1 Scaling-up Renewable Energy for Low Income Countries Program Investment Plan for the Kingdom of Cambodia July 2016 i

2 Table of Contents Proposal Summary... iv I. Country Context... 1 A. Geography and Demography... 1 B. Economy... 1 C. Poverty... 2 D. Climate Change... 2 E. Energy Supply and Demand... 2 F. Institutional Framework... 4 G. Policies and Regulatory Frameworks... 6 H. Electricity Supply and Demand... 7 II. Renewable Energy Sector A. Renewable Energy Resource Potential B. Renewable Energy Policy Framework C. Incentive Program: The Rural Electrification Fund D. Community-based Renewable Energy Development for Poverty Reduction in Remote Areas of the Country F. Empowerment of Women in Community-based Renewable Energy Development G. On-going Energy Programs and Projects III. Contribution to National Energy Roadmap IV. Prioritization of Renewable Energy Options V. Program Description VI. Financing Plan VII. Responsiveness to SREP Criteria VIII. Implementation Potential with Risk Assessment IX. Monitoring and Evaluation Framework List of Annexes Annex A: Assessment of Cambodia s Absorptive Capacity Annex B: Stakeholder Outreach Annex C: Co-Benefits Annex D: Project Concept Notes Annex E: Independent Quality Review ii

3 Acronyms ADB Asian Development Bank CDP Capacity Development Program CO 2 Carbon Dioxide GDP Gross Domestic Product GHG Greenhouse Gas GMS Greater Mekong Subregion EAC Electricity Authority of Cambodia EDC Electricité du Cambodge INDC Intended Nationally Determined Contribution IPP Independent Power Producers MME Ministry of Mines and Energy M&E Monitoring and Evaluation PEC Provincial electricity companies REE Rural Electricity Enterprises RE Renewable energy REF Rural Electrification Fund RGC Royal Government of Cambodia SEAC Solar Energy Association of Cambodia SEZs Special Economic Zones SHS Solar Home Systems SREP Scaling-up Renewable Energy Program WEIGHTS AND MEASURES kva (kilovolt-ampere) kwh (kilowatt-hour) W (watt) kw (kilowatt) MW (megawatt) GW (gigawatt) 1,000 volt-amperes 1,000 watts-hour unit of active power 1,000 watts 1,000 kilowatts 1,000,000 kilowatts NOTE In this report, $ refers to US dollars. $ 1 = KHR 4,000 iii

4 Proposal Summary 1. The proposed Scaling-up Renewable Energy for Low Income Countries Program Investment Plan (SREP IP) will assist the Royal Government of Cambodia (RGC) in undertaking renewable energy sector development for energy security, sustainable economic growth, and poverty reduction. The proposed investment plan is designed to help remove principal barriers impeding investments in renewable energy resources development. For the sustainable renewable energy growth in Cambodia, the activities under the proposed investment plan will also include addressing the knowledge, institutional and capacity building needs of the government institutions, mitigation of risk concerns of private sector through appropriate policy instruments; strengthen government capabilities in renewable energy sector planning, project formulation and design, addressing environmental and social issues, implementation arrangements and organizational structure for successful projects completion; supervision and monitoring; and dissemination of information. The indicative financing plan is presented in Table PS-1, and the results framework is presented in Table PS-2. The total estimated funding assumes that ADB contributions will cover 25% of total project costs, and that SREP cofinancing will facilitate additional private sector investment (financing plans for individual projects will be determined during project preparation; see additional discussion in main text). The conceptual approach of the IP is presented in Figure PS-1. Table PS-1: Indicative Financing Plan ($ million) Component 1: Solar Energy Development Program Subcomponent 1: Solar Energy Development SREP a ADB Private Sector Government b Total Solar Home Systems Solar Mini-grids Project Preparation Subcomponent 2: Accelerating Solar Power through Private Sector Rooftop Solar Systems Utility-scale Solar Farm Project Preparation Subtotal Component 2: Biomass Power Project Project Preparation Subtotal Component 3: Policy Support and Public Awareness Note: TOTAL a Excludes Investment Plan Preparation Grant (IPPG) of US$ 0.3 million b Government contribution to Rural Electrification Fund 2. The development objective of the investment plan is to improve supply and utilization of renewable energy sources to all categories of consumers including the rural poor in remote areas. The development objectives of the investment plan will be achieved through: (i) provision of adequate amount and appropriate financing modality to support the development iv

5 of commercially viable renewable energy resources for power generation; (ii) capacity building to strengthen the government's capability to implement the project; enforce related laws, regulations, and standards; and (iii) conduct, with the participation of the private sector bodies/organizations and civil society, a nationwide renewable energy awareness campaign through print and electronic, radio, television, other medium with focus on rural communities to create consumer awareness. It will also include a program for launching a year of renewable energy in Cambodia with a multitude of activities across the nation. Table PS-2: Results Framework for SREP in Cambodia Results Indicators Baseline Targets Support low carbon development pathways 1. Increased supply of renewable energy 2.New and additional sources for renewable energy projects 3. Increased access to modern energy services 4. Greenhouse Gas emissions mitigated SREP Transformative Impacts Percentage of total 55% in % by 2030 households with access to electricity 1 Capacity: Capacity: 60 MW in 150 MW by 2023; 2014 a 200 MW by 2030 RE capacity (MW) and annual electricity output (GWh/y) Increased annual public and private investments ($) in targeted subsector(s) Output: 158 GWh/y $84 million SREP Outcomes Output: 394 GWh/y by 2023; 526 GWh/y by 2030 $210 million in 2023 and $280 million Annual electricity output from RE as a result of SREP interventions Installed capacity 0 78 MW Design Output GWh/y Leverage factor ($ finance from other sources compared to SREP funding) Number of women and men, businesses and community services benefiting from improved access to electricity and fuels as a result of SREP interventions 0 1: ,000 people or around 92,000 households Male: 223,100 Female: 236,900 Means of Verification MME MME MME SREP Projects, MME SREP Projects M&E, MME SREP Projects M&E, MME CO2 emissions reduction 0 97,000 tco2e/year MME, MOE CO 2 = carbon dioxide, GWh/y = gigawatt-hour per year, MME = Ministry of Mines and Energy, MW = megawatt, M&E = Monitoring and Evaluation, tco 2e = tons of carbon dioxide equivalent. Note: a Does not include large hydropower Figure PS-1: SREP Investment Plan Conceptual Framework 1 The Revised SREP results framework (2012) indicates that this indicator should be a National measure of energy poverty such as the Multi-dimensional Energy Poverty Index (MEPI), or some equivalent mutually agreed measure. Energy poverty is a multi-dimensional problem which includes problems associated with a lack of access to sufficient energy supply, a lack of access to clean energy, and a lack of access to affordable energy. For this purpose, energy access is used to measure poverty. v

6 kwh=kilowatt-hour, MW=megawatt, RE=renewable energy. vi

7 I. Country Context A. Geography and Demography 3. Cambodia is situated at the heart of the Greater Mekong Subregion (GMS) with a land area of 181,035 square kilometers (km 2 ). It is bordered by Thailand and the gulf of Thailand in the West and South respectively, Viet Nam in the East, and Lao PDR in the North. It has a total population of about 15 million (3.16 million households), of which 51.5% are female and 48.5% are male. The country has a young population with more than half of the population under age 25 and almost one-third is under 15. Approximately 80% of the population lives in rural areas. The country is slowly urbanizing with its urban population rising to 21.4%, up from 19.5% in The capital city Phnom Penh, with 1.69 million residents, is larger than all other urban areas combined representing 11.5% of the total population and 53.7% of the urban population. 4. The country experienced conflicts and civil war over the last four decades which reduced economic growth to almost zero, and demolished most human capital and infrastructure assets. Since the 1990s, the RGC has undertaken an unprecedented rehabilitation, development and expansion program. However, because of the competing demand of other sectors of the economy on the limited national budget, investment allocation in the electric power sector has always been far less than the total investment needed for the sector development. Recognizing the problems, and constraints, the international community recognizes the current operations and the status of the country s electric power sector as highly commendable. However, RGC recognizes that much more has to be done for sustainable economic growth to improve quality life of its people B. Economy 5. The economy has grown by an average of 7.8% per annum over the period 1994 to In 2014, the Gross Domestic Product (GDP) growth rate was 7.2%. Agriculture and forestry play an important role in the economy, accounting for a quarter of GDP, while manufacturing and tourism also contribute significantly to economic development. The robust growth in services and expanding export industries drove economic growth of 7.2% in Agriculture slowed but industry and services expanded, maintaining economic growth at just above 7% for the third consecutive year. Industry grew by an estimated 10.5% on strong demand for Cambodian garments and footwear in the European Union. Increased private consumption, fueled by higher household incomes, contributed much of the GDP growth from the demand side. The government s development policy for 2013 to 2018 targets average annual economic growth at 7% and a reduction in the poverty rate by at least 1% per year. The current government policy framework puts great emphasis on commercializing agriculture, building urban infrastructure, supporting the development of the private sector, expanding vocational training, and strengthening social protection for the people. 1

8 C. Poverty 6. The prevalence of poverty has dropped from nearly 100% in 1979 to 39% in 1993, and 30.1% in In 2011, the difference in income poverty rates between households headed by women and those headed by men appear very small. In terms of energy poverty, only about 55% of the household population has access to electricity; one of the lowest rates in Southeast Asia. While urban areas enjoy 100% electrification, about 50% of the rural population has access to electricity from alternative off-grid sources or grid-supplies. The limited access to modern energy such as electricity and liquefied petroleum gas means that over 85% of households use traditional biomass such as firewood and charcoal for cooking; households who have no access to electricity are dependent on the use of candles, kerosene and batteries for lighting 2. D. Climate Change 7. Cambodia is classified as highly vulnerable to the impacts of climate change, due to a combination of increased climatic hazards (mainly floods and droughts), increases in population density, and low levels of human development. The intensity and frequency of floods and droughts has increased, and changes are occurring in heat and rainfall patterns. In Cambodia, the major source of greenhouse gas (GHG) emissions in the energy sector is fossil fuel combustion. All oil products are imported as there are no oil production and refining activities in the country. In 2012, energy-related GHG emissions consumption amounted to million tons of carbon dioxide equivalent (MtCO 2e) and per capita emission of 1.74 tco 2e. Both primary energy consumption and GHG emissions at least doubled over the past ten years. Cambodia is among the lowest emitting countries in the world. In terms of country ranking, Cambodia ranks 103 out of 184 countries on total GHG emission; and 143 out of 181 countries on per capita emission 3. E. Energy Supply and Demand 8. Sustainable energy supply is a prerequisite for sustainable development. No country has developed and will develop without access to reliable and affordable energy. Energy directly impacts on people, communities and countries in terms of economic growth, health, security, food and education. Sustainable energy is thus a key enabler of sustainable development for all countries and all people. 9. The challenges in the energy sector of Cambodia are enormous, among which one of the most pressing is the foreign exchange outflow required for imported petroleum products. The government expenditures on imported energy, particularly petroleum products, have stymied investment in the development of the country s alternative energy resources. Reducing energy 2 Source: Cambodia Sustainable Energy for All Rapid Assessment and Gap Analysis, Source: CAIT Climate Data Explorer Washington, DC: World Resources Institute. Available online at: Based on 2012 total GHG emissions (excluding Land-Use Change and Forestry) country rankings. 2

9 imports will expand the fiscal space for undertaking energy sector development and other social sector programs that will help improve quality of life. To achieve its objectives, the government plans to optimize the fuel mix to reduce dependence on imported petroleum products. As Cambodia has an abundance of renewable energy resources that can be utilized for power generation, MME is updating plans 4 to support the development of renewable energy resources including biomass, hydro, solar, and wind. 10. According to the International Energy Agency (IEA), total primary energy supply and total final energy consumption in 2013 was dominated by biomass (see Table 1). About half of total final energy consumption was in the form of biomass for residential, reflecting the fact that most consumers still rely on traditional biomass for energy. Total per capita energy consumption in 2013 was about 0.35 ton of oil equivalent (TOE). The commercial, industry, and residential sectors account for 78% of total energy as shown in Figure 1. The energy balance has changed significantly since 2013, with more than 450 MW of new domestic coal and large hydropower capacity coming on line (see further discussion below). According to IEA data, domestic coal production in 2013 was 96,000 tons; the existing coal fired power plants are dependent on imported coal. Table 1: Cambodia Energy Balance, 2013 (thousand tones oil equivalent, KTOE) Categories Coal 5 Oil Products Hydro Biofuels & Wastes Electricity Production 87 3,999 4,087 Imports 46 1, ,952 International Aviation Bunkers Total Primary Energy Supply 46 1, , ,974 Electricity Plants Other transformation Energy Industry Own Use -2-2 Losses Total Final Consumption 1,512 3, ,221 Industry Transport 1,170 1,170 Residential Commercial Non-specified Non-energy use Source: IEA Energy Balances of Non-OECD Countries 2015 Total 4 The Master Plan Study on Rural Electrification by Renewable Energy in the Kingdom of Cambodia (MME-2006) 5 Combination of domestic and imported coal 3

10 Figure 1: Energy Consumption Pattern by Sector, 2012 Government 5% Other 17% Commercial 32% Industry 18% Residential 28% Source: International Conference on Green Growth and Energy for ASEAN, Imported petroleum products are the main source of commercial energy for industry, transport, and the residential and commercial sectors. Kerosene is used for residential lighting and liquefied petroleum gas is commonly used for cooking. Fossil fuels are projected to further increase, with demand for petroleum products driven mainly by demand for diesel and gasoline as the country becomes more motorized and passenger cars more common, and coal use increases for power generation. At the household level, firewood dominates energy consumption: over 85% of households depend on firewood and charcoal for cooking. Charcoal use is dominant in urban households while firewood use is dominant in rural households. Urban households are estimated to use less biomass with 1.5 kilogram (kg) per household per day, compared to rural households which are estimated to use 5 kg per household per day 6 Taking into account lifecycles of these fuels, the use of equivalent wood stock from cooking with charcoal is higher than using firewood. F. Institutional Framework 12. The current energy sector organization has been established pursuant to the enactment of the Electricity Law in The Ministry of Mines and Energy (MME) is the main agency responsible for setting and administrating government policies, strategies and planning in the energy sector including setting technical standards. The agency has three core departments: (i) the Department of Energy Development, which is responsible for energy and electricity planning (21 staff); (ii) the Department of Hydropower (22 staff); and (iii) the Department of Technical 6 Source: Cambodia Sustainable Energy for All Rapid Assessment and Gap Analysis,

11 Energy, which is responsible for renewable energy (other than hydropower) and energy efficiency (37 staff). To promote the development of biomass energy, the government has formed a ministerial bioenergy program committee, which includes the Ministry of Economy and Finance; the Ministry of Environment; and the Ministry of Agriculture, Forestry and Fisheries, in addition to MME. The electric power sector structure is illustrated in Figure 2. Beginning in the 1990s, given the need for rapid addition of electricity supplies to support economic growth, new generation capacity has been developed mainly by the private sector. 13. The Electricity Authority of Cambodia (EAC) is an autonomous government agency created under the passage of 2001 Electricity Law and is responsible for regulating electricity services. It is responsible for the issuance of rules, regulations and procedures and monitoring, guidance, coordination of the operators in power sector both suppliers and consumers including requiring them to follow the policy, guidelines, and technical standards issued by MME. EAC has to ensure that the provision of services and the use of electricity shall be performed efficiently, qualitatively, sustainably and in a transparent manner. All power service suppliers must be licensed by the EAC. Figure 2: Electricity Power Sector Structure EDC = Electricite du Cambodge, IPP = independent power producer, PEC = provincial electricity company, REE = rural electricity enterprise. 5

12 14. Electricité du Cambodge (EDC) is a state-owned utility responsible for generation transmission, and distribution. It is owned jointly by MME and the Ministry of Economy and Finance. EDC mainly supplies the capital city, Phnom Penh. EDC buys power from independent power producers (IPPs, mainly joint ventures of Cambodian and foreign investors), and is responsible for power imports. Many rural areas are supplied by rural electricity enterprises (REEs), which operate as licensees, buying power from EDC and selling power into local distribution networks, and may have their own generation assets (typically diesel). Provincial electricity companies (PECs) have operated as integrated utilities at the province and subprovince level; these organizations have mostly been phased out in favor of REEs and IPPs. G. Policies and Regulatory Frameworks 15. The government has two overarching policy targets: (i) by 2020, all villages in the country should have access to electricity; and (ii) by 2030, at least 70% of total households in the country should have access to quality grid-supplied electricity. Achieving these two main targets depends on the utilization of all types of electricity sources and the participation from relevant stakeholders. 16. The government s energy policy is aimed at: (i) supplying adequate energy at affordable rates; (ii) ensuring the reliability and security of electricity supply to facilitate investments and advance national economic development; (iii) encouraging the socially acceptable development of energy resources; and (iv) promoting the efficient use of energy and minimizing detrimental environmental effects resulting from energy supply and consumption. 17. The Electricity Law (2001) provides the governing framework for the electric power supply and services throughout the Kingdom of Cambodia. The law covers all activities related to supply of electricity, provision of services and use of electricity and other associated activities of power sector. Key components include (i) establishing the principles for operation of the sectors; (ii) establishing favorable conditions for competition, private investment, private ownership and commercial operation of the electric power industry; and (iii) establishing and defining the functions of the EAC and the MME. 18. The electricity tariffs in Cambodia are higher than those in neighboring countries, reflecting the high cost of petroleum-based generation and the fragmented power supply system in the country, as well as inefficiencies in power generation and transmission infrastructure. In Phnom Penh, households pay about $0.18/kWh and industrial consumers pay as much as $0.21/kwh. Tariffs are even higher outside of Phnom Penh with about $0.70/kWh and the supply is even less dependable Retail electricity tariffs established by EAC for 2016 through 2020 are summarized in Table 2. Retail tariffs is expected to decline reflecting the drop in the overall cost of supply as the share of imports and diesel-based electricity decreases and supplies from lower cost coal and hydro 7 Source: USAID 2015: Private Financing Advisory Network (PFAN) Asia Program, The Business Case For: Solar PV in Cambodia 6

13 plants increases. EDC s weighted average cost of supply in 2014 and 2015 has been estimated at $0.1067/kWh and $0.095/kWh respectively. 8 The tariffs REEs can charge to residential consumers have been reduced to $0.20/kWh. Lifeline tariffs are in place for poorer consumers. The tariff regime through 2020 indicates possible opportunities for captive and distributed RE generation where electricity can be sold directly to consumers in the range of $ / kwh. Utility-scale projects selling directly to EDC will need to achieve grid parity in the foreseeable future to be economically attractive. In all cases, policy support and concessional finance will be required to jump-start and accelerate RE development (a logical entry point for SREP support, discussed in later sections of this document). Industrial and commercial customers Table 2: Retail Electricity Pricing ($/kwh) Type of Consumers Purchase from grid substation Purchase from national grid Purchase from provincial grid Residential customers Supplied by EDC Supplied by licensees (REEs) Subsidized tariff for poor households and agriculture Urban consumers with use below 50 kwh/month Rural consumers with use below 10 kwh/month Pumping in agriculture sector; use from 21:00-7:00 hours EDC = Electricité du Cambodge, kwh = kilowatt-hour, REEs = rural electricity enterprises. Source: EAC, 2016 H. Electricity Supply and Demand 20. Electricity consumption has increased significantly during the last decade. In 2015, per capita consumption of electricity reached 400 kwh, more than fivefold increase from 66.5 kwh in 2005 (World Bank Database). Power consumption is forecasted to grow at 9.4% per year until 2020, which will require more than 50% increase in energy output to keep pace with demand growth. This will mainly be driven by population increase, accelerated economic activity, and rural electrification. 21. The electricity supply currently does not meet the basic demand, where 24-hour supply of electricity is not assured and the quality of electricity is not reliable. According to the Power Demand Plan of the Kingdom of Cambodia in 2007, electricity demand is expected to show a 8 Source: Cambodia In Depth Study on Electricity Cost and Supplies, Final Report March Prepared by William Derbyshire, Economic Consulting Associates. 7

14 rapid increase until From 2002 to 2011, the annual electricity demand growth rate in the country was 16.3%. This demand growth was met mainly by imports from Thailand and Viet Nam; imports have declined since 2013 as new domestic coal and hydro plants have come online (see Table 3 below). As the energy demand in Phnom Penh grew a bit faster with an average growth rate of 17% during the same period, the share of the City of Phnom Penh in the total electricity demand was further increasing (multiplied by 4.8 since 2002) covering now at least 80% of the country s total electricity consumption. 22. Electricity coverage remains low despite the progress that has been made. Out of 13,935 villages, only 67% have transmission lines in their villages. 9 The electrification rate grew to 55.0% in 2015, which is up from 20.3% in Yet, about half of the entire population still has no access to electricity. 23. The total installed generation capacity as of 2015 was 1,569 megawatts (MW) which produced 4,448 gigawatt-hours (GWh), accounting for about 74% of total grid-supplied electricity. In 2015 an additional 1,572 GWh was imported from Viet Nam, Thailand, and Laos. Domestic production has significantly increased from 2013 to 2015, reducing imported electricity from more than 56% in 2013 to about 26% in 2015 (see Table 3). Hydropower accounts for the largest share of domestic capacity and output, with coal second, and diesel third, and industrial (captive) generation fourth. Biomass power and generation by small licensees (mainly Rural Electricity Enterprises) account for less than 1% of supply. Table 3: Grid-supplied Electricity Composition and Recent Trends, Power Sources MW GWh % MW GWh % MW GWh % DOMESTIC Biomass Coal , Diesel Hydro , , Industrial Small Licensees Subtotal , , , IMPORTS Lao PDR Thailand Viet Nam , , Subtotal , , TOTAL , , , GWh = gigawatt-hour, MW = megawatt, PDR = People s Democratic Republic of. Source: Ministry of Mines and Energy, Updated Power Development and Exchange, presented at The 19 th RPTCC Meeting, November, Cambodia remains partly dependent on imported electricity. Import from Viet Nam is at 22 kv through a number of connections and at 230 kv through Viet Nam Takeo - Phnom Penh 230 kv line. Similarly import from Thailand is at 22 kv through a number of connections and at Source: Update of Energy Sector in Cambodia (Fact Sheet by MME and EAC) 8

15 kv through Thailand - Banteay Meanchey - Battambang and Siem Reap line. Import from Laos is at 22 kv to Steung Treng area. 25. In 2011, Cambodia was importing about 26,000 barrels of refined petroleum per day, with International Monetary Fund (IMF) data showing the value of imported oil fluctuating enormously between 2000 and This exacerbates concerns about energy security, as do expectations of an increase in the international price of oil over time. Figure 4 below presents the value of oil imports into Cambodia during the period Figure 3: Value of Petroleum Imports ($ Million), Source: IMF, Based on Cambodia s Power Development Plan , coal and hydropower are expected to continue to dominate growth in new capacity during the next several years (shown in Figure 4 and Table 4). Figure 4: Cambodia Power Development Plan,

16 DO = diesel oil, HFO = Heavy Fuel Oil. Source: Ministry of Mines and Energy, Updated Power Development and Exchange, presented at The 19 th RPTCC Meeting, November, Table 4: Power Development Plan for Generation No. Project / Lead Developer Fuel Type Installed Capacity (MW) COD 1 Kamchay Hydro Power Plant / Sinohydro (China) Hydro Kirirom III Hydro power Plant Hydro Stung Atay Hydro Power Plant / Datang (China) Hydro MW Coal Power Plant (I) in Sihanouk Province - Phase 1 Coal Lower Stung Russei Chrum Hydro Power Plant / Huadian (China) Hydro Stung Tatay Hydro Power Plant / China National Heavy Machinery Corporation Hydro MW Coal Power Plant (II) -Phase 1 Coal MW Coal Power Plant (II) -Phase 2 Coal MW Coal Power Plant (II) -Phase 3 Coal MW Coal Power Plant (I) in Sihanouk Province - Phase 2 / CIIG (Cambodia) and Erdos Hungjun Coal (China) 11 Lower Se San II Hydro Power Plant / Huaneng (China) Hydro MW Coal Power Plant (II) -Phase 4 Coal Stung Chay Areng Hydro Power Plant / Sinohydro Hydro MW Coal Power Plant (II) -Phase 5 Coal Sambor Hydro Power Plant Hydro 450 / 2,600 After Coal Power Plant (III) or Gas Power Plant Coal/Natural Gas 400 After Stung Treng Hydro Power Plant Hydro 900 After 2020 TOTAL 5,374 / 6,679 COD = commercial operations date, MW= megawatt. Source: Ministry of Mines and Energy, Updated Power Development and Exchange, presented at The 19 th RPTCC Meeting, November, II. Renewable Energy Sector 10

17 A. Renewable Energy Resource Potential 27. Renewable energy (RE) potential is high but resources remained mostly untapped 10 : Biofuel: Jatropha plantations cover about 200 hectares (ha); palm oil about 4,000 ha with possible expansion to 10,000 ha; and sugar cane with 20,000 ha. There is one commercial plant producing ethanol from cassava: production capacity is 36,000 tons per year ethanol from 100,000 tons of cassava. Biogas: Effectiveness of small-scale biogas has been demonstrated by a number of different projects. The National Biodigester Programme (NBP) installed over 23,000 household size biodigesters since About 11.8 million cubic meters of biogas can be produced annually in Cambodia, which is 7.4 MW of generation capacity from commercial farms only. 11 The use of animal wastes to generate high quality gas for cooking has significant economic, health, social and environment benefits for poor rural households. Biomass: Generation potential is estimated to be 18,852 GWh per year (approximately 35 times EDC generation output in 2002), but less than 23 MW is operational. Significant sources are rice husk, sugar cane bagasse, cassava stems, etc. Hydropower: Potential is more than 10,000 MW; installed capacity was 927 MW in 2015, with several more large projects under development. Solar: High potential with average of 5 kwh/m2/day and average sunshine duration of 6-9 hours per day; technical potential is estimated at 8,100 MW based on estimated energy output of 14,781 GWh/y. Wind: Potential is estimated at 3,665 GWh/year (about 1,000 MW at 30% load factor), but only a small percentage of it is being tapped. Detailed wind mapping will be required to identify feasible utility-scale projects. The southern part of the Tonle Sap lake, mountainous districts in the southwest, and coastal regions such as Sihanoukville, Kampot, Kep and Koh Kong have annual average wind speed of 5m/s or greater. 28. Of these resources, hydro appears attractive mainly for larger projects. Wind is not as attractive in terms of the scale of the resource, and no detailed wind mapping has been conducted to support utility-scale wind farms. Solar and biomass appear more promising as these are widely distributed around the country. Solar is particularly attractive given the rapid declines in system costs during the last several years; land availability is not a constraint for large-scale development. Biomass is also attractive as an energy resource in rural areas where agriculture dominates the economy. The technical potentials of biomass and solar noted above are more than 500% of total grid-supplied electricity output in 2015 (see Table 3 above). Harnessing only 10% of the technical biomass and solar potential would avoid the need for most of the planned coal-fired capacity additions. Converting technical potential to actual RE capacity and output will require some changes to the policy framework so that development risks are reduced and commercial financing 10 Source: Sovanna (2010): The Current Status of Renewable Energy, Energy Efficiency Development in Cambodia, MME October 2010, Lao PDR 11 Source: UNIDO as cited in 11

18 is made available. Experience in other developing countries in the region (e.g., Thailand and India) provides valuable lessons learned in designing appropriate policy interventions to facilitate accelerated market development, especially for solar energy. 29. RE resource development and technology deployment in Cambodia is mainly in initial demonstration stages. To date, only about 980 MW RE capacity has been developed which largely is hydropower. Table 5 enumerates the existing RE projects in the country. Table 5: List of Existing RE Projects in Cambodia, 2016 Agency Type of Project Capacity (MW) 1. Korea International Cooperation Agency Solar PV Battery 0.11 (KOICA) Charging Station 2. United Nations Industrial Development Solar Battery Charging 0.04 Organization (UNIDO) Station 3. Japan International Cooperation Agency Solar Pumping 0.78 (JICA) 4. Rural Electrification Fund (REF) Solar Home System Prime Minister Project Solar Private Company Solar Electricity Authority of Cambodia (EAC) Biomass Private Company Hydro (> 10 MW) Others Micro hydro 0.60 Total Source: MME, 2016 B. Renewable Energy Policy Framework 30. Cambodia s renewable energy development and rural electrification policies are linked. The government s energy policy is aimed at: (i) supplying adequate energy at affordable rates; (ii) ensuring the reliability and security of electricity supply to facilitate investments and advance national economic development; (iii) encouraging the socially acceptable development of energy resources; and (iv) promoting the efficient use of energy and minimizing detrimental environmental effects resulting from energy supply and consumption. The goals of the government s rural electrification program are as follows: providing safe, reliable, and affordable electricity to rural communities in a way that minimizes negative impact on the environment; providing a legal framework that encourages the development of renewable energy sources by the private sector to supply electricity to rural communities; supporting renewable energy initiatives; promoting the adoption of renewable energy technologies by setting electricity rates in accordance with the Electricity Law (2001); promoting the use of least-cost forms of renewable energy in rural communities, through research and testing of grid and off-grid options; and supporting electrification in disadvantaged rural communities through funding assistance, training, and other means. 12

19 31. The key provisions of the National Policy on Rural Electrification by Renewable Energy are to: Provide access to reliable, safe electricity services, with insignificant impact on the environment, Encourage the private sector to participate in providing electricity services by renewable energy in the rural areas; Act as a market enabler, through various incentives, Encourage using renewable energy technologies, Promote electricity systems by renewable energy at least cost for rural communities, through research and pilot development, Empower to the poor involving in rural electrification to participate. 32. The government is targeting full electrification of villages by 2020 and 70% household electrification via the national grid by 2030 (see Figure 5 and Table 6). The village electrification target involves about 14,000 villages (with almost 2.5 million households). The main components of rural electrification are an expanded power grid; diesel stand-alone, mini-utility systems; crossborder power supply from neighboring countries; and renewable energy (solar, wind, mini and micro hydro, biogas, biomass). In the short- and medium-term, small village hybrid grid systems will also have an important role. Figure 5: Rural Electrification Goals Table 6: Progress Expected from the Extension of the National Grid Rural Area Connect to household 50% 51% 55% 65% 70% 13

20 Supply to village 55% 56% 67% 100% 100% C. Incentive Program: The Rural Electrification Fund 33. To help meet its rural electrification targets, the government established the Rural Electrification Fund (REF) with the help of a loan from the World Bank and a grant from the Global Environment Facility. The REF administers grants in support of rural electrification using both conventional technology and renewable energy technologies such as solar, mini and micro hydro, and biomass. Since 2008, the REF has carried out the following initiatives: To encourage electricity licensees to expand their networks, the REF has provided them with grant assistance of $45 for each newly connected household. To assist rural households living in remote areas: - The REF has purchased in bulk 50,000 units of solar home systems (SHSs) on a tax-exempt basis and sells them to rural households in remote areas at cost, less a subsidy of $100, to be repaid in installment without interest; - The REF bears the transportation and installation fees, and repayment charges; - The REF bears the yearly maintenance fee until repayment (or the supplier bears the fee for the first year), while the purchaser is responsible for the replacement of defective parts; and - Once the required installments are made, ownership of the SHS is transferred to the household. 34. The REF was integrated with the EDC in 2012 and is now implementing three joint programs: Solar home system program, retaining the above incentive mechanism; Power to the Poor Program, which provides interest-free loans of $120 per household to cover the expenses for connection, deposit, meter installation, and wiring, to be repaid in 36 monthly installments; and Assistance for the improvement of existing electricity infrastructure in rural areas for the development of new infrastructure, involving loan guarantees, interest-free loans of up to $100,000, or a combination of grants and interest-free loans. 35. The REF-supported program is considered to be successful to date in expanding services through private licenses in rural areas, but can be improved and expanded. Key lessons learned are: (i) product quality needs to be improved and supported with after-market operations and maintenance (O&M) support, which can be achieved through extended warranty periods and appropriate O&M contract provisions; (ii) multiple vendors should be engaged to ensure some competition and maintain downward pressure on system installation and O&M costs. 14

21 D. Community-based Renewable Energy Development for Poverty Reduction in Remote Areas of the Country 36. The challenges facing economic development efforts in remote areas for poverty reduction are varied and complex and include: (i) lack of employment creation; (ii) lack of electric power to sustain economic development; (iii) limited livelihood opportunities; (iv) limited human capital investment and development; (v) lack of financial services for the poor; and (vi) piecemeal approach to poverty reduction and limited over-arching anti-poverty programs. The communitybased renewable energy projects will help to (i) meet local electricity demand in an environmentally and socially sustainable manner; (ii) improve access to modern electricity services in rural areas; and (iii) improve standards of living for the poor through provision of community-level infrastructure. 37. Due to the high cost of grid extension and the lack of alternative resources, onsite RE projects appear to be the most cost-effective power source for remote areas, but scaling up deployment will require more detailed resource assessments to develop commercially viable projects. The increased use of RE-based electric power will produce local environmental and health benefits such as reduced exposure to indoor air pollution (mainly through displacement of kerosene for lighting), reduced local air pollution from diesel-fired generator sets, and direct economic benefits from the reduced need to purchase, transport and store petroleum fuels in remote areas for power generation, heating and cooking. In the long term, consumers can be expected to switch to electricity for cooking and reliable supplies grow. In addition to the environmental benefits, community-based RE projects will create opportunities for economic development, social empowerment and alleviation of poverty in underdeveloped and remote communities. The RE projects will also reduce greenhouse gas emissions that would otherwise be produced from diesel-based generator use. 38. The framework for RE development specifically for remote areas would be strengthened with the assistance of the proposed SREP investments, as well as defining the strategy to be followed in the medium to longer terms. The frame work would place increased emphasis on the design, demonstration, and pilot testing of dispersed off-grid, community-embedded, and standalone RE systems, including their financing and marketing modalities and integration with other social and physical infrastructure development (e.g., poverty alleviation, rural electrification). The framework should list potential RE projects, outlining priorities and sequencing, along with funding requirements which would be based on completed studies and prototype evaluations with specific RE and market targets and funding arrangements. E. Key Factors for Sustainability of Community-based Renewable Energy Development 39. Sustainability of the community-based RE projects is primarily linked to the capacity built up within the communities themselves. Key factors which would be addressed during program 15

22 design include the effective implementation of the community mobilization process, and the provision of technical and capacity building support to the communities to ensure the effective operation and maintenance of the system. The focus would be to (i) develop self-reliant and selfmanaged organizations in the target communities; (ii) promote information dissemination, awareness building, and knowledge sharing with other remote community areas; and (iii) build strategic partnerships with the private sector and civil society. F. Empowerment of Women in Community-based Renewable Energy Development 40. Women are the mainstream users and often providers of household energy in villages. Without their active involvement, renewable energy projects will not succeed. Women are not only the main users of household energy, but also influence if not make many family purchases related to energy. The role of women is a critical not only in household matters but also for the community at large. To encourage women to be involved in renewable energy development programs, an entrepreneurship program, designed and targeted exclusively for women s participation, is planned to be organized. The Village Women Entrepreneurship program would include special incentives and concessions so that they may invest in the renewable energy development in their respective areas and be a part of regional development and poverty reduction. To motivate women to set up renewable energy development projects, they would be extended special concessions, such as favorable financing terms, and fee waivers on loans, legal expenses, documentation charges, etc. G. On-going Energy Programs and Projects 41. The proposed interventions to be supported by SREP will be linked with the on-going programs and projects summarized in Table 7. Donor / Project Title / Budget ($) / Project completion date ADB Rural Energy Project (formerly Rural Energy Pilot Project) $10.92 million, ADB Medium-Voltage Sub-Transmission Expansion Sector Project Table 7: On-going Energy Programs and Projects Project Description The project targets: (i) electrifying up to 13,460 households in Svay Rieng Province by extending the 22 kilovolt medium-voltage subtransmission line and the low-voltage distribution network and installing meters; (ii) promoting the use of up to 90,000 improved cookstoves with higher efficiency in rural areas of Kampong Cham Province; and (iii) developing the capacity of Electricity Authority of Cambodia (EAC) which is the regulatory body overseeing the power sector. ADB will administer a grant of $6.110 million provided by the Government of Australia. The project will expand the supply of reliable and cost effective gridelectricity in Kampong Thom, Kampong Cham, Siem Reap, Kandal and Banteay Meanchey province in Cambodia. It will (i) expand the electricity transmission infrastructure by constructing 2,110 kilometer (km) of 22 16

23 Donor / Project Title / Budget ($) / Project completion date (former name: Rural Electrification Project) $ million, ADB Second Power Transmission and Distribution Project $ million, AFD, Green Microfinance Project Description kilovolt (kv) sub-transmission lines, (ii) support the implementation of the project, and (iii) improve the operational effectiveness and efficiency of EDC The Project will complement previous investments in the transmission and distribution facilities. It will (i) extend the 230 kilovolt (kv) transmission line from Kampot to Sihanoukville; (ii) build associated substations and bulk supply distribution facilities; and (iii) carry out institutional development and capacity building for EDC. A $6 million line to 3 MFIs (VisionFund, Kredit and LOLC) to broadcast solar home systems through microcredits all over Cambodia. IFAD, Building Adaptive Capacity through the Scaling-up of Renewable Energy Technologies in Rural Cambodia (S-RET) $4.6 million, UNIDO, Reduction of GHG emission through promotion of commercial biogas plants in Cambodia, $1.5million UNIDO, Access to Clean Energy for Productive Uses in Cambodia, $577,000, SNV Cambodia, National Biodigester Program A 2 million EUR subsidy from EU is used for technical assistance to coordinate the project (coordination between MFIs and solar suppliers, marketing and communication, good solar initiative management) and incentive grant for the solar suppliers (objectives of network expansion and after sales services development) The planned implementation period of S-RET is 4 years. Implementation will commence in the second quarter of 2016 and will be completed in the first quarter of The cost of GEF-funded S-RET is US$ 4.6 million. The project will augment the usage of biogas technologies for electricity generation in commercial animal farms by converting the methane emitted from animal waste into energy for productive uses. Implementing partners: Ministry of Environment (MoE) and Ministry of Agriculture, Forestry and Fisheries (MAFF) The project aims at increasing clean energy access for productive activities in off-grid communities by solar PV and enhancing the capacities of local fabricators of biomass gasifiers leading to availability of locally manufactured high quality biomass gasifiers. SNV Cambodia and the government s National Biodigester Program have supported the development of a commercial market for household biodigesters since The first phase of the program ( ) concentrated on the introduction, promotion and dissemination of the technology and on setting up sector infrastructure. The current phase ( ) has a strong focus on private sector development and on strengthening all actors to ensure long-term sustainability and ultimate independence from donor funding. The program is supported by EnDev, a multi-donor fund managed by the German development agency GIZ. There are additional linkages with the IFAD PADEE program. 17

24 Donor / Project Title / Budget ($) / Project completion date SNV Cambodia, Waste to Energy for the Rice Milling Sector in Cambodia SNV Cambodia, Solar Microfinance Program Project Description By 2014, SNV s program had contributed to the establishment of 66 biodigester companies, which have built more than 20,000 biogas plants in Cambodia. Another 9,000 biodigesters could be built by In collaboration with government, the public and private sectors, and the Federation of Cambodian Rice Millers Association (FCRMA), SNV is introducing clean and efficient gasification technology. Millers can fuel their machinery with the waste rice husks, allowing them to reduce their bottom line and be more competitive in the export market. The Waste to Energy for the Rice Milling Sector in Cambodia project is funded by the European Union and Foundation Ensemble. The project aims to broaden access to energy for 25,000 households in off-grid locations in rural Cambodia by enabling a sound supply of quality solar products and microcredit; and by triggering demand from households. The Solar Microfinance Program is funded by the French Development Agency AFD and the European Union. SNV Cambodia, Advanced Clean Cooking Solutions To lower the initial investment barrier for rural households, the Solar Microfinance Program collaborates with three leading Cambodian Microfinance Institutions (MFIs) which develop Cambodia s first dedicated solar microcredit offer for their customers. SNV is implementing the Advanced Clean Cooking Solutions (ACCS) program to introduce proven advanced clean cooking technologies to Cambodia and Lao PDR. These activities will result in a self-sustaining commercial sector for advanced clean cooking solutions with private entities as main actors. AFD = Agence française de développement, EDC = Electricité du Cambodge, IFAD = International Fund for Agricultural Development, EU = European Union, IFAD PADEE = International Fund for Agricultural Development Project for Agricultural Development and Economic Empowerment, MFIs = Microfinance Institutions, PDR = Peoples Democratic Republic of, PV = photovoltaic, SRET = Scaling-up of Renewable Energy Technologies in Rural Cambodia. 18

25 H. Critical Constraints and Recommended Policy Actions 42. The key issues and critical constraints on RE development and recommended policy actions are summarized in Table 8. The proposed investments and associated capacity development have been elucidation with these considerations in view. Table 8: Key Issues on Renewable Energy Resource Development and Institutional Structure Key Issues and Critical Constraints 1. Renewable Energy Resources Development Lack of access by private sector investor to appropriate tariff structure and financing mechanisms to undertake accelerated development of renewable energy resources (RES) are the major impediments and constraints. Appropriate Government Policy Actions The Government recognizes that private sector involvement will be crucial as about 80-85% of investment is expected to come from the private sector sources, consistent with the current practice of private sector development of conventional generation assets. The Government to establish an appropriate tariff structure for RE development by private sector to ensure adequate return on investment, and for funding sustainability. One of the critical constraints delaying implementation of renewable energy projects in Cambodia is the availability of financing in the amount and terms required owing to the lack of long-term debt market. Renewable energy have high front end capital cost per kwh installed which calls for debt with much longer maturity than is usually available in the market. The Government will continue to maintain dialogue with and seek assistance from multilateral and bilateral agencies (like the Asian Development Bank, World Bank, JICA, USAID, and other development partners) to provide new and innovative financing instruments through their private sector arm that would enhance the provision of private capital, goods and services. Appropriate policy and financing instruments will be determined for specific projects during identification and preparation stages. Government would encourage joint venture partnership with foreign investors, manufacturers, developers, and licensees; and also encourage the participation of the national universities and colleges and other stakeholders to undertake research and development covering renewable energy resources and facilitate the development of technologies suitable for Cambodian requirements. There appears to be an economic case for providing some financing subsidies in the initial phase of renewable energy development program because of their positive externalities both locally and globally. The subsidies will be designed to kick start an infant industry but will have a limited time span. 19

26 Key Issues and Critical Constraints For expanded private sector participation under competitive environment and for sustainable private sector investment, the provision of feed-in tariff and net metering as a stated policy of RGC, are considered essential in the scaling up of renewable energy development in Cambodia. Appropriate Government Policy Actions The MME has initiated discussion/consultation with relevant department/agencies including EDC for the provision of feed-in tariff and net metering as a government policy instrument, especially for rooftop solar. Utility-scale grid-connected RE plants selling to EDC may need some policy support in the near-term. Need for improved transparency, governance, and fair play. RGC should implement market-based reforms; create competitive sector structure; strengthen market regulations to ensure investor confidence. Policy framework should focus on creating competition as the driving force for improvement and private sector participation as a vehicle for creating a competitive environment building on private sector experience with conventional power plants. Need of a clear policy thrust on renewable energy for the rural areas. There exists a Government Policy Framework for the Development of Renewable Energy specifically for the remote areas, as well as a strategy for the medium to longer terms. The policy places increased emphasis on the design, demonstration, and pilot testing of dispersed off-grid, community embedded, and standalone renewable energy systems. There is lack of consumer awareness on benefits and opportunities of renewable energy; lack of stakeholder/community participation in energy choices and renewable energy projects. The Government plans are to have a nationwide awareness campaign and declare 2017 as a year of Renewable Energy Year. 2. Institutional Structure and Capacity Building A large number of RGC departments, agencies and offices are involved in the renewable energy development programs. A major challenge is to ensure that these entities work to their respective strengths in an integrated manner towards delivery of the national objectives. To address the sector efficiency improvement, and to avoid duplication of efforts, there is a need to restructure and consolidate the sector entities for a better and improved delivery of services to the people. EDC = Electricité du Cambodge, JICA = Japan International Cooperation Agency, MME = Ministry of Mines and Energy, RGC = Royal Government of Cambodia, USAID = United States Agency for International Development. 20

27 III. Contribution to National Energy Roadmap 43. Inadequate power supply has emerged as one of the most serious infrastructure constraints on sustainable economic growth in Cambodia. Electric power supply will need to increase at least as fast as economic growth to eliminate suppressed demand and meet future demand growth, i.e., energy supply needs to increase about 10% per year for the foreseeable future. Expanding electricity supply above 10% per year from 2015 output means that electricity output will need to increase by 61% by 2020, 259% by 2025, and 417% by The RGC recognizes that additional investments in traditional commercial power supply sources alone will not be sufficient to bridge the demand-supply gap. The heavy reliance on fossil fuels in the energy mix imposes major environmental concerns at the national, regional, and global levels, with respect to conventional pollutants and GHG emissions which impose substantial environmental, social, and economic costs. The RGC therefore considers it essential that the country must ease growth in fossil fuel energy consumption, curb upward pressure on energy prices, and improve energy security. Large hydropower projects may also require some re-engineering to become more sustainable. 44. Although many RE options appear very attractive compared to petroleum-based generation, commercial development has not occurred at scale mainly due a weak policy framework, and partly due to development of large hydropower and coal-fired power plants which have attracted the bulk of commercial finance given their much lower risk profiles. One of the key near-term challenges is to modify the energy development framework so that the benefits of RE versus fossil fuels can be monetized and delivered as up-front project finance. Alternatively stated, the business model for energy development needs to include use of natural capital as well as traditional finance. 45. The RE resource base biomass, hydro, solar, and wind is sufficient to displace all diesel generation in the foreseeable future. As noted above, the technical potential for biomass and solar is more than 500% of total grid-supplied electricity in 2015, theoretically sufficient to cover projected above 10% annual growth in electricity supply through 2030 noted above. Harnessing 10% and 50% of the biomass and solar potential would cover electricity demand growth projected through 2020 and 2030, respectively. Harnessing 20% of biomass and solar potential would avoid the need for most or all of the planned coal-fired capacity additions. Commercial operation of 200 MW of solar capacity operating 5 hours per day would be sufficient to cover Cambodia s Intended Nationally Determined Contributions (INDC) for energy industries. Clearly, RE resources can make a major contribution if development can be accelerated in the near future. 46. When RE reaches grid parity, energy sector transformation can be accelerated, but initiating the transformation presents a classic chicken and egg situation which is heavily loaded with first-mover risks. It is impossible to determine with certainty how much new RE output is 21

28 required to reach a tipping point in Cambodia, but experience in other developing countries can provide some hints. For example, India embarked on an ambitious solar development program with a concerted effort beginning in 2008, with large-scale solar parks under development by By 2014, more than 3,000 MW of new utility-scale solar capacity had been installed. By 2015 power purchase agreements were being negotiated at $0.09 and less, which is at parity with the national grid supply, and at parity with power plants using imported coal. The experience in India is noteworthy and instructive for other developing countries: the success in mobilizing commercial RE development at scale was facilitated by extensive dialogue between the government, private sector developers and investors, and regulatory agencies. This resulted in public-private collaboration, whereby state-level electric utilities took the lead in early project development to reduce up-front risks to IPPs and commercial investors. The risk-reduction efforts facilitated tendering of large-scale projects on a tariff basis (a reverse-auction model), with all bids coming in below the benchmark tariffs established by the Central Electricity Regulatory Commission; for the most part the success to date has not relied on FiTs. Closer to Cambodia, Thailand has also introduced FiTs and other incentives during the past several years with good results: solar capacity has increased from almost zero in 2010 to 2,600 MW by the end of In Cambodia, SREP can be catalytic in facilitating successively larger RE-based energy services via a combination of learning-by-doing investments complemented by policy evolution. A logical entry point is solar and biomass installations in areas where diesel generation dominates electricity supplies, including rural and peri-urban areas. Additional entry points are rooftop solar and solar farms, where new RE installations are for the most part competing against the grid mix. All of these investments and activities will require some grant and concessional financing (in the near term) due to the lack of long-term financing. Figure 6 illustrates the country and sector context and possible entry points for SREP support. 48. SREP also supports the implementation of the Cambodia Climate Change Strategic Plan , a national framework for engaging stakeholders in a participatory process for responding to climate change to support sustainable development. Among its strategic objectives are: promotion of low-carbon planning and technologies to support sustainable development, improvement of energy security and strengthen institutions and coordination frameworks for national climate change responses, shift towards a green development path by promoting lowcarbon development and technologies, and promotion of public awareness and participation in climate change response actions. 49. The investments envisioned for SREP cofinancing will have environmental and social cobenefits, mainly in the form of avoided emissions of conventional pollutants and GHGs. Cobenefits are summarized in Annex C. 12 Source: Thailand has been the beneficiary of support from the Clean Technology Fund, and lessons learned from utility-scale RE development will be considered for SREP cofinancing in Cambodia. 22

29 Figure 6: Country and Sector Context and Possible SREP Entry Points kwh=kilowatt-hour. 23

30 IV. Prioritization of Renewable Energy Options 50. The prospective renewable energy developments to be considered for SREP support were evaluated against a set of criteria and prioritized accordingly. The criteria reflect RGC strategic objectives, and the clear recognition that SREP funding should be used to overcome barriers to RE options (i.e., the combination of resources, energy conversion and utilization technologies, and enduse applications) that will have the potential to have a transformative impact on the energy sector. The criteria considered included: (a) Resource potential: Large renewable resource potential for sustainable production operation as expansion and accelerated development is an important consideration for the SREP transformational impact; (b) Unexploited market potential. The extent to which the resource is already exploited versus the technical potential; as noted in Section II, biomass and solar appear the most attractive on this basis. (c) Availability of sites: Availability of large number of sites for the RE installations; (d) Readiness of implementation: RE systems that are already in use in Cambodia and are readily available for additional implementation. RE options were ranked higher if there was reasonably good data on resource availability and potential sites or projects. Prospective RE options without good resource data were ranked lower or not considered. (e) Technology adaptability: Technology adaptability by existing technical skills in the country and the ease of learning the operational activities by the broad based Cambodian consumer base; (f) Financial viability: RE systems that are proven in Cambodia to be financially viable with cost -competitiveness with other existing operations for energy generation. (g) Consumer acceptability and affordability: Consumers willingness to pay. 51. Solar energy development ranked the highest with biomass power second. Wind energy was not included as there is very little data available. A systematic wind mapping could be undertaken in Cambodia as part of the policy support component of this IP. Mini-hydro was not a preferred option by the RGC because of low water availability during summer and the periods of drought which are becoming frequent in Cambodia as well as its poor performance in the past. Similarly, biogas and waste- to- energy was not included due to their poor performance in Cambodia. Table 9 summarizes the ranking of RE options. 24

31 Resource Potential Table 9: Ranking of Renewable Energy Options against Selection Criteria Criteria Biomass Solar Farm Rooftop Solar Solar Mini-grid Solar Home System Medium High Significant resources available from Significant solar resource available in Cambodia a variety of agricultural residues; with an average of 5 kwh/m 2 /day however need improved arrangements to secure feedstock Unexploited market potential Availability of sites Readiness for implementation Technology adaptability Financial viability Consumer acceptability / affordability High Lack of subsidy for small and large scale project; and lack of available and affordable financing/loans High Substantial potential sites available Low All power plants, including spare parts are imported; some are imported from unreliable suppliers Low Low technical capacity to operate the plant and lack of spare part available in the country High Viable compared to petroleumbased generation High EDC sells electricity to REE at price of cents per kwh. REE will be happy to buy electricity power at below price offered by EDC. It could be between 12 and 13 cents. High Lack of grants and soft loans that can de-risk the first RE projects. Solar energy sector is still small with 25 solar companies. Medium Available sites mainly in special economic zones Medium Some companies are technical capable for large-scale projects. Medium Technical capacity is available High Substantial commercial and residential rooftop potentials in Cambodia High Some companies are experienced in implementation High Technical capacity is available and applied Medium High capital costs and long pay-back time due to limitations in policy framework and regulatory uncertainty High Competitive against diesel generation High Competitive against diesel generation EDC = Electricité du Cambodge, kwh/m2 = kilowatt-hour per square meter, RE = renewable energy, REE = rural electricity enterprises. Low On-grid rural areas with high tariffs and sufficient day load usage Medium Depending on agreement with REE and EDC. No technical issues Medium Technical capacity is available High Sufficient off-grid remote rural areas High Solar companies are experienced in implementation High Technical capacity is available and applied High Viable compared to petroleum-based generation High Very competitive against diesel generation and offers 24 hours access to electricity High Competitive against diesel generation; however subsidy is needed for pro poor households 25

32 V. Program Description 52. Recognizing the multi-sectoral dimension of RE development for addressing climate change challenges, the IP is designed to facilitate national efforts of shifting to a low-emissions economy that provides employment opportunities with some specific focus on reducing poverty in rural areas and urban margins, and a broader view of the medium- to long-term prospects for RE. Given the immaturity of RE development in Cambodia, the IP must have flexibility in terms of project definition and implementation to adjust to changing circumstances and new opportunities, including uncertainty in the national policy framework and financial markets. The IP promotes systematic and expanded development of RE resources to support access to energy and productive end use of energy through a combination of mutually-reinforcing physical investments and technical assistance for improved policy framework. The physical investments include solar and biomass energy development, while the technical assistance includes (i) human development and capacity building, (ii) public awareness campaigns to facilitate RE project development and implementation, (iii) a proposed Year of Renewable Energy in Cambodia ; and (iv) investment preparation activities. 53. The main outcomes/benefits of the proposed investment plan will be (i) an improved policy framework to enable commercial RE development at progressively larger scale; (ii) commercial scale RE demonstration which is replicable and scalable; (iii) mobilization of private investment into RE development; (iv) reduced reliance on fossil-fuels resulting in foreign exchange savings and avoided emissions of conventional pollutants and GHGs; (v) reduced pressure on forest resources; and (vi) improved energy security through diversification of supply. The conceptual approach of the IP is presented in Figure 7. A. Strategic Issues 54. Energy policy evolution is needed including new policy and financing instruments. At the national level time-bound RE capacity and output targets can be defined using Sustainable Development Goal 7 (increasing access to modern energy services) and Cambodia s INDC for energy industries as a starting point. For example, the INDC includes avoided GHG emissions of 1.8 million tco 2e/y by 2030, which could be met by having 200 MW of solar PV in operation by Using this as a starting point, more ambitious national targets can be set, with policy guidance for EDC and REEs to facilitate market growth with expanded private sector investment. 55. The RE market can evolve quickly due to changes in tariffs for REEs (noted above). The RGC will continue to subsidize the $0.20/kWh tariff but the subsidy to REEs should be phased out as soon as possible to encourage shift from diesel-based generation to cheaper RE-based generation, and to direct government funds to support grid expansion or other sectors (e.g., education and health). Solar and biomass both should be feasible at levelized cost of electricity (LCOE) less than $0.20/kWh. Benchmark tariffs can be established, against which RE projects 26

33 can be competitively tendered; the resulting price discovery would then inform elucidation of FiTs (especially for rooftop solar). Adherence to high quality technical standards and incorporation of after-sales operation and maintenance support are critical for all types of new RE installations and operations. Figure 7: SREP IP Conceptual Approach kwh=kilowatt-hour, MW=megawatt, RE=renewable energy. 56. Because the RE policy framework is subject to change, and given the fact that electricity generation in Cambodia is delegated to the private sector, the candidate investments are indicative at best. As the SREP focal point for Cambodia, MME will provide overall guidance for implementing the IP. Most of the project concepts will be developed under the leadership of the ADB Private Sector Operations Department (ADB-PSOD); the exception is the proposed expansion of solar home systems (SHS) and introduction of solar mini-grids, which will be developed under the leadership of the ADB Southeast Asia Energy Division (ADB-SEEN). Details of project structure, financing instruments, and implementation arrangements will be determined during project preparation; lessons learned from prior RE development in Cambodia (and other countries including developing countries in Asia) will inform project design. 27

34 Component 1: Solar Energy Development 57. Continuing advances in technology and decline in installed system costs mean that the solar energy prospects can evolve fast enough to run ahead of policy development. Alternatively stated, prospective solar development can inform policy-making. For example, captive generation projects which compete against petroleum-based generation may become attractive for commercial development in the absence of major government policy changes. Successful commissioning of such projects provides price discovery, which in turn can inform tariff policy. Based on stakeholder consultations during IP preparation, 4 types of solar investments are proposed which are discussed below. a. Solar Home Systems 58. The solar home systems (SHS) program takes a dual approach with both a social and sector development program for the different social classes in rural areas. The social program provides pro-poor access to affordable energy with 80 Watt (W) SHS for poor households, while the sector development program aims upscale delivery to households who show demand and willingness to pay for 100 W or larger SHS. 59. The social program with the 80W SHS will be a design advance on the existing program from the Rural Electrification Fund (REF), which currently offers 50W SHS with a $100 subsidy and 4-year installment plan that results in a monthly cost of only $1. As price have declined, SHS of 80W or larger are now affordable and these larger SHSs better address the needs and wants of poorer households compared to the 50W model currently offered by REF. The model can provide cheaper electricity and generate electricity beyond basic needs, with multiple benefits such as education (extra study time), social (watching television) and health (fan to ward off mosquitoes). 60. The program will target delivery of 10,000 SHSs, including after-sales service and operations and maintenance support. Based on expected cost for the SHS and some pro-poor subsidy contribution, the repayment cost will be around $0.10 per day. Compared to the costs of battery charging, households will have a 45% direct saving on daily expenditures. Building on the experience of REF and other donor-supported programs, the SHS package should include a television set; with SREP support the program would include more efficient television rated at W consumption which cost around $70-$ Based on the experience of the on-going AFD/SNV program there is rural market demand for 100W to 250W SHSs. These larger systems give the household the option of adding a pumping system for water well and/or micro enterprise creation. A program for the larger SHS will be designed and developed to build on the experience of the ongoing SHS activities, and accelerate service delivery. Existing solar supply companies can develop their own strategy for 28

35 this segment, but would have to comply with the quality standards set by the Good Solar Initiative program. 13 b. Solar Mini Grids 62. Solar mini-grids provide the capability to scale up from SHS to a village-level micro-utility providing energy services to 50 to 100 households with a nominal system capacity of 10 kw. Mini-grids are inherently more challenging than SHS: for a mini-grid to work cost-effectively it needs sufficient day-loads to avoid the usage of a battery bank. 14 There are no known solar minigrids in Cambodia today, so pilot projects will be identified in villages with some commercial activities that require expanded energy supply. Experience of other developing countries in the region will inform the design of appropriate business models for mini-grid deployment, e.g., the SREP-supported programs in Nepal and Bangladesh. Mini-grids appear attractive in remote rural villages where electricity services presently costs around $0.75/kWh. Solar mini grids could lower costs to around $0.25/kWh, based on estimated cost of a 10 kw system with battery storage of around $55,000; SREP cofinancing could further reduce levelized costs by reducing the cost of financing. 63. A critical design point that needs to be addressed is future connection to the national grid. Once a village is connected to the grid, electricity would theoretically be available at prevailing EDC tariffs; today the EDC tariff is lower than the $0.25/kWh target cost noted above. At the moment, EDC is expanding the national grid faster than the targets set by MME for However, the target for 100% grid-connected villages is still 15 years away and continued decline in solar system costs indicate that mini-grids may be a permanent solution as the system costs would be mostly amortized after years. Project preparation will include analysis to determine appropriate financing arrangements so that mini-grids are future-proofed for possible connection to the grid. Preliminary assessment indicates that about 65% of the investment costs would need to be covered by grants. 64. The SHS and mini-grids are proposed for implementation through EDC and REF. Some re-tooling of operations will be required, which will be identified and addressed during project preparation. Based on prior experience, key changes will include (i) improved quality standards for solar systems (following the Good Solar Initiative guidelines), (ii) appropriate contract provisions for extended warranty and O&M support, and (iii) executing multiple contracts for solar system installation and services to ensure competition. The resulting REF v2.0 will be the implementing agency. 13 The Solar Energy Association of Cambodia has 25 member companies, of which 4 have been certified under the Good Solar Initiative. Supplier credit has not been provided for the SHS programs to date, but this might be a feature of the scale-up SHS program. 14 Considering that solar power systems are still at a relatively early stage of use in Cambodia, this component will focus on identifying installations that do not require batteries for viability; this approach is intended to keep system design simple and minimize costs. As experience is gained, batteries can be introduced in later stages, taking advantage of global cost reductions expected in the next several years. 29

36 c. Rooftop Solar Systems 65. The solar rooftop market could be on the order of 400 MW to 500 MW, but policy and financing barriers need to be eliminated to create a market for electricity consumers to become producers ( prosumers ). As system costs continue to decline, the potential savings to consumers are on the order of 35% to 40% of the current monthly payments. The most cost effective market for solar energy is for customers with daytime usage of the rooftop-generated energy, wherein battery storage is not required. Eliminating batteries makes the payback time of the systems more attractive as battery storage accounts for about 40-50% of the total costs. A key barrier at present is the lack of net metering and FiT especially for commercial consumers: weekends and holidays in Cambodia total up to about 120 days per year. Without an appropriate off-take pricing arrangement, about 33% of the annual generation output would either be wasted or simply not generated which is clearly a sub-optimal outcome. 66. Introduction of net metering in a pilot phase is strongly recommended as an appropriate policy instrument. With net metering, the grid takes any surplus energy output, eliminating the need for batteries, and is the obvious solution to optimize the capacity and cost-effectiveness of each solar rooftop system. If the Net Metering System is introduced, the saving could increase up to about 100%, that is, an individual consumer could effectively zero out the monthly electricity bill. This conclusion is based on recommendations of the Solar Energy Association of Cambodia, the Green Business Committee from Eurocham, and feedback from private sector developers. Lessons learned in the pilot phase can serve as input for policy development. Net metering will allow optimization of rooftop capacity and full utilization of all energy output. The potential for transformation exists, as the market potential for commercial and industrial buildings is estimated at MW and the additional energy can be absorbed by the grid at zero effective cost to EDC. 67. The residential market also has high potential but has different characteristics than the commercial and industrial market. Residential projects will have smaller installed capacity and typically show highest consumption outside the business hours. System capacity is normally optimized on an annual or monthly basis, while commercial and industrial systems are normally optimized on a daily or weekly basis. The residential market can be developed if a policy is in place to reward residential consumers for supplying surplus electricity to the grid during the day. A net-metering policy should consider annual variations since peak residential demand occurs in the dry season (mainly due to air conditioning load) when hydropower output is at a minimum. 68. An appropriate net metering policy can be developed based on experience from other countries and the knowledge base of existing solar companies in Cambodia. The policy and regulatory framework will need to evolve in order to unlock the market. In this context, SREP can provide grant support for advisory services including policy formulation, pilot program design, drafting of appropriate power purchase agreements (PPA), etc. 30

37 d. Solar Farms 69. Solar farms are the most promising opportunity for rapid scale up in the near term. At present MME reports only 1 MW of installed capacity with an insignificant contribution to the grid. Market development is in its infancy, but there is potential for several hundred MW in the near term. 15 Two market segments appear promising: (i) projects within Special Economic Zones (SEZs), and (ii) grid connected projects selling output to EDC. 70. Solar farms located in SEZs are more attractive in the near term due to regulatory simplicity: each SEZ has a license to distribute electricity to the member companies within the SEZ. Solar capacity can be scaled to SEZ demand and PPAs can be executed for captive generation without any direct intervention on the part of EDC and EAC. There are 30 SEZs with special incentives to attract direct foreign investments, including tax incentives. One local solar energy company (Kamworks) has reportedly signed a contract for an 8 MW project in the Vihear Sour SEZ Traditional IPP projects face classic first-mover risk. Solar developers report that commercial financing is non-existent at interest rates and tenors necessary for financial viability. Outside SEZs there are no tax exemptions which make it harder to finance large scale projects. MME, EDC, and EAC are taking action to jump-start solar farm development. MME is currently tendering a 10 MW project (located near the Viet Nam border in the town of Bavet), with an offered off-take price of less than $0.10/kWh. Five technical proposals were received of which four were qualified for further consideration; financial proposals will be reviewed in mid-may The experience of this project will inform further development and design of large scale projects, especially future projects which sell electricity directly to EDC. Assuming that a power purchase agreement is executed for less than $0.10/kWh, a single project cannot be expected to transform the energy sector: there will be still be a need for concessional support to accelerate solar development as has been the case in other developing countries ADB s Private Sector Operations Department (ADB-PSOD) will take the lead in identifying multiple solar farms, with an initial target of at least 3 installations of 5 MW each. The total capacity supported by SREP cofinancing is expected to be on the order of 60 MW, and will be determined during project preparation. Additional notes on the project concept are presented in Annex D. 15 For example, a Thailand-based company, Global Purify Power, is developing 225 MW of aggregate capacity in the provinces of Kampong Speu, Kampong Chhnang, and Takeo; the output will be sold to businesses and factories (no other details are available). 16 Intermittency of solar output will become an issue when penetration reaches around 20% of grid-connected capacity. In the near term this is not expected to be an issue, as grid-connected solar will be complemented by existing hydro plants. 17 For example, Thailand has benefited from $170 Million in concessional finance from the Clean Technology Fund (CTF), which has been instrumental in financing several utility-scale solar and wind projects. Prior to mobilization of CTF, some grant funds were used to support the first utility-scale solar project. In parallel with the CTF co-financed activities, the government introduced additional tariff incentives which have been instrumental in solar energy growth. This is a good example of learning-by-doing investment complemented by policy evolution, as is envisioned for Cambodia with SREP support. 31

38 Component 2: Biomass Energy Development 73. Biomass has the second highest potential after solar, and appears attractive because the resources are widely available and biomass power plants can provide baseload power in areas where diesel generation dominates. Biomass power plants are a logical part of plantation-based agro-industries where cogeneration and even tri-generation (combined power, heat, and cooling) designs may provide the best return on investment depending on the location of a specific plant. Feedstock include rice husk, sugar cane bagasse, corncobs and corn straw, waste wood from cashew and rubber processing. The technical potential is estimated at more than 18,000 GWh/y, or about 3,000 MW. The actual market potential could be as high as 500 MW, but only MW has been installed, which is less than 2% of grid-connected generation capacity and well below 1% of total domestic generation output. 74. Biomass is inherently more complicated than other forms of RE because feedstock must be secured and energy production technology should be tailored to feedstock as well as energy end use, e.g., power only versus cogeneration or tri-generation. Cambodia has some experience with biomass gasification technology using rice husk, but feedstock security has been a major challenge because as much as 33% of paddy rice is exported without milling. 75. The prospective market opportunities are based on the REE selling price of $0.20/kWh versus prospective biomass cost of production ranging from $ /kWh. The macroeconomic prospect is attractive as biomass power is a form of industrial cleaner production which can displace petroleum-based generation, and biomass power output can complement hydropower during the dry season. 76. SREP cofinancing is proposed to support at least 2 prototype projects of 1.5 MW each which can be quickly replicated; the target capacity is a total of 10 MW. Two candidate projects have been identified in Battambang and Kampong Cham province where feedstock availability is good, and an additional candidate project of 5 MW located in a SEZ has been identified for consideration. Additional sites and projects will be identified during project preparation. Additional notes on the proposed investments in biomass power development are presented in Annex D. Component 3: Policy Support and Public Awareness a. Policy Support 77. The solar and biomass investment concepts will be pursued in parallel with technical assistance for policy evolution and capacity building covering several key areas. MME needs capacity building so that it can facilitate policy changes, introduce new modalities e.g., publicprivate partnerships (PPPs), and apply lessons learned from other developing country experience (e.g., India and Thailand). PPAs should be standardized for different categories of RE projects to facilitate bankability of new projects. This should include a template PPA for solar farms, and 32

39 a template PPA for rooftop solar. The rooftop solar could be expanded to comprise (i) a template PPA for rooftop owners and other offtakers, and (ii) a template PPA for selling to EDC based on net metering. Technical assistance for PPA standardization will include legal advisers to assist in development of bankable projects, 78. EAC may need assistance to anticipate rapid evolution of RE development and to facilitate the types of investments outlined above. The rooftop market will require a FiT and net metering to evolve, as well as clear regulatory signal so that EDC takes and pays for all surplus power. In general, EDC will need to provide open access and be allowed to take a wheeling charge so that connection of new RE capacity is a revenue-neutral or revenue-positive proposition. RE suppliers and service companies can benefit from training on installation, operations and maintenance to ensure reliability and durability of new projects. This should build on the Good Solar Initiative and could include barefoot engineering approaches. Training requirements specific to solar and biomass investments can be addressed during preparation of those projects. Training syllabi will be elucidated based on further review of the various donor and MDB activities, and additional support from development partners will be encouraged. 79. A comprehensive Capacity Development Program (CDP) is needed to accelerate knowledge transfer to and within MME. This will includes identification of best practices to enhance sector improvements, corporate governance, and for overall improvement of MME s operational performance. The CDP is designed to ensure availability of skills, and needed institutional structure in attaining the MME s Management vision, goals and objectives for the short-, medium-, and long-term. The capacity building program will assist MME in establishing the institutional structure best suited for the Cambodian environment, and introduce measure for monitoring compliance and policy oversight. 80. The current organizational set up of MME appears to be adequate in meeting the operational requirements. However, a human development and capacity building program is needed for its operational activities, which are discussed below. Staff are hardworking, diligent, and have good working attitude, but lack certain specialization, particularly: planning, energy economics, economic and financial analysis, costs and cost analysis, banking and financial services, environmental and social engineering, environmental and social mitigation measures. Some retraining is possible but new recruitment will also be necessary in these areas. Under the proposed capacity development program, MME would select a group of qualified and experienced senior staff (middle and top management) and provide training for undertaking a long term planning of sector development and investment planning. 81. The human development and capacity building program will include three elements, namely: (i) Formulation of policy framework, strategy, and sector development plan; (ii) Review and recommendations on appropriate institutional arrangements and organizational set up for implementing a national RE program; and (iii) Development and design of RE capacity building program with implementation arrangement/mechanism; training topics, duration, and resources 33

40 requirements; preparation/compilation of manual; and linkages with regional institutions / organizations for sharing/conducting training programs. 82. Additional priorities include corporate management and planning, which is specific to MME and EDC. Environmental and social safeguards policies also need to be updated, which applies broadly to all government agencies involved in the energy sector. These topics are described briefly below. 83. The planning process involves close coordination with other ministries, sector entities, and industrial and commercial sectors, private sector activities and involvement, to have the knowledge and full understand of their operations and needs; the rate of GDP growth; which sectors will get priority; timeframe when additional electricity will be available to meet the domestic energy demand and possibly for export to other countries; and how will the growth of the energy sector be financed (e.g., surplus revenue from energy sale, private sector, foreign investors, borrowings, tax revenue etc.). The long-term (strategic) plan helps identify the true energy demand and supply gap; and to plan for investment to bridge the gap. These long-term plans are indicative and require regular updates because of changing factors (macroeconomic factors, economic growth, industrial and consumption growth rate not being the same as projected and other factors that are beyond the control of the energy sector). 84. It is extremely important for RGC to update and implement national environmental and social safeguard policies and procedures and build capacity in line with international good practices. This is particularly relevant if coal and large hydropower remain high priorities, as these types of projects are problematic with respect to long-term sustainability. Training will be provided for environmental and social impact assessment, and possibly for application of sustainability rating systems. b. Public Awareness 85. Public awareness campaigns are a necessary ingredient in energy sector transformation. This is particularly true for solar energy development given the rapid declines in system costs: the system costs and levelized costs of solar electricity in 2012 are obsolete, but planners and policy-making bodies may not be aware of the progress being made in achieving grid parity in other countries. Likewise, many consumers may not be aware of the potential benefits of rooftop solar. There are a host of issues in biomass energy development including potential competing land uses for food versus non-food crop production and potential impacts on forest conservation that need to be addressed in a systematic and transparent manner. The RGC also needs to consider soliciting additional support in meeting its INDCs under the Paris Climate Change Accord. 86. A public awareness campaign will be developed comprising 2 strategic aspects: (i) an internally-oriented campaign to support project development and implementation; and (ii) an 34

41 externally-oriented campaign to attract new investment and support from development partners. The external campaign will be the Year of Renewable Energy in Cambodia in These campaigns will be further outlined and elucidated pending endorsement of the IP. 35

42 VI. Financing Plan 87. Table 10 presents the indicative financing for the proposed investment components. Component 1: Solar Energy Development Program Subcomponent 1: Solar Energy Development Table 10: Indicative Financing Plan ($ million) SREP a ADB Private Sector Government b Total Solar Home Systems Solar Mini-grids Project Preparation Subcomponent 2: Accelerating Solar Power through Private Sector Rooftop Solar Systems Utility-scale Solar Farm Project Preparation Subtotal Component 2: Biomass Power Project Project Preparation Subtotal Component 3: Policy Support and Public Awareness Note: TOTAL a Excludes Investment Plan preparation grant (IPPG) of US$ 0.3 million b Government contribution to Rural Electrification Fund 88. The long-term investment for RE scale up to contribute to energy sector transformation is on the order of at least $1 billion, assuming ultimate capacity of 1,000 MW. Because of competing demands of other sectors of the economy, the government has already delegated electric power generation to the private sector. Any public sector capital outlay will be limited by necessity. As discussed in the preceding section, the enabling environment for commercial investment will need to evolve and improve rapidly. The financing plan presented in Table 10 is therefore indicative and subject to change. The total investment envisioned assumes that ADB contributions will cover 25% of total projects costs, and that SREP cofinancing will facilitate additional private sector investment (financing plans for individual projects will be determined during project preparation). Financing instruments will be identified during project preparation and may include grants, loans, equity, risk-sharing, guarantees, and output-based aid. Experiences from previous and on-going RE programs in Cambodia and other developing countries will be drawn upon to inform project design and financing arrangements. The principle of minimum concessionality will be applied; alternatively stated, precision-guided subsidies will be used to maximize the effectiveness of 36

43 SREP cofinancing. 18 ADB will assist the RGC in seeking support from other development partners. Recognizing the need for long-term financial support, a second phase of financing may be proposed based on progress during the first 2 years of implementation, which could include potential support from SREP (if new financial resources are made available), the Green Climate Fund, and other sources. 18 For example, in 2010 ADB-PSOD utilized a small grant from ADB s Clean Energy Financing Partnership Facility (CEFPF) as part of the construction contingency funds for a 55 MW solar project in Thailand which was the first utility-scale thin-film solar PV plant in Asia. At the time the project was being designed, construction contingencies for solar plants were higher than conventional plants by a factor of 10 or more, i.e., about $200,000 per MW of solar versus $15,000 20,000 for a conventional gas-fired power plant. A $2 million grant was approved as a standby contingency fund, which was ultimately not required for project commissioning; the grant was returned to ADB s CEFPF. In this instance, the leverage on the grant funds was effectively infinite since the CEFPF grant was not expended on the project. 37

44 VII. Responsiveness to SREP Criteria SREP Investment Criteria Increased RE capacity and increased access to energy via RE Low-emissions development Affordability and competitiveness of RE Table 11: Responsiveness to SREP Investment Criteria Solar Energy Development Program Strategic focus on scalable solutions for access to energy and productive end use of energy including (i) solar home systems, mini-grids, (iii) rooftop systems, and (iv) solar farms. Aggregate RE capacity of at least 68 MW and energy output greater than 124 GWh/y directly supported by SREP. Biomass Power Project Strategic focus on access to energy and productive end use of energy through use of waste biomass for electricity production. The proposed power installations are replicable and scalable. SREP will support 10MW biomass capacity with energy output of 60 GWh/y. Cambodia has an opportunity to diversify its energy supply mix and shift toward low emissions development with solar and biomass. Solar and biomass potential is estimated to be well over 1,000 MW, which can contribute significantly to reduced reliance on unsustainable fossil power. Commercial development of these priority resources can be expected to facilitate future development of wind power. From the total aggregated solar and biomass capacity, an estimated 97,000 tco2e of GHG emission is expected to be reduced. Off-grid solutions can be delivered well below the cost of existing petroleum-based generation. On-grid solutions will initially require concessional financing support, but installed costs are expected to decline rapidly on successive installations and achieve grid parity in the near term. Biomass power can be delivered at parity with grid power in rural areas where REE delivers power supplied by EDC. Biomass power can be delivered below the cost of diesel-based generation when feedstock is secured at low cost. Productive use of energy All solar components are expected to benefit from declining system costs in the near term. Solar home systems and mini-grids will provide households and villages expanded and improved electricity supplies for lighting, fans, refrigeration, radio, and television. Successively larger installations will expand productive end-use of energy which enhance income and welfare of rural communities. Additional capacity and output will support enhanced productivity in the agricultural sector. Economic, social, and environmental development impact Rooftop and solar farms provide on-grid capacity for residential, commercial, and industrial consumers, with benefits accruing from long-term cost savings. For solar home systems and mini-grids, additional economic benefits will result from expanded commercial use of energy. Social benefits will accrue from access to electricity for lighting, refrigeration, and home appliances. Economic benefits will result from reducing the cost of electricity supply to consumers. Social benefits will indirectly accrue from expanded energy supply in rural areas dominated by agriculture. 38

45 SREP Investment Criteria Economic and financial viability Leveraging of other financing Gender Solar Energy Development Program All solar components will provide economic benefits by reducing the cost of electricity supply to consumers. Environmental benefits will accrue from reduced use of petroleum fuels for power generation. The solar home systems and mini-grids will be economically viable based on avoided costs of petroleum-based generation. Biomass Power Project Environmental benefits will accrue from using biomass which would otherwise be disposed as waste, which will reduce use of petroleum fuels for power generation. Biomass power will become commercially viable with credit enhancements provided by concessional finance. Rooftop and solar farms will become commercially viable with credit enhancements provided by concessional finance. SREP funds will catalyze private sector development with overall leverage of about 1:4. The demonstration impact of the proposed solar program and biomass power project, along with policy evolution, are expected to result in replication and scale up in the near-term, with potential for as much as 500 MW of RE capacity in the medium to long term. Women and children will benefit from the affordable and reliable electricity. Women can extend their work hours, while children can study at night.. Potential gender benefits to be assessed during project preparation. Co-benefits will be mainly in form of reduced air emissions from diesel generation which will Co-benefits reduce impacts on public health. EDC = Electricité du Cambodge, GWh/y = Gigawatt-hours per year, MW=megawatt, RE = renewable energy, REE = rural electrification enterprise, SREP= Scaling Up Renewable Energy for low-income countries Program. 39

46 VIII. Implementation Potential with Risk Assessment 89. Table 12 describes the implementation potential of SREP IP in terms of risks associated, mitigation measures, and level of residual risk. Table 12: Implementation Potential and Risk Summary RISK DESCRIPTION MITIGATION Policy and Regulatory Framework Institutional Risks Financial Risk Social and environmental risks Renewable resource uncertainty Weak institutional and legal framework to support RE investments. The government does not have RE generation targets. Slow progression on the drafting and approval of framework and policies. Limited institutional capacity which might prevent a wellplanned and coordinated introduction of RE services targeted at rural development Lack of benchmark tariffs and Feed-in Tariffs (FiT) to support bankable power purchase agreements. Limited institutional capacity for addressing social and environmental issues RE technology outputs may be lower than expected due to seasonal variation. Issues on RE technology reliability need to be addressed. The capacity building program targets improvement in national RE regulatory and policy framework, which will cover the introduction of policies on net metering, FiT, and fair value tariffs to make investments in solar and biomass more attractive. A sector development plan will also be drafted, with Sustainable Development Goal 7 and Cambodia s Intended Nationally Determined Commitments to the Paris accord as starting points. Another component of the capacity building program is the review of institutional structure and recommendations of appropriate organizational set-up to ensure proper coordination among involved agencies. This will be complemented by a tailored capacity building activities among selected staff of MME, EAC, EDC, REF and private sectors to strengthen their technical knowledge and skills for managing various RE systems (including technologies for net metering), and for longterm development planning. The introduction and institutionalization of net metering and FIT will make investment payback times more attractive and reduce cost of capital. Project preparation will cover due diligence to assess potential environmental and social impacts of the proposed solar and biomass projects to ensure that the government and ADB safeguards requirements are complied. The project preparation will assess technical viability of solar and biomass. Solar energy is abundant in the country, thus low risk. However for biomass, there is a need to develop a system for collection and management of feedstock. Site selection for the proposed project will ensure availability of feedstock such as rice husks, and corncob and straw. Site RESIDUAL RISK Medium Low Low Low Low for solar. Medium for biomass. 40

47 RISK DESCRIPTION MITIGATION should be close to the off take area to have time/cost efficient logistics. RESIDUAL RISK Based on early experience with solar home systems deployed through REF, a minimum 2- year guarantee period will be required from suppliers of SHS and mini-grid systems. For rooftop and solar farms, similar guarantees will be required, and provision could be made for an extended operations and maintenance period. EDC = Electricité du Cambodge, EAC = Electricity Authority of Cambodia, FiT = Feed-in Tariffs, MME = Ministry of Mines and Energy, RE = renewable energy, REF = Rural Electrification Fund, SHS = solar home systems. 41

48 IX. Monitoring and Evaluation Framework 90. A monitoring and evaluation (M&E) system will be established by the Government, in cooperation with ADB and other donor partners, for the purpose of tracking and reporting on progress in achieving SREP objectives and outcomes. The M&E framework will be coordinated by the Ministry of Mines and Energy. Table 13 summarizes the proposed M&E framework for Cambodia s SREP IP. Table 13: Results Framework for SREP in Cambodia Results Indicators Baseline Targets Support low carbon development pathways 1. Increased supply of renewable energy 2.New and additional sources for renewable energy projects 3. Increased access to modern energy services 4. Greenhouse Gas emissions mitigated SREP Transformative Impacts Percentage of total households 55% in % by 2030 with access to electricity 19 Capacity: Capacity: 60 MW in 150 MW by 2023; 2014 a 200 MW by 2030 RE capacity (MW) and annual electricity output (GWh/y) Output: 158 GWh/y Increased annual public and private investments ($) in $84 million targeted subsector(s) SREP Outcomes Annual electricity output from RE Output: 394 GWh/y by 2023; 526 GWh/y by 2030 $210 million in 2023 and $280 million as a result of SREP interventions Installed capacity 0 78 MW Design Output GWh/y Leverage factor ($ finance from other sources compared to SREP funding) Number of women and men, businesses and community services benefiting from improved access to electricity and fuels as a result of SREP interventions CO2 emissions reduction 0 0 1: ,000 people or around 92,000 households Male: 223,100 Female: 236,900 97,000 tco2e/year by 2020 Means of Verification MME MME MME SREP Projects, MME SREP Projects M&E, MME SREP Projects M&E, MME MME, MOE CO 2 = carbon dioxide, GWh/y = gigawatt-hour per year, MME = Ministry of Mines and Energy, MW = megawatt, M&E = Monitoring and Evaluation, tco 2e = tons of carbon dioxide equivalent. Note: a Does not include large hydropower 19 The Revised SREP results framework (2012) indicates that this indicator should be a National measure of energy poverty such as the Multi-dimensional Energy Poverty Index (MEPI), or some equivalent mutually agreed measure. Energy poverty is a multidimensional problem which includes problems associated with a lack of access to sufficient energy supply, a lack of access to clean energy, and a lack of access to affordable energy.. For this purpose, energy access is used to measure poverty. 42

49 Annex A: Assessment of Cambodia s Absorptive Capacity A. Debt Sustainability Cambodia is among the fastest developing economies in recent years. In 2015, the country has sustained solid economic growth and expected to remain robust in 2016 with 7.0% projection. Garment and footwear manufacturing, construction, and services contributed strongly to the economic growth in Domestic demand remained strong, accommodated by low inflation and high credit growth. Inflation averaging 1.2% in 2015 is the lowest since The government s fiscal consolidation efforts narrowed the deficit, excluding grants, to an estimated 2.4% of GDP in 2015 from 3.5% in 2014 (ADB Asian Economic Outlook, 2016). The International Monetary Fund (IMF) 2015 debt sustainability analysis shows that Cambodia is at low risk of debt distress; however, it continues to be vulnerable to growth, exports, fiscal shocks, and the materialization of contingent liabilities. Country s external public debt rose from $5.4 billion in 2014 to an estimated $5.9 billion in 2015, equal to 33.9% of GDP. Large exchange rate depreciation or export shocks could potentially have a major impact on the debt dynamics, including loose fiscal policy. Figure A-1: Cambodia Public External Debt, ($ Million) Percent of GDP Source: IMF Cambodia Country Report, 2015 Cambodia s external public debt is one of the lowest among major developing countries. Large share of public debt is sourced out from bilateral sources, which increased from 50% in 2009 to 69% in China is the country s largest bilateral creditor, contributing to about 62% of the total bilateral debt stock and about 90% of bilateral debt disbursement during the past three years. External debt disbursement is projected to average about $550 million annually over the next five years, or about 2.5% of GDP. 43

50 Cambodia has practically no domestic debt. The Government targets to focus more on mobilizing domestic revenue and raising government deposits (i.e., savings, not borrowings) than issue domestic debt over the medium term. The vulnerability of the country s debt sustainability requires continued structural reforms to increase the economy s resilience against external shocks, and to mobilize fiscal revenues. The government remains committed to reduce fiscal deficit and maintain debt-to-gdp ratio below 30% over the medium term to ensure debt sustainability and to secure stronger fiscal buffer over the longer term. At the same time, the government s policy of avoiding non-concessional borrowing has also been a key factor in sustainable debt management. Moreover, the debt management committee has recently revised the debt policy framework, which now includes a ceiling on government guarantees at 4% of GDP. The authorities have also designated a contingency fund account for contingent liabilities related to enterprises in the power sector. Table A-1: Cambodia Public External Debt by Source, 2014 $ Millions Share of Total External Debt % of GDP Total 5, Multilateral 1, Bilateral 3, Source: IMF Staff Report for the 2015 Article 5 Consultation Debt Sustainability Analysis B. Institutional Capacity The Ministry of Mines and Energy will serve as focal point and the executing agency for the SREP Investment Plan (IP). The Electricité du Cambodge (EDC) will be the implementing agency for the proposed SREP projects. The preliminary implementation schedule is outlined in Table A-2 below. For the successful implementation of the SREP, extensive capacity building program will be conducted among selected staff of the MME. The proposed Capacity Development Program (CDP) will be a major undertaking under the proposed SREP IP. This program will accelerate the knowledge transfer at MME of best practices to enhance their respective capabilities for sector improvements, corporate governance, and for overall improvement of MME s operational performance. The capacity building program is designed to ensure availability of skills, and needed institutional structure in attaining the MME s Management vision, goals and objectives. The capacity building program will assist MME in establishing the institutional structure best suited for the Cambodian environment, and introduce measure for monitoring compliance and policy oversight. The implementation of the program covers the short-, medium-, and long-term capacity building requirements. The capacity building program will include three components, namely: (a) formulation of policy framework, strategy, and sector development Plan; 44

51 (b) review an recommendations on appropriate institutional structure/ organizational set up for implementing RE program; (c) development/design of RE capacity building program with implementation arrangement/mechanism; training topics, duration, & resources requirements; preparation/compilation of manual; and linkages with regional institutions/organizations for sharing/conducting training programs. Table A-2: SREP Implementation Schedule 45

52 Annex B: Stakeholder Outreach Integral to the development of the SREP IP for Cambodia is the engagement of various stakeholders to inform them on SREP objectives, solicit inputs and feedbacks on the proposed investments, and its development outcomes and impacts. Stakeholders were composed of representatives from government agencies, development partners, civil society organizations, local and international non-government organizations, and private sector. Series of consultations with a number of government agencies were undertaken in developing the IP. Table B-1 below provides the list. The government recognizes that Cambodia s development of renewable energy (RE) sources is very slow. RE resource development and technology deployment is mainly in initial demonstration stages. SREP support is needed to overcome barriers, including financing of physical investments and assistance for policy evolution. The Ministry of Mines and Energy (MME) highly supports solar and biomass energy development given the high technical potentials and market size for these two RE resources in the country. Table B-1: List of Government Agencies Consulted Institution Name/Title Contacts H.E. Hem Vanndy, Undersecretary of State Ministry of Economy and Finance (MEF) H.E. Pen Thirong, Deputy Director General Mr. Yi Sokthearith, Chief Multilateral Cooperation hemvanndy@hotmail.com Ministry of Planning (MOP) Council for Development of Cambodia (CDC) Ministry of Mines and Energy (MME) Ministry of Agriculture Forestry and Fisheries (MAFF) Ministry of Rural Development (MRD) Mr. Ohan Sopanhavorn Mr. Nop Rannavuth, Deputy Director General Mr. Chea Vuthy, Deputy Secretary General H.E. Victor Jona, Director General Mr. Toch Sovanna, Director, Department of New and Renewable Energy H.E. San Vanty, Undersecretary of State Mr. Dok Doma, Deputy Director of Water Supply jvictor.mime@gmail.com tochsovannamme@gmail.com dokdoma@gmail.com Rural Electrification Fund (REF) Mr. Loeung Keosela, Director Mr. Kim Rithy, Deputy Director,

53 EDC Institution Name/Title Contacts M&E Dr. Praing Chulasa, Deputy Managing Director, Planning & Techniques MME Petroleum Department Ministry of Environment Electricity Authority of Cambodia Mr. Rann Seihakkiry, Deputy Director of Coporate Planning and Projects Mr. Nong Sovanneth, Assistance Project Manager Mr. Chea Socheat Mr. Chuop Paris, Deputy Secretary General Mr. Thy Sum, Director Climate Change Department Mr. Badri Prasad Rekhani Electrical Engineer and Regulatory Expert January 2015, 1 st Stakeholders Consultation Workshop The first consultation workshop aims to orient stakeholders on the objectives of the SREP, its benefits and the modalities of its implementation in Cambodia to ensure a common understanding. CSOs, NGOs, private sector investors, technology suppliers and financial institutions attended the workshop. Feedback from the various stakeholders indicates that there is potential value-addition to be created with SREP support for larger scale RE development, exploitation of the full spectrum of RE resources, application of a variety of RE technologies for various end-users, and opportunities to employ new financing and business models for RE development. For example, SREP might be utilized to assist Rural Electricity Enterprises with RE systems to reduce diesel generation; this assistance might be delivered with support from existing micro-finance institutions. Table B-2: List of Private Sector, CSOs and NGOs Consulted Institution Name/Title Contacts Private Sector Solar Partners Asia Cambodia Ltd Mr. Jim Gramberg, CEO info@solarpartners.asia jim@solarpartners.asia , EcoSun Energy Cambodia Mr. Sun Mao, Director ecosuncam@gmail.com / , Khmer Solar Ltd Mr. Ford Thai, President info@khmersolar.com / / 47

54 Institution Name/Title Contacts / Foreign Trade Bank of Cambodia Mr. Mean Channarith, Official narith@ftbbank.com / Chief (Cambodia) Specialized Bank Plc. The Small-Scale Sustainable Infrastructure Development Fund, Inc. Rural Development Bank (RDB) Comin Khmer Co., Ltd Energy Saving Supply Co.; Ltd National Bank of Cambodia CSOs/NGOs The Asia Foundation SNV Cambodia Cambodian NTFP Development Organization (CANDO) Forum Syd Mr. Thul Kosal, Legal and Compliance Manager Mr. Sok Samnang, Deputy Marketing Manager Russell J. delucia, President Elizabeth Friend Miss Ou Sarinda, Credit Officer Keo Moly, Business Development Manager Mr. Tes Bunheang, Sale Manager Ms. Ponn Dalyn, Deputy Director, Economics Research Dept Ms. Sun Chhavivann Mr. Silas Everett, Country Representative Mr. Jon Exel, SNV Senior Renewable Energy Advisor Jason Steele, Sector Leader Renewable Energy Heang Sarim, Executive Director Mr. Tep Chansothea, Program Officer-Climate Change Mr. John Week, Communication Officer thulkosal@yahoo.com, samnang.sok@chiefholdings.c om.kh tola.vann@chiefholdings.com.k h delucia@s3idf.org Elizabeth@s3idf.org admin@rdb.com.kh /811 ckadmin@comin.com.kh keomoly@comin.com.kh / tes.bunheang@ess.com.kh ; info@nbc.org.kh / / cambodia.general@asiafounda tion.org cambodia@snvworld.org JSteele@snvworld.org JExel@snvworld.org ; candodevelopment@gmail.com / chansothea.tep@forumsyd.org May 2016, 2 nd Stakeholders Consultation Workshop 48

55 The second stakeholders consultation workshop aims to bring together different stakeholders to give updates in the preparation of the country s renewable energy investment plan, discuss criteria used for the selection of renewable energy technologies, present the proposed priority projects and potential development impacts, and solicit feedbacks and suggestions to further improve the plan. The workshop was comprised of morning and afternoon sessions. Representatives from private sectors, developers and non-government organizations participated the morning session, while development partners attended the afternoon session. Discussion with the private sectors and NGOs focused mainly on the lack of solar energy pipeline in the country, lack of policy framework such as net metering and FiT to attract private sector participation, and strategies for capacity building in managing and implementing RE technologies, including the after sales service. One suggestion is to link proposed capacity building activities with on-going efforts from different organizations such as World Bank and GIZ projects. Table B-3: List of Private Sector, CSOs and NGOs Consulted Organization Name Contact details Private Sector/Developers Asian Gateway Ms. Sen Chandany, Manager dany@asiangateway.co.jp Camagra Cambodia Office Prof. Nir Atzmon, GM Field Operation info@camagra.net nir.atzmon@gmail.com / Cambodia Solar Khim Bunlene, General DIrector bunlene.camsolar@gmail.com EcoSun Energy Cambodia Mr. Sun Mao, Director ecosuncam@gmail.com / / / Japan Development Institute Ltd. (JDI) Nexus NRG Solutions Lighting Engineering Solutions Solar Energy Association Cambodia (SEAC) / Eurocham Greenbiz Committee Solar Partners Asia (Cambodia), Ltd. Solar Partners Asia (Cambodia) Ltd Tsumio Hatsukade, Senior Consultant Ms. Nodira Akhmedkhodjaeva, Program Development Director Mr. Jack Pegle, Business Development Manager Mr. Sokun Sum, Chief Executive Officer Ms. Romina de Jong, Secretary/ Vice Chairman Ms. Pauline Ronteix Mr. Rogier Van Mansvelt, Chief Technical Office Mr. Jim Gramberg, CEO hatsukade@jditokyo.com n.akhmedkhodjaeva@nexusfor development.org jack@nrg-renewables.com Sokun@lightingengineeringsol ution.com Sum.sokun168@gmail.com (855) romi.dejong@gmail.com +855 (0) / +855(0) info@solarpartners.asia jim@solarpartners.asia ,

56 Organization Name Contact details Soma Energy Mr. Adisorn Masaw CSOs/NGOs Cambodia Climate Change Network Cambodia Development Resource Institute Enrich Institute Forum Syd Mr. Leuk Dana, Marketing Manager Mr. Udom Kong, Network Coordinator Mr. Nong Monin, Researcher Mr. Pheakdey Heng, PhD, Founder & Chairman Mr. Khieng Sochivy, Country Manager (0) Mr. Tep Chansothea, Programme Officer Environment and Climate Change Live & Learn Mr. Socheath Sou, Director 855 (89) NGO Forum Mr. Hoc Menghoin, Project Coordinator Royal University of Agriculture (Academe) SNV Cambodia Dr. Kunthy Sok, Vice Rector Dennis Barbian, Associate Adviser Renewable Energy Market Development / / In the afternoon session, each development partner discussed their ongoing and planned RE projects. Participants agreed that a regular donor coordinative meeting is helpful to inform everyone and avoid duplication of interventions. For example, UNDP will conduct a study on FIT and net metering in 2017 which SREP projects will benefit. AFD, on the other hand, is currently implementing the Green Microfinance Project providing credit line to three microfinance institutions in Cambodia and technical assistance for coordination and incentives for solar suppliers. Table B-4: List of Development Partners Consulted Organization Name Contact details Agence Française de Mr. Glen Andre andreg@afd.fr Développement (AFD) International Fund for Agricultural Development (IFAD) Mr. Karan Sehgal, Portfolio Officer, RE Technologies Environment and Climate k.sehgal@ifad.org International Finance Corporation Division Mr. Sukim Mel, Operations Officer smel@ifc.org

57 Organization Name Contact details Mr. Sokhai NOP, Advisor- Planning and Budgeting Climate Finance Readiness (CF Ready) Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Japan International Cooperation Agency (JICA) Mr. Chhorn Chamna, Program Officer, Infrastructure Division KfW Mr. Kob Math, Coordinator ChhornChamna.CM@jica.go.jp +855-(0) (0) United Nations Industrial Development Organization (UNIDO) United Nations Industrial Development Organization (UNIDO) United Nations Development Programme (UNDP) Mr. Narin Sok, Senior Representative Mr. Ngov-Veng Chheng, National Project Coordinator Phearanich Hing, Climate Change Policy Analyst N.SOK@unido.org N.CHHENG@unido.org phearanich.hing@undp.org , Ext: /

58 Annex C: Co-Benefits This Annex provides a list of co-benefits that are expected from the implementation of SREP investments. Support lowcarbon development pathways by increasing energy security Table C-1: Co-Benefits Associated with SREP Impacts and Outcomes Results Co-benefits Description Avoided GHG emissions The proposed investments on renewable energy will result to reduced reliance on fossil fuel and forest resources, thus help reduce potential GHG emissions. The implementation of the projects will directly avoid an estimated 97,000 tco2e/year which otherwise be produced from diesel-based generator use. Increased supply of renewable energy Employment opportunities Increased reliability Moreover, the awareness campaign component will help improve customer s perceptions on the value and benefits of renewable energy. It will create a customer-driven market on renewable energy thereby increasing potential for more GHG emission reduction. The community-based renewable energy projects will facilitate the creation of employment opportunities. The technical and capacity building support, which aims to ensure effective operation and maintenance of the system, will create longterm employment among local community members. The creation of a viable RE market will encourage participation among private sector investors. As a result, value-added employment will be created in solar and biomass industries, including manufacturing and energy services. SREP will help diversify the country s current energy mix by supporting the installation of about 68 MW of solar capacity and 10 MW of biomass. The implementation of the projects will increase availability and reliability of energy supply in the country, which currently does not meet demand and 24-hour supply of electricity is not assured. New and additional resources for renewable energy projects/ programme Reduced cost of RE Women will equally benefit from better security and reliability of supply. Women are the mainstream users of energy. SREP investments are expected to displace about 184 GWh worth of diesel per year. It will help reduce dependence on expensive fossil fuels and accelerate the development of solar and biomass energy in the country, which currently is at initial stage. The successful demonstration of these RE technologies will enable and encourage private sector participation which will help establish RE cost competitiveness as against diesel-based generation. GHG = greenhouse gas, GWh = gigawatt-hour, MW = megawatt, RE = renewable energy, SREP = Scaling-up Renewable Energy Program, tco 2e = tons of carbon dioxide equivalent 52

59 Annex D: Project Concept Notes Component 1: Solar Energy Development Program Problem statement 1. Solar is one of the best potential renewable energy (RE) resources in Cambodia with respect to scalability, potential applications, resource and technology risks, and speed of deployment. Cambodia s installed generation capacity in 2015 was 1,569 MW with energy output of 4,448 GWh. The technical solar energy potential is estimated at 8100 MW, with near-term market prospects of 400 MW to 500 MW which could provide 730 to 913 GWh per year 20, which is around 17% of total energy output in While this represents a small percentage of total energy output, the potential financial and economic savings are substantial. In areas served by petroleum-based generation costing around $0.70/kWh, there are compelling prospects to deliver access to electricity for productive end uses at much more affordable rates, especially to the poorest consumers. In grid-supplied areas, solar can save consumers as much as 40% on their monthly bill, but the solar prospect is still viewed as unfeasible. 2. The market remains largely undeveloped due to (i) psychological barriers due to past experience with sub-standard equipment and lack of after sales service and maintenance; (ii) financial barriers in the form of upfront capital costs and lack of commercial financing; and (iii) absence of clear policy support and instruments such as feed-in tariffs (FiTs), net metering, open access for grid interconnection issues, tax incentives, and licensing procedures. Despite these constraints, there is a nascent domestic solar industry with 25 companies. The Solar Energy Association of Cambodia (SEAC) has noted that a clear policy framework is needed so that capital can be mobilized to support solar development at progressively larger scale. Proposed contribution to initiating transformation 3. Given the constraints noted above, the solar industry needs both a policy pull and a market push. There are opportunities to develop utility scale solar farms in special economic zones (SEZs) and rooftop solar which would demonstrate the viability of solar for mainstream energy applications. Solar home systems (SHS) can be scaled up and deployment can be accelerated to deliver more affordable energy to bottom-of-the-pyramid consumers. The existing solar industry can deliver this market push if concessional financing is introduced. The policy pull requires intervention to develop appropriate instruments including FiTs, net metering, grid connectivity, etc., in parallel with the learning-by-doing gained through the market push. 4. Four types of installations are proposed: (i) scaled up SHS program, (ii) solar-powered village scale mini-grids, (iii) rooftop solar, and (iv) utility-scale solar farms. SREP funds would be utilized to take out up-front development risks and buy down the cost of capital to facilitate private 20 Assuming 5 hours per day of output at rated capacity. 53

60 sector installation and operation and maintenance of solar systems. For solar farms and other installations where some power is sold to the grid, SREP funds could cover part of the cost difference as necessary between solar output and EDC s benchmark tariff of $0.09/kWh. Lessons learned from other developing countries in Asia will be taken into consideration during project design and implementation. SREP and/or other development partners will fund the capacity development and advisory services for policy evolution including FiTs, net metering regulations, new power purchase agreements, and other incentives. Implementation readiness 5. The SHS and mini-grid investments will be supported by ADB s public sector operations (ADB-SEEN), while the rooftop solar and solar farms will be developed by ADB s Private Sector Operations Department (ADB-PSOD). The public sector operation will deliver SREP as cofinancing through the updated Rural Electrification Fund operations (REF v2.0, discussed in the main text) to support the solar home systems and mini-grids. The rooftop and solar farms will be supported by ADB-PSOD through a combination of concessional loan and other appropriate instruments. Specific funding mechanisms need to be identified and agreed to, so that SREP grant funds will catalyze private investment without over-subsidizing developers and service providers. To the extent practical, SREP funds will be deployed as output-based aid, i.e., disbursed based on achievement of solar development milestones. Project preparation will be required to identify the appropriate financing modalities and implementation arrangements: two preparation grants are requested, one for ADB-SEEN and one for ADB-PSOD. Subsequent to endorsement of the IP, project preparation will take 6-12 months, with SREP funding approval in first quarter of calendar year 2017 at the earliest. Rationale for SREP financing 6. Lack of commercial financing, limited policy support, and off-take price risks are major barriers to commercial solar development, which can be addressed with concessional financing. The program will support growth of the solar industry through expanded delivery of solar systems by existing private sector solar companies. The sector reforms will promote policy evolution to create a viable self-sustaining market for solar energy services. Table D1.1 presents performance and results indicators. Table D-1: Results Indicators and Targets Results Indicators Baseline Targets Means of Verification SREP Project Outcomes 1. Increased supply Installed capacity 1 MW > 68 MW Project review of renewable energy Design output GW/h a missions 2.Increased access Number of women and men, 0 310,000 people MME to modern energy services businesses, and community services benefiting from SREP interventions or 62,000 households b 3. Increase in investments from private sector in solar energy $ invested 0 $ 136 million Annual reports of energy companies, technology vendors 54

61 Results Indicators Baseline Targets 4. Greenhouse Gas emissions mitigated SREP Inputs 5. Capacity building activities CO2 emissions reduction 0 > 66,000 tco2e/year c Workshops/training on solar installation, operations and maintenance for consumers, service providers, Rural Electrification Enterprises (REEs) Workshops on solar development policy, tariff setting, feed-in tariff design, power purchase agreements, etc. 0 X training workshops conducted X workshops conducted Means of Verification MME, MOE Project implementation reports and ADB review missions ADB = Asian Development Bank, CO 2 = carbon dioxide, MME = Ministry of Mines and Energy, MOE = Ministry of Environment, tco 2e = tons of carbon dioxide equivalent. Notes: a Calculated based on 5 hours a day x 365 days a year b Calculated based on 400 kwh per person per year current average consumption. c Assumes 0.533tCO 2e/MWh, displacing a combination of grid-supplies and diesel generation. Reference: The International Renewable Energy Agency (IRENA), Renewable energy opportunities and challenges in the Pacific Islands region Palau, August With 10 years of operation from , the avoided GHG emissions represent about 25% of Cambodia s Intended Nationally Determined Contributions for Energy Industries. Component 1: Solar Energy Development Program Subcomponent 1: Solar Energy Development Table D-2: Financing plan SREP ADB Private Sector Government a Total Solar Home Systems Solar Mini-grids Project Preparation Subcomponent 2: Accelerating Solar Power through Private Sector Rooftop Solar Systems Utility-scale Solar Farm Project Preparation Total Note: a Government contribution to Rural Electrification Fund Table D-3: Project preparation timetable Milestone Date SREP Updated IP Endorsement Q2 / 2016 SREP funding approval Q1 / 2017 ADB Board/Management consideration Q3 /

62 Project Preparation Grant The RGC is requesting project preparatory grants for the two subcomponents of the Solar Power Development Program. Table D-4: Project Preparation Grant Request for Solar Power Development Program: Solar Energy Development (Solar Home Systems and Solar Mini-grids) SREP Project Preparation Grant Request Country/Region: Cambodia CIF Project ID#: Project Title: Tentative SREP Funding Request (in US million total) for Project at the time of Investment Plan submission (concept stage):: Preparation Grant Request (in $): National Project Focal Point: National Implementing Agency (project): MDB SREP Focal Point and Project Task Team Leader (TTL): Solar Energy Development (Solar Home Systems and Solar Minigrids) Grant: $5 million Loan: $1 million $650,000 MDB: Asian Development Bank Dr. Praing Chulasa, Deputy MD, EDC Electricite du Cambodge SREP Focal Point: Christian Ellermann Climate Change Specialist Asian Development Bank Description of activities covered by the preparation grant: TTL: Rehan Kausar Unit Head, Project Administration Southeast Asia Department Asian Development Bank A preparation grant is required for (i) detailed feasibility study for off-grid, mini-grid and grid-connected rooftop solar and utility-scale solar farm solar generation; (ii) solar energy resource assessment; and (iii) due diligence which covers: a. Technical. Appropriate technology for solar power will be assessed, particularly related to operating and maintenance requirements. b. Economic and financial. Economic and financial analysis will be undertaken of the project in accordance with ADB s financial management and analysis and economic analysis guidelines. c. Procurement. Procurement capacity assessment of EDC and the subsidiary Rural Electrification Fund (REF) will be undertaken. Procurement packages will be prepared. d. Institutional Capacity. Capacity assessment of EDC and REF will include procurement capacity, project management capacity and financial management capacity. e. Safeguards, Social, Poverty and Gender. All safeguards will be addressed according to the ADB Safeguard Policy Statement, June Environmental assessment will ensure environmental impacts are mitigated. Land acquisition and impact on indigenous peoples will be assessed and resettlement and indigenous peoples plans prepared, as required. Social, poverty and gender analysis will be conducted. A gender action plan will be prepared. Outputs: Deliverable (a) Detailed FS (c) Due Diligence Report (d) Grid Stability and Control Strategy (e) Project identification and pre-feasibility Timeline 10 months after Notice to Proceed (NTP) 10 months after NTP 12 months after NTP 12 months after NTP 56

63 Budget (indicative): Expenditures Amount ($) - estimates Consultants 450,000 Equipment 10,000 Local workshops/seminars 30,000 Travel/transportation 50,000 Others (admin costs/operational costs) 60,000 Contingencies (max. 10%) 50,000 Subtotal 650,000 Other contributions: Government - MDB - Private Sector - Others (please specify) - Total Cost 650,000 Timeframe (tentative) Expected Board/MDB Management approval date: Project Preparation Technical Assistance approval: January 2018 Other Partners involved in project design and implementation: If applicable, explanation for why the grant is MDB executed: The Government of Cambodia has requested ADB to execute the grant due to its limited capacity in handling the timely contractual preparation of such a consultancy. Implementation Arrangements (incl. procurement of goods and services): The executing agency will be EDC. The implementing agency will be REF will be established to review project progress, coordinate inter-ministerial activities and guide the Project Management Unit (PMU), which will be established within REF. The PMU will be supported by implementation consultants. All equipment and civil works procurement will be carried out in accordance with ADB's Procurement Guidelines (2010, as amended from time to time). Consultants will be recruited in line with ADB's Guidelines on the Use of Consultants (2013, as amended from time to time), through consulting firm or individual selection method. The procurement method would be international competitive bidding (ICB). 57

64 Table D-5: Project Preparation Grant Request for Solar Power Development Program: Accelerating Solar Power through Private Sector (Rooftop Solar Systems and Utility-scale Solar Farm) SREP Project Preparation Grant Request Country/Region: Cambodia CIF Project ID#: Project Title: Tentative SREP Funding Request (in $ million total) for Project at the time of Investment Plan submission (concept stage): Preparation Grant Request (in $): National Project Focal Point: National Implementing Agency (project): MDB SREP Focal Point and Project Task Team Leader (TTL): Accelerating Solar Power through Private Sector (Rooftop Solar Systems and Utility-scale Solar Farm) Grant: $3 million Loan: $11 million $650,000 MDB: Asian Development Bank Dr. Praing Chulasa, Deputy MD, Electricite du Cambodge Electricite du Cambodge SREP Focal Point: Christian Ellermann Climate Change Specialist Asian Development Bank Description of activities covered by the preparation grant: TTL: Shuji Hashizume Investment Specialist Private Sector Operations Department Asian Development Bank A preparation grant is required for (i) detailed feasibility study for mini-grid and grid-connected rooftop solar and utility-scale solar farm solar generation; (ii) solar energy resource assessment; and (iii) due diligence which covers: f. Technical. The following technical aspects will be assessed: (x) appropriate technology for solar power, particularly related to operating and maintenance requirements; (y) grid integration study to ensure stability of the grid after completion of the proposed project; and (z) for rooftop solar and mini-grid in particular, study on net metering what are the technical challenges and its mitigation measures. g. Economic and financial. Economic and financial analysis will be undertaken of the project. In the context of Cambodia, the following will be taken into account in particular: (x) expected and acceptable range of tariff level based on the average generation cost and return to project developer, and (y) complementarity with hydropower plants, as solar generation can save energy (and thus water) from the hydropower plants during dry season. h. Safeguards, Social, Poverty and Gender. All safeguards will be addressed according to the ADB Safeguard Policy Statement, June Environmental assessment will ensure environmental impacts are mitigated. Land acquisition and impact on indigenous peoples will be assessed and resettlement and indigenous peoples plans prepared, as required. Social, poverty and gender analysis will be conducted. A gender action plan will be prepared as appropriate. In case the project preparation grant is directly extended to the private sector for an unsolicited proposal, the cost should be reimbursable by the project sponsor upon actual materialization of the project. In case the grant is extended to the government, or the proposed project does not materialize, the costs will not be reimbursed. Outputs: Deliverable Timeline 58

65 (a) Detailed FS 10 months after Notice to Proceed (NTP) (c) Due Diligence Report 10 months after NTP (d) Grid Stability and Control Strategy 12 months after NTP (e) Project identification and pre-feasibility 12 months after NTP Budget (indicative): Expenditures Amount ($) - estimates Consultants $500,000 Equipment Local workshops/seminars $20,000 Travel/transportation $50,000 Others (admin costs/operational costs) $15,000 Contingencies (max. 10%) $65,000 Subtotal $650,000 Other contributions: Government - MDB - Private Sector - Others (please specify) - Total Cost $650,000 Timeframe (tentative) Expected Board/MDB Management approval date: Project Preparation Technical Assistance approval: January 2017 Other Partners involved in project design and implementation: If applicable, explanation for why the grant is MDB executed: The Government of Cambodia has requested ADB to execute the grant due to its limited capacity in handling the timely contractual preparation of such a consultancy. The private sector may also need the grant to undertake a feasibility study and due diligence due to nascent stage of renewable energy sector in Cambodia, although the costs should be reimbursed by the private sector upon materialization of an actual project from such a study. If reimbursed, the funds can be recycled for another feasibility study. Implementation Arrangements (incl. procurement of goods and services): The executing agency will be either EDC or the private sector developer. The implementing agency will be either EDC or ADB. All equipment and civil works procurement, if any, will be carried out in accordance with ADB's Procurement Guidelines (2010, as amended from time to time). Consultants will be recruited in line with ADB's Guidelines on the Use of Consultants (2013, as amended from time to time), through consulting firm or individual selection method. The procurement method would be international competitive bidding (ICB). 59

66 Table D-6: MDB Request for Payment for Project Implementation Services (MPIS) Solar Energy Development (Solar Home Systems and Solar Mini-grids) SCALING UP RENEWABLE ENERGY IN LOW-INCOME COUNTRIES MDB Request for Payment of Implementation Services Costs 1. Country/Region: Cambodia 2. CIF Project ID#: 3. Project Title: Solar Energy Development (Solar Home Systems and Solar Mini-grids) 4. Request for project funding (US million): At time of country submission (tentative): $6 million ($5 million At time of project approval: 5. Estimated costs for MDB project implementation services 6. Request for payment of MDB Implementation Services Costs: grant and $1 million loan) Initial estimate - at time of Country submission: $ 428,000 Final estimate - at time of project approval: First tranche: $ 214,000 Second tranche: n/a MDB: Asian Development Bank Date: May Project financing category: a - Investment financing - additional to ongoing MDB project b- Investment financing - blended with proposed MDB project c - Investment financing - stand-alone d - Capacity building - stand alone 8. Expected project duration (no. 5 years of years): 9. Explanation of final estimate Not applicable of MDB costs for implementation services: 10. Justification for proposed stand-alone financing in cases of above 6 c or d: not applicable 60

67 Table D-7: MDB Request for Payment for Project Implementation Services (MPIS) Accelerating Solar Power through Private Sector (Rooftop Solar Systems and Utility-scale Solar Farm) SCALING UP RENEWABLE ENERGY IN LOW-INCOME COUNTRIES MDB Request for Payment of Implementation Services Costs 1. Country/Region: Cambodia 2. CIF Project ID#: 3. Project Title: Accelerating Solar Power through Private Sector (Rooftop Solar Systems and Utility-scale Solar Farm) 4. Request for project funding (US million): At time of country submission (tentative): $14 million ($3 million At time of project approval: 5. Estimated costs for MDB project implementation services 6. Request for payment of MDB Implementation Services Costs: grant and $11 million loan) Initial estimate - at time of Country submission: $ 428,000 Final estimate - at time of project approval: First tranche: $ 128,000 Second tranche: n/a MDB: Asian Development Bank Date: May Project financing category: a - Investment financing - additional to ongoing MDB project b- Investment financing - blended with proposed MDB project c - Investment financing - stand-alone d - Capacity building - stand alone 8. Expected project duration (no. 5 years of years): 9. Explanation of final estimate Not applicable of MDB costs for implementation services: 10. Justification for proposed stand-alone financing in cases of above 6 c or d: not applicable 61

68 Component 2: Biomass Power Project Problem statement 1. Biomass has been designated as the second highest priority for renewable energy (RE) development with SREP support. Cambodia s installed generation capacity in 2015 was 1,569 MW with energy output of 4,448 GWh. Technical biomass energy potential is at least 500 MW 21, of which only MW has been installed for commercial operations. Scaling up the installed capacity by a factor of five to 100 MW could provide about 600 GWh per year 22, which is 13.6% of total domestic energy output in While 100 MW represents a small percentage of capacity and energy output compared to a large coal or hydropower plant, the scale up and replication potential would still be at least 5; biomass power lends itself to distributed generation in rural agricultural areas served mainly by diesel generators. The potential environmental benefits are substantial in terms of avoided ecological degradation and public health problems associated with coal and large hydropower. Modern biomass power plants exhibit production costs of around $0.12/kWh, which compares favorably to petroleum-based generation costing around $0.70/kWh. 2. The biomass potential remains largely undeveloped due to (i) higher upfront capital costs than other generation technologies; (ii) unavailability of commercial financing; (iii) lack of technical expertise to develop and operate generation units; (iv) logistical challenges of collecting and delivering biomass to power plants; and, (v) absence of clear policy support and instruments such as feed-in tariffs (FiTs) and renewable portfolio standards. A clear policy framework is needed so that capital can be mobilized to support biomass power development at progressively larger scale. Proposed contribution to initiating transformation 3. As is the case with the solar sub-sector, biomass power needs both a policy pull and a market push. There are opportunities to deploy commercial biomass power at progressively larger scale which would be particularly beneficial in rural areas where agriculture dominates the local economy. EDC sells grid-supplied electricity to Rural Electrification Enterprises (REEs) at a price of $0.147/kWh, while the proposed biomass plants are expected to be viable at a price of $ /kWh. 4. The proposed biomass power project will start small, with 2 or 3 installations of MW capacity each. SREP funds would be utilized to take out up-front development risks and buy down the cost of capital to facilitate private sector installation and operation and maintenance of the power plants. If necessary, SREP funds could cover part of the cost difference between EDC s price to REEs of $0.147/kWh and the price required to make the biomass units financially viable. Lessons learned from other developing countries in Asia will be taken into consideration during 21 Based on available information, potential is about 150 MW for rice husk, 125 MW for rubber wood wastes, and at least 300 MW for sugar cane bagasse. 22 Assuming 6,000 hours per year operation at rated capacity. 62

69 project design and implementation. SREP and/or other development partners will fund related capacity development and advisory services for policy evolution including FiTs and other incentives. Implementation readiness 5. The proposed physical investments are proposed for support by ADB-PSOD. Specific funding mechanisms need to be identified and agreed to, so that SREP grant funds will catalyze private sector development. To the extent practical, SREP funds will be deployed as output-based aid, i.e., disbursed based on achievement of solar development milestones. Project preparation will be required to identify the appropriate financing modalities and implementation arrangements. Subsequent to endorsement of the IP, project preparation will take about 12 months, with SREP funding approval anticipated in second quarter of calendar year Rationale for SREP financing 6. Lack of commercial financing is the main barrier to commercial biomass energy development, which can be addressed with concessional financing. The project will demonstrate the viability of modern biomass power for grid-connected supply in agricultural areas. The parallel sector reforms will promote policy evolution to create a viable biomass energy subsector, with replication and scale up potential of more than 500 MW. Table D-7 presents performance and results indicators. Table D-7: Results Indicators and Targets Results Indicators Baseline Targets Means of Verification SREP Project Outcomes 1. Increased supply Installed capacity 1 MW > 10 MW Project review of renewable energy Design output 0 60 GW/h a missions 2.Increased access Number of women and men, 0 150,000 people MME to modern energy services [on-grid solar power] businesses, and community services benefiting from SREP interventions or around 30,000 households b 3. Increase in $ invested 0 $25 million Annual reports of investments from private sector in energy companies, service renewable energy 4. Greenhouse Gas emissions mitigated SREP Inputs 5. Capacity building activities CO2 emissions reduction 0 > 31,000 tco2e/year c Workshops/training on solar installation, operations and maintenance for consumers, service providers, Rural Electrification Enterprises (REEs) 0 X training workshops conducted technology vendors MME, MOE Project implementation reports and ADB review missions Workshops on solar development policy, tariff setting, feed-in tariff design, power purchase agreements, etc. X workshops conducted 63

70 ADB = Asian Development Bank, CO 2 = carbon dioxide, MME = Ministry of Mines and Energy, MOE = Ministry of Environment, tco 2e = tons of carbon dioxide equivalent Notes: a Calculated based on 5 hours a day x 365 days a year b Calculated based on 400 kwh per person per year consumption target. c Assumes 533 tco2e/mwh, displacing a combination of grid-supplies and diesel generation Table D-8: Financing plan SREP b ADB Private Sector Government a Component 2: Biomass Power Project Total Project Preparation Total Table D-9 Project preparation timetable Milestone Date SREP IP Endorsement Q2 / 2016 SREP funding approval Q2 / 2017 ADB Board/Management consideration Q4 /

71 Project Preparation Grant The RGC is requesting for project preparatory grant for the Biomass Power Project. Table D-10: Project Preparation Grant Request for Biomass Power Project SREP Project Preparation Grant Request Country/Region: Cambodia CIF Project ID#: Project Title: Tentative SREP Funding Request (in US million total) for Project at the time of Investment Plan submission (concept stage):: Preparation Grant Request (in $): National Project Focal Point: National Implementing Agency (project): MDB SREP Focal Point and Project Task Team Leader (TTL): Biomass Power Project Grant: $0 Loan: $5 million $400,000 MDB: Asian Development Bank Dr. Praing Chulasa, Deputy MD, Electricite du Cambodge Electricite du Cambodge SREP Focal Point: Christian Ellermann Climate Change Specialist Asian Development Bank Description of activities covered by the preparation grant: TTL: Shuji Hashizume Investment Specialist Private Sector Operations Department Asian Development Bank A preparation grant is required for (i) detailed feasibility study for biomass generation; (ii) biomass resource assessment; and (iii) due diligence which covers: a. Technical. Appropriate technology for biomass power will be assessed, particularly related to feedstock and operating and maintenance requirements. b. Economic and financial. Economic and financial analysis will be undertaken. Particular attention will be paid to (i) sustainable tariff level, and (ii) economics of feedstock supply. c. Safeguards, Social, Poverty and Gender. All safeguards will be addressed according to the ADB Safeguard Policy Statement, June Environmental assessment will ensure environmental impacts are mitigated. Land acquisition and impact on indigenous peoples will be assessed and resettlement and indigenous peoples plans prepared, as required. Social, poverty and gender analysis will be conducted. A gender action plan will be prepared as appropriate. Outputs: Deliverable Timeline (a) Detailed FS 10 months after Notice to Proceed (NTP) (c) Due Diligence Report 10 months after NTP (d) Grid Stability and Control Strategy 12 months after NTP (e) Project identification and pre-feasibility 12 months after NTP Budget (indicative): Expenditures Amount ($) estimates Consultants $320,000 Equipment Local workshops/seminars $10,000 65

72 Travel/transportation $30,000 Others (admin costs/operational costs) $10,000 Contingencies (max. 10%) $30,000 Subtotal $400,000 Other contributions: Government - MDB - Private Sector - Others (please specify) - Total Cost $400,000 Timeframe (tentative) Expected Board/MDB Management approval date: Project Preparation Technical Assistance approval: January 2017 Other Partners involved in project design and implementation: If applicable, explanation for why the grant is MDB executed: The Government of Cambodia has requested ADB to execute the grant due to its limited capacity in handling the timely contractual preparation of such a consultancy. The private sector may also need the grant to undertake a feasibility study and due diligence due to nascent stage of renewable energy sector in Cambodia, although the costs should be reimbursed by the private sector upon materialization of an actual project from such a study. If reimbursed, the funds can be recycled for another feasibility study. Implementation Arrangements (incl. procurement of goods and services): The executing agency will be either EDC or the private sector developer. The implementing agency will be either EDC or ADB. All equipment and civil works procurement, if any, will be carried out in accordance with ADB's Procurement Guidelines (2010, as amended from time to time). Consultants will be recruited in line with ADB's Guidelines on the Use of Consultants (2013, as amended from time to time), through consulting firm or individual selection method. The procurement method would be quality- and cost-based selection (QCBS). 66

73 Table D-11: MDB Request for Payment for Project Implementation Services (MPIS) ADB Biomass Power Project SCALING UP RENEWABLE ENERGY IN LOW-INCOME COUNTRIES MDB Request for Payment of Implementation Services Costs 1. Country/Region: Cambodia 2. CIF Project ID#: 3. Project Title: Biomass Power Project 4. Request for project funding ($ million): 5. Estimated costs for MDB project implementation services 6. Request for payment of MDB Implementation Services Costs: At time of country submission (tentative): $5 million (loan) Initial estimate - at time of Country submission: $ 428,000 Final estimate - at time of project approval: First tranche: $ 214,000 Second tranche: n/a At time of project approval: MDB: Asian Development Bank Date: May Project financing category: a - Investment financing - additional to ongoing MDB project b- Investment financing - blended with proposed MDB project c - Investment financing - stand-alone d - Capacity building - stand alone 8. Expected project duration (no. 5 years of years): 9. Explanation of final estimate Not applicable of MDB costs for implementation services: 10. Justification for proposed stand-alone financing in cases of above 6 c or d: not applicable 67

74 Annex E: Independent Quality Review The matrix below presents the reviews and comments of Mr. Mike Allen, external reviewer, based on the draft SREP Investment Plan for Cambodia dated 6 May The review of the Investment Plan has been undertaken ahead of the submission of the plan to the SREP Sub-Committee. The matrix also presents the responses from the Government and the SREP technical team on the comments raised by the external reviewer. Comments General Comments on the Investment Plan 1. The Investment Plan (IP) as submitted appears to offer a balanced approach to undertake what is suggested are important steps to build on a relatively immature renewables industry in Cambodia. 2. The focus on extending experience with solar home systems (SHS), and exploring opportunities with mini-grids for rural villages, appears sensible; the opportunity to look at the potential for large scale rooftop systems and utility scale solar farms is perhaps equally important if renewables are to begin to build a significant role in providing clean electric power generation. Given the immaturity of the solar market in Cambodia, and a number of obvious institutional and implementation challenges, the IP could be strengthened by providing more evidence that there is an active private sector interest in investing in such markets. It is recognised that there are a number of small enterprises that have been engaged in the solar PV industry for some years but again the current strength of this group, and its ability to make real contributions under the growth strategy outlined, has yet to be documented. Thank you. Responses Biomass and solar resource are attractive in that both can be developed with technologies that are scalable and replicable. Smaller projects, such as rooftop systems and mini-grids, can be community-developed and - owned. Larger systems can be built out in modular fashion, which minimizes the up-front capital barrier faced by rooftop solar and other utility-scale projects. In all cases envisioned for SREP cofinancing, the challenge will be to identify appropriate project structures where development risk can be minimized so that RE investment is attractive in the mainstream rather than only to frontier entrepreneurs seeking unrealistic financial returns. With the passage of the Electricity Law in 2001, the private sector has taken the lead in the generation subsector. Although most of the generation capacity is conventional coal and large hydro, there is a nascent RE industry which is poised for rapid growth. The Solar Energy Association of Cambodia (SEAC) has 25 members, of which 4 have secured the Good Solar Initiative certificate. There are several international firms which are interested in utility-scale solar and biomass power projects; details are not available for all candidate projects but various private developers have identified at least 250 MW of aggregate capacity for commercial development. In short the generation subsector is already a private sector domain, and the learning curve for private sector development has been minimized to some extent. As noted in the draft IP, some policy evolution is needed to jump-start RE investment 68

75 Comments 3. As planning proceeds for projects under the IP / SREP, it will be important that the effective integration of any renewable energy projects within the national energy plans is clear before final commitments to their implementation. Part of the IP s justification for SREP support is that the proposed projects will assist as practical demonstrations of what could be achieved with wider support from the private sector (and other funders). This assumption should be revisited as each project is better defined. 4. While the IP recommends that the potential for biomass energy projects be explored, the plan acknowledges the key challenges that the biomass industry faces. In particular, the security of (year round) Responses and accelerate development, but a wholesale restructuring of the sector to introduce private participation is not necessary. In early 2016, the Ministry of Mines and Energy (MME) floated a tender for a 10 MW solar project which attracted 5 international firms (from France, Singapore, and Thailand), of which 4 technical proposals were qualified for further consideration; the outcome of this tender is of great interest since the request for proposals specified an off-take price of less than $0.10/kWh which is essentially EDC s average cost of supply, i.e., grid parity. Negotiation of a power purchase agreement at grid parity would indicate that the technical solar potential can be harnessed at scale. As noted in the revised IP, if this first 10 MW project is successful, a single project cannot be expected to transform the sector, therefore SREP cofinancing will still play a meaningful role in catalyzing additional commercial investment to accelerate RE development. It is not unreasonable to believe that LCOE for utility-scale solar would decline below grid parity in the near term, which is the tipping point for electricity sector transformation. The economic potential will grow as installed system costs decline relative to end-use applications; e.g., solar charging for electric vehicles may be competitive versus petroleum fuels at a levelized cost well above $0.10/kWh. Agreed. The RGC recognizes the need for effective integration, and has requested ADB to provide technical assistance for a grid integration study, as well as assistance for other policy evolution (e.g., net metering policy and FiTs). The RGC has also engaged other development partners in dialogue on these issues. The generation sub-sector is reserved for private sector developers, but as noted in the IP, most of the generation assets are conventional coal and large hydro plants. RE development faces classic first-mover risks; therefore new RE projects, especially utility-scale solar and biomass are expected to have a strong impact on opening up the market. In particular, commercial financing is not available at interest rates and tenors that make RE financially viable; this is a key entry point for concessional financing to facilitate jump-starting the RE market. Biomass power is more challenging than solar and other RE resources, as noted in the draft IP (and as acknowledged by MME and project developers). This resource is attractive mainly due to the widespread 69

76 Comments fuel supply is critical; many well-intentioned biomass projects have failed when fuel volumes are not as anticipated. 5. The IP suggests that there is a substantial level of potential renewable resources; caution is necessary that these figures are treated appropriately. While solar PV can be installed relatively quickly hydroelectric, and to some extent biomass options, are often slower and more complex developments. 6. Given the stated urgency to increase power production in Cambodia, and reduce some of the reliance on imported electricity, any plan will require flexibility. It is also important to ensure that choices reflect the true costs of development and that while feed in tariffs or similar subsidies may be considered important to open the renewable market, this should not be at the cost of longer term sustainability or inadvertently impacting the prices that end users must bear. Responses availability and scalability, with prospects for modular development to enhance lifecycle viability. Depending on the technology employed, a typical biomass project could start out with 1 to 2 MW of capacity and expand up to 5 to 10 MW, and possibly larger depending on feedstock security (the radius of capture for successful biomass projects is typically 1 day driving time). The best opportunities for biomass are in areas where (i) there is captive feedstock, (ii) petroleum-based generation is still dominant, (iii) there are opportunities to displace imported electricity, and (d) biomass could complement hydropower output in the low-flow season. These issues will be investigated during project preparation, and project proposals will be advanced only if due diligence indicates that risks can be successfully mitigated and managed. As noted in the draft IP, harnessing about 20% of the technical (theoretical) potential of biomass and solar resources would provide the equivalent of total electricity supply in Clearly, translating this theoretical potential into real energy output is not a trivial exercise, but the conditions are reasonably good for SREP to catalyze new investments in RE that can facilitate future transformation of the energy sector. The generation sector is essentially reserved for private sector developers, there is a nascent RE industry, and Cambodia can take advantage of experience gained in the region, especially in solar energy development. Cambodia has some coal reserves with modest domestic production, and some prospective oil and gas reserves but no commercial production and no refining capacity. The country is 100% reliant on imported petroleum products. Traditional biomass accounts for the bulk of total primary energy supply. A key starting point is that prospective RE will not be competing against a fully developed and integrated domestic coal and petroleum industry. Depending on the specific project location and end-use application, RE will compete against petroleum-based generation at a cost of $0.25/kWh or higher, imports at grid-supplied electricity at $0.126/kWh or higher. FiTs and concessional financing are needed to jump-start and accelerate RE development, but are not expected to be required in the long-term. 7. The overall investment proposal that the SREP funds will help seed See notes below on Financing. 70

77 Comments makes assumptions about significant additional investments that will be secured through MDBs and the private sector. Confirmation of the commitment from these sources should be a key element in making a final decision on the provision of funds under SREP. Financing 8. The table suggests that US$ 30 million of SREP funding is expected to catalyse more than four times as much investment, a large portion of it from the private sector (as equity or debt), and the public sector lending windows of the ADB. The IP however does not substantiate that these sources have been tested or any additional (albeit potential) commitments made by the private sector. It does however identify a number of current multilateral and bilateral programmes but it is unclear how their implementation links with work proposed under the IP itself. The reliance of the overall plan on significant co-funding from the ADB and the private sector needs to be tested thoroughly to ensure that commitments are in place before SREP funds are released. There is complexity in funding with blended financing, or using PPPs, and this should not be underestimated as its resolution will impact on project execution timelines. Responses The generation subsector is a private sector domain, so in a sense there is no testing required with respect to mobilizing private participation. A key intent is use a modest amount of grant and concessional finance to crowd in commercial financing for RE development. The overall investment envisioned assumes that ADB funds cover 25% of total project cost and that SREP cofinancing leverages additional funds. The ADB contribution may be higher for a public sector operation (in this case for solar home systems and mini-grids), while the 25% contribution is a hard rule for ADB s Private Sector Operations Department (ADB-PSOD). Note all project-related funds will be disbursed in parallel, hence it will never be SREP first, i.e. the SREP funds for projects will not be released unless there are commitments from the private sector. ADB- PSOD has financed a transmission line project in Cambodia, and is about to close a gas-fired IPP in Myanmar, both with significant cofunding from private sector. Therefore the appetite from private sector investors and financiers is always there even in frontier countries like Cambodia. Experience in other countries in the region also indicates that the expected leverage is within the realm of imagination. For example, in Thailand, ADB-PSOD utilized a small grant from ADB s Clean Energy Financing Partnership Facility (CEFPF) as part of the construction contingency funds for a 55 MW project which was the country s first utility-scale thin-film solar PV plant. At the time the project was designed, construction contingencies for solar plants were higher than conventional plants by a factor of 10 or more, about $200,000 per MW of solar versus $15,000 $20,000 for a conventional gas-fired power plant. ADB financing was approved in 2010, including a $2 million CEFPF grant which was used as a standby contingency fund; this grant was ultimately not required for project commissioning. In this instance, the leverage on the grant funds was effectively infinite since 71

78 Comments Specific Comments on Investment Plan Comments on Components 9. Acknowledging the limited experience in Cambodia in undertaking renewable projects to date, with the exception of modest SHS activities, the projects and focus suggested for support through SREP appear reasonable. The main concern is in implementation capacity and a clear demonstration that other funders / investors can be attracted to support the initial and subsequent programmes. The expansion of the SHS market and exploration of the potential for mini-grids would seem an achievable goal, based on current capacity and experience within Cambodia. The diagram below offers a clear explanation of the expected outcomes from the SREP support. In moving to larger scale PV installations, it also needs to be recognised that while the SHS, solar rooftop installations and solar parks use the same fundamental PV technology, there are significant differences in scale, investment, power sales agreements, operations and maintenance and underlying risks in developing and operating large scale grid connected PV installations. 10. The challenges of biomass developments have been noted in the IP. Opportunities that have succeeded are often linked to captive power developments where fuel comes from in-house operations. Such facilities require an appropriate policy structure that allows for partial sale of power into the grid, often on a non-firm basis. 11. The IP notes that there are a number of institutional and capacity issues that need to be addressed to ensure that the proposed programmes can be considered. It is noted that one of the critical issues is that: A large number of RGC departments, agencies and offices are involved in the renewable energy development programs. A major challenge is to ensure that these entities work to their respective strengths in an integrated manner towards delivery of the national objectives Responses the CEFPF grant was not expended on the project. Subsequent to endorsement of the IP, the scope of technical assistance for project preparation and policy evolution will be further refined. The technical assistance will include developing standardized power purchase agreements for different applications, e.g., rooftop solar with net metering versus a more traditional IPP business model. For the various solar systems envisioned, experience gained in Cambodia as well as other countries will be applied to project design and technical specifications. See notes above regarding prospective biomass opportunities and conditions for successful development. Captive generation that competes against diesel generation is the most promising starting point. Selling surplus into the grid may require policy support in terms of a short-term FiT or viability gap funding arrangement so that the off-take is revenue-neutral to EDC. After decades of conflict which destroyed most of the energy infrastructure as well as human capital, the situation in Cambodia stabilized in the early 1990s and the country has been rebuilding itself since then. In the past 25 years, the energy sector has been rebuilt, with the electricity network integrated to some extent with the neighboring countries of the Greater Mekong Sub-region (GMS), specifically Lao PDR, Thailand, and Viet Nam. Electricity imports have declined in the past several years and are expected to continue declining as new generation capacity comes online. Coal and large hydro plants accounted for about 70% of total electricity supply in 2015, and under 72

79 Comments This is a common issue in emerging economies and its resolution can be quite a challenge it will require strong and clear leadership from a high level in government if this is to be resolved in the near term. A clear indication within the IP of government commitment to addressing these issues would be of considerable importance. Compliance with SREP Goals Catalyse increased investments in renewable energy: 12. The plan suggests how it is anticipated that SREP investments and programme support will help attract other donor and private funding. As noted this is an aggressive plan with SREP funding the basis for what is anticipated would see significant leverage of other funds. This has yet to be clearly demonstrated as achievable. As yet there is no clear confirmation of a reasonable level of private sector interest and capability. Enabling environment 13. The IP acknowledges that there are a number of unaddressed hurdles to renewable implementation; there are strategies and an allocation of responsibilities to particular agencies to address these. Without prior engagement with these agencies it is hard to assess whether these tasks can reasonably achieved by these entities. This process will require strong leadership at a senior level and close monitoring as the success in establishing a sound enabling environment will be a key control on the value of the SREP investments. Increase energy access: Responses business-as-usual coal and large hydro will account for most of the programmed capacity expansion during the next 5 years. Compared to many other post-conflict countries (including those with endorsed SREP IPs) Cambodia s progress in the energy sector has been remarkably good, and current development trends indicate continued strong growth in capacity additions, energy output, and rural electrification. However, the continued reliance on coal and large hydropower is not sustainable in the long run. The IP includes technical assistance for capacity building and a public awareness campaign which will include all relevant agencies. See notes above noting that generation is reserved for the private sector; the policy framework is quite clear. On this basis, conventional generation assets have been developed by IPPs, and a nascent RE industry exists that is poised for growth. A key main barrier to RE development is lack of commercial financing. SREP cofinancing will help eliminate the first-mover risk. The overall investment envisioned assumes that ADB funds cover 25% of total project cost and that SREP cofinancing leverages additional funds. The ADB contribution may be higher for a public sector operation (in this case for solar home systems and mini-grids), while the 25% contribution is a hard rule for ADB s Private Sector Operations Department (ADB-PSOD). Agreed. The IP includes technical assistance for capacity building and a public awareness campaign which will include all relevant agencies. 73

80 Comments 14. The need for increased access to energy is clear. The SREP support will help accelerate this in some areas but is also being targeted at grid connected supply which generally may have limited impact on improving access at an individual level. Mention is made of SREP funds being used to reduce cost / increase affordability; use of funds for these purposes needs to be judicious to ensure that any subsidies, their impacts and eventual withdrawal are carefully considered. Implementation capacity: 15. It is suggested that the responsibilities for final implementation of various segments of the SREP supported programme have yet to be confirmed. The capacity and skills to execute the programme as outlined should not be underestimated. There is an allowance for financing policy work, training and up-skilling but this needs to be carefully targeted to ensure a balance between support to senior management and those at an operational level for whom the challenges in a new market can be very real. Improve the long-term economic viability of the renewable energy sector: 16. The renewable energy sector in Cambodia is understood to be relatively small and has been largely focused on off grid SHS activities, with public subsidies under-writing much of the larger programmes. The IP suggests a number of private sector entities have been engaged in the domestic PV market but provides no detail of their size and commercial capacity. This information would be an important addition to the IP. In addition, meetings with stakeholders are noted but there is no concrete summary of how the private sector views the planned SREP interventions. Again this additional detail would help provide reassurance about the collective support for what the IP is proposing. It is often suggested that SREP funded activities will drive a more focused and sustainable basis for future growth; there needs to be increased private sector engagement and this will only occur, on a sustained basis, when regulatory and pricing signals are clear and acceptable to the market. SREP funds must therefore be directed into projects where conditions are conducive to ensuring such Responses The IP notes the governments targets for grid extension and household electrification rates. Based on these targets, a combination of off-grid (scaled up SHS and solar mini-grids) and on-grid utility scale RE is required. SREP cofinancing will be deployed following the design principle of precision-guided subsidies. Subsequent to endorsement of the IP, the scope of technical assistance for policy evolution will be further defined to ensure complementarity with the proposed physical investments. As noted above, the generation subsector is The draft IP has identified key lessons learned from previous and ongoing programs, mainly the need for extended after-market operations and maintenance support for solar home systems (which is also applicable to mini-grids). Key policy issues have also been identified, for example the need for net metering and feed-in tariffs to support rooftop solar development. Additional evaluation of prior programs will be undertaken as necessary as a first step in project preparation (an exhaustive analysis of prior and ongoing programs will not change the government s overall decision to pursue biomass and solar). Lessons learned from other projects and programs in other countries will be applied, including experience on other projects with cofinancing from SREP and the Clean Technology Fund. 74

81 Comments outcomes. As noted, care must be taken to avoid inappropriate subsidies that cause market distortions. Transformative impact: 17. The limited spread of the proposed SREP investments in Cambodia is seen as pragmatic given the current energy market status, focus on electricity access and a need to enhance the enabling environment. Given the renewable sector is immature, it is not to be expected that there will be major transformations in the market through SREP alone but, if well managed and executed, the proposed programme should help promote the nascent renewable energy sector in the country. Experience suggests that demonstration projects with specialist funding, such as SREP, will not necessarily ensure that an attractive commercial market place results quickly. Their design is critical to allow an easier transition to subsequent projects that may have limited access to concessional finance. Comments and Suggestions 18. The IP demonstrates the effort that has gone into the background research, stakeholder consultation and evaluation of potential options that could be supported under SREP funding in Cambodia. There are however areas where this consultation could be better documented. As noted the level of funding and suggested leverage appear reasonably aggressive, given the nascent nature of the renewable industry and little indication of a clear private sector interest. Reassurance on government and stakeholder response to the focus of the IP will be important in building its credibility. 19. The attraction of the private sector into grid connected projects is recognised as challenging but part of the SREP programme will be to test the practicality of PPP projects and this experience can only be of value in determining the best models for future expansion of the energy sector. Responses Agreed. SREP can help initiate the move to transformation, but as noted in the IP, the tipping point is when RE is delivered at grid parity. For solar, it is not unreasonable to expect that utility-scale projects can achieve grid parity in the foreseeable future. This observation is supported by the fact that 5 bidders responded to the MME tender for a 10 MW solar plant, with an advertised off-take price at grid parity. Cambodia does not have a true national grid as yet, but rather a collection of grids. Therefore grid parity is location specific. While solar can be expected to achieve grid parity anywhere, biomass may only achieve grid parity where diesel generation is still dominant, or in areas served by imported electricity that is higher than EDC s average cost of supply. The IP outlines a combination of learning-by-doing investments complemented by policy evolution which will be critical to a viable RE sector in the medium to long term that is not reliant on subsidies. The policy analysis should also recognize that fossil power has implicit subsidies that need to be fully accounted for in long-term planning. See notes above regarding private sector participation and leverage. See notes above about private sector participation. The SHS and mini-grids projects will have a PPP modality in that ADB funds and SREP cofinancing will be channeled to an updated REF. For the on-grid projects, the learning curve is relatively shorter as there are is already an established IPP business model. 75

82 Comments Off grid activities, beyond the current SHS work, may be more immediately attractive to the private sector and care should be taken to ensure that the availability of SREP funds does not discourage this participation. 20. The IP comments on the problem that a lack of appropriate finances generates in attracting the private sector. It is critical that demonstration projects are carefully designed, sited and executed; access to concessional finance alone at this stage (under the SREP programme) will not necessarily result in attracting funding that continues to encourage a broader engagement of the private sector. 21. The private sector will be drawn to support renewables where the returns that they offer match or exceed those that can be achieved through other investments (in energy or other sectors). This will require a realistic and sustained tariff regime, a level playing field for all technologies and consistent policies and regulations; power projects are by their nature long term and nothing unsettles investors (and financiers) more than an unpredictable policy environment. Responses See notes above re: private sector participation and expected leverage. SREP funds will be deployed as cofinancing, not as stand-alone concessional finance. Agreed and this is the basis for SREP to support technical assistance for policy evolution. As noted in the IP, technical assistance is expected to cover net metering and FiT policies (mainly to support rooftop solar), and capacity building for MME and other government agencies including the electricity regulator EAC. 76

83 CLIMATE INVESTMENT FUNDS SCALING-UP RENEWABLE ENERGY PROGRAMME (SREP) INVESTMENT PLAN FOR CAMBODIA Review undertaken by Dr Mike Allen 10 th May 2016 Independent Review - Mike Allen

84 1.0 Introduction The review of the Investment Plan for Cambodia has been undertaken ahead of the submission of the plan to the SREP Sub-Committee of the Strategic Climate Funds, within the Climate Investment Funds at the World Bank. These notes are based on a review of the draft plan dated 6 th May A number of minor queries have been raised by and are reiterated in these notes. It is expected that these issues will be addressed in preparing the final draft of the IP before its submission. It should be noted that the reviewer has not visited Cambodia as part of this review, nor been involved in the preparation of this plan. The lack of a visit to Cambodia and any contact with the ministries, agencies, institutions and various stakeholders necessarily limits the personal background knowledge but the nature of the situation is common to many such economies in the region. The reviewer has some understanding of the energy issues facing Cambodia through work undertaken from other personal engagements. The Investment Plan (IP) as submitted appears to offer a balanced approach to undertake what is suggested are important steps to build on a relatively immature renewables industry in Cambodia. The focus on extending experience with solar home systems (SHS), and exploring opportunities with minigrids for rural villages, appears sensible; the opportunity to look at the potential for large scale rooftop systems and utility scale solar farms is perhaps equally important if renewables are to begin to build a significant role in providing clean electric power generation. Given the immaturity of the solar market in Cambodia, and a number of obvious institutional and implementation challenges, the IP could be strengthened by providing more evidence that there is an active private sector interest in investing in such markets. It is recognised that there are a number of small enterprises that have been engaged in the solar PV industry for some years but again the current strength of this group, and its ability to make real contributions under the growth strategy outlined, has yet to be documented. As planning proceeds for projects under the IP / SREP, it will be important that the effective integration of any renewable energy projects within the national energy plans is clear before final commitments to their implementation. Part of the IP s justification for SREP support is that the proposed projects will assist as practical demonstrations of what could be achieved with wider support from the private sector (and other funders). This assumption should be revisited as each project is better defined. While the IP recommends that the potential for biomass energy projects be explored, the plan acknowledges the key challenges that the biomass industry faces. In particular, the security of (year round) fuel supply is critical; many well-intentioned biomass projects have failed when fuel volumes are not as anticipated. The IP suggests that there is a substantial level of potential renewable resources; caution is necessary that these figures are treated appropriately. While solar PV can be installed relatively quickly hydroelectric, and to some extent biomass options, are often slower and more complex developments. Independent Review - Mike Allen 78

85 Given the stated urgency to increase power production in Cambodia, and reduce some of the reliance on imported electricity, any plan will require flexibility. It is also important to ensure that choices reflect the true costs of development and that while feed in tariffs or similar subsidies may be considered important to open the renewable market, this should not be at the cost of longer term sustainability or inadvertently impacting the prices that end users must bear. The overall investment proposal that the SREP funds will help seed makes assumptions about significant additional investments that will be secured through MDBs and the private sector. Confirmation of the commitment from these sources should be a key element in making a final decision on the provision of funds under SREP. 2.0 Specific Comments on Investment Plan 2.1 The Country Energy Policy It is noted in the IP that there have been a limited number of programmes to encourage the uptake of renewables, particularly focused on rural communities. The main thrust of the country s energy policy is stated to be: The government has two overarching policy targets: (1) by 2020, all villages in the country should have access to electricity; and (2) by 2030, at least 70% of total households in the country should have access to quality grid electricity. Achieving these two main targets depends on the utilization of all types of electricity sources and the participation from relevant stakeholders. In terms of specific renewable energy developments, the IP notes: Cambodia s renewable energy development and rural electrification policies are linked. The government s energy policy is aimed at: (i) supplying adequate energy at affordable rates; (ii) ensuring the reliability and security of electricity supply to facilitate investments and advance national economic development; (iii) encouraging the socially acceptable development of energy resources; and (iv) promoting the efficient use of energy and minimizing detrimental environmental effects resulting from energy supply and consumption. The goals of the government s rural electrification program are as follows: providing safe, reliable, and affordable electricity to rural communities in a way that minimizes negative impact on the environment; providing a legal framework that encourages the development of renewable energy sources by the private sector to supply electricity to rural communities; supporting renewable energy initiatives; promoting the adoption of renewable energy technologies by setting electricity rates in accordance with the Electricity Law (2001); Independent Review - Mike Allen 79

86 promoting the use of least-cost forms of renewable energy in rural communities, through research and testing of grid and off-grid options; and supporting electrification in disadvantaged rural communities through funding assistance, training, and other means. The key provisions of the National Policy on Rural Electrification by Renewable Energy are to: Provide access to reliable, safe electricity services, with insignificant impact on the environment, Encourage the private sector to participate in providing electricity services by renewable energy in the rural areas; Act as a market enabler, through various incentives, Encourage using renewable energy technologies, Promote electricity systems by renewable energy at least cost for rural communities, through research and pilot development, Empower to the poor involving in rural electrification to participate. The government is targeting full electrification of villages by 2020, and 70% household electrification by The village electrification target involves about 14,000 villages (with almost 2.5 million households). The main components of rural electrification are an expanded power grid; diesel stand-alone, mini-utility systems; cross-border power supply from neighbouring countries; and renewable energy (solar, wind, mini and micro hydro, biogas, biomass). In the short- and medium-term, small village hybrid grid systems will also have an important role. 2.2 Proposed SREP Programme The IP outlines the rationale for the proposed SREP programme and its structure as follows: Recognizing the multi-sectoral dimension of RE development for addressing climate change challenges, the IP is designed to facilitate national efforts of shifting to a low-emissions economy that provides employment opportunities with some specific focus on reducing poverty in rural areas and urban margins, and a broader view of the medium- to long-term prospects for RE. Given the immaturity of RE development in Cambodia, the IP must have flexibility in terms of project definition and implementation to adjust to changing circumstances and new opportunities, including uncertainty in the national policy framework and financial markets. The IP promotes systematic and expanded development of RE resources to support access to energy and productive end use of energy through a combination of mutually-reinforcing physical investments and technical assistance for improved policy framework. The physical investments include solar and biomass energy development, while the technical assistance includes (i) human development and capacity building, (ii) public awareness campaigns to facilitate RE project development and implementation, (iii) a proposed Year of Renewable Energy in Cambodia ; and (iv) investment preparation activities. The main outcomes/benefits of the proposed investment plan will be (i) an improved policy framework to enable commercial RE development at progressively larger scale; (ii) commercial Independent Review - Mike Allen 80

87 scale RE demonstration which is replicable and scalable; (iii) mobilization of private investment into RE development; (iv) reduced reliance on fossil-fuels resulting in foreign exchange savings and avoided emissions of conventional pollutants and GHGs; (v) reduced pressure on forest resources; and (v) improved energy security through diversification of supply. 2.3 Financing The table that follows summarises the anticipated SREP financing, co-financing and potential private sector financing leverage. Table 14: Indicative Financing Plan ($ million) SREP ADB Private Sector Government a Total 1. Solar Energy Solar Home Systems Mini-grids for Rural Villages Rooftop Solar Systems Utility-scale Solar Farm Project Preparation Subtotal Biomass Energy Projects Project Preparation Subtotal Policy Support and Public Awareness TOTAL Note: a Government contribution to Rural Electrification Fund The table suggests that US$ 30 million of SREP funding is expected to catalyse more than four times as much investment, a large portion of it from the private sector (as equity or debt), and the public sector lending windows of the ADB. The IP however does not substantiate that these sources have been tested or any additional (albeit potential) commitments made by the private sector. It does however identify a number of current multilateral and bilateral programmes but it is unclear how their implementation links with work proposed under the IP itself. The reliance of the overall plan on significant co-funding from the ADB and the private sector needs to be tested thoroughly to ensure that commitments are in place before SREP funds are released. There is complexity in funding with blended financing, or using PPPs, and this should not be underestimated as its resolution will impact on project execution timelines. 2.4 Comments on Components Acknowledging the limited experience in Cambodia in undertaking renewable projects to date, with the exception of modest SHS activities, the projects and focus suggested for support through SREP appear Independent Review - Mike Allen 81

88 reasonable. The main concern is in implementation capacity and a clear demonstration that other funders / investors can be attracted to support the initial and subsequent programmes. The expansion of the SHS market and exploration of the potential for mini-grids would seem an achievable goal, based on current capacity and experience within Cambodia. The diagram below offers a clear explanation of the expected outcomes from the SREP support. Customers can save 30-40% on electricity bill with rooftop solar National Level Urban (0.66 million households) - 100% access to grid - Electricity cost at $ $0.21/kWh - 45% access to grid - 80% of households use charcoal or wood for cooking Rural (2.5 million households) Solar farms can supply electricity at grid parity when deployed at sufficient scale - 1/3 of grid-supplied electricity from coal and diesel KWh per capita consumption of electricity, among the lowest - Retail prices of electricity are among the highest in the world Use waste biomass for baseload displacing diesel and coal - 40% access to grid - 50% access to alternative energy - 5 KWh/month per person average consumption - Electricity cost at $0.70/kWh Solar home system and mini-grid for off-grid access to electricity In moving to larger scale PV installations, it also needs to be recognised that while the SHS, solar rooftop installations and solar parks use the same fundamental PV technology, there are significant differences in scale, investment, power sales agreements, operations and maintenance and underlying risks in developing and operating large scale grid connected PV installations. The challenges of biomass developments have been noted in the IP. Opportunities that have succeeded are often linked to captive power developments where fuel comes from in-house operations. Such facilities require an appropriate policy structure that allows for partial sale of power into the grid, often on a nonfirm basis. The IP notes that there are a number of institutional and capacity issues that need to be addressed to ensure that the proposed programmes can be considered. It is noted that one of the critical issues is that: A large number of RGC departments, agencies and offices are involved in the renewable energy development programs. A major challenge is to ensure that these entities work to their respective strengths in an integrated manner towards delivery of the national objectives Independent Review - Mike Allen 82

SREP/SC.15/5 May 20, Meeting of the SREP Sub-Committee Oaxaca. Mexico Friday, June 17, Agenda Item 5 SREP INVESTMENT PLAN FOR CAMBODIA

SREP/SC.15/5 May 20, Meeting of the SREP Sub-Committee Oaxaca. Mexico Friday, June 17, Agenda Item 5 SREP INVESTMENT PLAN FOR CAMBODIA Meeting of the SREP Sub-Committee Oaxaca. Mexico Friday, June 17, 2016 SREP/SC.15/5 May 20, 2016 Agenda Item 5 SREP INVESTMENT PLAN FOR CAMBODIA PROPOSED DECISION The SREP Sub-Committee, having reviewed

More information

CLEAN POWER ASIA on Policy and incentives to encourage renewable energy development in Cambodia

CLEAN POWER ASIA on Policy and incentives to encourage renewable energy development in Cambodia CLEAN POWER ASIA on Policy and incentives to encourage renewable energy development in Cambodia 29-30 April 2013 Bangkok, Thailand Prepared Mr. HANG Seiha Department of Energy Technique Ministry of Industry,

More information

Rural Electrification by Renewable Energy in Cambodia

Rural Electrification by Renewable Energy in Cambodia Capacity and Institutional Strengthening for Rural Electrification and Development-Decentralized Energy Options Rural Electrification by Renewable Energy in Cambodia Heng Kunleang Deputy Director Energy

More information

Renewable Energy Development in Cambodia. Institute of Technology of Cambodia

Renewable Energy Development in Cambodia. Institute of Technology of Cambodia Renewable Energy Development in Cambodia Institute of Technology of Cambodia 1 BACKGROUND Cambodia, situated in Southeast Asia, shares borders with Vietnam, Laos and Thailand. Land area : 181 035 sq. km

More information

Ministry of Mines and Energy. Energy Power Plant in Cambodia

Ministry of Mines and Energy. Energy Power Plant in Cambodia Ministry of Mines and Energy MME Energy Power Plant in Cambodia Prepare by : KIN Sothea Energy Development Department General Department of Energy The 5 th ASEAN Connectivity Forum 28-30 November 2017,

More information

Contents Basic Facts of Cambodia Cambodia Power Sector Overview Major Issues Cambodia Power Industry (Structure) Energy Policy Cambodia Power Developm

Contents Basic Facts of Cambodia Cambodia Power Sector Overview Major Issues Cambodia Power Industry (Structure) Energy Policy Cambodia Power Developm TRAINING AND DIALOGUE PROGRAMS IEEJ: August 2012 All Right Reserv IEEJ : June 2012 Energy Policy (B) June 3, 2012 to June23, 2012 IEEJ, Japan Mr. Phan Bunthoeun (Cambodia) Ministry of Industry, Mines and

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Interim Country Partnership Strategy: Maldives, 2014 2015 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities A. Sector Performance 1. The Maldives

More information

Cambodia Power Sector

Cambodia Power Sector Cambodia Power Sector Cambodia Power Sector 31 August 2015, Phnom Penh, Cambodia 1 Content 1. Structure of Electricity Organization 2. Energy Policy 3. Cambodia Power Strategy 4. Overviews of Power Sector

More information

Scaling up Renewable Energy Program (SREP) Revised Investment Plan for Cambodia

Scaling up Renewable Energy Program (SREP) Revised Investment Plan for Cambodia Scaling up Renewable Energy Program (SREP) Revised Investment Plan for Cambodia 20 July 2017 Table of Contents Executive Summary... 1 I. Introduction... 3 II. Status of Implementation... 3 III. Circumstances

More information

Chapter 4. Cambodia Country Report. September 2016

Chapter 4. Cambodia Country Report. September 2016 Chapter 4 Cambodia Country Report September 2016 This chapter should be cited as Sarasy, C. (2016), Cambodia Country Report in Kimura, S. and P. Han (eds.) in Energy Outlook and Energy Saving Potential

More information

IEEJ: April 21 Outline Electricity STATUS in Cambodia Energy Supply and Demand Problem Statement Conclusion 2

IEEJ: April 21 Outline Electricity STATUS in Cambodia Energy Supply and Demand Problem Statement Conclusion 2 IEEJ: April 21 Training Course on Energy Policy on April 4 24, 21 Tokyo, JAPAN Country Report On energy SECTOR IN CAMBODIA By: MR. CHOUMNIT Gnhoung Officer of Planning Office Energy Development Department

More information

Electricity Data Collection

Electricity Data Collection Electricity Data Collection Energy Development Department General Department of Energy MINISTRY OF MINES AND ENRGY, CAMBODIA 02 March 2016, Paris, France Content 1. Overviews of Power Sector 2. Rule of

More information

RURAL ELECTRIFICATION WITH PV - MARKET POTENTIAL IN CAMBODIA

RURAL ELECTRIFICATION WITH PV - MARKET POTENTIAL IN CAMBODIA RURAL ELECTRIFICATION WITH PV - MARKET POTENTIAL IN CAMBODIA Paper for Renewable Energy Policy Dialogue and Working Visit 10-16 Jun 2012, Munich By Dr BUN NARITH; Deputy Director General Of Energy; Cambodian

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Interim Country Partnership Strategy: Myanmar, 2012 2014 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 A. Sector Performance, Problems, and Opportunities 1. Overview. Myanmar has abundant energy resources, particularly

More information

Analysis of Energy Demand Supply Station

Analysis of Energy Demand Supply Station Chapter 3 Analysis of Energy Demand Supply Station October 2016 This chapter should be cited as ERIA (2016), Analysis of Energy Demand Supply Station, prepared by the General Department of Energy and General

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities Power Distribution Improvement Project (RRP MYA 46390) SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Myanmar has abundant energy resources,

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY SECTOR ASSESSMENT (SUMMARY): ENERGY Country Partnership Strategy: Nepal, 2013-2017 A. Overview 1. Nepal has long recognized the development of its large hydropower potential as an important cornerstone

More information

Chapter 10. Lao PDR Country Report. September 2016

Chapter 10. Lao PDR Country Report. September 2016 Chapter 10 Lao PDR Country Report September 2016 This chapter should be cited as Kouphokham, K. (2016), Lao PDR Country Report in Kimura, S. and P. Han (eds.) in Energy Outlook and Energy Saving Potential

More information

Renewable Energy Policies and the Solar Home System in Cambodia

Renewable Energy Policies and the Solar Home System in Cambodia Chapter 13 Renewable Energy Policies and the Solar Home System in Cambodia Han Phoumin April 2016 This chapter should be cited as Han, P. (2015), Renewable Energy Policies and the Solar Home System in

More information

CAMBODIA BASELINE ASSESSMENT PERSPECTIVE

CAMBODIA BASELINE ASSESSMENT PERSPECTIVE CAMBODIA BASELINE ASSESSMENT PERSPECTIVE REGIONAL WORKSHOP ON SEA BASELINE ASSESSMENT PHNOM PENH HOTEL, 27-28 JANUARY 2010 Mekong River Commission SEA of hydropower on the mainstream Mekong River Outlines

More information

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013 World Small Hydropower Development Report 2013 www.smallhydroworld.org C AMBODIA Disclaimer Published in 2013 by United Nations Industrial Development Organization (UNIDO) and International Center on Small

More information

CAMBODIA ENERGY SECTOR

CAMBODIA ENERGY SECTOR CAMBODIA ENERGY SECTOR Overview of potential electricity sector opportunities June 2018 Background This summary paper has been prepared by Investing In Infrastructure Cambodia (3i) a development program

More information

Cambodia s First Solar Park

Cambodia s First Solar Park Cambodia s First Solar Park Pradeep Tharakan Principal Energy Specialist Asian Development Bank Asia Solar Energy Forum 5 June 2018 1 Outline of Presentation Cambodia Power Sector Overview Solar PV Grid

More information

ECONOMIC ANALYSIS. A. Background and Approach

ECONOMIC ANALYSIS. A. Background and Approach A. Background and Approach ECONOMIC ANALYSIS Rural Renewable Energy Development Project (RRP BHU 42252) 1. Economic analysis was undertaken to determine the economic viability of the project. The analysis

More information

The Current Policy and Investment Opportunities in Laos

The Current Policy and Investment Opportunities in Laos International Conference Renewable Energy Asia 2013-New Opportunities in the ASEAN Community-Focus on Renewable Energy and Energy Efficiency The Current Policy and Investment Opportunities in Laos Chantho

More information

Biomass and Solar Energy for Rural Electrification and CO 2 Mitigation in Cambodia

Biomass and Solar Energy for Rural Electrification and CO 2 Mitigation in Cambodia International Journal of Renewable Energy, Vol. 4, No. 2, July 2009 Biomass and Solar Energy for Rural Electrification and CO 2 Mitigation in Cambodia Kong Pagnarith 1 and Bundit Limmeechokchai 2 Sirindhorn

More information

Universal Access to Modern Energy Services and Clean Energy Development

Universal Access to Modern Energy Services and Clean Energy Development Universal Access to Modern Energy Services and Clean Energy Development USEA Global Workshop on Clean Energy Development December 5, 2012 Junhui Wu, Senior Policy Advisor Retired World Bank Director of

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Country Partnership Strategy: Azerbaijan, 2014 2018 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map A. Sector Performance, Problems, and Opportunities 1. Azerbaijan is rich in energy resources. The

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Sustainable and Inclusive Energy Program (Subprogram 2) (RRP INO 49043-002) SECTOR ASSESSMENT (SUMMARY): ENERGY 1. Sector Performance, Problems, and Opportunities 1. Indonesia is striving hard to increase

More information

Energy Policy in Lao PDR

Energy Policy in Lao PDR Energy Policy in Lao PDR Phonepasong SITHIDETH. Technical staff Ministry of Energy and Mines. (MEM) Department of Electricity. (DOE) IEEJ, May 2011 Tokyo Japan Content Background Current energy policy

More information

SUMMARY SECTOR ASSESSMENT: ENERGY 1

SUMMARY SECTOR ASSESSMENT: ENERGY 1 Access to Clean Energy Investment Program (RRP PAK 49056) SUMMARY SECTOR ASSESSMENT: ENERGY 1 A. Sector Performance, Problems, and Opportunities 1. A reliable and sustainable energy sector is essential

More information

Figure Gross Domestic Product Growth of Viet Nam,

Figure Gross Domestic Product Growth of Viet Nam, 1.4 Viet Nam Viet Nam is a country with a population of 92.7 million (2016). The United Nations (UN) estimates that by July 2018 the country s population will be 96.49 million (World Population Review,

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems and Opportunities Ha Noi and Ho Chi Minh City Power Grid Development Sector Project (RRP VIE 46391) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems and Opportunities 1. The Ministry of

More information

RENEWABLE ENERGY POLICY OF BANGLADESH

RENEWABLE ENERGY POLICY OF BANGLADESH Final RENEWABLE ENERGY POLICY OF BANGLADESH POWER DIVISION MINISTRY OF POWER, ENERGY AND MINERAL RESOURCES GOVERNMENT OF THE PEOPLE S REPUBLIC OF BANGLADESH 6 NOVEMBER 2008 DHAKA CONTENTS 1 INTRODUCTION...

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR)

SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR) Installed capacity (GW) Solar Rooftop Investment Program (RRP IND 49419) Sector Road Map SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR) 1. Sector Performance, Problems, and Opportunities

More information

The Ghana Experience in Funding Rural/Renewable Energy Through Levies on Fossil Fuels and Electricity

The Ghana Experience in Funding Rural/Renewable Energy Through Levies on Fossil Fuels and Electricity PfA Policy Dialogue Conference, The Role of Renewable Energy for Poverty Alleviation and Sustainable Development in Africa 22-24 June 2005, Dar es Salaam. The Ghana Experience in Funding Rural/Renewable

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Country Partnership Strategy: Timor-Leste, 2010 2015 A. Sector Road Map SECTOR ASSESSMENT (SUMMARY): ENERGY 1. Sector Performance, Problems, and Opportunities 1. The energy sector is dominated by offshore

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:47622 Project Name Rural

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:45460 Project Name Rural Electrification and Transmission Interconnection Project (RETP) Region EAST ASIA AND PACIFIC Sector Energy Project ID

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Country Partnership Strategy: Philippines, 2011 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1. Sector Performance, Problems, and Opportunities 1. Challenges. Economic growth has been impeded in the Philippines

More information

SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA

SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA SREP Sub- Committee Meeting, Cape Town June 21, 2011 1 Introduction Kenya is one of the six Pilot Countries selected to benefit

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Power Sector Rehabilitation Project (RRP KGZ 44198) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunity a. Introduction 1. The Kyrgyz Republic is a landlocked

More information

Renewable Energy Policies in Southeast Asia. Renewable Energy Auctions: A New Paradigm for Asia ACEF, 8 June 2018

Renewable Energy Policies in Southeast Asia. Renewable Energy Auctions: A New Paradigm for Asia ACEF, 8 June 2018 Renewable Energy Policies in Southeast Asia Renewable Energy Auctions: A New Paradigm for Asia ACEF, 8 June 2018 Rising energy demand to sustain development in Southeast Asia GDP reached USD 2.5 trillion

More information

SCALING UP RENEWABLE ENERGY PROGRAME IN TANZANIA

SCALING UP RENEWABLE ENERGY PROGRAME IN TANZANIA SCALING UP RENEWABLE ENERGY PROGRAME IN TANZANIA By: Edward Ishengoma Assistant Commissioner Renewable Energy Ministry of Energy and Minerals Tanzania 25 July, 2013 CONTENTS 1. Introduction 2. Status of

More information

Cambodia Perspective on Bioenergy

Cambodia Perspective on Bioenergy Cambodia Perspective on Bioenergy The Regional Forum on Sustainable Bioenergy 6-7 November, 2012, Bogor, Indonesia saruthchan@hotmail.com 1 Background Location: SEA and bordered with Vietnam, Laos and

More information

DESIGN DOCUMENT FOR THE PROGRAM ON SCALING-UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES (SREP), A TARGETED PROGRAM UNDER THE STRATEGIC CLIMATE FUND

DESIGN DOCUMENT FOR THE PROGRAM ON SCALING-UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES (SREP), A TARGETED PROGRAM UNDER THE STRATEGIC CLIMATE FUND June 1, 2009 DESIGN DOCUMENT FOR THE PROGRAM ON SCALING-UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES (SREP), A TARGETED PROGRAM UNDER THE STRATEGIC CLIMATE FUND BACKGROUND 1. Low income countries face a

More information

Thailand s Energy Situation

Thailand s Energy Situation 1 page Thailand s Energy Situation 2 Final Energy Consumption 2013 Thousand barrel oil equivalent / day Domestic 53% Import 47% Hydropower Coal/Lignite 2% 16% Domestic 30% Import 70% Natural Gas 46% Import

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities Interim Country Partnership Strategy: Mongolia, 2014 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 1. Sector Performance, Problems, and Opportunities 1. Low energy efficiency and urban air pollution. Presently,

More information

World Bank s Role: Support Shift toward Sustainability

World Bank s Role: Support Shift toward Sustainability 6 World Bank s Role: Support Shift toward Sustainability Key messages: The World Bank Group is committed to scale up investment and analytical and advisory activities (AAA) in sustainable energy to support

More information

Number of inhabitants in million population [1]

Number of inhabitants in million population [1] Biogas Slide 1 Overview of Cambodian population Millions 16 14 12 10 8 6 4 2 Number of inhabitants in million population [1] 0 1921 1931 1939 1948 1950 1958 1962 1970 1981 1985 1990 1995 1998 2004 2008

More information

Current Status of Energy in Viet Nam: Tran Thuc

Current Status of Energy in Viet Nam: Tran Thuc Current Status of Energy in Viet Nam: Tran Thuc 1. Overview Located in SE Asia, Country has a long shape and long coastline Area: about 330,000 km 2, Population: more than 83 million people Climate and

More information

Policy Developments in Turkey Bioenergy Markets Turkey

Policy Developments in Turkey Bioenergy Markets Turkey Policy Developments in Turkey Bioenergy Markets Turkey 30 September 2010, 14:00 Turkish International Renewable Energy Congress Grand Cevahir Hotel & Congress Center Sisli/Istanbul Turkey Erkan Erdogdu

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems and Opportunities West Kalimantan Power Grid Strengthening Project (RRP INO 41074) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems and Opportunities 1. Development of Indonesia s energy

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Namangan 500-Kilovolt Power Transmission Project (RRP UZB 46007-002) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Uzbekistan is a Central Asian

More information

Sustainable Development of Energy and Electricity Policy In Cambodia

Sustainable Development of Energy and Electricity Policy In Cambodia Sustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 Tokyo, Japan 21-June-2015 Content I. Cambodia Background II. Current energy policy and measures of Cambodia III. Cambodian

More information

SEE2006 Sustainable Energy and Environment Conference

SEE2006 Sustainable Energy and Environment Conference SEE2006 Sustainable Energy and Environment Conference 21 23 November 2006 Bangkok The Energy Situation and Policy and Programs on Sustainable Energy Development in Lao PDR. Lloyd Osborne CFO Sunlabob Rural

More information

National Stakeholders Workshop on Accessible and Affordable Sustainable Energy. Brief Report

National Stakeholders Workshop on Accessible and Affordable Sustainable Energy. Brief Report ASIAN AND PACIFIC CENTRE FOR TRANSFER OF TECHNOLOGY (APCTT) National Stakeholders Workshop on Accessible and Affordable Sustainable Energy 11-12 February 2014 Vientiane, Lao People's Democratic Republic

More information

Grid Resilience in Developing Countries

Grid Resilience in Developing Countries Grid Resilience in Developing Countries David Elzinga, Senior Energy Specialist Energy Sector Group 15 June 2018 1 ADB ENERGY Overview Prioritizes sustainable energy and low-carbon development: Promoting

More information

West Africa s Sustainable Energy Market

West Africa s Sustainable Energy Market ECOWAS SUSTAINABLE ENERGY WEEK Towards a Viable and Robust Energy Market in the ECOWAS region 17-19 October 2016, Accra, Ghana West Africa s Sustainable Energy Market Mahama Kappiah Executive Director

More information

Agriculture Services Programme for Innovation, Resilience and Extension

Agriculture Services Programme for Innovation, Resilience and Extension Ministry of Agriculture, Forestry and Fisheries Agriculture Services Programme for Innovation, Resilience and Extension (ASPIRE) TERMS OF REFERENCE (Individual Consultant, Fixed Term) Title: Programme:

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower Implementing Agency Report No. PID6033

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Java Bali 500-Kilovolt Power Transmission Crossing Project (RRP INO 42362) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Development of Indonesia

More information

Ex-Ante Evaluation. Japanese ODA Loan

Ex-Ante Evaluation. Japanese ODA Loan Japanese ODA Loan Ex-Ante Evaluation 1. Name of the Project Country: Kingdom of Cambodia Project: Phnom Penh City Transmission and Distribution System Expansion Project (Phase 2) (I) Loan Agreement: March

More information

Tin Zaw Myint Energy Planning Department (EPD), Ministry of Energy (MOE), Myanmar.

Tin Zaw Myint Energy Planning Department (EPD), Ministry of Energy (MOE), Myanmar. Chapter 12 Myanmar Country Report Tin Zaw Myint Energy Planning Department (EPD), Ministry of Energy (MOE), Myanmar. Nay Aung Energy Planning Department (EPD), Ministry of Energy (MOE), Myanmar. June 2013

More information

Solar PV in ASEAN Challenges and Opportunities. Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia

Solar PV in ASEAN Challenges and Opportunities. Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia Solar PV in ASEAN Challenges and Opportunities Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia ESI Workshop on the value of PV in Singapore 18 February 2016

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Country Partnership Strategy: People s Republic of China, 2016 2020 SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map A. Sector Performance, Problems, and Opportunities 1. Reduction in energy intensity.

More information

Biomass-based Bioenergy Investment for Poverty Reduction

Biomass-based Bioenergy Investment for Poverty Reduction Biomass-based Bioenergy Investment for Poverty Reduction Sununtar Setboonsarng Principal Natural Resources and Agriculture Economist Asian Development Bank 23 July 2014 Outline Energy and Food Security

More information

Rural Renewable Energy Development & Promotion Policies in China

Rural Renewable Energy Development & Promotion Policies in China Rural Renewable Energy Development & Promotion Policies in China YAO Xiangjun, President of CEEP TIAN Yishui, Senior Engineer International Workshop on Bioenergy Policies, Technologies and Financing 9th

More information

AZERBAIJAN ECONOMY AND POWER SECTOR: CHALLENGES AND OPPORTUNITIES

AZERBAIJAN ECONOMY AND POWER SECTOR: CHALLENGES AND OPPORTUNITIES AZERBAIJAN ECONOMY AND POWER SECTOR: CHALLENGES AND OPPORTUNITIES 1. Analysis 1. Economy. The economy grew, on average, by 29.3% from 2005-2007 and in 2008, the gross domestic product (GDP) increased by

More information

WtE - Gasification for the Rice Milling Sector in Cambodia

WtE - Gasification for the Rice Milling Sector in Cambodia WtE - Gasification for the Rice Milling Sector in Cambodia SNV Development Organization Ira Larasaty WtE Programme Leader WtE - Gasification for the Rice Milling Sector in Cambodia Introduction Chapter

More information

Expert Working Group Meeting on Universal Access to Energy Services, Renewable Energy, Energy Efficiency and Clean Use of Fossil Fuels 14 Dec 2017

Expert Working Group Meeting on Universal Access to Energy Services, Renewable Energy, Energy Efficiency and Clean Use of Fossil Fuels 14 Dec 2017 Expert Working Group Meeting on Universal Access to Energy Services, Renewable Energy, Energy Efficiency and Clean Use of Fossil Fuels 14 Dec 2017 United Nations Conference Center Bangkok, 14 December

More information

Sustainable biomass technology enhances Cambodia s rice milling sector

Sustainable biomass technology enhances Cambodia s rice milling sector IMPACT SHEET SWITCH-ASIA PROJECT WASTE TO ENERGY FOR THE RICE MILLING SECTOR IN CAMBODIA Sustainable biomass technology enhances Cambodia s rice milling sector Converting rice husk into energy to reduce

More information

Energy Situation in ASEAN countries

Energy Situation in ASEAN countries Energy Situation in ASEAN countries Vietnam, Laos, Cambodia, Myanmar Some knowledge from ODA UNESCO program, Promotion of Energy Science Education for Sustainable Development in ASEAN (2011 2014) 1 What

More information

Alternative Energy Promotion Centre

Alternative Energy Promotion Centre Plans and Policies for RE Development Dr. Govind Raj Pokharel Executive Director ASSESSMENT OF RENEWABLE ENERGY INTERVENTION POSSIBILITIES IN KARNALI DISTRICTS By Dr. Govind Raj Pokharel Mr. Ram Pd. Dhital

More information

WELCOME TO. The First General Meeting Network of Asian River Basin Organisation

WELCOME TO. The First General Meeting Network of Asian River Basin Organisation WELCOME TO The First General Meeting Network of Asian River Basin Organisation Prepared by : Dr. THENG TARA Director Department of Water Resource Management Batu, East Java,Indonesia, 24-26 February 2004

More information

TOWARD A LOW CARBON ENERGY TRANSITION IN CAMBODIA

TOWARD A LOW CARBON ENERGY TRANSITION IN CAMBODIA TOWARD A LOW CARBON ENERGY TRANSITION IN CAMBODIA PHEAKDEY HENG, PH.D Enrich Institute 2018 Printed in Phnom Penh in May 2018 All Rights Reserved. No part of this publication may be reproduced, stored

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Country Partnership Strategy: Armenia, 2014 2018 SECTOR ASSESSMENT (SUMMARY): ENERGY A. Sector Performance, Problems, and Opportunities 1. Sector performance. Armenia has no proven reserves of oil or natural

More information

CHAPTER 6 GLOBAL PROSPECTS FOR SDG 7

CHAPTER 6 GLOBAL PROSPECTS FOR SDG 7 CHAPTER 6 GLOBAL PROSPECTS FOR SDG 7 Photo: Supriya Biswas /Irena MAIN MESSAGES The world fails to achieve all Sustainable Development Goal (SDG) 7 targets under current levels of ambition. The New Policies

More information

POLICY AND REGULATORY FRAMEWORKS FOR ENERGY ACCESS IN AFRICA AND DEVELOPING COUNTRIES

POLICY AND REGULATORY FRAMEWORKS FOR ENERGY ACCESS IN AFRICA AND DEVELOPING COUNTRIES POLICY AND REGULATORY FRAMEWORKS FOR ENERGY ACCESS IN AFRICA AND DEVELOPING COUNTRIES Training programme on Energy Access for Sustainable Human Development Krithika PR 20 th November 2013 STRUCTURE OF

More information

DECEMBER Renewable Energy

DECEMBER Renewable Energy DECEMBER 2016 Renewable Energy law EMPOWERING ASEAN One of the fastest growing energy markets in the world lies in Southeast Asia. By 2040, regional demand for energy may grow by 80% and electricity demand

More information

Renewable Energy Programmes in India

Renewable Energy Programmes in India Renewable Energy Programmes in India Amit Kumar TERI, India Outline Indian Energy Scenario Renewable Energy in India Grid connected power Distributed generation Sustainable buildings Bio-energy Policy

More information

RENEWABLE ENERGY MARKET DEVELOPMENT IN LAO PDR- OPPORTUNITUES FOR INVESTMENT

RENEWABLE ENERGY MARKET DEVELOPMENT IN LAO PDR- OPPORTUNITUES FOR INVESTMENT RENEWABLE ENERGY MARKET DEVELOPMENT IN LAO PDR- OPPORTUNITUES FOR INVESTMENT Presented by Dr. Seumkham THOUMMAVONGSA Deputy Director General Institute of Renewable Energy Promotion (IREP) MEM 9 June 2017,

More information

Sustainable Energy for All (SE4ALL) Action Agenda for Ghana. Presented By: Gifty Delali Tettey (Mrs.) Deputy Director Ministry of Power

Sustainable Energy for All (SE4ALL) Action Agenda for Ghana. Presented By: Gifty Delali Tettey (Mrs.) Deputy Director Ministry of Power Sustainable Energy for All (SE4ALL) Action Agenda for Ghana Presented By: Gifty Delali Tettey (Mrs.) Deputy Director Ministry of Power Outline Ghana Overview Ghana s Energy Situation Policy Objectives

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY (ELECTRICITY TRANSMISSION AND DISTRIBUTION)

SECTOR ASSESSMENT (SUMMARY): ENERGY (ELECTRICITY TRANSMISSION AND DISTRIBUTION) Southwest Transmission Grid Expansion Project (RRP BAN 51137) SECTOR ASSESSMENT (SUMMARY): ENERGY (ELECTRICITY TRANSMISSION AND DISTRIBUTION) Sector Road Map 1. Sector Performance, Problems, and Opportunities

More information

PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND

PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND Re-submission Date: 27 November 2009 PART I: PROJECT IDENTIFICATION INDICATIVE CALENDAR GEF PROJECT ID: 4004 PROJECT

More information

Introduction: The Growing Importance of Biofuels in Asia

Introduction: The Growing Importance of Biofuels in Asia Chapter 1 Introduction: The Growing Importance of Biofuels in Asia November 2014 This chapter should be cited as ERIA (2014), Introduction: The Growing Importance of Biofuels in Asia, in Yamaguchi, K.

More information

Cambodian Agrarian Structure Study. Table 1 Basic Indicators of the Agricultural Sector in Cambodia

Cambodian Agrarian Structure Study. Table 1 Basic Indicators of the Agricultural Sector in Cambodia 11 Tables Table 1 Basic Indicators of the Agricultural Sector in Cambodia Indicators Value Agricultural Land ('000 ha) 2700 Population in 2003 ('000) 12943 Population growth 2.50% Rural Population 1998

More information

Proposed additional financing to the Kingdom of Cambodia for the Tonle Sap Poverty Reduction and Smallholder Development Project

Proposed additional financing to the Kingdom of Cambodia for the Tonle Sap Poverty Reduction and Smallholder Development Project Document: EB 2017/LOT/P.20 Date: 17 November 2017 Distribution: Public Original: English E President s memorandum Proposed additional financing to the Kingdom of Cambodia for the Tonle Sap Poverty Reduction

More information

Presentation on current status of or plan for nuclear HRD programs Country: Lao PDR

Presentation on current status of or plan for nuclear HRD programs Country: Lao PDR Presentation on current status of or plan for nuclear HRD programs Country: Lao PDR By: Mr Chansaveng Boungnong Deputy Director General Department of Energy Policy and Planning, Ministry of Energy and

More information

Preliminary Design Document SCF Program for Scaling-Up Renewable Energy in Low Income Countries (SREP)

Preliminary Design Document SCF Program for Scaling-Up Renewable Energy in Low Income Countries (SREP) CIF/SREPWG/2 March 12, 2009 Working Group on Designing Program for Scaling-Up Renewable Energy Paris, France March 25-26, 2009 Preliminary Design Document SCF Program for Scaling-Up Renewable Energy in

More information

14 TH to 18 th SEPTEMBER, 2015 ABIDJAN, CITE D IVOIRE

14 TH to 18 th SEPTEMBER, 2015 ABIDJAN, CITE D IVOIRE Within the Process and Strategy on the Development of Sustainable Energy for all (SE4All) Action Agendas, National Renewable Energy Action Plans (NREAPs) and National Energy Efficiency Action Plans (NEEAPs)

More information

Reliable, affordable, and sustainable energy services for agriculture,

Reliable, affordable, and sustainable energy services for agriculture, IDA at Work Energy Services for Poverty Reduction and Economic Growth Reliable, affordable, and sustainable energy services for agriculture, industry, commerce and households underpin growth in productivity

More information

Chapter 1 Primary Energy Data

Chapter 1 Primary Energy Data Chapter 1 Primary Energy Data The primary energy sources of the Lao People s Democratic Republic (Lao PDR) consist of coal, oil, hydro, and biomass. The country imports oil products to meet its domestic

More information

Primer. Energy Statistics. in Asia and the Pacific ( ) and. Energy Outlook. for Asia and the Pacific

Primer. Energy Statistics. in Asia and the Pacific ( ) and. Energy Outlook. for Asia and the Pacific Primer Energy Statistics in Asia and the Pacific (1990 2009) and Energy Outlook for Asia and the Pacific 2013 Asian Development Bank All rights reserved. Published in 2013. Printed in the Philippines.

More information

Best Practices of Rural Electrification in Developing Countries

Best Practices of Rural Electrification in Developing Countries Best Practices of Rural Electrification in Developing Countries Panos Kotsampopoulos National Technical University of Athens Aalborg 2015 Symposium on Microgrids, 27-28 August Overview Technologies and

More information

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 Country Partnership Strategy: Timor-Leste, 2016 2020 SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 A. Sector Performance, Problems, and Opportunities 1. Agriculture

More information

SECTOR ASSESSMENT (SUMMARY): POWER

SECTOR ASSESSMENT (SUMMARY): POWER Power System Expansion and Efficiency Improvement Investment Program (RRP BAN 42378) A. Power Generation SECTOR ASSESSMENT (SUMMARY): POWER 1. The energy sector in Bangladesh is characterized by an acute

More information

Current Status of Energy in Viet Nam. Assoc. Prof. Dr. Tran Thuc Director, Institute of Meteorology and Hydrology

Current Status of Energy in Viet Nam. Assoc. Prof. Dr. Tran Thuc Director, Institute of Meteorology and Hydrology Current Status of Energy in Viet Nam Assoc. Prof. Dr. Tran Thuc Director, Institute of Meteorology and Hydrology Outline Overview Current status of the Vietnamese Energy Sector Policies, Projects and Plans

More information

B I OMASS E N E RGY C O N S UMPTION PAT T ERNS I N C A MBODIA: C H ALLENGES A N D O P P O RTUNITIES

B I OMASS E N E RGY C O N S UMPTION PAT T ERNS I N C A MBODIA: C H ALLENGES A N D O P P O RTUNITIES APRIL 23 RD 2015 RAFFLES HOTEL PHNOM PENH B I OMASS E N E RGY C O N S UMPTION PAT T ERNS I N C A MBODIA: C H ALLENGES A N D O P P O RTUNITIES R o m a i n J OYA G E R E S Outline Objective: to set the context

More information

Energy. FIGURE 1: Framework for the Energy Sector Analysis. Macroeconomic variables driving energy demand (GDP, sectoral value added, energy prices)

Energy. FIGURE 1: Framework for the Energy Sector Analysis. Macroeconomic variables driving energy demand (GDP, sectoral value added, energy prices) Energy Relevance of the energy sector for green growth in Macedonia The energy sub-component of the Program seeks to assess the potential opportunities available in the energy producing and consuming sectors