1 REVISIONS TO PART 10 EFFECTIVE AS OF JULY 20, 2016 SCHEDULE 1 Part 10 of the Health, Safety and Reclamation Code for Mines in British Columbia is repealed and the following is substituted: TABLE OF CONTENTS Page 10.1 Mine Plan and Reclamation Program Information, Proposed Coal and Mineral Mines, Major Modifications to Existing Mines & Major Exploration and Development Notice of Filing Referral of Permit Application to Other Agencies Permitted Sites Operations Mine Closure Reclamation Standards 17 Definitions best available technology means the site specific combination of technologies and techniques that most effectively reduce the physical, geochemical, ecological and social risks associated with tailings storage during all stages of operation and closure. dam means a barrier on the surface preventing uncontrolled release of either water, slurry or solids or a barrier underground to prevent the uncontrolled flow of water, slurry or solids. dump or stockpile means the accumulation of deposited rock fragments or other unconsolidated material engineer of record means the Professional Engineer who is retained under section (1) of this code. 1

2 environmental design flood means the hydrological event that is to be managed without release of untreated water to the environment. fill means a deposit of discrete particles, either loose or well-compacted, placed in layers or dumped into a ravine, valley, or depression. HSRC Guidance Document means the guidance document prepared by the chief inspector in consultation with the health safety and reclamation code committee for the purposes of this code. impoundment means a body of water, slurry or solids that is confined by natural barriers or constructed dams and includes those barriers, dams and related items. inflow design flood means the flood into the impoundment resulting from the design hydrologic event. land capability means the capability of achieving a specified land use estimated by limitations as a result of climate, topography and soils. landform means a designated structure that can be considered to have a risk profile similar to the surrounding environment. major dump means a dump that contains a volume of dumped material that exceeds one million cubic metres, or has a dump height greater than 50 metres, or has an area that is covered by a dump that exceeds one hectare, or is founded upon natural or trimmed slopes that are sometimes steeper than 20 degrees from a horizontal plane, or contains material dumped or placed in a water course having a potential peak flow greater than one cubic metre per second, once in every 200 years, or any other mine dumps so declared the chief inspector. overburden means all unconsolidated naturally occurring material overlying bedrock. permit means a permit issued pursuant to section 10 (3) of the Mines Act. probable maximum flood means the hypothetical most severe flood that may credibly be expected to occur at a particular location resulting from the seasonal maximum combination of precipitation and snowmelt. qualified professional means an individual who (a) is registered, and in good standing, with a professional organization in British Columbia governed under an enactment, and (b) is acting within his or her area of professional expertise. quantifiable performance objectives means measureable monitoring parameters that are identified and required to be maintained within predetermined limits for tailings storage facility safety. surficial soil material means those soils commonly contained in the upper layers of the overburden mass, which are suitable for use in reclamation, either as growth medium, soil covers and seals, or other reclamation requirements. 2

3 tailings means the residue remaining from the preparation of a concentrate of minerals or coal. tailings storage facility or TSF means a facility that stores tailings. TSF qualified person means the person designated under section (1) (b) of this code. watercourse means a natural stream or source of water, whether usually containing water or not, and includes any lake, river, creek, spring, ravine, swamp, and gulch. Mine Plan and Reclamation Program Information Proposed Placer Mines, Gravel Pits and Quarries (1) The proposed mine plan and reclamation program filed with the inspector in compliance with section 10 (1) of the Mines Act, shall consist of the appropriate Notice of Work forms together with such other information as the inspector may require, for approval of placer mining, sand and gravel pits, rock quarries and industrial mineral quarries. (2) No work shall proceed without the inspector granting a permit or authorization or the chief inspector granting an exemption under section 10 (2) of the Mines Act. Proposed Coal and Mineral Mines, Major Modifications to Existing Mines & Major Exploration and Development Permit Application (1) The owner, agent or manager shall submit in writing, an application to the chief inspector for a permit under section 10 (1) of the Mines Act for (a) surface or underground development or production for coal and mineral mines, or major expansions or major modifications of existing producing coal and mineral mines, or (b) underground exploration requiring excavation, large pilot projects, bulk samples, trial cargos or test shipments. (2) No work shall proceed without the chief inspector granting a permit or authorization. (3) The chief inspector shall determine the number of copies of the application required. Application Requirements The application shall include the following unless otherwise authorized by the chief inspector: (a) a regional map showing the location of the mine property, along with a map or air photo showing the location and extent of the mine; 3

4 (b) the present use and condition of the land and watercourses including (i) land ownership, including surface and mineral rights, licensed or permitted users such as water users, guides, outfitters, trappers and grazing licenses, (ii) climate, (iii) general geology and detailed geological descriptions of the deposit, (iv) surface water and groundwater quality and flow, (v) fisheries and aquatic resources, (vi) air quality, (vii) surficial geology and terrain mapping, (viii) soil survey and soil characterization, (ix) vegetation, (x) wildlife, (xi) land capability and present land uses such as agriculture, forestry, fisheries, wildlife, recreation, industrial, commercial and residential, and (xi) inhabited places in the vicinity of the mine; (c) established and asserted aboriginal and treaty rights; (d) a mine plan including (i) a map at a scale of 1:10,000 or less showing topographic contours, surface drainage features, claims, leases or licences, buildings, roads, railways, power transmission lines, pipelines, and other relevant features and the locations of all proposed or existing surface and underground mining developments, waste disposal areas, stockpiles, processing facilities, mine buildings and other mining related disturbances or infrastructure, (ii) an inventory of areas disturbed to date, and projected over the next 5 years and over the projected life of the mine, (iii) descriptions of mining methods, mining rates, projected mine life, processing methods and infrastructure requirements, (iv) development schedule for construction and mine sequencing, (v) detailed geology and ore reserves, and projected volumes of ore and waste to be produced and relative time of production, (vi) designs and details for dumps, open pits, impoundments, underground workings including areas that may be affected by subsidence, stockpiles, processing facilities, water management structures, water storage and water treatment facilities, haulage roads, road construction and significant transportation or utilities infrastructure, compatible with environmental protection, reclamation and mine closure, 4

5 (vii) designs and details for tailings storage and a description of proposed quantifiable performance objectives, (viii) designs for material handling and waste disposal procedures, (ix) salvaging and stockpiling of surface soils and overburden materials, (x) source, use and water balance for any water required in the operation, (xi) overall site water balance, and (xii) a traffic control procedure as required under section of this code. (e) a program for the environmental protection of land and watercourses during the construction and operational phases of the mining operation, including plans for (i) prediction, identification and management of physical, chemical, and other risks associated with tailings storage facilities and dams, (ii) prediction, and if necessary, prevention, mitigation and management of metal leaching and acid rock drainage, (iii) erosion control and sediment retention, and (iv) environmental monitoring and surveillance designed to demonstrate that (A) the objectives of section of this code are being met, (B) the reclamation standards as outlined in section10.7 of this code are being met, and (C) environmental protection of land and watercourses required under paragraph (f) (i) and (ii) of this section are being achieved and maintained, (f) an alternatives assessment for the proposed tailings storage facilities that assesses best available technology, (g) a conceptual reclamation plan for the closure or abandonment of all aspects of the mining operation, including (i) plans for long term post-closure maintenance of facilities, (ii) proposed use and capability objectives for the land and watercourses, and (h) a closure plan for the tailings storage facility, (i) an estimate of the total expected costs of outstanding reclamation obligations over the planned life of the mine, including the costs of long term monitoring and maintenance which, with the approval of the chief inspector, may be filed in a separate confidential report, and (j) any other relevant information required by the chief inspector. 5

6 Design Standards (1) Impoundments, tailings storage facilities and water management facilities and dams shall be designed by a Professional Engineer. (2) The Professional Engineer shall develop design criteria for each facility referred to in subsection (1) that considers the HSRC Guidance Document. (3) Site characterizations for support of the design of a tailings storage facility or dam shall be carried out by a Professional Engineer and in consideration of the HSRC Guidance Document. Engineer of Record (1) The manager shall ensure that a Professional Engineer is retained as the engineer of record for each tailings storage facility and dam under their management. (2) The engineer of record, as a qualified professional, has professional responsibility for assuring that a tailings storage facility or dam has been designed and constructed in accordance with the applicable guidelines, standards and regulations. (3) The manager shall notify the chief inspector of the retained engineer of record, of changes in the engineer of record, and the notification shall include an acknowledgement by the engineer of record. Duty to Report Safety Issues at Tailings Storage Facilities (1) The engineer of record shall immediately notify the manager in writing of any unresolved safety issue that compromises the integrity of a tailings storage facility. (2) If the engineer of record and manager are unable to resolve the safety issue, the manager must report the issue to the chief inspector and provide a copy of the report to the engineer of record. (3) If the manager does not provide the report under subsection (2) in a timely fashion, the engineer of record shall report the issue to the chief inspector. Consequence Classification The consequence classification for a tailings storage facility shall be determined by the engineer of record in consideration of the HSRC Guidance Document. Seismic and Flood Design Criteria (1) Seismic and flood design criteria for tailings storage facilities and dams shall be determined by the engineer of record based on the consequence classification determined under section of this code in consideration of the HSRC Guidance Document, subject to the following criteria: (a) for tailings storage facilities that store water or saturated tailings, 6

7 (i) the minimum seismic design criteria shall be a return period of 1 in 2475 years, (ii) the minimum flood design criteria shall be a return period 1/3 rd of the way between the 1 in 975-year event and the probable maximum flood, and (iii) a facility that stores the inflow design flood shall use a minimum design event duration of 72 hours; (b) for tailings storage facilities that cannot retain water or saturated tailings, (i) the minimum seismic design criteria shall be a return period of 1 in 975 years, and (ii) the water management design shall include an assessment of tailings facility erosion and surface water diversions as well as measures to prevent impounded tailings from becoming saturated that consider the consequence classification as determined under section of this code. (2) The environmental design flood criteria shall be determined by a Professional Engineer in consultation with other qualified professionals. Design Slopes For a tailings storage facility design that has an overall downstream slope steeper than 2H:1V, the manager shall submit justification by the engineer of record for the selected design slope and receive authorization by the chief inspector prior to construction. Minimum Static Factor of Safety For a tailings storage facility design that has a calculated static factor of safety of less than 1.5, the manager shall submit justification by the engineer of record for the selected factor of safety and receive authorization by the chief inspector prior to construction. Breach and Inundation Study/Failure Runout Assessment A tailings storage facility shall have a breach and inundation study or a failure runout assessment prior to commencing operation, or as required by the chief inspector. Water Balance and Water Management Plan (1) The manager shall ensure that a tailings storage facility has a water balance and water management plan for the permitted life of mine that is prepared by a qualified person. (2) The manager shall notify the chief inspector if any unpermitted discharge of water occurs or is required. 7

8 Quantifiable Performance Objectives The manager shall ensure that quantifiable performance objectives for a tailings storage facility are determined and reviewed by the engineer of record and the TSF qualified person. Underground Openings and Workings (1) Tailings storage facility designs that use underground openings shall comply with of this code. (2) Tailings storage facility designs shall consider the potential effects on and interactions with underground workings. Major Dumps A major dump shall be designed (a) in consideration of the Interim Guidelines of the British Columbia Mine Waste Rock Pile Research Committee, and (b) so as to allow for re-contouring such that final reclamation is consistent with the approved end land use. Metal Leaching and Acid Rock Drainage Plans for the prediction, and if necessary, the prevention, mitigation and management of metal leaching and acid rock drainage shall be prepared in consideration of the Guidelines for Metal Leaching and Acid Rock Drainage at Mine sites in British Columbia. Preparation of Plans and Programs Mine, environmental protection, reclamation and closure plans required under sections , , and of this code shall (a) be prepared taking into consideration the health and safety of the public and persons involved in the work, (b) be designed so as to make it as practicable as possible in the future to mine zones affected by the plan, (c) be designed to protect the land and watercourses, and (d) be prepared in consideration of the HSRC Guidance Document, by qualified professionals or persons who in the opinion of the chief inspector are qualified to perform the work. Departure from Approval The owner, agent or manager shall notify the chief inspector in writing of any intention to depart from the mine plan and reclamation program authorized under sections or of this code to any substantial degree, and shall not proceed to implement the proposed changes without the written authorization of the chief inspector. 8

9 Exceptions (1) Sections through of this code do not apply to placer mines, sand and gravel pits, and quarries unless required by the chief inspector (2) Sections , and of this code do not apply to mines with respect to which the chief inspector has received an application for a permit before the date on which this subsection comes into force. Publication Notice of Filing When required by an inspector, notice of filing an application under section 10 (1) of the Mines Act shall be published, by the person filing it, in the Gazette and in local newspapers. Written Response Where a notice of filing has been published under section of this code, a person affected by, or interested in, the application has 30 days after the last date on which the notice was published to view the application and make written representations to the chief inspector. Referral of Permit Application to Other Agencies Mine Development Review Committee (1) The chief inspector may refer to the advisory committee or the regional advisory committee established pursuant to section 9 of the Mines Act, applications submitted under section of this code and may, where the chief inspector considers it to be appropriate, refer any Notice of Work submitted under section of this code. (2) The advisory committee or regional advisory committee shall review every application referred to them and make recommendations to the chief inspector within 60 days following application. (3) If no recommendations under subsection (2) have been received within 60 days, the chief inspector will deem that there are no concerns. Circulation of Application (1) If a permit application under section of this code is not referred to a committee for review under section , an inspector may circulate it to other ministries and agencies and they will have 30 days following referral to make written representations to the inspector. (2) If no written representations have been received within 30 days, the inspector will deem that there are no concerns. 9

10 Permit A permit issued under section 10 (1) of the Mines Act shall take into consideration (a) any written representations received under section of this code, (b) any recommendations made by a committee under section of this code, and (c) any written representations received under section of this code. Updated Plans Permitted Sites (1) After commencement of operations, mine plans, including programs for reclamation and closure, shall be updated, at a minimum, every 5 years. (2) Reclamation plans shall outline progressive reclamation activities for the 5 years following the date on which the plans are updated in accordance with subsection (1). (3) After commencement of operations, the water balance and water management plans under section of this code shall be reconciled annually and updated as required. Governance (1) The manager of a mine with one or more tailings storage facilities shall (a) develop and maintain a Tailings Management System that considers the HSRC Guidance Document and includes regular system audits, (b) designate a TSF qualified person for safe management of all Tailings Storage Facilities, (c) establish an Independent Tailings Review Board, unless exempted by the chief inspector, (d) review annually the tailings storage facility risk assessment to ensure that the quantifiable performance objectives and operating controls are current and manage the facility risks, (e) maintain tailings storage facility emergency preparedness and response plans integrated into the Mine Emergency Response Plan required under section of this code, and (f) ensure document records for key information are maintained and readily available for tailings storage facilities. (2) The composition of an Independent Tailings Review Board established under subsection (1) (c) shall be commensurate with the complexity of the tailings storage facility in consideration of the HSRC Guidance Document. (3) The manager shall submit the terms of reference for the Independent Tailings Review Board including the qualifications of the board members to the chief inspector for approval. 10

11 (4) The terms of reference for the Independent Tailings Review Board shall be developed or updated as required in consideration of the review under subsection (1) (d). Register of Tailings Storage Facilities and Dams (1) The manager of a mine with one or more tailings storage facilities shall maintain a Register of Tailings Storage Facilities and Dams. (2) The register shall be reviewed and updated at least annually. Annual Reporting The owner, agent or manager shall submit one or more annual reports in a summary form specified by the chief inspector or by the conditions of the permit by March 31 of the following year on the following: (a) reclamation and environmental monitoring work performed under section (e) of this code; (b) tailings storage facility and dam safety inspections performed under section of this code; (c) a report of the activities of the Independent Tailings Review Board established under section (1) (c) of this code that describes the following: (i) a summary of the reviews conducted that year, including the number of meetings and attendees; (ii) whether the work reviewed that year meets the Board s expectations of reasonably good practice; (iii) any conditions that compromise tailings storage facility integrity or occurrences of non-compliance with recommendations from the engineer of record; (iv) signed acknowledgement by the members of the Board, confirming that the report is a true and accurate representation of their reviews; (d) a summary of tailings storage facility and dam safety recommendations including a scheduled completion date; (e) performance of high-risk dumps under section of this code; (f) updates to the tailings storage facilities register as required; (g) other information as directed by the chief inspector. Other Reporting The owner, agent or manager shall submit the following periodic reports with the annual reporting in a form specified by the chief inspector or by the conditions of the permit by March 31 of the year following their completion: (a) mine plan, reclamation plan and closure plan updates under section of this code; 11

12 (b) dam safety review reports performed under section of this code; (c) as built reports for tailings storage facilities and dams under section of this code. Operations Construction of Tailings and Water Management Facilities (1) The manager shall submit issued for construction drawings, specifications and quality assurance/quality control plans as well as a summary construction schedule to the chief inspector prior to commencing construction of a tailings storage or water management facility. (2) The manager shall ensure that the initial operation of a tailings storage or water storage facility does not commence until an "as built" report under subsection (3) certifying that the facility was designed in accordance with this code and constructed according to design has been submitted to the chief inspector and a permit has been received. (3) The manager shall prepare as built reports for each stage of construction of a tailings storage or water storage facility that include, as a minimum, the following: (a) geotechnical foundation conditions; (b) geometry; (c) quality assurance/quality control data prepared by a Professional Engineer. (4) The manager shall ensure that the engineer of record has certified that the tailings storage facility or dam has been constructed in a manner consistent with the design and specifications and that the structures are suitable for the intended use. Operations, Maintenance and Surveillance (OMS) Manual (1) An Operations, Maintenance and Surveillance Manual shall be prepared by one or more qualified person and submitted to the chief inspector prior to operation of the Tailings Storage Facility or dam. (2) The Operations, Maintenance and Surveillance Manual shall be reviewed by the engineer of record and approved by the manager prior to implementation. (3) All employees involved in the operation of a tailings storage facility or dam shall be trained and qualified, based on the OMS requirements, prior to commencing work at the facility. (4) The Operations, Maintenance and Surveillance Manual shall be reviewed annually and revised as required during operations of a tailings storage facility or dam. 12

13 Annual Dam Safety Inspection Tailings storage and water management facilities and associated dams shall be inspected annually and a report shall be prepared by the engineer of record in consideration of the HSRC Guidance Document Dam Safety Reviews A Dam Safety Review Report on the tailings storage, water management facilities and associated dams shall be prepared by an independent Professional Engineer in consideration of the HSRC Guidance Document at least every 5 years or as directed by the chief inspector. Major Dumps Major dumps shall be operated and monitored in accordance with the Interim Guidelines of the British Columbia Mine Waste Rock Pile Research Committee Spontaneous combustible material Material with a high probability of spontaneous combustion shall be placed in a separate dump. Materials Inventory (1) Where required for the control of metal leaching and acid rock drainage, the owner, agent or manager shall maintain an inventory of identified material that includes (a) composition, mass, volume, surface area, and storage locations, (b) history and timing of excavation, (c) monitoring data, and (d) any other information required by the chief inspector. (2) Upon closure, the manager shall submit the material inventory to the chief inspector. Excavations Near Property Boundaries The excavation of soil material such as clay, silt, earth, sand or gravel, in a surface mine shall not be carried on within a setback distance of at least 5 metres horizontal from the vertical plane of the property boundary, and (a) there shall be no excavation of soil material below a surface sloping downwards into the property from the inside edge of the setback no steeper than 1.5 horizontal to 1 vertical, and (b) material that sloughs from within this distance shall not be removed without the written approval of the inspector. Excavation before April 1, The chief inspector may direct that any excavation that exists in soil materials on or before April 1, 1997 will not be considered to be out of compliance for not meeting 13

14 setback requirements providing that all further excavation is conducted in a manner consistent with the requirements of section of this code. Alternative setbacks and slopes Notwithstanding sections and of this code, the chief inspector may approve a mine plan, prepared by a Professional Engineer, with alternative setbacks and slopes that ensure that the property boundary will be adequately protected. Rock excavation Rock shall not be excavated within a distance of 5 m from the property boundary. Waiver by adjoining property owners The owners of adjoining properties may, be agreement in writing, waive the provisions of sections , and of this code. Notice Required Mine Closure The owner, agent, or manager shall provide written notice of not less than 7 days to an inspector of intention to stop work in, on, or about a mine. Cessation of operations (1) If a mine ceases operation, the owner, agent, or manager shall (a) continue to carry out the conditions of the permit, and (b) carry out a program of site monitoring and maintenance. (2) If a mine ceases operation for a period longer than one year, the owner, agent, or manager shall (a) apply for an amendment to the permit setting out a revised program for approval by an inspector, (b) identify the hazards and provide detailed engineered plans and drawings respecting the hazards to local emergency agencies, and update the drawings as required, and (c) if practicable, make the plans and drawings available on site in a conspicuous location. Filing of Plans (1) On the closure of a mine, the owner, agent or manager shall, within 90 days, file with the chief inspector accurate drawings, on a scale consistent with good engineering practice, showing (a) on a plan view (i) the surface and underground workings of the mine up to the time of closure and the boundaries of the mineral claims, licenses, or leases in which the workings are situated, and 14

15 (ii) identification of underground workings that come to within 25 meters of the surface, (b) a general long section and several cross section views of the surface and underground mine workings, and (c) any other plans that may be requested by the chief inspector. (2) The filed plans shall be preserved as a permanent record in the office of the chief inspector. Securing of Openings When a mine is closed for an indefinite period, or otherwise left unattended for any length of time, the owner, agent or manager shall take all practicable measures to prevent inadvertent access to mine entrances, pits and openings that are dangerous by reason of their depth or otherwise, by unauthorized persons and ensure that the mine workings and fixtures remain secure. Major Dumps The long-term stability of exposed slopes of any major dump shall meet the criteria provided in the Interim Guidelines of the British Columbia Mine Waste Rock Pile Research Committee at the time of permitting or as amended by the chief inspector. Impoundments (1) The long-term stability of exposed slopes of impoundments shall meet the criteria provided in the design at the time of permitting or as determined by the engineer of record. (2) Impoundments not operated for a period of 12 or more months may be declared as closed by the chief inspector. Closure of a tailings storage facility or dam (1) Prior to closure or upon declared closure of a tailings storage facility or dam, the manager shall submit a final detailed closure plan to achieve the approved end land and water use objectives. (2) The closure plan shall include a detailed construction cost estimate, schedule and monitoring plan for implementation. (3) The closure plan shall be prepared by one or more qualified professionals in consideration of the HSRC Guidance Document. Tailings Storage Facility Closure OMS Manual (1) The manager shall submit a Tailings Storage Facility Operations, Maintenance and Surveillance Manual for closure and review and update the plans regularly to reflect significant ongoing changes during closure. 15

16 (2) The Tailings Storage Facility Operations, Maintenance and Surveillance Manual shall include requirements for monitoring and shall define appropriate resources and staffing to carry out the works and monitoring associated with closure. On-going Management Requirements Where a mine requires on-going mitigation, monitoring or maintenance, the owner, agent, or manager shall submit a closure management manual that (a) describes and documents key aspects of the ongoing mitigation, monitoring and maintenance requirements, and (b) tracks important changes to components of the system that effect longterm mitigation, monitoring and maintenance requirements. Permanent Spillways Permanent spillways shall be designed by a Professional Engineer in consideration of the HSRC Guidance Document and installed prior to the completion of closure of the tailings storage facility or dam. Permit amendment or variance after closure The manager of a tailings storage facility or dam that has completed closure but not achieved the release of permit obligations may apply for permit amendments or variances including but not limited to reduced frequency of monitoring, dam safety inspections and dam safety reviews. Landforms The manager of a tailings storage facility or dam that can be considered a landform may apply to the chief inspector for the release of permit obligations under the Mines Act. Reactivation of impoundment The owner, agent or manager may make an application for a permit to reactivate a closed or abandoned impoundment. Decommissioning of Water Structures A water reservoir or pond which is closed or declared inoperative by the chief inspector shall be breached or otherwise disposed of in accordance with the license under the Water Sustainability Act or permit under the Environmental Management Act. Security On the closure of a mine, and on the chief inspector being satisfied that some or all the conditions of the permit have been complied with, the person who deposited a security under section 10 (4) or 10 (5) of the Mines Act shall be entitled to refund of some or all of the security and any accumulated interest, less any amount paid out under section 10 (8) of the Mines Act. 16

17 Application for security release An application for security release or a partial security release, that details the reclamation activities that have been completed under the requirements of the act, the code, and approved reclamation plan, shall be submitted to the chief inspector. Reclamation Defined Reclamation Standards It is the duty of every owner, agent, and manager to institute and, during the life of the mine, to carry out a program of environmental protection and reclamation, in accordance with the standards described in section to of this code. Pre-legislation Disturbances Where environmental disturbance occurred at a site prior to the enactment of reclamation legislation in 1969, and has remained inactive since this time, the portion of environmental disturbance, which occurred before the enactment of reclamation legislation in 1969, is exempt from the re-vegetation provisions. Exclusions A reclamation standard prescribed under section to of this code does not apply where (a) a mine is specifically excluded by a condition of its permit from complying with a particular standard, or (b) a disturbance created by a mining activity has been reclaimed, inspected, and found to be satisfactory to an inspector. Land Use The land surface shall be reclaimed to an end land use approved by the chief inspector that considers previous and potential uses. Capability Excluding lands that are not to be reclaimed, the average land capability to be achieved on the remaining lands shall be similar to the average that existed prior to mining, unless the land capability is not consistent with the approved end land use or compromises long-term physical and/or geochemical stability. Long Term Stability Land, watercourses and access roads shall be left in a manner that ensures long-term physical and geochemical stability. Re-vegetation On all lands to be re-vegetated, land shall be re-vegetated to a self-sustaining state using appropriate plant species. 17

18 Growth Medium On all lands to be re-vegetated, the growth medium shall satisfy land use, capability, and water quality objectives. All surficial soil materials removed for mining purposes shall be saved for use in reclamation programs unless these objectives can be otherwise achieved. Landforms Where practicable, land and watercourses shall be reclaimed in a manner that is consistent with the adjacent landforms. Structures and Equipment Prior to abandonment, and unless exempted by the chief inspector, (a) all machinery, equipment and building superstructures shall be removed, (b) concrete foundations shall be covered and re-vegetated, and (c) all scrap material shall be disposed of in a manner acceptable to an inspector. Dumps Dumps shall be reclaimed to ensure long-term stability, and long-term erosion control. Watercourses Watercourses shall be reclaimed to a condition that ensures (a) drainage is restored either to original watercourses or to new watercourses that will sustain themselves without maintenance, and (b) the level of productive capacity shall not be less than existed prior to mining, unless the owner, agent or manager can provide evidence which demonstrates, to the satisfaction of the chief inspector, the impracticality of doing so. Open Pits (1) Pit walls constructed in overburden shall be reclaimed in the same manner as dumps unless an inspector is satisfied that to do so would be unsafe or conflict with other proposed land uses. (2) Pit walls including benches constructed in rock, or steeply sloping footwalls, are not required to be re- vegetated. (3) Where the pit floor is free from water, and safely accessible, vegetation shall be established. (4) Where the pit floor will impound water and it is not part of a permanent water treatment system, provision must be made to create a body of water where use and productivity objectives are achieved. 18

19 Blocking Access Roads All access roads to surface areas of the mine that may be dangerous shall be effectively blocked to prevent inadvertent vehicular access. Securing openings (1) All shafts, raises, stope openings, adits, or drifts opening to the surface shall be either capped with a stopping of reinforced concrete or filled with material so that subsidence of the material will not pose a future hazard. (2) In the case of shafts or raises, the stopping shall be secured to solid rock or to a concrete collar secured to solid rock and capable of supporting a uniformly distributed load of 12 kpa or a concentrated load of 24 kn, whichever is greater. (3) Where there is evidence or a potential for use by wildlife, mine openings may be fitted with a barrier that allows wildlife passage but prevents human entry. Drains When mine openings are permanently closed and where it may be possible for mine water to build dangerous pressures and cause a blow-out of the fill or concrete with sudden and dangerous force, a permanent and effective drain shall be installed. Metal Uptake When required by the chief inspector, vegetation shall be monitored for metal uptake. Ecological Risk Assessment (1) When required by the chief inspector, the owner, agent or manager shall commission an ecological risk assessment. (2) Where there is a significant ecological risk, reclamation procedures shall ensure that levels are safe for plant and animal life and, where this cannot be achieved, other measures shall be taken to protect plant and animal life. Disposal of Chemicals and Reagents Chemicals or reagents, which cannot be returned to the manufacturer, shall be disposed of in compliance with municipal, regional, provincial and federal statutes. Water Quality If water quality from any component of the mine results in exceedances of applicable provincial water quality standards in the receiving environment, when required by the chief inspector, remediation strategies shall be implemented for as long as is necessary to mitigate the problem. 19

20 Monitoring The owner, agent, or manager shall undertake monitoring programs, as required by the chief inspector, to demonstrate that reclamation and environmental protection objectives including land use, productivity, water quality and stability of structures are being achieved. Release of Obligations If all conditions of the Act, code and permit have been fulfilled to the satisfaction of the chief inspector and there are no on-going inspection, monitoring, mitigation or maintenance requirements, the owner, agent or manager will be released from all further obligations under the Mines Act. 20

GUIDELINES to the MINING ACT

GUIDELINES to the MINING ACT GUIDELINES to the MINING ACT PART I Format Requirements Reports 1. All reports required to be submitted to the minister by the Mining Act or regulations shall (a) be bound in a folder; (b) be a typewritten

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 (No. JPBN. 1509/27 Vol. II CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 In exercise of the powers conferred by section 5 of the Conservation

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE Environmental Management Chapter 335-6-9 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE CHAPTER 335-6-9 SURFACE MINING RULES TABLE OF CONTENTS

More information

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0 PROTOCOL 15 FOR CONTAMINATED SITES Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil Version 1.0 Prepared pursuant to Section 64 of the Environmental Management

More information

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0200-S3N-R2 AFIN 32-00042 OCTOBER 12, 2016 LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT

More information

Surface Mining and Reclamation

Surface Mining and Reclamation Page 1 of 17 Surface Mining and Reclamation A. PURPOSE AND INTENT: The County of Trinity recognizes that the extraction of minerals is essential to the continued economic well-being of the County and to

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

Conservation and Reclamation INFORMATION LETTER. Environmental Protection Guidelines for Oil Production Sites - Revised January 2002

Conservation and Reclamation INFORMATION LETTER. Environmental Protection Guidelines for Oil Production Sites - Revised January 2002 March 2002 Conservation and Reclamation INFORMATION LETTER C&R/IL/02-1 Environmental Protection Guidelines for Oil Production Sites - Revised January 2002 CHANGES TO THE INFORMATION LETTER This Information

More information

Some excerpts from the federal Surface Mining Control and Reclamation Act of 1977 (SMCRA), passed August 3, 1977

Some excerpts from the federal Surface Mining Control and Reclamation Act of 1977 (SMCRA), passed August 3, 1977 Some excerpts from the federal Surface Mining Control and Reclamation Act of 1977 (SMCRA), passed August 3, 1977 PURPOSES [30 U.S.C. 1202] SEC. 102. It is the purpose of this Act to - (a) establish a nationwide

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION DOCUMENT NUMBER: 563-2113-660 TITLE: Coal Refuse Disposal - Site Selection EFFECTIVE DATE: February 8, 1999 AUTHORITY: The Coal Refuse

More information

These potential changes and their implications are outlined in Annex 1.

These potential changes and their implications are outlined in Annex 1. Guidance Note Hydropower Guidance Note: This Guidance Note has been prepared by Natural Resources Wales (NRW) to provide applicants for abstraction and impoundment licences for hydropower schemes with

More information

REPORT. Giant Nickel Tailings Dams INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT. November 26, 2014

REPORT. Giant Nickel Tailings Dams INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT. November 26, 2014 INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT Giant Nickel Tailings Dams Submitted to: Barrick Gold Inc. PO Box 788 Penticton, BC V2A 6Y7 Attention: Robbin Harmati REPORT Reference Number: 1412161-003-R-Rev1-2000

More information

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF) Preface In 2008, the inter-agency Drainage Act & Section 28 Regulations Team (DART) was established by the Ministry of Natural Resources (MNR) and the Ministry of Agriculture, Food and Rural Affairs (OMAFRA)

More information

The Afton TSF, situated approximately 12 km west of Kamloops, BC has been under care and maintenance since 1997.

The Afton TSF, situated approximately 12 km west of Kamloops, BC has been under care and maintenance since 1997. November 27, 2014 KGHM Ajax Mining Inc. Ajax Project Suite 200-124 Seymour Street Kamloops, BC V2C 2E1 ISSUED FOR USE FILE: V15103098-01 via Email: kate.parsons@kghm.com Attention: Subject: Kate Parsons,

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection DOCUMENT NUMBER: 363-0300-001 TITLE: Design Criteria - Wetlands Replacement/Monitoring EFFECTIVE DATE: February 11, 1997 AUTHORITY:

More information

Review of ML/ARD Geochemistry & Water Quality Predictions

Review of ML/ARD Geochemistry & Water Quality Predictions Review of ML/ARD Geochemistry & Water Quality Predictions Presented by Kim Bellefontaine, M.Sc., P.Geo. Senior Mine Review Geologist, MEMPR With contributions from: Kelly Sexsmith, M.S., P.Geo. Senior

More information

The Mineral Industry Environmental Protection Regulations, 1996

The Mineral Industry Environmental Protection Regulations, 1996 MINERAL INDUSTRY 1 The Mineral Industry Environmental Protection Regulations, 1996 being Chapter E-10.2 Reg 7 (effective March 6, 1996). NOTE: This consolidation is not official. Amendments have been incorporated

More information

Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories

Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories DRAFT Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories Preface... 5 Introduction... 7 Purpose... 7 Authority... 7 How These Guidelines

More information

LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0200-S3N-R2 AFIN 32-00042 OCTOBER 12, 2016 LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE

More information

Inrushes and Subsidence

Inrushes and Subsidence PURPOSE AND SCOPE... 2 DETAILS... 2 Appendices... 11 A Definitions... 11 B Related Documents... 11 C Revision Information... 11 1. Responsibility... 2 2. Hazard Management Process... 3 2.1 Overview...3

More information

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations ENVIRONMENTAL MANAGEMENT 1 ENVIRONMENTAL CODE ADOPTION) E-10.22 REG 2 The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations being Chapter E-10.22 Reg 2 (effective

More information

Ordinance No Lot Surface Drainage

Ordinance No Lot Surface Drainage Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section

More information

General Permit No.: OHR Page 53 of 146

General Permit No.: OHR Page 53 of 146 Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

WATER (MINISTERIAL) REGULATION

WATER (MINISTERIAL) REGULATION Province of Alberta WATER ACT WATER (MINISTERIAL) REGULATION Alberta Regulation 205/1998 With amendments up to and including Alberta Regulation 240/2017 Office Consolidation Published by Alberta Queen

More information

Water Development Plan Template

Water Development Plan Template Water Development Plan Template (Updated September 2005) Water Development Plan Template Note: For any application with a proposed diversion rate of over 25,000 gallons a day, a development plan must be

More information

Multi-Year Area-Based Permitting Policy for Mineral and Coal Exploration Activities

Multi-Year Area-Based Permitting Policy for Mineral and Coal Exploration Activities Mines and Mineral Resources Division Multi-Year Area-Based Permitting Policy for Mineral and Coal Exploration Activities 1. Introduction The Mines and Mineral Resources Division (MMRD) has historically

More information

Code of Practice for Land Treatment of Soil Containing Hydrocarbons

Code of Practice for Land Treatment of Soil Containing Hydrocarbons Code of Practice for Land Treatment of Soil Containing Hydrocarbons September 2008 Made under the Environmental Protection and Enhancement Act RSA 2000, ce-12 Published by Alberta Queen s Printer Alberta

More information

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines Howard J. Hayes, Program Administrator April 2011 What is a mine? Nonphosphate mine: Subsections

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual Design Specifications & Requirements Manual 10 SEDIMENT AND EROSION CONTROL 10.1 INTRODUCTION... 1 10.2 REFERENCE... 1 10.3 GENERAL INFORMATION REQUIREMENTS... 1 10.3.1 ESC Plan... 1 10.3.2 Servicing Drawings...

More information

Base Metal and Iron Ore Mining

Base Metal and Iron Ore Mining Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead

More information

Part 4: Floodplain, Riparian, & Lakeshore Regulations

Part 4: Floodplain, Riparian, & Lakeshore Regulations Part 4: Floodplain, Riparian, & Lakeshore Regulations The following additional definitions apply only to Part 4.1 of this Bylaw: DESIGNATED FLOOD means a flood as determined in this Bylaw based on the

More information

Self Assessment Questionnaire Inrushes and Subsidence Major Hazard Standard

Self Assessment Questionnaire Inrushes and Subsidence Major Hazard Standard WMC Environment, Health & Safety Management System Self Assessment Questionnaire Inrushes and Subsidence Major Hazard Standard MHS-09 DocsOpen : 57250, 11/07/2000 Uncontrolled copy check web for latest

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 NOVEMBER 2012 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

The Pipelines Regulations, 2000

The Pipelines Regulations, 2000 PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21; and by Saskatchewan Regulations

More information

SPECIFICATION FOR ENGINEERED FILLS

SPECIFICATION FOR ENGINEERED FILLS SPECIFICATION FOR ENGINEERED FILLS This specification is intended to be used for the engineered fill. The specification is suitable for most purposes but there may be special conditions existing at some

More information

7 Mineral and Energy Resources

7 Mineral and Energy Resources 7 Mineral and Energy Resources This chapter examines Humboldt County s mineral (including sand and gravel extraction) and energy (oil, gas, and geothermal) resources. Existing General Plan policies and

More information

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017 Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach October 2017 (Simulated FPF) INTRODUCTION Noront is proposing to develop a Ferrochrome Production Facility (FPF) in Northern

More information

Substation Developments Environmental Guidelines Checklist for Applicants

Substation Developments Environmental Guidelines Checklist for Applicants Substation Developments Environmental Guidelines Checklist for Applicants Effective date: February 1, 2016 These guidelines are intended to be used in conjunction with the flowchart in Figure 1 which conceptually

More information

Addition to Section 4 - Special Use Regulations

Addition to Section 4 - Special Use Regulations Large-Scale Ground-Mounted Solar Photovoltaic Installations Addition to Section 4 - Special Use Regulations 4.4 Large Scale Ground-Mounted Solar Photovoltaic Installations 4.4.1 Purpose The purpose of

More information

Surface Water and Non-Wetland Surface Waters Delineation and Classification pursuant Chapter F.A.C.

Surface Water and Non-Wetland Surface Waters Delineation and Classification pursuant Chapter F.A.C. Surface Water and Non-Wetland Surface Waters Delineation and Classification pursuant Chapter 62-340 F.A.C. What are Waters? 373.019 F.S. Definitions (20) Water or waters in the state means any and all

More information

DIVISION SEVENTEEN FLOODPLAIN MANAGEMENT WATER BODY PROVISIONS. For the purposes of this Section, the following definitions shall apply:

DIVISION SEVENTEEN FLOODPLAIN MANAGEMENT WATER BODY PROVISIONS. For the purposes of this Section, the following definitions shall apply: DIVISION SEVENTEEN FLOODPLAIN MANAGEMENT WATER BODY PROVISIONS SCEDULE 1701 FLOODPLAIN MANAGEMENT PROVISIONS The purpose of the floodplain management provisions is to reduce the risk of injury, loss of

More information

MINISTRY OF ENERGY AND MINES Mines and Mineral Resources Division. REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act)

MINISTRY OF ENERGY AND MINES Mines and Mineral Resources Division. REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act) MINISTRY OF ENERGY AND MINES Mines and Mineral Resources Division REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act) Name of Property: Permit No.: M-29 Mine Manager: Don

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries

More information

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities DS447 Date: 20 February 2015 IAEA SAFETY STANDARDS for protecting people and the environment STATUS: SPESS STEP 12 For submission to CSS Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle

More information

EVOLUTION OF RECLAMATION FOR WILDLIFE HABITAT AT SULPHIDE MINES IN BRITISH COLUMBIA, CANADA. Natalie Tashe November 9, 2012

EVOLUTION OF RECLAMATION FOR WILDLIFE HABITAT AT SULPHIDE MINES IN BRITISH COLUMBIA, CANADA. Natalie Tashe November 9, 2012 EVOLUTION OF RECLAMATION FOR WILDLIFE HABITAT AT SULPHIDE MINES IN BRITISH COLUMBIA, CANADA Natalie Tashe November 9, 2012 1 GEOGRAPHIC CONTEXT 2 DEFINING WILDLIFE HABITAT 3 OUTLINE 1. Mine Cycle for reclamation

More information

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 902 DECEMBER 1983 CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES 902.01 SCOPE 902.02 REFERENCES 902.03 DEFINITIONS TABLE OF

More information

Check the box below if you are operating mobile tire processing equipment [APC&EC Reg ]: Mobile Tire Processing Equipment

Check the box below if you are operating mobile tire processing equipment [APC&EC Reg ]: Mobile Tire Processing Equipment GENERAL PERMIT FOR THE CONSTRUCTION AND OPERATION OF TIRE COLLECTION CENTERS AND MOBILE TIRE PROCESSING EQUIPMENT ISSUED BY ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY PERMIT NUMBER: 0000-TAP-TCCMTP AUTHORITY:

More information

Guideline for Bridge Safety Management February 2012

Guideline for Bridge Safety Management February 2012 Guideline for Bridge Safety Management February 2012 Table of Contents Foreword Part A General 0.1 Definitions 0.2 Scope 0.3 Application 0.4 Responsibility Part B Bridge Safety Assurance 1.1 Scope 1.2

More information

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Terry Eldridge Golder Associates S.A., Chile Ben Wickland Golder Associates Ltd., Canada Adrian Goldstone Dundee Precious Metals

More information

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION 1 TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION Draft 2/08/10 (Revised 02-14-11,Revised 02-21-11, Revised 03-03-11, Revised 04-19-11, Revised 04-20-11, Revised 05-05-11, Revised 05-09-11). DEFINITIONS

More information

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES 1. COVERAGE UNDER THIS GENERAL PERMIT Area of Coverage: This permit covers all areas of the Commonwealth

More information

CMPDI. 4.6 Mine Closure Plan

CMPDI. 4.6 Mine Closure Plan 4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.

More information

Newmont Mining Corporation Tailing & Heap Leach Facility Management Standard

Newmont Mining Corporation Tailing & Heap Leach Facility Management Standard Page No: Page 1 of 5 1 PURPOSE AND OBJECTIVES This (the Standard ) sets the minimum Newmont requirements for the design and management of tailing storage facilities (TSF) and heap leach facilities (HLF)

More information

E7. Taking, using, damming and diversion of water and drilling

E7. Taking, using, damming and diversion of water and drilling E7. Taking, using, damming and diversion of water and drilling E7.1. Introduction Taking, using, damming and diversion of surface water and groundwater provisions in this plan apply in accordance with

More information

Mining Waste Directive - Risk Assessment requirements

Mining Waste Directive - Risk Assessment requirements Mining Waste Directive - Risk Assessment requirements Jörg Frauenstein Federal Environment Agency (UBA) Dessau-Roßlau Recommendations for a Risk Based Inventory of closed / abandoned waste facilities Scope

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Incident Reporting Requirements

Incident Reporting Requirements Incident Reporting Requirements Directive PNG014 December 2016 Version 2.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation

More information

Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories.

Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories. MVLWB/AANDC Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories November 2013 Cover photo: Image on left shows Colomac Mine site circa

More information

POND CONSTRUCTION. Woodland Steward Series

POND CONSTRUCTION. Woodland Steward Series POND CONSTRUCTION Woodland Steward Series BOB TWOMEY DISTRICT CONSERVATIONIST USDA NATURAL RESOURCES CONSERVATION SERVICE COURSE OUTLINE DEFINITION OF A POND OR LAKE TYPES OF PONDS GEOLOGIC CONSIDERATIONS

More information

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782 Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782 Members of the Red Fox Run Property Owner s Association, Inc. Attached are the guidelines of the Architectural Review Committee

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED HORIZON NORTH PIT EXTENSION PROJECT

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED HORIZON NORTH PIT EXTENSION PROJECT PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED HORIZON NORTH PIT EXTENSION PROJECT Approximately 70 km North of Fort McMurray, Alberta ISSUED

More information

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002 (18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002 (Gazette No. 23922, Notice No. 1273 dated 10 October 2002. Commencement date: 1 May 2004 [Proc. No. R25, Gazette No. 26264])

More information

LAW ON WATER RESOURCES MANAGEMENT OF THE KINGDOM OF CAMBODIA CHAPTER I GENERAL PROVISIONS

LAW ON WATER RESOURCES MANAGEMENT OF THE KINGDOM OF CAMBODIA CHAPTER I GENERAL PROVISIONS Law on Water Resources Management of the Kingdom of Cambodia Entry into force on 29 June 2007. LAW ON WATER RESOURCES MANAGEMENT OF THE KINGDOM OF CAMBODIA CHAPTER I GENERAL PROVISIONS Article 1 The general

More information

8.0 CLOSURE AND DECOMMISSIONING

8.0 CLOSURE AND DECOMMISSIONING Closure and Decommissioning 8-1 8.0 CLOSURE AND DECOMMISSIONING Closure and decommissioning of the Project would be accomplished in accordance with Ghana s Mining and Environmental Guidelines (1994) and

More information

Information Requirements Table for Liquid Waste

Information Requirements Table for Liquid Waste Applicant Summary Tracking # Authorization # Applicant / Facility Name Ministry of Environment Prepared by: Title Date The Information Requirements Table (IRT) for Liquid Waste is a tool used by Ministry

More information

CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI

CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI INITIAL PREPARATION DATE: October 11, 2016 TABLE OF CONTENTS 1. CERTIFICATION

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

(this cover page left intentionally blank)

(this cover page left intentionally blank) 4. Siting the Well (this cover page left intentionally blank) 4. Siting the Well Chapter Table of Contents Chapter Table of Contents Chapter Description... 4 Regulatory Requirements Well Siting... 4 Relevant

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

House Bill 4086 Ordered by the House February 21 Including House Amendments dated February 21

House Bill 4086 Ordered by the House February 21 Including House Amendments dated February 21 th OREGON LEGISLATIVE ASSEMBLY--0 Regular Session A-Engrossed House Bill 0 Ordered by the House February Including House Amendments dated February Introduced and printed pursuant to House Rule.00. Presession

More information

Mining and Our Natural Resources

Mining and Our Natural Resources Mining and Our Natural Resources February 28, 2008 Jennifer Engstrom Division of Lands and Minerals MN Department of Natural Resources Overview Brief overview of environmental review Permit to Mine for

More information

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani DESCRIPTION OF

More information

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS To Wit: To see if the Town will vote to amend the Town of Westborough Zoning Bylaws, Article 2, District Regulations, Section 2300, Use Regulations Schedule; and to amend Article 4, Special Regulations

More information

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 314 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING TABLE OF CONTENTS

More information

Spills to the Environment and Reporting Policy

Spills to the Environment and Reporting Policy Applicable Legislation: Environmental Protection Act, R.S.O. 1990 O.Reg. 675/98, Classification and Exemption of Spills, Guelph By-Law Number (1996)-15202 to regulate the discharge of wastes into the sanitary

More information

Tailings Storage Facility Conceptual Closure Plan Alternatives Assessment

Tailings Storage Facility Conceptual Closure Plan Alternatives Assessment Appendix 17.4-C Tailings Storage Facility Conceptual Closure Plan Alternatives Assessment AJAX PROJECT Environmental Assessment Certificate Application / Environmental Impact Statement for a Comprehensive

More information

Operations Mine Site, Tote Road and Railway

Operations Mine Site, Tote Road and Railway Operations Mine Site, Tote Road and Railway 2 Panel Members Michael Anderson Richard Cook John Binns Fernand Beaulac Steve Walker Mike Lepage Michael Sheahan 3 The Panel will address: FEIS Volumes 3, 5,

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22296-D01-2017 Hays Solar Power Plant June 7, 2017 Alberta Utilities Commission Decision 22296-D01-2017 Hays Solar Power Plant Proceeding 22296 Application 22296-A001 June 7, 2017 Published by

More information

DRAFT SPECIAL CONDITIONS

DRAFT SPECIAL CONDITIONS RECLAMATION OF ENTIRE MINING AREA DRAFT SPECIAL CONDITIONS 1. Full, complete, and appropriate closure in compliance with all applicable standards of the entire area contained within the mining area is

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

Environmental Regulation & Mine Permitting in Ontario

Environmental Regulation & Mine Permitting in Ontario Environmental Regulation & Mine Permitting in Ontario A Presentation to the Ad Hoc Committee on Mining Lake Superior Work Group Mark O Brien, Mineral Development Consultant MNDMF, Thunder Bay Agenda Regulatory

More information

Wetland Permit Application

Wetland Permit Application DAVID J. KLOTZLE WETLAND INSPECTOR, PHILIPSTOWN, NY 238 Main Street Cold Spring, NY 10516 (914) 736-7132 Wetland Permit Application MEMO TO APPLICANT 1. Use this form to apply for a Wetlands Permit as

More information

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No.

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No. Request i Final Terms of Environmental Impact Assessment Report for Coal Valley Resources Inc. (CVRI) Proposed Robb Trend Project Cross (Concordance) Table to Location in ii PURPOSE OF THE TERMS OF REFERENCE

More information

Radiation and Nuclear Safety Authority Regulation on the Safety of Disposal of Nuclear Waste Adopted in Helsinki on 22 December 2015

Radiation and Nuclear Safety Authority Regulation on the Safety of Disposal of Nuclear Waste Adopted in Helsinki on 22 December 2015 UNOFFICIAL TRANSLATION FROM FINNISH. LEGALLY BINDING ONLY IN FINNISH AND SWEDISH. REGULATION STUK Y/4/2016 Radiation and Nuclear Safety Authority Regulation on the Safety of Disposal of Nuclear Waste Adopted

More information

Plan Requirement Guidance for Quartz Mining Projects

Plan Requirement Guidance for Quartz Mining Projects Plan Requirement Guidance for Quartz Mining Projects Executive Summary A quartz mining project requires the submission of environmental protection plans and operational plans for the development, operation,

More information

Fluid Tailings Management for Oil Sands Mining Projects. 1 Introduction AER Requirements What s New in This Edition...

Fluid Tailings Management for Oil Sands Mining Projects. 1 Introduction AER Requirements What s New in This Edition... Directive 085 Release date: October 12, 2017 Effective date: October 12, 2017 Replaces previous edition issued July 14, 2016 Fluid Tailings Management for Oil Sands Mining Projects The Alberta Energy Regulator

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information

Rural-Residential Rural-Residential Explanatory Statement Significant Issues Objectives and Policies...

Rural-Residential Rural-Residential Explanatory Statement Significant Issues Objectives and Policies... Section Contents Rural-Residential... 2 16. Rural-Residential... 2 Explanatory Statement... 2 16.1 Significant Issues... 2 16.2 Objectives and Policies... 3 16.3 Activity Lists... 3 16.4 Activity Performance

More information

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs)

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs) VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION FORM B - ANIMAL FEEDING OPERATIONS (AFOs) Department of Environmental Quality Rev. 02-2013 VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION FORM

More information

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL 1. General la. Purpose VII-1 1B. Necessity of Grading Permit... VII-1 1C. Additional Requirements... VII-2 1D. Responsibility of Permittee... VII-2 2.

More information

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS Revised: June 4, 2014 Requirements for obtaining a site alteration permit vary depending on the type of project being proposed. This information

More information

The Effluent Permitting Process under the Environmental Management Act. An Overview for Mine Project Applicants

The Effluent Permitting Process under the Environmental Management Act. An Overview for Mine Project Applicants The Effluent Permitting Process under the Environmental Management Act An Overview for Mine Project Applicants APRIL 2013 Disclaimer This document does not replace the Environmental Management Act or its

More information

Chapter 10 Natural Environment

Chapter 10 Natural Environment Chapter 10 Natural Environment Existing Conditions The Natural Environment Element addresses the protection, conservation, preservation, and restoration of the natural resources the Bayview Ridge Subarea,

More information

RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION CHAPTER EROSION AND SEDIMENTATION CONTROL TABLE OF CONTENTS

RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION CHAPTER EROSION AND SEDIMENTATION CONTROL TABLE OF CONTENTS RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION CHAPTER 391-3-7 EROSION AND SEDIMENTATION CONTROL TABLE OF CONTENTS 391-3-7.01 Definitions. 391-3-7.02 (Repealed) 391-3-7.03

More information

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENTS CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED

More information

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions) Adams Co. Conservation District 670 Old Harrisburg Road, Suite 201 Gettysburg, PA 17325 Telephone: 334-0636 Fax: 337-0730 www.adamscounty.us Erosion and Sediment Pollution Control Guidelines for Residential

More information