1 BACKGROUND INFORMATION DOCUMENT QUANTUM POWER OPERATIONS LIMITED Environmental and Social Impact Assessment [ESIA] for Proposed Liquefied Natural Gas (LNG) Project at Tema in the Greater Accra Region of Ghana SCOPING PROCESS Introduction Quantum Power Operations Limited (herein referred to as Quantum Power) is a developer, owner and operator of electricity generation assets and power-related infrastructure throughout Africa. Quantum Power intends to construct and develop a Liquefied Natural Gas (LNG) project. The proposed project is located at Tema in the Greater Accra Region and it s characterized by other such heavy industrial operations. The project will install, commission and operate the infrastructure required to import, store, re-gasify Liquefied Natural Gas ( LNG ) and deliver re-gasified LNG to off-takers in the Tema area for an initial period of ten (10) years. Prior to commencing with construction of the LNG facility, approvals are required in terms of the Environmental Permitting as by under Regulation 3 of Environmental Assessment Regulations 1999 (LI 1652). The competent authority for the Environmental and Social Impact Assessment (ESIA) process is the Environmental Protection Agency (EPA). Knight Piesold Ghana Limited has been appointed as the independent environmental assessment practitioner (EAP), to undertake the ESIA and associated public participation processes for this project DUE DATE FOR COMMENT: 25 TH JUNE, 2014
2 Purpose of this Document This document serves to provide you with a brief introduction to the proposed project and the manner in which Interested and Affected Parties (I&APs) can become involved in the ESIA process. Additional documents will be available at various stages during the environmental assessment process to provide I&APs with information and further opportunities to raise issues of concern and suggestions for enhanced benefits Project Background The proposed project if approved will be the first Liquefied Natural Gas (LNG) facility development in Ghana. The development will affect three main administrative districts (Tema, Kpone and Ningo Prampram) who may wonder what LNG is, so a brief introduction is provided here. LNG is produced at an LNG plant by cooling natural gas to a very low (cryogenic) temperature until the gas becomes a liquid. The process reduces the volume of the natural gas to 1/600th of its unliquefied volume. This much smaller volume allows large amounts of natural gas to be transported economically over long distances by special ships called LNG carriers. When the LNG is unloaded at an international port, it is usually transported via pipeline to a nearby re-gasification terminal, where the LNG is heated and returned to its gaseous state. The resultant natural gas is then distributed to customers via natural gas pipelines and reticulation systems.
3 PROJECT DESCRIPTION The project will install, commission and operate the infrastructure required to import, store, regasify Liquefied Natural Gas ( LNG ) and deliver regasified LNG to off-takers in the Tema area for an initial period of ten (10) years. Objectives To deliver natural gas to the Independent Power Producers ( IPPs ) and industrial consumers with initial focus on Tema and its environs. The project will provide a single contract point for end-users covering storage, regasification and transmission of Natural Gas. The Project will operate primarily on a tolling basis. The price of LNG will be a pass through. Project Components The proposed project shall have the following components and infrastructure; Floating Storage and Regasification Unit ( FSRU ) Offshore Mooring and Support for Floating Units ( FSRU as well as LNG Supply Vessels) Subsea Gas Pipeline Landing Facilities and Distribution AFFECTED ENVIRONMENT The proposed project will be located in the Heavy Industrial Area of the Tema Metropolis. The projects distributed and landing facilities will travel across Kpone Katamanso and Ningo Prampram Districts within the metropolitan area. Residential and agricultural (farming) activities are dotted along the project location sites. Other characteristic features of the landing area are; biodiversity spots, wetlands and scattered mangroves I. Floating Storage and Regasification Unit ( FSRU ) The FSRU will berth at the offshore mooring jetty. It will have a storage capacity of 170, 000 m 3. The FSRU initial send-out rate capability will be of 250MMscf/d (able to supply approx. 1250MW of combined cycle capacity) with ability to deliver up to 750MMscf/d II. Offshore Mooring and Support for Floating Units ( FSRU as well as LNG Supply Vessels) The Floating Units will be connected to a five (5) kilometers subsea pipeline attached to the offshore mooring jetty. The mooring system will rest on permanent piles in the seabed and support a permanently moored storage and regasification vessel, an LNG trading vessel and a riser from the subsea pipeline. III. Subsea Gas Pipeline Twelve (12) kilometers of 18-inch seabed pipe will be laid to transport re-gasified LNG from the offshore facility to the shore near Tema. The pressure and temperature of the pipeline will meet the requirements of the onshore pipeline distribution network to which it will be connected (see below for subsea gas pipeline design). IV. Distribution and Landing Facilities Construction of an 18-inch gas pipeline distribution network to supply off-takers at their plant gates via onshore landing facilities and a metering station. (see below for distribution and landing sites).
4 1.0 Proposed Subsea Gas Pipeline Design Network
5 2.0 Proposed LNG Distribution and Landing Facilities
6 PROJECT DELIVERY, STATUS AND TIMELINES By the initial market studies it is expected that the project will commission and deliver first gas by first quarter in Other completed aspects of the projected development are summarised below; A significant proportion of the preliminary front-end engineering and design (pre- FEED) has already taken place and the equity required for the project is available. Government of Ghana has MoU with the project and is willing to take up to 10% of the Project s equity through nominated public institutions. Award of MetOcean Study of the Proposed Project Site to IntecSea Appointment of Owner s Engineer in 4th quarter 2013 MoU and Term sheets with prospective off takers Selection Process of FSRU Provider underway
7 ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT [ESIA] The objectives of the ESIA process are to provide: Interested and Affected Parties (I&APs) with adequate information to understand the potential environmental and socio economic impacts associated with the proposed project and opportunities for them to comment on the ESIA process; The engineering team with information that will assist them to incorporate effective measures into the design and execution of the project to minimise negative impacts and enhance benefits of the project; and The regulatory authorities with sufficient information to serve as a basis for sound decision making and grant of Environmental Permit. Legislative Requirements The proposed ESIA will be undertaken in terms of the Environmental Assessment Regulations 1999 (LI 1652) and the Environmental Protection Agency Act 1994 (Act 490). In addition, the following legislation will also be applicable to the propose project and the related legislative requirements will need to be fulfilled as part of the ESIA process: Energy Commission Act 1997 (Act 541 Ghana Maritime Authority Act 2002 (Act 630) Ghana Shipping (Protection of Offshore Operations and Assets) Regulations 2011 Oil in Navigable Waters Act, 1964, Act 235 Beaches Obstruction Ordinance of 1987 Cap 240 Lands (Statutory Wayleaves) Act 1963 (Act 186) Detailed legislative requirements of the proposed project will be presented during the Scoping phase. An integrated legislative approach will be adopted by Knight Piesold to identify all relevant legislation in relation to the project development. Key Environmental Considerations Identified Initial site visit to the project and project affected sites have considered the following estimated predicted impacts: Effects of noise on marine fauna and flora (especially marine mammals) Interference with fishing activities Effects on terrestrial ecology and biodiversity Interference with marine traffic Social economic, land ownership resource use Health and Safety
8 PUBLIC CONSULTATION AND PARTICIPATION Public participation and stakeholder consultation are a key component of environmental decision making process and will constitute a major part throughout the ESIA process. The consultation exercise and program will involve both institutional and public engagement. It will be directed and focused at promoting capacity building of stakeholders to the project development. A summary description of the public participation ESIA process and associated activities: 2 nd Quarter 2014 (May, 2014) PROJECT ANNOUNCEMENT Formal announcement of project to all stakeholders: Announcement letter and BID distribution; Placement of site notices; Placement of adverts Registration of I&APs. Key stakeholder / focus group meetings. 2 nd Quarter 2014 (June, 2014) SCOPING Announce availability of Draft Scoping Report for public review Lodge Draft Scoping Report available in the mass media Hold meetings with I&APs. Update Draft Scoping Report, Comment and Response Report. Submit Final Scoping Report to EPA and make available for public review period 3 rd Quarter 2014 (July-Aug, 2014) IMPACT ASSESSMENT Announce availability of Draft ESIA and PEMP Reports for review. Lodge Draft ESIA and EMP Reports available at public places Hold public meetings with I&APs. Update of Draft ESIA and PEMP Reports, Comment and Report Submit Final ESIA and PEMP Reports to EPA for public review 4 th Quarter 2014 (Sep, 2014) DECISION MAKING Announce decision from competent authorities to I&APs. Provide the needed information for appeals process in announcement Your registration as an I&AP and comments are important to this process. You are invited to raise issues of concern, identify opportunities and provide suggestions associated with the proposed project, pertaining to potential positive or negative environmental and social impacts which should be investigated during the ESIA process. You are invited to register as an IAP for PPP for this project. If you wish to be registered, please complete attached registration form and return to Knight Piésold (details below). WE THANK YOU FOR YOUR PARTICIPATION For additional information please contact: Knight Piésold Ghana Limited No. 20, 2 nd Close Airport Residential Area P.O. Box CT 4122, Cantonments, Accra p e. accra@knightpiésold.com
TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT
TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Final Scoping Report - Non-Technical Summary Presentation Structure of the Presentation Introduction to the Tema LNG Project
More informationCHAPTER 7 STAKEHOLDER ENGAGEMENT
CHAPTER 7 STAKEHOLDER ENGAGEMENT TABLE OF CONTENTS 7 STAKEHOLDER ENGAGEMENT PROCESS... 7-1 7.1 INTRODUCTION... 7-1 7.2 STAKEHOLDERS IDENTIFIED... 7-2 7.3 STAKEHOLDER ENGAGEMENT PROCESS... 7-4 7.3.1 Stakeholder
More informationMinistry of Energy and Water Government of Lebanon
Ministry of Energy and Water Government of Lebanon Call for Expressions of Interest for a Liquefied Natural Gas Import Project in Lebanon This document has been prepared by Poten & Partners, Inc. ( Poten
More informationBackground Information Document
Background Information Document Independent Power Producer Programme: EIA for a Floating Power Plant and EIA for LNG Import Facilities, Port of Richards Bay: ERM Ref Number: 0320839 Purpose of this Background
More information1 PROJECT OVERVIEW. Quantum Power Ghana Gas Limited 1 Knight Piésold Consulting GMF
1 PROJECT OVERVIEW Quantum Power Ghana Gas Limited (hereinafter referred to as Quantum Power) is a developer, owner and operator of electricity generation assets and power-related infrastructure throughout
More informationLNG Import Facility Infrastructure Options
LNG Import Facility Infrastructure Options Mangesh Patankar (Head of Business Development Galway Group) 28 th April 2016 www.galwaygroup.com Agenda Introduction to Galway Group Types of Regas terminals
More informationASX/MEDIA RELEASE 23 APRIL 2015 MAGNOLIA LNG PROJECT TOLLING AGREEMENT UPDATE WITH MERIDIAN LNG
ASX/MEDIA RELEASE 23 APRIL 2015 MAGNOLIA LNG PROJECT TOLLING AGREEMENT UPDATE WITH MERIDIAN LNG The Directors of Liquefied Natural Gas Limited (the Company, ASX Code: LNG) are pleased to advise that its
More informationOn Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry
On Board Regasification for LNG Ships 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry New Greenfield U.S. Terminals Will Be Almost Impossible to Site Key opportunity is to solve U.S. terminalling
More informationBackground Information Document
Environmental Impact Assessment (EIA) of the Proposed Development of Phosphate Deposits off the Coast of Namibia Background Information Document Note 1. This BID addresses the proposed activities within
More informationECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL
International Gas Union Research Conference 2011 ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL Youngchul.Eum Seunghyuk.Kim Kyoungmin.Doh MunKeun.Ha SAMSUNG HEAVY INDUSTRIES, Geoje-Si, Gyeongsangnam-do,
More informationOLT Offshore LNG Toscana Alessandro Fino CEO
Small Scale to large Market Strategies & Technologies towards the Mediterranean Area "La logistica primaria per la distribuzione del GNL" OLT Offshore LNG Toscana Alessandro Fino CEO 1 OLT Shareholders
More informationSHAPING THE NATURAL GAS MARKET OF CYPRUS
NATURAL GAS PUBLIC COMPANY (DEFA) SHAPING THE NATURAL GAS MARKET OF CYPRUS Dr. Symeon Kassianides Chairman Natural Gas Public Company New York 11/29/2017 SHAPING THE NATURAL GAS MARKET OF CYPRUS 1. Current
More informationGUIDE FOR APPLICANTS
GUIDE FOR APPLICANTS This guide has been prepared to assist you in applying for a position with Port of Newcastle. Prior to completing your application, please read the following information to gain an
More information9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction
9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE 9.1.1 Introduction This chapter is the provisional Environmental Management Plan (EMP) for the Jubilee Phase 1 Development project. The elements of
More informationConversion of Kurnell refinery to a fuel import terminal
Conversion of Kurnell refinery to a fuel import terminal Dr Jos Kusters 1 May 2014 AGENDA Background Kurnell site conversion Management of environmental and community impacts Operation as a terminal 2
More informationREPUBLIC OF KENYA MINISTRY OF ENERGY AND PETROLEUM KENYA PETROLEUM TECHNICAL ASSISTANCE PROJECT (KEPTAP) PROJECT MANAGEMENT UNIT (PMU)
REPUBLIC OF KENYA MINISTRY OF ENERGY AND PETROLEUM KENYA PETROLEUM TECHNICAL ASSISTANCE PROJECT (KEPTAP) PROJECT MANAGEMENT UNIT (PMU) COMPONENT C SUSTAINABLE IMPACT OF OIL AND GAS INDUSTRY REFORMS AND
More informationNearshore Regasification Terminals and FSRUs
Nearshore Regasification Terminals and FSRUs Results for our customers As the worldwide demand for natural gas imports increases, the technical and regulatory challenges and the scale of the investment
More informationAfrican Gas Infrastructure: Project Development and Financing
23 May 2017 African Gas Infrastructure: Project Development and Financing 1 Gas Midstream in SSA What is Gas Infrastructure? Context What is in scope for midstream gas infrastructure? State of play Project
More informationPIPED-GAS REGULATION FEBRUARY 2017
PIPED-GAS REGULATION FEBRUARY 2017 Disclaimer This frequently asked questions document (FAQ) is developed in the context of the liquefied natural gas (LNG) to Power IPP Procurement Programme currently
More informationGLOSSARY. Quantum Power Ghana Gas Limited ix Knight Piésold Consulting Environmental and Social Impact Assessment
GLOSSARY Alternative Alternatives can refer to any of the following, but are not limited to: alternative sites for development, alternative projects for a particular site, alternative site layouts, alternative
More informationThis is a working draft report provided for information purposes only, and may be modified prior to finalisation. It has been prepared on the basis
This is a working draft report provided for information purposes only, and may be modified prior to finalisation. It has been prepared on the basis of the design and engineering work as part of the feasibility
More informationFUGRO GROUP LNG FIELD DEVELOPMENT AND FACILITIES. TACKLING your complex challenges. UNDERSTANDING your operational objectives
LNG FIELD DEVELOPMENT AND FACILITIES FUGRO GROUP UNDERSTANDING your operational objectives TACKLING your complex challenges DELIVERING your global success stories LNG FIELD DEVELOPMENT AND FACILITIES Developing
More informationENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA DEA Reference Number: 12/12/20/2175 BACKGROUND INFORMATION
More informationThe Republic of South Africa. Department of Energy REQUEST FOR INFORMATION IN RESPECT OF THE DESIGN OF A GAS TO POWER PROGRAMME
The Republic of South Africa Department of Energy REQUEST FOR INFORMATION IN RESPECT OF THE DESIGN OF A GAS TO POWER PROGRAMME 2 TABLE OF CONTENTS 1. Disclaimer... 3 2. Definitions and Interpretation 5
More informationPetronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations
Petronet LNG Ltd., India LNG Terminal Design- Major Design Considerations OVERVIEW 1. What is LNG and LNG Chain 2. Project Development & Site Selection 3. Studies Required 4. Marine Facilities 5. Storage
More informationLNG Houston, February 6-7 th, The case for developing a Floating LNG Receiving Terminal on the US East Coast
LNG 2002 Houston, February 6-7 th, 2002 The case for developing a Floating LNG Receiving Terminal on the US East Coast By Sveinung J. Stohle, Executive Vice President, Golar LNG Ltd. Golar LNG s Strategy
More informationChallenges for Marine LNG Import to Unlock Gas to Power+ across Africa
Challenges for Marine LNG Import to Unlock Gas to Power+ across Africa Gary Mocke Prepared for the: AGM of the 2017 South African Maritime Law Association (MLA) Selborne Golf Estate, Hotel and Spa September
More informationURS- EIA- REP Date of Issue 19th November 2012
DocID: External DocID: URS-EIA-REP-201040 46369085_Doc020_REP_Rev03 Date of Issue 19th November 2012 This report has been prepared by URS Infrastructure & Environment UK Limited on behalf of South Stream
More informationWe deliver gas infrastructure
We deliver gas infrastructure We are Uniper We are a leading international energy company with operations in more than 40 countries and around 13,000 employees. We combine a balanced portfolio of modern
More informationWho is WesPac Midstream?
0 Who is WesPac Midstream? WesPac founded in 1998 to develop, own, and operate energy infrastructure projects Historically focused on tank farms, pipelines, marine terminals, rail off-loading, and airport
More informationV International Seminar on Port Engineering, Concepción, Chile. Site Selection & Design of Marine Terminals
V International Seminar on Port Engineering, Concepción, Chile Site Selection & Design of Marine Terminals by Dr C. Skipper 1, Captain Stephen Gyi 2 ABSTRACT This paper considers the site selection and
More informationCOMPLETING THE LNG VALUE CHAIN
COMPLETING THE LNG VALUE CHAIN Reidar Strande, Director, LNG, Wärtsilä Oil & Gas Systems Tord Johnsson, Area Business Development Manager, Oil and Gas Business, Wärtsilä Power Plants [ ENERGY & MARINE
More informationCHAPTER 3: GENERAL DESCRIPTION OF THE PROPOSED COEGA INTEGRATED POWER PROJECT
: GENERAL DESCRIPTION OF THE PROPOSED COEGA INTEGRATED POWER PROJECT CONTENTS 3. GENERAL DESCRIPTION OF THE PROPOSED COEGA 3-1 3.1 Overview of the Coega Integrated Power Project 3-1 3.2 Description of
More informationClassification of the Largest Ever Floating Storage Regasification Unit
NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Classification of the Largest Ever Floating Storage Regasification Unit Philippe CAMBOS Bureau Veritas AGENDA 1. Introduction 2. The project 3. Liquid
More information6th Annual LNG Transport Handling & Storage 2016 Forum. FSRU as The Pivotal Point for Effective LNG Distribution
6th Annual LNG Transport Handling & Storage 2016 Forum FSRU as The Pivotal Point for Effective LNG Distribution Bali, 15 th September 2016 PGN LNG Business at FSRU Lampung Maximum capacity of sales gas:
More informationNew York State Offshore Wind Master Plan. October 20, 2017
New York State Offshore Wind Master Plan October 20, 2017 2 Offshore Wind Master Plan A comprehensive State roadmap for advancing development of offshore wind in a cost-effective and responsible manner
More informationCapability Statement Gas and liquid bulk terminals Delta Marine Consultants
Capability Statement Gas and liquid bulk terminals Delta Marine Consultants Delta Marine Consultants Delta Marine Consultants provides comprehensive maritime engineering services for gas and liquid bulk
More informationINFORMATION BOOKLET. June Harbour Master - Burtonport
INFORMATION BOOKLET June 2017 Harbour Master - Burtonport Harbour Master QUALIFICATIONS 1. Character Each candidate must be of good character. 2. Health Each candidate must be in a state of health such
More informationDiscover a proven way! Arturas Drungilas. Marketing and Corporate Affairs Director
Discover a proven way! www.portofklaipeda.lt Arturas Drungilas Marketing and Corporate Affairs Director 2015 05 21 Annual cargo turnover in Klaipeda Port Average growth of annual cargo turnover is 6,6
More informationAppendix A: Project Characteristics
Gorgon Fourth Train Expansion Proposal Appendix A: Project Characteristics Appendices Project Characteristics A Key Characteristics table has been prepared to describe the elements of the Foundation Project
More informationLNG Supply Chain Infrastructure Configuration
Chapter 3 LNG Supply Chain Infrastructure Configuration February 2018 This chapter should be cited as ERIA (2018), LNG Supply Chain Infrastructure Configuration, in Uemura T. and K. Ishigami (eds.), Formulating
More informationNeed For The Project
Need For The Project Supply According to the EIA s AEO 2005, natural gas consumption in the U.S. is currently about 23 trillion cubic feet (tcf ) per year and is expected to increase to about 31 tcf per
More informationKOGAS s Technical Capability and Plan on Off-shore Plant Business
KOGAS s Technical Capability and Plan on Off-shore Plant Business 2017. 11. 1 Tony S. H. Kim Off-Shore Plant Development Team Overseas Plant Business Group Korea Gas Corporation. All rights Reserved Page
More informationGHANA PROJECT PIPELINE PRESENTATION
GHANA PROJECT PIPELINE PRESENTATION 6th Annual Global Infrastructure Leadership Forum, Alexander Hamilton U.S. Custom House, New York City, February 27 March, 2013 PART A: GHANA FACT FILE Country Overview
More informationFloating storage and regasification barges
Floating storage and regasification barges A FLEXIBLE AND MOVABLE SOLUTION BRINGING LNG TO AREAS WITH SITE LIMITATIONS CONCEPTS ADAPTABLE TO CUSTOMER NEEDS OF F S H OR E S E R V I C E V E S SE L (OS V)
More informationThe changing landscape of gas pipelines in SE Europe & the
The changing landscape of gas pipelines in SE Europe & the New landscape in the transportation of Natural Gas to Europe via pipelines The routes from East to West The South Corridor SCPx, TANAP, TAP: Moving
More information17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) The LNG Terminal
More informationThe general design of a LNG-terminal. Background
The general design of a LNG-terminal Project MAGALOG (Marin Gas Logistics) is a contribution to addressing port emission problems in Europe, with a special focus on the Baltic Sea, through the establishment
More informationPERSPECTIVE OF NATURAL GAS SUPPLY FOR POWER GENERATION IN THE SUB- REGION
BENIN GHANA NIGERIA TOGO 1 ERERA FORUM 2012 Bridging the gap between electricity demand and sustainable supply in West Africa Dakar, November 20-21, 2012 PERSPECTIVE OF NATURAL GAS SUPPLY FOR POWER GENERATION
More informationFRAMEWORK FOR AQUACULTURE DEVELOPMENT ON THE VOLTA LAKE. Implementation Guidelines Document
FRAMEWORK FOR AQUACULTURE DEVELOPMENT ON THE VOLTA LAKE Implementation Guidelines Document APRIL 2017 INTERPRETATIONS: In these Guidelines, unless the context otherwise requires: Applicant: Company or
More informationProject Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate
Project Overview Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate a natural gas-tomethanol production plant and storage facilities, and a new marine terminal, in the
More informationThe Adoption of FSRU For Cost-effective LNG Import Solution
The Adoption of FSRU For Cost-effective LNG Import Solution Aziz Kassim Sr. Director Business Development, Excelerate Energy 29-30 November 2017 Copyright Excelerate Energy L.P. Disclaimer Excelerate Energy
More informationChemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu
Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Compliance Report for Environmental Clearance No.11.63/2005.1A.III dated 19.12.2005 Specific Conditions
More informationTHE TRANSFER OF LNG IN OFFSHORE CONDITIONS. SAME SONG NEW SOUND
THE TRANSFER OF LNG IN OFFSHORE CONDITIONS. SAME SONG NEW SOUND Leendert Poldervaart Business Development Manager James Ellis Business Development Manager Single Buoy Moorings Gas Business Development
More informationGNL Mejillones, GenCo oriented
GNL Mejillones, GenCo oriented Jean-Michel Cabanes CEO congreso internacional Cigré tuturos desafíos para el sector eléctrico chileno Santiago, November 23 rd, 2015 key issues for flexibility 1. multi-service
More informationAvoiding the Disconnect
Avoiding the Disconnect Trelleborg Marine Systems Avoiding the Disconnect Executive Summary The use of liquefied natural gas (LNG) is now a mainstream, commercial reality, as the demand for energy continues
More informationFloating LNG What are the key business development risks and mitigation strategies in a FLNG project?
Floating LNG 2013 What are the key business development risks and mitigation strategies in a FLNG project? What are the key challenges? What are some of the risk mitigation strategies? What are some of
More informationThis is a working draft report provided for information purposes only, and may be modified prior to finalisation. It has been prepared on the basis
This is a working draft report provided for information purposes only, and may be modified prior to finalisation. It has been prepared on the basis of the design and engineering work as part of the feasibility
More informationGorgon Gas Development and Jansz Feed Gas Pipeline
Gorgon Gas Development and Jansz Feed Gas Pipeline Ministerial Statements 800, 965, and 769 Assessment 2017 Revision ID: 1.0 Revision Date: 25 October 2017 Next Revision Due: NA Information Sensitivity:
More informationThe Eastern Mediterranean and European Energy Landscape: Trends and Opportunities
The Eastern Mediterranean and European Energy Landscape: Trends and Opportunities by Prof. Yannis Maniatis Greek Minister of Environment, Energy and Climate Change COLUMBIA SIPA Center on Global Energy
More informationSaudi Aramco General Bid Slates (GBS)
Saudi Aramco General Bid Slates (GBS) Copyright 2015, Saudi Aramco. All rights reserved. Agenda Saudi Aramco Contracting Strategy Saudi Aramco General Bid Slate (GBS) General Bid Slate Work Types 2 Saudi
More informationCoTE Presentation LNG to Power Stornoway s Renard Mine Canada LNG Export 2015 May 19, 2015
CoTE Presentation LNG to Power Stornoway s Renard Mine Canada LNG Export 2015 May 19, 2015 Agenda SNC-Lavalin / Kentz Brief overview Global LNG presence LNG in Canada Stornoway Diamond Corporation Brief
More informationDUTY PORT MANAGER Competitive salary + benefits
DUTY PORT MANAGER Competitive salary + benefits The Port of Dover is Europe s busiest ferry port and a vital international gateway for the movement of passengers and trade. It is also an award-winning
More informationUPDATE OF THE AUTHORISATION OF A LNG CARRIER TO UNLOAD AT THE LNG TERMINAL IN PANIGAGLIA PANIGAGLIA LNG TERMINAL
UPDATE OF THE AUTHORISATION OF A LNG CARRIER TO UNLOAD AT THE LNG TERMINAL IN PANIGAGLIA PANIGAGLIA LNG TERMINAL CONTENTS 1. SUBJECT...3 2. DEFINITIONS...3 3. REFERENCE PROCEDURES...3 4. UPDATE OF DOCUMENTATION
More informationWharf structures and Quay Deck landing areas, will be built in stages to accommodate the following transport fleet:
8C Noise Design Assumptions and Source Data 8C.1 Construction Predicted noise levels at the nearest noise sensitive receptors from construction activities have been modelled and presented as noise contours,
More informationDevelopment of LNG solutions in the Baltic States
Development of LNG solutions in the Baltic States 10.12.2014 We are where the Norwegian companies are and we are where the clients on the markets are LNG in the region Energy security and need for alternative
More informationInnovations for the Global LNG Industry Bringing Continents of Energy Together Marine Technology Society March 22, 2007
Innovations for the Global LNG Industry Bringing Continents of Energy Together Marine Technology Society March 22, 2007 Kathleen Eisbrenner President and Chief Executive Officer Excelerate Energy Excelerate
More informationAsia s First FSRU And its Role in Pushing LNG Development in Indonesia
Asia s First FSRU And its Role in Pushing LNG Development in Indonesia Tammy Meidharma PT Nusantara Regas 4 th LNG Supply, Transportation & Storage Indonesia, 20 May 2014, Stone Hotel, Legian, Bali Overview
More informationPresentation on Initiatives to Improve Cargo Handling at the Port of Mombasa. Muhamad A. Jezan Resident Representative
Presentation on Initiatives to Improve Cargo Handling at the Port of Mombasa. Muhamad A. Jezan Resident Representative Outline 1. Introduction 2. Role of Ports in Economic Development 3. Mombasa Port Performance
More informationFebruary 2012 Tweneboa, Enyenra, Ntomme T.E.N. Development Project Environmental Impact Assessment Scoping Report and Terms of Reference (ToR)
February 2012 Tweneboa, Enyenra, Ntomme T.E.N. Development Project Environmental Impact Assessment Scoping Report and Terms of Reference (ToR) Project Overview: Background Exploration and appraisal drilling
More informationMINISTRY OF ENERGY UNLOCKING ECOWAS GAS MARKET: FROM LNG TO GAS-TO-POWER. Ghana s Downstream Sector and Investment Opportunities in Gas Sector
MINISTRY OF ENERGY UNLOCKING ECOWAS GAS MARKET: FROM LNG TO GAS-TO-POWER Ghana s Downstream Sector and Investment Opportunities in Gas Sector Ministry of Energy - Jacob Amuah, Director (Petroleum 12/6/2017
More informationCapabilities in LNG
16-04-25 Capabilities in LNG www.bmtindia.org LNG About us BMT Consultants India is a part of the UK based BMT Group, an international design, engineering and risk management consultancy working in the
More informationTransportation and regasification infrastructures
Transportation and regasification infrastructures Snam Rete Gas is the market leader in the Italian natural gas transportation and regasification sector and the only Italian operator that regasifies liquefied
More informationsmall to mid-scale LNG solutions LNG-TO-POWER
small to mid-scale LNG solutions LNG-TO-POWER strong partnership between sister companies LNG-TO-POWER Combining small to mid-scale LNG Floating Storage and Regasification Units (FSRU) with floating power
More informationCHAPTER 13 ASSESSMENT OF SOCIO-ECONOMIC IMPACTS AND MITIGATION
CHAPTER 13 ASSESSMENT OF SOCIO-ECONOMIC IMPACTS AND MITIGATION TABLE OF CONTENTS 13 ASSESSMENT OF SOCIO-ECONOMIC IMPACTS AND MITIGATION... 13-1 13.1 SOCIO-ECONOMICS AND LIVELIHOODS... 13-1 13.1.1 Increased
More informationSmall Scale LNG From Concept to Reality. Chris Johnson, General Manager, LNG New Markets, Shell
Small Scale LNG From Concept to Reality Chris Johnson, General Manager, LNG New Markets, Shell 0 Table of Contents Table of Contents... 1 Background... 1 Aims... 4 Methods... 5 Results... 11 Conclusions...
More informationOpportunities for Pan GCC Natural Gas Grid
IGU Executive Committee Workshop Regional Gas Industry Issues and Opportunities Prepared by National Oil & Gas Authority (NOGA) Kingdom of Bahrain Muscat, 30 Mar 2017 1 Natural Gas in Bahrain Average consumption
More informationGLADSTONE LNG leads the way with its first LNG shipment in 2012
GLADSTONE LNG leads the way with its first LNG shipment in 2012 LNG Business Model Development of mid-scale LNG projects of up to 1.5 million tonne per annum (Mtpa) production capacity per LNG train, based
More informationInvestment Opportunity LNG Terminal
Investment Opportunity LNG Terminal Sonmiani Pasni Gwadar Port Authority Ormara Naval Harbour Karachi Port Trust Keti Bandar Port Qasim Authority Legend Existing Ports Potential sites 2 Port Qasim Khirpranwala
More informationEnvironmental Governance in Myanmar. U Than Aye Director Environmental Conservation Department
Environmental Governance in Myanmar U Than Aye Director Environmental Conservation Department 1 Strategy for Environmental Safeguards To work for Economic Development in Parallel with Environmental Conservation
More informationFSRUs: Accommodating Emerging Markets Gas and Power Needs
FSRUs: Accommodating Emerging Markets Gas and Power Needs Ramon Wangdi Vice President Business Development, Excelerate Energy 6 April 2017 Copyright Excelerate Energy L.P. Who We Are: EXCELERATE ENERGY
More informationGRAIN LNG Challenges & benefits for the deployment of LNG in ports. October 2017 BPA Conference, Poole, UK
GRAIN LNG Challenges & benefits for the deployment of LNG in ports October 2017 BPA Conference, Poole, UK What is LNG? LNG is Liquefied Natural Gas Identical to the gas at home Stored as a liquid at 161oC
More informationConversion table working groups Name working group Old number New number Conception des barrages mobiles et de barriers anti-tempêtes PIANC WG 101
Conversion table working groups Name working group Old number New number Conception des barrages mobiles et de barriers anti-tempêtes PIANC WG 101 Guidelines for environmental impacts of vessels InCom
More informationFloating Regasification The Aegean LNG terminal
Energy and Shipping Athens, March 2013 Floating Regasification The Aegean LNG terminal George Polychroniou Division Head, Strategy & Corporate Development Contents The growing role of FSRUs The case of
More informationPetronas Gas Berhad KINDLY REFER TO THE LAST PAGE OF THIS PUBLICATION FOR IMPORTANT DISCLOSURES INVESTMENT HIGHLIGHTS KDN: PP 10744/06/2012
KDN: PP 10744/06/2012 17 January 2012 Visit Note Petronas Gas Berhad First LNG import in Aug2012 Reiterate BUY Increased Target Price (TP): RM16.50 (from RM15.60) INVESTMENT HIGHLIGHTS We visited Petronas
More informationKARENSLYST ALLÉ 4, 0278 OSLO, NORWAY P.O. BOX 157, 0212 OSLO, NORWAY
KARENSLYST ALLÉ 4, 0278 OSLO, NORWAY P.O. BOX 157, 0212 OSLO, NORWAY Content About us 2 Our model 3 Our experience 4 Oil and Gas (E&P) 5 Liquefied Natural Gas (LNG) 5 Regasification of LNG (FSRU) 6 Environment
More informationTABLE OF CONTENTS Clearances Minimum Distance Between the berth and the Center of the Channel Turning Basin...
TABLE OF CONTENTS EXECUTIVE SUMMARY... ES-1 1. MANDATE... 1-1 1.1 Introduction... 1-1 1.2 Scope of pre-feasibility study... 1-1 1.3 Study Methodology... 1-2 1.4 General Description of the Three Sites under
More informationLNG PUMPS FOR FLOATING STORAGE AND REGAS UNIT
4661 Eaker Street North Las Vegas, Nevada, 89081 USA Tel: +1 702 643 4900 Fax: +1 702 643 0391 nci.marketing@nikkisocryo.com http://www.nikkisocryo.com 1 Introduction. Lower capital costs, shorter on-stream
More informationDeveloping and Implementing Floating <Title of Presentation>
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) Developing and Implementing Floating Regasification
More informationLoading Master for Oil, LNG/Gas and Petrochemical Terminals
An Intensive 5 Day Training Course Loading Master for Oil, LNG/Gas and Petrochemical Terminals 30 Sep - 04 Oct 2018, Dubai 14-FEB-18 This course is Designed, Developed, and will be Delivered under ISO
More informationProposed G3 Terminal Vancouver Project Update. Presented to North Shore Waterfront Liaison Committee January 14, 2016
Proposed G3 Terminal Vancouver Project Update Presented to North Shore Waterfront Liaison Committee January 14, 2016 G3 & G3 Terminal Vancouver G3 formed to invest in Canada s grain sector by establishing
More informationLNG Importation Initiative. Saldanha Cape Town Corridor. Fossil Fuel Foundation 21 May 2014
LNG Importation Initiative Saldanha Cape Town Corridor Fossil Fuel Foundation 21 May 2014 Cape West Coast Gas Development Western Cape Provincial Cabinet defined natural gas as a strategic priority (May
More informationMARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT
MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT The health of the world s oceans and marine life is degrading rapidly as a result of excess human activities.
More informationClean LNG fuel for Black Sea-Danube-Rhine corridor
Clean LNG fuel for Black Sea-Danube-Rhine corridor SAGAU MIHAI Engineering and Environmental Sciences Department Maritime University of Constanta Constanta, Mircea street 104, PC 900663 ROMANIA mihai.sagau@yahoo.com
More informationB.C. TOWBOAT INDUSTRY CONFERENCE
LN G T erm inals on C ana da s W est C oast Kitimat LNG LN G T erm inals on C ana da s W est C oast Presentation to 17 th B.C. TOWBOAT INDUSTRY CONFERENCE Whistler, BC Kitimat LNG Alfred Sorensen Kitimat
More informationPreamble. Mindful of: Noting
CHARTER FOR THE SOUTH AFRICAN PETROLEUM AND LIQUID FUELS INDUSTRY ON EMPOWERING HISTORICALLY DISADVANTAGED SOUTH AFRICANS IN THE PETROLEUM AND LIQUID FUELS INDUSTRY CONTENTS Preamble Scope of Application
More informationINTRODUCTION. List of Figures. List of Tables
3 Introduction...3-1 3.1 The SCP Owner Group... 3-1 3.2 Project Rationale... 3-2 3.3 Project Alternatives... 3-3 3.4 Project Description... 3-4 3.5 Scope of this ESIA... 3-5 3.5.1 Geographical extent...
More informationGas Australia Asia Pacific Conference October, Perth
Gas Australia Asia Pacific Conference 2004 12-13 October, Perth Pilbara LNG Project Thebe 50 km Pilbara LNG Project Overview W A 346-P W A-1-R 0 25 50 KILOMETRES Jupiter 0.4 TCF Scarborough 8 TCF 270 km
More informationTill date, Rotary has built more than 60% of independent storage tanks in Singapore.
ROTARY Till date, Rotary has built more than 60% of independent storage tanks in Singapore. 2 Our Track Record Terminals/Depot Client Project Title Year of Completion United Arab Emirates, Fujairah Star
More informationThe Future of the Ocean Economy - Offshore Wind
The Future of the Ocean Economy - Offshore Wind Workshop on Shipping and the Offshore Industry Monday 24 th November, 2014 OECD, Paris Key data sources EWEA Background Projections Technology Finance IEA