1 PREFEASIBILITY REPORT for PROPOSED Expansion of existing production capacity of Diketene derivatives & Ketene derivatives and Installation of Ethyl acetate, EO derivatives and Cogeneration CPP In GOVT MIDC AREA (LAXMI ORGANIC INDUSTRIES LIMITED) Mahad, Dist: Raigad, Maharashtra 1

2 Synopsis 1. Introduction 2. Justification 3. Location 4. Recourses 5. Process 6. Pollution Control 7. Background Study 8. Safety 9. Benefits 10. EIA structure 11. Scoping 12. Conclusion 2

3 1. Introduction M/s.LAXMI ORGANIC INDUSTRIES LIMITED (This Industry, TI) are desirous to expand, diversify and energy integrate the existing specialty chemicals industrial unit for producing green solvents, specialty chemicals and co-generation based captive power plant (CPP), at Plot No. B-2/2, B-3/1/1, B-3/1/2; B-1/1/2, B-1/2/1& B-1/3/2, at Government developed Maharashtra Industrial Development Corporation (MIDC) industrial estate, Mahad, district Raigad, Maharashtra. The existing industrial unit is the only production facility in India to manufacture range of specialty chemicals based on acetic acid to cater to demand of pharmaceutical, colorant and agrochemical industry and substitutes imports by about 40% to 50%. The industry now proposes to expand the capacity and add additional capacity to further substitute imports and enhance exports. Indianand worldwide demand for green solvents and specialty chemicals is increasing steadily. The intermediates and solvent proposed to be manufactured will be used in following industry segments. Printing industry : As a green solvent substituting aromatic solvents. Pharmaceutical industry Colorant industry Agrochemical industry Organic synthesis industry Polymer and coating industry The Notification no. S.O promulgated on 14 th September 2006 has covered this type of industries under its entry 5 (f). Synthetic organic chemicals industry located in a notified industrial area/ estate will come under Cat Band come under purview of SEAC/SEIAA, Maharashtra to obtain environment clearance for. The industry submitted the proposal to SEAC, Maharashtra in June Subsequently, SEAC, Maharashtra have taken up the project in its 86th meeting dated 5 th and 6 th Sept 2014, and classified under Category A as the unit is falling within five km from Ecologically Sensitive Area (ESA) and directed TI to approach to Central EAC, MoEF, New Delhi. In the recent past, the industry was granted Environmental Clearances for the same unit in March 2010 and April 2013 by state SEAC/SEIAA. Now we are seeking expansion in production capacity with addition of new products. This prefeasibility report is prepared for forming a frame work for EIA study, scoping and finalizing terms of reference as may be required. Form I, as is prescribed by the said notification is duly filled up and submitted. The prefeasibility report is an accompaniment to the same. 3

4 Form I submitted by us generally covered Justification, nearby Land Use, Resources, Process, Pollution Control, Aesthetics, Risk Involved, Consequent Developments and Environmental Sensitive Issues. 2. Justification The Indian pharmaceutical industry is the world's second-largest by volume and is likely to lead the manufacturing sector of India. Several Government and private sector projects with huge amount of investments have been initiated but could not attend the speed of development for the need of good quality material. Over the last decade, there has been a sizeable growth in Pharmaceutical sector both in small, medium and large scale units. This has given rise to many small and medium scale units to manufacture pharma intermediate.the ever growing requirements of India,due to higher population and various diseases indicated the need for the growth of this industry. Thus there is a gap in demand and supply. Our efforts of generating products, by-products, downstream products and recycling - reprocessing are indeed needed. With multinational pharmaceutical companies enhancing their presence in India, the long-term prospects of the pharmaceutical industry seem fairly bright. The printing industry is increasing at robust rate due to globalization and change of life style in India. This calls for availability of green solvents like ethyl acetate which will substitute solvents like toluene, MIK and MIBK. Indian agro sector demand is increasing to improve productivity and to deal with attack of various types of pests etc. The intermediates proposed will substitute imports. The colorant industry demand for intermediates is increasing as multinational companies are shifting manufacturing base in India. But the impact of some factors on the industry's growth remains to be seen. For one, there is the power supply situation. Power accounts for around 10% of the manufacturing cost and availability could be an issue in future. Also, manufacturers need to modernize their processes to reduce energy consumption and become more cost efficient. Due to shortage of power in the country, the company proposes to generate captive power by energy integration by setting a co-generation plant and meets its captive requirements of steam and power. The fate of industrialization depends on the proper and effective conjugation of large and medium/small scale industries each supporting each other in their requirement to bridge the gap between demand and supply. In order to be competitive in the global market this synergy between large & medium/small scale industries is a prerogative. Therefore considering the above, large companies do require the help of small units to support them by giving them quality products at lesser price. 4

5 Industry is regularly submitting the EC compliance report to the statutory bodies. In addition, it is also examined whether industry had made compliance as expected in Consent to Operate by MPCB for existing production. S. No. Condition Compliance 1 Address & status Continuous the same no change 2 Validity Valid till Product size Sr. no. Product Capacity (TPM) 1 Diketene Intermediates for Pharmaceuticals, Pesticides and Pigments a Esters 1000 b Amides 480 c Arylides Ketene Derivatives / 1200 Acetic anhydride 4 Isolated storage of 8500 KL/M ethyl alcohol for captive consumption only 4 Waste water 100 m3 permitted. Limited inside quantity 5 Treatment Comprehensive, PCT, Biological & CETP. Found in limit 6 ECE Dust collector / Scrubbers, cyclone, bag filters in place 7 LDAR Leak detection & repair program with monitoring protocol undertaken as consented. No toward incident reported. Work zone ambiance cognizes 8 Hazardous waste Membership of CHWTSDF 5

6 Proposal: The industry proposed to produce as under : Product Present Additional Proposed, Total I. Diketene Derivatives (TPM) a. Esters / Ester Derivatives b. Amides / Amide Derivatives c. Arylides / Arylide Derivatives II. Diketene (TPM) III. Acetic anhydride (TPM) IV. Ketene derivatives (TPM) V. Ethyl acetate (TPM) VI. Ethylene / Propylene oxide derivatives (TPM) VII. Sodium acetate VIII. CPP- Electric Power (MW) These are important chemicals and none of them are banned for production in other developed countries, nor is banned for use. The chemicals produced have following merits. Import substitute Export oriented Energy integration by setting up co-generation for steam and power requirements. The reaction product is water Clean production technology adopted by ensuring 6

7 - Minimize pollutants at source - Maximize recycle - Treat to PCB norms - Use low ash and sulphur coal for Cogen-CPP. 100% recycle of increased effluents for process. No increase in effluent load to CETP Laxmi Organic Industries Limited (TI) is the only producer of Diketene derivatives & Ketene derivatives and major producer of Ethyl acetateand have expertise in Co-gen CPP. TI has proposed to increase capacity in the same products range and has expertise in design, engineering, construction, commissioning and operation of these products and has network of marketing these products in domestic and export markets. 3. Location- The proposed location is at plot number Plot No. B-2/2, B-3/1/1, B-3/1/2, B-1/1/2, B- 1/2/1& B-1/3/2, M.I.D.C, Mahad, District, MIDC at Mahad. This TI site is in premises of MIDC estate which is meant for this type of industries. On all four sides we are surrounded by industries and no nuisance is spread. The surrounding neighbors are, 1. East : MIDC vacant plot 2. West : Local body Road, vacant agricultural land. 3. South : Pearl Polymers 4. North :Lona Industries. Location too is justifiable. Unit size is kept correct for ease of handling and environmental control. Government MIDC at Mahad has provided all infrastructures like assured Electrical power, continuous water supply with purification from water works having, RSF (Rapid Sand Filtration) and disinfection, internal road, network, external approach roads and has networking with Common Hazardous Waste Storage Treatment and Disposal Facility (CHWTSDF). CHWTSDF at Maharashtra Industrial Development Corporation (MIDC), Taloja, in vicinity has been established with support of MIDC and Maharashtra Pollution control Board (MPCB). A Common effluent Treatment Plant (CETP), is also functional at MIDC, Mahad. As there are other industries in the neighborhood with similar nature, there is compatibility. Location can be thus justified. A relevant portion of index map is enclosed. The proposed land plot admeasuring 1,02,789 sq. mts. This is not a Prime Agricultural Land. The land use is already as Industrial. Thus, there is no change in the status. This is a 7

8 flat land where by cutting- filling balances and there will be No Low Borrowing from Nature. Within 10 km influence zone there is no tropical forest, biosphere reserve, national park, wild life sanctuary and coral formation reserve. The river, city Mahad, railway line and national highway are sufficiently at safe distance. The clearance is obtained from local body. Hence, have public acceptability. GEOGRAPHICAL LOCATION OF SITE : Latitude : Approx. 18 6'2.93"N Longitude : Approx '4.98"E Terrain : Flat terrain Climate : Semi-Arid 4 Resources TI is desirous to establish in MSI sector unit to expand, diversify and energy integrate the existing specialty chemicals industrial unit for producing green solvents, specialty chemicals and co-generation based captive power plant (CPP). It requires following resources, Area sq. mts Water Input Assured from MIDC Work force 240 Raw Materials commensurate with product, as also work up Chemicals, solvents & catalysts Effluent Facility high COD and TDS sub stream segregated self-treatment and CETP later. Haz. Waste Facility CSWTSDF at Taloja Process Developed by self Machinery available locally Laboratory maintained sophisticated Attendants Units cooling tower, hot water generations Instrumentation state of art Total Investment Rs Crores ( Present + Expansion) Environment Fund 2 % Proponents Law abiding. No litigation pending. Site 1. Existing industrial premises. 2. Climatic condition suitable for finer adjustments of control, making it fit for processing conditions. 3. Well connected for transportation. 4. Leveled ground and load bearing soil 5. TI being in Govt. MIDC Estate, its infrastructure will be used. 8

9 9

10 Technology Selection 1. The products proposed are in the same manufacturing range for which the technology is already developed and plants are in operation. 2. The process used is based on raw materials that are available, without anybottleneck. Thus, it is not necessary to store any one of it in excess, with a fear of crossing expiring date. Excess storage also means wastage. Here, we can follow easily the principle of JIT (Just In Time). 3. The process used is developed by TI themselves and hence we are aware about the sensitive points needing careful attention in advance. 4. The process is cost effective, safe and environmentally friendly. 5. There is no elevated pressure condition in processing. 6. Solvents used that are recoverable, and are so recovered. 7. The steam from boilers will be used for process and to produce power in turbine by installing new power plant. Instrumentation 1. Latest electronic instrumentation with high accuracy and reliability 2. DCS control system with 100% redundancy for control and power supply. 3. Emergency Shut Down System for ensuring safety of plant and personnel. 4. Stream flow, feed water flow is measurable (indicating and recording) 5. Water level and liquid material level is measurable (indicating and recording) 6. Multipoint temperature scanner with thermo couple. All points indicating and recording (all for steam, feed water, flue gas and air) 7. Pressure gauges at reactors. 8. DCS based multi-channel data logger to inputs like currents, mv, T/C and recording with columned dot matrix printer. 9. DCS based hooters for trips, low levels, high levels and high temperatures. Machinery &Hardware : 1. Modern pneumatic air handling transfer system is used to avoid any risks in human being handling the production. 2. All processing equipment like reactors material of construction will be compatible to process. Generally, will be of SS316 quality and will be kept validated as per strict international guidelines prescribed. 3. The condensers are in SS Wherever water is used, will be specially purified both for process and cleaningwashing. 5. Help of sophisticated configuration may be taken, if necessary. Project proponents Laxmi Organic Industries Ltd. is a producer of green solvents based on alcohols for pharmaceutical and printing industry. It was established in 1988, with a focus on the solvents for Pharmaceuticals and Printing industries. 10

11 The company has adopted following certifications 1. ISO ISO ISO ISO (Under implementation) 5. Kosher 6. Responsible Care Today, Laxmi Organic Industries Ltd manufactures a wide range of intermediates and solvents and has forged enduring relationships with large and small companies all over the world. Laxmi Organic Industries Ltd. has established reputation for providing quality products in manufacturing plants that meet global standards. The proponents are, S. No. Name Designation 1. Ravi V. Goenka Managing Director Chemical Engineer 2. A. K. Dudhane Chemical Engineer Executive Director & COO 3. N. K. Rao Vice President B.Sc.with Diploma in Marketing Marketing Management 4. V. B. Borse Chemical Engineer Sr. Vice-President (Operations& Projects) 5. B. K. Kabra Graduate in Commerce with Masters in Marketing Management 6. K.D. Das ACMA, MBA (Finance) 5 Process General Manager Exports C.F.O. Products TI proposes to establish a plant to produce green solvents. The products serve as green solvents for Pharmaceuticals and Printing. As season changes or as immunity changes, demand for particular chemical changes, the industry has thus to be in readiness to change the product suitability and be prepared to mitigate the corresponding environmental challenges. The utilities are normally the same, but the reactors are used by different combination and sequence. The product mix is as given below. Product Present Additional Proposed Total 1. Diketene Derivatives (TPM)

12 Esters / Ester Derivatives Amides / Amide Derivatives Arylides / Arylide Derivatives 2. Diketene (TPM) Acetic anhydride (TPM) Ketene derivatives (TPM) 5. Ethyl acetate (TPM) 6. Ethylene / Propylene oxide derivatives (TPM) 7. Sodium acetate CPP- Electric Power (MW) It may be seen that, There is a capability of making these products Production process is continuous with Cleaner Production strategy with effluents recycle Machineries, utilities will be installed according to the expansion requirement. Process The details of manufacturing process is submitted as annexures. Overall Environmental Significance: Unit Operation/ process 1. Incoming raw material 2. Weighing and strict quality control Peculiarities Selected from known vendors Transportation in closed tankers Load Cell based weighing system provided Environmental significance Prompt use and storage in closed containers prevent spillages and loss of strength. Less HC emissions. Better check on mass balance, purer material and less rejections. 3. In process Solvents Recovered and reused By products Recovered and sold to parties, when in demand Gaseous emissions Scrubbed and detoxified Process waste residue To be sent on common facility for disposal 12

13 4. Instrumentation DCS Control system for accurate process controls 5. Control Excellent system of documentation and control of critical stages in production process 6. Solvent recovery No solvents are used in the process Facilitates monitoring of quality of the product and safety aspects. Better operation and retrievable records for better checks. Not applicable 6 Pollution control Clean production technology adopted by ensuring following at design and engineering stage. - All reactions selected are producing water as by product. - Minimise pollutants at source - Maximise recycle - Treat to PCB norms - 100% recycle of increased effluents for process. - No increase in effluent load to CETP - Treatability data available from existing ETPs - Reduction of VOC at every processing stage by vent condensers and scrubbers. - Use low sulphur and ash coal for Cogen CPP for reducing emissions The process adopted is based on esterification of organic acid and alcohol producing water as an effluent. The recovery system will be designed in such a way that entire water is used for process application thereby replacing fresh water input. The boiler is provided with cyclone separator, bag filter/esp, to control emission within prescribed limits. The stack height is upto 60 meters to control ground level clearance within limits. Process vents are controlled by condensers followed by water scrubber and organics are recovered and recycled. (a) Water & waste water: The water and waste water generated in the factory will be as follows; a. Water requirement : # Use Station Existing Proposed Total 1 Domestic Cooling water

14 3 Process water Boiler feed Greening Total b. Waste Water generation: # Use Station Existing Proposed Total 1 Domestic Cooling water Process water Boiler Blow down Total There is no increase in effluent load to CETP. The industry has membership of CETP, letter is attached ESTIMATED QUALITY OF RAW & TREATED EFFLUENT : SR. NO. PARAMETER RAW EFFLUENT TREATED EFF. QUALITY (MPCB LIMITS) UNITS 1. ph B.O.D 300 Max. 100 Mg/lit. 3. C.O.D 800 Max. 250 Mg/lit. 4. T.S.S. 200 Max. 100 Mg/lit. 5. Oil & grease 8 Max. 10 Mg/lit. 6. Ammonical Nitrogen <50 <50 Mg/lit. 14

15 Proposed ETP Flow Sheet: 15

16 (b) Air pollution: The proposed plant will not produce any significant air pollution load. The major sources of air pollution are: Boiler D.G. Set Emissions Fugitive emissions Process emissions The efforts taken by the proposed plant to tackle these issues are also given below. Emission Control Equipment: The fuel used here is coal & electricity. Stack of 60 m shall be provided. DG set of capacity 1010 KVA will be on low sulphur diesel and will be provided stack and acoustic enclosure as per MoEF standards. # Source Pollutant In-plant Measures 1 Proposed SPM, CO,SO2, Dust Collectors,, Boiler NOx ESP, Dust extraction with Bag filters, fogging. 3 In process HC, VOC Closed loop transfer Control Equipment Tall stack of 60 m. Vent condensers, Extraction and scrubbing 4 In process SO2 &HCl SO2 and HCl gas Scrubbing and detoxification 5 ETP CO2, H2S Covered transfer Fully aerobic In addition, other attendant efforts like water spraying, tree plantations and covered storage,etc shall be adopted, wherever feasible and needed. 16

17 Stack Details: Stack numbers 1 2 3a 3b 3c Present Present Additional Present Present Additional Additional Attached to Boiler No 1 & 2 (No Air exhaust from Ketene Furnace (Additional Stack details as given below) Acid Recovery DG Set (No change) DG Set Cogen CPP change) Pneumatic conveying (No change) Capacity MM 5 MM 5 MM KVA 1010 KVA 75 MT/Hr Kcal/Hr Kcal/Hr Kcal/Hr Steam Fuel Type Boiler No. 1 : Coal Boiler No. 2 : Furnace Oil Fuel quantity (Kg/hr) Boiler No. 1 : 27 TPD Boiler No. 2 : 8.3 TPD Material of Construction Coal is gasified to produce Producer gas and used as Gas in the Furnace C-9 as alternative / support fuel Coal : 500 kg/hr C-9 : 2 KL/day Coal : 1100 kg/hr C-9 : 4 KL/day Coal : 1100 kg/hr C-9 : 4 KL/day Diesel Diesel Coal No continuous requirement. Used only during failure for critical areas. Not used for Plant No continuous requirement. Used only during failure for critical areas. Not used for Plant Coal : kg/hr MS MS MS MS MS MS MS MS RCC 17

18 Shape Round Round Round Round Round Round Round Round Round Height, mtrs (above 6.3 (above 60 roof) (2 nos) roof) (2 nos) Diameter, mtrs * 2 nos 0.25 * 2 nos 3 Gas Quantity Nm3/hr Gas Temperature o C Exit Gas Velocity (m/sec) 3 6 Control equipment preceeding the Stack Nature of pollutants likely to be present in the stack gases such as Cl2, NOx, Sox, TPM etc Emission Control System provided Incase of DG set Power generation capacity in KVA (Attach specifications including residue management systems of each of the Control equipment including inlet/outlet Dust collector & Bag filters SOx, TPM Dust collector & Bag filters Scrubber of diameter 1200mm N.A. since Gas fired Scrubber of diameter 600mm SOx, TPM SOx, TPM SOx, TPM Scrubber of diameter 1200mm N.A. since Gas fired Scrubber of diameter 600mm 7 As per air pollution prevention norms for DG SOx, TPM As per air pollution prevention norms for DG 7 5 As per air pollution prevention norms for DG Dust separators followed by ESP SOx, TPM CO2, SOx, NOX, SPM As per air pollution prevention norms for DG NA NA NA NA 1010 KVA. Plant will not be operated on the DG. DG shall be used only for Critical Consumers. The fuel used is high speed deisel available from Petrol / Diesel pumps. Residue management system is not applicable. Dust separators followed by ESP NA 18

19 concentration of relevant pollutants) Whether any release of Odiferous compounds such as Mercaptans, Phorate etc. are coming out from any storages or process house Do you have adequate facility for collection of platform, ladder etc. as per Central Board Publication Emission regulations Part - III Quality of treated flue gas emissions and process emissions. Quantity of treated flue gas emissions and process emissions (Specify concentration of criteria pollutants and industry/processspecific pollutants stack-wise. Enclose copy of latest report of analysis from the laboratory approved by State Board/Central No Yes Refer Annexure 19

20 Board/Central Govt. in the MoEF. For proposed unit funish expected characteristics of the emissions 20

21 Dispersion: Point Emissions are coming from six boilers, and a proper stacks are provided for the same. Refer enclosed of stack details The stack will be fitted with port-holes, ladder and platform for facility of taking samples. Fugitive: A number of mitigation measures are taken to control fugitive emissions Engineering the plant layout in such a way so as to virtually eliminate need of using heavy equipment for material handling in the main plant Internal roads paved, leveled, no undulations, no sharp curves, slow speed No open storage of materials involved Fumes extraction and scrubbing system provided for extraction of fumes from the reactors and the process plant areas. 8. SOLID WASTE Introduction: Following mitigation practice is the policy for future: Minimization at all levels will be attempted for discarded products, empty containers, packing surpluses, incoming raw material unloading spillages and fugitives. The plant will produce very less amount of scrap materials. All these, however, be carefully stored on raised platform with dwarf toe walls all around, and a roof over-head. The contents will not be held in the premises for more than a fortnight. The main solid waste from factory will be in form of and residues form catalyst recovery. This waste will be transported to the Common Hazardous Waste Treatment and Disposal site for proper treatment and disposal. We buy raw materials in tankers and chemicals in bags. The bags are recycled. The ETP sludge will be sent to CHWTSDF. (A) Non Hazardous solid waste: Based on above working, the summary of Non Hazardous solid waste is given below Non hazardous solid waste Type of Total Management generation waste From Domestic Activities Dry garbage 18 Kg/day Wet garbage 42 Kg/day Garbage sent to Muncipal collection centre Garbage sent to Muncipal collection centre 21

22 From Process Coal Ash 28 MT/day To Brick Manufacturers Plastic Drums / Containers 15 Nos./ Day Handed over to the authorized recyclers (B) Hazardous Waste: The unit is member of CHWTSDF Taloja the copy of membership is attached The relevant summary is given below: Sr. Schedule I No. Category No. Type (ETP Sludge) Chemical sludge from waste water treatment Qty (kgs/day) 6 (Present) 3 MT/month (Proposed Additional) Method of Disposal CHWTSDF Process waste sludge / residue containing acid or other toxic metals or organic complexes. D-7 Organic nitrogen containing compounds expressed as nitrogen 9 MT/month (Total) 55 MT/month (Present) 29 MT/month (Proposed) 84 MT/month (Total) Used as fuel in furnace along with other fuels, after reprocessing Aesthetics: There will be no nuisance from noise. DG set only run occasionally during power failures to keep plant under safe conditions. There are crushing and pulverizing operations for coal handling. Dust suppression system is provided. Dust extraction with dust collection is provided. Labor strength is also limited in this MSI unit. Odour however can be of some sensitivity in chemical industries. However, in this case majority input is odourless, and only few with mild or characteristic odour. This will be handled carefully. No nuisance will go to surrounding chemical industries. 22

23 7. Background Study: This is important part of study. (A)Natural Environment : We propose to do sampling as Surface Water: 2 Locations, 11 Parameters. Ground Water: 5 Locations, 9 Parameters. Includes 1 up gradient and 2 down gradient source. Air Quality: 3 Months, For PM10, PM2.5, SO2 and NOx. Noise: 5 Locations. Soil: 5 locations The stations will be selected in all the eight directions from the factory and in 10 km radius. (B) Manmade Environment This includes existing land-use, demography, employment, socio-economic aspects and community development needed and proposed. This is for entire area both rural and urban in this study zone. Socio-Economic Status in Influence Zone explained in the study of Non-Workers percentage whether high, from the percentage employed population on Agricultural, how far is the scope for other avenues of livelihood like Live Stock, Forestry, Fishing, Hunting, Orchards, Mining, Trade Commerce. Further Out of Total Land what percentage is already under Cultivation and Out of Total Land what percentage is already under Irrigation. If the land is not likely to support more people, then whether Industrialization is necessary to improve the situation. All this will be studied as cost benefit ratio. 8. Safety Safety and Occupational Health will be dealt carefully. A disciplined approach is natural to this industry. Safety policy will be in place. The unit is registered under Factory Act and is bound by State Factory Rules. A complete exercise of risk assessment & characterization is scientifically done. Mitigation plan is drawn as follows: Mitigation measures Sprinkling on excavation Scrubbers on process vents Bag filters for steam boilers Stack height per MPCB Trees Barrier walls as shielding technology to suppress blast pressures, fragments, fireballs 23

24 Chemical storage area ventilation, store-rooms, fuel dyked For Hazardous chemicals Flame-proof motors, No smoking, Thermal insulations. First aid trained and Fire-fighting trained person will be available in every shift. Safety Officer will be appointed, as also the competent person retained. Where necessary, provisions of other Acts, where required like Petroleum act, Explosive Act, etc. will be obeyed. Fire fighting system is kept as per norms of Insurance Company. DMP (Disaster Management Plan) and off-site emergency plan will be in place. Accordingly, Personal protection equipment will be given and use will be insisted. Consulting Physician is available to attain the factory. 9. Benefits The expanded capacity will meet the growing demand for green solvents locally and internationally. 40% of the products will be exported to EU and other countries. 10. EIA study report: This will be finally prepared and submitted as per guidelines given by MoEF as -- Chapters Contents I Proponents, ToR, Purpose II Project explained. Why this, Why needed, Why here, What priorities, What options III Environment Setting Natural & Man-made Material, Method, Delphi technique Approach IV High Significant Impact Low Insignificant Impact & Shield Proper Site Prevention Abatement Treatment Mitigation Smooth Disposal V Alternate Analysis Selection of Raw Materials, Site, Process, Machinery- Hardware, Collaborators, Staff & Team VI Monitoring = Stations, Parameters, Frequency, Statistics, Rectify VII Risk = To Environment, To Health, To Bankers Public Consultation Reporting Community = Other Assistance VIII Benefits = Physical, Social, Employment, Other Tangible. Sustainable considerations IX Cost-Benefit. If Project Done? If No-Project?? X EMP = Plan, Cell, Schedule, Watch-dog, Monitoring, Documentation, Reporting. XI Summary, Conclusion, Justification, Mitigation. XII EIA Team = Proponent, Consultant, Associates, Future 24

25 11. Scoping We shall propose in Scoping the details of all above, as also the following; The study area of 314 sq. km, the land under the unit is very small. Thus, there will not be change in land use pattern. The present land is already non agricultural and under the industrial use. Raw material requirement, water requirement, water balance, process details, technology, product details etc. Ambient Air Quality monitoring, for 3 months except monsoon covering 10 km radius around industry and its impact. Ground water quality around plant 10 km radius. Treatment scheme to achieve low discharged from premises. Scheme of treatment, mode of treatment Many other medium and large scale industries are present within 10 km radius in general and in this estate in particular. Information of solid waste, number of working days, CO2 emission from stack and process, etc. Employment generation, benefits of project The raw materials used are enlisted and their MSDS will be presented. Some of them will be covered under MIS rules. However there use in process is small below regulatory quantity. Risk assessment will be done and submitted. 12. Conclusion This project is very necessary to supply green solvents for printing industry and meet solvent demand of pharmaceutical industry both domestic and worldwide and also in view of : The local people desire that this industry will be welcome in their area. The candidate site is suitable from general MoEF expectations. Water, power, raw material, Filler Material and Market is assured and found available with ease. Full precautions will be taken for Pollution Control, Resource Conservation and Environmental Protection. This is cost effective and Sustainable Development. 25

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA M/s. ARTEMIS BIO TECH LTD., (A Division of Themis Medicare Ltd.,) PLOT NO. 1 & 5, Phase I, IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA PRE FEASIBILITY REPORT Artemis Bio tech Ltd.,

More information

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

Kana Aroma Industries. Pre-Feasibility Report

Kana Aroma Industries. Pre-Feasibility Report Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,

More information

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

Mangalam Cement Ltd.(Unit I)

Mangalam Cement Ltd.(Unit I) Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes MINISTRY OF ENVIRONMENT AND NDU ENVIRONMENTAL GUIDELINE No. 31 Asphalt Plant Set Up Temporarily For The Purposes Of A Project By A Public Department 1.0 Purpose of guideline This environmental guideline

More information

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement

More information

FORM V Environmental Audit Report for the financial Year ending the 31st March 2016 Company Information

FORM V Environmental Audit Report for the financial Year ending the 31st March 2016 Company Information FORM V Environmental Audit Report for the financial Year ending the 3st March 206 Company Information Company Name Century Rayon Application UAN number NA Address P B. No. 22, Murbad Road Plot no Taluka

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report Status of Compliance of stipulated conditions of the Environment Clearance J- 01 It is noted that total water consumption will increase from 1000-1200 m 3 /day to 1200-1300 m 3 /day. Fresh water requirement

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

Mangalam Cement Ltd.

Mangalam Cement Ltd. Mangalam Cement Ltd. Name of the Project :- New Cement Plant Unit - III and 17.5 mw CPP-II Project Code :- Raj- 80-600 - 2008 Clearance Letter No. :-F NO. J - 11011 / 30/2006 - IA II (I), dtd 17/07/2007

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY S1014-0340-0008MPW NTS Rev1.doc Print Date 19 February 2009 ISSUE NUMBER 1 DATE 19/02/09 AUTHOR CHECKED MPW SMO Title Page

More information

M/s.Aarti Industries Limited (Apple Organics Division), Vapi.

M/s.Aarti Industries Limited (Apple Organics Division), Vapi. EXECUTIVE SUMMARY M/s. Aarti Industries Limited (Apple Organics Division) first obtained CCA order 3431, issued on 16/08/2004. Further it was extended by CCA order no. AWH-73091 dated 14/09/2015 for manufacturing

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1. INTRODUCTION Executive Summary 1.1 Background: M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1.2 Proposed Project:

More information

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA)

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) Email: sv.patil@vsisugar.org.in AIDA Technical Seminar www.vsisugar.com

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A 1. Name and address of the Owner / Occupier of the Industry

More information

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai.

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai. To, Maharashtra Maritime Board at Ferry Wharf (Bhaucha Dhakka), Nerul and Mandwa Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:April 10, 2017 Subject: Sir,

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month)

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month) LIST OF PRODUCTS (PROPOSED) Sr.No. Name of Product Existing Total after expansion 1 Benzyl Acetate 20 50 2 Benzyl Benzoate 20 50 3 Benzyl Alcohol 20 50 4 Benzyl Cyanide 20 50 5 Phenyl Acetic Acid 20 50

More information

Environmental Conditions Laboratories (for commercial use) Group

Environmental Conditions Laboratories (for commercial use) Group GBR No. 20 Environmental Conditions Laboratories (for commercial use) Group ERA regulates the environmental impact of enterprises through two key mechanisms. Smaller scale activities are regulated through

More information

Hazardous Waste Treatment Technology

Hazardous Waste Treatment Technology Hazardous Waste Treatment Technology 29 October 2014 PADAENG INDUSTRY 2 Building on the Past Padaeng Co. Ltd. Confidential and Copyright 2014 3 CSR Policy & Principles PDI drives its business through innovation

More information

THERMAL ENGINEERING & TECHNOLOGY DEVELOPMENT DIVISION, CEA

THERMAL ENGINEERING & TECHNOLOGY DEVELOPMENT DIVISION, CEA New Environment Norms Issues and Challenges By: Sanjeev Kumar Kassi Director (TETD), CEA INSTALLED CAPACITY (MW) AS ON 29-02-2016 Type Capacity Share (%) Hydro 42703.42 14.79% Thermal 201360.04 69.76%

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics Multilateral Investment Guarantee Agency Environmental Guidelines for Coke Manufacturing Industry Description and Practices Coke and coke by-products (including coke oven gas) are produced by the pyrolysis

More information

Compliance Report of EC : Compliance Status

Compliance Report of EC : Compliance Status Report of EC : S. i. Permission/recommendation shall be obtained from State Forest Department regarding Banni area, which is declared as a protected forest land ii. iii iv v GPCB vide letter no. GPCB/Unit-I/FT-

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

NATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.)

NATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.) Half yearly compliance report for the period July 2016 to Dec 2016 on the conditions specified in Environmental Clearance issued by Ministry of Environment and Forests & Climate Change. Ref: Ministry s

More information

Ministry of Environment and Forests Notification New Delhi, the 4 th February ( As amended up to )

Ministry of Environment and Forests Notification New Delhi, the 4 th February ( As amended up to ) Ministry of Environment and Forests Notification New Delhi, the 4 th February 2011. ( As amended up to 2.7.2011) (Amendment carried out vide notification no. S.O. 1527 (E) dated 2.07.2011 have been shown

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The groups cement facilities are located

More information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A Company Information Company Name : Facility Name : Person Name * : Designation * : Premise Name

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

Callidus Oxidizer Systems. Thermal and Catalytic Oxidizer Systems

Callidus Oxidizer Systems. Thermal and Catalytic Oxidizer Systems Callidus Oxidizer Systems Thermal and Catalytic Oxidizer Systems Meet the Thermal Oxidizer Experts Wide Range of Applications Honeywell UOP Callidus is an industry leader in environmental combustion technology.

More information

S THERMAL OXIDIZER SOLUTIONS TO MEET TOMORROW S CHALLENGES

S THERMAL OXIDIZER SOLUTIONS TO MEET TOMORROW S CHALLENGES UOP Callidus Oxidizers for Waste Destruction TODAY S THERMAL OXIDIZER SOLUTIONS TO MEET TOMORROW S CHALLENGES Thermal oxidizer systems Catalytic oxidizer systems Callidus, experts in Thermal Oxidizers

More information

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs)

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) Policy Resolution for Promotion of Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) POLICY OBJECTIVES 1. The Petroleum, Chemicals and Petrochemical industry in India is well established

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India SUMMARY: Coal will be transported to the power plant by belt conveyors in case of pit head power plants. In case of power plants located far away from the mines, coal will be transported by rail. In some

More information

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT. COURSE CURRICULUM COURSE TITLE: POLLUTION CONTROL & EFFLUENT TREATMENT (Code: )

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT. COURSE CURRICULUM COURSE TITLE: POLLUTION CONTROL & EFFLUENT TREATMENT (Code: ) GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM COURSE TITLE: POLLUTION CONTROL & EFFLUENT TREATMENT (Code: 3340504) Diploma Programme in which this course is offered Chemical Engineering

More information

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE EC letter no. J-11011/79/2007-IA II (I) Dated 16.04.2009 A. Specific Conditions : SN Condition Compliance 1. Continuous stack monitoring facilities to monitor

More information

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016) Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated 06.09.2012 (Period April 2016 to September 2016) Sr. No. Conditions Compliance status A. Specific Conditions A.1 Water 1. The fresh

More information

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK. for the. Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK. for the. Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK for the Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT May 2011 INTRODUCTION The World Bank, through IDA funding, is proposing

More information

31. POLLUTION CONTROL COMMITTEE

31. POLLUTION CONTROL COMMITTEE 31. POLLUTION CONTROL COMMITTEE 90 31.1 Consent to A Duly filled in application Form Establish XIII under Water Act. * days an Industry B Duly filled in application FORM 1 under Air Act * C Consent fee

More information

Pesticides Manufacturing

Pesticides Manufacturing Multilateral Investment Guarantee Agency Environmental Guidelines for Pesticides Manufacturing Industry Description and Practices This document addresses the synthesis of the active ingredients used in

More information

Environment Management System in Chemical Unit-II (Pyridine & its Derivatives and Speciality Chemicals)

Environment Management System in Chemical Unit-II (Pyridine & its Derivatives and Speciality Chemicals) Environment Management System in Chemical Unit-II (Pyridine & its Derivatives and Speciality Chemicals) 1. Air Emission Management: Odour Management There will not be any specific source of air emission

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management WESTINGHOUSE PLASMA GASIFICATION Hazardous Waste Management Hazardous waste is just that hazardous. Medical, industrial and petrochemical wastes are all types of hazardous waste and pose threats to human

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

Controlling Emissions and Saving Money with Highly Engineered Cartridge Filter Technology

Controlling Emissions and Saving Money with Highly Engineered Cartridge Filter Technology Controlling Emissions and Saving Money with Highly Engineered Cartridge Filter Technology Introduction By Richard Lydon, VP Technology & Business Development Over the last number of years Clear Edge has

More information

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014 COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014 S. N. Conditions Remarks 2 The Ministry of Environment and Forests has

More information

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division) To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

More information

Appendix VIII: Determination of chimney heights

Appendix VIII: Determination of chimney heights Appendix VIII: Determination of chimney heights 181 Regional Air Quality Plan for Taranaki 182 Regional Air Quality Plan for Taranaki Appendix VIII: Determination of stack heights and boiler operation

More information

Solvent Recovery Systems

Solvent Recovery Systems Solvent Recovery Systems Use Steam Recycling A new technique that recycles the heat normally lost during solvent recovery can cut fuel bills and reduce plant exhaust emissions. by Stanley J. Macek Compliance

More information

Environmental Improvement Plan. Sohar Refinery

Environmental Improvement Plan. Sohar Refinery Environmental Improvement Plan Sohar Refinery Feb 2014 Page 1 of 18 Waste Water Treatment Plant Improvements Background The treatment of the waste water of the Refinery was malfunctioning for a long period.

More information

Sustainability and Environmental Issues in the Kraft Pulp Industry. Celso Foelkel

Sustainability and Environmental Issues in the Kraft Pulp Industry. Celso Foelkel Sustainability and Environmental Issues in the Kraft Pulp Industry Celso Foelkel www.celso-foelkel.com.br www.eucalyptus.com.br Sustainability Sustainability Anthropocentric-oriented concept Long term

More information

The Chemical Industry and Climate Change. A Snapshot from India

The Chemical Industry and Climate Change. A Snapshot from India The Chemical Industry and Climate Change A Snapshot from India B.H. Rahill Lead Environmental Specialist South Asia Environment June 14, 2006 Presentation Outline The Indian Situation (Part of) LBNL Benchmarking

More information

My Home Industries Pvt Ltd., (An ISO 9001:2008, ISO 14001:2004 and OHSAS Certified Company) Mellacheruvu Nalgonda District (Telangana)

My Home Industries Pvt Ltd., (An ISO 9001:2008, ISO 14001:2004 and OHSAS Certified Company) Mellacheruvu Nalgonda District (Telangana) My Home Industries Pvt Ltd., (An ISO 9001:2008, ISO 14001:2004 and OHSAS -18001 Certified Company) Mellacheruvu 508 246 Nalgonda District (Telangana) Company Profile My Home Industries Pvt Ltd (MHIPL)

More information

Environmental Impact Assessment for TASNEE Petrochemicals Ethylene and Polyethylene Projects

Environmental Impact Assessment for TASNEE Petrochemicals Ethylene and Polyethylene Projects Environmental Impact Assessment for TASNEE Petrochemicals Ethylene and Polyethylene Projects ATTACHMENT 3: This document contains proprietary information belonging to Fluor B.V., its parent and/or affiliated

More information

Country Questionnaire Prior to the Senior Officials Meeting on the 3R Initiative - INDIA -

Country Questionnaire Prior to the Senior Officials Meeting on the 3R Initiative - INDIA - Country Questionnaire Prior to the Senior Officials Meeting on the 3R Initiative - INDIA - [Country Questionnaire Survey] 1. Major developments regarding the strategies, policies and activities on the

More information

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Introduction SRU s (Sulfur Recovery Units) are critical pieces of equipment in refineries and gas plants. SRUs remove sulfur compounds from certain

More information

Electric Furnace Off-Gas Cleaning Systems Installation at PT Inco ABSTRACT

Electric Furnace Off-Gas Cleaning Systems Installation at PT Inco ABSTRACT Electric Furnace Off-Gas Cleaning Systems Installation at PT Inco Paykan Safe and Matt Russell WorleyParsons Gas Cleaning, Irving, Texas USA ABSTRACT PT Inco is a ferronickel smelter in Soroako, Sulawesi,

More information

ZZH/CLAB-KSPCB/04/ Environmental Officer,

ZZH/CLAB-KSPCB/04/ Environmental Officer, ZZH/CLAB-KSPCB/04/ 21273 08-12-2014 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16 th Cross Near Hari Om Trust, Habbuwada

More information