RFP No: WB/MOF/MINIS/CS/CQS/1.1.14/2014

Size: px
Start display at page:

Download "RFP No: WB/MOF/MINIS/CS/CQS/1.1.14/2014"

Transcription

1 Terms of Reference for a Cumulative Impacts Assessment in Tavan Tolgoi Coal Mine Region in Mongolia to be financed by Mining Infrastructure Investment Support Project (MINIS) RFP No: WB/MOF/MINIS/CS/CQS/1.1.14/2014 A. Background Mining development is growing rapidly in Mongolia. The International Monetary Fund expects growth to average 14% a year between 2012 and 2016.Despite the slowing of commodities demand from China (Mongolia s primary consumer), the sector experienced 8.9 per cent annual growth in 2012, up from 7.3 per cent growth in Although the mining sector s share of GDP has been decreasing since 2009 (15.7 per cent of GDP in 2012), other industries associated with mining industry investment (construction, transportation and other services) are increasing, and there has been a 17.9 per cent growth in mining sector employment since Much of Mongolia s mineral potential remains untapped only 15 per cent of the country is fully mapped, and only 17 per cent is under exploration. Underlying these statistics is the reality that commodity demands will increase over the long term, and the enormous potential of Mongolia s mineral resources will remain valuable.however, there is not a clear or shared vision of how mining growth may affect the development of Mongolia and the lives of Mongolians. The Mining Infrastructure Investment Support Project (MINIS) financed by the World Bank aims to facilitate investments in infrastructure to support mining related activities and downstream value-added processes (regardless of funding source) and to build local capacity to prepare and transact infrastructure Projects.The environmental assessment work should be conducted so that the results are able to support a due diligence process required for access to international financing sources. The process and detailed requirements described in this TOR are based on World Bank Guidelines but all work and the end products of the ESIA must conform to applicable Mongolian Laws and Regulations. Erdenes Tavan Tolgoi Feasibility Study. The project has undertaken a limited number of deposit level assessments which were largely advice on geological, legal, economic, and financial aspects. These activities in scope were consistent with the legal arrangements and had no direct effect on the environment. The one assignment that went deeper was a feasibility study undertaken in 2010 for the Eastern Tsankhi Coalfield, a project of Erdenes TavanTolgoi (ETT), a state-owned mining company under Erdenes MGL. The feasibility study, prepared by Norwest Corporation (USA), assessed geological potential of the coalfield and technical issues to start up the operation of a 15 million ton per annum mine. The study was also in part intended to properly define targets for the initial public offering for ETT planned at that time. The feasibility study provided recommendations on the need for an Environmental Impact Assessment (EIA). The former Ministry of Environment and Tourism formally approved the Environmental Impact Assessment Report for East Tsakhi in Environmental Safeguards. To review that generated information was adequate from a safeguards point of view (even if post-factum in the absence of a clear mechanism at the time the work had been undertaken); an environmental safeguards mission took place in May The mission visited 1

2 Ulaanbaatar and the mine site in the South Gobi region. Based on the review of documentation and interviews, the mission concluded that while the general legal requirements for EIAs in Mongolia were followed, there were a number of shortcomings that need to be addressed. The issues can be grouped in three areas: (i) strategic and cumulative issues related to the development of coal resources in the region (SESA level); (ii) gaps in the EIA prepared by ETT for East Tsankhi, including lacking information on disclosure and consultation and technical level gaps; and (iii) gaps in ETT (and local level) capacity to manage environmental and social risks of mine development. The mission developed an Action Plan recommending specific steps to address these shortcomings; however more detailed work to be carried out by ETT is required. As a Technical Assistance project, following the example of more recent Bank-financed projects supporting mining sector governance reforms, the sensitivity of the mineral sector in general and the work supported for the Erdenes TavanTolgoi (ETT) project, a detailed assessment of the environmental and social impacts from the ETT development, including an assessment of compliance with international best practice and World Bank norms, and recommendations for any remedial actions resulting from implementation need to be conducted. In its final phase of implementation have a number of activities planned that are related to safeguards issues. (i) A Sector Strategic Environment and Social Assessment are expected to be completed by mid (see the ToRs attached); (ii) the Ministry of Environment and Green Development (MEGD) is leading on the work to develop sector specific regulations including those for mine closure. SESA. In parallel to this cumulative assessment, a Strategic Environmental and Social Assessment to assess the regional environmental and social impacts caused by the development of coal mine projects and their associated facilities in the region is prepared. The SESA will be a planning tool that will involve a participatory consultative process aimed to help the Government to: (a) diagnose the key environmental and social problems and opportunities associated with the anticipated growth of Mongolia mining and gas sectors; (b) identify the policy, legal, regulatory, and institutional adjustments and capacity-building actions needed to minimize the adverse cumulative environmental and social impacts of mining and gas operations and associated infrastructure development, while enhancing the positive impacts; and (c) propose specific measures that Government can implement in the near future to improve the environmental and social sustainability of mining and gas sector in Mongolia. SESA was launched in November 2013 and is expected to be completed by the fall of GIS analysis and data from SESA will be made available as appropriate to support preparation of the Cumulative Assessment in TavanTolgoi. 2

3 B. Objectives The objectives of the proposed cumulative impact assessment are to: (a) Evaluate if the ETT project (including its associated facilities) will have an effect on Valuable Ecological Components (VEC); (b) Evaluate if the effect of the ETT project will act cumulatively with that of other projects (either from the past, current time, or in the future); (c) Evaluate if the effect of the ETT project, in combination with the other effects, may cause a significant change now or in the future in the characteristics of the VEC, after the application of mitigation measures. (d) Identify appropriate actions for the ETT project to address its contribution to significant impacts. C. Scope of Work The firm is required by the Government of Mongolia, represented by Ministry of Mining and Ministry of Environment and Green Development, to assist it to: Step 1: Describe the TavanTolgoi coal field development, its setting and other projects and activities that may give rise to cumulative effects. This cumulative impacts assessment will need to sequence planned developments of the mines in the coal fields and ancillary and regional infrastructure development (approximate time horizon of 20 years to start operation). Step 2: Identify key ETT-related contributions to cumulative effects on selected resources of concern, such as ground water, biodiversity, and livelihood of local communities; Step 3: Assess the level of cumulative effects (according to the manual on Cumulative impact assessment, MEGD). Step 4: Determine the impacts of cumulative effects; and Step 5: Recommendations: Analyze reasonable, feasible options for mitigating or avoiding contribution to any significant cumulative effects, following the national legal system related to the cumulative impact assessment1. The final conclusions of the CIA should define the following: (i) to what extent the ETT project will contribute to cumulative impacts; (ii) the mitigation measures which should be implemented by the ETT project; and (iii)the management/mitigation measures which are needed but beyond the scope of the ETT project, including the need for consequent additional assessments that the Government will need to require to ensure sustainable development of the area and to develop core principles for environmental and social management in the area that respective investors and project developers will need to be guided by. D. Main Tasks. Step 1: Describe the ETT development and its setting. Project Description. The first step in the CIA is to describe the ETT project and its phases, including key components that may give rise to cumulative effects. This will include the following: 1 Decree of Minister of Environment and Green Development (dated 14 January

4 Phases and timing of the project; Description of the scheme and project area of influence; Description of offsite facilities including coal transportation, power transmission lines, access roads; Identify environmentally sensitive areas, including protected areas, key stakeholders and affected people. Past, present, and probable future projects. Once ETT project issues have been identified, analyze past, present and probable future projects and activities within a defined temporal and spatial framework. The evaluation of other projects and activities should consider the following: Include those projects of known footprint that can be assessed; Consider a time frame that extends backwards to a pre-development scenario and forwards as realistically as possible; Include projects that are approved, awaiting approval, announced or under design; Include those projects whose environmental and social impacts and contribution to cumulative effects can be reasonably predicted, particularly projects with direct impacts on water resources, land and biodiversity; and, Discuss pending projects with regulators and incorporate the concerns of affected stakeholders. Prepare a map or schematic of all existing and planned projects with the basic information on location, water intake, wastewater discharge points, mining waste, and coal transportation roads. Define VECs. The domestic EIA has already identified some key issues of concern associated with the construction, operation, and decommissioning of the ETT project. Typical impacts include the following: Impacts on water resources (water use, quality, quantity) Impacts on biodiversity and wildlife Impacts on land use and soil? Loss of archaeological and cultural resources Impacts of mining wastes on environment Impacts on air quality Impacts on the livelihood of local communities and herders. Visual Impacts The VECs should be defined based on the assessment of impacts on the above aspects and consultations with stakeholders. VECs could be (but are not limited to): water resources, land erosion, wildlife, cultural resources, air quality etc. Step 2: Identify key ETT-related contributions to cumulative effects on selected resources of concern. The CIA should identify key impacts of ETT project activities throughout all phases (construction, operation and decommissioning) in conjunction with other projects and activities. The following questions should be answered: Are other projects and activities in the defined project area affecting the VECs? Do the effects of the project overlap or increase the effects on the resource? Do the effects of the project have a potential to affect the long-term sustainability of the resource? 4

5 Step 3: Assess the level of cumulative impacts. The next step in the CIA process is to assess the level of cumulative impacts. This uses a similar methodology to that employed in the EIA, but the difference is that it assesses the impacts of other projects and activities, in addition to the project in a defined spatial and temporal framework. For each resource/issue in question, the cumulative effects should consider typical components of an EIA assessment extent, frequency, duration, magnitude, uncertainty and probability. Step 4: Determine the impacts of cumulative impacts. Once the cumulative impacts are determined, their significance must be considered relative to an established threshold limit, an established legal guideline or policy, or a qualitative assessment based on professional opinion and consultation. In any case, the significance of the cumulative impacts must be defensible. The significance of the cumulative impacts and the contribution of the project must be subsequently evaluated by project decision makers. The significance of the ETT project interventions contribution to the cumulative impacts should be defined in one of the following ways: The project has a measurable effect on the resource; The project acts in conjunction with the effects of past present or future projects and activities; and The project in conjunction with other projects and activities shifts the resource to an unacceptable level or exceeds a threshold such that the impact is considered significant, in that: - The project s contribution to cumulative effects is responsible for exceeding the threshold and therefore is significant or, - The project is contributing with the effects of other projects and activities and the project contribution may or may not be significant, depending on the level of the contribution. Step 5: Formulate recommendations. The CIA should reach a conclusion on whether the contribution, if any, to the cumulative impacts by the ETT project is significant or not. An action plan (with time, institutional responsibilities, budget) should be developed based on this conclusion, and clearly define what mitigation measures need to be incorporated into the project Environmental Management Plan, and what mitigation/environmental management measures should be carried out above the project level. For example: Project level mitigation to reduce the impacts of the contribution of the project to cumulative effects; Cooperative mitigation measures between project proponents to reduce cumulative effects, or Regional intervention on behalf of government or regulators to reduce the overall cumulative effect through the establishment of thresholds or policy intervention. Mitigation/environmental management measures that are needed but beyond the scope of the ETT project, will be presented to relevant (government) agencies/entities in the form of a workshop andfinalized based on the views by the agencies. Their endorsement/acknowledgement on the recommendations from the CIA should be sought. 5

6 Presentation and Consultation The consultant will organize and carry out workshops in the Tavan Tolgoi region (the specific sites will be agreed upon with MEGD) to present the findings of the Cumulative Impact Assessment. To ensure meaningful consultations throughout the course of the CIA, key stakeholders, particularly for defining the Valuable Ecosystem Components and final results should be clearly documented. The records of public consultations undertaken will form part of the final deliveries by the consultant. The expected result of the workshops will be the following: (i) stakeholders will validate environmental, social (including labor and resettlement), health, safety and security priority concerns at the local level; (ii) workshops should also be a way of informing and engaging stakeholders in the immediate vicinity of the ETT project and impacted area subject to this cumulative assessment; (iii) vulnerable stakeholders (women, children, youth and others) should fully participate in the process, not only leaders, groups and NGOs that claim to represent their interests. E. Outputs Report and Consultation. Based upon the results of the Cumulative Impact Assessment Report, the firm will organize and carry out workshops in the Tavan Tolgoi region (the specific sites will be agreed upon with MEGD and MINIS). F. Duration and Timing The Cumulative Impacts Assessment Report should be completed within 4months of commencement. All reports should be prepared in Mongolian and English both in CD and hard copy. The final presentation workshop should be held within 5months of commencement of the contract. G. Institutional Arrangements The consultant shall report to MEGD and liaise with other agencies of the government including Ministry of Mining, and local authorities. Data will be provided by MEGD, MoM and aimag/soum authorities. Existing EIAs, EMPs, and plans for development will be provided by relevant ministries with facilitation from MEGD. Coordination and contract management will be carried out by MINIS Project Implementation Unit. The final output will be subject to acceptance by MEGD and World Bank for compliance with the World Bank guidelines for safeguards. H. Requirements for the Consultant Team To qualify to carry out the work the consultant should be a consulting firm experienced in performing work on projects similar in size and subject ( the consultant ). The consultant must have the following qualifications: (i) Consultants must have sound knowledge and at least five years work experience plus experience on at least two similar assignments, and must have good knowledge of mining regulations. (ii) The team should comprise the following specialists: 6

7 (1) A Team Leader who is skilled at leading and managing inter-disciplinary teams, can produce well-written reports on time, and is knowledgeable about strategic environmental assessments and extractive industries. (2) An Infrastructure Specialist with at least ten years of relevant experience in infrastructure policy and public administration of the mining sector. (3) A Mining Specialist who is knowledgeable in Mongolian geology and in modern mining technologies and practices. Proven experience in environmental regulatory frameworks and environmental standards for mining activities is required. (4) An Environmental Engineer or Scientist who is knowledgeable about the impacts of miningrelated activities on natural habitats, water, land and biodiversity. Experience in Mongolian terrestrial and aquatic ecosystems is desirable. (5) A Social Development Specialist who is knowledgeable about the direct and indirect social impacts (positive and negative) of mining-related activities including public health. S/he should have proven experience in anthropological studies of indigenous populations. (6) A Stakeholder Engagement Specialist who can effectively manage stakeholder engagement throughout the preparation process, including the facilitation of public consultation events and other large meetings. Specific technical inputs on legal, infrastructure development projects and gender should be provided by the team as needed. I. Payment Schedule Amount and payment of contract shall be in USD. The lump sum fee would be paid in the following manner: Ten percent (10%) upon acceptance of the Inception Report / Work Program and the Consultation and Communications Program. (Advance payment is optional) Fifteen percent (15%) upon acceptance of the Annotated Outline of Cumulative Impact Assessment Report. Twenty five percent (25%) upon acceptance of detailed report on workshops and findings. Twenty Five percent (25%) upon acceptance of Preliminary Draft Cumulative Impact Assessment Reports. Twenty percent (25%) after receiving an approval letter from the Client and upon acceptance of the Final Cumulative Impact Assessment Report. 7

RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014. A. Background

RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014. A. Background Terms of Reference for a Cumulative Impacts Assessment in Baganuur Coal Mine in Mongolia to be financed by Mining Infrastructure Investment Support Project (MINIS) RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014

More information

Tajikistan STRATEGIC ENVIRONMENTAL AND SOCIAL ASSESSMENT (SESA) OF THE MINERAL SECTOR

Tajikistan STRATEGIC ENVIRONMENTAL AND SOCIAL ASSESSMENT (SESA) OF THE MINERAL SECTOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Tajikistan PRIVATE SECTOR COMPETITIVENESS AND FINANCIAL SECTOR STRENGTHENING PROJECT

More information

ToR. Consultancy Firm to undertake Strategic Environmental Assessment (SEA) for the new Mining and Minerals Policy

ToR. Consultancy Firm to undertake Strategic Environmental Assessment (SEA) for the new Mining and Minerals Policy ToR Consultancy Firm to undertake Strategic Environmental Assessment (SEA) for the new Mining and Minerals Policy 1. Strategic Background Rwanda s has achieved a sustained economic growth over the past

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

MINISTRY OF LANDS AND NATURAL RESOURCES NATURAL RESOURCES AND ENVIRONMENTAL GOVERNANCE PROGRAMME (TECHNICAL ASSISTANCE- TA) DRAFT

MINISTRY OF LANDS AND NATURAL RESOURCES NATURAL RESOURCES AND ENVIRONMENTAL GOVERNANCE PROGRAMME (TECHNICAL ASSISTANCE- TA) DRAFT MINISTRY OF LANDS AND NATURAL RESOURCES NATURAL RESOURCES AND ENVIRONMENTAL GOVERNANCE PROGRAMME (TECHNICAL ASSISTANCE- TA) DRAFT TERMS OF REFERENCE (TOR) FOR THE REVISION OF THE FORESTRY DEVELOPMENT MASTER

More information

PROCUREMENT NOTICE. National Individual Consultant (IC): Capacity Building Needs Assessment. Date of issue: 03 August (Re-advertisement)

PROCUREMENT NOTICE. National Individual Consultant (IC): Capacity Building Needs Assessment. Date of issue: 03 August (Re-advertisement) POST TITLE: AGENCY/PROJECT NAME: PLACE OF ASSIGNMENT: PROCUREMENT NOTICE National Individual Consultant (IC) for Capacity Building Needs Assessment. Date of issue: 03 August 2018 (Re-advertisement) National

More information

NEW BUGESERA INTERNATIONAL AIRPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT- CUMULATIVE IMPACT ASSESSMENT

NEW BUGESERA INTERNATIONAL AIRPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT- CUMULATIVE IMPACT ASSESSMENT Intended for Bugesera Airport Company Limited Date January 2018 Project Number UK11-24483 NEW BUGESERA INTERNATIONAL AIRPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT- CUMULATIVE IMPACT ASSESSMENT

More information

Oyu Tolgoi Copper & Gold Mine Associated Power Plant:

Oyu Tolgoi Copper & Gold Mine Associated Power Plant: Oyu Tolgoi Copper & Gold Mine Associated Power Plant: Violations of IFC and World Bank Policies on Environmental Impacts and Criteria for Coal Projects Prepared For: The Sierra Club Gordon Scott November,

More information

Performance Requirements

Performance Requirements Environmental and Social Policy 15 Performance Requirements PR 1: Environmental and Social Appraisal and Management Introduction 1. The EBRD considers it important that all companies receiving EBRD financing

More information

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR Overview of Presentation 1. Objectives of the Consultancy 2. Hydropower in Myanmar 3. Draft Table of Contents 4.

More information

TERMS OF REFERENCE EIA ASSESSMENT CONSULTANCY

TERMS OF REFERENCE EIA ASSESSMENT CONSULTANCY TERMS OF REFERENCE EIA ASSESSMENT CONSULTANCY Location Application deadline Type of Contract Post Level Project Languages required: Duration of Initial Contract: Fiji 22/10/2014 (Fiji Time) Individual

More information

BACKGROUND / INTRODUCTION

BACKGROUND / INTRODUCTION Terms of reference Consultancy Propose a global strong framework on law and legislation for creating and managing deep sea marine protected areas in Lebanon Support to develop the MPA designations and

More information

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Terms of Reference(ToR) for the Strategic Environmental and Social Assessment (SESA) and Environmental Social Management

More information

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Terms of Reference(ToR) for the Strategic Environmental and Social Assessment (SESA) and Environmental Social Management

More information

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE Greater Mekong Subregion Nam Ngum 3 Hydropower Project (RRP LAO 41385) Supplementary Appendix 5 TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE Strengthening Biodiversity

More information

Terms of Reference (TOR)

Terms of Reference (TOR) Annex 4 Terms of Reference (TOR) Conducting Simplified Economic Appraisals for proposed labour intensive public infrastructure projects contributing to local economic development. 1. Project title: Simplified

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 02/01/2018 REF NO.: BBRSO36316 Country: Barbados Description of the assignment: Socio-economic/livelihood assessment consultancy Project name: Conserving

More information

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1 AMDAL Procedure (This is only indicative and for reference purposes. This is not exhaustive and therefore, the Consultants are requested to familiarize themselves with all the laws, rules, regulations,

More information

Terms of Reference. National or International consultants: International Consultant

Terms of Reference. National or International consultants: International Consultant Terms of Reference National or International consultants: International Consultant Description of the assignment (Title of consultancy): Development of National Guidelines for the Management of Rangelands

More information

Infrastructure, Environment, and Regional Development in South-Eastern Mongolia Issues Note The South Gobi region is poised for a major boom in

Infrastructure, Environment, and Regional Development in South-Eastern Mongolia Issues Note The South Gobi region is poised for a major boom in Infrastructure, Environment, and Regional Development in South-Eastern Mongolia Issues Note The South Gobi region is poised for a major boom in economic activity, with a foundation based on planned development

More information

THE COMMON MARKET FOR EASTERN AND SOUTHERN AFRICA REGIONAL TOBACCO FARMING STUDY CALL FOR APPLICATIONS

THE COMMON MARKET FOR EASTERN AND SOUTHERN AFRICA REGIONAL TOBACCO FARMING STUDY CALL FOR APPLICATIONS THE COMMON MARKET FOR EASTERN AND SOUTHERN AFRICA REGIONAL TOBACCO FARMING STUDY CALL FOR APPLICATIONS November 2017 0 P a g e A. Background Project title: Assignment title: An analysis of the trade, social,

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

Mining Environmental Impact Assessment Guidelines. May 2018

Mining Environmental Impact Assessment Guidelines. May 2018 Mining Sector Environmental and Social Impact Assessment Guidelines Mining Environmental Impact Assessment Guidelines May 2018 Background Mining EIA Guidelines Working Group established by Minister of

More information

UNRAVELING THE MYRAID OF STANDARDS AND TOOLS

UNRAVELING THE MYRAID OF STANDARDS AND TOOLS UNRAVELING THE MYRAID OF STANDARDS AND TOOLS HYDRO POWER DEVELOPMENT IN MEKONG REGION: CYCLING THROUGH FROM POLICY TO IMPLEMENTATION WORKSHOP SEPTEMBER 12-13, 2013 Basin Wide National regulations Project

More information

Development of an Environmental Manual for Environmental and Social Assessment, Management and Monitoring for the Road Sector in Suriname

Development of an Environmental Manual for Environmental and Social Assessment, Management and Monitoring for the Road Sector in Suriname Development of an Environmental Manual for Environmental and Social Assessment, Management and Monitoring for the Road Sector in Suriname 1. Background Information Terms of Reference Currently, the implementation

More information

SUSTAINABLE HYDROPOWER DEVELOPMENT A NORWEGIAN-GEORGIAN COOPERATION PROGRAM. A Citizen s Guide. Communication and Hydropower EIA

SUSTAINABLE HYDROPOWER DEVELOPMENT A NORWEGIAN-GEORGIAN COOPERATION PROGRAM. A Citizen s Guide. Communication and Hydropower EIA Communication and Hydropower EIA September, 2014 Dhillion, S.S. and Bakhtadze, M. 2014. A Citizen s Awareness Guide: Communication and Hydropower EIA. Sustainable Hydropower Development in Georgia. Report

More information

TERMS OF REFERENCE Risk Informed Budgeting Reference: PN/FJI Based in Suva (Fiji) with travel to Solomon Islands, Tonga and Vanuatu

TERMS OF REFERENCE Risk Informed Budgeting Reference: PN/FJI Based in Suva (Fiji) with travel to Solomon Islands, Tonga and Vanuatu Location Application deadline Type of Contract Post Level Languages required: TERMS OF REFERENCE Risk Informed Budgeting Reference: PN/FJI-18-17 Based in Suva (Fiji) with travel to Solomon Islands, Tonga

More information

Terms of Reference UNITED NATIONS PERCEPTION SURVEY IN RWANDA

Terms of Reference UNITED NATIONS PERCEPTION SURVEY IN RWANDA Terms of Reference UNITED NATIONS PERCEPTION SURVEY IN RWANDA 1.0 Introduction As part of the overall UN reform process, the Delivering as One (DaO) in Rwanda was launched at the beginning of 2007 with

More information

TERMS OF REFERENCE FOR NIUE R2R PROTECTED AREAS SPECIALIST

TERMS OF REFERENCE FOR NIUE R2R PROTECTED AREAS SPECIALIST A. Project Title: TERMS OF REFERENCE FOR NIUE R2R PROTECTED AREAS SPECIALIST Application of Ridge to Reef Concept for biodiversity conservation, and for the enhancement of ecosystem services and cultural

More information

IEMA ES Review Criteria

IEMA ES Review Criteria IEMA ES Review Criteria Structure of the Criteria The criteria are split into three sections and a review report is structured accordingly: Section 1 addresses all of the information contained within an

More information

United Nations Children s Fund (UNICEF) Phnom Penh, Cambodia

United Nations Children s Fund (UNICEF) Phnom Penh, Cambodia United Nations Children s Fund (UNICEF) Individual Consultant Technical Adviser to support the implementation of Cambodia PROTECT: A Communication Strategy to End Violence against Children and Unnecessary

More information

Environmental Governance in Myanmar. U Than Aye Director Environmental Conservation Department

Environmental Governance in Myanmar. U Than Aye Director Environmental Conservation Department Environmental Governance in Myanmar U Than Aye Director Environmental Conservation Department 1 Strategy for Environmental Safeguards To work for Economic Development in Parallel with Environmental Conservation

More information

NATIONAL ENVIRONMENTAL MANAGEMENT AUTHORITY (NEMA)

NATIONAL ENVIRONMENTAL MANAGEMENT AUTHORITY (NEMA) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL ENVIRONMENTAL MANAGEMENT AUTHORITY (NEMA) TERMS OF REFERENCE (TOR) FOR STRATEGIC

More information

TERMS OF REFERENCE Issued on: 26 November 2015

TERMS OF REFERENCE Issued on: 26 November 2015 Ref: UN-HABITAT/VA-I/2015/011 ORGANIZATIONAL LOCATION: FUNCTIONAL TITLE: DUTY STATION: PROJECT: GRAGE: STARTING DATE: United Nations Human Settlements Programme Myanmar No. 6, Natmauk Road, Yangon, Myanmar

More information

Period of assignment/services: 132 working days that shall end after 12 months following the contract signature

Period of assignment/services: 132 working days that shall end after 12 months following the contract signature Description of the assignment (Title of consultancy): Development of National Urban Policies in Lebanon Project Title: National Urban Policies in the Arab World Period of assignment/services: 132 working

More information

TERMS OF REFERENCE Socio-economic/ Livelihood Assessment and Site-based Sustainable Finance Plans Consultancy

TERMS OF REFERENCE Socio-economic/ Livelihood Assessment and Site-based Sustainable Finance Plans Consultancy TERMS OF REFERENCE Socio-economic/ Livelihood Assessment and Site-based Sustainable Finance Plans Consultancy Project Title: Conserving biodiversity and reducing habitat degradation in Protected Areas

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6108 Project Name. Mineral Development Support Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6108 Project Name. Mineral Development Support Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6108 Project Name Mineral

More information

Terms of Reference for an International Legal Consultant [and a Local Legal Adviser], among other things, to review draft legislation governing

Terms of Reference for an International Legal Consultant [and a Local Legal Adviser], among other things, to review draft legislation governing Terms of Reference for an International Legal Consultant [and a Local Legal Adviser], among other things, to review draft legislation governing 1. Background PRIVATIZATION The Government of [COUNTRY] (the

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE NATIONAL EXPERT TO CONDUCT CLIMATE VULNERABILITY & RISK ASSESSMENT FOR THE FISHERIES SECTOR IN LIBERIA

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE NATIONAL EXPERT TO CONDUCT CLIMATE VULNERABILITY & RISK ASSESSMENT FOR THE FISHERIES SECTOR IN LIBERIA INDIVIDUAL CONSULTANT PROCUREMENT NOTICE NATIONAL EXPERT TO CONDUCT CLIMATE VULNERABILITY & RISK ASSESSMENT FOR THE FISHERIES SECTOR IN LIBERIA PROCUREMENT NOTICE No. UNDP/IC/E&E/022/2018 Date: 26 June

More information

The undertaking involves 4 NGOs/CSOs under separate contract as follows:

The undertaking involves 4 NGOs/CSOs under separate contract as follows: TERMS OF REFERENCE FOR STRENGTHENING PARTICIPATORY STRUCTURES AND CONDUCTING CAPACITY BUILDING TRAININGS TO ENHANCE STAKEHOLDER ENGAGEMENT FOR UGANDA S NATIONAL REDD+ PROGRAMME AT NATIONAL LEVEL AS WELL

More information

Minerals and Infrastructure Development in the South. Ministry of Industry and Trade

Minerals and Infrastructure Development in the South. Ministry of Industry and Trade Minerals and Infrastructure Development in the South Ministry of Industry and Trade 1 The South Region The South region comprises Umnugobi, Dornogobi, Dundgobi, and Gobisumber aimags. Strategic deposits:

More information

SOUTH SUDAN EASTERN AFRICA REGIONAL TRANSPORT, TRADE AND DEVELOPMENT FACILITATION PROGRAM (SS-EARTTDFP) PROJECT ID (P131426)

SOUTH SUDAN EASTERN AFRICA REGIONAL TRANSPORT, TRADE AND DEVELOPMENT FACILITATION PROGRAM (SS-EARTTDFP) PROJECT ID (P131426) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOUTH SUDAN EASTERN AFRICA REGIONAL TRANSPORT, TRADE AND DEVELOPMENT FACILITATION PROGRAM

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Generic Terms of Reference (ToR) for Consulting Services for Environmental Impact Assessment (EIA) and Preparation of Environmental Management Plans (EMPs) for Transport Sector (Bridge and/or Road) Projects

More information

FOR DISCUSSION ONLY. (A) ADB Safeguard Policy Statement. (C) Extent of Equivalence 2

FOR DISCUSSION ONLY. (A) ADB Safeguard Policy Statement. (C) Extent of Equivalence 2 Comparative Analysis of Lao PDR s Legal Framework and Environment Safeguards in the Environmental Safeguards Objectives: To ensure the environmental soundness and sustainability of projects and to support

More information

TERMS OF REFERENCE (TOR) Legal and Justice Sector Reform Programme Development of Change Management Strategy

TERMS OF REFERENCE (TOR) Legal and Justice Sector Reform Programme Development of Change Management Strategy TERMS OF REFERENCE (TOR) Legal and Justice Sector Reform Programme Development of Change Management Strategy 1. BACKGROUND AND PROJECT DESCRIPTION An efficient and effective legal and justice service delivery

More information

Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT Weda Bay Nickel Project. Summary

Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT Weda Bay Nickel Project. Summary APPRAISAL REPORT CAO Appraisal for Audit of MIGA CAO Compliance October 3, 2011 PT Weda Bay Nickel Indonesia Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT

More information

SEMINAR ON CUMULATIVE IMPACT ASSESSMENT & MANAGEMENT

SEMINAR ON CUMULATIVE IMPACT ASSESSMENT & MANAGEMENT SEMINAR ON CUMULATIVE IMPACT ASSESSMENT & MANAGEMENT 29 February 2016 Seminar Agenda Time Item 09.00 Agenda/objectives 09.05 Impact Assessment Toolbox: Situating the CIA 09.15 What is Cumulative Impact

More information

DETAILED TERMS OF REFERENCE FOR

DETAILED TERMS OF REFERENCE FOR DETAILED TERMS OF REFERENCE FOR INTERNATIONAL LEAD EXPERT FOR THE PREPARATION OF THE PROJECT DOCUMENT A RIDGE-TO-REEF APPROACH FOR THE INTEGRATED MANAGEMENT OF MARINE, COASTAL AND TERRESTRIAL ECOSYSTEMS

More information

Terms of Reference. Application type: External vacancy Job Title: Category: Duty station:

Terms of Reference. Application type: External vacancy Job Title: Category: Duty station: Terms of Reference NATIONAL/INTERNATIONAL CONSULTANT ON WASTE MANAGEMENT TO SUPPORT THE ELABORATION OF A PROJECT PROPOSAL ON SOLID WASTE MANAGEMENT FOR KIGALI CITY, RWANDA, FOR SUBMISSION TO NATIONAL AUTHORITIES

More information

In all our projects, we seek to provide fresh inspiration and practical solutions that have a positive impact.

In all our projects, we seek to provide fresh inspiration and practical solutions that have a positive impact. Lapis Elite Consulting Services Text for Profile on Website Overview Lapis Elite Consulting Services provides a broad range of consultancy and professional services, including management consulting, organisational

More information

Comparative Analysis of Cambodia Legal Framework and ADB Safeguard Policy Statement: ENVIRONMENT

Comparative Analysis of Cambodia Legal Framework and ADB Safeguard Policy Statement: ENVIRONMENT Comparative Analysis of Cambodia Legal Framework and : ENVIRONMENT Policy Principle 1: Use a screening process for each proposed project, as early as possible, to determine the appropriate extent and type

More information

SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD

SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Critical criterion 1.4 of the 2017 SAN Standard requires that an independent

More information

SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD

SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD SAN GUIDANCE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Critical criterion 1.4 of the 2017 SAN Standard requires that an independent

More information

3.0 APPROACH AND METHODOLOGY

3.0 APPROACH AND METHODOLOGY 3.0 APPROACH AND METHODOLOGY The EIA will be completed to meet the requirements as set out in the Environmental Impact Assessment Guidelines and Procedures for Barbados, 1998 and the Thermal Power Guidelines

More information

The objectives of the consultancy are the following:

The objectives of the consultancy are the following: TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT TERMS OF REFERENCE Hiring Office: Purpose and background of consultancy: MNG06FPA GBV Project The One Stop Service Center (OSSC) is an international best practice

More information

GREEN DEVELOPMENT POLICY

GREEN DEVELOPMENT POLICY GREEN DEVELOPMENT POLICY 1. A NEED AND JUSTIFICATION FOR THE TRANSITION TO GREEN DEVELOPMENT 1.1. Global Perspective Climate change, rapid economic and population growth, the sharp increase in consumption

More information

TERMS OF REFERENCE Individual Contractor. Phnom Penh Cambodia and Home Based Expected Place of Travel:

TERMS OF REFERENCE Individual Contractor. Phnom Penh Cambodia and Home Based Expected Place of Travel: TERMS OF REFERENCE Individual Contractor 1. Assignment Information Assignment Title: International Senior Forest Economist Cluster/Project: Policy and Advocacy Unit Post Level: Senior Specialist Contract

More information

Support for Competitive Procurement of Renewables in Mongolia

Support for Competitive Procurement of Renewables in Mongolia TERMS OF REFERENCE Support for Competitive Procurement of Renewables in Mongolia 1. Background The European Bank for Reconstruction and Development ( EBRD or the Bank ) and the Mongolian Ministry of Energy

More information

TERMS OF REFERENCE - LRPS

TERMS OF REFERENCE - LRPS TERMS OF REFERENCE - LRPS-2017-9131824 UNICEF Mozambique Purpose of the Assignment: Institutional consultancy to develop and implement a Communication for Development Capacity Building Training package

More information

1. Background Provisioning Regulating: Cultural:

1. Background Provisioning Regulating: Cultural: IN PARTNERSHIP WITH EXECUTIVE SUMMARY The Myanmar hydropower sector, in the early stages of development, has the opportunity to develop sustainably by balancing electricity generation with environmental

More information

Three-month consultancy (total of 40 working days)

Three-month consultancy (total of 40 working days) Position Title: Position Location: Status: Travel Requirement: Language requirement Mid-Term Evaluation Consultant Ottawa, Ontario Three-month consultancy (total of 40 working days) None anticipated Fluency

More information

IDAL & THE SUSTAINABLE DEVELOPMENT GOALS (SDGS)

IDAL & THE SUSTAINABLE DEVELOPMENT GOALS (SDGS) SUSTAINABLE DEVELOPMENT GOALS (SDGS) investinlebanon.gov.lb THE ROLE OF IDAL IN ACHIEVING THE UNITED NATIONS SUSTAINABLE DEVELOPMENT GOALS IN LEBANON INTRODUCTION In 2016, the UN launched its 2030 Agenda

More information

Terms of Reference for National Consultant for Project Formulation Policy Framework Capacity and Conservation Needs Assessment (National)

Terms of Reference for National Consultant for Project Formulation Policy Framework Capacity and Conservation Needs Assessment (National) Terms of Reference for National Consultant for Project Formulation Policy Framework Capacity and Conservation Needs Assessment (National) Consultancy Period: 100 days over period from September 2013 to

More information

Landscape Level Planning new paradigms for sustainable development

Landscape Level Planning new paradigms for sustainable development Pippa Howard Fauna & Flora International Landscape Level Planning new paradigms for sustainable development Landscape Level Planning new paradigms for sustainable development Pippa Howard, Director, Business

More information

Multi-Year Area-Based Permitting Policy for Mineral and Coal Exploration Activities

Multi-Year Area-Based Permitting Policy for Mineral and Coal Exploration Activities Mines and Mineral Resources Division Multi-Year Area-Based Permitting Policy for Mineral and Coal Exploration Activities 1. Introduction The Mines and Mineral Resources Division (MMRD) has historically

More information

REQUEST FOR EXPRESSIONS OF INTEREST. (Long Term Individual Consultants, Environmental and Social Safeguards - Energy Sector)

REQUEST FOR EXPRESSIONS OF INTEREST. (Long Term Individual Consultants, Environmental and Social Safeguards - Energy Sector) REQUEST FOR EXPRESSIONS OF INTEREST (Long Term Individual Consultants, Environmental and Social Safeguards - Energy Sector) 01 BP 1387 Abidjan 01 Côte d'ivoire Téléphone : +225 20 26 38 31 1. The (AfDB)

More information

Public Information Note. Ongoing World Bank Study of Biodiversity Offsets

Public Information Note. Ongoing World Bank Study of Biodiversity Offsets Working Draft September 17, 2013 Public Information Note Ongoing World Bank Study of Biodiversity Offsets 1. Quick Summary. An ongoing World Bank study is examining the actual and potentially expanded

More information

Three-month consultancy (total of 40 working days)

Three-month consultancy (total of 40 working days) Position Title: Position Location: Status: Travel Requirement: Language requirement Mid-Term Evaluation Consultant Ottawa, Ontario Three-month consultancy (total of 40 working days) None anticipated Fluency

More information

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI

More information

TERMS OF REFERENCE STRATEGIC ENVIRONMENTAL, POVERTY AND SOCIAL ASSESSMENT (SEPSA) FOR CORRIDOR IMPROVEMENT PROGRAM (CIP)

TERMS OF REFERENCE STRATEGIC ENVIRONMENTAL, POVERTY AND SOCIAL ASSESSMENT (SEPSA) FOR CORRIDOR IMPROVEMENT PROGRAM (CIP) TERMS OF REFERENCE STRATEGIC ENVIRONMENTAL, POVERTY AND SOCIAL ASSESSMENT (SEPSA) FOR CORRIDOR IMPROVEMENT PROGRAM (CIP) Background The Government wants to sustain the current economic growth by improving

More information

Terms of Reference (ToR) End-of-the Project Evaluation UNDP Support to the Strategic Capacity Building Initiative

Terms of Reference (ToR) End-of-the Project Evaluation UNDP Support to the Strategic Capacity Building Initiative Terms of Reference (ToR) End-of-the Project Evaluation UNDP Support to the Strategic Capacity Building Initiative Introduction In 2011, The Government of Rwanda and the United Nations Development Programme

More information

REDD+ READINESS ACTIVITIES. Terms of Reference Study on Demand and Supply of Wood Products in Kenya

REDD+ READINESS ACTIVITIES. Terms of Reference Study on Demand and Supply of Wood Products in Kenya REDD+ READINESS ACTIVITIES Terms of Reference Study on Demand and Supply of Wood Products in Kenya 22 nd August 2012 1. Background REDD+ (Reducing Emissions from Deforestation and Forest Degradation, and

More information

National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR

National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR By Xaypaseuth PHOMSOUPHA Deputy Director General Department of Energy Promotion and Development Ministry of

More information

I Background and rationale

I Background and rationale REDD-Forestry and Climate Change Cell Ministry of Forests and Soil Conservation Babarmahal, Kathmandu, Nepal Terms of Reference Analytical Study on Assessing the Value of Forests, the Political Economy

More information

Terms of Reference for the recruitment of an International Consultant for the Setting up of a National Council of Social Work in Mauritius

Terms of Reference for the recruitment of an International Consultant for the Setting up of a National Council of Social Work in Mauritius CONSULTANCY SERVICES FOR THE SETTING UP OF A NATIONAL COUNCIL OF SOCIAL WORK (NCSW) IN COLLABORATION WITH MINISTRY OF SOCIAL SECURITY, NATIONAL SOLIDARITY & REFORM INSTITUTIONS AND UNITED NATIONS DEVELOPMENT

More information

TERMS OF REFERENCE Review of the Joint UNDP and UN Women programme Inclusive development and empowerment of Women in Rakhine State

TERMS OF REFERENCE Review of the Joint UNDP and UN Women programme Inclusive development and empowerment of Women in Rakhine State TERMS OF REFERENCE Review of the Joint UNDP and UN Women programme Inclusive development and empowerment of Women in Assignment Title Rakhine State International Consultant for Conflict Sensitivity National

More information

THE COLOMBO PLAN. (Colombo Plan Gender Affairs Programme) Terms of Reference

THE COLOMBO PLAN. (Colombo Plan Gender Affairs Programme) Terms of Reference THE COLOMBO PLAN For Cooperative Economic and Social Development in Asia and the Pacific (Colombo Plan Gender Affairs Programme) Terms of Reference Institutional Capacity Assessments and Improvement Plans

More information

EBRD Performance Requirement 1

EBRD Performance Requirement 1 EBRD Performance Requirement 1 Assessment and Management of Environmental and Social Impacts and Issues Introduction 1. This Performance Requirement (PR) establishes the importance of integrated assessment

More information

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental

More information

TERMS OF REFERENCE. Green enterprize Innovation and Development Project

TERMS OF REFERENCE. Green enterprize Innovation and Development Project Country Office for Zimbabwe and Namibia Call for Consultancy: An assessment of supply of and demand for technical and vocational skills to support green jobs opportunities for young women and men in Zimbabwe.

More information

ENVIRONMENT ASSESSMENT TOOLS FOR IMPROVING THE SUSTAINABILITY OF DEVELOPMENT IN THE MEKONG REGION

ENVIRONMENT ASSESSMENT TOOLS FOR IMPROVING THE SUSTAINABILITY OF DEVELOPMENT IN THE MEKONG REGION ENVIRONMENT ASSESSMENT TOOLS FOR IMPROVING THE SUSTAINABILITY OF DEVELOPMENT IN THE MEKONG REGION INTRODUCTION This brief introduces the main environmental assessment tools now used in the Mekong region

More information

REDD Readiness Progress Fact Sheet COUNTRY: ARGENTINA August 2016

REDD Readiness Progress Fact Sheet COUNTRY: ARGENTINA August 2016 1. R-PP Preparation and FCPF Readiness grant - Argentina s R-PP was assessed by FCPF PC at PC6 (June 2010), and the Readiness Preparation Grant funding was allocated. - The FCPF FMT confirmed on March

More information

Senior Minister, Minister of Environment

Senior Minister, Minister of Environment Unofficial Translation by Mr. DANH Serey, EIA Department KINGDOM OF CAMBODIA Nation Religion King MINISTRY of ENVIRONMENT N. 376 BRK.BST Phnom Penh, 02 September 2009 - - - - - - - PRAKAS (DECLARATION)

More information

IUCN Policy on Biodiversity Offsets

IUCN Policy on Biodiversity Offsets IUCN Policy on Biodiversity Offsets 1. Purpose Statement The purpose of this policy is to provide a framework to guide the design, implementation and governance of biodiversity offset schemes and projects.

More information

TERMS OF REFERENCE FOR TA CONSULTANTS

TERMS OF REFERENCE FOR TA CONSULTANTS Skills for Competitiveness Project (TRTA CAM 50394) TERMS OF REFERENCE FOR TA CONSULTANTS A. Individual consultants for preliminary analytical work 1. Industrial Human Resource Development Specialist (2.5

More information

EAST AFRICAN COMMUNITY DEVELOPING EAC FORESTRY POLICY AND STRATEGY TERMS OF REFERENCE

EAST AFRICAN COMMUNITY DEVELOPING EAC FORESTRY POLICY AND STRATEGY TERMS OF REFERENCE EAST AFRICAN COMMUNITY DEVELOPING EAC FORESTRY POLICY AND STRATEGY TERMS OF REFERENCE EAC SECRETARIAT ARUSHA FEBRUARY, 2018 1 1. INTRODUCTION The East African Community (EAC) is an inter-governmental organization

More information

TERMS OF REFERENCE FOR CONSULTANTS

TERMS OF REFERENCE FOR CONSULTANTS Implementing Innovative Approaches for Improved Water Governance (KSTA MON 51099) TERMS OF REFERENCE FOR CONSULTANTS 1. The knowledge and support technical assistance (TA) consultants will be recruited

More information

TERMS OF REFERENCE FOR MONITORING AND EVALUATION FRAMEWORK AND MONITORING INFORMATION SYSTEM

TERMS OF REFERENCE FOR MONITORING AND EVALUATION FRAMEWORK AND MONITORING INFORMATION SYSTEM TERMS OF REFERENCE FOR MONITORING AND EVALUATION FRAMEWORK AND MONITORING INFORMATION SYSTEM 1. BACKGROUND Zambia has a total land area of 752,618 sq km of which 60% comprises forests. The forests are

More information

Revised mapping of the CITES Strategic Vision: objectives and the Aichi Targets in the Strategic Plan for Biodiversity

Revised mapping of the CITES Strategic Vision: objectives and the Aichi Targets in the Strategic Plan for Biodiversity Revised mapping of the CITES Strategic Vision: 2008 2020 objectives and the Aichi Targets in the Strategic Plan for Biodiversity 2010-2020. Analysis of how CITES Strategic Vision objectives contribute

More information

Terms of Reference for a Gender Analysis

Terms of Reference for a Gender Analysis Terms of Reference for a Gender Analysis 1. BACKGROUND The European Commission defines a gender analysis as the study of differences in the conditions, needs, participation rates, access to resources and

More information

SANDCRETE ENGINEERING NIG. LTD. Background Information Document (BID)

SANDCRETE ENGINEERING NIG. LTD. Background Information Document (BID) ENVIRONMENTAL IMPACT ASSESSEMENT (EIA) FOR THE PROPOSED GOLD (Au) EXPLORATION AND MINING PROJECT AT RANDEGI DISTRICT, BIRNIN GWARI L.G.A OF KADUNA STATE BY SANDCRETE ENGINEERING NIG. LTD Background Information

More information

MINING EIA REVIEW CHECKLIST

MINING EIA REVIEW CHECKLIST EIA Review Checklist Mining and the Environment Mining is a sustainable activity MINING EIA REVIEW CHECKLIST Reviewing the Content General aspects Does the environmental assessment conform to national

More information

Terms of Reference (TOR)

Terms of Reference (TOR) CONFÉRENCE DES NATIONS UNIES SUR LE COMMERCE ET LE DÉVELOPPEMENT UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT Terms of Reference (TOR) External Evaluation of Development Account Project 1415 AX Support

More information

Template for ToR for Transaction Advisory Services

Template for ToR for Transaction Advisory Services Template for ToR for Transaction Advisory Services Addendum 1 Prepared by Genesis Analytics 4 December 2013 PPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services

More information

TO UNDERTAKE A REVIEW OF THE STATE OF STOCKS OF PRIORITY FISHERIES IN KENYA

TO UNDERTAKE A REVIEW OF THE STATE OF STOCKS OF PRIORITY FISHERIES IN KENYA Republic of Kenya MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY KENYA MARINE FISHERIES AND SOCIO-ECONOMIC DEVELOPMENT PROJECT (KEMFSED) TERMS OF REFERENCE

More information

DURATION : 30 working days over the period 20 September November 2016

DURATION : 30 working days over the period 20 September November 2016 Terms of Reference for the recruitment of a national consultant for the formulation of a Project Document on Inclusive Development and Public Sector Efficiency under the Pillar 1 of the UNDP Country Programme

More information

Mongolia: Reforms in Technical and Vocational Education and Training in Mongolia (Preparing the Skills for Employment Project)

Mongolia: Reforms in Technical and Vocational Education and Training in Mongolia (Preparing the Skills for Employment Project) Technical Assistance Report Project Number: 45010 Project Preparatory Technical Assistance (PPTA) December 2012 Mongolia: Reforms in Technical and Vocational Education and Training in Mongolia (Preparing

More information

Environmental and Social Impact Assessment (ESIA) for Oil & Gas Projects, a Myanmar Context

Environmental and Social Impact Assessment (ESIA) for Oil & Gas Projects, a Myanmar Context Environmental and Social Impact Assessment (ESIA) for Oil & Gas Projects, a Myanmar Context Insert then choose Picture select your picture. Right click your picture and Send to back. 26 th January 2015

More information

UNDP-Spain MDG Achievement Fund. Terms of Reference for Thematic Window on Environment and Climate Change

UNDP-Spain MDG Achievement Fund. Terms of Reference for Thematic Window on Environment and Climate Change UNDP-Spain MDG Achievement Fund Terms of Reference for Thematic Window on Environment and Climate Change This document provides policy guidance to UN Country Teams applying for funding under the UNDP-Spain

More information