1 Terms of Reference for a Cumulative Impacts Assessment in Baganuur Coal Mine in Mongolia to be financed by Mining Infrastructure Investment Support Project (MINIS) RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014 A. Background 1. Coal is most important primary energy source in Mongolia, due to insufficient oil reserves, absence of natural gas and presence of large coal reserves. Coal supplies about 93 percent of Mongolia s total energy requirements. Mongolia has vast coal resources, contained within 15 large-scale coal bearing basins. There are around 320 coal deposits and occurrences according to Geological Information Center of Mongolia. Total geological coal resources are estimated at approximately 150 billion tons, including about 20 billion tons explored. All the coal deposits and occurrences are located relatively in all areas of the country, but most of them in east, central and south areas. During last decade, coal exploration by foreign companies has been increased. 2. The Mining Infrastructure Investment Support Project (MINIS) financed by the World Bank aims to facilitate investments in infrastructure to support mining related activities and downstream value-added processes (regardless of funding source) and to build local capacity to prepare and transact infrastructure Projects.The environmental assessment work should be conducted so that the results are able to support a due diligence process required for access to international financing sources. The process and detailed requirements described in this TOR are based on World Bank Guidelines but all work and the end products of the ESIA must conform to applicable Mongolian Laws and Regulations. 3. Environmental and Social Safeguards. The total area of the land impacted by the mining activities of the mine, established in 1978 is hectare. Of this total area, hectare area was undergone through technical rehabilitation and hectare biological rehabilitation. These amounts equal to 9 % of the total area impacted. Technical and biological rehabilitations were undertaken in 10 hectare area of the land rehabilitated in One of the main factors that contribute to environmental pollution is the dust. The concentration of air dust at the mine site is mg/m3. Dust concentration increases during the activities of mining, constructing road, blasting, and coal crushing and loading. 1

2 The mine road watering system did not meet the requirement and the dust is in high concentration. Measures for dust reducing at by its sources should be improved in the future. The mine discharges an average of million cubic meters of water. In order to restore Baga gun Lake, 950 m long channel was created using the relief of the area surrounding the lake and the channel is fed by the underground water. Channel surface was covered with water-proof material and with gravel for the purpose of reducing water loss from the channel and cleaning and warming the water. Hygiene and sanitary condition Hygiene and sanitary conditions and the housekeeping in outside and inside of the industry have been improved better than previous years. The result of hygiene measurement performed on the workplace condition demonstrates that there are some definite progresses in the outcome of the dust reduction work. For instance, there is a progress in coal handling and loading plant-2, in that, 160 mg/m3 dust concentration was decreased to 80 mg/m3 by the last measurement after taking measures to reduce coal dust by dry suppression method. Environmental protection and rehabilitation works It is necessary to use advanced dust suppression method, suitable for each dust source. New technologies and options need to be introduced in mine road watering, as initial measures. Availability of water trucks should be ensured. In the further, dry dust adsorption method will be used for dust reducing at coal handling and loading plants. This method is offering several advantages, but best options for use not yet finalized, so further improvement is required. Further rehabilitation without irrigation method will not provide complete growing condition for plants, thus regular watering is necessary in the rehabilitation. Irrigation norms should be followed. Rehabilitation only covered 9% of all the damaged land, therefore it is necessary to develop and intensify rehabilitation projects. Employees health condition Providing double profession to employees, working in heavy condition is important in order to reduce the occupational disease. In other words, it will allow them to change work condition after 7-8 years of 2

3 working. Evaluation of authorized/ professional organization should be done, before constructing new building and facilities, use of new equipment. Blasting rules and instructions should be followed precisely to avoid accidents. International Safety Standard OHSAS should be implemented. Machinery and equipment used for many years can create certain condition for accident, thus equipment maintenance should be improved and technical innovation needs to be implemented duly. Preventive measures and actions against rock sliding and failures, coal combustion/fire and other technological violations should be implemented in time and proper manner. 4. As a Technical Assistance project, following the example of more recent Bank-financed projects supporting mining sector governance reforms, the sensitivity of the mineral sector in general and the work supported for the Baganuur Additional Exploration project, a detailed assessment of the environmental and social impacts from the ETT development, including an assessment of compliance with international best practice and World Bank norms, and recommendations for any remedial actions resulting from implementation need to be conducted. 5. In its final phase of implementation have a number of activities planned that are related to safeguards issues. (i) ASector Strategic Environment and Social Assessment are expected to be initiated in 2014 (see the ToRsattached); (ii) the Ministry of Environment and Green Development (MEGD) is leading on the work to develop sector specific regulations including those for mine closure. 6. SESA. In parallel to this cumulative assessment, a Strategic Environmental and Social Assessment to assess the regional environmental and social impacts caused by the development of coal mine projects and their associated facilities in the region is prepared. The SESA will be a planning tool that will involve a participatory consultative process aimed to help the Government to: (a) diagnose the key environmental and social problems and opportunities associated with the anticipated growth of Mongoliamining and gas sectors; (b) identify the policy, legal, regulatory, and institutional adjustments and capacity-building actions needed to minimize the adverse cumulative environmental and social impacts of mining and gas operations and associated infrastructure development, while enhancing the positive impacts; and (c) propose specific measures that Government can implement in the near future to improve the environmental and social sustainability of mining and gas sector in Mongolia.SESA was launched in November 2013 and is expected to be completed by the fall of

4 B. Objectives 7. The objectives of the proposed cumulative impact assessment are to: (a) Evaluate if the Baganuur Additional Exploration project (including its associated facilities) will have an effect on Valuable Ecological Components (VEC); (b) Evaluate if the effect of the Baganuur Additional Exploration project will act cumulatively with that of other projects (either from the past, current time, or in the future); (c) Evaluate if the effect of the Baganuur Additional Exploration project, in combination with the other effects, may cause a significant change now or in the future in the characteristics of the VEC, after the application of mitigation measures. (d) Identify appropriate actions for the Baganuur Additional Exploration project to address its contribution to significant impacts. C. Scope of Work 8. The firm is required by the Government of Mongolia, represented by MINISand Ministry of Environment and Green Development, to assist it to: Step 1: Describe the Baganuur coal field development, its setting and other projects and activities that may give rise to cumulative effects. This cumulative impacts assessment will need to sequence planned developments of the mines in the coal fields and ancillary and regional infrastructure development (approximate time horizon of 20 years to start operation). Step 2: Identify key Baganuur-related contributions to cumulative effects on selected resources of concern, such as ground water, biodiversity, and livelihood of local communities; Step 3: Assess the level of cumulative effects (according to the manual on Cumulative impact assessment, MEGD). Step 4: Determine the impacts of cumulative effects; and Step 5: Recommendations: Analyze reasonable, feasible options for mitigating or avoiding contribution to any significant cumulative effects, following the national legal system related to the cumulative impact assessment. 9. The final conclusions of the CIA should define the following: (i) to what extent the Baganuur Additional Exploration project will contribute to cumulative impacts; (ii) the mitigation measures which should be implemented by the Baganuur Additional Exploration project; and (iii)the 4

5 management/mitigation measures which are needed but beyond the scope of the Baganuur Additional Exploration project, including the need for consequent additional assessments that the Government will need to require to ensure sustainable development of the area and to develop core principles for environmental and social management in the area that respective investors and project developers will need to be guided by. D. Main Tasks. Step 1: Describe the Baganuur development and its setting. 10. Project Description. The first step in the CIA is to describe the Baganuur Additional Exploration project and its phases, including key components that may give rise to cumulative effects. This will include the following: Phases and timing of the project; Description of the scheme and project area of influence; Description of offsite facilities including coal transportation, power transmission lines, access roads; Identify environmentally sensitive areas, including protected areas, key stakeholders and affected people. 11. Past, present, and probable future projects.once Baganuur Additional Explorationproject issues have been identified, analyze past, present and probable future projects and activities within a defined temporal and spatial framework. The evaluation of other projects and activities should consider the following: Include those projects of known footprint that can be assessed; Consider a time frame that extends backwards to a pre-development scenario and forwards as realistically as possible; Include projects that are approved, awaiting approval, announced or under design; Include those projects whose environmental and social impacts and contribution to cumulative effects can be reasonably predicted, particularly projects with direct impacts on water resources, land and biodiversity; and, Discuss pending projects with regulators and incorporate the concerns of affected stakeholders. 5

6 Prepare a map or schematic of all existing and planned projects with the basic information on location, water intake, wastewater discharge points, mining waste, and coal transportation roads. 12. Define VECs. The domestic EIA has already identified some key issues of concern associated with the construction, operation, and decommissioning of the Baganuur Additional Exploration project. Typical impacts include the following: Impacts on water resources (water use, quality, quantity) Impacts on biodiversity and wildlife Impacts on land use and soil? Loss of archaeological and cultural resources Impacts of mining wastes on environment Impacts on air quality Impacts on the livelihood of local communities and herders. Visual Impacts The VECs should be defined based on the assessment of impacts on the above aspects and consultations with stakeholders. VECs could be (but are not limited to): water resources, land erosion, wildlife, cultural resources, air quality etc. Step 2: Identify key Baganuur-related contributions to cumulative effects on selected resources of concern. 13. The CIA should identify key impacts of Baganuur Additional Exploration project activities throughout all phases (construction, operation and decommissioning) in conjunction with other projects and activities. The following questions should be answered: Are other projects and activities in the defined project area affecting the VECs? Do the effects of the project overlap or increase the effects on the resource? Do the effects of the project have a potential to affect the long-term sustainability of the resource? Step 3: Assess the level of cumulative impacts. 14. The next step in the CIA process is to assess the level of cumulative impacts. This uses a similar methodology to that employed in the EIA, but the difference is that it assesses the impacts of other projects and activities, in addition to the project in a defined spatial and temporal framework. For each 6

7 resource/issue in question, the cumulative effects should consider typical components of an EIA assessment extent, frequency, duration, magnitude, uncertainty and probability. Step 4: Determine the impacts of cumulative impacts. 15. Once the cumulative impacts are determined, their significance must be considered relative to an established threshold limit, an established legal guideline or policy, or a qualitative assessment based on professional opinion and consultation. In any case, the significance of the cumulative impacts must be defensible. The significance of the cumulative impacts and the contribution of the project must be subsequently evaluated by project decision makers. The significance of the Baganuur Additional Exploration project interventions contribution to the cumulative impacts should be defined in one of the following ways: The project has a measurable effect on the resource; The project acts in conjunction with the effects of past present or future projects and activities; and The project in conjunction with other projects and activities shifts the resource to an unacceptable level or exceeds a threshold such that the impact is considered significant, in that: - The project s contribution to cumulative effects is responsible for exceeding the threshold and therefore is significant or, - The project is contributing with the effects of other projects and activities and the project contribution may or may not be significant, depending on the level of the contribution. Step 5: Formulate recommendations. 16. The CIA should reach a conclusion on whether the contribution, if any, to the cumulative impacts by the Baganuur Additional Exploration project is significant or not. An action plan (with time, institutional responsibilities, budget) should be developed based on this conclusion, and clearly define what mitigation measures need to be incorporated into the project Environmental Management Plan, and what mitigation/environmental management measures should be carried out above the project level. For example: Project level mitigation to reduce the impacts of the contribution of the project to cumulative effects; 7

8 Cooperative mitigation measures between project proponents to reduce cumulative effects, or Regional intervention on behalf of government or regulators to reduce the overall cumulative effect through the establishment of thresholds or policy intervention. 17. Mitigation/environmental management measures that are needed but beyond the scope of the Baganuur Additional Exploration project, will be presented to relevant (government) agencies/entities in the form of a workshop and finalized based on the views by the agencies. Their endorsement/acknowledgement on the recommendations from the CIA should be sought. Presentation and Consultation 18. The consultant will organize and carry out workshops in the Baganuurmine site to present the findings of the Cumulative Impact Assessment.To ensure meaningful consultations throughout the course of the CIA, key stakeholders, particularly for defining the Valuable Ecosystem Components and final results should be clearly documented. The records of public consultations undertaken will form part of the final deliveries by the consultant. 19. The expected result of the workshops will be the following: (i) stakeholders will validate environmental, social (including labor and resettlement), health, safety and security priority concerns at the local level; (ii) workshops should also be a way of informing and engaging stakeholders in the immediate vicinity of the Baganuur Additional Explorationproject and impacted area subject to this cumulative assessment; (iii) vulnerable stakeholders (women, children, youth and others) should fully participate in the process, not only leaders, groups and NGOs that claim to represent their interests. E. Outputs 20. Report and Consultation. Based upon the results of thecumulative Impact Assessment Report, the firm will organize and carry out workshops in the Baganuur mine site. F. Duration and Timing 21. The Cumulative Impacts Assessment Reportshould be completed within 4months of commencement. All reports should be prepared in Mongolian and English both in CD and hard copy. The final presentation workshop should be held within 5months of commencement of the contract. G. Institutional Arrangements 8

9 22. The consultant shall report to MEGD and liaise with other agencies of the government including Ministry of Energy and Mining, and local authorities. Data will be provided by MEGD, MEM and aimag/soum authorities. Existing EIAs, EMPs, and plans for development will be provided by relevant ministries with facilitation from MEGD. 23. Coordination and contract management will be carried out by MINIS Project ImplementationUnit. 24. The final output will be subject to acceptance by MEGD and World Bank for compliance with the World Bank guidelines for safeguards. H. Requirements for the Consultant Team 25. To qualify and carry out the work the consultant should be a consulting firm experienced in performing work on projects similar in size and subject ( the consultant ). 26. The consultant must have the following qualifications: (i) Consultants must have sound knowledge and at least five years work experience plus experience on at least two similar assignments, and must have good knowledge of mining regulations. (ii) The team should comprise the following specialists: (1) A Team Leader who is skilled at leading and managing inter-disciplinary teams, can produce well-written reports on time, and is knowledgeable about strategic environmental assessments and extractive industries. (2) An Infrastructure Specialist with at least ten years of relevant experience in infrastructure policy and public administration of the mining sector. (3) A Mining Specialist who is knowledgeable in Mongolian geology and in modern mining technologies and practices. Proven experience in environmental regulatory frameworks and environmental standards for mining activities is required. (4) An Environmental Engineer or Scientist who is knowledgeable about the impacts of miningrelated activities on natural habitats, water, land and biodiversity. Experience in Mongolian terrestrial and aquatic ecosystems is desirable. (5) A Social Development Specialist who is knowledgeable about the direct and indirect social impacts (positive and negative) of mining-related activities including public health. S/he should have proven experience in anthropological studies of indigenous populations. 9

10 (6) A Stakeholder Engagement Specialist who can effectively manage stakeholder engagement throughout the preparation process, including the facilitation of public consultation events and other large meetings. Specific technical inputs on legal, infrastructure development projects and gender should be provided by the team as needed. I. Payment Schedule Ten percent (10%) upon acceptance of the Inception Report / Work Program and the Consultation and Communications Program (Advance payment is optional) Twenty percent (20%) upon acceptance of the Annotated Outline of Cumulative Impact Assessment Report. Twenty percent (20%) upon acceptance of detailed report on workshops and findings. Twenty Five percent (25%) upon acceptance of Preliminary Draft Cumulative Impact Assessment Reports. Twenty percent (25%) after receiving an approval letter from the Client and upon acceptance of the Final Cumulative Impact Assessment Report. 10

RFP No: WB/MOF/MINIS/CS/CQS/1.1.14/2014

RFP No: WB/MOF/MINIS/CS/CQS/1.1.14/2014 Terms of Reference for a Cumulative Impacts Assessment in Tavan Tolgoi Coal Mine Region in Mongolia to be financed by Mining Infrastructure Investment Support Project (MINIS) RFP No: WB/MOF/MINIS/CS/CQS/1.1.14/2014

More information

Tajikistan STRATEGIC ENVIRONMENTAL AND SOCIAL ASSESSMENT (SESA) OF THE MINERAL SECTOR

Tajikistan STRATEGIC ENVIRONMENTAL AND SOCIAL ASSESSMENT (SESA) OF THE MINERAL SECTOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Tajikistan PRIVATE SECTOR COMPETITIVENESS AND FINANCIAL SECTOR STRENGTHENING PROJECT

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

Mining Environmental Impact Assessment Guidelines. May 2018

Mining Environmental Impact Assessment Guidelines. May 2018 Mining Sector Environmental and Social Impact Assessment Guidelines Mining Environmental Impact Assessment Guidelines May 2018 Background Mining EIA Guidelines Working Group established by Minister of

More information

MINISTRY OF LANDS AND NATURAL RESOURCES NATURAL RESOURCES AND ENVIRONMENTAL GOVERNANCE PROGRAMME (TECHNICAL ASSISTANCE- TA) DRAFT

MINISTRY OF LANDS AND NATURAL RESOURCES NATURAL RESOURCES AND ENVIRONMENTAL GOVERNANCE PROGRAMME (TECHNICAL ASSISTANCE- TA) DRAFT MINISTRY OF LANDS AND NATURAL RESOURCES NATURAL RESOURCES AND ENVIRONMENTAL GOVERNANCE PROGRAMME (TECHNICAL ASSISTANCE- TA) DRAFT TERMS OF REFERENCE (TOR) FOR THE REVISION OF THE FORESTRY DEVELOPMENT MASTER

More information

SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD

SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Critical criterion 1.4 of the 2017 SAN Standard requires that an independent

More information

SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD

SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD SAN GUIDANCE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Critical criterion 1.4 of the 2017 SAN Standard requires that an independent

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

FOR DISCUSSION ONLY. (A) ADB Safeguard Policy Statement. (C) Extent of Equivalence 2

FOR DISCUSSION ONLY. (A) ADB Safeguard Policy Statement. (C) Extent of Equivalence 2 Comparative Analysis of Lao PDR s Legal Framework and Environment Safeguards in the Environmental Safeguards Objectives: To ensure the environmental soundness and sustainability of projects and to support

More information

UNRAVELING THE MYRAID OF STANDARDS AND TOOLS

UNRAVELING THE MYRAID OF STANDARDS AND TOOLS UNRAVELING THE MYRAID OF STANDARDS AND TOOLS HYDRO POWER DEVELOPMENT IN MEKONG REGION: CYCLING THROUGH FROM POLICY TO IMPLEMENTATION WORKSHOP SEPTEMBER 12-13, 2013 Basin Wide National regulations Project

More information

NEW BUGESERA INTERNATIONAL AIRPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT- CUMULATIVE IMPACT ASSESSMENT

NEW BUGESERA INTERNATIONAL AIRPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT- CUMULATIVE IMPACT ASSESSMENT Intended for Bugesera Airport Company Limited Date January 2018 Project Number UK11-24483 NEW BUGESERA INTERNATIONAL AIRPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT- CUMULATIVE IMPACT ASSESSMENT

More information

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE Greater Mekong Subregion Nam Ngum 3 Hydropower Project (RRP LAO 41385) Supplementary Appendix 5 TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE Strengthening Biodiversity

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR Overview of Presentation 1. Objectives of the Consultancy 2. Hydropower in Myanmar 3. Draft Table of Contents 4.

More information

ToR. Consultancy Firm to undertake Strategic Environmental Assessment (SEA) for the new Mining and Minerals Policy

ToR. Consultancy Firm to undertake Strategic Environmental Assessment (SEA) for the new Mining and Minerals Policy ToR Consultancy Firm to undertake Strategic Environmental Assessment (SEA) for the new Mining and Minerals Policy 1. Strategic Background Rwanda s has achieved a sustained economic growth over the past

More information

Performance Requirements

Performance Requirements Environmental and Social Policy 15 Performance Requirements PR 1: Environmental and Social Appraisal and Management Introduction 1. The EBRD considers it important that all companies receiving EBRD financing

More information

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI

More information

DRAFT FOR CONSULTATION OCTOBER 7, 2014

DRAFT FOR CONSULTATION OCTOBER 7, 2014 The Board has authorized the release of this document for consultation purposes to seek feedback on its content. It has not endorsed the content of the draft, and the Committee on Development Effectiveness

More information

SUSTAINABLE HYDROPOWER DEVELOPMENT A NORWEGIAN-GEORGIAN COOPERATION PROGRAM. A Citizen s Guide. Communication and Hydropower EIA

SUSTAINABLE HYDROPOWER DEVELOPMENT A NORWEGIAN-GEORGIAN COOPERATION PROGRAM. A Citizen s Guide. Communication and Hydropower EIA Communication and Hydropower EIA September, 2014 Dhillion, S.S. and Bakhtadze, M. 2014. A Citizen s Awareness Guide: Communication and Hydropower EIA. Sustainable Hydropower Development in Georgia. Report

More information

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process 10 January 2018 Introduction 1. Environmental and social screening is an essential and

More information

Summary of Preparatory Study for Development Study

Summary of Preparatory Study for Development Study Summary of Preparatory Study for Development Study Creation Date: 30 March 2007 1. Full title of the Project The Study for Sustainable Rural Drinking Water Supply in the Southern Khatlon Oblast in the

More information

Environmental Governance in Myanmar. U Than Aye Director Environmental Conservation Department

Environmental Governance in Myanmar. U Than Aye Director Environmental Conservation Department Environmental Governance in Myanmar U Than Aye Director Environmental Conservation Department 1 Strategy for Environmental Safeguards To work for Economic Development in Parallel with Environmental Conservation

More information

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country?

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country? Checklist: 16. Power Transmission and Distribution Lines(1) Confirmation of and Social (1) ESIA and Permits 1 Have ESIA reports been officially completed? Have ESIA reports been written in the official

More information

NATIONAL ENVIRONMENTAL MANAGEMENT AUTHORITY (NEMA)

NATIONAL ENVIRONMENTAL MANAGEMENT AUTHORITY (NEMA) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL ENVIRONMENTAL MANAGEMENT AUTHORITY (NEMA) TERMS OF REFERENCE (TOR) FOR STRATEGIC

More information

Rainforest Alliance GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

Rainforest Alliance GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Rainforest Alliance GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT July, 2017 D.R. 2017 Red de Agricultura Sostenible, A.C. This document is provided by Red de Agricultura Sostenible, A.C. (also

More information

SOUTH SUDAN EASTERN AFRICA REGIONAL TRANSPORT, TRADE AND DEVELOPMENT FACILITATION PROGRAM (SS-EARTTDFP) PROJECT ID (P131426)

SOUTH SUDAN EASTERN AFRICA REGIONAL TRANSPORT, TRADE AND DEVELOPMENT FACILITATION PROGRAM (SS-EARTTDFP) PROJECT ID (P131426) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOUTH SUDAN EASTERN AFRICA REGIONAL TRANSPORT, TRADE AND DEVELOPMENT FACILITATION PROGRAM

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

EAGLE S NEST PROJECT

EAGLE S NEST PROJECT A Federal/Provincial Environmental Impact Statement/Environmental Assessment Report Draft Copy December 20, 2013 VOLUME 1 EXECUTIVE SUMMARY PAGE EXECUTIVE SUMMARY... 1-1 1 INTRODUCTION... 1-1 1.1 PROJECT

More information

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations al Checklist: 5. Non-Ferrous Metals Smelting and Refining(1) (1) ESIA and al Permits 1 Have ESIA reports been officially completed? Have ESIA reports been written in the official language or a language

More information

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify) PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:

More information

IUCN Policy on Biodiversity Offsets

IUCN Policy on Biodiversity Offsets IUCN Policy on Biodiversity Offsets 1. Purpose Statement The purpose of this policy is to provide a framework to guide the design, implementation and governance of biodiversity offset schemes and projects.

More information

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Terms of Reference(ToR) for the Strategic Environmental and Social Assessment (SESA) and Environmental Social Management

More information

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Terms of Reference(ToR) for the Strategic Environmental and Social Assessment (SESA) and Environmental Social Management

More information

SEMINAR ON CUMULATIVE IMPACT ASSESSMENT & MANAGEMENT

SEMINAR ON CUMULATIVE IMPACT ASSESSMENT & MANAGEMENT SEMINAR ON CUMULATIVE IMPACT ASSESSMENT & MANAGEMENT 29 February 2016 Seminar Agenda Time Item 09.00 Agenda/objectives 09.05 Impact Assessment Toolbox: Situating the CIA 09.15 What is Cumulative Impact

More information

EBRD Performance Requirement 1

EBRD Performance Requirement 1 EBRD Performance Requirement 1 Assessment and Management of Environmental and Social Impacts and Issues Introduction 1. This Performance Requirement (PR) establishes the importance of integrated assessment

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Generic Terms of Reference (ToR) for Consulting Services for Environmental Impact Assessment (EIA) and Preparation of Environmental Management Plans (EMPs) for Transport Sector (Bridge and/or Road) Projects

More information

Environmental and Social Impact Assessment (ESIA) for Oil & Gas Projects, a Myanmar Context

Environmental and Social Impact Assessment (ESIA) for Oil & Gas Projects, a Myanmar Context Environmental and Social Impact Assessment (ESIA) for Oil & Gas Projects, a Myanmar Context Insert then choose Picture select your picture. Right click your picture and Send to back. 26 th January 2015

More information

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories: 5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the

More information

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental

More information

[P ] ENVIRONMENTAL and SOCIAL COMMITMENT PLAN (ESCP) 10 February 2019

[P ] ENVIRONMENTAL and SOCIAL COMMITMENT PLAN (ESCP) 10 February 2019 (ESCP) - OCTOBER 2018 Japan, Mongolia Program Office Mongolia: Social Accountability Subs [P-167114] ENVIRONMENTAL and SOCIAL COMMITMENT PLAN (ESCP) 10 February 2019 1 P a g e (ESCP) - OCTOBER 2018 MONGOLIA

More information

Czech Republic National Reporting for CSD-18/19 Thematic profile: Mining

Czech Republic National Reporting for CSD-18/19 Thematic profile: Mining Czech Republic National Reporting for CSD-18/19 Thematic profile: Mining The Czech mining industry in 2006 2008 In the Czech Republic (hereinafter referred to as the "CZ"), there are currently approximately

More information

Responsible Mining in the Lake Superior Basin Dec. 2013

Responsible Mining in the Lake Superior Basin Dec. 2013 Responsible Mining in the Lake Superior Basin Dec. 2013 In this document Introduction Part 1: Statement on Responsible Mining Part 2: Specific Recommendations for Mining Projects in the Lake Superior Basin.

More information

3.0 APPROACH AND METHODOLOGY

3.0 APPROACH AND METHODOLOGY 3.0 APPROACH AND METHODOLOGY The EIA will be completed to meet the requirements as set out in the Environmental Impact Assessment Guidelines and Procedures for Barbados, 1998 and the Thermal Power Guidelines

More information

Multi-Year Area-Based Permitting Policy for Mineral and Coal Exploration Activities

Multi-Year Area-Based Permitting Policy for Mineral and Coal Exploration Activities Mines and Mineral Resources Division Multi-Year Area-Based Permitting Policy for Mineral and Coal Exploration Activities 1. Introduction The Mines and Mineral Resources Division (MMRD) has historically

More information

SANDCRETE ENGINEERING NIG. LTD. Background Information Document (BID)

SANDCRETE ENGINEERING NIG. LTD. Background Information Document (BID) ENVIRONMENTAL IMPACT ASSESSEMENT (EIA) FOR THE PROPOSED GOLD (Au) EXPLORATION AND MINING PROJECT AT RANDEGI DISTRICT, BIRNIN GWARI L.G.A OF KADUNA STATE BY SANDCRETE ENGINEERING NIG. LTD Background Information

More information

TERMS OF REFERENCE STRATEGIC ENVIRONMENTAL, POVERTY AND SOCIAL ASSESSMENT (SEPSA) FOR CORRIDOR IMPROVEMENT PROGRAM (CIP)

TERMS OF REFERENCE STRATEGIC ENVIRONMENTAL, POVERTY AND SOCIAL ASSESSMENT (SEPSA) FOR CORRIDOR IMPROVEMENT PROGRAM (CIP) TERMS OF REFERENCE STRATEGIC ENVIRONMENTAL, POVERTY AND SOCIAL ASSESSMENT (SEPSA) FOR CORRIDOR IMPROVEMENT PROGRAM (CIP) Background The Government wants to sustain the current economic growth by improving

More information

Oyu Tolgoi Copper & Gold Mine Associated Power Plant:

Oyu Tolgoi Copper & Gold Mine Associated Power Plant: Oyu Tolgoi Copper & Gold Mine Associated Power Plant: Violations of IFC and World Bank Policies on Environmental Impacts and Criteria for Coal Projects Prepared For: The Sierra Club Gordon Scott November,

More information

PROCUREMENT NOTICE. National Individual Consultant (IC): Capacity Building Needs Assessment. Date of issue: 03 August (Re-advertisement)

PROCUREMENT NOTICE. National Individual Consultant (IC): Capacity Building Needs Assessment. Date of issue: 03 August (Re-advertisement) POST TITLE: AGENCY/PROJECT NAME: PLACE OF ASSIGNMENT: PROCUREMENT NOTICE National Individual Consultant (IC) for Capacity Building Needs Assessment. Date of issue: 03 August 2018 (Re-advertisement) National

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 02/01/2018 REF NO.: BBRSO36316 Country: Barbados Description of the assignment: Socio-economic/livelihood assessment consultancy Project name: Conserving

More information

MINING EIA REVIEW CHECKLIST

MINING EIA REVIEW CHECKLIST EIA Review Checklist Mining and the Environment Mining is a sustainable activity MINING EIA REVIEW CHECKLIST Reviewing the Content General aspects Does the environmental assessment conform to national

More information

Terms of Reference. Application type: External vacancy Job Title: Category: Duty station:

Terms of Reference. Application type: External vacancy Job Title: Category: Duty station: Terms of Reference NATIONAL/INTERNATIONAL CONSULTANT ON WASTE MANAGEMENT TO SUPPORT THE ELABORATION OF A PROJECT PROPOSAL ON SOLID WASTE MANAGEMENT FOR KIGALI CITY, RWANDA, FOR SUBMISSION TO NATIONAL AUTHORITIES

More information

Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects

Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects Insert then choose Picture select your picture. Right click your picture and Send to back. August 6-8 th, 2014 Craig A. Reid Partner,

More information

Outline of the presentation

Outline of the presentation Socio-economic considerations in environmental decision-making in India Asha Rajvanshi ar@wii.gov.in Head, EIA Cell Wildlife Institute of India, Dehradun Outline of the presentation Historical perspective

More information

6 IMPACT ASSESSMENT METHOD

6 IMPACT ASSESSMENT METHOD 6 IMPACT ASSESSMENT METHOD ENTER HERE BACK TO CONTENTS 6 Impact Assessment Method This chapter outlines the methods employed within the EIS specialist technical studies to undertake an assessment of potential

More information

8 Geology, Hydrology & Hydrogeology

8 Geology, Hydrology & Hydrogeology Inverneill Wind Farm Scoping Report Page 42 8 Geology, Hydrology & Hydrogeology 8.1 Introduction The EIA will consider the potential issues arising from the construction, operation and decommissioning

More information

National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR

National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR By Xaypaseuth PHOMSOUPHA Deputy Director General Department of Energy Promotion and Development Ministry of

More information

Trishuli River Case Study

Trishuli River Case Study Moving from a Project-level to River Basin-level CIA: Trishuli River Case Study January 2018 Insert then choose Picture select your picture. Right click your picture and Send to back. Trishuli River Basin

More information

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES EMIOLA ABASS June 13, 2017 COURSE OBJECTIVE This course has been designed to provide guidance to

More information

BACKGROUND / INTRODUCTION

BACKGROUND / INTRODUCTION Terms of reference Consultancy Propose a global strong framework on law and legislation for creating and managing deep sea marine protected areas in Lebanon Support to develop the MPA designations and

More information

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given. PROPOSED TERMS OF REFERENCES (A) Suggested by the Applicant 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED

More information

IGF Geneva 2016 MPF-SDG Comparative Analysis. Perrine Toledano CCSI, Head: Extractive Industries

IGF Geneva 2016 MPF-SDG Comparative Analysis. Perrine Toledano CCSI, Head: Extractive Industries IGF Geneva 2016 MPF-SDG Comparative Analysis Perrine Toledano CCSI, Head: Extractive Industries SDG and MPF: Can they connect? The Sustainable Development Goals (SDGs) form the post-2015 global development

More information

TERMS OF REFERENCE Socio-economic/ Livelihood Assessment and Site-based Sustainable Finance Plans Consultancy

TERMS OF REFERENCE Socio-economic/ Livelihood Assessment and Site-based Sustainable Finance Plans Consultancy TERMS OF REFERENCE Socio-economic/ Livelihood Assessment and Site-based Sustainable Finance Plans Consultancy Project Title: Conserving biodiversity and reducing habitat degradation in Protected Areas

More information

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: Comprehensive Study Scoping Document for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: 07-03-26302 Prepared pursuant to Subsection 21(1) of the Canadian Environmental Assessment

More information

TERMS OF REFERENCE FOR TA CONSULTANTS

TERMS OF REFERENCE FOR TA CONSULTANTS Skills for Competitiveness Project (TRTA CAM 50394) TERMS OF REFERENCE FOR TA CONSULTANTS A. Individual consultants for preliminary analytical work 1. Industrial Human Resource Development Specialist (2.5

More information

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1 AMDAL Procedure (This is only indicative and for reference purposes. This is not exhaustive and therefore, the Consultants are requested to familiarize themselves with all the laws, rules, regulations,

More information

TECHNICAL REVIEW COMMENTS on the Environmental Impact Statement. Rio Tinto Uranium Corp. Roughrider Advanced Exploration Project

TECHNICAL REVIEW COMMENTS on the Environmental Impact Statement. Rio Tinto Uranium Corp. Roughrider Advanced Exploration Project TECHNICAL REVIEW COMMENTS on the Environmental Impact Statement Rio Tinto Uranium Corp. Roughrider Advanced Exploration Project Prepared by Saskatchewan Ministry of Environment Environmental Assessment

More information

EAO s Assessment of an Application for Certificate Amendment Prince Rupert Gas Transmission Project

EAO s Assessment of an Application for Certificate Amendment Prince Rupert Gas Transmission Project EAO s Assessment of an Application for Certificate Amendment Prince Rupert Gas Transmission Project EA Certificate #E14-06 Amendment #4, Additional Construction Camps and Stand-by Compressor Units Requested

More information

Terms of Reference. National or International consultants: International Consultant

Terms of Reference. National or International consultants: International Consultant Terms of Reference National or International consultants: International Consultant Description of the assignment (Title of consultancy): Development of National Guidelines for the Management of Rangelands

More information

1. Background Provisioning Regulating: Cultural:

1. Background Provisioning Regulating: Cultural: IN PARTNERSHIP WITH EXECUTIVE SUMMARY The Myanmar hydropower sector, in the early stages of development, has the opportunity to develop sustainably by balancing electricity generation with environmental

More information

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement. Environmental Impact Assessment Technical Review Comments on the Environmental Impact Statement as submitted by Claude Resources Inc. Saskatchewan Ministry of Environment December, 2009 1. INTRODUCTION

More information

Environmental and Social Data Sheet

Environmental and Social Data Sheet Environmental and Social Data Sheet Luxembourg, 08.09.2014 Overview Project Name: Project Number: 2013-0468 Country: Project Description: OUARZAZATE III (TOWER) Morocco Construction and operation of a

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Comparative Analysis of Cambodia Legal Framework and ADB Safeguard Policy Statement: ENVIRONMENT

Comparative Analysis of Cambodia Legal Framework and ADB Safeguard Policy Statement: ENVIRONMENT Comparative Analysis of Cambodia Legal Framework and : ENVIRONMENT Policy Principle 1: Use a screening process for each proposed project, as early as possible, to determine the appropriate extent and type

More information

GREEN DEVELOPMENT POLICY

GREEN DEVELOPMENT POLICY GREEN DEVELOPMENT POLICY 1. A NEED AND JUSTIFICATION FOR THE TRANSITION TO GREEN DEVELOPMENT 1.1. Global Perspective Climate change, rapid economic and population growth, the sharp increase in consumption

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

IEMA ES Review Criteria

IEMA ES Review Criteria IEMA ES Review Criteria Structure of the Criteria The criteria are split into three sections and a review report is structured accordingly: Section 1 addresses all of the information contained within an

More information

Europe and Central Asia Region Capacity Development Trust Fund

Europe and Central Asia Region Capacity Development Trust Fund Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Europe and Central Asia Region Capacity Development Trust Fund RP1439 Draft Terms of

More information

Licensing Nuclear Power Plants in Canada. Ensuring Safe and Environmentally Acceptable Operations

Licensing Nuclear Power Plants in Canada. Ensuring Safe and Environmentally Acceptable Operations Licensing Nuclear Power Plants in Canada Ensuring Safe and Environmentally Acceptable Operations Nuclear Power the ultimate Energy Source It s been around a long time Nuclear power closer to home Needs

More information

OPERATIONAL GUIDELINES ON ECOSYSTEM-BASED APPROACHES TO ADAPTATION

OPERATIONAL GUIDELINES ON ECOSYSTEM-BASED APPROACHES TO ADAPTATION LDCF/SCCF Council Meeting November 15, 2012 Washington, D.C GEF/LDCF.SCCF.13/Inf.06 October 16, 2012 OPERATIONAL GUIDELINES ON ECOSYSTEM-BASED APPROACHES TO ADAPTATION Table of Contents Background... 1

More information

In all our projects, we seek to provide fresh inspiration and practical solutions that have a positive impact.

In all our projects, we seek to provide fresh inspiration and practical solutions that have a positive impact. Lapis Elite Consulting Services Text for Profile on Website Overview Lapis Elite Consulting Services provides a broad range of consultancy and professional services, including management consulting, organisational

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

Development of an Environmental Manual for Environmental and Social Assessment, Management and Monitoring for the Road Sector in Suriname

Development of an Environmental Manual for Environmental and Social Assessment, Management and Monitoring for the Road Sector in Suriname Development of an Environmental Manual for Environmental and Social Assessment, Management and Monitoring for the Road Sector in Suriname 1. Background Information Terms of Reference Currently, the implementation

More information

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles Operational Manual - Table A1 - Environmental and Social Safeguard Policies Policy and Staff Connections- World Bank Intranet WB External Site WBG Directory Help Site Map Feedback Home News & Events Countries

More information

General issues and SESA purpose

General issues and SESA purpose Terms of Reference for the Development of the Strategic Environmental and Social Assessment (SESA) for Sanitary Protection Zones of the Cross-Border Karstic Aquifers of the Klokot Source (Bihać) Project

More information

TERMS OF REFERENCE FOR CONSULTANTS

TERMS OF REFERENCE FOR CONSULTANTS Implementing Innovative Approaches for Improved Water Governance (KSTA MON 51099) TERMS OF REFERENCE FOR CONSULTANTS 1. The knowledge and support technical assistance (TA) consultants will be recruited

More information

ENVIRONMENTAL AND SOCIAL ACTION PLAN ÖKSÜT GOLD MINE, TURKEY (THE 'PROJECT')

ENVIRONMENTAL AND SOCIAL ACTION PLAN ÖKSÜT GOLD MINE, TURKEY (THE 'PROJECT') ENVIRONMENTAL AND SOCIAL ACTION PLAN ÖKSÜT GOLD MINE, TURKEY (THE 'PROJECT') DRAFT FOR DISCLOSURE PURPOSES. FINAL ESAP TO BE AGREED POST DISCLOSURE AND PRIOR TO FINANCING DECISION PR1 Assessment and of

More information

Abeokuta, Nigeria Greenfield Power Generation Plant Environmental Impact Assessment (EIA) Background Information Document (BID) January 2015

Abeokuta, Nigeria Greenfield Power Generation Plant Environmental Impact Assessment (EIA) Background Information Document (BID) January 2015 Abeokuta, Nigeria Greenfield Power Generation Plant Environmental Impact Assessment (EIA) Background Information Document (BID) January 2015 Background Energy Culture, an indigenous integrated energy company,

More information

September 2016 ID Competency Statement Type

September 2016 ID Competency Statement Type September 06 Ensures that the impact assessment scope, criteria and conditions (geographic, environmental, economic, social, and cultural) are defined adequately. Develops a project management plan for

More information

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item. Checklist: 26. Forestry Projects(1) 1. Permits and Approvals, Explanations 2. Antipollution Measures (1) ESIA and Permits (2) Explanations to the Public (1) Air Quality (2) Water Quality (3) Waste (4)

More information

TERMS OF REFERENCE EIA ASSESSMENT CONSULTANCY

TERMS OF REFERENCE EIA ASSESSMENT CONSULTANCY TERMS OF REFERENCE EIA ASSESSMENT CONSULTANCY Location Application deadline Type of Contract Post Level Project Languages required: Duration of Initial Contract: Fiji 22/10/2014 (Fiji Time) Individual

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02-Nov-2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

Implementing the Mitigation Hierarchy

Implementing the Mitigation Hierarchy Implementing the Mitigation Hierarchy Presented by National Biodiversity and Business Network IUCN De Beers Group of Companies 10 August 2016 Objectives for the day Provide an overview of the overall framework

More information

Environmental and Social Review for GDF Projects

Environmental and Social Review for GDF Projects Environmental and Social Review for GDF Projects Laurie Hietter Sacramento, California October 24, 2016 Introduction 1 Importance of Environmental and Social Assessment 2 Regulations and Overview of Environmental

More information

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 Country Partnership Strategy: People s Republic of China, 2016 2020 SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 Sector Road Map A. Sector Performance, Problems,

More information

Public Information Note. Ongoing World Bank Study of Biodiversity Offsets

Public Information Note. Ongoing World Bank Study of Biodiversity Offsets Working Draft September 17, 2013 Public Information Note Ongoing World Bank Study of Biodiversity Offsets 1. Quick Summary. An ongoing World Bank study is examining the actual and potentially expanded

More information

Note: This is a draft document and does not represent a position or decision by government. Part 2: Policy for Cumulative Effects Management

Note: This is a draft document and does not represent a position or decision by government. Part 2: Policy for Cumulative Effects Management Cumulative CEF DRAFT Effects Policy (April, 2016) Framework Part 2: Policy for Cumulative Effects Management Preamble This is a draft natural resource sector policy being shared for the purpose of gaining

More information

Terms of Reference for National Consultant for Project Formulation Policy Framework Capacity and Conservation Needs Assessment (National)

Terms of Reference for National Consultant for Project Formulation Policy Framework Capacity and Conservation Needs Assessment (National) Terms of Reference for National Consultant for Project Formulation Policy Framework Capacity and Conservation Needs Assessment (National) Consultancy Period: 100 days over period from September 2013 to

More information

Environmental Impact Assessment (EIA)

Environmental Impact Assessment (EIA) Environmental Impact Assessment (EIA) as a tool for sustainable mining Cheryl E. Wasserman Associate Director for Policy Analysis Office of Federal Activities Office of Enforcement and Compliance Assurance

More information

SUMMARY 2013 EDITION

SUMMARY 2013 EDITION SUMMARY 2013 EDITION RSAT Joint Initiative on Rapid Basin-wide Hydropower Sustainability Assessment Tool PART 1: OVERVIEW OF THE RSAT The RSAT is designed as an integrative tool to assess hydropower development

More information