1 DISCRETE RADIOACTIVE PARTICLE ISSUES ASSOCIATED WITH A FUEL POOL CLEANOUT RICHARD L. DOTY and RICHARD C. KESSLER PPL SUSQUEHANNA, LLC 1 1 Two North Ninth Street (GENA93), Allentown, PA 18101, U.S.A. and Susquehanna Steam Electric Station, 707 Salem Boulevard, Berwick, PA 18603, U.S.A.; (610) and (570) , fax (610) , rldoty@pplweb.com or rckessler@pplweb.com. Abstract As Susquehanna Steam Electric Station personnel were nearing the end of a project to remove control rod blades and other irradiated materials from the fuel pools at the station, the unit that was used to process the irradiated hardware (the advanced crusher and shearer or ACS) was removed from the cask storage pit. As the ACS was moved over the refueling floor to a location for further decontamination prior to shipment offsite, local area radiation monitors began to alarm. These alarms were due to one or more highly radioactive particles (up to 2.8 gigabecquerel) that were generated during the fuel pool cleanout (FPC) project and were inadvertently relocated from the pool to the surface of the refueling floor. Although these particles did not contact protective clothing or skin, these particles had the potential to deliver substantial doses to personnel in a very short period of time. Over a period of several months, more discrete radioactive particles were found as a result of processing the irradiated hardware and performing other work evolutions during the FPC project. The highest estimated personnel doses were 0.12 and 0.17 Sv shallow dose equivalent, respectively. The presentation will emphasize the lessons learned by Susquehanna personnel regarding planning for the FPC project, management oversight of the project, underlying cultural and mindset deficiencies that contributed to lack of preparedness for risks associated with highly active particles, and the steps for ensuring adequate contamination control. Introduction In developing the content for the 3 rd EC/ISOE Workshop on Occupational Exposure Management at NPPs, the Program Committee proposed four topical sessions, including one on management of contamination control. The Committee suggested consideration of several aspects of contamination control-measurement, management, perception, and culture. A series of contamination control events occurred in the last few months of the year 2000 at the Susquehanna Steam Electric Station, a two-unit boiling-water-reactor plant in the eastern United States of America. Those events challenged the personnel at the station and, as soon became clear, challenged some basic perceptions about the importance of contamination control as an element of exposure management. The intent of this paper is to briefly describe the situation and its industry-wide implications. By discussing those implications, a secondary result may be to leave the audience with a questioning attitude about the situation at their home plants. That is not to suggest weaknesses in any plant s radiation safety program, but only to state that all radiation safety professionals can learn from the operating experiences at other stations. Portoroz Workshop Session 4 Doty 1/6

2 Events of Fall 2000 The Susquehanna station was conducting a clean-out campaign from the fuel pools in the latter half of The plan was to remove control rod blades, low power range monitors, and miscellaneous irradiated hardware from the pools, by processing and packaging the hardware for shipping and then transporting the materials to a licensed waste disposal facility. The project was to be of about five months in duration. About two months into the project, a key piece of equipment began to show degraded performance. The advanced crusher and shearer (ACS) was repaired and returned to service. Shortly thereafter, the forearm of a contract worker was exposed to a discrete radioactive particle, and a shallow dose equivalent of about 0.12 Sv was assigned. Refinement of radiation safety practices occurred over the next month as project activities continued. When work with the ACS was completed, the ACS was removed from the cask storage pit and moved over the refueling floor to a laydown area for further decontamination prior to shipment off-site. During the movement of the ACS, a local plant-installed area radiation monitor began to alarm. On investigation, a 2.8 gigabecquerel (Gbq) hot particle, reading about 8 Sv/h on contact and consisting of cobalt-60, was discovered on the refueling floor. The likely source was displacement from the ACS as it was moved. Recovery of the particle occurred over the next several days, with shielding and access control restrictions in place. A search for additional particles was conducted; three more contaminated areas were found. Additional radiation safety precautions were instituted, with some personnel surveyed for particles every 15 minutes. Over the next two months, additional particles were identified. The two particles of highest activity were about 0.8 Gbq and 0.7 Gbq, respectively. No significant dose to personnel resulted from these particles. An additional personnel exposure occurred in early December An absorbed skin dose rate of 0.47 Gy/h resulted in an assigned shallow dose equivalent (SDE) of 0.17 Sv from a particle on an individual s protective shoe cover. Work on the project was suspended at this time. No doses in excess of any annual regulatory dose limits occurred during the project. Near-Term Response to Events The station initiated several investigations during the course of the project. One root cause evaluation focused specifically on the event involving the discrete radioactive particle measuring 8 Sv/h. Another, later evaluation focused on the entire series of hot-particle events. Two evaluations focused on different aspects of project and refueling-floor management and independent oversight of the project. One evaluation even had as its emphasis a critique of the evaluation and investigation processes. Results will be described later in the paper. After the events described above, the station s Radiation Protection Manager (RPM) left the company. The remaining investigative matters and the implementation of corrective actions were the responsibility of the incoming RPM. The regulator (U.S. Nuclear Regulatory Commission or NRC) issued a Notice of Violation to the station for failure to conduct adequate evaluations and surveys. The emphasis of the NRC was on the potential for doses exceeding the annual limit on Total Effective Dose Equivalent (TEDE), while it recognized that no workers accrued doses exceeding either the TEDE or SDE limits. That is, the NRC wished to bring attention to the potential for significant deep-dose equivalents given the high activities (and resultant high radiation fields) around some of the particles that were identified. The detailed consideration of the whole-body dose implications of discrete radioactive particle exposures was an extension from the more common evaluations primarily for shallow (or skin) doses from exposures to hot particles. Listed in the references are some of the major documents relating to discrete radioactive particle exposures that were available by mid-2000 (1, 2, 9, 11). Neither the deep nor the shallow dose equivalent components of exposure may be overlooked for high-activity particles. In the case of a 2.8 Gbq Portoroz Workshop Session 4 Doty 2/6

3 particle of cobalt-60, a one-hour exposure can lead to doses of on the order of 2,900 Gy (skin, SDE) and 2.3 Gy (skin, DDE). Note should be made that means of calculating meaningful dose from exposure to discrete radioactive particles are under review. References 10 and 12 provide relevant information, and proposals for enhanced use of effective-dose-equivalent methodologies applicable to particle exposures are in review. Lessons Learned per Regulator and Industry Organizations The NRC, the Institute of Nuclear Power Operations (INPO), and the World Association of Nuclear Operators (WANO), have all released documents based on the events at Susquehanna. The NRC Information Notice (reference 13) brings forth the issue described above related to the potential for substantial dose to personnel, both for SDE and TEDE. The NRC describes also the need to consider adequacy of incorporation of previous plant and industry-wide experience into project planning, to ensure prevention of recurrence at Susquehanna or other stations. INPO, in its Significant Event Report (reference 7), noted also the potential for significant unplanned exposures in short time periods. In addition, the INPO analysis listed the following contributors to the events: inadequate guidance for establishing a Hot Particle Control Zone (HPCZ) inadequate pre-job briefings inadequate contamination control methods (e.g., inadequate hydrolazing and rinsing of the ACS prior to moving it); incomplete consideration of previous plant experience with discrete radioactive particles, and inadequate senior management presence and communication of high standards. The staff at INPO are in the process of preparing a revision to its Guidelines for Radiological Protection at Nuclear Power Stations (reference 3). Increased discussion on discrete radioactive particles is to be included. A citation to the Susquehanna event (via reference 5) is included in the draft wording. WANO, in its Significant Event Report (reference 14), stated also the potential for individuals to receive substantial unplanned exposures quickly. WANO then encouraged its member plants to consider the following: risk assessments that fully consider prior operating experience contingency work plans for evolutions that may involve higher levels of risk, and adequacy of communications at pre-job briefings and during shift handovers. Questions posed for appropriate discussion by radiation protection personnel and supervision are similar in the INPO and WANO documents. Those questions emphasize pre-planning of contamination controls and contingency planning for identification of highly radioactive particles. Susquehanna Perspective The NRC, INPO and WANO documents described above are professionally done and should be useful to radiation protection staffs in their work planning. To supplement those evaluations, the items described below may also be useful to staff at other stations. Portoroz Workshop Session 4 Doty 3/6

4 Root causes (RC) for the events at the Susquehanna station included the following five items: 1. Highly radioactive particles were generated during the fuel pool clean-out project and were removed from the pool and cask storage pit; 2. Personnel possessed an inaccurate risk perception of the dose consequence due to a discrete radioactive particle exposure. This was believed due to (a) the documented history of hot-particle exposure being a skin dose concern, and (b) research results identifying a lower risk from exposure to discrete radioactive particles [Workshop issue-perception]; 3. Assessment processes that focused on actual personnel doses from particles that came in contact with either clothing or skin versus the potential doses that may have resulted from particles not found on personnel [Workshop issue - culture]; 4. Inadequate pre-job plans with respect to control of particle exposures survey techniques, instrumentation, and decontamination techniques were not sufficient [Workshop issues management, measurement]; and 5. Previously identified cultural and performance issues that were not timely and effectively addressed lack of a strong questioning attitude, inadequate communications, and incomplete use of operating experience had not yet been fully resolved [Workshop issue culture]. Along with those causes were listed seven causal factors, which included items such as the inadequate procedural guidance and ineffective involvement of management that are stated in the analyses by the industry-wide organizations. Putting the above issues into a different perspective, what is it that Susquehanna staff learned? First, there was a lack of sensitivity to the consequences of exposure to highly radioactive material (RC2) [Workshop issue perception]. Associated with that was an attitude that significant radiological events couldn t happen at Susquehanna, a station with 18 years of operations. Also, the staff had to put more emphasis on the potential for exposure while at the same time addressing actual doses being accrued. The staff learned that additional attention needed to be paid to contamination control planning (RC4), not only on the refueling floor but also in potentially impacted systems [Workshop issue culture]. About a dozen systems received re-assessments of the potential for generation or release of highly active material. For the refueling floor, underwater vacuuming and filtration, hydrolazing, rinsing, and component covering were all reworked. The need for structured, comprehensive pre-job briefings before work commences in a HPCZ is now fully recognized, as is the need for specific Radiation Work Permits (RWPs) for HPCZ work [Workshop issue management]. In development of those RWPs, the use of respiratory protection to prevent the intake of particles needs to be carefully considered. Radiation protection procedures have been revised to enhance radiological controls. Areas revised include survey techniques, labeling and posting, limiting dose rate and protective clothing requirements, and source term control. To supplement the enhanced survey techniques, instruments were modified for use in performance of surveys in HPCZs or when hot-particle presence is suspected. Radiation protection technicians received additional training on conducting particle surveys and on containment of identified particles [Workshop issue measurement]. The self-assessment program is being revised to place additional emphasis on performance-based assessment of high-risk evolutions. Performance indicators have been developed. At the same time, procedures have been revised to more clearly identify high-risk evolutions and the enhanced precautions that must be taken for such jobs. Further, the need for additional management presence during the planning for and conduct of high-risk activities is considered on a case-by-case basis. Specific to contamination Portoroz Workshop Session 4 Doty 4/6

5 control, ongoing, critical self-assessment of practices is utilized and is being found to be effective in identifying and correcting contamination control deficiencies [Workshop issue management]. Finally, there are two simply stated axioms: (1) be proactive to potential conditions rather than reactive to emergent conditions, and (2) when the mindset exists that it can t happen here, it will. Additional Commentary INPO, in reference 4, addresses precursors for unplanned exposures. Three of the root causes described above are aligned with the precursors described by INPO. That is, the adequacy of surveys and assessment (RC3), the adequacy of work planning and RWPs (RC4), and the effectiveness of supervisory direction and oversight (RC5) are correlated with listed precursors. For information, two other precursors noted by INPO were not directly applicable to this event; that is, neither incorrect guidance by radiological protection technicians nor non-compliance with radiological protection rules were contributors to the events at Susquehanna. The re-visiting of documents such as INPO s SER 4-08 may be advisable for all plants as high-risk activities are planned. The Susquehanna experience was certainly a focus of attention for numerous agencies for some time. Discrete radioactive particle events are not unique to Susquehanna, however. Examples of recent operating experience at other plants are described in references 6, 8 and 15. The point of mentioning those experiences is simple particle events can happen at any plant. It is only with defense in depth through strong management, comprehensive planning, accurate perceptions of risk, a culture of awareness and risk control, and good measurement processes that prevention of recurrences will be successful. References 1. Electric Power Research Institute, EPRI TR , Industry Experience with Discrete Radioactive Particles, July Institute of Nuclear Power Operations, INPO , Good Practice RP-605, Hot Particle Controls Program, July Institute of Nuclear Power Operations, INPO Revision 1, Guidelines for Radiological Protection at Nuclear Power Stations, October Institute of Nuclear Power Operations, SER 4-98, Unplanned Personnel Radiation Dose, 23 November Institute of Nuclear Power Operations, Operating Experience Report No. OE11779, Highly Radioactive Particles Associated with Spent Fuel Pool Work, 27 December Institute of Nuclear Power Operations, Operating Experience Report No. OE12059, Hot Particle Incident, 28 March Institute of Nuclear Power Operations, SER 3-01, Highly Radioactive Particles Associated with Fuel Pool Work, 30 March Institute of Nuclear Power Operations, Operating Experience Report No. OE13293, Inadequate Documentation of Hot Particle Event, 15 February National Council on Radiation Protection and Measurements, NCRP Report No. 130, Biological Effects and Exposure Limits for Hot Particles, 10 December National Council on Radiation Protection and Measurements, NCRP Statement No. 9, Extension of the Skin Dose Limit for Hot Particles to Other External Sources of Skin Irradiation, 30 March U.S. Nuclear Regulatory Commission, Information Notice 90-48, Enforcement Policy for Hot Particle Exposures, 2 August Portoroz Workshop Session 4 Doty 5/6

6 12. U. S. Nuclear Regulatory Commission, Proposed Rules, 10CFR20, Revision of the Skin Dose Limit, Federal Register 66, No. 134, , 12 July U.S. Nuclear Regulatory Commission, Information Notice , Highly Radioactive Particle Control Problems During Spent Fuel Pool Cleanout, 10 January World Association of Nuclear Operators, WANO SER , Highly Radioactive Particles Associated with Fuel Pool Work, August World Association of Nuclear Operators, WOE00430, PHWR Event High Extremity Dose Received from Hot Particle (9.6 rem), 21 December Portoroz Workshop Session 4 Doty 6/6

Collective Radiation Exposure Performance and Industry Performance Trends

Collective Radiation Exposure Performance and Industry Performance Trends Institute of Nuclear Power Operations Collective Radiation Exposure Performance and Industry Performance Trends 2012 ISOE ALARA Symposium Bill Bullard, Sr. Evaluator. Radiation Protection 2012 Institute

More information

Radiological Services Radiation Protection Technician Development Program

Radiological Services Radiation Protection Technician Development Program Radiological Services Radiation Protection Technician Development Program Revision: 1 Effective Date: 7-25-2018 Table of Contents 1.0 Introduction... 1 1.1 Purpose... 1 1.2 Scope and Applicability... 1

More information

Radiological Services Radiation Protection Technician Development Program

Radiological Services Radiation Protection Technician Development Program Radiological Services Radiation Protection Technician Development Program Revision: Final Effective Date: 10-7-2017 Table of Contents 1.0 Introduction... 1 1.1 Purpose... 1 1.2 Scope and Applicability...

More information

RP Fundamentals NISP-RP-11

RP Fundamentals NISP-RP-11 NUCLEAR INDUSTRY STANDARD PROCESS Radiological Protection RP Fundamentals NISP-RP-11 Effective Date: 08-22-2017 This is an industry document for standardizing radiation protection processes used by supplemental

More information

METHODOLOGY FOR ENSURING THE INTEGRATION OF ALARA INTO THE DESIGN OF

METHODOLOGY FOR ENSURING THE INTEGRATION OF ALARA INTO THE DESIGN OF METHODOLOGY FOR ENSURING THE INTEGRATION OF ALARA INTO THE DESIGN OF THE AP1000 TM REACTOR Erik Slobe slobeed@westinghouse.com Westinghouse Electric Company LLC 1000 Westinghouse Drive Cranberry Township,

More information

STATE NUCLEAR POWER SAFETY INSPECTORATE Of THE REPUBLIC OF LITHUANIA (VATESI) REGULATIONS

STATE NUCLEAR POWER SAFETY INSPECTORATE Of THE REPUBLIC OF LITHUANIA (VATESI) REGULATIONS 1 Translation from Russian STATE NUCLEAR POWER SAFETY INSPECTORATE Of THE REPUBLIC OF LITHUANIA (VATESI) REGULATIONS GENERAL REQUIREMENTS FOR THE EVENT REPORTING SYSTEM AT A NUCLEAR POWER PLANT VD-E-04-98

More information

Vasile Simionov, Liliana Samson, Health Physics Department, CNE Cernavoda, ROMANIA. ISOE 2016 Brussels, June, 2016

Vasile Simionov, Liliana Samson, Health Physics Department, CNE Cernavoda, ROMANIA. ISOE 2016 Brussels, June, 2016 Vasile Simionov, Liliana Samson, Health Physics Department, CNE Cernavoda, ROMANIA ISOE 2016 Brussels, 01 03 June, 2016 CONTENTS Introduction ALARA Performance Indicators New ALARA Performance Indicators

More information

NUCLEAR INDUSTRY STANDARD PROCESS Radiological Protection

NUCLEAR INDUSTRY STANDARD PROCESS Radiological Protection NUCLEAR INDUSTRY STANDARD PROCESS Radiological Protection Level 3 Information Use NISP-RP-011 Industry Approval Date: September 10, 2018 This is an industry document for standardizing radiation protection

More information

Radiological Job Coverage NISP-RP-10

Radiological Job Coverage NISP-RP-10 NUCLEAR INDUSTRY STANDARD PROCESS Radiological Protection NISP-RP-10 This is an industry document for standardizing radiation protection processes used by supplemental radiation protection technicians.

More information

NUCLEAR INDUSTRY STANDARD PROCESS

NUCLEAR INDUSTRY STANDARD PROCESS NUCLEAR INDUSTRY STANDARD PROCESS Radiological Protection Level 3 Information Use NISP-RP-010 Industry Approval Date: November 9, 2018 This is an industry document for standardizing radiation protection

More information

Cook Critical RP Survey Program

Cook Critical RP Survey Program Cook Critical RP Survey Program A New, Systematic Approach To Radiation Protection Program Information Capture Bob Hite - RP, Chemistry, Environmental Director American Electric Power - Cook Nuclear Plant

More information

ACCESS CONTROL AND WORK AREA SETUP RCT STUDY GUIDE State responsibilities in using or initiating a RWP.

ACCESS CONTROL AND WORK AREA SETUP RCT STUDY GUIDE State responsibilities in using or initiating a RWP. LEARNING OBJECTIVES: 2.10.01 State the purpose of and information found on a Radiological Work Permit (RWP) including the different classifications at your site. 2.10.02 State responsibilities in using

More information

Personnel Contamination Monitoring NISP-RP-06

Personnel Contamination Monitoring NISP-RP-06 NUCLEAR INDUSTRY STANDARD PROCESS Radiological Protection NISP-RP-06 Effective Date: 5-10-2017 This is an industry document for standardizing radiation protection processes used by supplemental radiation

More information

DOE-HDBK Identify the ALARA philosophy for collective personnel exposure and individual exposure.

DOE-HDBK Identify the ALARA philosophy for collective personnel exposure and individual exposure. Course Title: Radiological Control Technician Module Title: ALARA Module Number: 1.10 Objectives: 1.10.01 Describe the assumptions on which the current ALARA philosophy is based. 1.10.02 Identify the ALARA

More information

Driving Performance Improvements with the use of Key Performance Indicators

Driving Performance Improvements with the use of Key Performance Indicators Driving Performance Improvements with the use of Key Performance Indicators Patricia A. Jones Senior Staff Health Physicist Constellation Energy Nuclear Group, LLC Calvert Cliffs Nuclear Power Plant Driving

More information

EPRI Alpha Monitoring and Control Guidelines for Operating Nuclear Power Stations, Revision 2 ( )

EPRI Alpha Monitoring and Control Guidelines for Operating Nuclear Power Stations, Revision 2 ( ) EPRI Alpha Monitoring and Control Guidelines for Operating Nuclear Power Stations, Revision 2 (3002000409) Phung Tran Principal Technical Leader ISOE European ALARA Symposium April 9-10, 2014 Outline Overview

More information

Posting Radiological Hazards RP RP Approved Rev: 11/29/17

Posting Radiological Hazards RP RP Approved Rev: 11/29/17 Posting Radiological Hazards RP 02.04 RP 03.04 Approved Rev: 11/29/17 Standardized Task Evaluation Program The Standardized Task Evaluation (STE) program promotes a work-ready workforce through the standardization

More information

Nuclear power plant licensees are required to control

Nuclear power plant licensees are required to control The Industry Ground Water Protection Initiative: A Watershed Moment By Kathleen C. Yhip, George J. Oliver, and Ralph L. Andersen Nuclear power plant licensees are required to control releases of radioactive

More information

Fort Calhoun Station

Fort Calhoun Station Fort Calhoun Station Challenges and Successes During Major Equipment Replacement Activities EPRI Meeting January 14, 2009 Randy Hodgson Fort Calhoun Station The Big Outage - NSSSRP What Made this outage

More information

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ] Entergy Nuclear Indian Point Unit 2, LLC

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ] Entergy Nuclear Indian Point Unit 2, LLC This document is scheduled to be published in the Federal Register on 07/13/2012 and available online at http://federalregister.gov/a/2012-17110, and on FDsys.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION

More information

Prairie Island Nuclear Generating Plant. EAL Reference Manual. Revision 9

Prairie Island Nuclear Generating Plant. EAL Reference Manual. Revision 9 Prairie Island Nuclear Generating Plant EAL Reference Manual Notice to Users This document has been prepared for the Prairie Island Nuclear Generating Plant (PINGP). Its purpose is to provide general information

More information

Regulatory Guide Monitoring the Effectiveness of Maintenance at Nuclear Power Plants

Regulatory Guide Monitoring the Effectiveness of Maintenance at Nuclear Power Plants Regulatory Guide 1.160 Revision 2 Page 1 of 14 Revision 2 March 1997 Regulatory Guide 1.160 Monitoring the Effectiveness of Maintenance at Nuclear Power Plants Publication Information (Draft issued as

More information

Irradiated Hardware Characterization and Packaging During Decommissioning of the Ford Nuclear Reactor at University of Michigan

Irradiated Hardware Characterization and Packaging During Decommissioning of the Ford Nuclear Reactor at University of Michigan Irradiated Hardware Characterization and Packaging During Decommissioning of the Ford Nuclear Reactor at University of Michigan A. Freitag, J. Sullivan, G.Tombari WMG, Inc. Peekskill, NY 10566 USA ABSTRACT

More information

PERFORMANCE OBJECTIVES AND CRITERIA

PERFORMANCE OBJECTIVES AND CRITERIA Performance Objectives and Criteria December 2012 PERFORMANCE OBJECTIVES AND CRITERIA Rev. 0 GENERAL DISTRIBUTION GENERAL DISTRIBUTION: Copyright 2012 by the Institute of Nuclear Power Operations. Not

More information

Nuclear Accident in Japan: NRC Early Protective Action Recommendations

Nuclear Accident in Japan: NRC Early Protective Action Recommendations Nuclear Accident in Japan: NRC Early Protective Action Recommendations National Radiological Emergency Preparedness Conference April 18, 2011 Patricia A. Milligan, CHP Senior Technical Advisor for Preparedness

More information

Low-Level Waste and Radiation Management

Low-Level Waste and Radiation Management Low-Level Waste and Radiation Management Program Description Program Overview Nuclear power plants face significant regulatory, economic, environmental, and public perception pressures with respect to

More information

port and maritime radiological

port and maritime radiological Regional coordination of coastal emergency preparedness and response arrangements for port and maritime radiological emergencies for Member States in the Mediterranean region of Africa and the Middle East

More information

LESSONS LEARNED THE DONALD C. COOK NUCLEAR PLANT STEAM GENERATOR DISPOSAL PROJECT. W. T. MacRae American Electric Power

LESSONS LEARNED THE DONALD C. COOK NUCLEAR PLANT STEAM GENERATOR DISPOSAL PROJECT. W. T. MacRae American Electric Power LESSONS LEARNED THE DONALD C. COOK NUCLEAR PLANT STEAM GENERATOR DISPOSAL PROJECT W. T. MacRae American Electric Power ABSTRACT The disposal of the Donald C. Cook Nuclear Plant s Unit 1 Steam Generators

More information

Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective

Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective B.A. Watson, J.T. Buckley, C.M. Craig U.S. Nuclear Regulatory

More information

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011 Stress tests specifications Proposal by the WENRA Task Force 21 April 2011 Introduction Considering the accident at the Fukushima nuclear power plant in Japan, the Council of the European Union declared

More information

INPO on Maintenance and Work Management

INPO on Maintenance and Work Management Photo: David burghardt/island Photography Nuclear Power Plant Maintenance Special Section UTILITY WORKING CONFERENCE INPO on maintenance and work management 64 Nuclear News October 2015 The Institute of

More information

Implementation of ANSI Radiation Safety Training for Workers

Implementation of ANSI Radiation Safety Training for Workers Implementation of ANSI 13.36 Radiation Safety Training for Workers INTRODUCTION P.A. Trinoskey and L. Wells Lawrence Livermore National Laboratory University of California Radiation Safety Training for

More information

FIG. 1. Fort St. Vrain Nuclear Generation Station.

FIG. 1. Fort St. Vrain Nuclear Generation Station. Invited Paper XA9848067 FORT ST. VRAIN DECOMMISSIONING PROJECT M. FISHER Public Service Company of Colorado, Denver, Colorado, USA Abstract Public Service Company of Colorado (PSCo), owner of the Fort

More information

DOE STANDARD RADIOLOGICAL CONTROL. U.S. Department of Energy Washington, D.C DOE-STD July 1999

DOE STANDARD RADIOLOGICAL CONTROL. U.S. Department of Energy Washington, D.C DOE-STD July 1999 TS NOT MEASUREMENT SENSITIVE DOE-STD-1098-99 July 1999 DOE STANDARD RADIOLOGICAL CONTROL U.S. Department of Energy Washington, D.C. 20585 AREA SAFT DISTRIBUTION STATEMENT A. Approved for public release;

More information

Government Decree (736/2008) on the safety of disposal of nuclear waste

Government Decree (736/2008) on the safety of disposal of nuclear waste Government Decree (736/2008) on the safety of disposal of nuclear waste Issued in Helsinki 27 November 2008 According to the Government decision made on the submission by the Ministry of Employment and

More information

INPO s Approach to Human Performance in the U.S. Commercial Nuclear Industry

INPO s Approach to Human Performance in the U.S. Commercial Nuclear Industry INPO s Approach to Human Performance in the U.S. Commercial Nuclear Industry Tony Muschara Principal Program Manager Hu Institute of Nuclear Power Operations INPO s Mission to promote the highest levels

More information

Remediation and Decommissioning Technology

Remediation and Decommissioning Technology Remediation and Decommissioning Technology Program Description Program Overview Nuclear power plant operations can lead to releases of radionuclides into the site soil and groundwater that may need to

More information

Power Reactor Decommissioning: U.S. Perspective on Regulatory Insights and Challenges

Power Reactor Decommissioning: U.S. Perspective on Regulatory Insights and Challenges Power Reactor Decommissioning: U.S. Perspective on Regulatory Insights and Challenges Scott W. Moore Deputy Director, Office of Nuclear Material Safety and Safeguards (NMSS), USNRC Japan Nuclear Regulation

More information

Cook Nuclear Plant Unit 1 - Event and Recovery

Cook Nuclear Plant Unit 1 - Event and Recovery Cook Nuclear Plant Unit 1 - Event and Recovery Presented by Gary Hatcher, CIH EEI Spring Occupational Safety and Health Committee Conference April 21-24, 2009 Contents Cook Unit 1 9/20/08 Main Turbine

More information

Low-Level Waste and Radiation Management

Low-Level Waste and Radiation Management Low-Level Waste and Radiation Management Program Description Program Overview Nuclear power plants face significant regulatory, economic, environmental, and public perception pressures with respect to

More information

Best practices for preparing vessel internals segmentation projects

Best practices for preparing vessel internals segmentation projects Best practices for preparing vessel internals segmentation projects Joseph BOUCAU a*, Per SEGERUD b, Moisés SANCHEZ c a Westinghouse Electric Company, 43 rue de l Industrie, 1400 Nivelles, Belgium b Westinghouse

More information

Boiling Water Reactor Vessel and Internals (QA)

Boiling Water Reactor Vessel and Internals (QA) Boiling Water Reactor Vessel and Internals (QA) Program Description Program Overview As boiling water reactors have aged, various forms of operation-limiting stress corrosion cracking have appeared, first

More information

Radiological Emergency Planning and Response Perception of Risk

Radiological Emergency Planning and Response Perception of Risk Radiological Emergency Planning and Response Perception of Risk Patricia A. Milligan, CHP Senior Technical Advisor Office of Nuclear Security and Incident Response The Perception Gap When fears don't match

More information

LONGENECKER and ASSOCIATES. Ronald E. Matthews

LONGENECKER and ASSOCIATES. Ronald E. Matthews DETAILED EXPERIENCE MARCH 2006 to Present LONGENECKER and ASSOCIATES ARGONNE NATIONAL LABORARY CHICAGO, IL (SERVICES CONTRACTED THROUGH SERVICE SOURCE, INC AND NAVARRO RESEARCH AND ENGINEERING, INC.) POSITION

More information

NRC INSPECTION MANUAL

NRC INSPECTION MANUAL NRC INSPECTION MANUAL IRIB INSPECTION PROCEDURE 71124 RADIATION SAFETY PUBLIC AND OCCUPATIONAL PROGRAM APPLICABILITY: IMC 2515 EFFECTIVE DATE: January 1, 2010 71124-01 INSPECTION OBJECTIVE To independently

More information

Radiation Protection during Decommissioning of Nuclear Facilities Experiences and Challenges

Radiation Protection during Decommissioning of Nuclear Facilities Experiences and Challenges Radiation Protection during Decommissioning of Nuclear Facilities Experiences and Challenges IRPA Glasgow 13 th International Congress of the International Radiation Protection Association 13 18 May 2012

More information

Activities of the NRC s Division of Spent Fuel Management: An Overview

Activities of the NRC s Division of Spent Fuel Management: An Overview Activities of the NRC s Division of Spent Fuel Management: An Overview David W. Pstrak Senior Project Manager Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards

More information

Reactor Oversight Process

Reactor Oversight Process Reactor Oversight Process Mark A. Cunningham NRRC Workshop on Risk-Informed Decision Making: A Survey of U.S. Experience Tokyo, Japan, June 1-2, 2017 Introduction The USNRC modified its reactor inspection

More information

IAEA Safety Standards and Guidelines for Preparedness and Response to Nuclear and Radiological Emergencies

IAEA Safety Standards and Guidelines for Preparedness and Response to Nuclear and Radiological Emergencies International Conference on Effective Nuclear Regulatory Systems Transforming experience into regulatory improvements 8-12 April 2013, Ottawa, Canada Safety Standards and Guidelines for Preparedness and

More information

DECOMMISSIONING LESSONS LEARNED AT YANKEE ROWE. M. S. Terrell, D. McGee, Duke Engineering and Services (USA)

DECOMMISSIONING LESSONS LEARNED AT YANKEE ROWE. M. S. Terrell, D. McGee, Duke Engineering and Services (USA) DECOMMISSIONING LESSONS LEARNED AT YANKEE ROWE M. S. Terrell, D. McGee, Duke Engineering and Services (USA) ABSTRACT The experiences and lessons learned in the decommissioning of Yankee Rowe span almost

More information

DOE STANDARD RADIOLOGICAL CONTROL

DOE STANDARD RADIOLOGICAL CONTROL NOT MEASUREMENT SENSITIVE DOE-STD-1098-2008 October 2008 ------------------------------------- Change Notice 1 May 2009 DOE STANDARD RADIOLOGICAL CONTROL U.S. Department of Energy Washington, D.C. 20585

More information

Federal Authority for Nuclear Regulation UAE

Federal Authority for Nuclear Regulation UAE Federal Authority for Nuclear Regulation UAE 2012 International ISOE ALARA Symposium Session VIII: New Developments in ALARA Programs Development of the FANR RP Program During Design Phases of New Builds

More information

Internal exposure at Cernavoda NPP. Vasile Simionov, Catalina Chitu,

Internal exposure at Cernavoda NPP. Vasile Simionov, Catalina Chitu, Internal exposure at Cernavoda NPP Vasile Simionov, vsimionov@cne.ro, Catalina Chitu, cchitu@cne.ro CNE Cernavoda NPP, No. 2, Medgidiei Str. Cernavoda 905200, Romania 1.0 INTRODUCTION Work efficiency is

More information

Revision 0. PPA AP Procedure Performance Metrics

Revision 0. PPA AP Procedure Performance Metrics Revision 0 Procedure Performance Metrics JANUARY 2016 Page 2 of 18, Revision 0, Procedure Performance Metrics Approved on 1/12/2016 Approved By Bruce Mills, PPA Chairman Notice Neither PPA nor any of its

More information

Decommissioning of Nuclear Facilities - Regulatory Requirements -

Decommissioning of Nuclear Facilities - Regulatory Requirements - Decommissioning of Nuclear Facilities - Regulatory Requirements - Ernst Warnecke; NSRW R²D²Project: Basics of Decommissioning of Research Reactors / Manila; 16-20 October 2006 1 International Atomic Energy

More information

Occupational Radiation Protection in Nuclear / Fuel Cycle Facilities Summary of the Contributed Papers

Occupational Radiation Protection in Nuclear / Fuel Cycle Facilities Summary of the Contributed Papers Occupational Radiation Protection in Nuclear / Fuel Cycle Facilities Summary of the Contributed Papers H. Burçin OKYAR OECD Nuclear Energy Agency Radiological Protection and Radioactive Waste Management

More information

San Onofre Unit 1 Decommissioning

San Onofre Unit 1 Decommissioning San Onofre Unit 1 Decommissioning Eric M. Goldin, Ph.D., CHP Southern California Edison P. O. Box 128 San Clemente, CA 92674-0128 USA Introduction Nuclear plant decommissioning presents several challenges

More information

VIA to: and

VIA  to: and January 29, 2018 Todd Shrader and Anthony Stone Carlsbad Field Office Carlsbad, NM VIA EMAIL to: WIPP.EA@WIPP.ws and todd.shrader@cbfo.doe.gov RE: Draft Environmental Assessment - EA 2064: ABOVE GROUND

More information

Recent evolution in the regulatory framework of the Belgian class II nuclear installations such as irradiators and accelerators

Recent evolution in the regulatory framework of the Belgian class II nuclear installations such as irradiators and accelerators E. Minne, C. Peters, C. Mommaert, C. Kennes, G. Degreef, G. Cortenbosch, F. Schmitz, M. Van haesendonck, H. Drymael (Bel V) P. Carlier (Federal Agency for Nuclear Control) Recent evolution in the regulatory

More information

SAFETY CULTURE FRAMEWORK FOR THE LAGUNA VERDE NPP

SAFETY CULTURE FRAMEWORK FOR THE LAGUNA VERDE NPP SAFETY CULTURE FRAMEWORK FOR THE LAGUNA VERDE NPP Mr. Antonio Hernández Maldonado Head of Operation and Certification Department of Operational Verification Nuclear Safety Division Content 1. Introduction

More information

1. The NSC Act now binds the crown (federal and provincial government departments and agencies).

1. The NSC Act now binds the crown (federal and provincial government departments and agencies). THE CONTAMINATED LANDS EVALUATION AND ASSESSMENT NETWORK PROGRAM R.E. Stenson, Canadian Nuclear Safety Commission, P.O. Box 1046, Station B, Ottawa CANADA K1P 5S9 ABSTRACT The (Contaminated Lands Evaluation

More information

HEALTH PHYSICS Emergency Procedures and Levels of Action

HEALTH PHYSICS Emergency Procedures and Levels of Action HEALTH PHYSICS Emergency Procedures and Levels of Action AREAS OF RESPONSIBILITY: 1. Personnel Monitoring: Film badges, ring dosimeters, and other types of personnel monitors are available to persons working

More information

RADIOACTIVE WASTE MANAGEMENT PLAN

RADIOACTIVE WASTE MANAGEMENT PLAN RADIOACTIVE WASTE MANAGEMENT PLAN Copies of this plan will be made available to all members of the campus community with the potential to generate radioactive waste. Contents I. Purpose II. Regulatory

More information

2. CURRENT STATUS Koeberg nuclear power plant

2. CURRENT STATUS Koeberg nuclear power plant SPENT FUEL MANAGEMENT IN SOUTH AFRICA P. J. BREDELL Atomic Energy Corporation of South Africa, Pretoria A. K. STOTT Eskom, Johannesburg South Africa Abstract Eskom, the South African utility, operates

More information

Comparison of decommissioning options for the example of 2 research reactors of type TRIGA

Comparison of decommissioning options for the example of 2 research reactors of type TRIGA Comparison of decommissioning options for the example of 2 research reactors of type TRIGA Dr. Jörg Kaulard *, Barbara Jünger-Gräf ** * Gesellschaft für Anlagen- und Reaktorsicherheit (GRS) mbh ** German

More information

Division of Spent Fuel Management Interim Staff Guidance 2, Revision 2. Fuel Retrievability in Spent Fuel Storage Applications

Division of Spent Fuel Management Interim Staff Guidance 2, Revision 2. Fuel Retrievability in Spent Fuel Storage Applications Division of Spent Fuel Management Interim Staff Guidance 2, Revision 2 Issue: Fuel Retrievability in Spent Fuel Storage Applications Introduction: This Interim Staff Guidance (ISG) provides guidance to

More information

EVALUATION OF SAFETY CULTURE IN WANO PRE-STARTUP REVIEWS

EVALUATION OF SAFETY CULTURE IN WANO PRE-STARTUP REVIEWS EVALUATION OF SAFETY CULTURE IN WANO PRE-STARTUP REVIEWS Todd Brumfield World Association of Nuclear Operators (WANO) Atlanta, Georgia, USA ABSTRACT: The requirements for performance of pre-startup reviews

More information

ATTACHMENT Guidance for Conducting an Independent NRC Safety Culture Assessment

ATTACHMENT Guidance for Conducting an Independent NRC Safety Culture Assessment ATTACHMENT 95003.02 Introduction Guidance for Conducting an Independent NRC Safety Culture Assessment The purpose of this assessment is for the NRC to assess the licensee s safety culture. Safety culture

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS WASHINGTON, DC 20555

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS WASHINGTON, DC 20555 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS WASHINGTON, DC 20555 October 26, 2004 NRC INFORMATION NOTICE 2004-18: RECENT SAFETY-RELATED EVENT AT PANORAMIC

More information

RSP-2 Page 1 of 12. Environmental Health and Safety Radiation Protection Committee

RSP-2 Page 1 of 12. Environmental Health and Safety Radiation Protection Committee Radiation Safety Manual Title: Number: Radiation Safety Program Administrative Structure and Permit Process Page 1 of 12 Issued by: Approved by: Environmental Health and Safety Radiation Protection Committee

More information

Recommendations for the Implementation of Selected Leading Indicators of Performance at Nuclear Power Production Plants EED-99-01

Recommendations for the Implementation of Selected Leading Indicators of Performance at Nuclear Power Production Plants EED-99-01 Recommendations for the Implementation of Selected Leading Indicators of EED-99-01 Revision 0 August, 1999 Prepared and Issued by the Nuclear Power Production Committee Energy and Environmental Division

More information

OELG Event Categories

OELG Event Categories OELG Event Categories The table below outlines a proposed set of event categories. These have been developed from the MOD event categories and those used previously by the OELG. The aim of the work has

More information

Operational Challenges of Extended Dry Storage of Spent Nuclear Fuel 12550

Operational Challenges of Extended Dry Storage of Spent Nuclear Fuel 12550 Operational Challenges of Extended Dry Storage of Spent Nuclear Fuel 12550 M. Nichol Nuclear Energy Institute, Washington DC ABSTRACT As a result of the termination of the Yucca Mountain used fuel repository

More information

Markers of Nuclear Plant Performance Decline. March 23, 2016

Markers of Nuclear Plant Performance Decline. March 23, 2016 Markers of Nuclear Plant Performance Decline March 23, 2016 Markers of Nuclear Plant Performance Decline INTRODUCTION When performance at a nuclear plant declines, good operators put in a strong recovery

More information

Reference Based Learning Objectives Technical Bases

Reference Based Learning Objectives Technical Bases Reference Based Learning Objectives Technical Bases Revision 5 March, 2008 INTRODUCTION... 3 MINIMUM LEVEL OF COMPETENCE (MLC) V. STANDARDS OF PERFORMANCE... 3 Performance Criterion... 4 Evaluation Instruments...

More information

CHARACTERISTICS AND COMMON VULNERABILITIES INFRASTRUCTURE CATEGORY: NUCLEAR SPENT FUEL STORAGE FACILITIES

CHARACTERISTICS AND COMMON VULNERABILITIES INFRASTRUCTURE CATEGORY: NUCLEAR SPENT FUEL STORAGE FACILITIES CHARACTERISTICS AND COMMON VULNERABILITIES INFRASTRUCTURE CATEGORY: NUCLEAR SPENT FUEL STORAGE FACILITIES Protective Security Division Department of Homeland Security Version 2, September 22, 2003 Introduction

More information

Cause and Effect Relationship with Trending

Cause and Effect Relationship with Trending Cause and Effect Relationship with Trending Alex Torres Contractor Assurance Washington River Protection LLC. Contractor to the U.S. Department of Energy 1 Purpose Provide an overview of the relationship

More information

CNSC Fukushima Task Force Nuclear Power Plant Safety Review Criteria

CNSC Fukushima Task Force Nuclear Power Plant Safety Review Criteria CNSC Fukushima Task Force E-doc 3743877 July 2011 Executive Summary In response to the March 11, 2011 accident at the Fukushima Daiichi Nuclear Power Plant (NPP), the CNSC convened a Task Force to evaluate

More information

Radiation Safety Training at the Open Pool Australian Lightwater (OPAL) Multipurpose Reactor

Radiation Safety Training at the Open Pool Australian Lightwater (OPAL) Multipurpose Reactor Radiation Safety Training at the Open Pool Australian Lightwater (OPAL) Multipurpose Reactor John Bus IGORR 18 Conference, Sydney Australia, 4-7 December 2017 The Systematic Approach to Radiation Safety

More information

GENERAL DISTRIBUTION:

GENERAL DISTRIBUTION: Convention on Nuclear Safety Report: The role of the Institute of Nuclear Power Operations in supporting the United States commercial nuclear electric utility industry s focus on nuclear safety September

More information

Western Michigan University

Western Michigan University Western Michigan University Radiation Safety Source Inventory and Control Program Purpose A. To ensure all Western Michigan University licensed material and radiation producing machines are controlled

More information

NRC INFORMATION NOTICE 96-28:

NRC INFORMATION NOTICE 96-28: NOTE: The following information is an updated excerpt from NRC Information Notice 96-28 issued during 1996. NRC INFORMATION NOTICE 96-28 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL

More information

RECENT DEVELOPMENTS IN NUCLEAR SAFETY IN HUNGARY April 2016

RECENT DEVELOPMENTS IN NUCLEAR SAFETY IN HUNGARY April 2016 1 HI LI HUNGARIAN ATOMIC ENERGY AUTHORITY Nuclear Safety Bulletin H-1539 Budapest, P.O. Box 676, Tel: +36 1 436-9881, Fax: +36 1 436-9883, e-mail: nsd@haea.gov.hu website: www.haea.gov.hu RECENT DEVELOPMENTS

More information

ANALYSIS OF THE DOSES ASSOCIATED WITH THE SPENT FUEL SHIPMENTS FROM THE FRENCH NPPS: ARE THEY ALARA?

ANALYSIS OF THE DOSES ASSOCIATED WITH THE SPENT FUEL SHIPMENTS FROM THE FRENCH NPPS: ARE THEY ALARA? ANALYSIS OF THE DOSES ASSOCIATED WITH THE SPENT FUEL SHIPMENTS FROM THE FRENCH NPPS: ARE THEY ALARA? J.P Degrange*, C. Benhamou*, L. d'ascenzo*, A. Leroy **, E. Vrignaud *** * Centre d étude sur l Evaluation

More information

Safety Aspects of the RA-6 Spent Fuel Shipment to the USA

Safety Aspects of the RA-6 Spent Fuel Shipment to the USA Safety Aspects of the RA-6 Spent Fuel Shipment to the USA Oscar Novara, Guillermo Facchini, Carlos Fernández Comisión Nacional de Energía Atómica, Av del Libertador 8250, (1429), Buenos Aires, Argentina

More information

APPLIED SYNERGY IN WASTE MANAGEMENT ACTIVITIES FOR DECOMMISSIONING AT THE LOS ALAMOS NATIONAL LABORATORY

APPLIED SYNERGY IN WASTE MANAGEMENT ACTIVITIES FOR DECOMMISSIONING AT THE LOS ALAMOS NATIONAL LABORATORY APPLIED SYNERGY IN WASTE MANAGEMENT ACTIVITIES FOR DECOMMISSIONING AT THE LOS ALAMOS NATIONAL LABORATORY A. Drom Duratek Federal Services, Inc. Los Alamos Operations Office 555 Oppenheimer, Suite 101,

More information

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities DS447 Date: 20 February 2015 IAEA SAFETY STANDARDS for protecting people and the environment STATUS: SPESS STEP 12 For submission to CSS Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle

More information

Safety Performance Indicators Program. Vidal, P.G.

Safety Performance Indicators Program. Vidal, P.G. Safety Performance Indicators Program Vidal, P.G. Presentado en: Technical Meeting on NPP Safety Performance Indicators for Use by the Regulatory Organizations. Viena, Austria, 17-21 noviembre 2003 SAFETY

More information

SUCCESS AND CHALLENGES IN TRANSPORTING FOREIGN RESEARCH REACTOR SPENT NUCLEAR FUEL

SUCCESS AND CHALLENGES IN TRANSPORTING FOREIGN RESEARCH REACTOR SPENT NUCLEAR FUEL SUCCESS AND CHALLENGES IN TRANSPORTING FOREIGN RESEARCH REACTOR SPENT NUCLEAR FUEL Mr. William D. Clark, Jr. Manager, Spent Nuclear Fuel Program U.S. Department of Energy Savannah River Operations Office

More information

Safety Considerations in the Transition from Operation to Decommissioning of Research Reactors

Safety Considerations in the Transition from Operation to Decommissioning of Research Reactors Safety Considerations in the Transition from Operation to Decommissioning of Research Reactors Research Reactor Safety Section Division of Nuclear Installation Safety - EBP Workshop on the Transition Period

More information

EPRI Fukushima Technical Evaluation Project Fukushima Radiological Assessment Tool

EPRI Fukushima Technical Evaluation Project Fukushima Radiological Assessment Tool EPRI Fukushima Technical Evaluation Project Fukushima Radiological Assessment Tool Karen Kim Project Manager 2012 RETS/REMP Workshop June 25-27, 2012 Objectives: Fukushima Technical Evaluations Project

More information

A Practical Example of the Implementation of an NPP Human Performance Promotion Program and a Safety Culture Peer Review in China

A Practical Example of the Implementation of an NPP Human Performance Promotion Program and a Safety Culture Peer Review in China A Practical Example of the Implementation of an NPP Human Performance Promotion Program and a Safety Culture Peer Review in China Sujia Li Research Institute of Nuclear Power Operation (RINPO) May 21-24,

More information

Plenary Session 3 The System of Protection: Current and Future Developments. IAEA perspective

Plenary Session 3 The System of Protection: Current and Future Developments. IAEA perspective IRPA13 Congress Glasgow/Scotland 14 th to 18 th May 2012 Plenary Session 3 The System of Protection: Current and Future Developments perspective Pil-Soo HAHN Director, Division of Radiation, Transport

More information

NUREG-1549: Decision Methods for Dose Assessment to Comply With Radiological Criteria for License Termination

NUREG-1549: Decision Methods for Dose Assessment to Comply With Radiological Criteria for License Termination NUREG-1549: Decision Methods for Dose Assessment to Comply With Radiological Criteria for License Termination Abstract This draft NUREG-series report describes a methodology for calculating doses to demonstrate

More information

ALARA Self-Evaluation Guide

ALARA Self-Evaluation Guide ALARA Self-Evaluation Guide Caroline SCHIEBER, Sylvain ANDRESZ ISOE International Symposium Fort Lauderdale, 9-11 January 2017 cepn Guide's elaboration framework Questions from utilities: 2005, 2010 :

More information

Service Operation. Scenario One

Service Operation. Scenario One Service Operation Scenario One A large corporation completed implementing a new IT service management framework last month and has selected its new service management tools. The new processes of the framework

More information

PRR-1 Decommissioning: Preparing for Dismantling and Decontamination. R2D2 Project Meeting, Manila, Philippines September

PRR-1 Decommissioning: Preparing for Dismantling and Decontamination. R2D2 Project Meeting, Manila, Philippines September PRR-1 Decommissioning: Preparing for Dismantling and Decontamination R2D2 Project Meeting, Manila, Philippines 15-19 September 2008 1 Presented by Leonardo S. Leopando Philippine Nuclear Research Institute

More information

Past Experience and Future Plan in Korea

Past Experience and Future Plan in Korea Past Experience and Future Plan in Korea (Experience in Implementing ICRP Recommendations) First ICRP Symposium on the International System of Radiological Protection 26 October 2011 K. Cho, J. Lee and

More information

NSr1: UNPLANEND AUTOMATIC SHUTDOWNS PER 7000 HOURS CRITICAL (WANO UA7)

NSr1: UNPLANEND AUTOMATIC SHUTDOWNS PER 7000 HOURS CRITICAL (WANO UA7) Nuclear Performance Indicators NSr1: UNPLANEND AUTOMATIC SHUTDOWNS PER 7000 HOURS CRITICAL (WANO UA7) Values are calculated on annual basis (http://www.wano.info/) to monitor evolution of unplanned automatic

More information