1 STAFF REPORT ST. JEAN MOORING BUOY &ACCESS CUTBACK TO: Douglas County Hearing Examiner FROM: Douglas County Land Services Staff RE:, SP DATE: January 6,2014 I. GENERAL INFORMATION Requested Action: An application for a shoreline substantial development permit for the installation of a mooring buoy and shoreline cutback for trail access. Location: The subject property is described as Lot 1 of the Braeburn Short Plat and is further described as being located within the NE Quarter of Section 12, Township 26N., Range 21 E., W.M., Douglas County, Washington. II. SITE INFORMATION Site Characteristics: The subject property contains a steep bank down to the Ordinary High Water Mark of the Columbia River forming a definite top of the bank, approximately 18 ft above and 25 ft landward fo the OHWM. The entire shoreline slope is vegetated; however, the vegetation is dominated by upland grasses and weedy species. There are two large ponderosa pines, along with one medium and 1 small ponderosa pines which all but one is located greater than 15 ft from OHWM. There is also a small patch of poison iivy approximately 8 ft landward of the OHWM. Zoning and Development Standards: The subject property is located within the Rural Resource 5 acres (RR-5) Zoning District. The purpose of the RR-5 rural resource district is to provide an area for a variety of rural lifestyles, hobby farms, densities, and open space, while protecting the rural and resource characteristics in the vicinity. This district provides an opportunity for compatible rural land uses, and is sensitive to the site's physical characteristics. RR-5 districts are often located adjacent to urban growth areas or existing rural development of higher densities, are intended as a transition, and provide a buffer area between commercial agricultural areas or more intense development areas. These areas may be incorporated into the urban area at a future date. This district is also appropriate for areas that currently have a range of rural densities or land parcel sizes generally less than twenty acres in size and/or have adequate rural levels of services available such as roads, schools, and fire protection. Clustering or other innovative techniques for residential lots are encouraged provided that the density does not encourage urban levels of service and provide significant open space corridors and protection of critical areas. III. COMPREHENSIVE PLAN: The Douglas County Countywide Comprehensive Plan designates this property as Rural Resource 5 acres. The following goals and policies set forth in the comprehensive plan are relevant to this development: Page 1

2 RURAL: POLICY RD-4: Development and recreational opportunities in rural shoreline and other rural areas shall minimize potential adverse impacts to water quality, slope stability, vegetation, wildlife and aquatic life. CRITICAL AREAS - FISH AND WILDLIFE HABITAT CONSERVATION AREAS GOAL 2: Protect fish and wildlife habitat areas as an important natural resource for Douglas County, particularly in regard to their economic, aesthetic and quality of life values. POLICY CA-15: Impacts of new development on the quality of land, wildlife and vegetative resources will be considered as part of the environmental review process and require any appropriate mitigating measures. Such mitigation may involve the retention and/or enhancement of habitats. POLICY CA-16 The maximum amount of vegetation should be maintained in its natural state and be disturbed only as minimally necessary for the development. Disturbed areas should be re-vegetated with native vegetation as soon as possible. Re-vegetation will be maintained in good growing conditions, as well as being kept free of noxious weeds. POLICY CA 17: If a development proposal is located in or near a habitat conservation area shown on the reference maps, a consultation and subsequent mitigation measures, if needed, should be encouraged from the WDFW or other appropriate agency. POLICY CA-20: Proper riparian management that maintains existing riparian habitat and is consistent with best agricultural management practices should be encouraged. POLICY CA-21: Ensure that land uses adjacent to naturally occurring wetlands and other fish and wildlife habitat areas will not negatively impact the habitat areas. If a change in land use occurs, adequate buffers will be provided to the habitat areas. POLICY CA-22: Activities allowed in fish and wildlife habitat conservation areas and open space will be consistent with the species located there, including all applicable state and federal regulations and/or best management practices for the activity regarding that species. IV. SHORELINE MASTER PROGRAM The Douglas County Shoreline Master Program classifies this reach of the Columbia River shoreline as Rural Conservancy. The purpose of the rural conservancy environment is to protect ecological functions, conserve existing natural resources and valuable historic and cultural areas in order to provide for sustained resource use, achieve natural flood plain processes, and provide recreational opportunities. A listing of the applicable policies and regulations are found in the analysis section of this staff report. WASHINGTON ADMINISTRATIVE CODE (WAC) WAC provides updated rules for administering the Shoreline Management Act (RCW 90.58) and the local master program. WAC , establishes minimum review criteria for substantial development permits. This criteria states that a substantial development permit shall be granted only when the proposed development is consistent with: Page 2

3 };> The policies and procedures of the Act; };> The provisions of this regulations; and };> The applicable master program adopted or approved for the area. V. ENVIRONMENTAL REVIEW Douglas County issued a Determination of Non-significance on December 30, 2013 in accordance with WAC (Optional DNS). VI. AGENCY AND PUBLIC COMMENTS: Applicable agencies have been given the opportunity to review this proposal. The following agencies have been sent copies of the proposal and have commented as indicated below: Agency Notified Response Received Agency Notified Response Received WA Department of Ecology N/R WA Dept of Fish &Wildlife N/R Chelan County PUD 8/13/13 Army Corps of Engineers N/R Colville Tribes 8/19/13 Yakama Tribes N/R WA Dept of Arch & Hist Pres * N/R = No Reply NIR Agency comments have been included as Attachment A. No public comments were received at the writing of this staff report. Confederated Tribes of the Colville Reservation During the comment period the Colville Tribes recommended that the cultural resources survey be performed due to the proximity prehistoric, ethnographic, historic and traditional sites of value to the Colville Tribes. The applicant submitted a cultural resources assessment from Cultural Resource Consultants Inc. dated November 25, This report did not identify any archaeological or historic features could be affected by the project. Additionally the report provided recommendations for actions should resources be inadvertently discovered. This report was forwarded to WA DAHP, The Colville Tribes and the Yakama Nation on December 10, 2013 with a request for comment. As of the writing of this staff report no comment has been received. VII. PROJECT ANALYSIS Upon review of the application materials, site plans, public and agency comments, the Douglas County Countywide Comprehensive Plan, and applicable codes and Page 3

4 requirements, planning staff offers the following analysis and recommendations for the subject application: Com prehensive plan consistency: Residential development and recreational opportunities in shoreline areas of the Rural Resource 5 land use designation can be considered when potential adverse impacts to water quality, slope stability, vegetation, wildlife and aquatic life have been sufficiently addressed. Critical area policies place preference on the protection of and preservation of wetlands over the alteration and mitigation of impacts to wetlands. The proposal is consistent with the goals and policies of the Douglas County Countywide Comprehensive Plan. Consistency with the Douglas County Shoreline Master Program Mooring Buoys and shoreline access trails are a permitted use in the Rural Conservancy shoreline designation. 4.1 ECOLOGICAL PROTECTION AND CRITICAL AREAS POLICY 1: Shoreline use and development should occur in a manner that assures no net loss of existing ecological functions and processes and protects critical areas. Uses should be designed and conducted to avoid, minimize, or to fully mitigate in so far as practical, any damage to the ecology and environment. The project cannot avoid damage to the aquatic environment. However, the project has been designed to minimize damage and to fully mitigate pursuant to adopted mitigation ratios. REGULATION 1: Mitigation sequencing - applicants shall demonstrate all reasonable efforts have been taken to mitigate potential adverse impacts in the following prioritized order: a. Avoiding the impact altogether by not taking a certain action or parts of an action; The project is located in the aquatic environment and therefore cannot avoid impacts. b. Minimizing impacts by limiting the degree or magnitude of the action and its implementation, by using appropriate technology, or by taking affirmative steps, such as project redesign, relocation, or timing, to avoid or reduce impacts; This application proposes a cutback that will blend in with existing shoreline character and provide a safer access to the shoreline. The cutback will provide a stablelvegetated slope which will resist erosion resulting from people traversing the slope to access the waterline. Page 4

5 c. Rectifying the impact by repairing, rehabilitating, or restoring the affected environment to the conditions existing at the time of the initiation of the project; The project is for a new structure to be placed in the aquatic environment, therefore rectifying the impact is not possible.!t. Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action; The project is for a new structure to be placed in the aquatic environment, therefore reducing or eliminating the impact over time via this permit is not possible. The possibility does exist that a future buoy design would reduce impacts however implementation ofthat new design would require a future permit and analysis. e. Compensating for the impact by replacing, enhancing, or providing substitute resources or environments; and The project is proposing mitigation per the adopted mitigation ratios that will compensate for the impact. Suggested conditions of approval require installation ofmitigation per the approved plan. f. Monitoring the impact and the compensation projects and taking appropriate corrective measures. Suggested conditions of approval require that the mitigation measures be monitored for 5 years after installation to determine survivability and corrective measures be taken if survivability is not achieved. 4.2 WATER QUALITY REGULATION 3: Best management practices (BMP's) for control or erosion and sedimentation shall be implemented for all development in shoreline through an approved temporary erosion and sediment control plan, identified in the Stormwater Management Manual for Eastern Washington, as amended. Suggested conditions of approval require that a temporary erosion and sediment control plan be submitted and approved prior to approval ofthe performance surety. PageS

6 4.3 VEGETATION CONSERVATION REGULATION 2: Where impacts to buffers are permitted under Section 4.1, Ecological Protection and Critical Areas, new developments shall be required to develop and implement a management and mitigation plan. When required, management and mitigation plans shall be prepared by a qualified biologist and shall be consistent with the requirements of Appendix H. Management and mitigation plans shall describe actions that will ensure no net loss of ecological functions. Vegetation shall be maintained over the life of the use and/or development by means of a conservation easement or similar legal instrument recorded with the County Auditor. A fish and wildlife management and mitigation plan prepared by Grette & Associates was submitted in the application materials. REGULATION 4: Native vegetation clearing shall be limited to the minimum necessary to accommodate approved shoreline development. The shoreline access is proposed to be located in an area that minimizes impacts to native vegetation. The amount of grading is the minimum necessary to facilitate safe access to the shoreline. 4.7 Restoration POLlCY 2: Mitigation associated with shoreline development projects shall be designed to achieve no net loss of ecological function. A fish and wildlife management and mitigation plan prepared by Grette & Associates was submitted in the application materials. The plan identifies that the project will result in no net loss of ecological function. 4.4 Archaeological and historical resources REGULATION 1: If archaeological resources are uncovered during excavation, developers and property owners shall immediately stop work and notify the local government, the Washington State Department of Archaeology and Historic Preservation and affected Indian Tribes. The cultural resources assessment submitted for the project provides recommended protocols should cultural resources be inadvertently discovered during the project development. These protocols are included in the suggested conditions of approval. REGULATION 2: An archaeological resource site inspection and/or evaluation is required by a professional archaeologist in coordination with affected Indian tribes where known archaeological resources are present. Properties near a site known to contain a historic, cultural or archaeological resource(s) shall require a cultural resource site assessment. During the comment period the Colville Tribes recommended that the cultural resources survey be performed due to the proximity prehistoric, ethnographic, historic and traditional sites of value to the Colville Tribes. The applicant submitted a cultural resources assessment from Cultural Resource Consultants Inc. dated November 25, This report did not identify any archaeological or historic features could be affected by the project. Page 6

7 5.8 Filling, grading and excavation REGULATION 1: Filling, grading, and excavation shall be minimized to the maximum extent practicable and only authorized along with approved shoreline use and development activities that are consistent with this Program. The applicants' agent has provided responses to the filling, grading and excavation section of the SMP. These responses are included in the application materials. The amount ofgrading is the minimum necessary to facilitate safe access to the shoreline. REGULATION 4: Filling, grading or excavation shall not be located where shoreline stabilization will be necessary to protect materials placed or removed. Disturbed areas shall be immediately stabilized and revegetated, as applicable. The applicants' agent has provided responses to the filling, grading and excavation section ofthe SMP. The grading activity will not result in the need for protective materials to be placed. The fish and wildlife habitat management and mitigation plan identifies that the grading area will be revegitated with native species. REGULATION 5: Filling, grading, beach nourishment and excavation shall be designed to blend physically and visually with existing topography whenever possible, so as not to interfere with long-term appropriate use including lawfull access and enjoyment of scenery. The applicants' agent has provided responses to the filling, grading and excavation section of the SMP. REGULATION 6: Cut and fill slopes shall generally be no steeper than one foot vertical for every three feet horizontal unless a specific engineering analysis has been provided certifying that the proposed slope is stable, and the Administrator determines that the fill blends physically and visually with existing topography. The applicants' agent has provided responses to the filling, grading and excavation section of the SMP. REGULATION 7: A temporary erosion and sediment control (TESC) plan, consistent with the standards found in the Stormwater Manual for Eastern Washington, shall be provided for all proposed filling, grading and excavation activities. Consistent with the application materials; suggested conditions of approval require that a temporary erosion and sediment control plan be submitted with the mitigation installation quotes and approved prior to approval ofthe performance surety. st. Jean Page 7

8 5.10 Moorage: docks, piers, watercraft lifts, mooring buoys, floats POLICY 4: Moorage should be spaced and oriented in a manner that minimizes hazards and obstructions to navigation and other water-oriented activities such as fishing, swimming and pleasure boating, as well as property rights of adjacent land owners. The project proposes to locate the mooring buoy approximate to the extended centerline ofthe property. The buoy will not pose a hazard to navigation. REGULATION 7: Moorage facilities shall be the minimum size necessary to meet the needs of the proposed water-dependent use and shall observe the following criteria: a. If allowed, only one private dock with one accessory float, and two watercraft lifts (the combination of one boat and one jet ski or other watercraft together) shall be permitted on a shoreline lot owned for residential or private recreational use. The proposed project is for a mooring buoy. b. Moorage shall be designed to avoid the need for maintenance dredging. The moorage of a boat larger than provided for in the original moorage design shall not be grounds for approval of dredging. The location does not indicate the need for maintenance dredging. REGULATION 12: Mooring buoys shall be placed at a distance specified by state and federal agencies to avoid near shore habitat and to minimize obstruction to navigation. Anchors and other design features shall meet Washington Department of Fish and Wildlife and/or Department of Natural Resources standards. Application materials indicate that the buoy will be placed consistent with State requirements. State permits are required prior to installation ofthe buoy. REGULATION 16: Moorage facilities shall be constructed and maintained so that no part of a facility creates hazardous conditions nor damages other shore property or natural features during predictable flood conditions. Floats shall be securely anchored. The buoy is designed and secured so that it will not damage shoreline property or natural features. REGULATION 21: All moorage facilities must permanently mark all of the components with name, address, telephone number and date of installation. Suggested conditions of approval requires that the buoy be permanently marked for identification. REGULATION 23: Moorage facilities shall avoid locations that will adversely impact shoreline ecological functions or processes. The buoy is proposed to be located in the most appropriate shoreline location on the subject property. Page 8

9 Appendix H, Chapter 3: Critical Areas - Fish and Wildlife Habitat Conservation Areas' An Aquatic Habitat Buffer Assessment of the subject property was performed for the project The assessment identified that the property met the criteria in the SMP for a 100 foot buffer., '.Mt '~<\The'''nstallation of a mooring buoy, cutting back of the bank, and installation of the access trail will impact the aquatic and riparian environment. A fish and wildlife habitat management and mitigation plan has determined that a total of 3,937 square feet of habitat will be disturbed by the installation of the buoy, shoreline cutback, and access trail, The plan proposes 3,937 square feet of riparian vegetation plantings to meet the mitigation requirement for disturbance of habitat. A planting plan is proposed on page 7 of 7 of the diagrams in the Fish & Wildlife Habitat Management and Mitigation Plan. As conditioned, the proposal is consistent with this section. Consistency with WAC and RCW 90.58: As conditioned below, the project appears consistent with the requirements and criteria of the Shoreline Management and Enforcement Procedures, and the Shoreline Management Act VIII. RECOMMENDATION As conditioned below, this application does not appear to be detrimental to the general public health, safety or welfare and meets the basic intent and criteria associated with Title 18 and 19 of the Douglas County Code, the Douglas County Countywide Comprehensive Plan, and the Douglas County Shoreline Master Program. Staff recommends approval of SP#13-1 0, subject to the following findings of fact and conditions: Suggested Findings of Fact 1. The applicant is Mike, th St SE, Snohomish WA General Description: An application for a shoreline substantial development permit for the installation of a mooring buoy and shoreline cutback for trail access. 3. The subject property is described as Lot 1 of the Braeburn Short Plat and is further described as being located within the NE Quarter of Section 12, Township 26N., Range 21 E., W.M., Douglas County, Washington. 4. The Comprehensive Plan Designation is Rural Resource 5 Acres. 5. The subject property is located in the RR-5 zoning district. 6. The Columbia River Shoreline section of the subject property is designated as "Rural Conservancy" by the Douglas County Shoreline Master Program. 7. WAC establishes minimum review criteria for Shoreline Management Substantial Development Permits. This criteria states that a substantial development permit shall be granted only when the development proposed is consistent with the policies and procedures of the Act; the provisions of this regulation; and the applicable master program adopted or approved for the area. 8. An Aquatic Habitat Buffer Assessment dated May 29, 2013 was performed by Grette & Associates for the subject proeprty. The assessment determined that the property met the criteria in the shoreline master program for a 100 foot buffer. Page 9

10 9. A fish and wildlife habitat management and mitigation plan dated May 2013 was performed for the project by Grette & Associates. 10. A fish and wildlife habitat management and mitigation plan determined that a total of 3,937 square feet of aquatic and riparian habitat will be disturbed by installation of the buoy, shoreline cutback and access trail. The plan proposes 3,937 square feet of riparian vegetation plantings to meet the mitigation requirement for disturbance of habitat. A planting plan is proposed on page 7 of 7 of the diagrams in the Fish & Wildlife Habitat Management and Mitigation Plan. 11. The mitigation proposed in the Fish and Wildlife Management and Mitigation Plan meets the requirements of the Douglas County Regional Shoreline Master Program. 12. During the comment period the Colville Tribes recommended that the cultural resources survey be performed due to the proximity prehistoric, ethnographic, historic and traditional sites of value to the Colville Tribes. The applicant submitted a cultural resources assessment from Cultural Resource ConSUltants Inc. dated November 25, This report did not identify any archaeological or historic features could be affected by the project. Additionally the report provided recommendations for actions should resources be inadvertently discovered. 13. Comments from reviewing agencies have been considered and addressed where appropriate. 14. Douglas County issued a Determination of Non-significance on December 30,2013 in accordance with WAC (Optional DNS). 15. Surrounding property owners were given the opportunity to comment on the proposals, can request a copy of the decision, and can appeal the decision subject to the requirements outlined in DCC Title Proper legal requirements were met and surrounding property owners were given the opportunity to comment on the proposal at a public hearing. 17. WAC requires that construction must be commenced within 2 years of the effective date of the shoreline permit and that authorization for construction shall terminate 5 years after the effective date of the shoreline permit. 18. As conditioned, the development will not adversely affect the general public, health, safety and general welfare. Suggested Conclusions: 1. As conditioned, the development meets the goals, policies and implementation recommendations as set forth in the Douglas County Countywide Comprehensive Plan and the Douglas County Shoreline Master Program. 2. As conditioned, this proposal is consistent with applicable federal and state laws and regulations. 3. As proposed, revised, and conditioned, potential impacts of the project can be mitigated. 4. Public interests will be served by approval of this proposal. 5. As conditioned, the proposal is consistent with Title 18 "Zoning" and Title 19 "Environment" of the Douglas County Code. Suggested Conditions of Approval 1. The project shall proceed in substantial conformance with the plans and application materials of file submitted on July 15, 2013 and November 26, 2013 except as amended by the conditions herein. Page 10

11 2. The applicant shall comply with all applicable local, state and federal regulations. 3. A copy of this permit and attached conditions shall be kept on-site and provided to the contractor and all others working within the shoreline area at all times. The applicant, contractor, machinery operators and all others working within the shoreline area shall have read this permit and attached conditions and shall follow its conditions at all times. 4. A temporary erosion and sediment control plan shall be submitted with the mitigation installation quotes and shall be approved prior to approval of the performance surety. 5. In the event that human remains. Burials, funerary items, sacred objects or objects of cultural patrimony are found during project implementation, the proponent or his authorized agent shall adhere to all of the requirements of RCW They shall immediately cease any activity which may cause further disturbance and then take steps to protect the find from further damage or disruption. They shall then contact the county coroner, who will contact the WA Dept. of Archaeology and Historic Preservation and the Historic Preservation Officer for the Confederated Tribes of the Colville Reservation, No further work shall be allowed on the project until there is an approved plan for managing or preserving the remains or items. 6. In the event that prehistoric artifacts (i.e. arrowheads, spear points, mortars, pestles, other ground stone tools, knives, scrapers, or flakes from the manufacture of tools, fire pits, peeled trees, etc.) or historic period artifacts or features (i.e. fragments of old plates or ceramic vessels, weathered glass, dumps of old cans, cabins, root cellars etc.) are found during project implementation, the proponent or his authorized agent shall cease work immediately within 200 feet of the find. They shall contact the WA Dept of Archaeology and Historic Preservation and the Historic Preservation Officer for the Confederated Tribes of the Colville Reservation. No further work shall be allowed on the project until there is an approved plan for managing or preserving the artifacts or features. 7. The buoy shall be permanently marked with name, address, telephone number and date of installation. Documentation shall be provided with the performance surety documentation. 8. The project application shall proceed consistent with the Fish & Wildlife Habitat Management and Mitigation Plan prepared by Grette &Associates, dated May Where necessary, a permanent means of irrigation shall be installed for the mitigation plantings that are designed by a landscape architect or equivalent professional. Said design shall meet the specific needs of riparian and shrub steppe vegetation. 10. Mitigation planting as shown on the mitigation planting plan sheet 7 of 7, dated 10/17/12 shall be planted upon completion of the work. 11. A performance surety agreement in conformance with Title 14, D.C.C. shall be entered into between the property owner and Douglas County Transportation and Land Services prior to commencing work. Douglas County must approve quotes for the cost of installation, delivery, plant material, soil amendments, irrigation, seed mix and necessary monitoring visits and reports by the biologist of record and Washington State sales tax. 12. The mitigation site shall be maintained to ensure the management and mitigation plan objectives are successful. Maintenance shall ensure 80% survival during the 5 year monitoring period and shall include corrective actions to rectify problems, include rigorous, as-needed elimination of undesirable plants; protection of shrubs and small trees from competition by grasses and herbaceous plants, and repair and replacement of any dead plants. Page 11

12 13. A five year monitoring period shall commence upon placement of the planting materials and irrigation system. A performance surety agreement in conformance with Title 14 of Douglas County Code shall be entered into between the property owner and Douglas County Transportation and Land Services. Douglas County must approve quotes for the cost of installation, delivery, plant material, soil amendments, permanent irrigation, seed mix, and 3 monitoring visits and reports by a qualified biologist, and the quotes shall include Washington State sales tax. 14. Onsite monitoring and monitoring reports shall be submitted to Douglas County Transportation and Land Services 1 year after mitigation installation; 3 years after mitigation installation; and 5 years after mitigation installation. Monitoring reports shall be submitted by a qualified biologist, as defined by Douglas County Code. The biologist must verify that the conditions of approval and provisions in the fish & wildlife habitat management and mitigation plan submitted by Grette & Associates, dated May 2013 have been satisfied. 15. Sequential release of funds associated with the surety agreement shall be reviewed for conformance with the conditions of approval and the management and mitigation plan. Release of funds may occur in increments of 1/3 for substantial conformance with the plan and conditions of approval. If the standards that are not met are only minimally out of compliance and contingency actions are actively being pursued by the property owner to bring the project into compliance, the County may choose to consider a partial release of the scheduled increment. Non-compliance can result in one or more of the following actions: carry over of the surety amount to the next review period; use of funds to remedy the nonconformance; scheduling a hearing with the Douglas County Hearing Examiner to review conformance with the conditions of approval and to determine what actions may be appropriate. 16. Where a condition imposed herein may be found inconsistent with the requirements of the Washington State Department of Fish and Wildlife, HPA Permit, or permitting issued by the United States Army Corps of Engineers, the Douglas County Land Services Director shall have discretion to allow for project redesign consistent with the approvals granted by said agencies; if the redesign can be found consistent with the Douglas County Code, the Shoreline Master Program, and the Shoreline Management Act. 17. Construction of the project for which this permit has been granted must be commenced within two (2) years of the effective date of this permit. Authorization to conduct development activities granted by the permit shall terminate five (5) years from the filing date of the permit. Attachments Page 12

13 ATTACHMENT A

14 The Confederated Tribes ofthe Colville Reservation History/Archaeology Program (509) P.O. Box 150, Nespelem, WA FAX: (509) August 2013 AUG CUltis Lillquist Doug/esc ountytls HA# Douglas County Transportation & Land Services th S1. N.W., Suite A East Wenatchee, WA U\ RE: Doug Co. T & L - Permit App# SP~ : Lot 1 Braebum Short Plat Dear Curtis Lillquist, The Confederated Tribes of the Colville Reservation (also known as the Colville Confederated Tribes or CCT) received a package from you dated 22 July 20 I 3 containing a copy of the Mike Application# SP for review and comment This package indicated all comments be directed to you. The CCT appreciates the opportunity to comment, and recommends the area be surveyed for cultural resoul'ces because information on Native American use in the project vicinity shows that prehistoric, ethnographic, historic, and traditional sites of value to the CCT are in proximity to the project area. Additionally, our records and a review of those on file with the Washington State Department of Archaeology and Historic Preservation indicate that this area has not been previously surveyed for cultural resources. The proposed undertaking lies within the traditional territory ofthe Chelan tribe, one ofthe twelve tribes that make up CCT, which is governed by the Colville Business Council (CBC). The CBC has delegated to the Tribal Historic Preservation Officer (THPO) the responsibility of representing the CCT with regard to cultural resources management issues throughout the traditional territories ofall of the constituent tribes under Resolution This area includes parts of eastern Washington, northeastern Oregon, and the Palus (Palouse) territory in Idaho. In addition, the THPO has assumed the responsibilities of a state historic preservation office within the exterior boundaries ofthe Colville Reservation and associated parcels of trust land that lay outside the current reservation boundaries, as outlined in Section 101 (d) (2) ofthe National Historic Preservation Act (NHPA). If you have any questions or concerns, please contact Aaron Naumann at (509) or aaronnaumann@colvilletribes.com. If you wish to speak with the THPO, then please call (509) Guy Moura Tribal Historic Preservation Officer Page I of2

15 Curtis Lillquist (x6588) From: Graves, Lisa Sent: Tuesday, August 13, :09 PM To: Curtis Lillquist (x6588) Cc: Dunning, Tracy Subject: Comment on buoy and trail SP Mr. Lillquist, The District has reviewed the above referenced application and finds it acceptable as there will be minimal impact to the District's Rocky Reach Hydro operations. The District does request that Douglas County condition final approval on the applicants receiving a District license for the buoy. Thank you for this opportunity to review. UsIA Lisa Graves I Real Estate Specialist I PLiD #1 of Chelan County (509) llisa.graves@chelanpud.org 1

I. GENERAL INFORMATION

I. GENERAL INFORMATION STAFF REPORT BARROS VIOLATION RESOLUTION TO: Douglas County Hearing Examiner FROM: Douglas County Land Services Staff RE:, SP-16-05 DATE: November 7,2016 I. GENERAL INFORMATION Requested Action: An application

More information

PLANNING COMMISSION STAFF REPORT. Utah Crew Rowing Dock Conditional Use 830 S. Delong Street September 8, 2010 Petition #PLNPCM

PLANNING COMMISSION STAFF REPORT. Utah Crew Rowing Dock Conditional Use 830 S. Delong Street September 8, 2010 Petition #PLNPCM PLANNING COMMISSION STAFF REPORT Utah Crew Rowing Dock Conditional Use 830 S. Delong Street September 8, 2010 Petition #PLNPCM2010-00449 Planning Division Department of Community and Economic Development

More information

Final Draft Shoreline Master Program

Final Draft Shoreline Master Program Planning Commission Review Draft: BOCC Review: Adopted: Approved: Effective: //0 /0/0 /0/0 0//0 //0 February 0 PREPARED FOR: FRANKLIN COUNTY Shoreline Master Program Update Prepared by: 0 W. Grandridge

More information

Joint Public Notice. LOCATION: In Salmon Bay, Lake Washington Ship Canal, at Seattle, Washington.

Joint Public Notice. LOCATION: In Salmon Bay, Lake Washington Ship Canal, at Seattle, Washington. US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

CHAPTER 9.05 CRITICAL AREAS

CHAPTER 9.05 CRITICAL AREAS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 CHAPTER 9.05 CRITICAL AREAS Section 9.05 General Provisions Section 9.05A

More information

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS I. POLICY STATEMENT Auburn University's (the University's) "Policy for Natural Resource Management Areas" implements the Campus Master Plan Land Use Element

More information

Trails Permitting Process

Trails Permitting Process Appendix H: Trail Permitting Process A PPENDIX H: T RAIL P ERMITTING P ROCESS Trails Permitting Process The permitting process is a critical component in the successful development of a trail network.

More information

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303)

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303) PUBLIC NOTICE US Army Corps of Engineers Omaha District Application No: NWO-2017-01366-DEN Project: Douglas Lane Tributary Stabilization Project Applicant: Town of Castle Rock Waterway: Douglas Lane Tributary

More information

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS CHAPTER 19.66 SURFACE MINING AND RECLAMATION PLAN REGULATIONS Section: 19.66.010 PURPOSE AND INTENT 19.66.020 INCORPORATION OF SMARA AND STATE REGULATIONS 19.66.030 APPLICABILITY 19.66.040 EXEMPTIONS 19.66.050

More information

CITY OF LONGVIEW SHORELINE MASTER PROGRAM

CITY OF LONGVIEW SHORELINE MASTER PROGRAM CITY OF LONGVIEW SHORELINE MASTER PROGRAM - 2015 1 City of Longview Shoreline Master Program Table of Contents CITY OF LONGVIEW SHORELINE MASTER PROGRAM... 2 I. INTRODUCTION... 4 II. SHORELINE MASTER PROGRAM

More information

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS Section 1 Intent. 49 Section 2 Floodplain Requirements 49 Section 3 Water-Oriented Accessory Structures 50 Section 4 Stairways,

More information

SUBJECT: WASHINGTON DEPARTMENT OF FISH AND WILDLIFE COMMENTS ON THE CITY OF MOSES LAKE DRAFT SHORELINE MASTER PROGRAM

SUBJECT: WASHINGTON DEPARTMENT OF FISH AND WILDLIFE COMMENTS ON THE CITY OF MOSES LAKE DRAFT SHORELINE MASTER PROGRAM State of Washington Department of Fish and Wildlife Mailing Address: 1550 Alder St. NW, Ephrata, WA 98823 Main Office Location: Natural Resources Building, 1111 Washington St. SE Olympia WA July 9, 2014

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection DOCUMENT NUMBER: 363-0300-001 TITLE: Design Criteria - Wetlands Replacement/Monitoring EFFECTIVE DATE: February 11, 1997 AUTHORITY:

More information

Notice No Closing Date: May 12, 2017

Notice No Closing Date: May 12, 2017 Public Notice U.S. Army Corps of Engineers Pittsburgh District In Reply Refer to Notice No. below US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Application

More information

15A NCAC 07H.0209 COASTAL SHORELINES (a) Description. The Coastal Shorelines category includes estuarine shorelines and public trust shorelines.

15A NCAC 07H.0209 COASTAL SHORELINES (a) Description. The Coastal Shorelines category includes estuarine shorelines and public trust shorelines. 15A NCAC 07H.0209 COASTAL SHORELINES (a) Description. The Coastal Shorelines category includes estuarine shorelines and public trust shorelines. Estuarine shorelines AEC are those non-ocean shorelines

More information

Chapter 10 Natural Environment

Chapter 10 Natural Environment Chapter 10 Natural Environment Existing Conditions The Natural Environment Element addresses the protection, conservation, preservation, and restoration of the natural resources the Bayview Ridge Subarea,

More information

Fence and Wall Requirements

Fence and Wall Requirements Fence and Wall Requirements Definitions Decorative wall - A wall constructed of stone or other material erected for the sole purpose of providing a decorative and/or landscaped feature, and not to include

More information

Addition to Section 4 - Special Use Regulations

Addition to Section 4 - Special Use Regulations Large-Scale Ground-Mounted Solar Photovoltaic Installations Addition to Section 4 - Special Use Regulations 4.4 Large Scale Ground-Mounted Solar Photovoltaic Installations 4.4.1 Purpose The purpose of

More information

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 17, 2014 Comment Deadline: July 17, 2014 Corps Action ID#: SAW-2009-00655 NC DOT TIP: R-4903 The Wilmington District, Corps

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

Chapter 4 Policies and Regulations for Shoreline Modifications

Chapter 4 Policies and Regulations for Shoreline Modifications Chapter 4 Policies and Regulations for Shoreline Modifications 4.1 Beach Access Structures 4.1.0 Applicability Beach Access Structures, as defined in Chapter 11, shall be consistent with the following

More information

JOINT PUBLIC NOTICE May 14, 2018

JOINT PUBLIC NOTICE May 14, 2018 JOINT PUBLIC NOTICE May 14, 2018 United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Water Permits Division 7400 Leake Avenue

More information

(For individual lake and stream classifications in Cook County, refer to Appendix II)

(For individual lake and stream classifications in Cook County, refer to Appendix II) Article 7 Sec. 7.01 Shoreland Management Regulations Policy The uncontrolled use of shorelands of Cook County, Minnesota affects the public health, safety and general welfare not only by contributing to

More information

CITY OF AIRWAY HEIGHTS SPOKANE COUNTY, WASHINGTON ORDINANCE C-664

CITY OF AIRWAY HEIGHTS SPOKANE COUNTY, WASHINGTON ORDINANCE C-664 CITY OF AIRWAY HEIGHTS SPOKANE COUNTY, WASHINGTON ORDINANCE C-664 AN ORDINANCE OF THE CITY OF AIRWAY HEIGHTS, WASHINGTON ADOPTING TITLE 19 OF THE AIRWAY HEIGHTS MUNICIPAL CODE ENTITLED CRITICAL AREAS AND

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898 Public Notice of Application for Permit PUBLIC NOTICE DATE: July 5, 2017 EXPIRATION

More information

BEFORE THE SKAGIT COUNTY HEARING EXAMINER FINDINGS, CONCLUSIONS AND DECISION

BEFORE THE SKAGIT COUNTY HEARING EXAMINER FINDINGS, CONCLUSIONS AND DECISION BEFORE THE SKAGIT COUNTY HEARING EXAMINER FINDINGS, CONCLUSIONS AND DECISION Applicant: File Nos Requests: Location: Land Use Designations: Summary of Proposal: Public Hearing: Decision: Washington Department

More information

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF) Preface In 2008, the inter-agency Drainage Act & Section 28 Regulations Team (DART) was established by the Ministry of Natural Resources (MNR) and the Ministry of Agriculture, Food and Rural Affairs (OMAFRA)

More information

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES The County will: GOALS AND OBJECTIVES 1.1 Conserve, Enhance, Protect, Maintain and Manage Vegetative, Water, Fish and Wildlife Resources Promote

More information

Natural Resources KEY ISSUES SCENIC AREA ACT PROVISIONS CHAPTER 3. not adversely affect natural resources [Section 6(d)(3)].

Natural Resources KEY ISSUES SCENIC AREA ACT PROVISIONS CHAPTER 3. not adversely affect natural resources [Section 6(d)(3)]. CHAPTER 3 Natural Resources Climate, geology, soils, and other environmental factors combine to make the Gorge rich in natural resources. For this chapter, natural resources mean wetlands, streams, ponds

More information

Franklin County Communique to the Planning Board

Franklin County Communique to the Planning Board Franklin County Communique to the Planning Board PETITIONER(S): Name of Petitioner: Carolina Solar Energy II, LLC Address: 400 W. Main St. Suite 503 City/State/Zip: Durham, NC 27701 LOCATION: REQUEST FOR

More information

Public Notice Charlestown Road New Albany, Indiana 47150

Public Notice Charlestown Road New Albany, Indiana 47150 Public Notice Public Notice No. Date: Closing Date: LRL-2014-408-teh Dec 25 2017 Jan 24 2018 Please address all comments and inquiries to: U.S. Army Corps of Engineers, Louisville District ATTN: Todd Hagman,

More information

STATE OF WASHINGTON FINAL DECISIONS AND SECTION 401 WATER QUALITY CERTIFICATION CONDITIONS FOR THE CORPS OF ENGINEERS 2017 NATIONWIDE PERMIT PROGRAM

STATE OF WASHINGTON FINAL DECISIONS AND SECTION 401 WATER QUALITY CERTIFICATION CONDITIONS FOR THE CORPS OF ENGINEERS 2017 NATIONWIDE PERMIT PROGRAM STATE OF WASHINGTON FINAL DECISIONS AND SECTION 401 WATER QUALITY CERTIFICATION CONDITIONS FOR THE CORPS OF ENGINEERS 2017 NATIONWIDE PERMIT PROGRAM In addition to all the U.S. Army Corps of Engineers

More information

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

CATEGORY a protection of the natural environment, its ecosystems and biodiversity. 29. ENVIRONMENTAL DEVELOPMENT PERMIT AREA CATEGORY a protection of the natural environment, its ecosystems and biodiversity. The requirement to obtain an environmental development permit is cited in Section

More information

Cass County Soil Erosion & Sedimentation Control Program

Cass County Soil Erosion & Sedimentation Control Program Cass County Soil Erosion & Sedimentation Control Program Both residents and visitors of Cass County enjoy the beauty of over 250 lakes and ponds, along with numerous streams, creeks, and wetlands that

More information

Public Notice. Public Notice No. Date: Closing Date: US Army Corps LRL mad 6 Apr May 2018 of Engineers Louisville District

Public Notice. Public Notice No. Date: Closing Date: US Army Corps LRL mad 6 Apr May 2018 of Engineers Louisville District Public Notice Public Notice No. Date: Closing Date: US Army Corps LRL-2016-1083-mad 6 Apr 2018 7 May 2018 of Engineers Louisville District Please address all comments and inquiries to: U.S. Army Corps

More information

Nationwide Permit General Conditions

Nationwide Permit General Conditions Nationwide Permit General Conditions Note: To qualify for NWP authorization, the prospective permittee must comply with the following general conditions, as applicable, in addition to any regional or case-specific

More information

DEVELOPMENT CODE REVISIONS CHAPTER 6 1 CASE # RESO # SECTION/DESCRIPTION DATE , 6206, 6207, /09/03

DEVELOPMENT CODE REVISIONS CHAPTER 6 1 CASE # RESO # SECTION/DESCRIPTION DATE , 6206, 6207, /09/03 DEVELOPMENT CODE REVISIONS CHAPTER 6 1 CASE # RESO # SECTION/DESCRIPTION DATE 03-005 03-45 6102.01, 6206, 6207, 6402 06/09/03 03-061 03-71 Deleted berm regs (moved to Chapter 3) 9/8/03 04-077 07-44 Comprehensive

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 1949 Industrial Park Road, Room 140 Conway, South Carolina 29526 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District FAIRBANKS FIELD OFFICE Regulatory Division (1145) CEPOA-RD 2175 University Avenue, Suite 201E Fairbanks, Alaska 99709-4927 Public Notice of Application for Permit

More information

3.0 Planning and Submittal Requirements

3.0 Planning and Submittal Requirements October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)

More information

JOINT PUBLIC NOTICE. February 18, 2014

JOINT PUBLIC NOTICE. February 18, 2014 JOINT PUBLIC NOTICE February 18, 2014 United States Army State of Louisiana Corps of Engineers Department of Environmental Quality New Orleans District is required Attn: Water Quality Certification Regulatory

More information

Public Notice ISSUED: March 14, 2018 EXPIRES: April 13, 2018

Public Notice ISSUED: March 14, 2018 EXPIRES: April 13, 2018 APPLICANT: REFER TO: Wellington Management, Inc. 2004-04510-BBY Public Notice ISSUED: March 14, 2018 EXPIRES: April 13, 2018 SECTION:404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge fill material

More information

Definitions. Currently serviceable: Useable as is or with some maintenance, but not so Degraded as to essentially require reconstruction.

Definitions. Currently serviceable: Useable as is or with some maintenance, but not so Degraded as to essentially require reconstruction. Definitions Best management practices (BMPs): Policies, practices, procedures, or structures implemented to mitigate the adverse environmental effects on surface water quality resulting from development.

More information

Fish and Wildlife Habitat Conservation Areas

Fish and Wildlife Habitat Conservation Areas Thurston County planning Department BOARD OF COUNTY COMMISSIONERS PUBLIC HEARING DRAFT AMENDMENTS TO THE CRITICAL AREAS REGULATIONS Changes From Planning Commission Recommendation Chapter 24.25 6/4/2012

More information

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing Page 1 of 6 Background DECISION MEMO USDA Forest Service Madison Ranger District Madison County T12S, R4W, Section 30 The project is in the Gravelly Landscape, Snowcrest Recommended Wilderness Management

More information

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number: Public Notice Applicant: City of Dallas Project No.: SWF- 2014-00151 Date: April 18, 2014 The purpose of this public notice is to inform you of a proposal for work in which you might be interested. It

More information

CITY OF CHELAN SHORELINE MASTER PROGRAM

CITY OF CHELAN SHORELINE MASTER PROGRAM CHELAN COUNTY GRANT NO. G0800231 Revisions to Planning Commission Hearing Draft: Reformat and Text Reductions and Responses to Comments CITY OF CHELAN SHORELINE MASTER PROGRAM Prepared for: City of Chelan

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 J O I N T P U B L I C N O T I C E CHARLESTON AND SAVANNAH DISTRICTS- US ARMY

More information

ORDINANCE NO

ORDINANCE NO CITY OF NORTH BRANCH STATE OF MINNESOTA COUNTY OF CHISAGO ORDINANCE NO. 211-14 AN ORDINANCE AMENDING THE NORTH BRANCH ZONING ORDINANCE BY ADDING STANDARDS AND DEFINITIONS FOR SOLAR ENERGY SYSTEMS, SOLAR

More information

Shoreline Master Program

Shoreline Master Program Ocean Shores Shoreline Master Program Update Shoreline Master Program Environment Designations, Policies, & Regulations Prepared by: 2215 North 30 th Street, Suite 300 2200 Sixth Avenue, Suite 1100 Tacoma,

More information

BMPs TO CONSERVE WOODED AREAS AT THE SUBDIVISION LEVEL

BMPs TO CONSERVE WOODED AREAS AT THE SUBDIVISION LEVEL BMPs to Conserve Wooded Areas 31 BMPs TO CONSERVE WOODED AREAS AT THE SUBDIVISION LEVEL Audience This section is primarily directed toward: local units of government, landowners and developers, builders

More information

JOINT PUBLIC NOTICE. December 26, 2017

JOINT PUBLIC NOTICE. December 26, 2017 JOINT PUBLIC NOTICE December 26, 2017 United States Army State of Louisiana Corps of Engineers Department of Environmental Quality New Orleans District ATTN: Water Quality Certifications Regulatory Branch

More information

ARTICLE 5 RESIDENTIAL MANUFACTURED HOME DISTRICT. Description and Purpose CHARTER TOWNSHIP OF BRIGHTON ZONING ORDINANCE

ARTICLE 5 RESIDENTIAL MANUFACTURED HOME DISTRICT. Description and Purpose CHARTER TOWNSHIP OF BRIGHTON ZONING ORDINANCE ARTICLE RESIDENTIAL MANUFACTURED HOME DISTRICT This Article was reviewed and approved by the Michigan Department of Consumer and Industry Services, Corporation and Securities Bureau, Manufactured Home

More information

This page intentionally left blank

This page intentionally left blank Monterey County has elected to include an as part of the General Plan. Agriculture consisting of crop farming and livestock grazing is the largest industry in the County and contributes a significant amount

More information

CEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA

CEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA CEQA and its Role in Historic Preservation Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA General CEQA Requirements and Limitations Mitigation Measures

More information

dpd Seattle Permits CAM Environmentally Critical Areas: Wetlands and Fish & Wildlife Habitat Conservation Areas

dpd Seattle Permits CAM  Environmentally Critical Areas: Wetlands and Fish & Wildlife Habitat Conservation Areas dpd Department of Planning and Seattle Permits CAM Client Assistance Memo 326 part of a multi-departmental City of Seattle series on getting a permit Environmentally Critical Areas: Wetlands and Fish &

More information

Chapter 516 Shoreland Districts

Chapter 516 Shoreland Districts Chapter 516 Shoreland Districts 516.01 Statutory Authorization The State of Minnesota in Minnesota Statutes, Chapter 103F, has defined shoreland areas and described limitations on uses and locations of

More information

Deleted Text: Strikethrough Proposed Changes: Underlined Staff Comments: Italics Unaffected Omitted Text: ( )

Deleted Text: Strikethrough Proposed Changes: Underlined Staff Comments: Italics Unaffected Omitted Text: ( ) Thurston County Planning Department DRAFT IN PROGRESS AMENDMENTS TO THE CRITICAL AREAS REGULATIONS TCC 24.30 04/06/2011 Chapter 24.30 WETLANDS WETLANDS Sections: 24.30.005 Wetlands General purposes. 24.30.010

More information

SHORELINE STABILIZATION AND MARINE FACILITIES PUBLIC WORKSHOP. Town of Jupiter Community Center February 12, :30 PM

SHORELINE STABILIZATION AND MARINE FACILITIES PUBLIC WORKSHOP. Town of Jupiter Community Center February 12, :30 PM SHORELINE STABILIZATION AND MARINE FACILITIES PUBLIC WORKSHOP Town of Jupiter Community Center February 12, 2015 5:30 PM We are here to Discuss new options and flexibility with regard to marine facilities

More information

These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development.

These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development. PIER GUIDELINES 1 PIER CONSTRUCTION GUIDELINES These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development. 1. DEFINITIONS The following definitions

More information

CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION

CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION Effective Date: April 2, 2014 Reg. Meas. ID: 394568 SWRCB ID: SB13007GN Project: U.S. Army Corps of Engineers Reauthorization of Regional General

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, South Carolina 29403 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Ocean

More information

ENVIRONMENTAL RESOURCE PERMIT APPLICATION

ENVIRONMENTAL RESOURCE PERMIT APPLICATION ENVIRONMENTAL RESOURCE PERMIT APPLICATION SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT 2379 BROAD STREET, BROOKSVILLE, FL 34604-6899 (352) 796-7211 OR FLORIDA WATS 1 (800) 423-1476 SECTION E INFORMATION

More information

NOTICE DATE: May 04, Joint Public Notice U.S. Army Corps of Engineers and State of Arkansas

NOTICE DATE: May 04, Joint Public Notice U.S. Army Corps of Engineers and State of Arkansas US Army Corps of Engineers Memphis District FILE NUMBER: MVM-2017-400 (RDM) Public Notice NOTICE DATE: May 04, 2018 Attn: Postmaster, Please Post Until EXPIRATION DATE: June 04, 2018 Joint Public Notice

More information

SKAGIT COUNTY PLANNING AND DEVELOPMENT SERVICES FINDINGS OF FACT. APPLICATION NUMBER: Shoreline Substantial Development Application PL

SKAGIT COUNTY PLANNING AND DEVELOPMENT SERVICES FINDINGS OF FACT. APPLICATION NUMBER: Shoreline Substantial Development Application PL SKAGIT COUNTY PLANNING AND DEVELOPMENT SERVICES FINDINGS OF FACT HEARING AUTHORITY: Skagit County Hearing Examiner HEARING DATE: April 24, 2013 APPLICATION NUMBER: Shoreline Substantial Development Application

More information

Sections:

Sections: DIVISION 15: NATURAL RESOURCES REGULATIONS CHAPTER 9-1500 NATURAL RESOURCES REGULATIONS: INTENT AND ORGANIZATION 9-1500.1 Title and Intent. 9-1500.2 Organization. 9-1500.1 TFlZE AND INTENT. Division 15

More information

The Shoreline Management Act and Use of State-Owned Aquatic Lands

The Shoreline Management Act and Use of State-Owned Aquatic Lands This packet of materials helps to define the nexus between the Shoreline Management Act and the Washington State Department of Natural Resources (WDNRs) management of state-owned aquatic lands. This was

More information

Department of the Army Permit Application

Department of the Army Permit Application Department of the Army Permit Application DA File Number U.S. Army Corps of Engineers Honolulu District Date Received by CEPOH-RO Send Completed Application to: Honolulu District, U.S. Army Corps of Engineers

More information

Texas Commission on Environmental Quality 401 Water Quality Certification Conditions for Nationwide Permits Attachment 1

Texas Commission on Environmental Quality 401 Water Quality Certification Conditions for Nationwide Permits Attachment 1 Texas Commission on Environmental Quality 401 Water Quality Certification Conditions for Nationwide Permits Attachment 1 Below are the 401 water quality certification conditions the Texas Commission on

More information

DRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park

DRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park DRAFT FINDING OF NO SIGNIFICANT IMPACT for Tioga Sports Park The U.S. Fish and Wildlife Service (USFWS) prepared an Environmental Assessment (EA) to analyze the potential effects of the proposal by the

More information

JOINT PUBLIC NOTICE, 2014

JOINT PUBLIC NOTICE, 2014 DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT CORPS OF ENGINEERS REGULATORY FUNCTIONS BRANCH P.O. BOX 60267 NEW ORLEANS, LA 70160 JOINT PUBLIC NOTICE, 2014 STATE OF LOUISIANA DEPARTMENT OF ENVIRONMENTAL

More information

Chapter 13: Wildlife and Vegetation

Chapter 13: Wildlife and Vegetation Chapter 13: Wildlife and Vegetation Introduction and Setting Nevada County contains an extremely wide range of plants, animals and habitat types. With topographic elevations ranging from 300 feet in the

More information

JOINT PUBLIC NOTICE SAM PAH U. S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL

JOINT PUBLIC NOTICE SAM PAH U. S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 June 2, 2015 CESAM-RD-C PUBLIC NOTICE NO. SAM-2015-00573-PAH JOINT PUBLIC NOTICE SAM-2015-00573-PAH

More information

Ordinance No Lot Surface Drainage

Ordinance No Lot Surface Drainage Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

DECISION MEMO. USDA Forest Service. Butte District Silver Bow County T4N, R8W, Section 36

DECISION MEMO. USDA Forest Service. Butte District Silver Bow County T4N, R8W, Section 36 Page 1 of 5 Background DECISION MEMO USDA Forest Service Butte District Silver Bow County T4N, R8W, Section 36 Northwestern Energy operates utility systems and facilities on federal lands under a Master

More information

(a) The cultivation of a nonindigenous species unless that species has been previously cultivated in the waterbody;

(a) The cultivation of a nonindigenous species unless that species has been previously cultivated in the waterbody; Nationwide Permit 48 - Commercial Shellfish Aquaculture Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 48 - Commercial Shellfish

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 1949 INDUSTRIAL PARK ROAD, ROOM 140 CONWAY, SOUTH CAROLINA 29526 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Water

More information

DECISION MEMO. East Fork Blacktail Trail Reroute

DECISION MEMO. East Fork Blacktail Trail Reroute Page 1 of 6 DECISION MEMO USDA Forest Service Madison Ranger District Madison County Background The East Fork Blacktail Trail #6069 is a mainline trail in the Snowcrest Mountains. The Two Meadows Trail

More information

STREAM AND BUFFER AREA PROTECTION/RESTORATION

STREAM AND BUFFER AREA PROTECTION/RESTORATION STREAM AND BUFFER AREA PROTECTION/RESTORATION AMENDMENT OPTIONS TO STRENGTHEN POLICY IN HEADWATERS AREAS DRAFT SUBSEQUENT TO THE JANUARY 25, 2007 MEETING OF THE PLANNING COMMISSION ENVIRONMENT COMMITTEE

More information

Planning & Development Services

Planning & Development Services Planning & Development Services 1 8 0 0 C o n t i n e n t a l P l a c e M o u n t V e r n o n, W a s h i n g t o n 9 8 2 7 3 o f f i c e 3 6 0-4 1 6-1 3 2 0 p d s @ c o. s k a g i t. w a. u s w w w. s

More information

PENDER HARBOUR DOCK MANAGEMENT PLAN

PENDER HARBOUR DOCK MANAGEMENT PLAN PENDER HARBOUR DOCK MANAGEMENT PLAN 1.0 INTENT OF DOCK MANAGEMENT PLAN The Pender Harbour Dock Management Plan (the DMP) is an instrument of policy that provides guidance in relation to docks authorized

More information

3-13 Other Required Findings and Regulatory Compliance

3-13 Other Required Findings and Regulatory Compliance Affected Environment and Environmental Consequences 3-13 Other Required Findings and Regulatory Compliance 3-13.1 Short-term Uses and Long-term Productivity NEPA requires consideration of the relationship

More information

Wetland Permit Application

Wetland Permit Application DAVID J. KLOTZLE WETLAND INSPECTOR, PHILIPSTOWN, NY 238 Main Street Cold Spring, NY 10516 (914) 736-7132 Wetland Permit Application MEMO TO APPLICANT 1. Use this form to apply for a Wetlands Permit as

More information

PUBLIC NOTICE US Army Corps of Engineers, Honolulu District

PUBLIC NOTICE US Army Corps of Engineers, Honolulu District PUBLIC NOTICE US Army Corps of Engineers, Honolulu District Regulatory Office (CEPOH-RO) Public Notice Date: March 16, 218 Building 23 Expiration Date: March 3, 218 Fort Shafter, Hawaii 9688-44 Permit

More information

Critical Areas Ordinance

Critical Areas Ordinance Public Review Draft // Public Review Draft // Kitsap County Code Title Critical Areas Ordinance Underline / Strike out Version.00 Fish and Wildlife Habitat Conservation Areas 0 Public Review Draft // Chapter.00

More information

EROSION, SEDIMENTATION, ETC

EROSION, SEDIMENTATION, ETC EROSION, SEDIMENTATION, ETC. 19-61 ARTICLE V. WATER QUALITY REVIEW IN SPECIAL PROTECTION AREAS. Sec. 19-60. Findings and purpose. (a) The County Council finds that streams, rivers, wetlands, and other

More information

PRESENTERS. Contact Information: RW Armstrong Union Station, 300 S. Meridian St. Indianapolis, IN

PRESENTERS. Contact Information: RW Armstrong Union Station, 300 S. Meridian St. Indianapolis, IN 1 PRESENTERS David Bourff, Director of Environmental Planning Simon Davies, LEED AP, Environmental Scientist Summer O Brien, PWS, Senior Environmental Scientist Contact Information: RW Armstrong Union

More information

PUBLIC NOTICE. Dredging with ten-years maintenance, return flow to the waterway and upland placement. Georgica Cove, tributary of Georgica Pond

PUBLIC NOTICE. Dredging with ten-years maintenance, return flow to the waterway and upland placement. Georgica Cove, tributary of Georgica Pond PUBLIC NOTICE US Army Corps of Engineers New York District Jacob K. Javits Federal Building New York, N.Y. 10278-0090 ATIN: Regulatory Branch In replying refer to: Public Notice Number: NAN-2016-01054-EHA

More information

Public Notice ISSUED: August 11, 2015 EXPIRES: September 10, 2015

Public Notice ISSUED: August 11, 2015 EXPIRES: September 10, 2015 APPLICANT: John Deer Horicon Works Public Notice ISSUED: August 11, 2015 EXPIRES: September 10, 2015 REFER TO: MVP-2015-02020-JVD SECTION: 404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge fill

More information

TOWN OF HARRISON SHORELAND ZONING ORDINANCE $3.00. Adopted June 30, 1992

TOWN OF HARRISON SHORELAND ZONING ORDINANCE $3.00. Adopted June 30, 1992 TOWN OF HARRISON SHORELAND ZONING ORDINANCE $3.00 Adopted June 30, 1992 Amended June 19, 1993 Amended June 12, 1996 Amended June 9, 1999 Amended June 13, 2002 Amended September 21, 2004 Amended June 15,

More information

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY In the Matter of the Application of ) Project No. 2011103481 ) SSDP-11-111060 Doug Eklund, on behalf of Thurston PUD ) ) ) Tempo Lake Glade Water System

More information

Staff Report. Application: A Application #: A Parcel number:

Staff Report. Application: A Application #: A Parcel number: Staff Report Application: 2016 20A Application #: 2016 20A Parcel number: 87-029-1110 Applicants: Bob and Carol Faye Muller on property described as: All that part of Government Lot 1, Section 29 Township

More information

MEMORANDUM OF UNDERSTANDING

MEMORANDUM OF UNDERSTANDING MEMORANDUM OF UNDERSTANDING Between United States Department of Agriculture Forest Service, Washington State Department of Natural Resources, Washington State Department of Fish and Wildlife, Yakama Nation

More information

Project Name: Gerber Stew Stewardship Contract CX Log #: OR-014 CX Chase Mtn./ Upper Bear Valley Plantation Thinnings

Project Name: Gerber Stew Stewardship Contract CX Log #: OR-014 CX Chase Mtn./ Upper Bear Valley Plantation Thinnings Decision Memorandum on Action and for Application of: Categorical Exclusion 516 DM2, Appendix 1, 1.12 Hazardous Fuel Reduction (PLAN CONFORMANCE AND CATEGORICAL EXCLUSION DETERMINATION) Project Name: Gerber

More information

VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN

VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources

More information

-01k( Rec.by:DZ. ARTICLE IX - STANDARDS FOR TELECOMMUNICATIONS TOWERS AND ANTENNAS. Section Intent

-01k( Rec.by:DZ. ARTICLE IX - STANDARDS FOR TELECOMMUNICATIONS TOWERS AND ANTENNAS. Section Intent ARTICLE IX - STANDARDS FOR TELECOMMUNICATIONS TOWERS AND ANTENNAS Section 900 - Intent The intent and purpose of this Article is to establish general guidelines for the sitting of commercial telecommunications

More information

TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN

TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources

More information

Sustainable Natural Environment Fish Habitat

Sustainable Natural Environment Fish Habitat Town of Huntsville Official Plan Review - POLICY BACKGROUND PAPER Sustainable Natural Environment Fish Habitat BACKGROUND: Lakes, rivers, streams, ponds and many wetlands provide fish habitat. Intermittent

More information

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Public Notice U.S. Army Corps Permit Application No: SWG-2007-01866 Of Engineers Date Issued: 13 March 2018 Galveston District Comments Due: 12 April 2018 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

More information