COAL TAR RECOVERY: LESSONS LEARNED AT A FORMER MANUFACTURED GAS PLANT SITE

Size: px
Start display at page:

Download "COAL TAR RECOVERY: LESSONS LEARNED AT A FORMER MANUFACTURED GAS PLANT SITE"

Transcription

1 COAL TAR RECOVERY: LESSONS LEARNED AT A FORMER MANUFACTURED GAS PLANT SITE By Joseph E. Higgins, P.E., L.S.P., Michael Lotti, L.S.P. (Innovative Engineering Solutions, Inc. - Walpole, Massachusetts) Elizabeth Greene, L.S.P. (National Grid - Westborough, Massachusetts) Background Former MGP site with coal tar released. Silty clay perching layer encountered at a depth of about 25 feet Groundwater present at a depth of 14 feet Regional groundwater present at a depth of 45 feet Contamination coincident with the silty clay layer Coal tar DNAPL observed at thicknesses greater than 8 feet above the silty clay layer Estimated 100,000 gallons downward movement of the DNAPL limited by perching layer.

2 Extent of Contamination Up to 8 feet of DNAPL has been measured on top of the perched layer. The perched water table is the result of a silty clay layer approximately 150 by 100 feet in area. Profile

3 Remedial Strategy Recover NAPL Initial recovery efforts 9 peristaltic pumps operating on timers 8,000 gallons of fluid (primarily NAPL) were recovered in 1 year Dewater perching layer Pump/fluid recovery test conducted 600,000 gallons of fluid on the perching layer Recharge of precipitation contributes 1,000,000 gallons of water to the layer annually. Recovery system expanded Initial System

4 Expanded System Designed to remove recoverable NAPL and water from perching layer and collect annual recharge volume. Fluids recovered from 20 recovery wells using peristaltic and pneumatic pumps Aboveground separation of fluids NAPL transferred to an on-site storage tank Water treated and discharged to the POTW Bag filters to remove particulates Granular activated carbon (GAC) to remove organics. Expanded System

5 Manifold Problems Encountered Compatibility with System Components Pump performance Cyanide in Groundwater

6 System Component Compatibility System components Steel Separator (epoxy coated) HDPE for underground piping, NAPL storage tanks PVC for separator coalescing media, aboveground piping System component compatibility with coal tar considered PVC monitoring wells and recovery wells Some 10 years old No signs of deterioration Separator

7 Compatibility Upgraded System Replaced PVC coalescing media with stainless steel Replaced HDPE NAPL storage tanks with stainless steel Replace aboveground piping in manifold with stainless steel and brass Monitor other system components Installed vapor phase treatment on tanks and separator

8 Upgraded System Upgraded System Before After

9 Pump Performance Peristaltic pumps used for initial system Suction limitations Compatibility with coal tar Low recovery Pneumatic pumps used for expanded system Initially used off the shelf bottom loading pumps Float/controller required frequent maintenance Designed and constructed bottom loading pump Operates on a timer Control panel at well head Easier to adjust recovery rates Peristaltic Setup

10 Pneumatic Pump Control Panel Cyanide in Groundwater Cyanide concentrations slowly increased over time, resulting in excessive GAC replacement POTW cyanide discharge limit of 630 ug/l 5,000 pounds of GAC were consumed after treating about 200,000 gallons of water). Conducted column tests using activated carbons, organoclays, and resins Evaluated effectiveness in removing cyanide and oil and grease Oil and grease a primary component in the influent POTW limit of 50 mg/l; the use of one media would be preferable over two media

11 Cyanide Removal Use the existing GAC filters for oil and grease removal Use an anionic exchange resin for cyanide removal System modified 4,000 pounds of GAC 160 pounds of resin Modified system has treated more than 500,000 gallons of water without requiring media replacement. System Costs Capital Costs OMM Costs Total Costs Tar Recovered (Gallons) Water Treated (Gallons) Initial System Expanded System $150,000 $165,000 $315,000 4,000 4,000 $400,000 $950,000 $1,540,000 47,156 2,312,686 Component Upgrades $140,000 Cyanide Issue $50,000 Total $740,000 $1,115,000 $1,855,000 51,156 2,316,686

12 Fluid Recovery System Costs Capital Costs OMM Costs Per Gallon of Tar Recovered Per Gallon of Water Treated Per Gallon of Tar Recovered Per Gallon of Water Treated Initial System $78.75 $78.75 $41.25 $36.67 Expanded System $32.66 $0.67 $20.23 $0.41

13 Summary Points Component compatibility is critical After 4 years of operation, PVC and HDPE piping still intact Many types of PVC, some hard, some soft, PVC coalescing media may not have been resistant to the tar, PVC pipe may be PVC pipe typically weakens at glued joint, not at pipe HDPE can get soft with tar May not have structural support needed for a tank May be adequate as small diameter buried pipe PVC well screens may have swelled and reduced potential for tar recovery Summary Points (cont d) Tar removal less complicated using a total fluids system with aboveground separation Tar viscosity will affect pump selection Tar viscosity can change over time Evaluate discharge options for the water before designing treatment system System operation continues to reduce fluid on the layer After 4 years of operation, tar thickness reduced by more than 7 feet, to less than 1 foot Currently evaluating in-situ methods to enhance tar recovery ph adjustments, surfactants

Remediation of a Hexavalent Chromium Release To Groundwater Using Ion-Specific Resins

Remediation of a Hexavalent Chromium Release To Groundwater Using Ion-Specific Resins Proceedings of the Annual International Conference on Soils, Sediments, Water and Energy Volume 15 Article 7 June 2010 Remediation of a Hexavalent Chromium Release To Groundwater Using Ion-Specific Resins

More information

Thermal Remediation Services, Inc.

Thermal Remediation Services, Inc. Thermal Remediation Services, Inc. Electrical Resistance Heating for In-Situ Remediation of Soil & Groundwater December 10, 2002 Greg Beyke (770) 794-1168 gbeyke@thermalrs.com www.thermalrs.com 1 1 2 2

More information

Vapor Extraction / Groundwater Extraction (VE/GE) System Initial Report

Vapor Extraction / Groundwater Extraction (VE/GE) System Initial Report Vapor Extraction / Groundwater Extraction (VE/GE) System Initial Report Gasoline Fueling Station Royal Farms #96 500 Mechanics Valley Road North East, MD 21901 MDE OCP Case No. 2011-0729-CE Facility ID

More information

Pressure Washwater Management for Marina/Boatyard Industries

Pressure Washwater Management for Marina/Boatyard Industries Pressure Washwater Management for Marina/Boatyard Industries Paul G. Richard, P.E. Senior Program Director EBI Consulting 617.715.1825 prichard@ebiconsulting.com Agenda Introduction Storm Water vs. Industrial

More information

ETHICALCHEM BACKGROUND

ETHICALCHEM BACKGROUND A division of Ethical Solutions LLC Successfully Integrating Surfactants Into Chemox Technologies Dan Socci, CEO, EthicalChem Green Chemical Solutions for Environmental Remediation ETHICALCHEM BACKGROUND

More information

REACTION TANKS ADVANCED MEMBRANE FILTRATION

REACTION TANKS ADVANCED MEMBRANE FILTRATION REACTION TANKS ADVANCED MEMBRANE FILTRATION Memtek EFC-Series Microfiltration System A MAJOR ADVANTAGE FOR RELIABLE WASTEWATER TREATMENT OR PROCESS FILTRATION SYSTEMS THAT GIVE YOU GREATER FLEXIBILITY

More information

--- Surfactant Enhanced Aquifer Restoration at a Former Chemical Weapons Manufacturing Site

--- Surfactant Enhanced Aquifer Restoration at a Former Chemical Weapons Manufacturing Site 25/03/2015 Amélioration de la réhabilitation d un aquifère pollué par du chloroforme et du triclorofluorométhane (Freon-11) par usage de surfactant sur un ancien site de fabrication d armes chimiques ---

More information

In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project ABSTRACT In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project R. Juhlin, M. Butherus S.M. Stoller Corporation 2597 B ¾ Road, Grand Junction, C0 81506 USA The

More information

Sanitaire TotalCare: Fine Bubble Diffuser Maintenance & Diffuser Cleaning Methods

Sanitaire TotalCare: Fine Bubble Diffuser Maintenance & Diffuser Cleaning Methods August 10, 2015 Sanitaire TotalCare: Fine Bubble Diffuser Maintenance & Diffuser Cleaning Methods Annie Weidert Introducing The Sanitaire TotalCare Team Brett Bigham Aftermarket Business Development Manager

More information

S-ISCO REMEDIATION OF COAL TAR

S-ISCO REMEDIATION OF COAL TAR Case Study Site Former Roofing Products Manufacturer, Queens, New York Contaminants of Concern VOCs (BTEX) & SVOCs (PAHs and naphthalene) related to MGP coal tar in soil & groundwater East River S-ISCO

More information

Thermal Remediation Services, Inc.

Thermal Remediation Services, Inc. Thermal Remediation Services, Inc. Electrical Resistance Heating for Rapid Remediation of DNAPL April 2003 David Fleming 425-396-4266 dfleming@thermalrs.com www.thermalrs.com What is Electrical Resistance

More information

How To Effectively Recover Free Product At Leaking Underground Storage Tank Sites

How To Effectively Recover Free Product At Leaking Underground Storage Tank Sites How To Effectively Recover Free Product At Leaking Underground Storage Tank Sites A Guide For State Regulators United States Environmental Protection Agency Office of Underground Storage Tanks, OSWER National

More information

Calculate the Costs of Piping System Elements

Calculate the Costs of Piping System Elements Calculate the Costs of Piping System Elements by Ray Hardee, Engineered Software, Inc. Last month s column described the process of creating an energy cost balance sheet for a piping system (see Figure

More information

Surfactant Enhanced Remediation Of Petroleum and Chlorinated Contaminated Sites. Bud Ivey Ivey International

Surfactant Enhanced Remediation Of Petroleum and Chlorinated Contaminated Sites. Bud Ivey Ivey International Surfactant Enhanced Remediation Of Petroleum and Chlorinated Contaminated Sites Bud Ivey Ivey International SMART Remediation Ottawa, ON February 16, 2017 SMART is Powered by: www.vertexenvironmental.ca

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS INTERIM GUIDE CRITERIA FOR AEROBIC BACTERIAL GENERATOR FOR INSERT INTO SEPTIC TANKS, GREASE INTERCEPTORS AND GREASE TRAPS IAPMO IGC 180-20023

More information

Enhanced In Situ Hydrocarbon Recovery: Dual Phase Vacuum Extraction and Pneumatic Fracturing Project

Enhanced In Situ Hydrocarbon Recovery: Dual Phase Vacuum Extraction and Pneumatic Fracturing Project Enhanced In Situ Hydrocarbon Recovery: Dual Phase Vacuum Extraction and Pneumatic Fracturing Project Greg T. Saretzky, M.Sc., P.Eng., Kris Bradshaw, E.I.T. (Stantec Consulting Ltd.) and Russell Roy, P.Eng.

More information

GTR Description Jenks Drive Corona, CA

GTR Description Jenks Drive Corona, CA GTR Description 1612 Jenks Drive Corona, CA 92880 1.714.283.1682 www.georemco.com Gas Thermal Remediation (GTR) Description G.E.O. Inc.'s patented GTR TM system is used for In-Situ Thermal Remediation

More information

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED Chapter 17 Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.1.1 Applicability The regulations in this chapter apply to any private potable water supply system where plumbing fixtures are

More information

LEAF Method Testing of MGP-impacted Sediments in Gowanus Canal

LEAF Method Testing of MGP-impacted Sediments in Gowanus Canal LEAF Method Testing of MGP-impacted Sediments in Gowanus Canal RE3 Conference 2014 Jeff Gentry, P.E. Principal Technologist January 28, 2014 Gowanus Canal Superfund Site 1.8 mile long canal in Brooklyn,

More information

Task 5. Christopher Mack Zack Kaldy MET 330 Fluid Mechanics November 8, Purpose

Task 5. Christopher Mack Zack Kaldy MET 330 Fluid Mechanics November 8, Purpose Purpose Task 5 Christopher Mack Zack Kaldy MET 330 Fluid Mechanics November 8, 2015 For the fifth task of this project we are asked to specify the layout of the piping system, the material type and sizes

More information

Enhanced Anaerobic Biodegradation of a Refinery Benzene Groundwater Plume

Enhanced Anaerobic Biodegradation of a Refinery Benzene Groundwater Plume Enhanced Anaerobic Biodegradation of a Refinery Benzene Groundwater Plume Robert (Rory) S. Johnston, PE Michael Eberle SAWEA CONFERENCE DECEMBER 2007 Presentation Outline Go With the Flow Anaerobic Process

More information

GUIDANCE MEMO NO : GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON-POTABLE PIPELINES

GUIDANCE MEMO NO : GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON-POTABLE PIPELINES State of California Memorandum Department of Health Services Date: April 4, 2003 To: From: Subject: Regional and District Engineers David P. Spath, Ph.D., Chief (Original signed by Dave) Drinking Water

More information

ION EXCHANGE RESIN CHAMBERS and SYSTEMS

ION EXCHANGE RESIN CHAMBERS and SYSTEMS ION EXCHANGE CHAMBERS and SYSTEMS 367 For PRECIOUS METAL RECOVERY These resin systems can recover gold and other metals from plating operations easily and economically. Select the proper resin for gold

More information

MASSACHUSETTS CONTINGENCY PLAN REMEDY OPERATION STATUS OPINION

MASSACHUSETTS CONTINGENCY PLAN REMEDY OPERATION STATUS OPINION 273 West Main Street, Norton, MA 02766 Tel: (508) 226-1800 Fax: (508) 226-1811 MASSACHUSETTS CONTINGENCY PLAN REMEDY OPERATION STATUS OPINION CITGO BULK STORAGE TERMINAL 385 QUINCY AVENUE BRAINTREE, MASSACHUSETTS

More information

AALSO Summary of Formulas needed for Levels I, II and III.

AALSO Summary of Formulas needed for Levels I, II and III. AALSO Summary of Formulas needed for Levels I, II and III. The information provided below is used in the math portion of the proficiency exams. Please take time to review and learn how to use these formulas

More information

DIGESTER FOAMING. Maintenance for Biosolids Systems. Steve Walker Senior Operations Specialist. September 13, sw510s1.pptx/1

DIGESTER FOAMING. Maintenance for Biosolids Systems. Steve Walker Senior Operations Specialist. September 13, sw510s1.pptx/1 DIGESTER FOAMING CAUSES AND SOLUTIONS CWEA Math, Operations, and Maintenance for Biosolids Systems Seminar September 13, 2011 Steve Walker Senior Operations Specialist sw510s1.pptx/1 LEARNING OBJECTIVES

More information

INVESTIGATION RESULTS

INVESTIGATION RESULTS September 13, 2011 Burt Fleischer, R.E.A., R.E.P. Director, Environmental Affairs Hilmar Cheese Company 9001 N. Lander Avenue Hilmar, CA 95324 Subject: Revised Work Plan for Supply Well IN 1 Destruction

More information

LANDFILL GAS CONTROL SYSTEMS: DESIGN AND CONSTRUCTION CONSIDERATIONS. Mike Bradford, P.E.

LANDFILL GAS CONTROL SYSTEMS: DESIGN AND CONSTRUCTION CONSIDERATIONS. Mike Bradford, P.E. LANDFILL GAS CONTROL SYSTEMS: DESIGN AND CONSTRUCTION CONSIDERATIONS Mike Bradford, P.E. 2 Today s Agenda SOLUTIONS YOU CAN COUNT ON. PEOPLE YOU CAN TRUST. What are we controlling? FOCUS: How do we control

More information

CeraMem. Ceramic Membrane Technology. Advanced Heavy Metals Removal System WATER TECHNOLOGIES

CeraMem. Ceramic Membrane Technology. Advanced Heavy Metals Removal System WATER TECHNOLOGIES CeraMem Ceramic Membrane Technology Advanced Heavy Metals Removal System WATER TECHNOLOGIES Key System Features CeraMem UF membranes act as an absolute barrier to oils, suspended solids, and precipitated

More information

AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal

AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal Technical Bulletin 2004-02 rev0707 Q: What is the AdEdge AD26 System? A: The AD26 system is a pre-engineered, packaged treatment system specifically

More information

SECTION 7 SEPARATION OF WATER MAINS AND SANITARY SEWERS

SECTION 7 SEPARATION OF WATER MAINS AND SANITARY SEWERS SECTION 7 SEPARATION OF WATER MAINS AND SANITARY SEWERS To prevent the contamination of the public water supplies from nearby sanitary sewers, the following State Water Resources Control Board Division

More information

Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities

Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities 147 Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities Todd Stong PE 1, Ron R. Jorgenson 2, and Jacob Sauer 3 1 Senior Engineer,

More information

STRATEGIES FOR LNAPL REMEDIATION

STRATEGIES FOR LNAPL REMEDIATION STRATEGIES FOR LNAPL REMEDIATION J. D. Keetley Petroleum Storage Tank Trust Fund Utah Department of Environmental Quality 2011 ASTSWMO LUST and State Funds Workshop September 13-15, 2011 Chicago, Illinois

More information

LIGHTSHIP ENGINEERING

LIGHTSHIP ENGINEERING LIGHTSHIP ENGINEERING ASSESSMENT AND REMEDIATION CIVIL ENGINEERING ENERGY MANAGEMENT WATER AND WASTEWATER MANAGEMENT PERMITTING RELEASE ABATEMENT MEASURE STATUS REPORT Former Fisherville Mill 60 Main Street

More information

Best Practices for Chemical Facility Design in Water Treatment. Sara N. Gibson, P.E.

Best Practices for Chemical Facility Design in Water Treatment. Sara N. Gibson, P.E. Best Practices for Chemical Facility Design in Water Treatment Sara N. Gibson, P.E. Overview Introduction Design Considerations Storage Tanks Recirculation / Transfer Pumps Metering Pumps Piping and Valves

More information

Self-Sustaining Treatment for Active Remediation (STAR): Overview and Applications of the Technology

Self-Sustaining Treatment for Active Remediation (STAR): Overview and Applications of the Technology Self-Sustaining Treatment for Active Remediation (STAR): Overview and Applications of the Technology Shanna Thompson, P.E. Gavin Grant, Ph.D., P.Eng. In Partnership with: siremlab.com/star Overview The

More information

DRINKING WATER STORAGE TANK

DRINKING WATER STORAGE TANK Technical Sheet * TECHNICAL DATA Operating range: maximum flow rate 120 l/min, head up to 65 metres Pumped fluid: clean, free from solids or abrasive substances, not viscous, not aggressive, not crystallised

More information

Imagine the result. Boatyard Stormwater Treatment Technology Cost Analysis

Imagine the result. Boatyard Stormwater Treatment Technology Cost Analysis Imagine the result Northwest Marine Trade Association Puget Soundkeeper Alliance Washington State Department of Ecology Boatyard Stormwater Treatment Technology Cost Analysis June 27, 2008 Boatyard Stormwater

More information

VENTURI FLOW METER CALIBRATIONS SERIAL NUMBERS: , , , Prepared for. Imperial Flange and Fitting.

VENTURI FLOW METER CALIBRATIONS SERIAL NUMBERS: , , , Prepared for. Imperial Flange and Fitting. VENTURI FLOW METER CALIBRATIONS SERIAL NUMBERS: 23034-1, 23034-2, 23034-3, 23034-4 Prepared for Imperial Flange and Fitting January 2007 UTAH WATER RESEARCH LABORATORY Utah State University Report No.

More information

ENVIRONMENTAL FOOTPRINT ANALYSIS OF STEAM ENHANCED EXTRACTION REMEDY FORMER WILLIAMS AIR FORCE BASE, SITE ST012 MESA, AZ

ENVIRONMENTAL FOOTPRINT ANALYSIS OF STEAM ENHANCED EXTRACTION REMEDY FORMER WILLIAMS AIR FORCE BASE, SITE ST012 MESA, AZ EPA 542-R-14-004 June 25, 2104 ENVIRONMENTAL FOOTPRINT ANALYSIS OF STEAM ENHANCED EXTRACTION REMEDY FORMER WILLIAMS AIR FORCE BASE, SITE ST012 MESA, AZ FINAL REPORT June 25, 2014 NOTICE Work described

More information

Case Study Using Fenton s Reagent Under a Performance- Based Remediation Contract

Case Study Using Fenton s Reagent Under a Performance- Based Remediation Contract Case Study Using Fenton s Reagent Under a Performance- Based Remediation Contract Presented at JSEM 2006 Presented by: John Mieher, RG 7500 N Dreamy Draw Dr., Suite 2321 Phoenix, AZ 85020 602.266.2011

More information

2019 Salt River Siphon Outage Customer Focus Meeting

2019 Salt River Siphon Outage Customer Focus Meeting 2019 Salt River Siphon Outage Customer Focus Meeting Darrin Francom, PE Engineering Services Department Manager Agenda 1. Overview of the Siphon 2. Review of Repair in 2001 3. Results of 2009 Inspection

More information

Handling Fluid Fertilizers Selecting the Right Equipment Components

Handling Fluid Fertilizers Selecting the Right Equipment Components Handling Fluid Fertilizers Selecting the Right Equipment Components 9/2/2010 1 Considerations Systematic approach Compatible components Short term vs. long term Plan ahead for future expansion 9/2/2010

More information

Environmental Management Division. David Amidei NASA HQ

Environmental Management Division. David Amidei NASA HQ NASA s Remediation Challenges David Amidei NASA HQ Environmental Management Division i i NASA Facilities Environmental Management Division Previous Practices Environmental Management Division and more

More information

Water Quality Specification for Power Supplies

Water Quality Specification for Power Supplies Technical Note #6 Water Quality Specification for Power Supplies Introduction The cooling water for Alpha Scientific Power Supplies must meet certain minimum specifications in regard to quality and flow

More information

ATTACHMENT BWSC-105 EVERETT STREET AT MASSACHUSETTS AVENUE CAMBRIDGE, MASSACHUSETTS RTN D. DESCRIPTION OF RESPONSE ACTIONS

ATTACHMENT BWSC-105 EVERETT STREET AT MASSACHUSETTS AVENUE CAMBRIDGE, MASSACHUSETTS RTN D. DESCRIPTION OF RESPONSE ACTIONS ATTACHMENT BWSC-105 EVERETT STREET AT MASSACHUSETTS AVENUE CAMBRIDGE, MASSACHUSETTS RTN 3-26434 D. DESCRIPTION OF RESPONSE ACTIONS 14. Removal of Drums, Tanks or Containers: a. Describe Quantity and Amount:

More information

Chlorinated Organics Closed Loop Unloading of Solvent Tank Trailers

Chlorinated Organics Closed Loop Unloading of Solvent Tank Trailers Chlorinated Organics Closed Loop Unloading of Solvent Tank Trailers Closed loop unloading systems are designed to minimize solvent vapor emissions during transfer by exchanging the liquid solvent in the

More information

CHEMICAL INJECTION METHODS Pros & Cons

CHEMICAL INJECTION METHODS Pros & Cons CHEMICAL INJECTION METHODS Pros & Cons 1 Chemical injection is an integral component of any pipeline integrity program. The petroleum, chemical, and water treatment industries require chemical treatments

More information

NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL HEALTH ON-SITE WASTEWATER SECTION

NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL HEALTH ON-SITE WASTEWATER SECTION NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL HEALTH ON-SITE WASTEWATER SECTION INNOVATIVE WASTEWATER SYSTEM APPROVAL, Attachment INNOVATIVE WASTEWATER SYSTEM

More information

The following definitions apply with regard to requirements specified in this document:

The following definitions apply with regard to requirements specified in this document: GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved

More information

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program www.pca.state.mn.us Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program This document describes the requirements for excavating petroleum-contaminated soil

More information

DETAILED EQUIPMENT SPECIFICATION MFS SERIES FILTERS

DETAILED EQUIPMENT SPECIFICATION MFS SERIES FILTERS 5356 Hillside Avenue Indianapolis, IN 46220 P: +1 888-56-Water (569-2837) F: +1 317-255-4727 info@nancrede.com www.nancrede.com DETAILED EQUIPMENT SPECIFICATION MFS SERIES FILTERS 1.0 SCOPE 1.1 Provide

More information

2018 YEARLY BID FORMS SUPPLIER BID FORM. ITEM # 1: Fire Hydrants: 3 and 4 Bury, 3 ways, 5 ¼ valve opening, 6 mechanical joint shoe.

2018 YEARLY BID FORMS SUPPLIER BID FORM. ITEM # 1: Fire Hydrants: 3 and 4 Bury, 3 ways, 5 ¼ valve opening, 6 mechanical joint shoe. 2018 YEARLY BID FORMS SUPPLIER BID FORM ITEM # 1: Fire Hydrants: 3 and 4 Bury, 3 ways, 5 ¼ valve opening, 6 mechanical joint shoe. PHONE # OF BIDDER MAKE OF UNIT BID MODEL OF UNIT BID_ ITEM 3 BURY FIRE

More information

BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS

BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS 1. Crop Feedstocks for Bio-Ethanol 2. Cellulose Feedstocks for Bio-Ethanol 3. Wood Feedstocks

More information

OIL / WATER SEPARATORS UNDERGROUND FIBERGLASS STORAGE TANKS MODELS: CSI-10 / CSI-15 / UL 2215

OIL / WATER SEPARATORS UNDERGROUND FIBERGLASS STORAGE TANKS MODELS: CSI-10 / CSI-15 / UL 2215 OIL / WATER SEPARATORS UNDERGROUND FIBERGLASS STORAGE TANKS MODELS: CSI-10 / CSI-15 / UL 2215 FIBERGLASS UNDERGROUND OIL/WATER SEPARATORS Containment Solutions, Inc. (CSI) provides a full range of dependable

More information

CO 2 Capture and Utilization using Microalgae

CO 2 Capture and Utilization using Microalgae CO 2 Capture and Utilization using Microalgae Mark Crocker University of Kentucky Center for Applied Energy Research (CAER) Energy in Kentucky 92% of KY electricity from coal KY is 1.4% of US population

More information

Alamogordo Desalination Project

Alamogordo Desalination Project Alamogordo Desalination Project 2015 Multi State Salinity Conference Robert Fowlie, PE, BCEE February 19, 2015 Alamogordo Regional Water Supply Project Existing Water Sources Surface Water City has 5400

More information

In Situ Well Development Techniques for Efficient Production and Groundwater Restoration. John Cash Ur-Energy USA Inc.

In Situ Well Development Techniques for Efficient Production and Groundwater Restoration. John Cash Ur-Energy USA Inc. In Situ Well Development Techniques for Efficient Production and Groundwater Restoration By John Cash Ur-Energy USA Inc. What is Well Development? Any action taken after the well is installed to improve

More information

In Situ Chemical Oxidation of Volatile Organic Compounds in a Fractured Bedrock Aquifer

In Situ Chemical Oxidation of Volatile Organic Compounds in a Fractured Bedrock Aquifer In Situ Chemical Oxidation of Volatile Organic Compounds in a Fractured Bedrock Aquifer Paul D. Rohde, CH2M HILL and Cynthia R. Butler, P.E., CH2M HILL Abstract Site Background A pilot-scale study of in

More information

AALSO Proficiency Program Level I, II & III

AALSO Proficiency Program Level I, II & III AALSO Proficiency Program Level I, II & III Hello, and welcome to AALSO s 2010 Proficiency Program! AALSO offers a multi-level operator competency acknowledgment program based on test scores received from

More information

Transitioning from the Percolation Test to Soils Evaluation Colorado Environmental Health Association Annual Education Conference 2015

Transitioning from the Percolation Test to Soils Evaluation Colorado Environmental Health Association Annual Education Conference 2015 Transitioning from the Percolation Test to Soils Evaluation Colorado Environmental Health Association Annual Education Conference 2015 Roy Laws, P.E. Jefferson County Public Health Warren S. Brown, P.E.

More information

Water Utility Science Water Math and Hydraulics 050. Name: Date:

Water Utility Science Water Math and Hydraulics 050. Name: Date: Water Utility Science Water Math and Hydraulics 050 Name: Date: Note: Please show all of your calculations for each problem no matter how simple the problem may seem. Please use the accompanying pieces

More information

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment Village of Bolivar, NY Fe/Mn Removal/Village of Bolivar, NY Presentation Outline Fe/Mn Overview Treatment Options Village of Bolivar Challenge

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 11241 - Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S PART 1 - GENERAL... 1 1.01 Scope... 1 1.02 Scope of Work... 1 1.03

More information

MPPE Benefits. 1 Very High Separation Performance Reduction factor 1,000,000 times = % removal if required

MPPE Benefits. 1 Very High Separation Performance Reduction factor 1,000,000 times = % removal if required MPPE Systems MPPE Benefits 1 Very High Separation Performance Reduction factor 1,000,000 times = 99.9999% removal if required 2 Cost Competitive Cost competitiveness proven compared with air stripping

More information

Enviro Voraxial Technology

Enviro Voraxial Technology 1.0 Introduction Enviro Voraxial Technology 821 NW 57 th Place, Fort Lauderdale, FL 33309 Phone 954.958.9968 Fax: 954.958.8057 sales@evtn.com www.evtn.com Case Study Voraxial 4000 Separator On Offshore

More information

DRAFT DESIGN REGULATIONS FOR SUBSURFACE DRIP DISPERSAL SYSTEMS

DRAFT DESIGN REGULATIONS FOR SUBSURFACE DRIP DISPERSAL SYSTEMS DRAFT DESIGN REGULATIONS FOR SUBSURFACE DRIP DISPERSAL SYSTEMS Boone County Regional Sewer District Boone County, Missouri Adopted xx/xx/xxxx Chapter 5 Contents 5.1. Introduction... 1 5.2. General Provisions...

More information

STANDARD OPERATING PROCEDURES

STANDARD OPERATING PROCEDURES PAGE: 1 of 7 CONTENTS 1.0 SCOPE AND APPLICATION* 2.0 METHOD SUMMARY* 3.0 SAMPLE PRESERVATION, CONTAINERS, HANDLING, AND STORAGE 4.0 INTERFERENCES AND POTENTIAL PROBLEMS* 5.0 EQUIPMENT/APPARATUS* 6.0 REAGENTS

More information

Feed Water Reduction in Industrial Water Purification Systems

Feed Water Reduction in Industrial Water Purification Systems Feed Water Reduction in Industrial Water Purification Systems Ground Water Protection Council 2010 Annual Forum Water/Energy Sustainability Symposium Pittsburgh, PA September 26-29, 2010 William V. Collentro

More information

27/9/01 CFS0078 WERRIBEE 1966 TEST LINE - HISTORY & TEST RESULTS

27/9/01 CFS0078 WERRIBEE 1966 TEST LINE - HISTORY & TEST RESULTS Memorandum 7/9/01 CFS0078 WERRIBEE 1966 TEST LINE - HISTORY & TEST RESULTS ABSTRACT Various pipe materials and protective systems for concrete were tested for performance in H S conditions in a 375 mm

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

REMEDIATION SYSTEM EVALUATION (RSE) AMERICAN CREOSOTE WORKS SITE PENSACOLA, FLORIDA

REMEDIATION SYSTEM EVALUATION (RSE) AMERICAN CREOSOTE WORKS SITE PENSACOLA, FLORIDA EPA 542-R-06-014 June 2006 www.epa.gov/tio www.clu-in.org/optimization REMEDIATION SYSTEM EVALUATION (RSE) AMERICAN CREOSOTE WORKS SITE PENSACOLA, FLORIDA Report of the Remediation System Evaluation Site

More information

Use of Alternative Water Sources for Power Plant Cooling

Use of Alternative Water Sources for Power Plant Cooling Use of Alternative Water Sources for Power Plant Cooling Robert Goldstein (rogoldst@epri.com) Senior Technical Executive, Water and Ecosystems, EPRI ASME Water Management Technology Best Management Practices

More information

Speaker Lowell Kessel GEO Incorporated - Gas Thermal Remediation Services

Speaker Lowell Kessel GEO Incorporated - Gas Thermal Remediation Services Speaker Lowell Kessel GEO Incorporated - Gas Thermal Remediation Services 2 1980s- Steam Enhanced Extraction Netherlands Soil & GW Remediation 1989- Thermal Conductive Heating Shell Oil Co.- In Situ Soil

More information

A. Codes and Standards that are Standard at the University: 1. AGA Compliance: LC 1-91 Interior Fuel Gas Piping Systems

A. Codes and Standards that are Standard at the University: 1. AGA Compliance: LC 1-91 Interior Fuel Gas Piping Systems PART 1: GENERAL 1.01 Purpose: This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is to

More information

NAPL. Fixing. Sediments. pg 18. September Super Early Bird expires on 9/30/14! Solutions for Air, Water, Waste and Remediation

NAPL. Fixing. Sediments. pg 18. September Super Early Bird expires on 9/30/14! Solutions for Air, Water, Waste and Remediation September 2014 Solutions for Air, Water, Waste and Remediation > IMPROVING ACCURACY > HORMONE DISTRUPTORS > RECYCLING CUTTINGS > WEFTEC PREVIEW pg 24 pg 28 pg 34 pg 38 Fixing NAPL Sediments pg 18 Super

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

February 23, 2010 Version 0.0

February 23, 2010 Version 0.0 February 23, 2010 Version 0.0 New Jersey Department of Environmental Protection Site Remediation Program Guidance for Light Non-aqueous Phase Liquid (LNAPL) Free Product Initial Recovery and Interim Remedial

More information

Product Information CHEMGLAZE B 9942 A/B. Coating for Casting Pits. Easy Application Chemglaze B 9942 A/B will bond to damp and wet surfaces.

Product Information CHEMGLAZE B 9942 A/B. Coating for Casting Pits. Easy Application Chemglaze B 9942 A/B will bond to damp and wet surfaces. Product Information Chemical Products Division CHEMGLAZE B 9942 A/B Coating for Casting Pits. FEATURES BENEFITS. Easy Application Chemglaze B 9942 A/B will bond to damp and wet surfaces. Will build to

More information

Pit Systems & Accessories. Water Treatment Systems. Mi-T-M Water Treatment Systems provide a better tomorrow by protecting our environment today.

Pit Systems & Accessories. Water Treatment Systems. Mi-T-M Water Treatment Systems provide a better tomorrow by protecting our environment today. Mi-T-M WATER TREATMENT WATER TREATMENT Water Treatment Mi-T-M Water Treatment provide a better tomorrow by protecting our environment today. Use an in-ground pit system to pre-treat wastewater efficiently

More information

GUIDELINES FOR INSTALLATION OF ABOVEGROUND DIESEL FUEL TANKS

GUIDELINES FOR INSTALLATION OF ABOVEGROUND DIESEL FUEL TANKS GUIDELINES FOR INSTALLATION OF ABOVEGROUND DIESEL FUEL TANKS Revised 1/1/17 Authority cited: California Fire Code; National Fire Protection Association 30 (NFPA) Flammable and Combustible Liquids Code

More information

ROUX ASSOCIATES, INC. Environmental Consulting & Management

ROUX ASSOCIATES, INC. Environmental Consulting & Management February 28, 2012 PARTIAL RESPONSE ACTION OUTCOME STATEMENT (RAO) 17 Central Street Property Peabody Essex Museum RTN 3-23396 Prepared for PEABODY ESSEX MUSEUM East India Square Salem, Massachusetts 01907

More information

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager Pittsburgh Water Treatment Plant Projects by Jay R. Lucas, P.E. Senior Project Manager Who Is American Water We are the largest publicly traded water and wastewater utility in the United States Broad national

More information

Ohio Department of Natural Resources Castalia State Fish Hatchery Steelhead and Rainbow Trout Programs

Ohio Department of Natural Resources Castalia State Fish Hatchery Steelhead and Rainbow Trout Programs Ohio Department of Natural Resources Castalia State Fish Hatchery Steelhead and Rainbow Trout Programs Planning, Design, Construction Administration, and Training and Commissioning Services provided by

More information

MANAGING DROUGHT IMPACTS ON WASTEWATER COLLECTION SYSTEMS

MANAGING DROUGHT IMPACTS ON WASTEWATER COLLECTION SYSTEMS MANAGING DROUGHT IMPACTS ON WASTEWATER COLLECTION SYSTEMS Northern California Pipe Users Group 24 th Annual Sharing Technologies Seminar February 18, 2016 LANI GOOD, PE COURTNEY HALL, EIT Acknowledgements

More information

Slant Well Desalination Feedwater Supply

Slant Well Desalination Feedwater Supply Slant Well Desalination Feedwater Supply Comparison Between Dana Point Test Slant Well and CEMEX Test Slant Well CalAm 9 Oct 14 Doheny Ocean Desalination Project Dana Pt. Project Location & Layout 30 mgd

More information

Section 5 - Planning Criteria. Section 5

Section 5 - Planning Criteria. Section 5 Section 5 - Planning Criteria Section 5 SECTION 5 PLANNING CRITERIA This section presents the design criteria and methodologies for analysis used to evaluate the existing distribution system and its facilities

More information

ABRASION resistant ACID resistant

ABRASION resistant ACID resistant MIN-TEC (Caspian Mineral Processing Co.) Official Exclusive Representative In IRAN ABRASION resistant ACID resistant Caspian Mineral Processing Co - MINTEC +98 (21) 88535792-3 info@mintecco.com Iran, Tehran,

More information

SUITABILITY FOR IN-SITU RECOVERY (ISR) CONFIRMED

SUITABILITY FOR IN-SITU RECOVERY (ISR) CONFIRMED 8 September 2008 Companies Announcement Office Via Electronic Lodgement SUITABILITY FOR IN-SITU RECOVERY (ISR) CONFIRMED Independent review of historical data has confirmed that the Lance Project is suitable

More information

PRODUCT GUIDE: ZINC-RICH COATINGS. Version:

PRODUCT GUIDE: ZINC-RICH COATINGS. Version: PRODUCT GUIDE: ZINC-RICH COATINGS Version: 08.07.17 305 Zinc Rich Epoxy Polyamide Primer Description: 305 is a user friendly zinc-rich epoxy primer formulated for use as a primer under acrylic, epoxy,

More information

Community Environmental Newsletter

Community Environmental Newsletter Community Environmental Newsletter, San Diego, CA April 2007 Volume 1, Issue 1 Defense Fuel Support Point (DFSP) Point Loma This newsletter is the first in a series intended to keep the local Point Loma

More information

SUBCHAPTER 2C - WELL CONSTRUCTION STANDARDS SECTION CRITERIA AND STANDARDS APPLICABLE TO WATER-SUPPLY AND CERTAIN OTHER TYPE WELLS

SUBCHAPTER 2C - WELL CONSTRUCTION STANDARDS SECTION CRITERIA AND STANDARDS APPLICABLE TO WATER-SUPPLY AND CERTAIN OTHER TYPE WELLS SUBCHAPTER 2C - WELL CONSTRUCTION STANDARDS SECTION.0100 - CRITERIA AND STANDARDS APPLICABLE TO WATER-SUPPLY AND CERTAIN OTHER TYPE WELLS 15A NCAC 02C.0101 GENERAL PROVISIONS (a) Authorization. The North

More information

Implementation of Electrokinetic Based Soil Desalinization

Implementation of Electrokinetic Based Soil Desalinization Implementation of Electrokinetic Based Soil Desalinization Christopher J. Athmer, P.E., Brent E. Huntsman, CPG Terran Corporation Dustin Andersen Oasis Petroleum Current Remediation Technologies for Brine

More information

Successfully dosing pipe networks. Kevin Sherman, Ph.D., P.E., D.WRE Vice President of Engineering Clearstream Wastewater Systems, Inc.

Successfully dosing pipe networks. Kevin Sherman, Ph.D., P.E., D.WRE Vice President of Engineering Clearstream Wastewater Systems, Inc. Successfully dosing pipe networks Kevin Sherman, Ph.D., P.E., D.WRE Vice President of Engineering Clearstream Wastewater Systems, Inc. What is a successful dose? Spreads effluent throughout soil disp.

More information

Remediation of the Former Gasworks, High Wycombe, UK

Remediation of the Former Gasworks, High Wycombe, UK Remediation of the Former Gasworks, High Wycombe, UK Apr-4-06 MGP Symposium, Reading UK, April 2006 Presented By Stuart Arch Apr-4-06 4/4/06 WPREpresentation1.ppt 1 Site Setting Contents of Presentation

More information

SECTION 1000 ENGINEERING SPECIFICATION: AIR STRIPPER (REMOVABLE TRAY)

SECTION 1000 ENGINEERING SPECIFICATION: AIR STRIPPER (REMOVABLE TRAY) SECTION 1000 ENGINEERING SPECIFICATION: AIR STRIPPER (REMOVABLE TRAY) PART 1 GENERAL 1.1 SCOPE 1.1.1 The manufacturer shall furnish a low profile, multi-tray Air Stripper for removal of volatile organic

More information

Brewery Wastewater Best Management Practices

Brewery Wastewater Best Management Practices King County Industrial Waste Program (KCIW) Brewery Wastewater Best Management Practices Arnaud Girard, KCIW Compliance Investigator arnaud.girard@kingcounty.gov 206-477-5440 Introduction to King County

More information

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv 1 Lake County WTP Improvements and Capacity Increase OTCO 9 th Annual Water and Wastewater Workshop 7.31.2013 Nick Pizzi Aqua Serv Rick Douglas Lake County Presentation Agenda Some topics we will cover:

More information