1 Workshop on Transboundary Water Resources Management in Western and Central Europe 8-10 February 2011, Budapest, HU Hydromorphology in the Danube River Basin Raimund MAIR, ICPDR Technical Expert on River Basin Management
2 Content General information ICPDR EU WFD and Danube River Basin Management Plan Hydromorphological situation in the Danube River Basin and Joint Programme of Measures (JPM) Integration with other sectors Summary & conclusions
3 From Black Forest to Black Sea
4
5 ICPDR International Commission for the Protection of the Danube River ICPDR established on the Danube River Protection Convention (signed 1994) legal frame for cooperation Mandate to ensure conservation, improvement and rational use of surface waters and ground water Reduce inputs of nutrients and hazardous substances Control floods and ice hazards Reduce pollution loads to the Black Sea Since 2000 the ICPDR is the coordinating body for implementing the EU Water Framework Directive in the Danube River Basin
6 ICPDR Contracting Parties Germany Austria Czech Republic Slovakia Hungary Slovenia Croatia EU Member States (8) Non-EU Member States (6) Bosnia & Herzegovina Serbia Montenegro Romania Bulgaria Rep. of Moldova Ukraine European Union
7 ICPDR and the EU Water Framework Directive Implementation of the EU Water Framework Directive (WFD) in the Danube River Basin Implementation of Directive is legal requirement for the 8 EU Member States Political commitment from the non-eu Member States to make all efforts to achieve a coordinated River Basin Management Plan Result: Adoption of the 1 st Danube River Basin District Management Plan (DRBMP) end 2009
8 Hydromorphological Alterations 2004 Article 5 Reports according to the WFD Hydromorphological alterations have been identified as significant water management issues all over Europe Heavily Modified Water Bodies have been designated on a provisional basis in high percentage HYMO alterations in focus of RBM Plans 2009 beside traditional pollution parameters
9 What are HYMO Alterations? HYMO Alterations are human pressures to the natural structure of surface waters such as modification of bank structures, sediment/habitat composition, discharge regime, gradient and slope. The consequence of these pressures can impact aquatic ecological fauna and flora and can hence significantly impact the water status.
10 Natural Driver/Pressure HYMO alteration
11 POSSIBLE PRESSURES DRIVER Which Driver - Which Pressures? Hydropower Generation Flood Defence Navigation River & habitat continuity interruption Alteration of sediment transport Wetland reconnection Wetland reduction Bed stabilisation Deepening river bed Sidearm disconnection Overlapping Pressures River & habitat continuity interruption Wetland/floodplain disconnection Bank reinforcement Alteration of river course and channelization Alteration of hydraulic/hydrological characteristics
12 Hydromorphological Alterations Drivers Key Drivers Hydropower generation Navigation Flood defence Water supply Other Drivers Recreation Urban planning Agriculture
13 Significant Water Management Issues HYMO alterations Organic Pollution Nutrient Pollution Hazardous Substances Pollution River and Habitat Continuity Interruptions Disconnection of Adjacent Wetlands/Floodplains Hydrological Alterations Hydromorphological Alterations Future Infrastructure Projects
14 Danube River Basin Management Plan (DRBMP) WFD requirement; Management Plan adopted end 2009 Assessment of situation on basinwide scale Addressing the 4 Significant Water Management Issues (Organic-, Nutrient-, Hazardous Substances Pollution and Hydromorphology) Joint Programme of Measures
15 Danube River Basin Management Plan HYMO alterations Danube River Basin Management Plan KEY RESULTS Hydromorphological Alterations
16 Designation of Heavily Modified (HMWB) and Artificial Water Bodies (AWB) Heavily Modified Water Body (HMWB): body of surface water which as a result of physical alterations by human activity is substantially changed in character Artificial Water Body (AWB): body of surface water created by human activity For the Danube River Agreement on harmonised procedure and specific criteria for final HMWB designation in the frame of the ICPDR (designation for HR, RS and UA is provisional): Significantly physically altered change of character Failure to achieve good ecological status
17 Share of natural water bodies, HMWB and AWB in the Danube River Basin (catchment areas > 4,000 km 2 ) In relation to total length of river water bodies 47% (provisional) natural 40% final or provisional HMWB 4% AWB 9% no designation HMWBs, AWBs and natural water bodies indicated as length (km) and relation to total length of river water bodies (Danube and tributaries > 4,000 km 2 ).
18 Ecological status & ecological potential in the Danube River Basin (catchment areas > 4,000 km 2 ) In relation to total length of river water bodies 22% ecological status/potential good or above 53% ecological status/potential moderate or worse 25% no data Ecological status and ecological potential for river water bodies in the DRBD indicated as length (km) and relation to total length of river water bodies (Danube and tributaries > 4,000 km 2 ).
19 Joint Programme of Measures Significant share of water bodies (provisionally) designated as heavily modified water bodies - substantially changed in character Significant share of water bodies not in good ecological status/potential, thus in need for actions (not only on hydromorphology) to achieve WFD objectives Agreement on Joint Programme of Measures (JPM) as part of the Danube River Basin Management Plan
20 DRBMP Visions & Management Objectives River and Habitat Continuity Interruptions Anthropogenic barriers and habitat deficits do not hinder fish migration and spawning anymore sturgeon species and specified other migratory species are able to access the Danube River and relevant tributaries. Sturgeon species and specified other migratory species are represented with self-sustaining populations in the DRBD according to their historical distribution.
21 Hydromorphological Alterations River and Habitat Continuity Interruptions
22 River and Habitat Continuity Interruptions 2015 (expected improvements) extracted zoomed map version
23 Hydromorphological Alterations River and Habitat Continuity Interruptions 932 barriers for fish migration in the Danube River Basin 108 migration aids to be constructed by 2015 Remaining continuity interruptions to be addressed by 2021/2027 Perform feasibility study on the re-opening of the Iron Gate Dams Achieve the WFD environmental objectives in an ecologically effective way: initial measures should focus on the defined ecological priority river stretches
24 Hydromorphological Alterations Ecological prioritisation approach for basin-wide measures on river continuity Classification of fish regions in DRB List and map of key migration routes of medium and long distance migratory fish species Development of prioritisation index Danube Sturgeon for measures based on agreed criteria Map illustrating prioritisation index and therefore measure priority Danube Salmon
25 Ecological prioritisation regarding restoration measures for river and habitat continuity Priority: Free migration in the Danube River and the direct connection of tributaries
26 DRBMP Visions & Management Objectives Disconnection of adjacent floodplains / wetlands The ICPDR s basin-wide vision is that floodplains/wetlands in the entire DRBD are re-connected and restored. The integrated function of these riverine systems ensure the development of selfsustaining aquatic populations, flood protection and reduction of pollution in the DRBD.
27 Hydromorphological Alterations Disconnection Wetlands/Floodplains 612,745 ha of wetlands/floodplains with reconnection potential 62,300 ha reconnected and/or the hydrological regime improved by 2015 Difficult to indicate currently the effect of measures on basin-wide scale
28 DRBMP Visions & Management Objectives Hydrological alterations The ICPDR s basin-wide vision for hydrological alterations is that they are managed in such a way, that the aquatic ecosystem is not influenced in its natural development and distribution.
29 Hydromorphological Alterations Hydrological Alterations Hydrological alterations: Impoundments, water abstractions, hydro-peaking
30 Hydromorphological Alterations Hydrological Alterations 697 hydrological alterations in the Danube River Basin Measures will be taken to improve the ecological status/potential of water bodies impacted by significant hydrological alterations on the basin-wide scale Remaining hydrological alterations will be addressed by 2021/2027 Difficult to indicate currently the effect of measures on basin-wide scale
31 DRBMP Visions & Management Objectives Future infrastructure projects The ICPDR s basin-wide vision for future infrastructure projects is that they are conducted in a transparent way using best environmental practices and best available techniques in the entire DRBD impacts on or deterioration of the good status and negative transboundary effects are fully prevented, mitigated or compensated.
32 Hydromorphological Alterations Future Infrastructure Projects Future Infrastructure Projects (FIPs) can impact and deteriorate the water status Main share of reported projects dedicated to navigation and flood protection Rest: hydropower generation, water supply and other purposes 91 FIPs expected to have negative transboundary effects on other water bodies 87 FIPs expected to provoke deterioration of water status
33 Hydromorphological Alterations How to prevent deterioration through FIPs in future? Performance of sound SEAs and EIAs Fulfilment of WFD Article 4(7) Application of best environmental practices (BEP) and best available techniques (BAT) Ensure integrated planning approaches for achievement of FIP and environmental objectives
34 Integration NEW INFRASTRUCTURE PROJECTS Particular importance that environmental requirements are considered as integral part of planning and implementation process Process already ongoing with NAVIGATION sector to reduce and prevent negative effects from projects and maintenance works (Joint Statement and Platina Manual) Similar process launched for HYDROPOWER Inter-linkages WFD and implementation EUROPEAN FLOODS DIRECTIVE
35 NAVIGATION Joint Statement and Platina Manual Guiding Principles for the Development of Inland Navigation and Environmental Protection in the Danube River Basin Manual on Good Practices in Sustainable Waterway Planning (Platina Manual)
36 EU Danube Strategy Communication published in late 2010 ICPDR has observer status Important for non-eu Members as well Different issues relevant for hydromorphology and river basin management addressed (e.g. navigation, hydropower, flood protection, river continuity, wetlands, etc.) Strategy fully supports measures agreed in the Danube River Basin Management Plan
37 Conclusions (1) Hydromorphological alterations Significant Water Management Issue in the Danube basin Danube River Basin Management Plan (DRBMP) provides assessment of situation Significant share of water bodies (provisionally) designated as HMWB Significant share of water bodies not in good status/potential and in need for measures to achieve WFD objectives
38 Conclusions (2) DRBMP contains Joint Programme of Measures - measures address different hydromorphological issues Substantial progress in implementation of measures will be achieved by 2015, follow-up in 2 nd and 3 rd WFD implementation cycle Important topic integration ongoing for navigation, launched for hydropower and flood risk management EU Danube Strategy considered as policy instrument highly relevant for river basin management
39 Thank you very much! For more information please consult the ICPDR website and the Danube River Basin Management Plan
European Union Strategy for Danube Region and the implementation of the Water Framework Directive
COST 869 Mitigation options for Nutrient Reduction in Surface Water and Groundwaters Final Meeting, Keszthely, 12-14 October 2011 European Union Strategy for Danube Region and the implementation of the
More informationInterim Overview: Significant Water Management Issues in the Danube River Basin District
Interim Overview: Significant Water Management Issues in the Danube River Basin District Interim overview on the Significant Water Management Issues to meet the requirements of WFD (Directive 2000/60/EC)
More informationGuidelines for balancing different water uses: navigation and environment, sustainable hydropower development
2 nd UNECE Workshop River Basin Commissions and other Joint Bodies for Transboundary Water Cooperation: Technical Aspects, Geneva, 9-10 April 2014 Guidelines for balancing different water uses: navigation
More informationGuiding Principles on Sustainable Hydropower Development in the Danube River Basin
Guiding Principles on Sustainable Hydropower Development in the Danube River Basin Lead Countries : Austria, Romania, Slovenia in the frame of the International Commission for the Danube River Protection
More informationThe Global Dimension of Change in River Basins
The Global Dimension of Change in River Basins GWSP Conference, December 6-8 2010 Physical Heterogeneity and Socio-economic Differences as Determinants of Change in the Danube River Basin IWHW-BOKU Structure
More informationSETTING UP OF INTER-MINISTERIAL COORDINATING MECHANISMS FOR THE POLLUTION CONTROL
January 2004 SETTING UP OF INTER-MINISTERIAL COORDINATING MECHANISMS FOR THE POLLUTION CONTROL Evaluation of Results of National Reports AUTHORS Michael von Berg Joachim Bendow Evaluation of Results of
More informationMorava River Basin - Slovakia
Morava River Basin - Slovakia Pavel Hucko 1 General description of the basin Slovak territory Morava river basin is bounded River basin districts of the Slovak Republic and their sub-basins White Carpathians
More informationDanube River Basin. Updated Transboundary Diagnostic Analysis (2006) Based on EU Water Framework Directive Analysis Report
Danube River Basin Updated Transboundary Diagnostic Analysis (2006) Based on EU Water Framework Directive Analysis Report Danube Transboundary Analysis page 1 CONTENTS 1. Summary... 7 2. Introduction...
More informationBiodiversity as a Priority Area of the EU Strategy for the Danube Region (EUSDR) The potential role of DANUBEPARKS as flagship project
DANUBEPARKS 3rd Steering Committee Meeting Schloss Orth, 2.-4. September 2011 Biodiversity as a Priority Area of the EU Strategy for the Danube Region (EUSDR) The potential role of DANUBEPARKS as flagship
More informationCOMMON IMPLEMENTATION STRATEGY FOR THE WATER FRAMEWORK DIRECTIVE (2000/60/EC)
COMMON IMPLEMENTATION STRATEGY FOR THE WATER FRAMEWORK DIRECTIVE (2000/60/EC) POLICY SUMMARY to Guidance Document No. 4 Produced by Working Group 2.2 - HMWB EXPLANATORY NOTE This policy summary gives an
More informationConnectivities and Linkages within the Danube Basin
Connectivities and Linkages within the Danube Basin Prof. Dr. Wolfram Mauser Ludwig-Maximilians-Universität München Connectivities: Why important? Natural connectivities: Shape the biosphere and hydrosphere
More informationWATER RESOURCES MANAGEMENT IN THE DANUBE RIVER BASIN. Prof. Dr. Laszlo Vermes
WATER RESOURCES MANAGEMENT IN THE DANUBE RIVER BASIN Prof. Dr. Laszlo Vermes The Danube is one of the greatest rivers in the World second biggest in Europe (after the Volga) Total length: 2842 km watershed
More informationEuropean State Questionnaire on Hydropower and the WFD
Water management, Water Framework Directive & Hydropower Common Implementation Strategy Workshop Brussels, 13-14 September 2011 European State Questionnaire on Hydropower and the WFD 1. Context The 2 nd
More informationDanube WILDislands - Definitions & Strategy
Expert Workshop WP3 WILDisland Visegrád, 8 September 2017 Danube WILDislands - Definitions & Strategy by Alexander Zinke, Environment Agency Austria Map: Fluvius Looking for answers to simple questions
More informationAustrian inland navigation policy & the Integrated River Engineering Project on the Danube East of Vienna
Austrian inland navigation policy & the Integrated River Engineering Project on the Danube East of Vienna Robert TÖGEL & Markus SIMONER Zagreb, June 9th, 2009 Austrian inland navigation policy Austrian
More informationIntegrated River Engineering Project Danube East of Vienna.
Integrated River Engineering Project Danube East of Vienna www.donau.bmvit.gv.at/en Integrated River Engineering Project on the Danube East of Vienna is a project of via donau, realized ed on behalf of
More informationThese potential changes and their implications are outlined in Annex 1.
Guidance Note Hydropower Guidance Note: This Guidance Note has been prepared by Natural Resources Wales (NRW) to provide applicants for abstraction and impoundment licences for hydropower schemes with
More informationBalkan Rivers - The Blue Heart of Europe
Balkan Rivers - The Blue Heart of Europe Hydromorphological Status and Dam Projects Executive Summary Supported by: Vienna, March 2012 Executive Summary Among the biggest current threats to the natural
More informationWATER MANAGEMENT THE BASIS OF THE ROMANIAN SUSTAINABLE DEVELOPMENT - PRESENT STAGE AND PERSPECTIVES -
MINISTRY OF ENVIRONMENT AND SUSTAINABLE DEVELOPMENT WATER MANAGEMENT THE BASIS OF THE ROMANIAN SUSTAINABLE DEVELOPMENT - PRESENT STAGE AND PERSPECTIVES - Water is not a commercial product like any other
More informationHUNGARIAN NATIONAL REPORT AND THE FOLLOWING IMPLEMENTATION OF EU WFD IN 2005
HUNGARIAN NATIONAL REPORT AND THE FOLLOWING IMPLEMENTATION OF EU WFD IN 2005 Dr.Perger László OKTVF/ NDENW Budapest Department of River Basin Management Danube River Basin 2005. 10. 04. EU WFD report 2005
More informationCONVENTION ON THE CONSERVATION OF EUROPEAN WILDLIFE AND NATURAL HABITATS. Standing Committee. 37 th meeting Strasbourg, 5-8 December 2017
Strasbourg, 7 November 2017 T-PVS/Inf (2017) 22 [Inf22e_2016.docx] CONVENTION ON THE CONSERVATION OF EUROPEAN WILDLIFE AND NATURAL HABITATS Standing Committee 37 th meeting Strasbourg, 5-8 December 2017
More informationIssue Paper on Nutrient Pollution in the Danube River Basin Document Number: IC/WD/273 Document version: 13 Date: 2 Nov 2007
Issue Paper on Nutrient Pollution in the Danube River Basin Document Number: IC/WD/273 Document version: 13 Date: 2 Nov 2007 Draft 13 ICPDR Issue Paper on Nutrient Pollution in the Danube River Basin Imprint
More informationIntegrated River Engineering Project Danube East of Vienna.
Integrated River Engineering Project Danube East of Vienna www.donau.bmvit.gv.at/en Integrated River Engineering Project on the Danube East of Vienna is a project of via donau, realized ed on behalf of
More informationThe Elbe River Basin: Preliminary evaluation of the answers. Janos J. Bogardi Executive Officer of GWSP
GWSP-GCI II Workshop on the Water-Energy-Food Security Nexus The Elbe River Basin: Preliminary evaluation of the answers Janos J. Bogardi Executive Officer of GWSP Winnipeg, Canada, 3-4 May 2012 The Elbe
More informationAstana Water Action (AWA) Actions by HUNGARY
Astana Water Action (AWA) Actions by HUNGARY Country: Hungary Title of the action: National Remediation Program of Contaminated Sites (AWA Paragraphs 13 f, g, 15c,d,g) The Hungarian National Remediation
More informationInternational River Basin Management in Large River Basins
International River Basin Management in Large River Basins Istvan IJJAS Prof. and Head of Department Budapest University of Technology and Economics Department of Hydraulic and Water Resources Engineering
More informationImpulse Statement: Development of Danube Navigation
Impulse Statement: Development of Danube Navigation Bratislava, 30 October 2012 Hans-Peter Hasenbichler CEO via donau Central and Easteran European Summit on Transport and Logistics Inland navigation?
More informationSpoil and Water. Irish Ports Association Conference Ciaran Callan Dublin Port Company. 26 th September 2008
Spoil and Water Ciaran Callan Dublin Port Company Irish Ports Association Conference 2008 26 th September 2008 Disposal of Dredge Material: Regulation and Process of Application Requirement for disposal
More informationImproving the condition of Solway Tweed s water environment Tweed area management plan
Improving the condition of Solway Tweed s water environment Tweed area management plan 2010 2015 Supplementary to the river basin management plan for the Solway Tweed river basin district Page 1 of 20
More informationCommon Implementation Strategy for the Water Framework Directive (2000/60/EC)
European Commission Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Guidance document n. o 4 Identification and Designation of Heavily Modified and Artificial Water Bodies
More informationCOMMISSION STAFF WORKING DOCUMENT. Report on the implementation of the Water Framework Directive River Basin Management Plans Member State: CROATIA
EUROPEAN COMMISSION Brussels, 9.3.2015 SWD(2015) 53 final COMMISSION STAFF WORKING DOCUMENT Report on the implementation of the Water Framework Directive River Basin Management Plans Member State: CROATIA
More informationA. EXECUTIVE SUMMARY. 1. Water status management. 1.1 Water status
A. EXECUTIVE SUMMARY 1. Water status management 1.1 Water status Data and analyses of water status indicators suggest that the water resources in Croatia are subject to the impact of human activities.
More informationClassification of Heavily Modified Water bodies and Derivation of the Ecological Potential in the German federal state of Bavaria
Bavarian Environment Agency Action Guidelines Classification of Heavily Modified Water bodies and Derivation of the Ecological Potential in the German federal state of Bavaria within the framework of the
More informationTHE AUSTRIAN DRAVA MANAGEMENT IN THE RELATION TO THE INTERNATIONAL RIVER CORRIDOR
THE AUSTRIAN DRAVA MANAGEMENT IN THE RELATION TO THE INTERNATIONAL RIVER CORRIDOR ALEXANDER ZINKE, Environment Consultant and External Project Expert of BMLFUW (Federal Ministry for Agriculture, Forestry,
More informationPromoting PES in the Danube Basin
Promoting PES in the Danube Basin Fostering PES projects in CEE and NIS Training Seminar, December 7-9 2006, Isle of Vilm Yanka Kazakova WWF Danube Carpathian Programme The Danube The most international
More informationWater for life and livelihoods
Water for life and livelihoods Western Wales River Basin District: Challenges and choices Facts and statistics Background information On 1 April Natural Resources Wales brought together the work of the
More informationGuidance on the Classification of Ecological Potential for Heavily Modified Water Bodies and Artificial Water Bodies
Guidance on the Classification of Ecological Potential for Heavily Modified Water Bodies and Artificial Water Bodies UKTAG Guidance 31st March 2008 Document title UKTAG Guidance on the Classification of
More informationDefinitions and outcomes of NWRM EU project
Definitions and outcomes of NWRM EU project DG Environment Water Unit Lucia Bernal Saukkonen BUCHAREST 12 TH NOVEMBER 2014, WORKSHOP ON RIVER RESTORATION AND NWRM Overview Policy background Blueprint and
More informationWFD IMPLEMENTATION IN ROMANIA TRANSBOUNDARY ISSUES AND COOPERATION WITH THE NEIGHBOURING COUNTRIES
WFD IMPLEMENTATION IN ROMANIA TRANSBOUNDARY ISSUES AND COOPERATION WITH THE NEIGHBOURING COUNTRIES WORKSHOP ON TRANSBOUDARY WATER RESOURCES MANAGEMENT IN EASTERN AND NORTHERN EUROPE KIEV,, 27-29 April
More informationEU Water Framework Directive
EU Water Framework Directive Overview and state of implementation TAIEX Seminar on the Water Framework and Urban Waste Water Directive Zagreb, 25-26 September 2008 Jorge Rodríguez Romero European Commission,
More informationAssessment of the Ecological Status and Classification of Surface Water Bodies
1 Assessment of the Ecological Status and Classification of Surface Water Bodies - Approaches and Tools Dr. Ursula Schmedtje 2 Environmental Objectives (Art. 4) The Member States shall... achieve the good
More informationTidal Thames Catchment-based Pilot Project
Tidal Catchment-based Pilot Project Context The catchment of the Tidal flows from Teddington, in the west, to the estuary near Southend-on-Sea, in the east. The water surface area for this length of the
More informationEUROPEAN CONFERENCE OF MINISTERS OF TRANSPORT INLAND WATERWAYS & ENVIRONMENTAL PROTECTION
EUROPEAN CONFERENCE OF MINISTERS OF TRANSPORT INLAND WATERWAYS & ENVIRONMENTAL PROTECTION EUROPEAN CONFERENCE OF MINISTERS OF TRANSPORT INLAND WATERWAYS & ENVIRONMENTAL PROTECTION EUROPEAN CONFERENCE OF
More informationSpeech of Mr. Petru LIFICIU Minister of Ministry of Waters and Environmental Protection
R O M A N I A MINISTRYof WATERS and ENVIRONMENTAL PROTECTION Speech of Mr. Petru LIFICIU Minister of Ministry of Waters and Environmental Protection At the third World Water Forum INBO OFFICIAL SESSION
More informationPart A Basin-wide overview Short: Danube Basin Analysis (WFD Roof Report 2004)
The Danube River Basin District River basin characteristics, impact of human activities and economic analysis required under Article 5, Annex II and Annex III, and inventory of protected areas required
More informationDAMS IN EUROPE THE WATER FRAMEWORK DIRECTIVE AND THE WORLD COMMISSION ON DAMS RECOMMENDATIONS A LEGAL AND POLICY ANALYSIS
DAMS IN EUROPE THE WATER FRAMEWORK DIRECTIVE AND THE WORLD COMMISSION ON DAMS RECOMMENDATIONS A LEGAL AND POLICY ANALYSIS This report was commissioned from Ana Barreira 1 by the WWF International Dams
More informationA Strategic Research and Innovation Agenda for the Water in the EU
A Strategic Research and Innovation Agenda for the Water in the EU Antonio Lo Porto Water Research Institute (IRSA-CNR) Italy EU and the Water Framework Directive In the E.U., the Water Framework Directive
More informationNatura 2000 and Hydropower. Hydropower and Fish Workshop Brussels 29 May, 2017
Natura 2000 and Hydropower Hydropower and Fish Workshop Brussels 29 May, 2017 Christina Pantazi European Commission DG Environment, Nature Protection Unit (D3) Hydropower and Natura 2000 Hydropower one
More informationEU Energy Winter Package (RED Recast) and Future of Forest Biomass Piotr Borkowski, EUSTAFOR s Executive Director
EU Energy Winter Package (RED Recast) and Future of Forest Biomass Piotr Borkowski, EUSTAFOR s Executive Director Conference: The Need for Sectoral Education on the European path of B&H 9-10/2/2017, Kupres,
More informationEU Water legislation
EU Water legislation PEIP National Workshop Bosnia and Herzegovina Sarajevo, 19 February 2009 Ruslan Zhechkov, REC based on a presentation by Dagmar Kaljarikova, European Commission, DG Environment Unit
More informationDanube waterway- European key transport axis
Danube waterway- European key transport axis OSCE, Economic and Environmental Forum 29 th of January 2008 Manfred Seitz, via donau Presentation Overview Economic importance of the Danube region European
More informationSUMMARY 2013 EDITION
SUMMARY 2013 EDITION RSAT Joint Initiative on Rapid Basin-wide Hydropower Sustainability Assessment Tool PART 1: OVERVIEW OF THE RSAT The RSAT is designed as an integrative tool to assess hydropower development
More informationWater management in Sweden an introduction
Water management in Sweden an introduction Andreas Aronsson Inland Water Management Coordinator Five Water Scientifically based borders Five Marine Basins Main Drainage Areas Five out of 21 County Administrations
More informationWater Security in Eastern Europe
Water Security in Eastern Europe Securing Water, Sustaining Growth GWP Central and Eastern Europe Richard Müller The Global Water Partnership's vision is for a water secure world Our mission is to support
More informationDanube Facts and Figures. The Czech Republic (July 2007)
Danube Facts and Figures The (July 2007) General Overview The is situated at the roof of Europe, and its waters are drained through rivers into three different seas. The major part of the territory is
More informationReport on public consultation activities for DRBM Plan Update 2015 & DFRM Plan
Report on public consultation activities for DRBM Plan Update 2015 & DFRM Plan Public consultation on the Danube River Basin Management Plan Update 2015 and 1 st Danube Flood Risk Management Plan Document
More informationWorkshop Hydropower and Fish Existing hydropower facilities: Strategic planning for ecological restoration
Workshop Hydropower and Fish Existing hydropower facilities: Strategic planning for ecological restoration Verbund Hydro Power Gmbh, Gerd Frik, Brussels, 30.05.2017 Existing hydropower facilities: Strategic
More informationOxon Ray Catchment Summary of significant issues affecting the water environment
Oxon Ray Catchment Summary of significant issues affecting the water environment Introduction This information pack has been produced to support the Challenges and Choices consultation document for the
More informationThe EU Water Framework Directive
The EU Water Framework Directive Why is it important to the recreational boating industry? SEPTEMBER 2004 The EU Water Framework Directive: why is it important to the recreational boating industry? The
More informationIntroducing the WBG Guidelines for selecting EFlow assessment methods. Cate Brown
Introducing the WBG Guidelines for selecting EFlow assessment methods Cate Brown This presentation Factors affected potential impacts Level of detail in EFlows assessments: Magnitude and complexity of
More informationStrategic planning approach for new hydropower development in Austria
Hydropower and Fish, 29-30 May 2017, Brussels Strategic planning approach for new hydropower development in Austria Dr. Veronika Koller-Kreimel Ministry of Agriculture, Forestry, Environment & Water Management,
More informationWater management, Water Framework Directive & Hydropower
Water management, Water Framework Directive & Hydropower Common Implementation Strategy Workshop Brussels, 13-14 September 2011 Issue Paper (final version) November 2011 Authors Eleftheria Kampa, Johanna
More informationWater Framework Directive. Draft River Basin Management Plans. National Summary Programme of Measures
Water Framework Directive Draft River Basin Management Plans National Summary Programme of Measures December 2008 Draft River Basin Management Plans National Summary of Programme of Measures Contents 1
More informationSTRATEGIC ACTION PLAN FOR THE DANUBE RIVER BASIN REVISION 1999
DANUBE POLLUTION REDUCTION PROGRAMME STRATEGIC ACTION PLAN FOR THE DANUBE RIVER BASIN 1995-2005 REVISION 1999 Programme Coordination Unit UNDP/GEF Assistance DANUBE POLLUTION REDUCTION PROGRAMME STRATEGIC
More informationRiver Basin Management of the Meuse
River Basin Management of the Meuse The IMC Masterplan for Migratory Fish Willem L.M. Schreurs Secretary General EC IEA Hydropower Workshop, Brussels 29 30 May 2017 River Basin Management of the Meuse
More informationThe Contribution of the UNECE Water Regime to Transboundary Cooperation in the Danube River Basin
chapter 20 The Contribution of the UNECE Water Regime to Transboundary Cooperation in the Danube River Basin Ruby Moynihan* 1 Introduction The UNECE, which was established to support international cooperation
More informationBaltic Marine Environment Protection Commission
Baltic Marine Environment Protection Commission HELCOM RECOMMENDATION 37/3 Adopted 11 March 2016, having regard to Article 20, Paragraph 1 b) of the Helsinki Convention SUSTAINABLE AQUACULTURE IN THE BALTIC
More informationFINAL IC/30 February Summary of National Practices concerning the Monitoring of Waste Water Discharges
FINAL IC/30 February 2000 Summary of National Practices concerning the Monitoring of Waste Water Discharges 2 Summary of National Practices concerning the Monitoring of Waste Water Discharges Introduction
More informationAn Extended Method for Continuous Hydromorphological Assessment Applied in the Joint Danube Survey 3, 2013
ACTA ZOOLOGICA BULGARICA Acta zool. bulg., Suppl. 7, 2014: 123-127 An Extended Method for Continuous Hydromorphological Assessment Applied in the Joint Danube Survey 3, 2013 Ulrich Schwarz Fluvius Floodplain
More informationRiver Basin Management Plans for Northern Ireland. Kerry Anderson (NIEA)
River Basin Management Plans for Northern Ireland Kerry Anderson (NIEA) Overview WMU Reorganisation Northern Ireland River Basin Districts Current Status Pressures and Measures Partnership Working The
More informationUK TAG WFD21 Comparison of Draft River Basin Management Plans
SNIFFER Greenside House, 25 Greenside Place Edinburgh, EH1 3A Scotland UK UK TAG WFD21 Comparison of Draft River Basin Management Plans Final Report 27th March 2009 Ecologic Institute Vienna In co operation
More informationWATER MANAGEMENT IN ROMANIA. River Basin Management at the lowest Appropriate Level When and Why does it (NOT) Work in Practice Poland,
WATER MANAGEMENT IN ROMANIA River Management at the lowest Appropriate Level When and Why does it (NOT) Work in Practice Poland, 22 25.05.2005 REFERENCE POINTS OF ACTIVITY 1924 - The first Water Law which
More informationSAVE THE ALPINE RIVERS!
SAVE THE ALPINE RIVERS! SAVE THE ALPINE RIVERS! WWF European Alpine Program, 2014 WWF EALP Freshwater Mag. Christoph Litschauer Ottakringer Str. 114-116 A-1160 Vienna Austria CONTENT INTRODUCTION METHODOLOGY
More informationTowards Better Environmental Options for Flood risk management
Towards Better Environmental Options for Flood risk management Why this initiative? Floods are the most common and most costly natural disasters in Europe. Severe floods with devastating effects happen
More informationWillow Brook Catchment Project
Willow Brook Catchment Project Willow Brook Park Page 1 Contents 1. Introduction. 3 1.1 Background The Water Framework Directive and Drivers for Change... 3 1.2 The Willow Brook Catchment and Water Framework
More informationEuropean sediment regulations: Gaps and bridges
Sednet Conference, Venice 2004 European sediment regulations: Gaps and bridges Helge Bergmann Federal Institute of Hydrology Koblenz (Germany) Sednet 2004 Folie 1 Professional background contaminants in
More informationPRIORITY AXIS 1: A well connected region
PRIORITY AXIS 1: A well connected region Corresponds to Thematic objective 7- promoting sustainable transport and removing bottlenecks in key network infrastructures All data presented is published for
More informationCountry reports Summary of Environmental Issues
WORLD BANK - SUPPORT TO WATER RESOURCES MANAGEMENT IN THE DRINA RIVER BASIN Mouth of Lim River into the Drina River, Republika Srpska, Bosnia and Herzegovia Country reports Summary of Environmental Issues
More informationDaugava/Western Dvina basin: situation and public engagement in River Basin Management (RBM) Druskininkai, December 18, 2017
Daugava/Western Dvina basin: situation and public engagement in River Basin Management (RBM) Druskininkai, December 18, 2017 Aija Caune, VAK, Environmental Protection Club of Latvia Natallia Parechyna,
More informationChehalis Basin Strategy Programmatic SEPA Draft EIS
Chehalis Basin Strategy Programmatic SEPA Draft EIS History of Flooding I-5 closed in 1990, 1996, 2007, 2009 Five largest flood events occurred since 1986 2 History of Habitat Degradation Harvest has been
More informationPriorities for international cooperation with the countries of central and eastern Europe and central Asia in the transition of their forest sectors
Yhteistyö Keski- ja Itä-Euroopan sekä Keski- Aasian maiden kanssa Keski- ja Itä-Euroopan metsätietopalvelu www.metla.fi/metinfo/kie Dr. Ján Ilavský 1 External researcher The Finnish Forest Research Institute
More informationCoordination between the water, energy and environment sectors in a transboundary context
Coordination between the water, energy and environment sectors in a transboundary context Waltina Scheumann(DIE) International Kick-off Workshop, 11-12 November 2013, Dresden Dams attheheartofthenexus
More informationGuideline for Hydromorphological Monitoring and Assessment of Rivers in Croatia
Guideline for Hydromorphological Monitoring and Assessment of Rivers in Croatia 2 Guideline for Hydromorphological Monitoring and Assessment of Rivers in Croatia March 2013 3 4 Summary Since the start
More informationInternational trade related air freight volumes move back above the precrisis level of June 2008 both in the EU area and in the Unites States;
Statistics Brief Global Trade and Transport October 2017 Air freight volumes increase since the second quarter of 2016 The latest update of global freight data collected by the International Transport
More informationEcosystem Service Valuation from Floodplain Restoration in the Danube River Basin: An International Choice Experiment Application
Ecosystem Service Valuation from Floodplain Restoration in the Danube River Basin: An International Choice Experiment Application Paper by M Bliem, R Brouwer, Z Flachner, M Getzner, S Kerekes, S Milton,
More informationSTRATEGIC PLANNING IN AUSTRIA
Art. 4.7 Workshop, 13/14 Dec 2016,, Brussels STRATEGIC PLANNING IN AUSTRIA Veronika Koller-Kreimel Austrian Ministry of Agriculture, Forestry, Environment & Water Management, Dep. for National and International
More informationRiver restoration and flood management fact or fiction: a British perspective
River restoration and flood management fact or fiction: a British perspective Dr Jenny Mant Head of Water Management Jenny.Mant@ricardo.com jenny.mant@ricardo.com 6/2/2017 A Retrospective Look 2007 UK
More informationChapter 6 Objective: Protect and Enhance the Environment
Chapter 6 Objective: Protect and Enhance the Environment 49 Irish Water Water Services Strategic Plan Our Strategic Aims Ensure that Irish Water services are delivered in a sustainable manner which contributes
More informationLocal governance in Integrated Water Resources Management in the Danube Basin (a working paper)
Local governance in Integrated Water Resources Management in the Danube Basin (a working paper) Dermot O Regan, Caroline Sullivan and John Bromley by Contacts caroline.sullivan@ouce.ox.ac.uk, john.bromley@ouce.ox.ac.uk
More informationNatural Water Retention Measures
Natural Water Retention Measures DG Environment Water Unit Lucia Bernal Saukkonen GIIR WORKING GROUP 19.11.2014 Current activities on NWRM Within the CIS: EU Policy document on NWRM Pilot project: Integration
More informationIryna Makarenko LL.M., Pollution Monitoring and Assessment Officer
Iryna Makarenko LL.M., Pollution Monitoring and Assessment Officer Permanent Secretariat of the Commission on the Protection of the Black Sea Against Pollution The ecological state of the coastal waters
More informationTHE WATER FRAMEWORK DIRECTIVE TRANSITIONAL AND COASTAL WATERS
THE WATER FRAMEWORK DIRECTIVE TRANSITIONAL AND COASTAL WATERS SUMMARY 1.The Directive 2000/60/EC of the European Parliament and of the Council of 23 October 2000 2. Common Implementation Strategy, CIS
More informationLecture 1 Integrated water resources management and wetlands
Wetlands and Poverty Reduction Project (WPRP) Training module on Wetlands and Water Resources Management Lecture 1 Integrated water resources management and wetlands 1 Water resources and use The hydrological
More informationSIRET WATER BASIN ADMINISTRATION PP3. 29 November September Joint Operational Programme Romania Ukraine Republic of Moldova
SIRET WATER BASIN ADMINISTRATION PP3 29 November 2013-28 September 2015 Joint Operational Programme Romania Ukraine Republic of Moldova 2007-2013 EAST AVERT PROJECT The prevention and protection against
More informationEKOPEN Ltd. & milieu Ltd EKOPEN s.r.o. Bratislava, Leškova 8 AUTHORS. milieu Ltd. 29, rue des Pierres. EKOPEN Ltd. & milieu Ltd.
December 2006 DRAFT Strengthening of Inter-Ministerial Coordination Mechanisms for Water Management in the Danube River Basin and the Black Sea Countries Current Inter-Ministerial Coordination Mechanisms
More informationSession: For more information:
Session: For more information: www.hydropower.org/congress General Institute of Water Resources and Hydropower Planning and Design, Ministry of Water Resource Regulation of Downstream Flows in China Li
More informationWhat benefits are associated with NWRMs for the purposes of water management?
What benefits are associated with NWRMs for the purposes of water management? Regional workshop Integration of natural water retention measures (NWRM) into river basin management in the Baltic Sea Region
More informationPresentation 2. The Common Assessment Framework CAF 2013
Common Assessment Framework: the reference model for total The quality management in the public sector in Europe and the Asian Productivity Organisation s Public Sector Framework. Presentation 2 The Common
More informationWater Framework Directive Water for Life and Livelihoods
England and Wales Approach to Implementation UKELA Conference 17th June 2005 Dr Martin Griffiths Environment Agency England and Wales Purpose Prevent deterioration, enhance status of aquatic ecosystems
More informationThe GEF Strategic Partnership for the Danube/Black Sea
The GEF Strategic Partnership for the Danube/Black Sea A Partnership for Moving from Planning to Action Emilia Battaglini The World Bank Bucharest, February 2007 Key Issues (1999) Danube and Black Sea
More information