1 Annexure - 11 PRE-FEASIBILITY REPORT (AS PER THE GUIDELINE OF MoEF) FOR PROPOSED NEW UNIT Name of the Industrial Unit Registered Office M/S. ANSHIKA POLYSURF LIMITED PLOT NO.C-383/1, GIDC-ESTATE, TAL-VAGRA, SAYAKHA DIST. BHARUCH, STATE-GUJARAT C-157, PREET VIHAR, NEW DELHI TEL.:
2 1.0 EXECUTIVE SUMMARY Now-a-days, petrochemical industries are gradually growing and the demand Of these chemicals are also increasing rapidly so the company has decided to Activate its production in this field. The company s proprietor Mr. Anubhav Jain has got good experience in this field. Aromatic and aliphatic solvents, which are used as fuel in various industries, and also used in the pesticide, Paint, ink industries. As these are wide spread industries, sky is the limit in this field. The total market size of these solvents is about 4 lakh tones per year including More than 500 companies, big and small. Big customers are M/s Goodlass Nerolac Paints Ltd., ICI Ltd., Denocil crap protection Ltd., coates of India ltd., Bengal paint, Calcutta etc. The plant will be equipped with latest techanology so that No process waste remains and the plant is Well maintained ETP in aspect of Pollution of environment. Applicability of EIA Notification 2006 The proposed new project M/s. ANSHIKA POLYSURF LIMITED (Sayakha Division) shall Synthetic organic chemicals at Sayakha in the Indian state of Gujarat. Hence it falls under project type 5(f) of the EIA notification dated and therefore requires prior Environmental Clearance from State Environment Impact Assessment Authority (SEIAA), Gujarat. 2.0 INTRODUCTION OF THE PROJECT/ BACK GROUND INFORMATION 2.1 Identification of project and project proponent. BACKGROUND OF THE PROMOTERS : Mr. Anubhav Jain is the proprietor of the unit. His complete bio-data is as under : Name : Anubhav Jain Age : 38 years Sex : Male Educational Qualification : MBA Experience : 10 years Mr. Anubhav Jain is a businessman and is doing trading of various chemical items. His line of products included Petro-Products, Non-edible by-products, Fuel Oils, etc. He is selfmade entrepreneur. After qualifying his graduation in commerce, he started his own business in the year 2005, after gaining some initial experience of the line. After hard work and business acumen, his turnover of trading business has reached to Rs.1475 lacks in the financial year With sound experience of Trading business, he decided to set up his Page 2 of 15
3 own manufacturing unit and he chose Bharuch as preferred location for this purpose, looking to the advantages attached to the area for successful business future. The firm proposes to employ technically qualified and experienced production persons and other subordinate staff to maintain the quality of the products. The total proposed strength of the employees shall be 11 and proprietor shall look after Marketing and Financial matters. He is well acquainted with the market related to this field like Agrochemical formulation Paint, Ink, Textile, Leather, Construction chemicals, Plastic, Glass Proposed new unit of M/s. ANSHIKA POLYSURF LIMITED is located at Plot No.C-383/1, GIDC-Estate, Tal-Vagra, Sayakha , Dist. Bharuch, State-Gujarat. Promoter Information: M/s. ANSHIKA POLYSURF LIMITED is the venture of well known board of directors group of M/s. ANSHIKA POLYSURF LIMITED The detail of Directors name and address provided here in (Annexure:2) Key Personnel Mr. ANUBHAV JAIN 2.2 Brief description of nature of the project. The company now proposes to start the Synthetic organic chemical production facilities at the Sayakha site by putting up one more Multi-purpose chemical plant for Synthetic organic chemicals. Along with the production facilities, necessary support infra-structure like Wastewater Treatment plant and required Utilities will be put up. SR. NO. PRODUCT NAME PROPOSED PRODUCTION MT/MONTH 1. ETHYLENE OXIDE 1300 PROPYLENE OXIDE CONDENSATE 2. ETHYLENE OXIDE 1200 PROPYLENE OXIDE GLYCOL ETHERS 3. ANIONIC SURFACTANTS 400 (CABS) 4. CATIONIC SURFACTANTS BLENDED SURFACTANTS POWDER SURFACTANTS MISCELLANEOUS SURFACTANTS FRACTIONAL DISTILLATION PRODUCTS SPRRAY DRYER POLYVINYL ACETATE EMULSION 750 (HOMO POLYMER) 11. PAINT BINDER 1250 (STYRENE ACRYLIC EMULSION) 12. PAINT BINDER 500 Page 3 of 15
4 (PURE ACRYLIC EMULSION) 13. PAINT BINDER (VAM ACRYLIC EMULSION) 14. PRESSURE SENSITIVE ADHESIVE (STICKER GRADE) LAMINATION ADHESIVE- 50 WATER MEDIUM 16. DI BUTYL MALEATE PLASTICIZERS DI OCTYL MALEATE PLASTICIZERS DI BUTYL PHTHALATE PLASTICIZERS STYRENE BUTADINE RUBBER (SBR) EMULSION 500 TOTAL Need for the project and its importance to the country and or region The proposed project is necessitated because of the following reasons: To make the facility more resource efficient. Reduce operational costs and increase productivity. Development of the infrastructure of the facility. Entry into new product segments. Its importance to the country can be accounted by Add to foreign exchange generated by Exports. Ensure continued employment to workforce without affecting work conditions and hence supporting their families. Lead to generation of direct and indirect employment opportunities. Reduce dependence on Imports hence reducing Forex risks. 2.4 Domestic / export Markets. Aromatic and aliphatic solvents, which are used as fuel in various industries, and also used in the pesticide, Paint, ink industries. As these are wide spread industries, sky is the limit in this field 2.5 Employment Generation (Direct and Indirect) due to the project. After proposed unit direct & indirect employment generation will be increased. Direct: 100 Nos. Indirect: 100 Nos. Page 4 of 15
5 3.0 PROJECT DISCRIPTION 3.1 Type of project including interlinked and interdependent projects, if any. Independent Project. 3.2 Location (map showing general location, specific location, and project boundary & Project site layout) with coordinates. Latitude: 21 48' "N Longitude: 72 53' "E Detailed site plan is attached as Annexure-1 The unit has total sq. m. of land area. Unit will commit to develop green 33%. The site is located within Sayakha and hence there is no agricultural or forest land involved in the project site. The estate is located at sufficient distance from reserved forests and sanctuaries, archeological sites and historical sites to ensure that there is no impact of industrial activities. 3.3 Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted, Land is acquired for the proposed new project in the GIDC Notified Industrial Area having proper industrial infrastructure hence alternate site consideration is not envisaged. 3.4 Size or magnitude of operation. M/s. ANSHIKA POLYSURF LIMITED. shall be a Large scale industry. The total monthly production capacity shall be MT/Annum. 3.5 Project description with process details Detailed manufacturing process of existing & proposed products are attached as an annexure Raw material required along with estimated quantity, Likely source, marketing area of final product/s, Mode of transport of raw material and Finished product The raw materials required for the proposed unit of production shall be either imported or procured from domestic market and transported conveniently by road. Detail raw material (MT/MT & MT/Month) of the product is explained Annexure-4 Page 5 of 15
6 The manufacturing process for the proposed products are detailed step-wise with material balance and calculations for product-wise waste generation w.r.t water and hazardous waste are made. Detailed manufacturing process of proposed products are attached as an annexure-5 As being in Sayakha, Mode of transport would be via road or Water. 3.7 Resource optimization/ recycling and reuse envisaged in the project, if any, should be briefly outline Proponent commit that they shall be optimize resource and reuse envisaged in the project at the time of commissioning. 3.8 Availability of water & its sources, Energy power requirement Water : Supplied from GIDC reservoir Proposed: 100 KL/Day (Annexure - 6) Electricity Power is supplied from own GEB Proposed requirement of 200 KVA from GEB Fuel consumption shall be coal ( 11 MT/Day) or FO (1.2 KL/Day) and Diesel (3.0 KL/Day) 3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management/disposal Wastewater Generation, Treatment and Disposal Propose effluent generation: 12 KL/day ( Domestic (1 KLD) + Industrial 11 KLD) in which domestic effluent 1.0 KL/Day send to soak pit via septic tank. Industrial effluent 11 KL/day shall be treated in ETP & treated effluent shall be disposed through u/g pipeline of GIDC into deep sea. (Detail attached as annexure-6) Air pollution and Control Measures Flue gas Emission: The flue gas emission from operation of boilers & TFH. Proponent shall be use Coal/FO as a fuel. All stacks shall be provided with APCM & sampling point and access ladder. Annexure-7 Process Emissions : There is process emission for PM Page 6 of 15
7 Solid / Hazardous wastes The hazardous / solid wastes shall be generated from proposed production as per the Hazardous Wastes Authorization Rules. Adequate arrangements shall be made for the storage, treatment and disposal of these wastes. Detailed of all waste category with quantity and their storage and disposal are given in Annexure-8. Environmental Monitoring Plan The unit shall be establish an EHS cell and prepare an Environmental Monitoring plan for carrying out the following activities : 1. To follow the trend of parameters those have been identified as critical; 2. To comply with the conditions of consent order of GPCB 3. To check / assess / maintain the efficiency of controlling measures; In-house facilities and infrastructure for monitoring of certain parameters shall be developed. Where it is not feasible to establish such facilities, the same shall be done by appointing external recognized/ approved agencies. The monitoring of environmental parameters shall be carried out time to time and the reports of all the monitoring / analysis / assessment studies shall be welldocumented Schematic representations of the feasibility drawing which give information of EIA purpose It will be submitted later up on the requirement. 4.0 SITE ANALYSIS 4.1 Connectivity Nearest towns / cities : Bharuch km to SE Transport by Rail: Bharuch km to SE Transport by road: SH km to NEE 4.2 Land form, Land use and land ownership Since the project is new unit located in Sayakha. land possession document is attached herewith as Annexure: Topography(along with map) The following are the main features of this estate, which make it suitable for industrial activities of all types. The entire estate area is located at sufficient height from sea level and assessed for suitability with respect to topographical and geological requirement for industrial activities. District map and area map from googlemaps.com and googleearth.com are as under, Page 7 of 15
8 4.4 Existing land use pattern, nearby water bodies, forest, eco sensitive zones, CRZ.etc. Sr.No. Particulars Details 1. Town Sayakha 2. Taluka Vagra 3. District Bharuch 4. Latitude 21 48' "N 5. Longitude 72 53' "E 6. Nearest water bodies Narmada Canal 0.25 km to W Bhukhi river-1.96 km to SE 9. Nearest Highway SH km to NEE 10. Nearest Railway Bharuch Railway Station km to SE station 11. Nearest Airport/ Airbase Vadodara km to NNE Surat km to SSW Mumbai international airport km to S Existing land use is already allotted for industrial use Sayakha GIDC No eco sensitive zone. The project is not covered under CRZ. The estate is located at sufficient distance from reserved forests and sanctuaries, archeological sites and historical sites to ensure that there is no impact of industrial activities. Page 8 of 15
9 4.5 Existing infrastructure Not applicable (New Unit) 4.6 Soil classification The project is new. The soil classification of Gujarat state is as under, The quality of Bharuch district area soil had been identified as deep black coastal alluvial type. 4.7 Climate data from secondary sources Month (2013) Temperature in C Relative humidity in % Wind speed in kmph Cloud Cover in oktas Min. Max hrs 1730 hrs 0830 hrs 1730 hrs 0830 hrs 1730 hrs Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. Total Rainfall in mm January February March April May June July August September October November December Rainy days (Courtesy: Indian Meteorological Department, Surat) 4.8 Social infrastructure available Educational facilities in project area shall be quite good because all nearby villages have primary schools. There are secondary and higher secondary schools in Bharuch city. There are collages having different streams of education. Page 9 of 15
10 The town has private dispensaries and hospitals in all major branches of medicines and surgery. Drinking water quality is good. All small villages have postal and telephone connection facilities. Electricity for all purpose (agriculture, industrial and residential) is available. All small villages are connected with pucca roads. 5.0 PLANNING BRIEF 5.1 Planning concept (type of industries, facilities, transportation etc) M/s. Anshika Polysurf Limited shall a Large scale industry. It proposes to new plant in Sayakha. 5.2 Population projection It will be submitted later up on the requirement. 5.3 Land use planning, break up along with green belt etc.) Proposed brake up of land. As per annexure Assessment of infrastructure demand (physical & social) Well developed Infrastructure since project site is located in Sayakha 5.5 Amenities/Facilities The amenities/facilities of project area are explained as earlier. 6.0 PROPOSED INFRASTRUCTURE 6.1 Industrial area (processing area) Explained in CA certificate. Attached as Annexure Non processing area Explained in CA certificate. Attached as Annexure Greenbelt Unit is committed to develop green 33%. The green belt will be developed as per MoEFCC guideline. Page 10 of 15
11 6.4 Social infrastructure The project is a Large scale and plant & utility investment will be approximately Rs 25 Crore and total investment approximately 33 Crore. The project proponent is planning towards the social and economic development of small villages around Sayakha. 6.5 Connectivity(Transportation) The existing connectivity is convenient for future also. 6.6 Drinking water management(source and supply) The proposed source of drinking water is GIDC water supply. 6.7 Sewage system The generation of Domestic effluent shall be 1 KL/Day. However, domestic effluent send to soak pit via septic tank. 6.8 Industrial waste management Industrial waste water will be generated 11 KL/Day. The industrial effluent will be treated in own ETP. Detail water balance diagram is attached as annexure:6 Detail of schematic diagram of proposed ETP is attached as annexure:9 6.9 Solid waste management There shall be Six (6) numbers of Hazardous / solid waste categories identified to be generated. The unit shall be obtained membership of TSDF & incineration Site Detail of solid waste is explained in annexure Power requirement and supply source. Electricity Power shall be supplied by own GEB Total Proposed requirement of 200 KVA from GEB 7.0 REHABILITATION AND RESETTLEMENT (R&R)Plan 7.1 Policy to be adopted(central/state) in respect of the project affected persons including home outees, land outees and landless laborers (a brief outline to be given) Not applicable because the unit is in Sayakha Page 11 of 15
12 8.0 PROJECT SCHDULE& COST ESTIMATION 8.1 Likely date of start of construction and likely date of completion(time schedule) Construction is planned to be started after having an Environmental clearance from SEAC & SEIAA, Gujarat. Likely completion time is considered approximately two years of project construction/commission. 8.2 Estimated project cost along with analysis in terms of economic viability of the project The estimated approx. cost of the project shall be Rs. 33 Crore out of which approximately Rs. 3 Crore shall be invested in Environmental Management System (EMS) constituting proposed ETP, solid / hazardous waste management and disposal facilities, green belt development, Air pollution control measures Table given as under, MS STORAGE TANKS COST OF EQUIPMENT 30 KL 5 3,10,000 X 5 = 15,50, KL 6 4,40,000 X 6 = 26,40, KL 5 5,00,000 X 5 = 25,00, KL 4 7,50,000 X 4 = 30,00, KL 1 10,00,000 X 1 = 10,00,000 TOTAL MS TANKS 21 TOTAL COST = 1,06,90,000 SS-304 STORAGE TANKS 50 KL 1 12,00,000 X 1 = 12,00, KL 3 15,00,000 X 3 = 45,00, KL 5 20,00,000 X 5 = 1,00,00,000 TOTAL SS-304 TANKS 9 TOTAL COST = 1,57,00,000 SS-304 BULLETS 20 KL 3 15,00,000 X 3 = 45,00,000 MS U/G TANKS 20 KL 5 2,70,000 X 5 = 13,50,000 RIBBON BLENDER SS KL 1 25,00,000 X 1 = 25,00,000 3 KL 1 30,00,000 X 1 = 30,00,000 5 KL 1 32,00,000 X 1 = 32,00,000 TOTAL BLANDERS 3 TOTAL COST = 87,00,000 Page 12 of 15
13 CONDENSORS 1 KL 2 1,20,000 X 2 = 2,40,000 2 KL 2 1,50,000 X 2 = 3,00,000 3 KL 2 1,75,000 X 2 = 3,50,000 5 KL 3 2,00,000 X 3 = 6,00, KL 3 3,25,000 X 3 = 9,75, KL 2 4,50,000 X 2 = 9,00, KL 1 6,00,000 X 1 = 6,00,000 TOTAL CONDENSORS 15 TOTAL COST = 39,65,000 DISTILLATION COLUMNS 12 MTR PACKED COLUMNS 2 6,00,000 X 2 = 12,00, MTR PACKED COLUMNS 1 4,00,000 X 1 = 4,00,000 SPRAY DRYER 1 25,00,000 X 1 = 25,00,000 FLAKER 1 10,00,000 X 1 = 10,00,000 DYNOMILL 1 2,00,000 X1 = 2,00,000 TOTAL COST = 53,00,000 SS-316 REACTORS 1 KL 3 2,00,000 X 3 = 6,00,000 2 KL 1 1,25,000 X 1 = 1,25,000 3 KL 2 1,75,000 X 2 = 3,50,000 5 KL 5 2,50,000 X 5 = 12,50, KL 5 4,50,000 X 5 = 22,50, KL 4 5,75,000 X 4 = 23,00, KL 2 6,50,000 X 2 = 13,00,000 TOTAL REACTORS 22 TOTAL COST = 81,75,000 SS-304 BLENDER (JACKETED) 1 KL 1 1,00,000 X 1 =1,00,000 2 KL 2 1,35,000 X 2 = 2,70,000 3 KL 2 2,00,000 X 2 = 4,00,000 5 KL 1 3,00,000 X 1 = 3,00, KL 2 3,50,000 X 2 = 7,00, KL 2 4,00,000 X 2 = 8,00, KL 1 5,50,000 X 1 = 5,50,000 Page 13 of 15
14 TOTAL BLENDERS 11 TOTAL COST = 30,70,000 SS-304 BLENDER (NON JACKETED) 3 KL 1 1,10,000 X 1 = 1,10,000 5 KL 1 2,00,000 X 1 = 2,00, KL 2 3,00,000 X 2 = 6,00, KL 2 5,00,000 X 2 = 10,00,000 TOTAL BLENDERS 6 TOTAL COST = 18,00,000 TOTAL GEAR PUMPS 10 25,00,000 X 10 = 2,50,000 TOTAL CENTRIFUGAL PUMPS 15 15,00,000 X 15 = 2,25,000 Coal boiler 8 MT/HR (10 kg/cm2) 98,50,000 X 1 = 98,50,000 Thermopack (FO/COAL) 6 lac kcal 9,00,000 X1 = 9,00,000 Cooling tower 500 TR 50,00,000 X 1 = 50,00,000 Chiller 100 TR 20,00,000 X 1 = 20,00,000 Chilled brine 30 TR 10,00,000 X 1 = 10,00,000 DM plant 2.5 KL/hr (60 kl/day) 15,00,000 X 1 = 15,00,000 Air compressure 350 m3/hr (6 bar pressure) 25,00,000 X 1 = 25,00,000 Nitrogen compressure 75 m3/hr (6 bar pressure) 30,00,000 X 1 = 30,00,000 ETP 75 KL/DAY 13,00,000 X 1 = 13,00,000 STP 10 KL/DAY 4,50,000 X 1 = 4,50,000 DG set 200 KVA 5,00,000 X 1 = 5,00,000 Weigh bridge 60 MT 3,25,000 X 1 = 3,25,000 TOTAL UTILITY COST = 2,55,25, ANALYSIS OF PROPOSAL(FINAL RECOMMANDATIONS) 9.1 Financial and social benefits with special emphasis on the benefit to the local people including tribal population any in the area From the proposed production, there shall be increase to foreign exchange generated by Exports. Reduce dependence on Imports hence reducing forex risks. There shall be direct or indirectly increase in employment generation for the local people hence supporting their families. Company shall increase its contribution for community welfare of the local connected area. The proposed new project shall not have any adverse environmental impacts because adequate protection measures will be provided to achieve permissible norms of GPCB. Page 14 of 15
15 Conclusion: The proposed project is feasible w.r.t environmental impact since there is no major POLLUTION LOAD as well as adequate environmental protection measures are proposed by the unit. Page 15 of 15
PRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,
More informationPre-Feasibility Report For
Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS
More informationPROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT
PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,
More informationProposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad
1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar
More information(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF
(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY
More informationPROJECT FEASIBILITY REPORT
PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For EXPANSION IN EXISTING MANUFACTURING PLANT Of M/s. SHIVA DYE STUFF PVT. LTD Plot no. A2-11/6104,G.I.D.C. Industrial Estate, Ankleshwar-393002, Gujarat. 1 CONTENTS Sr. No. Description
More informationPRE-FEASIBILITY REPORT. for
PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared
More informationPREFEASIBILITY REPORT
(B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY
More informationEXISTING PROJECT FOR ORDINARY SAND MINING
(C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY
More informationPre-Feasibility Report
Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.
More information1.0 EXECUTIVE SUMMARY
1.0 EXECUTIVE SUMMARY M/s Merino Industries Limited has proposed for manufacturing Phenol Formaldehyde Resin, Melamine Formaldehyde Resin at Plot No D2 CH 36, Dahej Phase II, Dist. Bharuch, Gujarat. The
More informationPREFEASIBILITY REPORT
PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,
More informationM/S. Dain Colour Chem
PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS
More informationShri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad
Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.
More informationFor TOR New Projects. Mo. no. : Contact no. and ID of the Applicant
SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries
More informationUNSATURATED POLYESTER RESIN
PROJECT REPORT ON UNSATURATED POLYESTER RESIN BY AQUA CHEM INDUSTRIES Survey No. 50/2, Jodhpar (Nadi), Morbi - 363641, Gujarat. I N D E X Sr. No. Contents Page No. 1 Introduction 3 2 Project Description
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project Of MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS of 850 MT/Month By PASHUPATI INDUSTRIES 169/1/A2, Phase 1, Opposite Telephone Exchange, GIDC Naroda, Ahmedabad-382330
More informationM/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.
Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,
More informationPREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR
PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE
More informationPre-feasibility Report
Pre-feasibility Report for expansion of production capacity of Fluoropolymers including Poly Tetrafluoro Ethylene (PTFE), manufacturing of new age refrigerant gas Difluoromethane (HFC 32) and related products,
More informationPRE FEASIBILTY REPORT
PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST
More informationKana Aroma Industries. Pre-Feasibility Report
Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF CARBON BLACK (10950 TPM TO 15750 TPM ) AND CO-GENERATION POWER PLANT (22 MW TO 32 MW) IN EXISTING PREMISES of M/s. PHILLIPS CARBON BLACK LTD. Survey No.
More informationPRE FEASIBILTY REPORT MANUFACTURING OF ORGANIC PIGMENT M/S PRINCE CHEMICALS
PRE FEASIBILTY REPORT ON PROPOSED PROJECT FOR MANUFACTURING OF ORGANIC PIGMENT OF M/S PRINCE CHEMICALS AT PLOT NO: 9111/3,9111/2/1 GIDC ESTATE, ANKLESHWAR, DIST: BHARUCH, STATE: GUJARAT 1 Index Sr no.
More informationLG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH
LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s
More informationPRE-FEASIBILITY REPORT FOR ORDINARY SAND
PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS
More informationSTONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)
Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL
More informationPRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant
PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION
More informationPROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)
BRIEF SUMMARY OF THE PROJECT for PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT of M/s. BASF INDIA LTD. (UNIT-II) PLOT NO. 8001 & 8001A, PHASE-VI, G.I.D.C., ANKLESHWAR, DIST: BHARUCH-393002,
More informationSynthetic Organic Chemicals 5(f)
SEAC, Gujarat Page 1 of 14 Synthetic Organic Chemicals 5(f) For Terms of Reference [ToR] New Project 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot
More informationFor TOR New. 1. Basic Information of the Project:
SEAC, Gujarat: Page 1 of 12 For TOR New. 1. Basic Information of the Project: i Name & Address of the Project site M/s. Shreenathji Dye Chem (Complete details with plot no./survey no., Landmark etc. )
More informationPRE-FEASIBILITY REPORT OF SAND QUARRY
PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL
More informationPROJECT PRE-FEASIBILITY REPORT. For
PROJECT PRE-FEASIBILITY REPORT For THE PROPOSED ORGANIC CHEMICALS MANUFACTURING IN EXISTING IN FORMULATION OF PESTICIDE, AGROCHEMICAL AND BIO FERTILIZERS MANUFACTURING UNIT AT M/S. SULPHUR MILLS LTD. PLOT
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For NEW MANUFCTURING PLANT Of BHIMANI DYE CHEM INDUSTRIES Plot No. 2, Survey No. 316, At: Dhanot, Ta: Kalol, Dist: Gandhinagar, Gujarat. CONTENTS Sr.No. Description 1. Executive
More informationEXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E
EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at
More informationPRE-FEASIBILITY REPORT PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES. OF M/s. UMIYA CHEM INTERMEDIATES
PRE-FEASIBILITY REPORT ON PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES OF M/s. UMIYA CHEM INTERMEDIATES AT PLOT NO: 4705/1/1, GIDC ESTATE,ANKLESHWAR, DIST:BHARUCH STATE:-GUJARAT 1 1.0 EXECUTIVE
More informationPRE-FEASIBILITY REPORT
M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,
More informationANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management
ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure
More informationPRE FEASIBILITY REPORT
VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,
More informationTable 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others
1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT ON PROPOSED PROJECT OF MANUFACTURING OF ORGANIC CHEMICALS OF AARTI INDUSTRIES LIMITED (UNIT-V) LOCATED AT Plot 41/1, GIDC Estate, Jhagadia, Bharuch-393110 1.0 EXECUTIVE SUMMARY M/s.
More information10 PF Resin (liquid) PF Resin (powder) Silver refining Hexamine Hardener Hexamine Tablet
PREFEASBILITY REPORT: 1.0 INTRODUCTION : M/s.Simalin Chemicals Pvt. Ltd.. is an existing unit located at plot no. 13, GIDC, Nandesari, Dist. Vadodara which is a chemical notified zone. The unit is involved
More informationPRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.
More informationPRE FEASIBILITY REPORT. M/s. Riddhi Dyechem Industries
PRE FEASIBILITY REPORT FOR OBTAINING ENVIRONMENTAL CLEARANCE For the Proposed Dye Manufacturing Unit of M/s. Riddhi Dyechem Industries Block No.: 680/p, 681/p, 682/p Village: Pariej, Taluka: Matar, District:
More informationKadam Environmental Consultants
M/s. PERSTORP INDUSTRIES INDIA PRIVATE Prefeasibility Report for Proposed Pentaerythritols Manufacturing Plant at Plot No. T 49 to T 54, Saykha Industrial Estate, Vagra Taluka, Bharuch District MARCH 2018
More informationvii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter)
SEAC, Gujarat: Page 1 of 28 For TOR Expansion Case. 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) M/s. Om Interchem
More informationM/s. Lakeland Chemicals (India) Ltd.
FOR THE PROPOSED EXPANSION PROJECT FOR MANUFACTURING OF SPECALITY CHEMICALS Category: 5(f) A OF Located at: Plot no 63,6A,6B, Rasayani Road, Vill. Madap, Tq. Khalapur, Dist. Raigad.( Maharashtra) 1 Project
More informationBALAJI AMINES LIMITED
FOR EXPANSION OF EXISTING SYNTHETIC ORGANIC CHEMICALS MANUFACTURING UNIT BALAJI AMINES LIMITED At Plot No: 4 & 5, Beside Sub-Station-II, I.D.A, Bollaram, Jinnaram (M), Medak District, Telangana State -
More informationMODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.
MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT
More informationTo The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar
March 18, 2019 BY HAND DELIVERY/RPAD To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar 382 010 SUB.: APPLICATION FOR SUBMISSION OF ESSENTIAL DETAIL SOUGHT
More informationPRE FEASIBILITY REPORT
ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL PARK, ATTIVARAM VILLAGE, OZILI MANDAL, SPSR NELLORE DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL
More informationPre-Feasibility Report
Pre-Feasibility Report M/s. Veer Poly Chem 0 1. Introduction M/s. Veer Polychem is an existing unit located at Plot 119 & 120, Ranpur road, GIDC Dhandhuka, Dist: Ahmedabad, Gujarat. Currently, unit is
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name
More informationProduct Profile. Quantity in MT/Month CAS Solvent Dark Violet R Solvent Black
Annexure - A Product Profile Sr. No. Product Name Quantity in MT/Month CAS Existing Proposed Ultimate Number End Users 1 Acid Dyes 5.000-5.000 0.000 -- -- Solvent Yellow 82 12227-67-7 Solvent Dark Violet
More informationPrasol Chemicals Ltd., Add. Mahad MIDC BRIEF SUMMARY
1. INTRODUCTION BRIEF SUMMARY Prasol Chemicals Limited (Prasol), form an integral part of the global chemical industry. Prasol is an ISO 9001: 2008, ISO 14001: 2004 and an OHSAS 18001:2007 certified company
More informationTHE PROPOSED NEW PROJECT FOR MANUFACTURING
FOR THE PROPOSED NEW PROJECT FOR MANUFACTURING OF Various Auxiliary Chemicals "Textile Binder, Wetting & Dispersing Agents, Flock Binder and Paint Binder" synthetic organic chemicals industry Activity:
More informationPrefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC
Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,
More informationPRE FEASIBILITY REPORT
Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT
More information2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT ON PROPOSED PROJECT OF MANUFACTURING OF ORGANIC CHEMICALS OF AARTI INDUSTRIES LIMITED (UNIT-II) LOCATED AT Plot Z/103/D, Dahej SEZ-II, Dahej, Bharuch-392110 1.0 EXECUTIVE SUMMARY
More informationPREFEASIBILITY REPORT
PREFEASIBILITY REPORT For EC FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL At Indian Oil Corporation Limited (IOCL), Panipat marketing Complex, Village-Baholi, P.O.-Panipat Refinery, Tehsil Panipat,
More informationEnvironmental Clearance
SIX MONTHLY COMPLIANCE REPORT For the Period of July 2016 to December 2016 Of Environmental Clearance For Carbon Di-Sulphide Manufacturing Unit By Indo Baijin Chemicals Pvt. Ltd. Z-7/1 & Z-8/Part, Dahej
More informationEnvironment Consultant:
MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village
More information(MT/Month) Total Consumption MT/Month
1. INTRODUCTION M/s. Ambic Organic proposed to manufacture Aluminum Phosphide technical, Zinc Phosphide technical and its formulation at Survey No. 717/4, at Post: Kathlal, Taluka: Kathlal, Dist: Kheda.
More informationRamans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR
Annexure A Product Profile Sr. No. 1 2 Product Crude OBA AND/OR Crude OBA-CBS-X Standardized OBA Solid AND/OR Standardized OBA Liquid Proposed Qty (MT/ M) 400 400 1600 Note : For making Standardized OBA
More informationM/S. Ever Shine Décor P. Ltd.
PRE FEASIBILITY REPORT OF M/S. Ever Shine Décor P. Ltd. Survey No. : 40, Village Indrad, Taluka Kadi, District Mehsana, Gujarat. Mob No.: 09898186603 Email: bhupeshgopani@gmail.com Prepared By: T. R. ASSOCIATES
More informationPRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location
1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease
More informationFormat for Appraisal-New:5
SEAC Gujarat: Pageof5 Format for Appraisal-New:5. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) M/S. DHARMANANDAN FINE
More informationM/s. RAPID INTERMEDIATES
BRIEF SUMMARY OF THE PROJECT for PROPOSED PESTICIDE SPECIFIC INTERMEDIATES AND SPECIALTY CHEMICALS PLANT of M/s. RAPID INTERMEDIATES PLOT NO. 2325, GIDC ESTATE-PANOLI, TALUKA: ANKLESHWAR, DIST: BHARUCH,
More informationLimestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report
Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER
More informationPre- Feasibility RepoRt
Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY
More informationPRE - FEASIBILITY REPORT
PRE - FEASIBILITY REPORT for PROPOSED EXPANSION OF BOILER (24 TPH) AS A UTILITY, COAL BASED CPP & CHANGED IN FUEL FROM NATURAL GAS TO COAL IN EXISTING RUBBER & LATTICES MANUFACTURING UNIT of M/S. APCOTEX
More informationIDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA
M/s. ARTEMIS BIO TECH LTD., (A Division of Themis Medicare Ltd.,) PLOT NO. 1 & 5, Phase I, IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA PRE FEASIBILITY REPORT Artemis Bio tech Ltd.,
More informationTable 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha
1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted
More informationANNEXURE A DETAILS OF PRODUCTS
Annexures to Form 1 & Pre Feasibility Report Proposed Project for manufacturing of Dyes Intermediates of M/s Jay Dyechem, Narol-Vatva Road,Ta : City, District : Ahmedabad, Gujarat. ANNEXURE A DETAILS OF
More informationPre-Feasibility Report
Pre-Feasibility Report Essentials Pharma 1 1. Introduction M/s. Essentials Pharma is an new unit to be located at Plot 19, Survey 10/1, Rajkot-Ahmedabad National Highway 8-B, Village: Hirasar, Tal: Rajkot,
More informationPRE-FEASIBILTY REPORT
Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District
More informationPre-Feasibility Report for Construction of Additional Tankage at POL Terminal Partapur, Meerut, M/s IOCL PRE-FEASIBILITY REPORT
PREAMBLE Pre-Feasibility Report for Construction of Additional PRE-FEASIBILITY REPORT Indian Oil Corporation Limited (IOCL) is India's largest commercial enterprise, with a sales turnover of Rs. 4,38,710
More informationPRE FEASIBILITY REPORT
ASTRIX LABORATORIES LIMITED SY. NO. 10 & 42, IDA, GADDAPOTHARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Sy. No. 10 & 42, IDA, Gaddapotharam (V), Jinnaram (M), Medak
More informationMr. Ravikumar R Vansadiya Mob No.: Prepared By: T. R. Associates
PRE FEASIBILITY REPORT FOR PROPOSED NEW PROJECT OF M/s. Roman Petrochemical Survey No. 922/P, Village-Mota Dahisara, Navlakhi Highway, Ta-Maliya, Dist.-Morbi, Gujarat Mr. Ravikumar R Vansadiya Mob No.:
More informationLIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation
LIST OF ANNEXURE Annexure-1 Location of the project site Annexure-2 Layout plan Annexure-3 Break up of land area requirement Annexure-4 Details of products and raw materials and storage facility for the
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY M/s Colorant Limited (Unit II) is a proposed expansion project located at Plot No. 3225, Phase IV, GIDC Vatva, Ahmedabad in Gujarat State. M/s Colorant Limited
More informationEXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,
More informationENVIRONMENTAL IMPACT ASSESSMENT REPORT. M/s. VISHRUDH ORGANICS PVT LTD.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT OF M/s. VISHRUDH ORGANICS PVT LTD. (Plot No.141/2/B, GIDC Estate, Ankleshwar, ) PREPARED BY BHAGWATI ENVIRO CARE PVT. LTD. [ISO 9001,
More informationPlot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State.
ON Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District 561 205, Karnataka State. Table of Contents 1. EXECUTIVE SUMMARY 2. INTRODUCTION OF THE PROJECT/
More informationPRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2
PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya
More informationM/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN:
Pre-feasibility Study Report For M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN: 401506 Prepared By: M/s SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited
More information(Pollution Control Consultant & Engineers)
(Pollution Control Consultant & Engineers) VISION To improvise and utilize cutting edge technologies and to excel in prevalent technologies for pollution control in India to support development without
More informationCheck list for construction Project of EC [Category 8(a)]:
Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist
More information