1 Brownfield Revitalization; Leveraging Your Resources Case Study: Goshen s River Race Redevelopment Area Tuesday, August 14, 2012 Brownfield Workshop Goshen Chamber of Commerce

2 Goshen s River Race Redevelopment Area 22 acres, mix of uses 9 Brownfield sites Millrace Canal Goshen s historic industrial corridor 2 blocks from downtown Goshen Borders a 90 acre park and nature preserve On the Maple City Greenway, a 10 mile pedestrian/bike path

3 A look back at the history : Construction of the Millrace Canal o Constructed to generate hydroelectric power o Dug by 40 men using horses & plows o Construction Cost: $100,000

4 A look back at the history By 1870, companies such as the Hawks Furniture Co. had began locating to the area to utilize the hydroelectric power Industrial uses continued in the area through the early 2000 s

5 The Birth of a Vision: 2005 Ball State Study

6 Ball State Study Vision

7 Barriers to Achieving Vision Environmental Contamination Floodplain Soil Stability Infrastructure o Bridges o Alley o Levy Multiple Ownership Incompatible Uses In other words: classic brownfield site challenges.

8 Step One: Assessment Assessment Funding USEPA Assessment Grant $200,000 Hazardous Substances $200,000 Petroleum Substances IFA Matching Grant $30,000 Hazardous Substances $30,000 Petroleum Substances IFA Stipulated Assessment Grant (Sites 2 & 9) $95,000 Hazardous Substances Accomplishments Phase I ESA s and updates Phase II ESA s Supplemental Phase II ESA s (where needed) Remedial Alternatives Plans (RAP s)

9 Step Two: Remediation Taking what we learned through the assessment create land ready for redevelopment.

10 Establishing Our Goals Creation of the River Race Advisory Committee o Purpose: to make recommendations to the Redevelopment Commission on future land use for the corridor o Membership: neighborhood association, Chamber, Redevelopment, Plan Commission, Downtown Goshen, City Council, City staff o Recommendations: to focus on residential development, architectural standards, green construction and limited commercial o West side of the canal designated for public development (park, community center, amphitheater, etc )

11 Site 1 Former NIPSCO Property Funding Sources: $200,000 USEPA Cleanup Grant $40,000 IFA Matching Grant $520,000 IFA SRF Loan $700,000 Local TIF Funds $205,000 Interra Credit Union Contribution Site Details: 2.62 acres Occupied by electrical power companies dating back to 1885

12 Site 1 Former NIPSCO Property Cleanup Activities: Excavation & Disposal of 13,872 tons of nonhazardous, lead/arsenic impacted soil Removal of multiple buried historic building foundations Installation of a 2 soil cap and reforestation of the western portion of the site Construction of a 90+ space pervious brick paver parking lot to act as a cap Installation of a gravel pedestrian path Installation of water, sewer and gas services to the existing building and adjacent powerhouse to allow for redevelopment

13 Site 2 Former Wait Property (West Subparcel) Funding Sources: $200,000 USEPA Cleanup Grant $40,000 IFA Matching Grant $25,000 IFA SRF Loan Site Details: 3.95 acres Operated as a variety of industrial uses including multiple furniture manufacturing companies and a barrel factory from

14 Site 2 Former Wait Property (West Subparcel) Cleanup Activities: Building demolition and foundation removals Excavation & disposal of 4,661 tons of non-hazardous, lead/arsenic impacted soil Disposal of debris and concrete discovered within uncovered historic basements Site grading and installation of a 2 clean soil cap in contaminated areas of the site

15 Sites 3 6 Funding Sources: $200,000 USEPA Cleanup Grant $40,000 IFA Matching Grant $33,500 IFA SRF Loan Funds $68,000 IFA RLF Loan Funds $15,000 Local TIF Funds Site Details: 1.75 acres Operated as a variety of uses including a creamery, ice house, a blacksmith company dating back to 1886

16 Sites 3-6 Cleanup Activities: Demolition of a residential structure, outbuilding and commercial structure Removal and disposal of 2 fuel oil tanks Excavation & Disposal of 4,775 tons of nonhazardous, lead/arsenic impacted soil Installation of a 2 clean soil cap across all 4 sites and along the canal bank

17 Site 7 Former Omnisource Property Funding Sources: $200,000 USEPA Cleanup Grant $40,000 IFA Matching Grant $70,000 Local TIF Funds Site Details: 3.4 acres Operated primarily as a scrap yard from

18 Site 7 Former Omnisource Property Cleanup Activities: Excavation & Disposal of 2,687 cubic yards of non-hazardous, leadimpacted soil Excavation & Disposal of 12.5 cubic yards of hazardous, leadimpacted soil Injection of 6,048 gallons of 4% RegenOX solution at 21 locations across the site to address PCE contamination Removal of an additional 2,000 tons of soil along canal bank

19 Site 8 Former Gordy Property Funding Sources: $200,000 USEPA Cleanup Grant $40,000 IFA Matching Grant Site Details: 1.8 acres Operated as a variety of industrial uses from Uses included an ice cream factory and a rubber manufacturing facility

20 Site 8 Former Gordy Property Cleanup Activities: Deconstruction of multiple buildings Excavation & Disposal of 1,782 cubic yards of non-hazardous, leadimpacted soil Removal of 2 undocumented underground storage tanks Removal of multiple hydraulic lift systems found beneath the building foundations Abandonment of two 104 deep water supply wells

21 Site 9 Former Street Dept. Property Funding Sources: $200,000 USEPA Cleanup Grant $40,000 IFA Matching Grant $167,000 IFA SRF Loan Funds Site Details: 6.7 acres Operated as a variety of industrial uses including a lumber yard/sawmill, Reith Riley Construction Company and the Street Department site for the City of Goshen from

22 Site 9 Former Street Department Property Cleanup Activities: Excavation and disposal of 1,067 tons of nonhazardous, lead/arsenic impacted soil Removal of 3 documented underground storage tanks Building Demolition included grinding of building materials for use as daily cover material at Elkhart County Landfill Site grading and installation of a 2 clean soil cap in contaminated areas of the site

23 Total Funding Summary USEPA Assessment Grant Funds - $400,000 IFA Assessment Matching Grant - $60,000 IFA Stipulated Assessment Grants - $95,000 USEPA Brownfield Cleanup Grants - $1,200,000 o 6 separate site-specific grant awards IFA Brownfield Cleanup Matching Grants - $240,000 o 6 separate site-specific grant awards IFA State Revolving Fund (SRF) Loan - $1,000,000 IFA Revolving Loan Fund (RLF) Loan - $68,000 Interra Credit Union Contribution - $205,000 Local TIF Funds - $785,000 TOTAL - $3,848,000

24 Next Steps for the Area Hawks Building Selective Demolition & Remediation o Demolition of the non-historic building additions & foundations o Soil excavation and installation of a two foot (2 ) soil cap for all exposed areas of the site, including the canal bank, to allow for environmental closure o To be funded using TIF funds approximately $250,000 o Contract to be awarded in August 2012 o Project to be completed within eight (8) months

25 Next Steps for the Area Millrace Levee Stabilization Project o Currently undergoing a study to evaluate for stabilization alternatives o Primary concerns: Erosion & Water Seepage through the levies o Estimated project costs: $1.2 to $5 million o Anticipate beginning repairs on Phase I within the next 2 years

26 What the future holds Redevelopment of the NIPSCO building Lease agreement to be executed in August 2012 To be redeveloped as a restaurant Estimated private investment: $500,000

27 What the future holds Redevelopment of the Hawks building Lease agreement executed in 2012 To be redeveloped as an Arts & Enterprise Center artist live/work space with commercial opportunities on the main floor Estimated private investment: $7,000,000

28 What the future holds Redevelopment of Sites 7 & 8 RFP to be issued to developers in September 2012 To be redeveloped as residential Estimated private investment: $6,000,000

29 Lessons Learned 1. Cost o o A cleanup grant alone will not be enough Must be creative in identifying multiple funding sources 2. Future Use Drives Cleanup o The cleanup plan should be determined based on the desired end use! 3. Value of community involvement and input o o Community input is a driver in determining desired end use Gaining consensus early on amongst community members is key to a successful project

30 Lessons Learned 3. Value of having dedicated brownfield staff o o o A person dedicated to coordinating cleanup activities between numerous City departments Importance of having an understanding of regulations and requirements for environmental projects Establishing relationship with the regulators 4. Importance of consultant selection process o o o o Value in hiring a grant writing consultant Select consultants that are the best fit for each project Use team approach to interview and rank consultants Be as detailed as possible in preparing an RFP scope of work 5. EXPECT THE UNEXPECTED o Build in contingency funding to cover unexpected finds (tanks, foundations, etc )

31 Questions?

ENVIRONMENTAL SUMMARY OF CATALYST AREA 1

ENVIRONMENTAL SUMMARY OF CATALYST AREA 1 ENVIRONMENTAL SUMMARY OF CATALYST AREA 1 Phase I Environmental Site Assessment and Phase II Environmental Site Assessment for 55 South River Street. Environmental Response Program WDNR File Review for,

More information

CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, Prepared By:

CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, Prepared By: CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, 2016 Prepared By: SHANNON & WILSON, INC. 5430 Fairbanks Street, Suite 3 Anchorage, Alaska 99507 (907)

More information

Priority Redevelopment Sites

Priority Redevelopment Sites Priority Redevelopment Sites Downtown Petoskey There are two main focus areas for downtown redevelopment: 200 East Lake Street and the Michigan Street Parking Lot (Darling Lot). Although these two distinct

More information

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location Maryland Department of the Environment Site Location FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) This 2.4581-acres site (Site) consists of four parcels of

More information

Why Camden s environment is important to everyone in the Delaware Watershed...

Why Camden s environment is important to everyone in the Delaware Watershed... Delaware Estuary Science & Environmental Summit 2015 Wednesday January 28, 2015 Camden s Waterfront Brownfields & Landfills: Opportunities For Creation of Environmental Assets That Benefit the Entire Delaware

More information

Phase II/III Environmental Site Assessments

Phase II/III Environmental Site Assessments Draft Analysis of Brownfields Cleanup Alternatives Remediation of Contaminated Former Drycleaning and Dye Works 69 East Main Street, Meriden, CT 06450 Prepared by the City of Meriden I. Introduction &

More information

Soil Remediation and Reuse in the US Superfund Program

Soil Remediation and Reuse in the US Superfund Program Soil Remediation and Reuse in the US Superfund Program Bruce Means Office of Superfund Remediation and Technology Innovation September 16, 2009 9 th Meeting of the ICCL Helsinki, Finland Estimated Number

More information

Section 3.11: Hazardous Materials

Section 3.11: Hazardous Materials Section 3.11: Hazardous Materials Section 3.11 Hazardous Materials 3.11 HAZARDOUS MATERIALS 3.11.1 Introduction to Analysis This section provides information regarding known contaminated sites and general

More information

1 st Annual Southeast Brownfield Conference Orlando, Florida. October 2014

1 st Annual Southeast Brownfield Conference Orlando, Florida. October 2014 1 st Annual Southeast Brownfield Conference Orlando, Florida October 2014 1 Introduction 2 Barbara Alfano Brownfields Coordinator, U.S. Environmental Protection Agency Region 4, Atlanta GA 26 years of

More information

ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES

ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES Preliminary Evaluation for Wells & Son Metal Recycling aka Cardinal Grain Property 607 South Chauncey Street Columbia City, Indiana 46725 1.0 INTRODUCTION This

More information

Central Florida Drum Brownfield Site Winter Springs, Florida

Central Florida Drum Brownfield Site Winter Springs, Florida Central Florida Drum Brownfield Site Winter Springs, Florida Site History Mixed Use Setting Early 1940s Through Late 1980s Citrus Groves 1965-1986 Central Florida Drum (Cleaning/Refurbishing) 1991-1998

More information

DRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA)

DRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA) DRAFT Analysis of Brownfields Cleanup Alternatives (ABCA) Preliminary Evaluation Ball Square Station Site Boston Avenue and Broadway Somerville and Medford, Massachusetts Massachusetts DEP Release Tracking

More information

OVERVIEW SCOPE OF WORK (SOW)

OVERVIEW SCOPE OF WORK (SOW) Site Description The subject property is occupied by the former Parker Service Station, which contained a former Service Garage (now called Former Garage) and Filling Station Store (now called Storage

More information

Where Brownfields and Land Banks Meet

Where Brownfields and Land Banks Meet Where Brownfields and Land Banks Meet 7th Annual Ohio Land Bank Conference Presented by Partners, an Environmental, Safety, Engineering & Surveying Firm September 13, 2017 Overview I. Introduction II.

More information

REQUEST FOR PROPOSAL Redevelopment Opportunity West Bend, Wisconsin

REQUEST FOR PROPOSAL Redevelopment Opportunity West Bend, Wisconsin REQUEST FOR PROPOSAL Redevelopment Opportunity West Bend, Wisconsin Q17-03, Site Redevelopment Design Services, TID 12 RFP Issuance Date: 1/6/2017 RFP Due Date: 2/24/2017 Project Overview The City of West

More information

3.11 HAZARDOUS MATERIALS

3.11 HAZARDOUS MATERIALS 3.11 HAZARDOUS MATERIALS 3.11.1 Introduction to Analysis This section provides information regarding known contaminated sites and general areas of potentially contaminated properties along the proposed

More information

Redeveloping Brownfield Sites in Minnesota Michael Ahern SVP, System Development

Redeveloping Brownfield Sites in Minnesota Michael Ahern SVP, System Development Redeveloping Brownfield Sites in Minnesota Michael Ahern SVP, System Development Common Themes Partnership Set a common vision Leverage local resources Leverage existing assets One size does not fit all

More information

TAYLOR COLLIERY REDEVELOPMENT PROJECT

TAYLOR COLLIERY REDEVELOPMENT PROJECT TAYLOR COLLIERY REDEVELOPMENT PROJECT Presented by: Gregory M. Firely Malcolm Pirnie, Inc. July 14, 2009 2009 Malcolm Pirnie, Inc. All Rights Reserved 1 1 Taylor History Taylor Borough is located in the

More information

General Motors (Central Foundry Division) Cleanup Progress Update Massena, St. Lawrence County, NY

General Motors (Central Foundry Division) Cleanup Progress Update Massena, St. Lawrence County, NY General Motors (Central Foundry Division) Cleanup Progress Update Massena, St. Lawrence County, NY U.S. Environmental Protection Agency Spring 2016 Cleanup of GM Site Continues The cleanup of the GM site

More information

New York State Department of Environmental Conservation August Receive Site Fact Sheets by . See "For More Information" to Learn How.

New York State Department of Environmental Conservation August Receive Site Fact Sheets by  . See For More Information to Learn How. New York State Department of Environmental Conservation August 2013 FACT SHEET Environmental Restoration Program Receive Site Fact Sheets by Email. See "For More Information" to Learn How. Site Name: 1201

More information

New York State Department of Environmental Conservation. Receive Site Fact Sheets by . See "For More Information" to Learn How.

New York State Department of Environmental Conservation. Receive Site Fact Sheets by  . See For More Information to Learn How. New York State Department of Environmental Conservation November 2013 FACT SHEET Brownfield Cleanup Program Receive Site Fact Sheets by Email. See "For More Information" to Learn How. Site Name: West 28th

More information

Brownfield Redevelopment Financial, Legal and Technical Assistance Resources

Brownfield Redevelopment Financial, Legal and Technical Assistance Resources Brownfield Redevelopment Financial, Legal and Technical Assistance Resources. Michele Oertel 317-234-0235 Environmental Stewardship. Economic Development. Indiana 15 Regional Planning Commission: Regional

More information

D2 Project Environmental Remediation Briefing August 21, 2018

D2 Project Environmental Remediation Briefing August 21, 2018 D2 Project Environmental Remediation Briefing August 21, 2018 The Union Square Revitalization Project (USQ) is a 2.4 million square foot transit-oriented, mixed use project that is transforming Union Square,

More information

Design and Construction Considerations on Brownfield Sites

Design and Construction Considerations on Brownfield Sites Design and Construction Considerations on Brownfield Sites Presented to: City of St Petersburg, Florida September 26, 2012 David, Goldman, P.G. Kimley-Horn and Associates, Inc. 904-828-3912 David.goldman@kimley-horn.com

More information

September 27, Scott Yonke Ramsey County Parks & Recreation Dept N. Van Dyke Street Maplewood, MN 55109

September 27, Scott Yonke Ramsey County Parks & Recreation Dept N. Van Dyke Street Maplewood, MN 55109 Ramsey County Parks & Recreation Dept. 2015 N. Van Dyke Street Maplewood, MN 55109 RE: No Further Action Determination for Soil Rice Creek Regional Trail, Arden Hills Billing ID: 199943 Dear : The Minnesota

More information

UNITED STATES FORGECRAFT

UNITED STATES FORGECRAFT UNITED STATES FORGECRAFT STATE PRIORITY LIST SITE FORT SMITH, ARKANSAS ADEQ 5301 Northshore Drive North Little Rock, Arkansas 72118 EPA RCRA ID No: ARD006341747 EPA CERCLA ID No: ARD006341747 AFIN: 66-00145

More information

Kayla Virgone City of Tucson

Kayla Virgone City of Tucson Kayla Virgone City of Tucson Session 4: Healthfields and Community Uses Center for Creative Land Recycling Workshop October 5 th, 2017 Brownfields to Healthfields Case Studies Gardens Recreational Space

More information

Creamer Environmental. Containment, Caps & Liners. 12 Old Bridge Road C ed ar Grov e, N e w Jer s e y

Creamer Environmental. Containment, Caps & Liners. 12 Old Bridge Road C ed ar Grov e, N e w Jer s e y Containment, Caps & Liners While excavation and treatment are common solutions for many soil and groundwater remediation projects, containment can sometimes be a more appropriate and more economical alternative.,

More information

The Role of Brownfield Redevelopment in a Transition to a Low Carbon Economy

The Role of Brownfield Redevelopment in a Transition to a Low Carbon Economy The Role of Brownfield Redevelopment in a Transition to a Low Carbon Economy Presentation to: Meeting Date: March 10, 2009 I. What is a Low Carbon Economy (LCE)? II. III. IV. What is a Brownfield? What

More information

PROPOSED PLAN OF REMEDIAL ACTION. Harper-Thiel Site Wilmington, DE DNREC Project No. DE-197

PROPOSED PLAN OF REMEDIAL ACTION. Harper-Thiel Site Wilmington, DE DNREC Project No. DE-197 PROPOSED PLAN OF REMEDIAL ACTION Harper-Thiel Site Wilmington, DE DNREC Project No. DE-197 July 2007 Delaware Department of Natural Resources and Environmental Control Division of Air and Waste Management

More information

TOWN OF PLAINFIELD REQUEST FOR PROPOSAL BROWNFIELDS HAZARDOUS SUBSTANCES ASSESSMENT PROGRAM

TOWN OF PLAINFIELD REQUEST FOR PROPOSAL BROWNFIELDS HAZARDOUS SUBSTANCES ASSESSMENT PROGRAM TOWN OF PLAINFIELD REQUEST FOR PROPOSAL BROWNFIELDS HAZARDOUS SUBSTANCES ASSESSMENT PROGRAM 1. Description of Project The Town of Plainfield ( Town ) has been awarded a $200,000 site-specific brownfields

More information

SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT

SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT All Best Management Practices (BMPs) are considered feasible until demonstrated otherwise.

More information

Mill Street Corridor Assessment/Cleanup Overview

Mill Street Corridor Assessment/Cleanup Overview Mill Street Corridor Assessment/Cleanup Overview Former S. Bent Mill Site Site History Overview Circa 1867 to 1992 - S. Bent Mill Company (furniture manufacturing) Circa early 1900s - expansion of the

More information

PACKARD SQUARE REDEVELOPMENT PROJECT

PACKARD SQUARE REDEVELOPMENT PROJECT PACKARD SQUARE REDEVELOPMENT PROJECT Development Entity Info 1. Legal Name: Packard Square LLC, a Michigan LLC. 2. EIN: 27-4355597 3. Mailing Address: P.O. Box 7067, Bloomfield Hills, MI 48302 4. Organization

More information

MARKET LOFTS TIF PROPOSAL

MARKET LOFTS TIF PROPOSAL + 8500 Santa Fe Drive Overland Park, Kansas 66212 913/895-6000 Fax: 913-895-5009 www.opkansas.org July 1, 2008 Mayor Carl Gerlach Council President Jim Hix Members of the City Council MARKET LOFTS TIF

More information

Introduction. Remedial Action Objectives. In This Guide

Introduction. Remedial Action Objectives. In This Guide Addendum to Citizens Guide Proposed soil cleanup plans for additional Tax Blocks for Lockheed Martin s Middle River Complex Winter 2013-2014 Lockheed Martin Would Like to Invite the Community to a Public

More information

CENTRAL VERMONT REGIONAL PLANNING COMMISSION Brownfields Advisory Committee Draft Minutes May 21, 2018

CENTRAL VERMONT REGIONAL PLANNING COMMISSION Brownfields Advisory Committee Draft Minutes May 21, 2018 Committee Members: CENTRAL VERMONT REGIONAL PLANNING COMMISSION Brownfields Advisory Committee Draft Minutes May 21, 2018 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

More information

ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES (ABCA) US EPA BROWNFIELD CLEANUP GRANT PROGRAM Sibley Mill 1717 Goodrich Street Augusta, GA

ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES (ABCA) US EPA BROWNFIELD CLEANUP GRANT PROGRAM Sibley Mill 1717 Goodrich Street Augusta, GA ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES (ABCA) US EPA BROWNFIELD CLEANUP GRANT PROGRAM Sibley Mill 1717 Goodrich Street Augusta, GA Introduction and Background The subject site is located at 1717 Goodrich

More information

Tamiami Trail Corridor Brownfields Program

Tamiami Trail Corridor Brownfields Program Tamiami Trail Corridor Brownfields Program Prepared by Cardno TBE for the: Florida Brownfields Association 2012 Statewide Conference Presented by: Michael Maholtz Sarasota/Manatee Metropolitan Planning

More information

BEE BRANCH WATERSHED GREEN INFRASTRUCTURE SUMMARY

BEE BRANCH WATERSHED GREEN INFRASTRUCTURE SUMMARY BEE BRANCH WATERSHED GREEN INFRASTRUCTURE SUMMARY purpose & background PURPOSE & BACKGROUND Through the Bee Branch Watershed Green Infrastructure Project, the City proposes to install permeable interlocking

More information

Storm Water Infiltration on Sites with Contaminated Soils

Storm Water Infiltration on Sites with Contaminated Soils Storm Water Infiltration on Sites with Contaminated Soils Strategies for Implementation & Sustainable Reuse Jessica Dominguez Sustainable Reuse Lead Brownfields Program EPA Region 1 Green Infrastructure

More information

Source Water Protection in the Twin Cities Metropolitan Area

Source Water Protection in the Twin Cities Metropolitan Area Source Water Protection in the Twin Cities Metropolitan Area Lanya Ross, Environmental Analyst Metropolitan Council 9/20/2018 Land Use Advisory Committee Source water Water from streams, rivers, lakes

More information

Re: Construction Related Depressions at Golden State Warriors Mission Bay Site

Re: Construction Related Depressions at Golden State Warriors Mission Bay Site October 1, 2014 David Kelly, Esq GSW Arena LLC 1011 Broadway, 5th Floor Oakland, California 94607 Re: Construction Related Depressions at Golden State Warriors Mission Bay Site Dear Mr Kelly, This report

More information

So, You ve Got a Superfund Site in Your Town!

So, You ve Got a Superfund Site in Your Town! So, You ve Got a Superfund Site in Your Town! American Public Works Association September 13, 2005 3:30 PM Minneapolis, Minnesota You re Not Alone EPA estimates as many as 350,000 hazardous waste sites

More information

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008 FINAL PLAN OF REMEDIAL ACTION Burns and McBride South Market and A Streets August 19, 2008 Wilmington, Delaware DNREC Project No. DE-0325 This Revised Final Plan of Remedial Action (Final Plan) presents

More information

ECSI Number: Responsible Party: Klamath County. QTime Number: Entry Date: 9/22/04 (VCP)

ECSI Number: Responsible Party: Klamath County. QTime Number: Entry Date: 9/22/04 (VCP) ECSI Number: 1213 Responsible Party: Klamath County QTime Number: 37941 Entry Date: 9/22/04 (VCP) Proposed Remedial Action Staff Report - Addendum Chiloquin Forest Products Chiloquin, Klamath County, Oregon

More information

Brownfield Redevelopment In Georgia Past, Present & Future. Presented by: Dan Grogan

Brownfield Redevelopment In Georgia Past, Present & Future. Presented by: Dan Grogan Brownfield Redevelopment In Georgia Past, Present & Future Presented by: Dan Grogan Overview PAST: Atlantic Station PRESENT: Durango Paper Mill Site Ford Hapeville Site Atlanta BeltLine FUTURE (discussion

More information

Chittenden County Brownfields Program

Chittenden County Brownfields Program inactive state hazardous site #92-1300 due to contamination detected Chittenden County Brownfields Program during removal of a heating oil UST in 1992 Site Nomination / Assistance Request Form For information

More information

MISSOURI DEPARTMENT OF NATURAL RESOURCES. Requirements for Asbestos and Lead Paint Abatement at Voluntary Cleanup Program Sites Technical Bulletin

MISSOURI DEPARTMENT OF NATURAL RESOURCES. Requirements for Asbestos and Lead Paint Abatement at Voluntary Cleanup Program Sites Technical Bulletin MISSOURI DEPARTMENT OF NATURAL RESOURCES Requirements for Asbestos and Lead Paint Abatement at Voluntary Cleanup Program Sites Technical Bulletin 7/2001 Division of Environmental Quality Hazardous Waste

More information

MASTER PLAN. Public Workshop Overview Presentation

MASTER PLAN. Public Workshop Overview Presentation MASTER PLAN Public Workshop Overview Presentation MURRAY CITY HALL September 27, 2018 Purpose of the Project Assess the built environment and development conditions Understand the physical and environmental

More information

Problem Assessment: The Bee Branch Watershed, where over 50% of Dubuque s

Problem Assessment: The Bee Branch Watershed, where over 50% of Dubuque s Problem Assessment: The Bee Branch Watershed, where over 50% of Dubuque s residents either live or work, has been hit hard with flash flooding that inundates basements and rushes down streets. In the early

More information

Analysis of Brownfields Cleanup Alternatives Upshur County Youth Camp Tarpit Site 76 Youth Camp Road Selbyville, West Virginia Prepared For:

Analysis of Brownfields Cleanup Alternatives Upshur County Youth Camp Tarpit Site 76 Youth Camp Road Selbyville, West Virginia Prepared For: 1. Introduction and Background a. Site Location Analysis of Brownfields Cleanup Alternatives Upshur County Youth Camp Tarpit Site 76 Youth Camp Road Selbyville, West Virginia 26236 Prepared For: Upshur

More information

Tar Creek Superfund Site Ottawa, Oklahoma

Tar Creek Superfund Site Ottawa, Oklahoma CASE STUDY Tar Creek Superfund Site Ottawa, Oklahoma August 2010 Prepared by The Interstate Technology & Regulatory Council Mining Waste Team Permission is granted to refer to or quote from this publication

More information

SUSTAINABLE REMEDIATION & BROWNFIELD RE-DEVELOPMENT Former industrial site in St. Laurent, Montreal, Qc

SUSTAINABLE REMEDIATION & BROWNFIELD RE-DEVELOPMENT Former industrial site in St. Laurent, Montreal, Qc SUSTAINABLE REMEDIATION & BROWNFIELD RE-DEVELOPMENT Former industrial site in St. Laurent, Montreal, Qc François Dubé, B. A. Sc. David Harper, M.Sc., P. Geo. Introduction Kilmer Brownfield Equity Fund

More information

Traverse City Downtown Development Authority TAX INCREMENT FINANCING & DEVELOPMENT PLAN #97

Traverse City Downtown Development Authority TAX INCREMENT FINANCING & DEVELOPMENT PLAN #97 Traverse City Downtown Development Authority TAX INCREMENT FINANCING & DEVELOPMENT PLAN #97 Revised April 30, 2015 TABLE OF CONTENTS INTRODUCTION! 1 DEVELOPMENT PLAN! 2 TAX INCREMENT FINANCING PROCEDURE.!

More information

The Port of Bellingham

The Port of Bellingham The Port of Bellingham Revitalizing Bellingham s Waterfront Mike Stoner, Environmental Director June 8, 2015 1 The Bellingham Bay Demonstration Pilot 2 100 Years of Industrial Use 3 4 Community Uncertainty

More information

Chapter 11: Hazardous Materials A. INTRODUCTION

Chapter 11: Hazardous Materials A. INTRODUCTION Chapter 11: Hazardous Materials A. INTRODUCTION This chapter relies on the analysis from the Fresh Kills Park Final Generic Environmental Impact Statement (FGEIS) and summarizes the conclusions drawn from

More information

Greenwich Mohawk Brownfield

Greenwich Mohawk Brownfield Greenwich Mohawk Brownfield Remedial Options Feasibility Study Prepared for The Corporation of the City of Brantford Phase One & Two Environmental Site Assessment Greenwich Mohawk Brownfield consists of

More information

American Can Building

American Can Building American Can Building 4101 Spring Grove Avenue Cincinnati, Hamilton County, Ohio American Can Building, LLC Port of Greater Cincinnati Development Authority Donald A. Fay, CP, The Payne Firm Presenters:

More information

SECTION V - STATE AND FEDERAL IMPLEMENTATION

SECTION V - STATE AND FEDERAL IMPLEMENTATION SECTION V - STATE AND FEDERAL IMPLEMENTATION A. State Actions Needed The State of New York is an active partner in the revitalization of the Buffalo LWRA. In addition to the ongoing implementation of the

More information

Waste Management. Our Approach REDUCE, REUSE, SAFELY DISPOSE

Waste Management. Our Approach REDUCE, REUSE, SAFELY DISPOSE As we transition to cleaner sources of energy and retire aging coal plants, the coal ash produced at our plants has declined 41 percent since 2005. REDUCE, REUSE, SAFELY DISPOSE Waste Management Our Approach

More information

Introduction to Brownfields: Site Assessment and Cleanup

Introduction to Brownfields: Site Assessment and Cleanup consulting engineers and scientists Introduction to Brownfields: Site Assessment and Cleanup Presented by: Barry Giroux, P.E., LEP, Senior Project Manager TAB Technical Assistance for Brownfields Team

More information

What is a Brownfield? and Steps for Successful Redevelopment

What is a Brownfield? and Steps for Successful Redevelopment What is a Brownfield? and Steps for Successful Redevelopment Blase Leven Technical Assistance to Brownfields (TAB) Program Kansas State University October, 2013 Technical Assistance to Brownfield (TAB)

More information

EJ Industrial Spine BOA Nomination Study

EJ Industrial Spine BOA Nomination Study A. Selecting Priority Sites Section V. Redevelopment of Priority Sites Section IV of this Nomination Study presents a summary of the analyses of the Study Area and market conditions affecting the E-J BOA

More information

ADDRESSING ENVIRONMENTAL CONCERNS DURING THE EAST VILLAGE BROWNFIELD REDEVELOPMENT PROJECT

ADDRESSING ENVIRONMENTAL CONCERNS DURING THE EAST VILLAGE BROWNFIELD REDEVELOPMENT PROJECT Remediation Technologies Symposium October 21 st, 2010 East Village and Fort Calgary circa 2008, looking west Source: CMLC (East Village Master Plan Executive Summary) ADDRESSING ENVIRONMENTAL CONCERNS

More information

Expect the Unexpected Contamination at Public Infrastructure Projects January 26, City Engineers Association of Minnesota Annual Conference

Expect the Unexpected Contamination at Public Infrastructure Projects January 26, City Engineers Association of Minnesota Annual Conference Expect the Unexpected Contamination at Public Infrastructure Projects January 26, 2017 City Engineers Association of Minnesota Annual Conference Introductions Dan Fetter, Barr Engineering Jackie Dylla,

More information

Memorandum. Rian Amiton; City of Brockton Planning Department. John McRobbie and Thomas Biolsi; TRC Environmental Corporation

Memorandum. Rian Amiton; City of Brockton Planning Department. John McRobbie and Thomas Biolsi; TRC Environmental Corporation TRC Wannalancit Mills 650 Suffolk Street Lowell, Massachusetts 01854 Main 978.970.5600 Fax 978.453.1995 Memorandum To: From: Subject: Rian Amiton; City of Brockton Planning Department John McRobbie and

More information

Introduction to Brownfields: Site Assessment and Cleanup

Introduction to Brownfields: Site Assessment and Cleanup consulting engineers and scientists Introduction to Brownfields: Site Assessment and Cleanup Presented by: Ileen S. Gladstone, P.E., LSP, LEED AP Vice President & Senior Practice Leader TAB Technical Assistance

More information

PROPOSED PLAN OF REMEDIAL ACTION

PROPOSED PLAN OF REMEDIAL ACTION PROPOSED PLAN OF REMEDIAL ACTION Delaware Technical Community College Wilmington, DE DE 1089 August 1999 Delaware Department of Natural Resources and Environmental Control Division of Air and Waste Management

More information

FACTS ABOUT: Kop-Flex. Site Location. Site History. Environmental Investigations

FACTS ABOUT: Kop-Flex. Site Location. Site History. Environmental Investigations FACTS ABOUT: Kop-Flex Maryland Department of the Environment Site Location The 25-acre property is located at 7565 Harmans Road in Hanover, Anne Arundel County, Maryland. The property is owned by Emerson

More information

LIMITED ENVIRONMENTAL REVIEW. Bowling Green Wooster and Main Street Water Main Replacement

LIMITED ENVIRONMENTAL REVIEW. Bowling Green Wooster and Main Street Water Main Replacement LIMITED ENVIRONMENTAL REVIEW Project Identification Project: Applicant: Bowling Green Brian O Connell, Director of Utilities City of Bowling Green 304 North Church Street Bowling Green, Ohio 43402 Loan

More information

Gray s Fine Printing Site Proposed Plan of Remedial Action DE1094

Gray s Fine Printing Site Proposed Plan of Remedial Action DE1094 Gray s Fine Printing Site DE1094 June 1998 Department of Natural Resources and Environmental Control Division of Air and Waste Management Site Investigation and Restoration Branch Table of Contents I.

More information

Asbestos and Lead-Based Paint Abatement Requirements at Brownfields/Voluntary Cleanup Program Sites

Asbestos and Lead-Based Paint Abatement Requirements at Brownfields/Voluntary Cleanup Program Sites Asbestos and Lead-Based Paint Abatement Requirements at Brownfields/Voluntary Cleanup Program Sites Hazardous Waste Program Fact Sheet Asbestos-containing materials and lead-based paint have the potential

More information

Northampton s New Stormwater and Flood Control Utility

Northampton s New Stormwater and Flood Control Utility Northampton s New Stormwater and Flood Control Utility James Laurila, Northampton City Engineer Virginia Roach, CDM Smith Stormwater Utility Workshop Chelmsford, MA March 25, 2015 Overview Northampton

More information

And the Minnesota Targeted Brownfield Assessment Program

And the Minnesota Targeted Brownfield Assessment Program And the Minnesota Targeted Brownfield Assessment Program Minnesota Pollution Control Agency (MPCA) Voluntary Investigation and Cleanup (VIC) Program Former dry cleaners, old dumps, contaminated fill, etc.

More information

ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES (ABCA) US EPA BROWNFIELD CLEANUP GRANT PROGRAM. Northern Parcel - Sibley Mill Goodrich Street

ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES (ABCA) US EPA BROWNFIELD CLEANUP GRANT PROGRAM. Northern Parcel - Sibley Mill Goodrich Street ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES (ABCA) US EPA BROWNFIELD CLEANUP GRANT PROGRAM Northern Parcel - Sibley Mill 1717 Goodrich Street Augusta, Georgia Augusta Canal Authority Dayton L. Sherrouse,

More information

Division of Waste Management. Landfill Redevelopment and Chapter

Division of Waste Management. Landfill Redevelopment and Chapter Division of Waste Management Landfill Redevelopment and Chapter 62-780 Interaction of Chapters 701 and 780 How is Chapter 62-780 applied at old and existing landfills? 62-780 applies to sites with a discharge

More information

The Port Authority will demolish, remediate, and clear the site for future development by a company or end user.

The Port Authority will demolish, remediate, and clear the site for future development by a company or end user. Who is the Port of Greater Cincinnati Development Authority? The Port of Greater Cincinnati Development Authority (Port Authority) is a quasi-governmental, economic development agency that initiates projects

More information

TOWARDS NEW DEVELOPMENT: RECOMMENDATIONS FROM FINANCE AGENCIES THE COUNCIL OF DEVELOPMENT

TOWARDS NEW DEVELOPMENT: RECOMMENDATIONS FROM FINANCE AGENCIES THE COUNCIL OF DEVELOPMENT TOWARDS NEW DEVELOPMENT: RECOMMENDATIONS FROM THE COUNCIL OF DEVELOPMENT FINANCE AGENCIES 9 May, 2018 El Foro de Alcaldes, Centro Comunal Yolanda Guerrero, Guaynabo, Puerto Rico Presenter: David Southgate,

More information

Brownfields Site Evaluation Criteria

Brownfields Site Evaluation Criteria Chittenden County Brownfields Program FY 2017 Brownfields Site Evaluation Criteria Project Name: Pine and Flynn Development Address/Project Location: 316 Flynn Avenue, Burlington Applicant: Redstone Reviewer:

More information

6.13 Utilities and Service Systems

6.13 Utilities and Service Systems 6.13 6.13.1 Introduction This section describes impacts for utilities and service systems that would result from construction and operation of the CEQA Alternatives. 6.13.2 Regulatory Setting There are

More information

And the Minnesota Targeted Brownfield Assessment Program

And the Minnesota Targeted Brownfield Assessment Program And the Minnesota Targeted Brownfield Assessment Program Minnesota Pollution Control Agency (MPCA) Voluntary Investigation and Cleanup (VIC) Program Former dry cleaners, old dumps, contaminated fill, etc.

More information

Contracting Services Environmental Liability Policy

Contracting Services Environmental Liability Policy Environmental Contracting Services Environmental Liability Policy 24 environmental contracting services claim scenarios you may not have thought about. Great American Insurance Group s Contracting Services

More information

DRAFT. Introduction and Background. June 20, 2013 Project

DRAFT. Introduction and Background. June 20, 2013 Project Geotechnical Environmental and Water Resources Engineering June 20, 2013 Project 116320 Mr. Nick Hodgkins Maine Department of Environmental Protection 17 State House Station Augusta, ME 04333 Dear Nick:

More information

A Case Study in Brownfield Development Ponce City Market

A Case Study in Brownfield Development Ponce City Market Georgia Environmental Conference A Case Study in Brownfield Development Ponce City Market John C. Spinrad, Partner Ponce City Market 2 Atlanta s Most Iconic Redevelopment Jamestown, the owner of Ponce

More information

2017 CEDA APPLICATION

2017 CEDA APPLICATION 2017 CEDA APPLICATION All Applications Must Be Received By August 18, 2017 The 2017 TEDC Community Economic Development Awards (CEDA) will be presented during TEDC's Annual Conference Award s Luncheon

More information

Excavation Of Pcb-Contaminated Sediment Adjacent To The Intake Of A 12-Mgd Drinking Water Plant

Excavation Of Pcb-Contaminated Sediment Adjacent To The Intake Of A 12-Mgd Drinking Water Plant Proceedings of the Annual International Conference on Soils, Sediments, Water and Energy Volume 11 Article 21 January 2010 Excavation Of Pcb-Contaminated Sediment Adjacent To The Intake Of A 12-Mgd Drinking

More information

Brownfields Programs. City of Wichita Brownfields Projects. Brownfields. Brownfields

Brownfields Programs. City of Wichita Brownfields Projects. Brownfields. Brownfields City of Wichita Brownfields Projects Shawn Maloney, P.G. Environmental Assessment & Remediation Brownfields Programs City of Wichita has worked with the EPA and KDHE Brownfield Programs These include:

More information

Athens-Clarke County, Georgia Urban Redevelopment Plan

Athens-Clarke County, Georgia Urban Redevelopment Plan Athens-Clarke County, Georgia Urban Redevelopment Plan Prepared by Athens-Clarke County Department of Human and Economic Development 2011 1 Table of Contents Introduction 3 Urban Redevelopment Act 3 Athens-Clarke

More information

Green Remediation and Ecological Restoration for

Green Remediation and Ecological Restoration for Green Remediation and Ecological Restoration for Reuse of a RCRA Correction Action site Green Remediation and Ecological Restoration for Susan J. Dugas, P.E. Quantum Management Group, Inc. A BSI Professional

More information

Ongoing and Future Project Work. Construction Management

Ongoing and Future Project Work. Construction Management Ongoing and Future Project Work New Broward County Courthouse Tower 1,000 Car Courthouse Garage Midrise Building Renovations 714,000 square foot, 20-story Civil/Family Courthouse replacing 1950 s era

More information

BROWNFIELDS PRIMER. Chicago - June 2017

BROWNFIELDS PRIMER. Chicago - June 2017 BROWNFIELDS PRIMER Chicago - June 2017 PRESENTED BY THOMAS BARRASSO DIRECTOR OF ENERGY & ENVIRONMENTAL AFFAIRS CITY OF AMESBURY, MASSACHUSETTS History of EPA/Superfund/Brownfields Timeline: 1970 EPA Established

More information

Decommissioning and Redevelopment JEA - Southside Generating Station Jacksonville, Florida February 2014

Decommissioning and Redevelopment JEA - Southside Generating Station Jacksonville, Florida February 2014 Fact Sheet Update No. 8 Decommissioning and Redevelopment JEA - Southside Generating Station Jacksonville, Florida February 2014 Introduction This is the eighth update to the November 2002 Fact Sheet on

More information

CE 326 Principles of Environmental Engineering INTEGRATED SOLID WASTE MANAGEMENT

CE 326 Principles of Environmental Engineering INTEGRATED SOLID WASTE MANAGEMENT CE 326 Principles of Environmental Engineering INTEGRATED SOLID WASTE MANAGEMENT Field Trip: Meet at the Ames Resource Recovery Plant at half past the hour of the scheduled lab period. The plant is located

More information

Vero Beach Vision Plan

Vero Beach Vision Plan Vero Beach Vision Plan City of Vero Beach, Florida Prepared in cooperation with: The Vero Beach Vision Team and The Citizens of Vero Beach Prepared by: Gould Evans Associates 4041 Mill Street Kansas City,

More information

Once known as warehousing and distribution, the process

Once known as warehousing and distribution, the process Map III-2.3 Proposed Agile Port Industrial Area AGILE PORT INDUSTRIAL AREA PLAN Once known as warehousing and distribution, the process of moving goods to market has evolved dramatically. No longer is

More information

Masonic Hall - Alphabet City Project Case Study

Masonic Hall - Alphabet City Project Case Study Masonic Hall - Alphabet City Project Case Study Craig Dunham 12/5/2018 1 Agenda: Site History Non-Profit Sponsor Arts Anchor Project Scope Financing Sources & Uses Financing Structure Outcomes Lessons

More information

Nova Scotia Lands Inc. Crown Corporation Province of Nova Scotia Business Plan

Nova Scotia Lands Inc. Crown Corporation Province of Nova Scotia Business Plan Nova Scotia Lands Inc. Crown Corporation Province of Nova Scotia Business Plan 2010 2011 1 Message from the Minister and President Since its establishment in 2006, Nova Scotia Lands Inc. (NSLI) has achieved

More information

60 Year Old Construction Yard REMEDIATED AND REDEVELOPED

60 Year Old Construction Yard REMEDIATED AND REDEVELOPED 60 Year Old Construction Yard REMEDIATED AND REDEVELOPED Vladimir Agatonovic, P. Geol., Focus Environment and Geosciences Group Operations Manager/Senior Hydrogeologist Erwin Greisinger, Courtenay Real

More information