsets from Mine Methane Capture and their Role in California Cap-and-Trade. June 19, 2014

An Overview of Offsets from Mine Methane Capture and their Role in California Cap-and-Trade. June 19, 2014 An Overview of Offsets from Mine Methane Capture and their Role in California Cap-and-Trade June 19, 2014 Agenda Introduction & Overview of Project Type Project Eligibility Monitoring and Reporting Requirements

More information

Gangwon Wind Park Project

Gangwon Wind Park Project Report No. TA201-200501, Revision 03 Final Validation Report Gangwon Wind Park Project December 9, 2005 KOREA ENERGY MANAGEMENT CORPORATION Contents 1. Summary of the Project Activity 2 2. Principles 3

More information

Article 5 Ozone Depleting Substances Project Protocol

Article 5 Ozone Depleting Substances Project Protocol Article 5 Ozone Depleting Substances Project Protocol April 8, 2010 The Climate Action Reserve Independent non-profit, chartered by California state legislation in 2001 Mission is to encourage early voluntary

More information

Indonesia Sumatera SNG Project Feasibility Study of Low rank coal to SNG

Indonesia Sumatera SNG Project Feasibility Study of Low rank coal to SNG Feasibility Studies with the Aim of Developing a Bilateral Offset Credit Mechanism FY2011 Studies for Project Development and Organization Indonesia Sumatera SNG Project Feasibility Study of Low rank coal

More information

Capacity Building Workshop on Development of CDM Activities and NAMA for Public And Private Sector In Zimbabwe

Capacity Building Workshop on Development of CDM Activities and NAMA for Public And Private Sector In Zimbabwe CDM Project Cycle Capacity Building Workshop on Development of CDM Activities and NAMA for Public And Private Sector In Zimbabwe Nyanga, Zimbabwe 24 25 August 2016 UNFCCC Secretariat UNFCCC RCC UNFCCC

More information

Global Gas Flaring Reduction

Global Gas Flaring Reduction Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Global Gas Flaring Reduction A Public-Private Partnership A VOLUNTARY STANDARD FOR GLOBAL

More information

Greenhouse Gas Reductions from Demand-Side Management

Greenhouse Gas Reductions from Demand-Side Management Greenhouse Gas Reductions from Demand-Side Management Control # 722 Melissa K. Antoine Trinity Consultants, 6600 Peachtree Dunwoody Road, 600 Embassy Row, Suite 350 Atlanta, Georgia 30328 ABSTRACT This

More information

Climate Change and Energy Package

Climate Change and Energy Package Climate Change and Energy Package The 4th International Conference NEUF 2008 Warszawa, 6 June 2008 Piotr J. Tulej Head of Unit Energy and Environment Directorate-General Environment European Commission

More information

Update on the Nigerian Gas Master-plan

Update on the Nigerian Gas Master-plan June 5 th 2013 NOG Tech Lagos, Nigeria Update on the Nigerian Gas Master-plan Dr. David Ige Group Executive Director, Gas & Power NNPC Outline Overview of the Nigerian Gas Sector Our Scorecard Gas Industrialization

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS CDM Executive Board page 1 CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS A. General description of project activity B. Application

More information

CARBON DIOXIDE TRANSPORT, INJECTION AND GEOLOGICAL STORAGE

CARBON DIOXIDE TRANSPORT, INJECTION AND GEOLOGICAL STORAGE Chapter 5: Carbon Dioxide Transport, Injection and Geological Storage CHAPTER 5 CARBON DIOXIDE TRANSPORT, INJECTION AND GEOLOGICAL STORAGE 2006 IPCC Guidelines for National Greenhouse Gas Inventories 5.1

More information

Guidance Note on Accounting for Self- generated Certified Emission Reductions (CERs) (Issued 2012)

Guidance Note on Accounting for Self- generated Certified Emission Reductions (CERs) (Issued 2012) Guidance Note on Accounting for Self- generated Certified Emission Reductions (CERs) (Issued 2012) The Institute of Chartered Accountants of India (Set up by an Act of Parliament) New Delhi Foreword At

More information

Framework Convention on Climate Change. Materiality standard under the clean development mechanism

Framework Convention on Climate Change. Materiality standard under the clean development mechanism United Nations Framework Convention on Climate Change Distr.: General 31 May 2011 English only FCCC/TP/2011/4 Materiality standard under the clean development mechanism Technical paper Summary This document

More information

INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE

INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE WMO INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE UNEP INTERGOVERNMENTAL PANEL IPCC-XIX/Doc. 9 ON CLIMATE CHANGE (22.III.2002) NINETEENTH SESSION Geneva, 17-20 (morning only) April 2002 Agenda item: 6.a.ii.I.

More information

UNFCCC/CCNUCC DRAFT STANDARD FOR THE DEVELOPMENT OF ELIGIBILITY CRITERIA FOR THE INCLUSION OF A PROJECT ACTIVITY AS A CPA UNDER THE POA. I.

UNFCCC/CCNUCC DRAFT STANDARD FOR THE DEVELOPMENT OF ELIGIBILITY CRITERIA FOR THE INCLUSION OF A PROJECT ACTIVITY AS A CPA UNDER THE POA. I. Page 1 STANDARD FOR THE DEVELOPMENT OF ELIGIBILITY CRITERIA FOR THE INCLUSION OF A PROJECT ACTIVITY AS A CPA UNDER THE POA I. Background 1. In decision 3/CMP.1 paragraph 4, Parties requested the clean

More information

Energy Efficient Environmental Solutions

Energy Efficient Environmental Solutions COMPLETE ENVIRONMENTAL SOLUTIONS Energy Efficient Environmental Solutions OUR MISSION It is our goal to maximize our clients competitive edge by improving overall performance and profitability with cost

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS CDM Executive Board page 1 CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS A. General description of project activity B. Application

More information

TECHNOLOGY CHOICE AND WATER CONSUMPTION FOR COAL ELECTRICITY PRODUCTION WITH CARBON CAPTURE AND STORAGE

TECHNOLOGY CHOICE AND WATER CONSUMPTION FOR COAL ELECTRICITY PRODUCTION WITH CARBON CAPTURE AND STORAGE Proceedings of the ASME 2014 Power Conference POWER2014 July 28-31, 2014, Baltimore, Maryland, USA POWER2014-32178 TECHNOLOGY CHOICE AND WATER CONSUMPTION FOR COAL ELECTRICITY PRODUCTION WITH CARBON CAPTURE

More information

Carbon Capture and Storage in Climate Change Mitigation

Carbon Capture and Storage in Climate Change Mitigation Carbon Capture and Storage in Climate Change Mitigation - a Norwegian perspective 3 March 2009 Tone Skogen Deputy Director General Norwegian IEA: Global economic growth requires increased energy supply

More information

CLIMATE CHANGE IN ZIMBABWE ON THE ROLE OF CLEAN DEVELOPMENT MECHANISM

CLIMATE CHANGE IN ZIMBABWE ON THE ROLE OF CLEAN DEVELOPMENT MECHANISM CLIMATE CHANGE IN ZIMBABWE ON THE ROLE OF CLEAN DEVELOPMENT MECHANISM 24 September 2007 W. Zhakata Climate Change Office WHAT IS THE PROBLEM?? What's Known for Certain? Scientists know for certain that

More information

Pemex Gas and Basic Petrochemicals Division of Production

Pemex Gas and Basic Petrochemicals Division of Production Reducing Methane Emissions from Wet Seal Centrifugal Compressors, Replication of Projects Identified by Methane to Markets: The Case of Compressor Dry Seals in PEMEX Pemex Gas and Basic Petrochemicals

More information

Global Overview of Policies Affecting Coal Mine Methane (CMM) Recovery and Utilization

Global Overview of Policies Affecting Coal Mine Methane (CMM) Recovery and Utilization Global Overview of Policies Affecting Coal Mine Methane (CMM) Recovery and Utilization Pamela M. Franklin U.S. Environmental Protection Agency August 30 31, 2010 Methane to Markets Partnership - Mongolia

More information

Clean Development Mechanism (CDM) Registration for the Gianyar Waste Recovery Project

Clean Development Mechanism (CDM) Registration for the Gianyar Waste Recovery Project Yayasan Pemilahan Sampah Temesi September 17, 2009 Clean Development Mechanism (CDM) Registration for the Gianyar Waste Recovery Project Content: 1. The Clean Development Mechanisms (CDM) Page 2 1.1 CDM

More information

ASSOCIATED PETROLEUM GAS UTILISATION IN RUSSIA

ASSOCIATED PETROLEUM GAS UTILISATION IN RUSSIA PETROLEUM UTILISATION IN RUSSIA ABOUT PETROLEUM Associated petroleum gas (APG) is the gas dissolved in oil fluids, which contains methane, a common natural gas, and natural gas liquids (NGLs) used as fuel

More information

Australian carbon policy: Implications for farm businesses

Australian carbon policy: Implications for farm businesses Australian carbon policy: Implications for farm businesses Australian carbon policy Carbon markets and prices Some CFI case studies Farm business implications Key messages Atmosphere Sequestration Mitigation

More information