1 PRE-FEASIBILITY REPORT for UCCHANGIDURGA BUILDING STONE QUARRY Of M/s Shri Marulusiddeshwara Stone Crusher at Sy. No. 509/A2 (Patta Land) of Ucchangidurga Village, Ucchangidurga Taluk, Davanagere Dist. Extent: Acres (0.809 Ha) 1.0 EXECUTIVE SUMMARY M/s Marulusiddeshwara stone crusher is one of the quarry operators experienced in the field of building stone extraction in Davanagere District of Karnataka State and Supply of building stone/raw materials to local peoples. In accordance with the statuary obligation this project needs Environmental Clearance from authorities as per EIA notification 2006 to start quarry operation. Therefore the following pre requisite documents are submitted for environment clearance viz. 1) Duly filled Form-1, 2) Pre-Feasibility Report covering project details, baseline data, environmental management plan, 3) Approved quarry Plan covering geology of the area, reserve estimation production capacity, PMCP etc. 4) Land documents present & proposed status of land and 5) Connected maps. The project comes under new category, the area is Govt. land, and mineral extraction is building stone. In order to obtain the notification the following pre-requisite documents are also obtained from the concerned Dept. and submitted to DMG. Copy of the notification issued by DMG enclosed as Annexure-1 Copy of the NoC from Revenue Department - Annexure-2(A). Copy of the NoC from Forest Department - Annexure-2(B). The RTC copy of the area is enclosed as- Annexure-2(C). Copy Of Non- Agriculture Conversion Letter - Annexure-2(D). PR1

2 1.01 Need for the project: Demand for Building Stone is increasing by many folds with more & more constructions in the country. Karnataka is one of the important states where rich building stone deposit is found. Quarrying for building stone production is an important economic activity contributing significantly to the state revenue. This is also generating lot of employment to the local people and help improving socio-economic status of the people around the quarry lease. The region is economically backward mostly depends on seasonal forming. The per capita income of the villagers is much below the national average. As a result of this project various facilities like educational medical social benefits will get augmented in the area. In view of the above, Ucchangidurga building stone quarry intent to produce TPA Building stone from Sy.no-502/A2 of Ucchangidurga village with the following objectives... The requirement for the proposed production is 1. Reserve availability sufficient 2. Infrastructure for the production will be organized 3. Quarry operation modern technology 4. Environmental status Scientifically maintained 5. Environmental Management Plan Scientifically maintained The above details are given in the coming chapters Location & Accessibility The quarry is located towards S-W of Ucchangidurga Village at a distance of 1.5 Km. The Ucchangidurga village is located at a distance of 4 km from the main road connected from Ucchangidurga to Potalakatte road. The road connecting from quarry area to Bevinahalli main road at a distance of 1 km, and can be approached in all seasons. The Ucchangidurga Village is at a distance of 13.5 Kms from Harapanahalli town. The Harapanahalli is the taluk head quarter. The district head quarter is Davanagere at a distance of 35 kms. The nearest railway station is Davanagere at a distance of 28 kms. And nearest airport is Hubli at a distance of 75 kms. PR2

3 2.00 Introduction of the project/ Background information Identification of project and project proponent. Ucchangidurga deposit in Davanagere dist. Building Stone Quarry is one of the good building stone to meet the requirement of the locals. The M/s Marulusiddeshwara Stone Crusher is experienced in the field of building stones extraction road material extraction. Considering the experience and request and to meet the raw materials for locals. Quarry lease has been notified by GoK Brief description of the nature of the project The nature of the project involves extraction of TPA building stone from an area of 2.00 Acres (0.809 Ha) Sy.No. 502/A2 of Ucchangidurga village, Channagiri Taluk. It is a very small project based on the following grounds. The proposed project covering an area of 2.00 Acres is a bare minimum. The reserve available is sufficient for production. The bench height & width will be 5 mtrs & 7 mtrs respectively. The method of quarrying is open cast semi mechanized/manual. There is no deep hole drilling involved. Daily production is only 80 TPD. There is no major impact on environment. Salient feature of the quarry activities Sl.No Particulars Units Existing Proposed 1 Geological reserves tonne Minable reserves TONNE Method of quarry OCM Open pit quarrying Open pit quarrying 4 Building stones TPA Production Waste Building stones TPA Total handling TPA Block and waste ratio - - 1: Cost of the project in Rs in lakhs Lakhs 9 Water requirement KLD Life of the quarry years - 12 PR3

4 2.03 Demand and supply gap As the population increases, the infrastructure such as construction of buildings are also increasing which are all essential requirement. Therefore, there is a lot of demand for the building materials increases by many fold also there is a good demand in the local market. The present production is lesser than the demand in the local. However, some of the quantity could be able to supply to fulfill the requirement of the locals Imports vs. Indigenous production. There is no need of any material by importing for this project Export Possibility. There are no possibilities for export the material as it is being used in domestic purpose Domestic / export Markets. There is a good demand for local market Employment Generation (Direct & indirect due to the project) The proposed man power requirement for the Ucchangidurga Building stone quarry operation for extraction of tonnes /Annum is given below. Sl.No Designation in No s Existing in Proposed in Total No s No s 1 manager Foreman Mine mate Supervisor Office clerk Labor (unskilled) Labor (skilled) Watch ward Operators/Drivers Total From the above chart it is clear that total 30 nos direct employment for the project, whereas indirect employment will be around 150 peoples considering 5 persons dependence on direct employment. PR4

5 3.0 PROJECT DESCRIPTION 3.01 Details of alternative site. Mineral occurrence is a site specific, non-renewable resource. Quarrying has to be carried out where the building stones are available. Therefore, alternative site selection cannot be possible for the building stones or mining projects Size or magnitude of operation. The project covering an area of 2.00 Acres only. All the quarry activities are confined within this area. The production of building stones proposed to be TPA and over burden handling will be around 2680 TPA. The operation will be carried out by manual method. But there is no deep hole drilling and blasting. The total no. of employment will be 30 people for the proposed production and associated activities. From the above it could be summarized that the quarry operations and connected activities are in the micro level and there is no impact on environmental parameters Project description with process details (a schematic diagram/ flow chart showing the project layout, components of the project etc. should be given) Development and extraction of building stones is planned from this quarry. Plain quarrying with single/high bench/low bench/multiple high bench/low bench. Though the above quarrying methods are adopted as per the site condition, but the general procedure s to be adopted in development and extraction of building stones is Clearing of bushes, removal of topsoil and overburden weathered rock to expose the sheet rock or boulder. The building stone which recovered will be directly supplied to the buyer. PR5

6 3.04 Geology & Reserves Geology: The surface geological plan is prepared on scale 1:1000 incorporating exposures and existing pits. The average width and length of the granite band is 122 and 50 mts, the depth of 20 mts considered for reserve estimations. The leased area covers grey granitic gneiss trending in N-S direction. The rock is light grey in color medium grained and exhibiting phaneritic texture. Most of the area is covered Building stone formations and small portion occupied with soil cover in the western margins of the lease boundary. The sheetrock is mainly composed of quartz, feldspar, mica, amphiboles as principle mineral constituents and apatite, sphene etc. are secondary mineral constituents. On the surface exposure sheet rock shoewing irregular multiple sets of joints and fractures. Rock is hard compact in fabric. No major structural feature such as faults, folds, shear zone etc. has been noticed in the lease area. Granitic genesis Granitic genesis is the predominant rock type found in this area. It is well exposed all over the lease area. It exhibit foliation predominantly on the weathered surface. The rock having coarse grained to medium grained having color varies from light grey to dark grey and shows typical greasy luster. Since, it is medium hard rock suitable for building stone purpose. The surface geological plan & section has been prepared and enclosed as Plate No-3. Indicate geological and recoverable reserves and grade, duly supported by standard method of estimation and calculations along with required sections (giving split up of various categories i.e. proved, probable, possible). Indicate cut-off grade. Availability of resources should also be indicated for the entire leasehold: The following parameters are considered for reserve estimations of the Building Stone deposit: PR6

7 The entire quarry lease block surveyed and geological map has been prepared. The exposed dimensions of the Building Stone bodies have been measured and digitizing the map prepared on GIS format using Auto-CAD software. The reserves are calculated on the basis of the outcrops of Building Stone boulders sheets max height (dimensions). The conventional methods of total sectional area in square meters, influence in mts and recovery factor. The Building Stone recovery is about 90% and waste is about 10%. The influence along the strike, for each cross section has been taken as half the distance from the cross section on one side and up to the demarked limit of the Building Stone zone on the other side. The shape, size and depth extension of the Building Stone body as inferred in the cross section have been considered for reserve estimation. The limiting reserves based on the existing outcrops of Building Stone boulders and sheets. The reserve estimated up to the depth of level for proved reserve and further depth of 10 mtrs ( ) for probable reserves as taken into consideration. Based on the test conducted on the Building Stone and past quarry data the recovery factor considered as 90% in the leased area Geological Reserve Estimation The abstract of geological reserves and mineable reserves is given below. Category of reserves Geological reserves in Tones Mineable reserves in Tones Proved (111) Probable (122) Total PR7

8 3.06 Quarrying method The proposed method of working in the plan period is by semimechanized open cast quarrying. The technical parameters like surface topography quality variation geo-technical aspects are taken to considered for advancing the quarry operation. The development work will be carried out by using machines till the sheet rock is exposed. New free face will be created which will be accomplished through the conventional drill by jack hammer and blast for recovery of building stone. The bench height & width will be maintained by 5 X 7 mtrs respectively and bench slope proposed to be 80 degree to the horizontal. The plan showing position of working proposed extension, bench parameters, pit configuration at the end of plan period is indicated in the production development plan as well as conceptual plan as shown in Plate.No.04 & 06. Due care will be taken in designing the benches by straightening and advancing the benches for effective and economical operation of the quarry. Since the ground water table is much below and the rainfall is not very high during monsoon, drainage of water inside the pit will not pose problem Quarrying technique: Development work will be carried out on the sheet rock is exposed. Now free face will be created which will be accomplished through the conventional drill and blast for recovery of building stone. The following quarry techniques will be adopted for safe quarrying. Clearing of bushes, removal of topsoil and overburden weathered rock to expose the sheet rock or boulder. The building stone which recovered will be directly supplied to the buyer. Loading the material by using Shovel or manual method. The RoM will be transported to Crushing yard/crusher directly. PR8

9 3.08 Raw material required along with estimated quantity, likely source, marketing area of final product/s, Mode of transport of raw Material and Finished Product. There is no raw material required for this project Resource optimization/ recycling and reuse envisaged in the project, if any, should be briefly outlined. As explained in the earlier chapter the resources availability is 2.85 Lakhs tones under UNFC classification 111 and the average utilization will be 0.24 LTPA. In this operation about 10% of building stone below the required specification will be generated from the quarry operation. This will works out to be 2680 TPA. This below specification material will be transported to dump yard Quantity of wastes to be generated (liquid and solid) and scheme for their Management/disposal. In the plan period about tonnes waste likely to be generated. The maximum waste likely to be generated in a year will be about 2680 tonnes only. An area of Ha identified for dump yard with in the lease area. The area is free from mineralized zone and it s fit for dumping of waste. In this area about tonne waste materials could be accommodated considering 15 mts height of the dump and 30 o dump slope to the horizontal. Considering the rate of waste generation per year and accommodation capacity of dump yard the waste could be stored about 12 Years at this rate of production. PR9

10 Which give information of EIA purpose. Schematic representations for quarrying Lease Area Other over burden removal Mother rock cutting Loading Crushing Yard Transport to destination 2.00 Acres (0.809 Ha) Tipper, TMC Channel cut by drill & blast Using skilled man power For required size storing Using lorry 4.00 SITE ANALYSIS 4.01 Connectivity. The road connecting from quarry area to Bevinahalli main road at a distance of 1 km, and can be approached in all seasons. The Ucchangidurga Village is at a distance of 13.5 Kms from Harapanahalli town. The Harapanahalli is the taluk head quarter. The district head quarter is Davanagere at a distance of 35 kms. The nearest railway station is Davanagere at a distance of 28 kms. And nearest airport is Hubli at a distance of 75 kms Land Form, Land use and Land ownership. The subject land is rocky exposer and belongs to Govt. land. The RTC copy enclosed as Annexure 2(C). The entire area covered with Building Stone deposit. There is no infrastructure in the area Topography (along with map). The quarry lease area is a sloping towards West having the maximum & minimum elevation of 770 mtrs and 765 mtrs above MSL respectively. The area is characterized with small flat showing elevation around 05 mtrs from general ground level. The quarry lease hold area trending in N-S direction. The drainage pattern is dendritic and the drainage density is moderate formed by network of several third order streams originating from the elevated area. There is no Forest, Buildings & PR10

11 Electric Line etc in the area. exposure and devoid of tree growth Existing land use pattern. Present & proposed land use pattern of core zone Particulars Present Area in Ha The granted area covered with a rocky Plan period (in Ha) Area after 5 years in Ha Total (Ha) Quarrying Dumping Green Belt Road Covered in quarrying & green belt area infrastructures Covered in green belt area Stock yard Covered in quarrying area Unused Area Total % From the above chart it is clear that an area of Ha is proposed to be utilized for quarrying and connected activities in the Plan period. Out of which, an area of Ha Land will be utilized for mining activities and Ha Proposed to be utilized for dumping of waste material. Besides an area of Ha proposed for Green belt development all along the quarry lease boundary Existing Infrastructure. At present there is no existing infrastructure Soil classification There is no top soil in the leased area. In case if it is occurred, which will be recover concurrent to quarry operation and stored in the designated yard. Which will be protected from erosion and subsequently used for Agriculture & afforestation purpose. The type of soil classified as sandy loom having a texture of salty clay the sand silt ratio is 35 & 65% respectively. PR11

12 5.0 PLANNING BRIEF This is a quarry operation, which involves removal of overburden and extraction of building stone from mother rock by using required machineries. The building stone extracted will be transported to local constructions activities Population Projection The project involves only 30 man powers, who are all engaged from the local peoples. There will not be any variation in population projection. Present & proposed land use pattern of core zone Particulars Present Area in Ha Plan period (in Ha) Area after 5 years in Ha Total (Ha) Quarrying Dumping Green Belt Road Covered in quarrying & green belt area infrastructures Covered in green belt area Stock yard Covered in quarrying area Unused Area Total % From the above chart it is clear that an area of Ha is proposed to be utilized for quarrying and connected activities in the Plan period. Out of which, an area of Ha Land will be utilized for mining activities and Ha Proposed to be utilized for dumping of waste material. Besides an area of Ha proposed for Green belt development all along the quarry lease boundary. Post Mining land use Plan The Reclamation has not been proposed because of the fact that the mineral reserves are still persisting below the Proved level. Hence, back filling is not advisable and not suggested. The present Exploration, UPL drawn for development of mine reveals that an area of Ha required for quarry alone which works out PR12

13 to be 57.11% of the total area which may be change after complete exploration. Based on the present data and exploration, the post quarry land proposed for afforestation, Water Pond, public use. This post quarry land use will be implemented only after Final Mine Closure Plan approved by the Authority Amenities/Facilities. The required Amenities/Facilities for the employees will be provided as per the mines act & rules and directive from the respective authorities PROPOSED INFRASTRUCTURE 6.01 Industrial Area (Processing Area). Ucchangidurga Building Stone Quarry area is Ha only. There is no proposal for additional area for the project Residential Area (Non Processing Area). There is no any proposal for residential area connected to this Project Social Infrastructure. The CSR works proposed for this Project along with budgetary provisions are given below. Social Infrastructure Proposed. Sl.No CSR Activities Proposed Budget Lakhs. 1 Providing furniture s to the local school at Ucchangidurga Village Medical facilities for the local villages Local road maintenance Temple development (surrounding villages) Cultural program(surrounding villages) Drinking water facilities for Ucchangidurga 0.70 Village 7 Up liftment of SC/ST colony of Kandegal Village 0.70 Total 3.70 in PR13

14 6.04 Connectivity (Traffic and Transportation Road/ Rail/Metro/Water ways etc). The area can be approached in all season. The carrying capacity of the existing road from lease area is more than sufficient for transporting the production. The building stones production of TPA works out to be only 10 trucks /day will be added to the general traffic density. This additional traffic of 10 trucks will not be impact on traffic density as the road carrying capacity is more than sufficient. There is no proposal for rail transport, water way transport, metro transport for this project Drinking Water Management (Source & Supply of water) sour ce Water Requirement Flow Chart for Proposed Mining Activities Bore well near Mines 10KLD Cons umer 6KLD Dust Suppression Domestic 1 KLD 3KLD Green Belt Development W A S T E W A T E R Septic Tank & Soak Pit Zero Effluent to Environment From the above chat it is clear that there is no effluent generation in the project. PR14

15 6.06 Solid Waste Management. The dump height will be restricting to 15 mtrs and it will be invert terraces will be maintained at the height of 10 mtrs each slice. Adequate retaining wall is constructed all along the toe of the dump. The dump slope will be maintained 28 o to the horizontal. There is no sub-grade mineral from this quarry operation. Every year 25 mtrs retaining wall proposed to be constructed Power Requirement & Supply / source. There is no proposal for electricity power for this project REHABILITATION AND RESETTLEMENT (R & R) PLAN The project is located in the Govt. land, covered with building stones. There is no any displacement of people, monuments, and residences. Therefore, rehabilitation and resettlement does not arise PROJECT SCHEDULE & COST ESTIMATES A. Project Schedule As per the building stones reserve available the life of the project will be about 12 years at the rate of TPA. The cost of the Building stones will be about Rs.150/tonnes, which work out to be Rs lakhs turn over. The expected net profit will be about Rs.20/tonne. B. Cost Estimates Sl.No Parameters Items 1 Production in TPA Sale price /tonne Cost Production/tonne in Rs Net profit/tonne in Rs 20 Total Turnover in lakhs rupees Total Net Profit in lakhs rupees 4.80 From the above A & B it is clear that the project is economically viable for long term sustainable of the project. PR15

16 9.00 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) The Ucchangidurga building stones activity will help in improvement of the economic status of the people around the area. Building stones activities will benefit the local people and boost up the local market. The building stones reserves of this area are economically viable. The building stones activities will provide socio-economic benefits to the local peoples with direct & indirect employment opportunities. The regional benefits to the state in the form of Royalty, Cess, Taxes etc PR16

17 10.0 RAPID ENVIRONMENTAL IMPACT ASSESSMENT (REIA) & ENVIRONMENTAL MANAGEMENT PLAN (EMP) Base line environmental data: In order to determine the impact of mining activities on environmental status, base line data generation is very essential which helps to evaluate the predicted impact on various environmental attributes by using scientifically developed and widely accepted impact assessment methodologies and also helps in preparing EMP for improving the environmental quality. Therefore this chapter illustrates the description of existing environmental status of the study area with reference to the prominent environmental attributes such as climate, atmospheric condition, water quality, soil quality, vegetation pattern, land use pattern, ecology, archeological places, socio economic aspect etc. The studies were carried out enclosing a radius of 5 km around Ucchangidurga building stone quarry. This zone is further classified as core zone and buffer zone for better understanding of base line status. The environmental screening was done based on the available secondary data supplemented by regular field visit the primary and secondary data s where collected to describe the existing environmental setup. (a) Micro-Meteorology The historical data on meteorological parameters has been collected from nearest Indian Meteorological Department, Davanagere, which is at a distance of 50 km from the site. The same data is used as they will have similar climatological conditions as that of project area. The following climatological parameters have been recorded. Temperature Wind velocity and direction Rainfall PR17

18 (i) Temperature. Monthly Max, Min & Avg temperature recorded is given below All figures in degree centigrade Month Year 2014 Max Min Avg The warmest month of the year is April, with an average temperature of 29.7 C. The lowest average temperatures in the year occur in December, when it is around 22.5 C. (ii)wind speed & direction: The wind speed in the study area was 15.5 km/hr and average is 5.2km/hr the direction is north-west to south-east. (iii) Rainfall The rainfall data are collected from the Metrological data for the past 5 years. Shown below are the arithmetic averages of rainfall of stations under the District. PR18

19 Year wise, Month wise Rainfall Data Year Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec From the above data, it could be concluded that maximum rainfall during the month of August and September & minimum rainfall will be during January & February. Summary of micro-meteorological data Parameters Units Data Maximum Temperature 0C 34.5 Minimum Temperature 0C 15.3 Average annual rainfall mm 613 (b) Air Environment The existing baseline ambient air quality of the study area was assessed by setting up of a network of 2 ambient air quality sampling locations namely. a) Proposed Working Pit (A1) & b) Haulage Road (A2), that are considered as representative samples of the area. These representative sites were selected based on the wind prevailing wind direction, coverage factor, population & terrain which determines the occurrence of ground level concentration of pollutants due to proposed activity. The Air Monitoring data are enclosed as Annexure 3(A). The results reveals that, all the parameters are within the stipulated limit. (c) Noise Environment To identify the Noise level information, 2 monitoring stations namely working pit & Haulage Road were established in core zone and there data s are enclosed as Annexure 3(B). The results reveals that, all the parameters are within the stipulated limit. PR19

20 (d) Water Environment In order to assess the baseline data on water resources, The ground water and surface water sampling locations were identified at Doddabigere village bore well. The samples were collected and analyzed in a NABL laboratory. It s data s are enclosed as Annexure 3(C). The results reveals that, all the parameters are within the stipulated limit. (e) Soil Environment The soil sample locations namely mining area (S1) and agriculture (S2) land were identified and collected data s are enclosed as Annexure 3(D). The results reveals that, all the parameters are within the stipulated limit. The soil quality at the mine site found as salty loam with calcareous natures. The ph value indicating is slightly alkaline. The primary nutrients N, P and K are in moderate concentrations in sample S2 whereas in sample S1 the nutrients are slightly low. (F) SOCIO ECONOMIC ENVIRONMENT Socio economic study is an important integral part of environmental study. Existing as well as upcoming projects will have some impact (adverse or beneficial) on the environment. The impact may alter the socio economic status of the society in dual ways. Hence, it is important to conduct socio-economic studies and assess the existing status and also the impacts envisaged by upcoming projects on the socioeconomic conditions of the study area. The information on socio-economic aspects has been compiled from various secondary sources including government and semi-government offices. PR20

21 Study involved following phases: o To collect baseline information on socio-economic status of the surrounding villages. o To draw suggestion on the kind of schemes/ community development o Understand the people perception on the initiatives taken up by mining companies. o Broaden the scope of the company s involvement with the local community. Conclusion Improvement of the economic status of the people around the area. Boost up the local market, which will invite people from different places to install their ancillary units. Direct & indirect employment opportunities. Benefits to the state in the form of Royalty, Cess, Taxes etc., Provide medical facility to all the employees and medical checkup camps to the local villagers. Hence, there will be an overall positive impact on socio-economics of people living in the villages Environmental Impact Assessment: Considering the lease area, extent of mechanization, production, manpower etc. the project is micro level. Other activities are more beneficial to the local people and the raw materials are very essential for the growth of construction activities Therefore, it could be summarized that there is no impact on environment due to this proposed quarry operation. However the individual parameters impact assessments are given below. i) Land Management ii) From the proposed quarry activity it is expected to broken about Ha land in the life of the quarry. As result slight change will be expected on land use. Which could be managed better way as it was in the post quarry land use plan. It is proposed to use the excavated land for water pond, agriculture, afforestation and public use purpose at the post mining stage. This post quarrying land use will be taken up only at the end of the life period. PR21

22 ii) Air quality The impact on air quality due to proposed mining activity would be negligible from the quarry operation. iii) Water quality They are no toxic or poisonous discharges into the drains from mining operations. So, the quality of water shall not be affected. But in the surface water some suspended silt particles may find their way. Therefore, it could be concluded that there is no impact on water quality due to this proposed mining activity. iv) Noise level Noise can be considered as an integral part of the quarry activity. The magnitude of impact depends on the methodology of quarry, machinery deployed and allied activities. The activities are very minimal; hence there is no impact on noise level. v) Vibration: Only mm drilling proposed for quarry operation, there is no deep hole drilling and blasting in the plan period. Hence the vibration due to quarry operation is negligible and there is no impact due to drilling and blasting. vi) Socio economics People residing in the nearby villages are benefited by the direct and indirect employment opportunity created by the quarry activity. The mine has employed 30 persons directly. There will be increase in per capita income, better life style, demand for the local goods / products, employment opportunities etc., are benefitted to the local people. Hence, there is a positive impact on socio-economic field due to this quarry activity. PR22

23 vii) Occupational health Main occupation of the people is agriculture, quarrying related activities etc and lately many of them have found more rewarding jobs in the quarrying sector. Further safety shoes, helmets, goggles, leather gloves, earmuffs, breathing mask etc will be provided to eligible workers as pert the prescribed norms of DGMS. viii) Historical monument There is no historical monuments, important places, temples, within 5 km radius. At the outset there is no impact due to these quarry operations. However in order to maintain Eco-friendly quarry operations the environmental management plan has been drawn and proposed for implementation Environmental management plan: In order to attaining the desired objective of environmental quantity and sustainable quarry operations in and around the Sy.no. 502/A2 Ucchangidurga village environmental management is must. The principal environmental parameters such as air, water, noise & land are considered for impact assessment and management. (a) Air Pollution Control Measures: Water sprinkling on haulage roads to suppress dust. Maintenance of haulage road slopes, removal of accumulated dusty Material on road regularly. Regular maintenance of earthmoving equipment s and vehicles. Restriction on speed of vehicles. Periodical monitoring of air quality. PR23

24 (b) Noise Mitigative Measures Regular maintenance of machinery and vehicles. Greenbelt development along the roads, lease boundary & crusher. Providing ear muffles to the workers. (c) Water pollution control measures Check dams will be constructed at different locations across the nallah outside the lease where ever necessary. Ground water recharging and rain water harvesting systems will be adopted in the quarry area. Drains shall be constructed to collect storm water and divert the same to the nearby nullahs. Adequate retention wall will be constructed all along the toe of the dump. Garland drains formation in the appropriate place. Afforestation will be carried out in consultation with local forest authority for selection of species, in the green belt area, barren area, all along the road side and inactive dump areas. The corresponding Conceptual plan is enclosed as Plate No. 7. The abstract of Proposed Environmental protective works along with budget. A.Environmental Works. Protective measures Unit Proposed Specification Appr. Rate/unit Total in Rs.Lakhs Air quality Ls Regular Water spray Rs. 0.75/year 3.75 management Garland drains Rmts 150 On site 500/ M³ 0.75 Retaining Wall Rmts 150 On Site 750/mtrs 1.12 Compound Rmts 200 On Site Rs.500/mtr 1.00 Wall Environmental Per Ls Regular Rs.0.75Lakh/yea 3.75 Monitoring year r Afforestation Ha 2.50 On road 0.90 Lakh/Ha 2.25 Total PR24

25 B. CSR Works Sl.N CSR Activities Proposed o Budget in Lakhs. 1 Providing furniture s to the local school 0.50 at Ucchangidurga Village 2 Medical facilities for the local villages Local road maintenance Temple development (surrounding 0.50 villages) 5 Cultural program(surrounding villages) Drinking water facilities for 0.70 Ucchangidurga Village 7 Up liftment of SC/ST colony of 0.70 Ucchangidurga Village Total 3.70 Total A+B For implementation of Environment Management Plan a small unit called Environment Management Cell will be formed under the control of the Manager. The job of this cell will be: Implementation of pollution control measure. Monitoring programe implementation. Post-plantation care. To estimate the efficiency of pollution control measures taken. To bring out any other unforeseen effect on environment not covered under report. Seeking expert s advice when needed. PR25

26 CONCULSION : The Ucchangidurga building stones activity will help In Improvement of the economic status of the people around the area. Boost up the local market, which will invite people from different places to install their ancillary units. Direct & indirect employment opportunities. Benefits to the state in the form of Royalty, Cess, Taxes etc., Provide medical facility to all the employees and medical checkup camps to the local villagers. Hence, it could be summarized that there is no impact on environment and will be an overall positive impact on socio-economics of people living in the villages. PR26

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT 1 MCDR INSPECTION REPORT General SN Particulars Details Date of Inspection 18.10.2016 1 Name of the Mine Dhobitola Titaniferous Iron Ore Mine 2 Total Lease Area (Ha) 2.61 Ha (Entire Forest Land) with breakup

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY S.No Particulars Details 1 Name of Project 2 Project Proponent 3 Village Proposed Granite Building Stone Quarry of Mr. Saji Sebastian Mr. Saji Sebastian Madeckal House, Kizhakkambalam

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office Mine file No : KNT/GLB/LST/7/BNG (i) Name of the Inspecting : Officer and ID No. (ii)

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

PRE FEASIBILITY REPORT (PFR)

PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 27 PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 28 INDEX S. No. Contents Page No. 1.0 EXECUTIVE SUMMARY 30 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For EXISTING MINING ACTIVITY CATEGARY B2 UNDER THE EIA NOTIFICATION 2006 AMENDED ON 31/05/2012 TO PIRABHAI VALABHAI NANDASANIYA LOCATED

More information

THE RAMCO CEMENTS LIMITED

THE RAMCO CEMENTS LIMITED 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF

PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF Indulal C. Vora AT VILLAGE:- Palakhda, TALUKA:- Porbandar, DIST.:-Porbandar 1 (B) CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

CMPDI. 4.6 Mine Closure Plan

CMPDI. 4.6 Mine Closure Plan 4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

The mine is opened on The reasons for delay for starting mining operations are:

The mine is opened on The reasons for delay for starting mining operations are: 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly known as Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE BUDAWADA LIMESTONE MINE - 1.10 MILLION TPA CAPACITY EC Lr. No : J-11015/150/2008-IA.II

More information

STANDARD OPERATING PROCEDURE

STANDARD OPERATING PROCEDURE STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame

More information

PRE-FEASIBILITY REPORT. 5.0 Hectare sand mine under bhu-jal

PRE-FEASIBILITY REPORT. 5.0 Hectare sand mine under bhu-jal 1.0 SUMMARY OF THE PROJECT PRE-FEASIBILITY REPORT Project Name of Company / Mine Location Village Taluka District State Sand mine Gram Panchayat Tarrighat, Sand mine Tarrighat Tarrighat Patan Durg Chhattisgarh

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Sr.No Condition Status A. SPECIFIC CONDITIONS: J.K. CEMENT WORKS, MANGROL (RAJ.) Compliance report of Mangrol Lime stone mine (For the period from April 2011 to September 2011) Sub:- Conditions of Environment Clearance from MOEF, New Delhi Letter No.

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

ToR Letter No. SEIAA/AP/ANT/ Dated Monitoring Period : October 2016 to December Applicant

ToR Letter No. SEIAA/AP/ANT/ Dated Monitoring Period : October 2016 to December Applicant EXECUTIVE SUMMARY of Proposed Quartz Mine (30.667 Ha.) with a Production of 91,125 TPA at Sy. No. 410, D.Cherlopalli Village, Bathalapalli Mandal, Anantapur District, Andhra Pradesh. ToR Letter No. SEIAA/AP/ANT/2015-3568

More information

PRESENTATION ON MANGANESE ORE DEPOSITS OF SMIORE FOR THE WORK SHOP ON REVISION OF THRESHOLD VALUES OF MINERALS AT GOA

PRESENTATION ON MANGANESE ORE DEPOSITS OF SMIORE FOR THE WORK SHOP ON REVISION OF THRESHOLD VALUES OF MINERALS AT GOA PRESENTATION ON MANGANESE ORE DEPOSITS OF SMIORE FOR THE WORK SHOP ON REVISION OF THRESHOLD VALUES OF MINERALS AT GOA 21-07-2107 INTRODUCTION The Sandur Manganese & Iron Ores Ltd. (SMIORE) are operating

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH FORM I (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri K. Ravi Shankar Door No. 39/49/39, Krishnadevaraya

More information

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A 1. Name and address of the Owner / Occupier of the Industry

More information

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M. MAJHIGAWAN LIMESTONE MINE Mine Lease area 362.68 ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002 (18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002 (Gazette No. 23922, Notice No. 1273 dated 10 October 2002. Commencement date: 1 May 2004 [Proc. No. R25, Gazette No. 26264])

More information

GUIDELINES to the MINING ACT

GUIDELINES to the MINING ACT GUIDELINES to the MINING ACT PART I Format Requirements Reports 1. All reports required to be submitted to the minister by the Mining Act or regulations shall (a) be bound in a folder; (b) be a typewritten

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

STONE CRUSHER. Profile No.: 60 NIC Code: INTRODUCTION: 2. PRODUCT & ITS APPLICATION:

STONE CRUSHER. Profile No.: 60 NIC Code: INTRODUCTION: 2. PRODUCT & ITS APPLICATION: Profile No.: 60 NIC Code: 08106 STONE CRUSHER 1. INTRODUCTION: Crushed stone is also known as metal jelly. Crushed stone is segregated into various sizes viz. 35mm, 20mm, 12mm etc. for different uses.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP)

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP)

More information

Pre-Feasibility Report. for. Proposed Construction project of Santnagari

Pre-Feasibility Report. for. Proposed Construction project of Santnagari Pre-Feasibility Report for Proposed Construction project of Santnagari at Survey No. 1439, Near Dharoi Dam, Village Mahor, Taluka Vadali, District Sabarkantha, Gujarat By Gujarat Pavitra Yatradham Vikas

More information

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425 WILPINJONG COAL PTY LTD Environment Protection Licence (EPL) 12425 Link to Environment Protection Licence EPL12425 LICENCE MONITORING DATA MONTHLY SUMMARY REPORT for 1 June 2017 to 30 June 2017 Air Monitoring

More information

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425 WILPINJONG COAL PTY LTD Environment Protection Licence (EPL) 12425 Link to Environment Protection Licence EPL12425 LICENCE MONITORING DATA MONTHLY SUMMARY REPORT for 1 August 2017 to 31 August 2017 Air

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

SECTION 7: CLIMATE AND AIR QUALITY

SECTION 7: CLIMATE AND AIR QUALITY SECTION 7: CLIMATE AND AIR QUALITY 7.1 INTRODUCTION This study considers the potential impacts of emissions to atmosphere on air quality including, airborne pollutants and dust emissions during operation

More information

Evaluation of Bench Height Selection for Limestone Resource Optimization A Case Study. N K Sharma, R Mazumder, D K Panda, A K Dubey

Evaluation of Bench Height Selection for Limestone Resource Optimization A Case Study. N K Sharma, R Mazumder, D K Panda, A K Dubey Evaluation of Bench Height Selection for Limestone Resource Optimization A Case Study N K Sharma, R Mazumder, D K Panda, A K Dubey Abstract The economic viability of the modern day limestone mine and its

More information

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani DESCRIPTION OF

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

Mangalam Cement Ltd.(Unit I)

Mangalam Cement Ltd.(Unit I) Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE Environmental Management Chapter 335-6-9 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE CHAPTER 335-6-9 SURFACE MINING RULES TABLE OF CONTENTS

More information

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-110 003. Dated the 28th June, 2013 To, M/ s Arbind Kumar Singh

More information

Urban Rainwater Harvesting Systems: Promises and Challenges

Urban Rainwater Harvesting Systems: Promises and Challenges TheWaterChannel Webinar #5 Urban Rainwater Harvesting Systems: Promises and Challenges By Vishwanath S Zenrainman@gmail.com www.ircsa.org www.rainwaterclub.org Thanks for coming. The webinar will begin

More information

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 (No. JPBN. 1509/27 Vol. II CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 In exercise of the powers conferred by section 5 of the Conservation

More information

PRE FEASIBILITY REPORT FOR. Mining of Riverbed Sand. From Darakeswar River. Area : 8.09 Ha ( 20 Acres )

PRE FEASIBILITY REPORT FOR. Mining of Riverbed Sand. From Darakeswar River. Area : 8.09 Ha ( 20 Acres ) PRE FEASIBILITY REPORT FOR Mining of Riverbed Sand From Darakeswar River Area : 8.09 Ha ( 20 Acres ) AT Mouza: Kunjapur, Plot No: 2227 (P), 2269 (P), 2603 (P),JL: 112, Village: Kunjapur, Block : Indus,,

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

Information Request 11

Information Request 11 Information Request 11 Information Request 11 11-1 Responses to Information Request 11 Response to Information Request 11a Response to Information Request 11b 11-2 11-6 Federal Review Panel Information

More information

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India SUMMARY: Coal will be transported to the power plant by belt conveyors in case of pit head power plants. In case of power plants located far away from the mines, coal will be transported by rail. In some

More information

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Updated: November 2010 Directive 74 Appendix C Requirement Approval: 8512D Submitted to SHELL CANADA ENERGY MRM DDA PLAN-UPDATE NOV

More information

Environmental Protection Licence 2688

Environmental Protection Licence 2688 Perilya Environmental Protection Licence 2688 Licensee Perilya Broken Hill Limited (PBHL) Address Wentworth Rd, Broken Hill, NSW, 2880. Environmental Protection Licence 2688 (Southern Operations) Link

More information

LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT

LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT APPENDIX

More information

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 i) Name and address of the owner / Occupier ii) Industry category Primary (STC Code) Secondary (SIC Code) PART

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

ENVIRONMENTAL EFFECTS OF THE OPEN CAST MINING OPERATIONS AT SAMMAD URBAN AREAS NEAR TO LIMESTONE QUARRIES AMMAN 2010

ENVIRONMENTAL EFFECTS OF THE OPEN CAST MINING OPERATIONS AT SAMMAD URBAN AREAS NEAR TO LIMESTONE QUARRIES AMMAN 2010 ENVIRONMENTAL EFFECTS OF THE OPEN CAST MINING OPERATIONS AT SAMMAD URBAN AREAS NEAR TO LIMESTONE QUARRIES DR. AWWAD HUSNI TITI NATURAL RESOURCES AUTHORITY AMMAN JORDAN PHONE:+962 6 58576; FAX: +962 6 5811866

More information

EXECUTIVE SUMMARY INTRODUCTION : Jayaswal Neco Industries Limited

EXECUTIVE SUMMARY INTRODUCTION : Jayaswal Neco Industries Limited EXECUTIVE SUMMARY A. INTRODUCTION : M/s Jayaswal Neco Industries Limited (JNIL) belongs to the wellknown industrial group of Central India viz. NECO GROUP having annual turnover exceeding Rs. 3500 Crores.

More information

Base Metal and Iron Ore Mining

Base Metal and Iron Ore Mining Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead

More information

General Permit No.: OHR Page 53 of 146

General Permit No.: OHR Page 53 of 146 Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information

MEMORANDUM OF UNDERSTANDING BETWEEN HINDUSTAN COPPER LIMITED AND MINISTRY OF MINES FOR

MEMORANDUM OF UNDERSTANDING BETWEEN HINDUSTAN COPPER LIMITED AND MINISTRY OF MINES FOR i.exe MEMORANDUM OF UNDERSTANDING BETWEEN HINDUSTAN COPPER LIMITED AND MINISTRY OF MINES FOR 2010-2011 MEMORANDUM OF UNDERSTANDING (MOU) BETWEEN HINDUSTAN COPPER LIMITED AND MINISTRY OF MINES FOR 2010-2011

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

Trenches combined with living hedges or grass lines Rwanda - Imiringoti

Trenches combined with living hedges or grass lines Rwanda - Imiringoti Trenches combined with living hedges or grass lines Rwanda - Imiringoti Trenches combined with living hedges or grass lines are slow-forming terraces to control soil erosion by changing the length of the

More information

Page# The Top soil generation is very less and it is being simultaneously utilized.

Page# The Top soil generation is very less and it is being simultaneously utilized. Page# 1 Name of Project : Belkapahar Mine of Wolkem Industries Ltd. Project Code: 226/336/-2005 Clearance Letter No. : J-11015/23/2004-IA.II (M) dated 31.03.2005 Period of Compliance Report : October,

More information

RECLAMATION OF COAL MINE VOID

RECLAMATION OF COAL MINE VOID RECLAMATION OF COAL MINE VOID Reclamation of Coal Mine Void with Fly Ash Filling of mine voids with fly ash in an environmental sound process is the most viable option of bulk utilisation. This not only

More information

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions) Adams Co. Conservation District 670 Old Harrisburg Road, Suite 201 Gettysburg, PA 17325 Telephone: 334-0636 Fax: 337-0730 www.adamscounty.us Erosion and Sediment Pollution Control Guidelines for Residential

More information

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The groups cement facilities are located

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Stone Quarry (Area 1.00 ha) Survey No: - 526, 527 & 528 (Part) Village Raimoha, Taluka Shirur (Kasar), Dist - Beed (M.S). Owner & Lessee Shri. Chakradhar Subhash Dhakane Prepared

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

Topic: Site Formation

Topic: Site Formation Topic: Site Formation Presentation prepared by Raymond Wong February 2006 Purpose of site formation is to prepare a piece of land in order to: Accommodate building/s or other facilities which will be placed

More information

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement

More information

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule Of Works 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule of Works (Package II, Chainage 5/400 to 7/800 = 2400 mtrs SCHEDULE - A (CUTTING) Name of work: Limited tender for

More information

AGRAR. Augmenting Groundwater Resources by Artificial Recharge. ICARDA, Aleppo, Syria nd November 2006

AGRAR. Augmenting Groundwater Resources by Artificial Recharge. ICARDA, Aleppo, Syria nd November 2006 AGRAR Augmenting Groundwater Resources by Artificial Recharge UNESCO G-WADI MEETING ON WATER HARVESTING ICARDA, Aleppo, Syria 20 22 nd November 2006 Project objectives BGS approached by DFID in 2000 to

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Executive Summary for Dang Sarkar Metal Stone Quarry (42.63 Ha) EXECUTIVE SUMMARY

Executive Summary for Dang Sarkar Metal Stone Quarry (42.63 Ha) EXECUTIVE SUMMARY EXECUTIVE SUMMARY 1. PREAMBLE Minerals are the chief source of present phase of industrialization, and play an important role in the present phase of the national economy and overall development of the

More information

IMPACT OF IN-PIT CRUSHING AND CONVEYING ON PIT SHELL OPTIMIZATION. Marc Johnson, Regional Manager - South America

IMPACT OF IN-PIT CRUSHING AND CONVEYING ON PIT SHELL OPTIMIZATION. Marc Johnson, Regional Manager - South America IMPACT OF IN-PIT CRUSHING AND CONVEYING ON PIT SHELL OPTIMIZATION Marc Johnson, Regional Manager - South America Abstract In Pit Crushing and Conveying (IPCC) systems have matured as a technology to the

More information