1 Name of the Project : Gurha East Lignite Mine Project (1MTPA) of M/s. V.S. Lignite Power Private Ltd. Located at village- Gurha, Kolayat, Bikaner, Rajasthan. Project Code : Raj-456/753/09 Clearance Letter No : J-11015/200/2006-IA.II (M), Dt: 07/03/2007 Period of the Compliance Report: April, 2013 to September, S no Conditions A. Specific Conditions i Mining shall be carried out as per statuette at a safe distance from the seasonal nallah/stream flowing within the lease boundary ii An embankment of 3 m ht shall be constructed along the bank of the nallah/stream. The slope of the embankment shall be at least 2:1 towards the ML. The height of the embankment shall be at least 5 m higher than the HFL of the nallah/stream iii Top soil shall be stacked properly with proper slope at earmarked site(s) and should not be kept active and shall be used for reclamation and development of green belt. iv OB should be stacked at earmarked one external OB dumpsite within ML area only for the first 6 years of mining operation. OB dump shall be a maximum ht of 40 m only and consist of four benches of 10 m each. The ultimate slope of the dump shall not exceed 28 deg. The OB dump shall be vegetatively reclaimed monitoring and management of reclaimed dump site should continue until vegetation becomes self-sustaining compliance Mining is being carried out keeping safe distance from seasonal nallah/ stream. Embankment has been constructed along the nallah so that no rain water enters into the mine. Photo has been provided in Annexure-I. Top soil stacked separately as per approved mining Plan. Photo has been provided in Annexure-I. - Overburden(OB) is being stacked at earmarked external dump -Height of Overburden dump will be maintained up to 40 m as suggested -Slope is being maintained -At present being active dump vegetative reclamation not applicable. Compliance status should be submitted to the MoEF and its regional office located at Lucknow - Half yearly compliance report is being sent regularly to MoEF, Six monthly compliance report for Gurha East Lignite Mine Project (1 MTPA), Page 1

2 v vi vii viii ix on an yearly basis. Catch drains and siltation ponds of appropriate size should be constructed to arrest silt and sediments flow from soil, OB, and mineral dumps. The water so collected should be utilized for watering the mine area, roads, green belt development etc. The drains should be regularly desilted and maintained properly. Garland drains (size, gradient and length) and sump capacity should be designed keeping 50% safety margin over and above the peak sudden rainfall and maximum discharge in the area adjoining the mine site. Sump capacity should also provide adequate retention period to allow proper settling of silt material. Dimension of retaining wall at the toe of the dumps and OB benches within the mine to check the runoff and siltation should be based on the rainfall data. High efficiency bag filters/water sprinkling system should be provided to check fugitive emission from lignite handling Plant, crushing operations, conveyors system, haulage roads, transfer points etc. Mining shall not involve drilling and blasting operations. The total area brought under afforestion at the end of mine life (post mining land use) shall be not less than ha and shall include reclaimed external OB dump (104.69ha), reclaimed quarry area ( ha), green belt including plantation along ML boundary (200 ha), Bikaner. Half yearly report for the period October, 2012 to March, 2013 submitted to MoEF, Bikaner vide letter no. MOE&F, LKN/VK/ /248 dated Copy of the letter is attached as Annexure-II. Overburden dumping is in progress and catch drains along the mining dump area has been created. The drains are being maintained properly. Retention wall has been created at toe of dump and Overburden (OB) benches to check run off and siltation. Water sprinkling is being done to control fugitive emissions from haulage roads. Fixed water sprinklers have been installed to check fugitive emission from crushing operations & conveyors belts & transfer points. Photo has been provided in Annexure-I. There is no drilling and blasting involved in the mining operations. Presently the mine is under operation and currently a total of plants in 81 hectares have been planted in Mines and has a survival rate of 85.6%. Plantation has been carried out along the periphery Six monthly compliance report for Gurha East Lignite Mine Project (1 MTPA), Page 2

3 x xi xii xiii roads (4 ha), dismantled and reclaimed infrastructure area (36ha) and vacant /undisturbed area ( ha) by planting native species in consultation with the local DFO/ Agriculture Department. Density of the trees should be around 2000 plants /ha. Backfilling shall begin from 6 th years of mining operations. A progressive mine closure plan shall be implemented from the 6 th years of mining operations and the OB generated shall be concurrently backfilled covering a total area of ha. Plantation shall be developed over the backfilled area and the balance of excavated area (void) covering an area of ha shall be used as a water reservoir, the higher benches of which shall be gently sloped. The project authorities shall provide for grazing, if required in the reclaimed land /quarry area in the consultation with the local villagers. No groundwater shall be used for mining operations. Prior approval of the competent authority such as the SGWB/CGWA shall be obtained for using ground water for the project. Regular monitoring of ground water level and quality should be carried out by establishing a net work of existing wells and construction of new peizometers. The monitoring for quantity should be done four times a year in the pre-monsoon (May), Monsoon (August), Post monsoon (November) and winter (January) seasons and for quality in May. Data thus collected should be submitted to the MoEF and to the CPCB quarterly within one month of monitoring. of the Overburden and Top soil dumps and along both sides of the road. Existing trees and shrubs are also protected over undisturbed area. Photographs of the plantation is attached as Annexure-III Referred conditions will be complied as suggested and as per approved mine plan. Presently the mine is in operation stage and hence after reclamation provision for grazing will be made in consultation with local villagers. No Ground water is being used for mining operations. Water/ treated waste water from Power plant is being used. At present no groundwater has been intercepted as mining depth is 90 m only. The Ground water level is 100 m below ground level (bgl). Monitoring will be carried out after intercepting the groundwater in the Mine. Monitored groundwater quality report from nearby areas is attached as Annexure-IV. Baseline ground water quality from nearby areas are saline was saline in nature and also current ground water monitoring shows Total dissolved solids in the range of mg/l and hardness (as CaCO3) is in Six monthly compliance report for Gurha East Lignite Mine Project (1 MTPA), Page 3

4 xiv xv xvi xvii The company shall put up artificial ground water recharge measures for augmentation of ground water resource. The project authorities should meet water requirement of nearby village in case the village wells go dry due to dewatering of mine ETP should also be provided for workshop and CHP wastewater Digital processing of entire lease area using remote sensing technique should be done regularly once 3 years for monitoring land use pattern and report submitted to MoEF and its regional office at Lucknow Besides carrying out regular periodic health checkup of the workers,10% of the workers identified from work force engaged in active mining operations shall be subjected to health check up for occupational diseases and hearing the range of mg/l respectively. Hence mining activity has not affected the ground water quality. Presently dewatering of mine in not being done and hence no effect on village wells. Existing wells present in mine lease area are being protected and maintained for ground water recharging. Treated waste water from power plant is sprayed through fixed sprinklers to control fugitive emission from different points in CHP. The mining machineries and vehicles deployed are new and under warranty. The same are being sent to Local dealer for maintenance purpose. There is no work shop for Vehicles, hence ETP is not applicable. The report prepared by M/s. Indian Resources Information & Management Technologies Ltd., Hyderabad has been submitted to the MoEF, Lucknow vide letter No.MOE&F,LKN/GS/ /1203, dated Study has been carried out using satellite data of IRS- P6 and LISS-IV MX of year and The outcome clearly depict that degradation to the environment has been maintained at minimum level by developing green belt around mine dump area and establishing proper sprinkling system around active mining area. Copy of the letter is attached as Annexure-V. 24 persons from mine have been checked for occupational diseases and hearing impairment through M/s. Occupational and Environmental Health Services, Noida on Six monthly compliance report for Gurha East Lignite Mine Project (1 MTPA), Page 4

5 impairment, if any, through an agency such as NIOH, Ahmedabad within a period of one year and the results reported to this ministry and to DGMS. xviii A final mine closure plan along with details of corpus of funds should be submitted to MoEF 5 years in advance of final mine closure for approval. xix Consent to operate shall be taken before starting mining operations i ii iii iv B. general conditions No change in mining technology and scope of working should be made without prior approval of MoEF No change in the calendar plan including excavation, quantum of mineral and waste should be made Four AAQM stations should be established in the core zone as well as in the buffer zone for SPM, RPM, SO 2 and NOx monitoring. Locations of the stations should be based on the meteorological data, topographical features and environmentally and ecologically sensitive targets in consultation with State Pollution Control Board. Data on ambient air quality (SPM, RPM, SO 2 and NOx) should be regularly submitted to the MoEF including its regional office at Lucknow and to the Pollution Control Board and CPCB once in six months The reports of all the persons checked were found to be normal. The report was sent attached along with half yearly compliance report vide letter no. MOEF, LKN/GS/ /932 dated Copy of the letter is attached as Annexure-VI. Final closure Plan prepared and submitted to Ministry of Coal for approval. Consent to Operate (File. no. F (Mines)/Bikaner(Kolayat)/12(1)/ / ; Order No: /Mines/834 dated : has been obtained from RSPCB and is valid up to Renewal application has been already filed and the approval process from RSPCB is under progress. At present there is no change in mining technology and if any, prior approval from MoEF will be obtained There will be no change in calendar Plan. A total of eight ambient stations have been established covering both core and buffer zone with monitoring frequency being two days per week. Report attached as Annexure-IV. PM 10, PM 2.5, SO 2 and NO 2 were found to be within prescribed limit. Half yearly compliance report is being sent regularly to MoEF, Bikaner. Half yearly report for the period October, 2012 to March, 2013 submitted to MoEF, Bikaner vide letter no. MOE&F, Six monthly compliance report for Gurha East Lignite Mine Project (1 MTPA), Page 5

6 v vi vii viii ix Fugitive emission from all the sources should be controlled, regularly monitored and data recoded properly. Water spraying arrangement on haul roads, wagon loading, dump-trucks (loading and unloading) points should be provided and properly maintained. Adequate measures should be taken for control of noise levels below 85 dba in the work environment. Workers engaged in blasting and drilling operations, operation of HEMM, etc should be provided with ear plug/muffs. Industrial wastewater (work shop and waste water from mine) should be properly collected, treated so as to conform to the standards prescribed under GSR 422(E) dated 19 th may 1993 and 31 st December 1993 or as amended from time to time before discharge.oil and grease trap should be installed before discharge of workshop effluents. Vehicular emission should be kept under control and regularly monitored. Vehicles used for transporting the mineral should be covered with tarpaulins and optimally loaded. Environmental laboratory should be established with adequate number and types of pollution monitoring and analysis equipments in consultation with SPCB LKN/VK/ /248 dated Copy of the same is attached as Annexure-II Fugitive dust from all the sources are regularly monitored and recorded properly. Treated waste water from power plant is being sprayed is on roads, loading and unloading points to control dust. Monitored ambient air quality parameters are well within the prescribed limits. Regular monitoring is in progress and noise level is within the prescribed limit. No drilling and blasting is involved. Noise monitoring reports are sent along with half yearly reports to MoEF. No waste water from mine is generated. The mining machineries and vehicles deployed are new and under warranty. The same are being sent to local dealer for maintenance purpose. Vehicular emission is kept under control and monitored every six months. The vehicle is optimally loaded. Environmental laboratory is equipped with (i) analytical balance-2 nos. (ii) Spectrophotometer-2 nos. (iii) ph meter-1no. (iv) Conductivity meter-1 no. (v) COD apparatus-1set (vi) BOD measurer-1no. (vii) BOD culture cabinet-1 no. (viii) Oil measurer-1 no. (ix) Sound level meter-1 no. (x) Refrigerator-1 no. (xi) Continuous ambient air quality monitoring system-3 no. Six monthly compliance report for Gurha East Lignite Mine Project (1 MTPA), Page 6

7 x xi xii xiii xiv xv Personnel working in dusty areas should wear protective respiratory devices and they should also be provided with adequate training and information on safety and health aspects. A separate environment management cell with suitable qualified personnel should be set up under the control of a senior executive, who will report directly to the Head of the company. The funds earmarked for environmental protection measures should be kept in a separate account and should not be diverted for other purposes. Year wise expenditure should be reported to this ministry and its regional office at Lucknow A copy of this will be marked to concerned panchayat/local NGO, if any, from whom any suggestion/ representation has been received while processing the proposal State pollution control board should display a copy of the clearance letter at the Regional office, District industry centre and collector s office /Tehsildar office for 30 days. The project authorities should advertise at least in two local news papers widely circulated around the project, one of which shall be in the vernacular language of the locality concerned within seven days of the clearance letter informing that the project has been accorded environmental clearance and a copy of the clearance letter is available with the state pollution control board and may also be seen at the web site of the MoEF at (xii) Manual ambient air quality monitoring device-1 no. (xiii) Weather station (wind vane, anemometer, thermometer, hygrometer, evaporimeter, rainfall gauge). Also, environmental monitoring is being carried out by a reputed and authorized agency. Proper care is being taken and adequate training and information on safety and health aspects are being given. An environment management cell consisting of mining engineers, geologists, environmental engineer and senior chemist has been set up. Fund is earmarked and the same will be utilized only for environmental protection measures. Complied Noted Advertised in two dailies, Dainik Bhaskar and Rajasthan Patrika on Pl. refer annexure-vii(a & b) Six monthly compliance report for Gurha East Lignite Mine Project (1 MTPA), Page 7

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

V.S LIGNITE POWER Pvt. Ltd. [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd. [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 Name of the Project : Gurha East

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

J.K. Cement WORKS, NIMBAHERA (RAJ)

J.K. Cement WORKS, NIMBAHERA (RAJ) A. SPECIFIC CONDITIONS : J.K. Cement WORKS, NIMBAHERA (RAJ) Compliance report of Environment Clearance for Nimbahera - Ahirpura Lime Stone Mine (For the Period from April 2013 to September 2013) Reference

More information

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006 Name of the Project: North North Naubasta Limestone Mine (ML 2) (A unit of M/s Jaiprakash Associates Limited) of Mining Capacity 1.85 MTPA at villages Naubasta, Sumeda, Atrauli and Garhwa Tehsil Huzur

More information

S.N. Condition in Environmental Clearance Compliance Status upto June (A) Specific Conditions (i)

S.N. Condition in Environmental Clearance Compliance Status upto June (A) Specific Conditions (i) Six Monthly Status of Compliance for Environmental Clearance No J-11015/108/2005- IA.II (M) dated 28.07.2006 for 2.2 MTPA Coal Mining from Utkal B-2 Coal Block by M/s. Monnet Ispat & Energy Limited S.N.

More information

Sl. No. Conditions Compliance

Sl. No. Conditions Compliance Annexure-I CONDITIONS TO BE COMPLIED AS PER ENVIRONMENTAL CLEARANCE APPROVAL KATHAUTIA OPEN CAST COAL MINE, DALTONGANJ EC. No. J-11015 /61//2006-IA.II(M) dated 19 th June, 2006 A. SPECIFIC CONDITIONS Sl.

More information

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005 Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner Six Monthly COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS (Grant Order no. J-11015/236/2006-IA (M) dated 11.01.2007 to prior allottee, M/s Electrosteel Castings Limited

More information

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED Sr. STIPULATION ACTION No. 2A. Specific Conditions (i) (ii) All the conditions stipulated by the State Pollution Control Board in their Consent should be effectively implemented. The project proponent

More information

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II Status of Environmental Clearances received from MOEF vide MoEF No.J- 11015/497/2007-IA II(M) dated 18.10.2007-Bhavanipuram Limestone Mine 2(73.93.11 Ha), as on March 2017 1. Compliance reports are enclosed

More information

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II Status of Environmental Clearances received from MOEF vide MoEF No.J- 11015/497/2007-IA II(M) dated 18.10.2007-Bhavanipuram Limestone Mine 2 (73.93.11 Ha), as on September 2018 1. Compliance reports are

More information

A. SPECIFIC CONDITIONS. No. Conditions Status of Compliance. Noted and Agreed

A. SPECIFIC CONDITIONS. No. Conditions Status of Compliance. Noted and Agreed Status of compliance as on 1 st March, 2015 (Period :, 2014 March 2015) to the conditions stipulated in Environmental clearance granted by MoEF vide letter No:- J- 11015/42/2005-IA-II(M) Dated 18 th May

More information

THE RAMCO CEMENTS LIMITED

THE RAMCO CEMENTS LIMITED 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II

More information

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Sr.No Condition Status A. SPECIFIC CONDITIONS: J.K. CEMENT WORKS, MANGROL (RAJ.) Compliance report of Mangrol Lime stone mine (For the period from April 2011 to September 2011) Sub:- Conditions of Environment Clearance from MOEF, New Delhi Letter No.

More information

The project proponent shall develop fodder plots in the non-mineralized area in lieu of use of grazing land.

The project proponent shall develop fodder plots in the non-mineralized area in lieu of use of grazing land. J.K. Cement WORKS, MANGROL (RAJ) Dated 29.05.2018 Compliance report of Environment Clearance for Mangrol Lime Stone Mine (For the Period from October 2017 to March 2018) Reference Letter from MOEF, New

More information

Agreed. 8 The project proponent shall ensure that no natural watercourse and/or water resources shall Shall be complied with.

Agreed. 8 The project proponent shall ensure that no natural watercourse and/or water resources shall Shall be complied with. Compliance Report for the period June 2012 - November 2012, to the conditions specified in the Environmental Clearance (EC), granted by MOEF, vide letter No. J-11015/889/2007 - IA.II (M) dated 22nd Feb,

More information

Period of Compliance Report : April, 2017 to September, 2017

Period of Compliance Report : April, 2017 to September, 2017 Name of the Project Project Code Clearance Letter No. with date : OSTAPAL CHROMITE MINES, M/S. FACOR LTD. : Mining (Non-Coal) : No. J-11015/183/2007-IA-II (M) dt.13-05-09 Period of Compliance Report :

More information

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia HALF YEARLY PROGRESSIVE CLEARANCE ACCORDED BY THE MINISTRY OF ENVIRONMENT & FOREST, GOVT. OF INDIA, TO THE PROJECT EXPANSION OF GANUA IRON & MN. MINE OF SHRI PAWAN KUMAR AHLUWALIA (FROM 0.140 MTPA TO 0.36

More information

NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P.

NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P. NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P. Sub: Ref: Period: Six Monthly Environmental Progress Report Environmental clearance no: No.J-11015/82/2009-IA.II(M),

More information

Viliage Guri13, fellsi! Kolayal, Dis\. l3ikaner HaJaslhan

Viliage Guri13, fellsi! Kolayal, Dis\. l3ikaner HaJaslhan Ref.: MoE&F, LKNjVJJNjl040124j 558 Date: 31.10.2017 Viliage Guri13, fellsi! Kolayal, Dis\. l3ikaner HaJaslhan 8-2,293182iN431iA, Hoad No, 22, Jubilee Hills, Hyderabad - 500033 Tel: +91-40-23559922-25 Fax:

More information

Implementation of the Conservation Plan for Schedule I species report in the study area namely Pavo cristatus (Indian peafowl).

Implementation of the Conservation Plan for Schedule I species report in the study area namely Pavo cristatus (Indian peafowl). J.K. Cement WORKS, MANGROL (RAJ) Compliance report of Environment Clearance for Mangrol Tilakhera Lime Stone Mine Reference Letter from MOEF, New Delhi - J-11015/25/2011-1A. II (M) dated 23.01.2014 (For

More information

PKA/Gonua/MoEF/ Date:

PKA/Gonua/MoEF/ Date: PKA/Gonua/MoEF/ Date: -18.06.2018 To The Director, Ministry of Environment & Forests (Central) Eastern Regional Office A/3 - Chandrasekharpur Bhubaneswar-751023 Sub:- Sir, Half Yearly Progressive Compliance

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

Name of Project: Panchagavi Laterite Mine, M/s J.K. Cement Works, Muddapur (Karnataka)

Name of Project: Panchagavi Laterite Mine, M/s J.K. Cement Works, Muddapur (Karnataka) Panchagavi Laterite Mine, Village- Panchagavi, Taluka-Ramdurg, District- Belgaum, Karnataka Ref: - MoEF Letter No. SEIAA 107 MIN 2014 dtd. 24th December 2014 Compliance Report for the period from October

More information

No.J-11015/42/2006-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhawan, C.G.O. Complex, Lodi Road, New Delhi

No.J-11015/42/2006-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhawan, C.G.O. Complex, Lodi Road, New Delhi No.J-11015/42/2006-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhawan, C.G.O. Complex, Lodi Road, New Delhi 110 003 To, M/s Rajasthan State Mines and Minerals Ltd. SBU&PC-Limestone,

More information

By Speed Post. Dated: 30 th September, 2013

By Speed Post. Dated: 30 th September, 2013 By Speed Post No. J-11015/349/2009-IA.II (M) Government of India Ministry of Environment and Forests Impact Assessment Division *** Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-110 003 Dated:

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

J-11015/248/2007-IA.I(M) ) 13, MTPA ( ML

J-11015/248/2007-IA.I(M) ) 13, MTPA ( ML Status of Compliance (Period: October 2012 to March 2013) to the conditions stipulated in the Environment Clearance granted by MoEF vide letter No.- J-11015/248/2007-IA.I(M) dated May 13, 2009 for 0.27

More information

Village Gurha, Tehsil Kolayal, Disl. Bikaner. Rajaslhan.

Village Gurha, Tehsil Kolayal, Disl. Bikaner. Rajaslhan. VS Lignite Power Private Limited Works Registered Office Village Gurha, Tehsil Kolayal, Disl. Bikaner. Rajaslhan. fl-2-2931b2in4311a, Road No. 22, Jubilee Hills. Hyderabad - 500033 Tel: +91-40-23559922-25

More information

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-110 003. Dated the 28th June, 2013 To, M/ s Arbind Kumar Singh

More information

Compliance Status of Environmental Clearance of West Bokaro Opencast Coal Mine

Compliance Status of Environmental Clearance of West Bokaro Opencast Coal Mine Compliance Status of Environmental Clearance of West Bokaro Opencast Coal Mine Tata Steel Ltd. 1 A. Specific Conditions (i) No mining operations shall be undertaken in the forestland until clearance has

More information

Name of the Project:- J&K Mineral Development Corporation Limited.

Name of the Project:- J&K Mineral Development Corporation Limited. Name of the Project:- J&K Mineral Development Corporation Limited. Sub:- Six Monthly report of the status of the compliance of the stipulated environment condition of Environment clearance granted vide

More information

The mine is opened on The reasons for delay for starting mining operations are:

The mine is opened on The reasons for delay for starting mining operations are: 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly known as Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE BUDAWADA LIMESTONE MINE - 1.10 MILLION TPA CAPACITY EC Lr. No : J-11015/150/2008-IA.II

More information

Six Monthly EC Compliance Report

Six Monthly EC Compliance Report Six Monthly EC Compliance Report Period: October, 2016 to March, 2017 JORURI IRON & MN MINES (54.754 HA) M/s. KALINGA MINING CORPORATION At Joruri, PO Jajnag, Dist. Keonjhar, Odisha 758 052 A. SPECIFIC

More information

State Level Environment Impact Assessment Authority

State Level Environment Impact Assessment Authority State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Research and Development Wing Madhya Pradesh Pollution Control Board Paryavaran

More information

LIMESTONE MINE (BLOCK-V)

LIMESTONE MINE (BLOCK-V) LIMESTONE MINE (BLOCK-V) 128.52 ha Mining lease and 19.33 ha outside dump, Production of 2.0 MTPA of M/S. ADHUNIK CEMENT LIMITED (Subsidiary of DALMIA CEMENT (BHARAT) LIMITED) Umsoo Mootang, Vill- Thangskai,P.O.

More information

From : April 2015 To : October 2015 Status of conditions stipulated in Environmental and CRZ clearance. Adani Vizag Coal Terminal Private Limited

From : April 2015 To : October 2015 Status of conditions stipulated in Environmental and CRZ clearance. Adani Vizag Coal Terminal Private Limited Page 1 of 27 Half yearly Compliance report for Environment and CRZ Clearance for development of East quay -1 (EQ-l) by replacing the existing EQ-l berth and part of EQ-2 berth. Sr. No. Conditions Compliance

More information

S.N SPECIFIC CONDITION COMPLIANCE STATUS

S.N SPECIFIC CONDITION COMPLIANCE STATUS S.N SPECIFIC CONDITION COMPLIANCE STATUS i. Environmental clearance is subject to obtaining clearance under the Wildlife (Protection) Act, 1972 from the competent authority, as may be applicable to this

More information

Mangalam Cement Ltd.(Unit I)

Mangalam Cement Ltd.(Unit I) Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd

More information

SreeJayajothi Cements Limited (100% Subsidiary of M/s. My Home Industries Private Limited), Srinagar, Yanakandla , Kurnool Dist, Andhra

SreeJayajothi Cements Limited (100% Subsidiary of M/s. My Home Industries Private Limited), Srinagar, Yanakandla , Kurnool Dist, Andhra 1 Environmental Clearance Point Wise Half Yearly Compliance Report (April- 2015 to September- 2015) Lime Stone Mines: Ref: No. J-11015/338/2009-IA-II(M)) Dated: 13 th July 2011 S.NO CONDITION COMPLIANCE

More information

Noted please. Noted please. Noted please.

Noted please. Noted please. Noted please. Compliance Report on Environment Clearance for Gare-Pelma IV/4 coal mining project given by Ministry of Environment Forests & Climate Change vide letter No. J 11011/183/2010- IA.II (M) Dated: - 16th April

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information

STATUS OF CONDITIONS OF ENVIRONMENTAL CLEARANCE FOR KIRIBURU -MEGHAHATUBURU IRON ORE MINES, STEEL AUTHORITY OF INDIA LIMITED

STATUS OF CONDITIONS OF ENVIRONMENTAL CLEARANCE FOR KIRIBURU -MEGHAHATUBURU IRON ORE MINES, STEEL AUTHORITY OF INDIA LIMITED STATUS OF CONDITIONS OF ENVIRONMENTAL CLEARANCE FOR KIRIBURU -MEGHAHATUBURU IRON ORE MINES, STEEL AUTHORITY OF INDIA LIMITED Ref. : Env. Clearance No. J-11015/5/2006-IA.II (M) dated 27.12.2006 A. Specific

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,

More information

Environmental Clearance Maliparbat Bauxite Mines-Compliance Report Page 2

Environmental Clearance Maliparbat Bauxite Mines-Compliance Report Page 2 A. Specific Conditions: (i) All the conditions stipulated by the State Pollution Control Board in their consent to establish should be effectively implemented. Submission: Implementation is ongoing. (ii)

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct, 2016 to March 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11015/384/2013- IA II (M) dated 11 th Feb,

More information

[FORM-V] PART-A PART-B

[FORM-V] PART-A PART-B [FORM-V] (See Rule 14) Environment Statement for the financial year ending the 31 st March 2015 PART-A (1) Name and address of the owner - M/s. Serajuddin and Co. / Occupier of the industry, Balda Block

More information

BHILAI JAYPEE CEMENT LIMITED

BHILAI JAYPEE CEMENT LIMITED BHILAI JAYPEE CEMENT LIMITED BABUPUR (SATNA) MP-485112 Environmental Compliance Half yearly report for the period October-2013 to March -2014 Compliance report for the period Oct-2013 to March-2014 to

More information

STEEL AUTHORITY OF INDIA LTD.

STEEL AUTHORITY OF INDIA LTD. STEEL AUTHORITY OF INDIA LTD. RAW MATERIALS DIVISION (A Govt. of India Enterprise) Kiriburu Iron ore Mines Regd. Office: Ispat Bhawan, Lodi Road, P.O. : Kiriburu - 833 222 New Delhi- 110 003 Dist. : Singhbhum

More information

M/s J. Lakshmana Rao, Village: Bhamidika, Mandal: Nathavaram District: Visakhapatnam Andhra Pradesh Telephone No.

M/s J. Lakshmana Rao, Village: Bhamidika, Mandal: Nathavaram District: Visakhapatnam Andhra Pradesh Telephone No. To BY SPEED POST No. J-11015/379/2010-IA.II (M) Government of India Ministry of Environment, Forests & Climate Change Impact Assessment Division 3rd Floor, Vayu Wing, Indira Paryavaran Bhawan, Jorbagh

More information

MAHAGIRI MINES (CHROMITE) M/S INDIAN METALS & FERRO ALLOYS LTD.

MAHAGIRI MINES (CHROMITE) M/S INDIAN METALS & FERRO ALLOYS LTD. MAHAGIRI MINES (CHROMITE) M/S INDIAN METALS & FERRO ALLOYS LTD. Conditions of MoEF, Govt. of India, New Delhi vide MoEF letter No. J-11015/345/2007-IA.II(M) dated 10 th Dec. 2008 issued with Environmental

More information

Environment Management Plan

Environment Management Plan Environment Management Plan Environmental Impact Assessment Statement describing the impact of mining and beneficiation on environment on the following: i) Land area indicating the area likely to be degraded

More information

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II (M), DTD

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II (M), DTD COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II (M), DTD.19.02.09. PROJECT NAME: UTKAL ALUMINA INTERNATIOAL LIMITED.

More information

[LOGO] Ministry of Environment & Forests (MOEF) BY SPEED POST. No.J-11015/44/2009-IA.II (M) Paryavaran Bhawan, C.G.O.Complex, New Delhi

[LOGO] Ministry of Environment & Forests (MOEF) BY SPEED POST. No.J-11015/44/2009-IA.II (M) Paryavaran Bhawan, C.G.O.Complex, New Delhi [LOGO] No.J-11015/44/2009-IA.II (M) To General Manager (E&F), M/s South Eastern Coalfields Ltd., Bilaspur, Chhattisgarh. Ministry of Environment & Forests (MOEF) BY SPEED POST Paryavaran Bhawan, C.G.O.Complex,

More information

State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests)

State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests) State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests) To, Shri Pradeep Jain C/o Jain Medical store, Main Market,Tendukheda, District Narsingpur M.P.

More information

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE 01. Name of the Project: JILLING LANGALOTA IRON & MANGANESE MINES of M/s. ESSEL MINING & INDUSTRIES LIMITED, Barbil, Keonjhar,

More information

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE 01. Name of the Project: Enhancement of Production of Iron Ore from 4.2 million TPA to 6.28 million TPA and installation

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

Mangalam Cement Ltd.

Mangalam Cement Ltd. Mangalam Cement Ltd. Name of the Project :- New Cement Plant Unit - III and 17.5 mw CPP-II Project Code :- Raj- 80-600 - 2008 Clearance Letter No. :-F NO. J - 11011 / 30/2006 - IA II (I), dtd 17/07/2007

More information

COMPLIANCE REPORT PERIOD: APRIL 2015-SEPTEMBER 2015

COMPLIANCE REPORT PERIOD: APRIL 2015-SEPTEMBER 2015 COMPLIANCE REPORT PERIOD: APRIL 2015-SEPTEMBER 2015 ENVIRONMENTAL CLEARANCE TO JODA EAST IRON MINE OF TATA STEEL LIMITED VIDE MoEF s LETTER NO. J-11015/215/2008-IA.II(M), DATED: 11.03.2013 FOR PRODUCTION

More information

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Reference: Environment clearance to CFG3 Project vides MOEF letter.no. J-11011/664/2008-IAII

More information

Six monthly EC Compliance report of Nuagaon Iron Ore Beneficiation Plant project of M/s. KJS Ahluwalia for the period October, 2013 to March, 2014.

Six monthly EC Compliance report of Nuagaon Iron Ore Beneficiation Plant project of M/s. KJS Ahluwalia for the period October, 2013 to March, 2014. Six monthly EC Compliance report of Nuagaon Iron Ore Beneficiation Plant project of M/s. KJS Ahluwalia for the period October, 2013 to March, 2014. Status of Environmental Clearance Conditions Nuagaon

More information

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I)

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I) COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER-2016 F. No. J-11011/309/2011-IA-ll (I) SUBMITTED BY- M/S. GASGEN FERRO ALLOYS LLP LOHIA HOUSE, 2ND FLOOR M.G.ROAD,

More information

HINDUSTAN ZINC LIMITED RAMPURA AGUCHA MINE

HINDUSTAN ZINC LIMITED RAMPURA AGUCHA MINE HINDUSTAN ZINC LIMITED RAMPURA AGUCHA MINE MoEF Environmental Clearance for Expansion of Rampura Agucha Lead and Zinc Opencast and Underground Mining Project (from 5.00 to 6.15 mtpa) and Beneficiation

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

EMP CLEARANCE [J-11015/227/2007-IA.II(M)]

EMP CLEARANCE [J-11015/227/2007-IA.II(M)] SIX MONTHLY REPORT OF EMP CLEARANCE [J-11015/227/2007-IA.II(M)] for the period October 14 March 15 (1 st June 2015) ROHINI OPENCAST EXPANSION PROJECT N K AREA CENTRAL COALFIELDS LIMITED (A Miniratna Company)

More information

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE 01. Name of the Project:JILLING LANGALOTA IRON & MANGANESE MINES of M/s. ESSEL MINING & INDUSTRIES LIMITED, Barbil, Keonjhar,

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

Janki Corp. Ltd., Six Monthly Compliance Report

Janki Corp. Ltd., Six Monthly Compliance Report Janki Corp. Ltd., Six Monthly Compliance Report Period: October 2014 to March 2015 Project: Expansion of Sponge Iron Plant (1,80,000 to 4,00,000TPA) and Installation of Iron ore Beneficiation Plant (0.6

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

ANNEXURE LIST OF COVERING LETTER

ANNEXURE LIST OF COVERING LETTER ANNEXURE LIST OF COVERING LETTER S. No. Annexure Name Annexure No. 1. Environmental Clearance issued by MoEF & CC, New Delhi dated 2nd January, 2014. 2. Letter no. P.16 (3) Khan/Group-2/2000 dated 21.04.2014.

More information

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement

More information

Cement Manufacturing Company Ltd. Page 1

Cement Manufacturing Company Ltd. Page 1 Six Monthly Compliance status of Environment Clearance for Cement Plant (2400 TPD) at Village Lumshnong, Meghalaya July to December 2013 Ref.: Environmental Clearance no. SEIAA/Project-6/2008/23 dtd. 16.03.10.

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011 Ref.No:POL/U-II/EC/12-13/176 Date : 23.11.2012 To, Dr. A. Mehrotra, Director (S) Ministry of Environment & Forests, Regional Office, Western Region, Kendriya Paryavaran Bhavan Link Road No.3, E-5, Ravi

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

Page# The Top soil generation is very less and it is being simultaneously utilized.

Page# The Top soil generation is very less and it is being simultaneously utilized. Page# 1 Name of Project : Belkapahar Mine of Wolkem Industries Ltd. Project Code: 226/336/-2005 Clearance Letter No. : J-11015/23/2004-IA.II (M) dated 31.03.2005 Period of Compliance Report : October,

More information

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017 A. SPECIFIC CONDITIONS Sl. No. i ii Condition Continuous stack monitoring facilities for all stacks and adequate air pollution control systems e.g. electrostatic precipitators (ESP) to clinker cooler and

More information

Calcom Cement India Limited

Calcom Cement India Limited Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam 782446 Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I)

More information

(A) Specific Conditions

(A) Specific Conditions J.K. Cement WORKS, Mangrol (RAJ) Dated 01.06.2017 Six Monthly Compliance report of Environment Clearance for Mangrol Cement Plant Line-3 (For the Period from October 2016 to March 2017) Reference Letter

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

No. J-11015/337/2009-IA.1I (M) Government of India Ministry of Environment & Forests

No. J-11015/337/2009-IA.1I (M) Government of India Ministry of Environment & Forests BY SPEED POST No. J-11015/337/2009-IA.1I (M) Government of India Ministry of Environment & Forests Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-11 0 003. To, M/s Madras Cement Limited Auras

More information

ASHAPUR MNECHEM LIMT CIN No. LI 41 08MH1982PLCO26396

ASHAPUR MNECHEM LIMT CIN No. LI 41 08MH1982PLCO26396 ASHAPUR MNECHEM LIMT CIN No. LI 41 08MH1982PLCO26396.O(ht!firIal Fru1cipa ( ttief (or -. -. 2015 )i:c -./. - CAVE -W H Sub: Suhrni.sin f Six monthly compfia nce repor1s for the period April 2u15 Sptemher

More information

Telefax: 011: Dated:10 th May, 2013

Telefax: 011: Dated:10 th May, 2013 F. No. J-11011/41/2011-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax: 011:

More information

TATA STEEL LIMITED JHARIA DIVISION

TATA STEEL LIMITED JHARIA DIVISION Page 1 HALF YEARLY COMPLIANCE REPORT OF DIGWADIH COLLIERY TATA STEEL LIMITED, P.O.- JEALGORA, DIST. - DHANBAD, STATE- JHARKHAND, PIN CODE 828110. ENVIRONMENTAL CLEARANCE GRANTED VIDE LETTER NO. - J-11015/372/2010-IA.II(M)

More information

NMDC Limited Arid Limestone Project, Arid, District: Solan ill.p.)

NMDC Limited Arid Limestone Project, Arid, District: Solan ill.p.) NMDC Limited Arid Limestone Project, Arid, District: Solan ill.p.) Sub: Six Monthly EC Progress Report for the period from Apr 2016 to Sept 2016. Ref:Environmental Clearance no: No.J-11015/82/2009-IA.II(M),

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &

More information

ASHAPURN. Ado -- - ( re. (Ti' H I

ASHAPURN. Ado -- - ( re. (Ti' H I ASHAPURN Ado -- - ( re JLL TI - - 2 II Uttice \-I - -.rit (Ti' H I Sub: Suhmissioi f Six. III :nthh ci;iii ree reports for the period April 2015 Scptemher 2015 w.r.traie Bauxite Aline of \1 s. Ashapur

More information

ENVIRONMENTAL MONITORING REPORT

ENVIRONMENTAL MONITORING REPORT ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM APRIL 2018 SEPTEMBER 2018 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT

More information

Sl. No PRESENT STATUS SPECIFIC CONDITIONS

Sl. No PRESENT STATUS SPECIFIC CONDITIONS Compliance Status of Environmental Clearance Conditions Balda Block Iron Ore Mining Project of M/s Serajuddin and Co. located in village(s) Balda, Bada Kalimati and Nayagarh, Sub-division Champua, District

More information

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-XIII (GRANTED VIDE LETTER NO.J-11015/10/2010-IA.II(M) DATED

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-XIII (GRANTED VIDE LETTER NO.J-11015/10/2010-IA.II(M) DATED ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-XIII (GRANTED VIDE LETTER NO.J-11015/10/2010-IA.II(M) DATED 06.06.2013 (Oct.,2013 to March,2014) Sl. No. A. Specific Conditions by MOEF: Compliance i. ii No

More information

No. J-11015/308/2010-IA.II (M) Government of India Ministry of Environment & Forests

No. J-11015/308/2010-IA.II (M) Government of India Ministry of Environment & Forests No. J-11015/308/2010-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi-110003 Dated: 16 th July, 2013 To, The General Manager M/s Madhya

More information

6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA

6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA 6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA As on 01.04.2014 General Condition: Sl No. CONDITIONS COMPLIANCE I. The project authorities must strictly adhere to the stipulations made by the

More information