1 Florida Department of TRANSPORTATION 2018 FTBA CONSTRUCTION CONFERENCE February 8-9, 2018 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW Presenter: Brian Blanchard, Assistant Secretary Engineering and Operations 1

2 Florida s Continued Growth An additional 5.4 million residents are expected by Strategic investments to our infrastructure allows Florida to keep pace with the growing demands and prepare for future growth. A fully funded budget will ensure FDOT is able to keep pace with projected growth. 2

3 GOVERNOR S SECURING FLORIDA S FUTURE BUDGET FY 2019 $10.1 Billion Transportation Work Program Maintenance, Enhancement, and Expansion of the State s Transportation System Includes Investments in Seaports, Airports, Transit Systems, Railways, Roadways, etc. 3

4 CONSTRUCTION PROGRAM FY 2019 PROJECT LETTINGS - BY MANAGING DISTRICT PROJECT LETTINGS (AS OF JANUARY 10, 2018 SNAPSHOT) LETTINGS LETTINGS DISTRICT AMOUNT IN $MILLIONS NUMBER OF PROJECTS 1 $ $ $ $ $ $ $ TE $ CO $1.0 1 SW $3, TARGETS & RESERVE BOXES NOT INCLUDED Includes Highway and Bridge Programs only, which includes Resurfacing, Bridges, Roadway, Safety, and Traffic Operations. Only Contract Classes 1 (Central Office Let), 7 (District Office Let), and 9 (Design-Build) are included. Only Transportation Systems 1-7 and 16 are included (excludes all multimodal systems). Multiple projects may be included in a single contract. 4

5 FY 2019 PROJECT LETTINGS (D1-D5) 1/10/18 SNAPSHOT - PROJECT LETTINGS > $20M PLANNED DESIGN BUILD DIST FIN PRJ PROJECT DESCRIPTION EST $M SR 82 FROM SHAWNEE ROAD TO ALABAMA ROAD S SR 82 FROM GATOR SLOUGH LANE TO SR SR20 FROM: ALACHUA C/L TO: SW 56TH AVENUE SR20 FROM: SW 56TH AVENUE TO: CR315 IN INTERLACHEN SR23 FROM EAST OF CR209 TO NORTH OF SR SR23 FROM NORTH OF SR16 TO NORTH OF SR21(BLANDING BLVD) SR 390 ST ANDREWS FROM SR RD ST TO E OF CR 2312 BALDWIN ROAD SR 30 (US 98) GREGORY ST & BAYFRONT 17TH AVE INTERCHANGE SR-808/GLADES ROAD SR-9/I-95 FROM SOUTH OF GLADES RD. TO SOUTH OF LINTON BLVD SR 46 (WEKIVA PKWY) FROM ORANGE BLVD TO N. OREGON ST/WAYSIDE DR SR 429 (WEKIVA PKWY) FROM ORANGE BOULEVARD TO W OF I-4 (SR 400) I-95 FROM VOLUSIA COUNTY LINE TO NORTH OF PALM COAST PARKWAY SR A1A CONSTRUCTION SEGMENT 3 FROM N 18TH ST TO OSPREY DR Includes Highway and Bridge Programs only, which includes Resurfacing, Bridges, Roadway, Safety, and Traffic Operations. Only Contract Classes 1 (Central Office Let), 7 (District Office Let), and 9 (Design-Build) are included. Only Transportation Systems 1-7 and 16 are included (excludes all multimodal systems). Multiple projects may be included in a single contract. 5

6 FY 2019 PROJECT LETTINGS (D6-TP) 1/10/18 SNAPSHOT - PROJECT LETTINGS > $20M PLANNED DESIGN BUILD DIST FIN PRJ PROJECT DESCRIPTION EST $M SR 25/OKEECHOBEE RD FROM W. OF NW 138 ST TO E. OF NW 107 AVE (CNCRETE) SR 997/KROME AVENUE FROM SW 296 STREET TO S OF SW 232 STREET SR 52 (SCHRADER HWY) FROM W OF SUNCOAST PKWY TO E OF US 41 (SR 45) CR 578 (CO LINE RD) FROM SUNCOAST PARKWAY TO US41 AT AYERS RD SR 50 FROM US 98/MCKETHAN RD TO US SR 50 FM WINDMERE RD/BRONSON BL TO US 98/MCKETHAN RD SR 52 REALIGNMENT FROM URADCO PLACE TO W OF FORT KING ROAD I-275/SR 93 FROM S OF KENNEDY BLVD TO S OF LOIS AVE WIDEN TPK(SR91) BOYNTON BEACH BLVD-LAKE WORTH RD(4TO8LNS W/EL)(MP ALL ELECTRONIC TOLLING (AET) PHASE 8 - TICKET SYSTEM (MP ) WIDEN HEFT- NW 106TH ST TO I-75 (MP34 TO MP39) 6TO10 LANES W/EXP LANES WIDEN HEFT FROM SR836 TO NW 106TH ST (MP26-34) (6/8 LNS TO 10 INC EXP) RECONSTRUCT TPK MAINLINE ST. LUCIE CNTY, MP RESURFACE TPK MAINLINE IN PALM BEACH CNTY, MP RESURFACE TPK MAINLINE IN MARTIN CNTY, MP Includes Highway and Bridge Programs only, which includes Resurfacing, Bridges, Roadway, Safety, and Traffic Operations. Only Contract Classes 1 (Central Office Let), 7 (District Office Let), and 9 (Design-Build) are included. Only Transportation Systems 1-7 and 16 are included (excludes all multimodal systems). Multiple projects may be included in a single contract. 6

7 MAJOR PROJECTS > $100M FY AS OF 1/10/18 SNAPSHOT DESIGN BUILD FY DIST FIN PRJ PROJECT DESCRIPTION EST $M SR23 FROM EAST OF CR209 TO NORTH OF SR SR23 FROM NORTH OF SR16 TO NORTH OF SR21(BLANDING BLVD) SR 429 (WEKIVA PKWY) FROM ORANGE BOULEVARD TO W OF I-4 (SR 400) WIDEN TPK(SR91) BOYNTON BEACH BLVD-LAKE WORTH RD(4TO8LNS W/EL)(MP WIDEN HEFT- NW 106TH ST TO I-75 (MP34 TO MP39) 6TO10 LANES W/EXP LANES WIDEN HEFT FROM SR836 TO NW 106TH ST (MP26-34) (6/8 LNS TO 10 INC EXP) I-75 (SR 93) AT US 301 INTERCHANGE I-10 FROM: I-295 TO: I SR 400 (I-4) W OF SR 528 BEACHLINE TO W OF SR 435 KIRKMAN RD SR 40 FROM END OF 4 LANES TO EAST OF CR I-4 BTU CONNECTION FROM 150' WEST OF CENTRAL FLORIDA PARKWAY TO SR I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND SR-5/US-1 FEDERAL HIGHWAY FROM CR-A1A TO BEACH ROAD SR 826/PALMETTO EXPY - SR 826 EASTBOUND RAMP TO SR 9A/I-95 NORTHBOUND GOLDEN GLADES INTERCHANGE IMPROVEMENTS (MAINLINE SPUR MP 0X) WIDEN SAWGRASS- N OF ATLANTIC TO SR 7 (MP8-18)(6TO10 LNS) (W EXP LNS) WIDEN TPK- ORANGE/LAKE C/L - MINNEOLA ( ) 4TO8LNS W/EXP Includes Highway and Bridge Programs only, which includes Resurfacing, Bridges, Roadway, Safety, and Traffic Operations. Only Contract Classes 1 (Central Office Let), 7 (District Office Let), and 9 (Design-Build) are included. Only Transportation Systems 1-7 and 16 are included (excludes all multimodal systems). Multiple projects may be included in a single contract. 7

8 Work Zone Safety FDOT remains an active participant in the Florida Work Zone Safety Coalition and is committed to increasing safety in work zones. FDOT has executed a new FHP Hireback contract and its usage is increasing. FDOT has revised standard specifications to include the use of off-duty law enforcement during night lane closures on facilities with speed limits > 55 mph; and for moving contractor equipment on project sites. 8

9 Transportation Innovation Challenge FDOT continually strives to enhance all areas of our operations. We invite you to share your thoughts on ways we can challenge ourselves to be innovative, efficient and exceptional. index.shtm 9

10 Partners in Transportation 10

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127

More information

Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc.

Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc. AMENDMENT #3 + Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc. Adopted October 16, 2014 by the Board of Directors Palm Beach

More information

LANE CLOSURE GUIDELINES

LANE CLOSURE GUIDELINES LANE CLOSURE GUIDELINES OBJECTIVE: Provide guidance for the development and approval of various types of lane closure requests. Detail the process for requesting approvals, necessary data to support a

More information

Florida Department of Transportation

Florida Department of Transportation Florida Department of Transportation Major Projects Update Report District 6 September 2017 Table of Contents Table of Contents Project Development and Environment (PD&E) Study Phase S.R. 9A/I-95 from

More information

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. Palm Beach County, Florida Palm Beach Metropolitan Planning Organization April 217 Project Study Area LIMITS: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to

More information

Florida Department of Transportation

Florida Department of Transportation Florida Department of Transportation Major Projects Report District 6 April 2018 Table of Contents Table of Contents Project Development and Environment (PD&E) Study Phase S.R. 9A/I-95 from U.S. 1 to Broward

More information

FTBA 2018 Construction Conference Major Projects Update

FTBA 2018 Construction Conference Major Projects Update FTBA 2018 Construction Conference Major Projects Update Bill Jones, P.E. FDOT District 7 Director of Transportation Development 1 2 3 FUNDED PROJECTS Howard Frankland Bridge Industry Forum September 2018

More information

NOISE STUDY REPORT. for the WEKIVA PARKWAY (SR 429)/SR 46 REALIGNMENT PD&E STUDY. Orange, Lake, and Seminole Counties, Florida

NOISE STUDY REPORT. for the WEKIVA PARKWAY (SR 429)/SR 46 REALIGNMENT PD&E STUDY. Orange, Lake, and Seminole Counties, Florida UPDATED FINAL REPORT NOISE STUDY REPORT for the WEKIVA PARKWAY (SR 429)/SR 46 REALIGNMENT PD&E STUDY Orange, Lake, and Seminole Counties, Florida Financial Project ID: 238275 1 22 01 and 240200 1 22 01

More information

MAINTENANCE OF TRAFFIC NOTES

MAINTENANCE OF TRAFFIC NOTES MAINTENANCE OF TRAFFIC NOTES GENERAL: 1. THE REGULATORY SPEED USED FOR MOT CALCULATIONS FOR EACH FACILITY ARE NOTED BELOW. MODIFICATIONS TO THE REGULATORY SPEED MAY REQUIRE RESUBMITTAL OF THE MOT PLAN.

More information

US 27 Transportation Alternatives Study

US 27 Transportation Alternatives Study US 27 Transportation Alternatives Study Prepared for: Florida Department of Transportation Systems Planning Office October 2012 Technical Memorandum: Alternative Options and Policy Implications Prepared

More information

Florida Gas Transmission Section #3 Hydrostatic Test

Florida Gas Transmission Section #3 Hydrostatic Test Florida Gas Transmission Section #3 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From East of Lake Magdalene to West of County Line Hillsborough and Pinellas Counties Today s Outline Who

More information

Final Recommendations Identification of Improvements, Strategies, and Solutions

Final Recommendations Identification of Improvements, Strategies, and Solutions Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...

More information

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1 PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road STAFFING MATRIX Construction Engineering and Inspection-Wiles Road JAMES JEFFERS, P.E. Senior Project Engineer Years of Experience:

More information

TRANSPORTATION IMPROVEMENT PROGRAM *

TRANSPORTATION IMPROVEMENT PROGRAM * 2017 TRANSPORTATION IMPROVEMENT PROGRAM * TRANSPORTATION IMPROVEMENT PROGRAM FISCAL YEARS 2016/2017 TO 2020/2021 TIP Citizen s Version METROPOLITAN PLANNING ORGANIZATION FOR THE MIAMI URBANIZED AREA 2017

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501 SR 874/Don Shula Expressway Ramp Connector Project Development & Environment (PD&E) Study PUBLIC HEARING December 8, 2011 MDX Contract #: RFP-09-04 MDX Work Program #: 87410.011 ETDM #: 11501 1 This Public

More information

The Gateway Expressway FTBA Conference. February 2-3, 2017

The Gateway Expressway FTBA Conference. February 2-3, 2017 The Gateway Expressway FTBA Conference February 2-3, 2017 256996-1 SR 686 (Roosevelt Blvd.) at CR 611 (49th St. N) PD&E 256866-1 Segment 2A 256997-1 SR 686 (Roosevelt Blvd.) from 49th St. Bridge to north

More information

South Florida Regional Freight Plan

South Florida Regional Freight Plan South Florida Regional Freight Plan A collaboration between: Prepared by: In conjunction with: March 2010 Table of Contents INTRODUCTION... 1 ORGANIZATION OF REGIONAL FREIGHT PLAN REPORT... 1 GOALS, OBJECTIVES,

More information

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913 RICK SCOTT GOVERNOR Florida Department of Transportation 10041 Daniels Parkway Fort Myers, FL 33913 ANANTH PRASAD, P.E. SECRETARY Mr. Ray Eubanks Plan Processing Administrator Department of Economic Opportunity

More information

DOCUMENT CONTROL PANEL

DOCUMENT CONTROL PANEL August 2013 DOCUMENT CONTROL PANEL File Name: I-95 Integrated Corridor Management System, Broward County File Location: 11555 Heron Bay Boulevard, Suite 200, Coral Springs, FL 33076 Document Tracking Number:

More information

Table of Contents. I-4 Express Lanes Concept of Operations

Table of Contents. I-4 Express Lanes Concept of Operations Table of Contents 1 Overview... 5 1.1 Purpose of the Concept of Operations... 5 1.2 Scope... 5 1.3 Background... 5 1.4 Operational Needs... 7 2 Referenced Documentation... 9 3 Existing Conditions... 10

More information

NOVEMBER 13, 2017 S O L I C I T A T I O N N O. V P

NOVEMBER 13, 2017 S O L I C I T A T I O N N O. V P NOVEMBER 13, 2017 PRE QUALIFICATIONS R.J. Behar & Company, Inc. (RJB) has overseen in excess of $1 billion in construction projects throughout the state of Florida. Our team is fully qualified in the following

More information

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012 I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings Tier II June 11 th & 13 th, 2012 Agenda Introduction & Background Study Area Purpose & Need Project Status Tier Methodology & Tier I Evaluation

More information

Engineering District 5-0

Engineering District 5-0 Engineering District 5-0 Executive Staff Michael W. Rebert, PE District Executive Christopher Kufro, PE Assistant District Executive (Design) Alfred A. Picca, PE Assistant District Executive (Construction)

More information

Overview of the Project Development Process. Brian Blanchard, PE Assistant Secretary for Engineering and Operations

Overview of the Project Development Process. Brian Blanchard, PE Assistant Secretary for Engineering and Operations Overview of the Project Development Process Brian Blanchard, PE Assistant Secretary for Engineering and Operations Overall Project Development Process The time it takes to produce a project varies significantly

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

Progress Report on the Implementation of the Strategic Intermodal System (SIS)

Progress Report on the Implementation of the Strategic Intermodal System (SIS) Progress Report on the Implementation of the Strategic Intermodal System (SIS) Supplement to the Review of the Department of Transportation Tentative Work Program FY 2006/07 through 2010/11 Supplement

More information

CEI Services Transit Bus Stop Infrastructure

CEI Services Transit Bus Stop Infrastructure Presentation for: Broward County Board of County Commissioners sioners V2114585P1 CEI Services Transit Bus Stop Infrastructure Presented by: SOLID Consulting Engineers, Inc. (CBE/SBE) COMPANY AND TEAM

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List February 2017 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016 Overall project Johnson County Gateway Interchange Project Improvements 87th Street The $288 million Phase 2 DesignBuild project starts construction this spring, with completion by December 31, 2016 Phase

More information

Value Engineering For Transportation Improvements. Interstate 4 from West of State Road 528 (Beachline) to West of State Road 435 (Kirkman Road)

Value Engineering For Transportation Improvements. Interstate 4 from West of State Road 528 (Beachline) to West of State Road 435 (Kirkman Road) Value Engineering For Transportation Improvements Interstate 4 from West of State Road 528 (Beachline) to West of State Road 435 (Kirkman Road) Value Engineering Study Draft Report FM Number: 242484-7

More information

NORTH I-75 MASTER PLAN Summary Report

NORTH I-75 MASTER PLAN Summary Report NORTH I-75 MASTER PLAN Summary Report Interstate 75 (SR 93) From the Florida s Turnpike Interchange to the I-10 Interchange Alachua, Bradford, Clay, Citrus, Columbia, Duval, Levy, Marion, and Sumter Counties,

More information

Gov. Scott Issues Updates on Hurricane Matthew Preparedness Efforts as Storm Approaches Florida

Gov. Scott Issues Updates on Hurricane Matthew Preparedness Efforts as Storm Approaches Florida FOR IMMEDIATE RELEASE October 4, 2016 CONTACT: GOVERNOR S PRESS OFFICE (850) 717-9282 media@eog.myflorida.com Gov. Scott Issues Updates on Hurricane Matthew Preparedness Efforts as Storm Approaches Florida

More information

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES Planning Feasibility Study June 2003 INTRODUCTION AND HISTORY The SR 417 Extension Study was a yearlong effort undertaken by Florida s Turnpike Enterprise to investigate the feasibility of a new toll road

More information

CITY OF SAFETY HARBOR ENGINEERING

CITY OF SAFETY HARBOR ENGINEERING CITY OF SAFETY HARBOR ENGINEERING The Engineering Department provides the city with technical services including design of construction and maintenance projects, review of development plans, field surveys,

More information

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT District 2 1109 South Marion Avenue Lake City, FL 32025-5874 INTERSTATE 10 (SR 8) / SR

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened

More information

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence. THE PROJECT A freeway segment ranked 6th worst in the Nation, with levels of congestion, pollution and accidents that are simply unacceptable and which have Statewide and National implications. Executive

More information

Executive Summary. Overview

Executive Summary. Overview Executive Summary Overview The Genesee-Finger Lakes Diversion Route Initiative identifies the most suitable diversion routes for Principal Arterial roads in the nine-county Genesee-Finger Lakes Region.

More information

CORRIDOR ALTERNATIVES EVALUATION SUMMARY REPORT

CORRIDOR ALTERNATIVES EVALUATION SUMMARY REPORT CORRIDOR ALTERNATIVES EVALUATION SUMMARY REPORT GULF COAST PARKWAY PD&E STUDY from US 98 to US 231 with a connection to US 98 in Springfield Gulf County and Bay County, Florida FINANCIAL PROJECT ID NUMBER:

More information

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study CENTRAL FLORIDA EXPRESSWAY AUTHORITY SR 408 Eastern Extension PD&E Study WHAT IS A PD&E? Process used to evaluate - o Engineering Alternatives o Environmental Impacts and Social, Cultural and Economic

More information

CORRIDOR ALTERNATIVES EVALUATION SUMMARY REPORT

CORRIDOR ALTERNATIVES EVALUATION SUMMARY REPORT CORRIDOR ALTERNATIVES EVALUATION SUMMARY REPORT GULF COAST PARKWAY PD&E STUDY from US 98 to US 231 with a connection to US 98 in Springfield Gulf County and Bay County, Florida FINANCIAL PROJECT ID NUMBER:

More information

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Memorandum Date: January 15, 2014 To: CC: From: Subject: Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Paul Danielson, P.E. Project Manager, Southwest Light Rail

More information

1.0 PROJECT SUMMARY Project Background

1.0 PROJECT SUMMARY Project Background 1-1 1.0 PROJECT SUMMARY 1.1 Project Background In 2004, the Florida Legislature enacted the Wekiva Parkway and Protection Act, Chapter 369, Part III, Florida Statutes (F.S.), in order to address the need

More information

Appendix B Highway 407 Interchange Review - Cochrane Street Area

Appendix B Highway 407 Interchange Review - Cochrane Street Area Appendix B Highway 407 Interchange Review - Cochrane Street Area AECOM 300 ater Street hitby, ON, Canada L1N 9J2 www.aecom.com Memorandum To Michael May, P.Eng., Town of hitby Page 1 CC Subject Greg Hardy,

More information

Introduction Who We Are

Introduction Who We Are Introduction Who We Are We offer a diverse scope of professional services that often enables us to serve as a reliable one-source partner, efficiently tackling time-sensitive projects with customized solutions.

More information

Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN. Draft

Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN. Draft 2 0 4 0 Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN Draft 2040 Long Range Transportation Plan Amendment 1 DRAFT January 2018 Background The JUMPO 2040 LRTP

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014 SR 29 Project Development & Environment Study Presentation to SR 29 Stakeholders Advisory Committee January 23, 2014 Purpose and Need Enhancing Economic Competitiveness Improving Emergency Evacuation Capabilities

More information

Alico Road. Connector Study. Lee County Department of Transportation. Prepared by. Lee County, Florida

Alico Road. Connector Study. Lee County Department of Transportation. Prepared by. Lee County, Florida Alico Road Connector Study Lee County Department of Transportation Lee County, Florida Prepared by July 2009 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Project Description and Purpose...

More information

Florida. Logistics & Distribution Industry Edition. Source: Florida Department of Economic Opportunity, Bureau of Labor Market Statistics

Florida. Logistics & Distribution Industry Edition. Source: Florida Department of Economic Opportunity, Bureau of Labor Market Statistics L a b o r M a r k e t I n d u s t r y P r o f i l e Florida Logistics & Distribution Industry 2017 Edition Source: Florida Department of Economic Opportunity, Bureau of Labor Market Statistics Florida

More information

TSM&O Consortium Meeting

TSM&O Consortium Meeting TSM&O Consortium Meeting MEETING AGENDA D5 Urban Office 133 S. Semoran Blvd. Orlando, FL Lake Apopka B Conference Room April 7, 2016; 10:00 AM-12:00 PM 1) INTRODUCTIONS AND BUSINESS PROCESS DIMENSION OVERVIEW

More information

Interchange Workshop Report (August 2004)

Interchange Workshop Report (August 2004) U.S. Highway 14 Corridor Study New Ulm to North Mankato Table of Contents Section Interchange Workshop Report (August 2004) Page 1. Introduction and Next Steps 1 2. Interchange Workshop Participants &

More information

EXHIBIT A SCOPE OF SERVICES MAINTENANCE PERSONNEL SUPPORT

EXHIBIT A SCOPE OF SERVICES MAINTENANCE PERSONNEL SUPPORT EXHIBIT A SCOPE OF SERVICES I. PURPOSE: MAINTENANCE PERSONNEL SUPPORT The Department is requesting Personnel Support Services to augment the Department s Maintenance personnel in the administration of

More information

CONTRACT No.: E8M79 Date: 06/30/14 Page 1 of 5

CONTRACT No.: E8M79 Date: 06/30/14 Page 1 of 5 Page 1 of 5 FLORIDA S TURNPIKE ENTERPRISE (FTE) Construction Engineer: Pete Nissen, P.E. Assistant Construction Engineer: Bill Sears, P.E. FDOT Design William Sloup, P.E. GEC Design Terry Miller, P.E.

More information

APPENDIX A TIER 1 ANALYSIS

APPENDIX A TIER 1 ANALYSIS SPN H.004100 FEASIBILITY STUDY APPENDIX A TIER 1 ANALYSIS 040-012-042AH Appendices Lead Sheets PROVIDENCE STATE PROJECT. H.004100 The following worksheets analyze various project alternatives at various

More information

TECHNICAL MEMORANDUM I-710 EIR/EIS INITIAL FEASIBILITY ANALYSIS (IFA) TECHNICAL APPENDIX WBS TASK ID:

TECHNICAL MEMORANDUM I-710 EIR/EIS INITIAL FEASIBILITY ANALYSIS (IFA) TECHNICAL APPENDIX WBS TASK ID: FINAL REPORT TECHNICAL MEMORANDUM I-710 EIR/EIS INITIAL FEASIBILITY ANALYSIS (IFA) TECHNICAL APPENDIX WBS TASK ID: 165.10.09 Prepared for Los Angeles County Metropolitan Transportation Authority December

More information

A KEY MULTI-PURPOSE REAL ESTATE OPPORTUNITY

A KEY MULTI-PURPOSE REAL ESTATE OPPORTUNITY A KEY MULTI-PURPOSE REAL ESTATE OPPORTUNITY WORLD-CLASS MULTI-PURPOSE BUSINESS PARK Beacon Lakes Industrial Park is a premier master-planned commercial development predominantly consisting of Class-A,

More information

CONSTRUCTION CONFERENCE

CONSTRUCTION CONFERENCE CONSTRUCTION CONFERENCE - 2010 Concrete Paving Session February 23, 2010 Greg Schiess 1 2 3 CHANGE 4 TOPICS OF DISCUSSION Implementation of the new Design Guide and related software Pavement Type Selection

More information

CRA District Tax Increment Financing Analysis. Board Presentation of Draft Report March 24, 2016

CRA District Tax Increment Financing Analysis. Board Presentation of Draft Report March 24, 2016 CRA District Tax Increment Financing Analysis Board Presentation of Draft Report March 24, 2016 Complete Assessment Of Entire CRA District Since Inception; Forecast TIF Revenues Thru 2045; Develop Funding

More information

ALTERNATIVE PROJECT DELIVERY

ALTERNATIVE PROJECT DELIVERY ALTERNATIVE PROJECT DELIVERY 2017 Educational Series ALTERNATIVE PROJECT DELIVERY OVERVIEW TxDOT uses comprehensive development agreements (CDAs) an umbrella term for public-private partnerships in order

More information

Miami-Dade Transit. Alice N. Bravo, P.E. Director. Miami-Dade Transit 1

Miami-Dade Transit. Alice N. Bravo, P.E. Director. Miami-Dade Transit 1 Miami-Dade Transit Alice N. Bravo, P.E. Director Miami-Dade Transit 1 Miami-Dade Transit MDT is the largest transit agency in the State of Florida, and one of the largest departments within Miami-Dade

More information

REGIONAL MULTIMODAL TRANSPORTATION PLAN FOR NORTHEAST FLORIDA CREATING REGIONAL CONNECTIONS

REGIONAL MULTIMODAL TRANSPORTATION PLAN FOR NORTHEAST FLORIDA CREATING REGIONAL CONNECTIONS REGIONAL MULTIMODAL TRANSPORTATION PLAN FOR NORTHEAST FLORIDA CREATING REGIONAL CONNECTIONS Contents Introduction... 1 Summary... 1 History... 2 Planning Process... 4 Background... 4 Goals, Objectives

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

Mega Projects at WSDOT

Mega Projects at WSDOT Mega Projects at WSDOT Managing multiple projects in major urban corridors LINEA LAIRD, WSDOT ASSISTANT SECRETARY ENGINEERING & OPERATIONS Presentation to Oregon State Legislature Congestion Work Group

More information

Southeast Florida Freight and Goods Movement Update Treasure Coast Regional Planning Council September 16, 2011

Southeast Florida Freight and Goods Movement Update Treasure Coast Regional Planning Council September 16, 2011 Southeast Florida Freight and Goods Movement Update Treasure Coast Regional Planning Council September 16, 2011 For Questions on this Presentation, Please Contact: Jeff Weidner, Mobility Manager Florida

More information

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006

More information

Technical Advisory Committee / Policy Advisory Committee. Solution Assessment 5/25/2017. Photo: City of Richmond COMMERCE CORRIDOR STUDY 1

Technical Advisory Committee / Policy Advisory Committee. Solution Assessment 5/25/2017. Photo: City of Richmond COMMERCE CORRIDOR STUDY 1 COMMERCE CORRIDOR STUDY Technical Advisory Committee / Policy Advisory Committee Solution Assessment 5/25/2017 Photo: City of Richmond COMMERCE CORRIDOR STUDY 1 Agenda Welcome and Roll Call Barbara Nelson,

More information

Public Notice Date: Dec 27, 2017 Expiration Date: Jan 29, 2018

Public Notice Date: Dec 27, 2017 Expiration Date: Jan 29, 2018 US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

Transportation Subcommittee Meeting July 18, 2014

Transportation Subcommittee Meeting July 18, 2014 Transportation Subcommittee Meeting July 18, 2014 Action Requested Recommend for Planning and Programming Committee approval in August 2014 and placement on the Board of Directors agenda for October 2014.

More information

Draft Noise Study Report

Draft Noise Study Report Project Development & Environment Study I-75 (SR 93A) From Moccasin Wallow Road (CR 6) to South of US Highway 301 (SR 43) Draft Noise Study Report WPI Segment No.: 419235 2 Manatee & Hillsborough Counties

More information

Florida uses new SHRP2 Solutions to manage risk, promote mode choices. Ananth Prasad Secretary, Florida Department of Transportation August 25, 2014

Florida uses new SHRP2 Solutions to manage risk, promote mode choices. Ananth Prasad Secretary, Florida Department of Transportation August 25, 2014 Florida uses new SHRP2 Solutions to manage risk, promote mode choices Ananth Prasad Secretary, Florida Department of Transportation August 25, 2014 Today s Presentation Florida s participation implementing

More information

Report of Preliminary Geotechnical Engineering Investigation for Ponds

Report of Preliminary Geotechnical Engineering Investigation for Ponds Report of Preliminary Geotechnical Engineering Investigation for Ponds Segment 2: State Road 400 (SR 400)/Interstate 4 (I-4) from West of SR 528 (Beachline Expressway) to West of SR 435 (Kirkman Road)

More information

ES-1. Central Florida Freight Corridor (US 27/SR 60) Multimodal Mobility Enhancement Improvements. Project Name

ES-1. Central Florida Freight Corridor (US 27/SR 60) Multimodal Mobility Enhancement Improvements. Project Name Project Name Central Florida Freight Corridor (US 27/SR 60) Multimodal Mobility Enhancement Improvements Was a FASTLANE application for this project submitted previously? No If yes, what was the name of

More information

Chapter 1. Proposed Project. 1.1 Introduction

Chapter 1. Proposed Project. 1.1 Introduction Chapter 1 Proposed Project 1.1 Introduction The Riverside Transportation Commission (RCTC), California Department of Transportation (Caltrans), and the Federal Highway Administration (FHWA), propose to

More information

Chapter 6: Regional Transportation

Chapter 6: Regional Transportation Chapter 6: Regional Transportation Continued growth and development throughout the region magnifies the significance of connections to surrounding counties as economic and social interactions continue

More information

3 INTERSTATES. The Carolina Crossroads Project Team Welcomes You

3 INTERSTATES. The Carolina Crossroads Project Team Welcomes You The Carolina Crossroads Project Team Welcomes You 3 INTERSTATES + 12 = KEY INTERCHANGES We re here to: Discuss the Carolina Crossroads I-20/26/126 Corridor Project Gather your input on study issues We

More information

MIC Core Pre-Schematic Program Analysis

MIC Core Pre-Schematic Program Analysis MIC Core Pre-Schematic Program Analysis April 2001 MIAMI INTERMODAL CENTER (MIC) PROGRAM Work Program Item No. 6113820 State Project No. 87000-1528 Financial Management Item No. 249643 PRE-SCHEMATIC DESIGN

More information

Tier 1 Recommendations October 30, 2017

Tier 1 Recommendations October 30, 2017 Tier 1 Recommendations October 30, 2017 Page Left Intentionally Blank Bristol District B.2 B.9 Need Tier 1 District Needs Need Description Within the Bristol MPO, the I-81 interchanges in Abingdon have

More information

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange Jeromy Grenard, PE, PTOE American Structurepoint Hardik Shah, PE, PTOE American Structurepoint Roundabouts

More information

Florida Turnpike Enterprise s Incident Management Program: Key Success Factors Ingrid Birenbaum, P.E., PTOE Senior Project Manager, PBS&J

Florida Turnpike Enterprise s Incident Management Program: Key Success Factors Ingrid Birenbaum, P.E., PTOE Senior Project Manager, PBS&J Florida Turnpike Enterprise s Incident Management Program: Key Success Factors Ingrid Birenbaum, P.E., PTOE Senior Project Manager, PBS&J Abstract. This paper discusses Florida Turnpike Enterprise s Incident

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 7

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 7 TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 7 From: Date: Staff March 20, 2009 Council Meeting Subject: Resolution Supporting the Inclusion of the Intercity

More information

ORLANDO INTERNATIONAL AIRPORT (OIA) CONNECTOR REFRESH ALTERNATIVES ANALYSIS FINAL REPORT

ORLANDO INTERNATIONAL AIRPORT (OIA) CONNECTOR REFRESH ALTERNATIVES ANALYSIS FINAL REPORT ORLANDO INTERNATIONAL AIRPORT (OIA) CONNECTOR REFRESH ALTERNATIVES ANALYSIS FINAL REPORT Prepared For: Florida Department of Transportation, District Five Prepared By: HDR Engineering, Inc. February 2016

More information

NOISE STUDY REPORT DESIGN ADDENDUM

NOISE STUDY REPORT DESIGN ADDENDUM NOISE STUDY REPORT DESIGN ADDENDUM for Wekiva Parkway Segment 8 - Ballantrae Apartments Seminole County, Florida Financial Project ID: 240200-4-32-01 Prepared for: Florida Department of Transportation

More information

VISION. 4. Vision. 31 Page

VISION. 4. Vision. 31 Page VISION 4. Vision The 2035 LRTP, branded as Transformation, is the Broward MPO s plan for change. Economic vitality for the region, a better environment, and enhanced quality of life are envisioned. This

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Downtown & Mid-Corridor Project Status Update Meeting Holman United Methodist Church Thursday, July 23, 2009 Phase 1 Project Description 8.6 mile corridor from Downtown

More information

RISK ASSESSMENT PROCESS 3 ENTERPRISE AUDIT PLAN 6 FDOT AUDIT PLAN 7 DISTRIBUTION, PROJECT TEAM AND STATEMENT OF ACCORDANCE 12

RISK ASSESSMENT PROCESS 3 ENTERPRISE AUDIT PLAN 6 FDOT AUDIT PLAN 7 DISTRIBUTION, PROJECT TEAM AND STATEMENT OF ACCORDANCE 12 TABLE OF CONTENTS RISK ASSESSMENT PROCESS 3 ENTERPRISE AUDIT PLAN 6 FDOT 2012-2013 AUDIT PLAN 7 DISTRIBUTION, PROJECT TEAM AND STATEMENT OF ACCORDANCE 12 -Audit Plan Page 2 of 12 RISK ASSESSMENT PROCESS

More information

August 15, 2006 (Revised) July 3, 2006 Project No A

August 15, 2006 (Revised) July 3, 2006 Project No A August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway

More information

Sunrise Project South I-205 Corridor Improvement Project

Sunrise Project South I-205 Corridor Improvement Project Sunrise Project South I-205 Corridor Improvement Project January 24, 2007 Sunrise and I-205 Project Summary Conclusions Sunrise Scoping Study Key Results South I-205 Scoping Study Key Results South I-205

More information

Highway 15 Project Hutchinson, MN

Highway 15 Project Hutchinson, MN Highway 15 Project Hutchinson, MN Adjacent Properties and Businesses Meeting Hutchinson Area Chamber of Commerce 1 Agenda Topic 1) Introduce the project scope 2) Project goals and benefits 3) Project timeline

More information

INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM)

INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM) INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM) TSITE 2016 Winter Meeting Nashville, TN February 25, 2016 AGENDA Project History IHSDM: Background & Overview IHSDM: Interstate 24 Model IHSDM: Interstate

More information

Memorandum. 921 SW Washington Street, Suite 468, Portland, OR tel fax

Memorandum. 921 SW Washington Street, Suite 468, Portland, OR tel fax Date: September 16, 2010 To: I-84/US 395 IAMP Project Team From: Shayna Rehberg, AICP Darci Rudzinski, AICP Re: I-84/US 395 Interchange Area Management Plan Proposed IAMP Policies and Code Amendments L

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 23, Alexander Road to Maple Lake Road DBNUM: 11424 / UPC: 114240 Initiated from the Pavement Management System, this project will resurface within the project limits. ADA upgrades and guiderail repair

More information

I-80 Integrated Corridor Mobility (ICM) Project Corridor System Management Plan (CSMP)

I-80 Integrated Corridor Mobility (ICM) Project Corridor System Management Plan (CSMP) I-80 Integrated Corridor Mobility (ICM) Project Corridor System Management Plan (CSMP) WCCTAC TAC Presentation June 10, 2010 DRAFT 1 Study Corridor Existing Conditions I-80 Corridor CSMP Near-Term Conditions

More information

Canaveral Port Authority: Rail Extension Update

Canaveral Port Authority: Rail Extension Update Rail Extension Update Canaveral Port Authority: Rail Extension Update Thursday, April 30, 2015 5:30 to 6:30 p.m. Port Canaveral Maritime Center John Walsh CEO, Canaveral Port Authority Jim Dubea Speakers

More information

Presented by Andrew Velasquez URS Corporation/Florida s Turnpike Enterprise

Presented by Andrew Velasquez URS Corporation/Florida s Turnpike Enterprise Presented by Andrew Velasquez URS Corporation/Florida s Turnpike Enterprise Traffic and Revenue Study Assessment of the viability of tolling a facility and expected toll revenue over a long term time frame.

More information

BOCA RATON AIRPORT Airspace Obstruction Clearance Atlas

BOCA RATON AIRPORT Airspace Obstruction Clearance Atlas BOCA RATON AIRPORT Airspace Obstruction Clearance Atlas JULY 206 Introduction As the owner and operator of the Boca Raton Airport (BCT or the Airport), the Boca Raton Airport Authority (BRAA) is responsible

More information

Following is a compilation of quarterly progress reports by the Florida Department of Transportation Districts and Florida s Turnpike Enterprise.

Following is a compilation of quarterly progress reports by the Florida Department of Transportation Districts and Florida s Turnpike Enterprise. Following is a compilation of quarterly progress reports by the Florida Department of Transportation Districts and Florida s Turnpike Enterprise. District One Advanced Traffic Management Systems Lee County

More information