1 SVL LIFE SCIENCE PVT. LTD. SY.NO. 45/1 TO 45/54 AND 46/1 TO 46/22, KOVVADA AGRAHARAM VILLAGE, PUSAPATIREGA MANDAL, VIZIANAGARAM DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED TO ANDHRA PRADESH STATE POLLUTION CONTROL BOARD, REGIONAL OFFICE, VIZIANAGARAM
2 EXECUTIVE SUMMARY Introduction M/s. SVL Life Science Pvt. Ltd., proposes to establish the unit in an area of acres at Sy.No. 45/1 to 45/54 and 46/1 to 46/22, Kovvada Agraharam Village, Pusapatirega Mandal, Vizianagaram District, Andhra Pradesh. The capital cost of the project is Rs. 25 crores. Prior environmental clearance is mandated by Ministry of Environment, Forest and Climate Change (MoEFCC), vide SO 1533, dated September 14, 2006, for synthetic organic chemicals manufacturing activity. The project sought terms of reference for preparation of EIA report during February 2016, and the scoping of TOR was held in EAC meeting held in April The terms of reference for the environmental impact assessment studies was obtained from MoEFCC vide letter no. F.No. J-11011/83/2016-IA II (I) dated and the draft Environmental impact assessment (EIA) report is prepared in compliance of the TOR to conduct public hearing. Location of the Project: The project site is located at Sy.No. 45/1 to 45/54 and 46/1 to 46/22, Kovvada Agraharam Village, Pusapatirega Mandal, Vizianagaram District, Andhra Pradesh. The site is located at the intersection of (N) latitude and (E) longitude. The site elevation above mean sea level (MSL) is 53 m. The site is surrounded by open lands in all directions. The main approach road is NH 5 passing at a distance of 0.85 km from the plant site in northwest. The nearest habitation from the plant is Kovvada Agraharam village at a distance of 1.4 km in southwest direction. The nearest Town and Railway station is Vizianagaram at a distance of 19.5 km in east direction. The nearest airport is Visakhapatnam located at a distance of 56 km in southwest direction. There are three reserve forests in the study area; Kumili RF at a distance of 1.6 km in northwest direction, Amarsingi RF at a distance of 7.6 km in west direction and Konada RF at a distance of 7.8 km in south direction. Bay of Bengal is at a distance of 8 km in south direction. There are no ecologically sensitive areas like national parks, sanctuaries within 10 km radius of the site. E-1
3 Product Profile The manufacturing capacity of proposed products and by-products are presented in the following tables Manufacturing Capacity S.No Name of the Product CAS No. Capacity Kg/day TPM I. Bulk Drugs 1 Losartan Potassium Pregablin Flucanozole Ketorolac Ondansetron Atrovastatin Calcium Olanzapine Linezolide Sumatriptan Succinate Quetiamine Fumerate Dronedarone HCl Total - I (Worst case 6 Products on campaign basis) II. Drug Intermediates 12 Cis Hydroxy Lactum Pramipexole HCl Total - II III. Fine Chemicals 14 Sodium Methoxide Total - III IV. Nano Carbons 16 Kantera Graphene Oxide Total - IV Grand Total (I+II+III+IV) List of By-Products S.No Name of Product Stage Name of By- product Capacity Kg/day TPM 1 Pregablin II Sodium Methoxide III Ethyl Alcohol Cis Hydroxy Lactum III 2-phenyl ethyl amine Pramipexole HCl I Acetic Acid Kantera III Pyridine HCl E-2
4 Manufacturing Process Chemical synthesis produces the compounds for manufacture. Chemical synthesis consists of four steps - reaction, separation, purification, and drying. Large volumes of solvents are used during chemical synthesis, extractions, and solvent interchanges. The manufacturing process of the above mentioned molecules involve various types of reactions like acetylyzation, protection, deprotection, hydrolysis etc. The manufacturing process of all the compounds, reactions involved, material balance are presented in chapter 2 of EIA report. Utilities It is proposed to establish coal fired boilers of capacity of 10 TPH and 6 TPH. The required steam for process and ZLD system shall be drawn from 10 TPH boiler, while 6 TPH boiler shall be kept as standby. The DG sets requirement for emergency power during load shut down is estimated at 2000 KVA. Accordingly 2 x 1000 Kva and 1 x 500 Kva DG sets are proposed. The list of utilities is presented in the following Table. List of Utilities S.No Description Capacity 1 Coal Fired Boilers (TPH) 1 x 10 1 x 6* 2 DG Sets (KVA)# 2 x x 500 * Boiler shall be kept as standby. #DG sets will be used during load shut down by APTRANSCO. Water Requirement Water is required for process, scrubbers, washing, cooling tower makeup, steam generation and domestic purposes. The required water shall be drawn from bore wells within plant premises in addition to reuse of treated wastewater. The total water requirement is KLD consisting of KLD of fresh water and 111 KLD of recycled water. The water balance for daily consumption is presented in the following table; E-3
5 Water Balance Purpose INPUT (KLD) OUTPUT (KLD) Fresh Water Recycled Water Loss Effluent Process * Washings Scrubber 7 7 Boiler Feed Cooling Tower RO/DM Plant Domestic Gardening 5 5 Gross Total Total * Process effluents contain soluble raw materials, byproducts, solvents etc. Baseline Environmental Data The baseline data was collected in the study area during March to June The baseline data includes collection of samples of ground water, surface water and soil, monitoring of ambient air quality, noise levels, ecological status and meteorological parameters. The analytical results show that the values are within the prescribed limits for air quality. The ground water quality is observed to be above the limits for potable purpose when compared to the prescribed standards of IS: at few locations. Identification and Quantification of Impacts The potential effects due to interaction of environment with the pollution loads from the proposed industry are identified, quantified and assessed to select optimum mitigation and or management measures. The sources of pollution from the proposed plant are air emissions from utilities and process; liquid effluents from process, utilities and domestic usage; solid wastes from process, treatment systems and utilities; and noise pollution from utilities, and process equipment. Impacts on Air quality: The impacts on air quality shall be due to the emissions from Coal Fired Boilers and standby DG sets. The incremental ambient air quality concentrations due to these emissions are quantified using ISC-AERMOD model based on ISCST3 Algorithm. The results indicate marginal increase in ambient air quality concentration. The predicted values for PM, PM 10, PM 2.5, SO 2 and NO x are 5.54, 2.26, 0.99, 7.98 and 9.3 μg/m 3 respectively at a distance of 1.6 km in northeast direction. The cumulative concentrations of baseline air quality combined with predicted values are E-4
6 found to be within the prescribed limits of National Ambient Air Quality Standards. The proposed mitigation and control measures of air pollution shall ensure that the impact on air quality is local within the site area and its surroundings, with low magnitude, medium term duration, and an irreversible impact. The fugitive and diffuse emissions were quantified and the air borne concentrations were predicted using a box model, and the results indicate the work room concentrations were less than the threshold limit values (TLV) for various solvents. Impacts on Water: The water requirement is for process utilities and domestic use. The required water is abstracted from borewells and recycling of treated wastewater. The fresh water requirement is KLD while the recycled water quantity is 111 KLD. No impact on water quality is expected due to the discharge of effluents as zero liquid discharge is envisagedensuring reuse of treated effluents for cooling tower makeup. There is no usage of treated wastewater for on land irrigation. The impact on hydrogeology shall be negative as it is proposed to utilize ground water resulting in impacts at regional level with medium magnitude for a medium term, continuous frequency, and is reversible in the long term. Impacts on Noise quality: The noise levels may increase due to motors, compressors, DG set and other activities. The major source of noise generation is DG sets which emit noise level of maximum 90 db (A) at a reference distance of 1m from the source. The predicted cumulative noise levels (as calculated by the logarithmic model without noise attenuation) ranged between 55 and 75 db(a) at distances of 8 to 12m. The increase in noise levels shall have neutral impact, restricted to within site area due to its low magnitude and occasional frequency. Impacts on Soil: The solid wastes generated from process, utilities and effluent treatment plant may have significant negative impacts if disposed indiscriminately. The total solid waste will be stored separately in Hazardous storage area. Solid waste will be sent to cements plants for co-incineration based on calorific value or sent to TSDF. The operational phase impacts shall be neutral due to effective implementation of mitigative measures in handling, storing and transferring of solid wastes, effluents and chemicals, and development of green belt. E-5
7 Impacts on Ecology: There are no endangered species of flora and fauna in the impact area. The impact on biological environment is neutral with the effect confined mainly to the site area with low magnitude for a medium term with isolated frequency. Impacts on Socio Economy: There is a potential for direct/indirect employment of about 30 people during construction phase and 120 during operation phase. The impact area will have positive benefits due to the project. The project shall have positive impact on socioeconomic environment due to provision of employment both direct and indirect and also due to propose CSR activities to be implemented by the proponent. Environment Management Plan (EMP) The management plan is drawn in consultation with project proponents and technical consultants after evaluating a number of technologies available for mitigation and control of pollution. The EMP is drawn to address the impacts monitored, identified and predicted. The impacts during construction stage are temporary and less significant, the management plan for impacts identified during operation stage is detailed below. Liquid Effluents The effluent generated is mainly from process, washings, scrubbers, cooling towers and boiler blow downs, Reverse osmosis/demineralization plant rejects from pre-treatment of water and domestic wastewater. The waste streams are segregated as high TDS and Low TDS streams. Total Effluent generated and mode of treatment is presented as follows: E-6
8 Total Effluent Generated and Mode of Treatment Description Quantity (KLD) Mode of Treatment HTDS Effluents Process 61.7 Sent to Stripper followed by MEE and ATFD. Stripper Washings 12 Scrubber Effluent 7 RO/DM rejects 10 Total - I 90.7 Condensate sent to Cement Plants for Co-Incineration. MEE and ATFD Condensate sent to Biological treatment plant followed by RO. RO rejects sent to MEE and permeate is reused in cooling towers makeup. LTDS Effluents Boiler Blow downs 5 Sent to Biological Treatment System followed by RO. Cooling Tower Blow down 15 Domestic 4.5 Total - II 24.5 Grand Total (I+II) Effluent Treatment System RO permeate reused for cooling tower makeup. RO rejects sent to MEE. The Effluent management system is developed to ensure `Zero Liquid Discharge. Segregation of effluents is critical in effective treatment of various effluent streams. The effluents are segregated into two streams; High COD/ TDS and Low COD/ TDS streams. Effluents generated from process, washings, scrubbing effluent and rejects from pre-treatment of raw water are considered as High TDS, while utility blow downs and domestic wastewater are considered as Low TDS effluents. The High TDS/ COD Effluents The treatment system for treating High TDS/ COD effluents consists of equalization, neutralization, settling tank, stripper, multiple Effect Evaporator (MEE) followed by agitated thin Ffilm dryer (ATFD). The organic distillate from the stripper is sent to cement plants for co-incineration and aqueous bottom from stripper is sent to MEE followed by ATFD for evaporation. The condensate from the MEE and ATFD are sent to ETP (Biological). Salts from ATFD are disposed to TSDF. The Low TDS/ COD Effluents These effluents along with the condensate from MEE and ATFD are treated in primary treatment consisting of equalization, neutralization, and primary sedimentation followed by secondary biological treatment consisting of aeration tank and clarifier. The treated effluents after biological treatment are subjected to tertiary treatment in a reverse osmosis E-7
9 (RO) system. Permeate from RO is reused for cooling tower and boiler make-up and rejects are sent to MEE followed by ATFD. Sludge from various units of Biological treatment and effluent pretreatment is thickened in sludge handling system and sent to TSDF. Air Pollution The sources of air emission expected from the plant are coal fired boiler and DG sets. Bag filter will be provided as air pollution control equipment for 10 TPH and 6 TPH coal fired boilers. DG sets shall be provided with effective stack height based on the CPCB formula. The process emissions contain Ammonia, Carbon dioxide Hydrogen, Hydrogen Bromide, Hydrogen Chloride, Nitrogen, Oxygen and Sulfur dioxide. Ammonia, Hydrogen chloride, Hydrogen Bromide and Sulphur dioxide are sent to scrubber in series. Ammonium Chloride from ammonia scrubbing, Sodium chloride from HCl scrubbing, Sodium bromide from HBr Scrubbing and Sodium Bisulfite from Sulphur dioxide Scrubbing are sent to ETP. The other gases Carbon dioxide, Oxygen and Nitrogen are let out into atmosphere following a standard operating procedure, while Hydrogen gas is let out into atmosphere through a water column. Diffuse emissions are also released from various operations of manufacturing like centrifuge, drying, distillation, extraction etc. These emissions mainly contain volatile contents of the material used for processing. It is proposed to provide vent condensers in series to reactors, distillation columns, driers and centrifuge etc. to mitigate VOC emissions release. Solvent Use and Recycle Solvents are used for extraction of products and as reaction medium. Used solvents are recovered by distillation for reuse. Residues from distillation columns and mixed solvents shall be sent to TSDF for incineration or cement plants for co-incineration. If any of the distilled spent solvents are not reused due to statutory reasons the same shall be sold to other reusers. E-8
10 Solid Waste Solid wastes are generated from process, solvent distillation, effluent treatment system, DG sets and boilers. Stripper distillate, process residue and solvent residue are sent to cement plants for co-incineration based on acceptability as the same contain significant calorific value. If these wastes are not suitable for co-incineration, the same are sent to TSDF facility. The evaporation salts are sent to TSDF. Waste oil and used batteries from the DG sets are sent to authorized recyclers. Sludge from effluent treatment plant is considered hazardous and the same is sent to TSDF. Other solid wastes expected from the unit are containers, empty drums which are returned to the product seller or sold to authorized buyers after detoxification. Coal ash from boiler is sold to brick manufacturers. Noise Pollution Noise is anticipated from motors, compressors, centrifuges and DG sets. DG set shall be provided with acoustic enclosure. Motors and compressors shall be mounted properly to ensure reduction of noise and vibration. Employees working in noise generating areas shall be provided with appropriate personnel protective equipment. Occupational Safety and Health Direct exposure to organic chemicals or its raw materials may affect health of employees. Direct exposure to hazardous materials is eliminated by providing closed handling facilities. Personal Protective Equipment (PPE) i.e., hand gloves, safety goggles, safety shoes, safety helmets, respiratory masks etc. are provided to all the employees working in the plant. Company has a policy of providing PPEs to all personnel including contract workers. Periodic medical checkup in addition to checkup during recruitment is adopted to monitor health status of employees. Prevention, maintenance and operation of Environment Control Systems The pollution control equipment, and the effluent treatment systems is monitored periodically to estimate their efficiency and performance potential as part of adaptive management. Proactive maintenance and monitoring program for all equipment and machinery is adopted to identify the problems/under performance of the equipment. Necessary steps will be taken to rectify the identified problems/defects. The E-9
11 management agrees that the results of monitoring will be reviewed periodically to adopt new measures if necessary, for efficient pollution control. Transport systems All the raw materials and finished products are transported by road. Dedicated parking facility is provided for transport vehicles. The plant is located away from highway. Hence there will not be any unauthorized shop or settlements along the road connecting the plant site. There will be truck trips per day to the factory for transporting raw materials and products. Traffic signage will be placed in the battery limit. The drivers of the vehicles will be provided with TREM cards of chemicals and materials to be transported, and will be explained the measure to be adopted during various emergencies Reduce, Recycle and Reuse A number of measures are proposed to achieve high yields and reduce generation of wastes. It shall be the endeavor of R&D team to improve yields through constant research and development activities. The solvents shall be recycled for reuse in the process after distillation. Mother liquors from the first crop shall be reused for process. The steam condensate shall be reused for boiler feed. Treated effluent shall be reused for cooling tower makeup. It is also proposed to explore recovery of various salts from MEE salts, and from process effluents to reduce effluent loads, and quantity of solid waste. Green Belt Development It is proposed to provide green belt in an area of 5.9 acres, covering the boundary of the site as part of environment management plan. Native species shall be identified for plantation and guidelines issued by CPCB for development of green belt shall be followed. The green belt shall enhance environmental quality through mitigation of fugitive emissions, attenuation of noise levels, balancing eco-environment, prevention of soil erosion, and creation of aesthetic environment. Post Project Monitoring Environmental monitoring for water, air, noise and solid waste quality shall be conducted periodically either by proponent or third party. The frequency of monitoring E-10
12 and the quality parameters shall be as suggested by the Ministry of Environment and Forests and Climate Change, Government of India. Environment Management Department The Environment Management Cell of the project shall be headed by Environment Engineer and shall be assisted by 4 nos. of operators, 4 nos. of chemists, 5 nos. of fitters and 2 nos. of horticultural staff. E-11
SRI KUSUMA HARANADHA AGRO FURAL LIMITED (UNIT II) SY. NO
SRI KUSUMA HARANADHA AGRO FURAL LIMITED (UNIT II) SY. NO. 116/1, 119/3, 120/7, 118/2, 119/3, 98/4, 117/2, 119/6,120/2 AND 120/5 ALLIVEDU REVENUE VILLAGE, PEDAVEGI MANDAL, WEST GODAVARI DISTRICT, ANDHRA
More informationPRE FEASIBILITY REPORT
VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,
More informationM/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh
M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25
More informationPRE FEASIBILITY REPORT
ASTRIX LABORATORIES LIMITED SY. NO. 10 & 42, IDA, GADDAPOTHARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Sy. No. 10 & 42, IDA, Gaddapotharam (V), Jinnaram (M), Medak
More informationSREE RAYALASEEMA ALKALIES AND ALLIED CHEMICALS LIMITED SY. NO
SREE RAYALASEEMA ALKALIES AND ALLIED CHEMICALS LIMITED SY. NO. 51/1, 2A, 2B, 2C1, 2C2, 2C3, 56/1, 58/1, 59/1, 60, 62/3/2D2, 2C1/A2, 2C1/A3, 2C2/C, 2G/1, 2E, 2F, 1A, 1B, 62A, 62 B, 63, 64, 70/C2, 72/P,
More informationPRE FEASIBILITY REPORT
ASTRICA LABORATORIES PRIVATE LIMITED SY. NO. Part of 46,50,51,52,53, 54,55&56, ANANTHSAGAR VILLAGE, CHEGUNTA MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED
More informationIDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA
M/s. ARTEMIS BIO TECH LTD., (A Division of Themis Medicare Ltd.,) PLOT NO. 1 & 5, Phase I, IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA PRE FEASIBILITY REPORT Artemis Bio tech Ltd.,
More informationANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI
M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement
More informationPRE FEASIBILITY REPORT
ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL PARK, ATTIVARAM VILLAGE, OZILI MANDAL, SPSR NELLORE DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL
More informationPRE FEASIBILITY REPORT
ESHWAR PHARMACEUTICALS (P) LTD. (Formerly known as Konar Organics Ltd.,) SY. NO. 180/2, IDA KHAZIPALLY, KHAZIPALLY VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Eshwar
More informationPRE FEASIBILITY REPORT
GENSYNTH FINE CHEMICALS PVT. LTD. PLOT NO. 220, 239 & 248, PHASE II, IDA, PASHAMAILARAM VILLAGE, PATANCHERU MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Gensynth Fine Chemicals Pvt. Ltd.,
More informationPRE FEASIBILITY REPORT
AGRSOL (NDA) PVT. LTD SY. NO. 163, 164 & 165, UDUMULAPADU VLLAGE, DHONE MANDAL, KURNOOL DSTRCT, ANDHRA PRADESH PRE FEASBLTY REPORT AGRSOL (NDA) PVT. LTD H.No. 10 2 289/87, 101 Fortune Heights, Shantinagar,
More informationThe unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.
1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad
More informationLG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH
LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s
More informationPRE FEASIBILITY REPORT
DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to
More informationSUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam
More informationM/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA
1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which
More informationPRE FEASIBILITY REPORT
DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS I PLOT NO.137, 138, 145 & 146, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES
More informationPRE - FEASIBILITY REPORT
PRE - FEASIBILITY REPORT For PROPOSED BULK DRUGS INTERMEDIATES MANUFACTURING UNIT at SY. NO: PARTS OF 318, 319 AND 321 LOCATED AT PALLEPAHAD VILLAGE, THURKAPALLY MANDAL, YADADRI - BHONGIR DISTRICT, TELANGANA
More information: Industrial Projects - 2. : 26th October, 2016
1. Proposal No. : IA/AP/IND/26243/2014, 2. MoEFCC File No. : J-11011/408/2014-IA II (I) 3. Category of the Proposal : Industrial Projects - 2 4. Name of the proposal : M/s Divis laboratories limited, Unit
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh
More informationEXECUTIVE SUMMARY SUBMITTED TO ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, VIZIANAGARAM
SMS PHARMACEUTICALS LIMITED, UNIT - VII SY.NO. 160,161,163 TO 168 AND 170 (KANDIVALASA VILLAGE), SY. NO.72 (KOVVADA AGRAHARAM VILLAGE), PUSAPATIREGA MANDAL, VIZIANAGARAM DISTRICT, ANDHRA PRADESH EXECUTIVE
More informationM/S. HETERO INFRASTRUCTURE SEZ LIMITED
ENVIRONMENTAL STATEMENT (FORM - V) FOR THE FINANCIAL YEAR ENDING MARCH-2016. M/S. HETERO INFRASTRUCTURE SEZ LIMITED N.NARASAPURAM(V),NAKKAPALLI(M) VISAKHAPATNAM DISTRICT. SUBMITTED TO : ANDHRA PRADESH
More information4. The ambient air quality monitoring stations We are monitoring the ambient air quality
GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions
More informationFORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25
3 ANNEXURES Annexure 1: Production Details Name of Products Products Production Capacity in MT/Month 1 Metformin Hydrochloride 1000 2 Paracetamol 1200 3 Bronopol 25 By-Products Total 2225 1 Acetic acid
More informationENVIRONMENTAL STATEMENT-FORM-V
ENVIRONMENTAL STATEMENT (FORM V) FOR THE FINANCIAL YEAR ENDING MARCH 2017 M/S. (Formerly CIREX PHARMACEUTICALS LTD) GUNDLAMACHNOOR- VILLAGE, HATHNORA - MANDAL, SANGAREDDY -DISTRICT TELANGANA - 502296 SUBMITTED
More informationEXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT
EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged
More informationAmendment required in the existing EC
Amendment required in the existing EC Change/Addition in Phase I; 250 KLPD Grain based Distillery with 20 MW Co-gen Power Plant / Molasses 160 KLPD based distillery with 12 MW Co-gen Power Plant in Environmental
More informationBALAJI AMINES LIMITED
FOR EXPANSION OF EXISTING SYNTHETIC ORGANIC CHEMICALS MANUFACTURING UNIT BALAJI AMINES LIMITED At Plot No: 4 & 5, Beside Sub-Station-II, I.D.A, Bollaram, Jinnaram (M), Medak District, Telangana State -
More informationRamans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR
Annexure A Product Profile Sr. No. 1 2 Product Crude OBA AND/OR Crude OBA-CBS-X Standardized OBA Solid AND/OR Standardized OBA Liquid Proposed Qty (MT/ M) 400 400 1600 Note : For making Standardized OBA
More informationDESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT
DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,
More informationTo The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar
March 18, 2019 BY HAND DELIVERY/RPAD To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar 382 010 SUB.: APPLICATION FOR SUBMISSION OF ESSENTIAL DETAIL SOUGHT
More informationPRE FEASIBILITY REPORT
DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS II PLOT NO.75A, 75B, 1, 110,111 & 112, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY
More informationINSPIRE INDUSTRIES PVT. LTD.
For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory
More informationPRE FEASIBILITY REPORT
DASAMI LAB PVT.LTD. (Formerly Known as Medchem Organics Pvt. Ltd.) SY.NO. 404, 405, 407, 408, 409 & 410, VELIMINEDU VILLAGE, CHITYAL MANDAL, NALGONDA DISTRICT, TELANGANA PRE FEASIBILITY REPORT M/s. Hazelo
More informationANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management
ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant
More informationPRE FEASIBILITY REPORT
PIRAMAL ENTERPRISES LIMITED SY. NO. 71, 77, 78, 79A to 80A, 81A & 82A, DIGWAL VILLAGE, KOHIR MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Piramal Enterprises Limited Digwal (V), Kohir
More informationFor TOR New Projects. Mo. no. : Contact no. and ID of the Applicant
SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries
More informationMars Power & Steel Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,
More informationProposed Terms of Reference for EIA studies
Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10
More informationANNEXURE A DETAILS OF PRODUCTS
Annexures to Form 1 & Pre Feasibility Report Proposed Project for manufacturing of Dyes Intermediates of M/s Jay Dyechem, Narol-Vatva Road,Ta : City, District : Ahmedabad, Gujarat. ANNEXURE A DETAILS OF
More informationNATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.)
Half yearly compliance report for the period July 2016 to Dec 2016 on the conditions specified in Environmental Clearance issued by Ministry of Environment and Forests & Climate Change. Ref: Ministry s
More informationNorth East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial
More informationProduct Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600
Annexure A Product Profile Sr. No. 1 Product Crude OBA AND/ OR Standardized OBA liquid/ powder MT/ M Consented Ultimate 525 190 AND/ OR 2600-23 - Annexure - B Details of Raw Materials Qty (Kg/ Kg) Qty/
More informationProposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad
1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon
More informationS.V.LABS PVT.LTD. SY.NO. 501,506 & 507, KOYYALAGUDEM VILLAGE, CHOUTUPPAL MANDAL, NALGONDA DISTRICT, TELANGANA
S.V.LABS PVT.LTD. SY.NO. 501,506 & 507, KOYYALAGUDEM VILLAGE, CHOUTUPPAL MANDAL, NALGONDA DISTRICT, TELANGANA PRE FEASIBILITY REPORT S.V. Labs Pvt. Ltd. Plot No: 3,4&5, First Cross, Anrich Industrial Estate,
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,
More informationSynthetic Organic Chemicals 5(f)
SEAC, Gujarat Page 1 of 14 Synthetic Organic Chemicals 5(f) For Terms of Reference [ToR] New Project 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot
More informationPRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi
PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is
More informationNATCO PHARMA LIMITED CHEMICAL DIVISION
Half yearly compliance report for the period - Oct 2016 to March 2017 on the conditions specified in Environmental Clearance issued by Ministry of Environment and Forests & Climate Change. Ref: Ministry
More informationUNSATURATED POLYESTER RESIN
PROJECT REPORT ON UNSATURATED POLYESTER RESIN BY AQUA CHEM INDUSTRIES Survey No. 50/2, Jodhpar (Nadi), Morbi - 363641, Gujarat. I N D E X Sr. No. Contents Page No. 1 Introduction 3 2 Project Description
More informationPREFEASIBILITY REPORT
PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Pannageshwar Sugar Mills Ltd. (PSML), At: Pangaon, Tal.: Renapur, Dist.: Latur, Maharashtra was registered vide registration no. 11-130803 dated 01.01.2001.
More informationRED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE
ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION
More informationEXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,
More informationM/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola
0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,
More informationList of Annexures S. No Description Page No. Other Annexures
List of Annexures S. No Description Page No. I Plant Layout 12 II Manufacturing Description & Flow Chart Details 13-25 III Effluent Treatment Plant Flow Chart & Solid Waste Handling Details 26 IV Water
More informationAnnexure-I List of Products
Annexure-I List of Products Sr. No. Name of Products Quantity (MT/Month) 1. Mono Chloro Acetic Acid (MCA) 300 2. Chloro Acetyl Chloride (CAC) 150 3. Tri Chloro Acetyl Chloride (TCAC) 150 4. Aluminum Chloroide
More informationSUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at
SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER 2011 1 CONTENTS 1.0 Project Description Page 3 2.0 Description
More informationAccord Energy Corporation India Pvt. Ltd.
Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II
More informationEXECUTIVE SUMMARY. (Approved Consultant)
ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CAPTIVE RESIN PLANT OF 100000 TPA PRODUCTION CAPACITY AT ROUTHUSURAMALA VILLAGE, THOTTAMBEDU MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY
More informationZero Liquid Discharge for Pharma Challenges & Solutions
Zero Liquid Discharge for Pharma Challenges & Solutions 5.02.2013 1 Green Chemistry Water & Wastewater Solution www.praj.net 2 Effluent Composition Solvents Methanol MDC ACN IPA Toluene Acetone Ethanol
More informationJ-11011/45/2009- IA II (I)
SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar
More informationSARVANI LABS PVT LTD
EXECUTIVE SUMMARY OF DRAFT EIA REPORT OF SARVANI LABS PVT LTD For Proposed Bulk Drugs & Intermediates Manufacturing Unit AT SY NO: 109, JAYANTHIPURAM (V), JAGGAYYAPET (M), KRISHNA DISTRICT, ANDHRA PRADESH.
More informationLIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation
LIST OF ANNEXURE Annexure-1 Location of the project site Annexure-2 Layout plan Annexure-3 Break up of land area requirement Annexure-4 Details of products and raw materials and storage facility for the
More informationFormat for Appraisal-New:5
SEAC Gujarat: Pageof5 Format for Appraisal-New:5. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) M/S. DHARMANANDAN FINE
More informationREQUIREMENTS FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE JUSTIFICATION FOR MODIFICATION IN THE SCHEME FOR SPENT WASH HANDLING IN THE DISTILLERY PLANT
AMENDMENT IN ENVIRONMENTAL CLEARANCE GRANTED BY MINISTRY OF ENVONMENT AND FORESTS, NEW DELHI VIDE FILE NO. J-11011/773/2007 IA II (I) DATED 16 TH JANUARY, 2008 REQUIREMENTS FOR AMENDMENT IN ENVIRONMENTAL
More informationShri Girija Alloy & Power (I) Pvt. Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Shri Girija Alloy & Power (I) Expansion of Ferro Alloys unit at Submitted to ANDHRA PRADESH POLLUTION CONTROL BOARD 0 1.0 PROJECT DESCRIPTION Shri Girija
More informationRajasthan State Pollution Control Board
M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and
More informationChambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)
Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Reference: Environment clearance to CFG3 Project vides MOEF letter.no. J-11011/664/2008-IAII
More informationDated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana
F.No.10-12/201S-IA.III Government of India Ministry of Environment, Forest & Climate Change (IA.IIISection) Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi - 110 003. To The Director, Mjs Vulcan Waste
More informationSARACA LABORATORIES LIMITED ENVIRONMENT CLEARANCE CONDITION WISE COMPLIANCE REPORT. No.: SEIAA/TS/MDK-38/ , dated: 20:05:2016.
SARACA LABORATORIES LIMITED ENIRONMENT CLEARANCE CONDITION WISE COMPLIANCE REPORT No.: SEIAA/TS/MDK-38/2015-501, dated: 20:05:2016. ( November-2017 - April-2018) S.NO CONDITION Status of Compliance A SPECIFIC
More informationPRE FEASIBILTY REPORT
PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST
More informationKana Aroma Industries. Pre-Feasibility Report
Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,
More informationProduct Profile. Quantity in MT/Month CAS Solvent Dark Violet R Solvent Black
Annexure - A Product Profile Sr. No. Product Name Quantity in MT/Month CAS Existing Proposed Ultimate Number End Users 1 Acid Dyes 5.000-5.000 0.000 -- -- Solvent Yellow 82 12227-67-7 Solvent Dark Violet
More informationRoquette Riddhi Siddhi Private Limited
SUMMARY ON DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Roquette Riddhi Siddhi Private Limited (Expansion of co-generation power plant from 6MW to 18 MW) at Gokak Village & Taluk, Belagavi District,
More informationPROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT
PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.
More informationPre-Feasibility Report For
Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,
More informationTorrent Pharmaceuticals Ltd. Indrad EC Compliance Report
Status of Compliance of stipulated conditions of the Environment Clearance J- 01 It is noted that total water consumption will increase from 1000-1200 m 3 /day to 1200-1300 m 3 /day. Fresh water requirement
More informationPre-Feasibility Report
Pre-Feasibility Report M/s. Veer Poly Chem 0 1. Introduction M/s. Veer Polychem is an existing unit located at Plot 119 & 120, Ranpur road, GIDC Dhandhuka, Dist: Ahmedabad, Gujarat. Currently, unit is
More informationSUMMARY. for New Standalone Cement Grinding Unit. proposed at
SUMMARY of ENVIRONMENT IMPACT ASSESSMENT REPORT for New Standalone Cement Grinding Unit ( 2 x 1.0 million tons per annum) proposed at Gaithulapalem, Tallapalem & Narasapuram Villages, Kasimkota Mandal,
More informationState Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests
State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us
More informationEffluent Treatment Methods And Reverse Osmosis and its Rejects Handling
Effluent Treatment Methods And Reverse Osmosis and its Rejects Handling Dr P P Lal Krishna Chief Executive Officer Ramky Pharma City (India) Ltd Developer of Jawaharlal Nehru Pharma City - Vizag TREATMENT
More informationFor TOR New. 1. Basic Information of the Project:
SEAC, Gujarat: Page 1 of 12 For TOR New. 1. Basic Information of the Project: i Name & Address of the Project site M/s. Shreenathji Dye Chem (Complete details with plot no./survey no., Landmark etc. )
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Shivneri Sugars Ltd., A/p. - Ganesh tekadi, Nhavi (Bk.), Tal.: Koregaon, Dist.: Satara, Maharashtra State was registered vide
More informationTITLE : ZERO LIQUID DISCHARGE TECHNOLOGIES & ECONOMICS
TITLE : ZERO LIQUID DISCHARGE TECHNOLOGIES & ECONOMICS Author : Soham Mehta Managing Director Advent Envirocare Technology Pvt. Ltd. A-1, 8th Floor, Safal Profitaire, Corporate Road, Prahaladnagar, Ahmedabad
More informationPREFEASIBILITY REPORT
PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,
More informationvii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter)
SEAC, Gujarat: Page 1 of 28 For TOR Expansion Case. 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) M/s. Om Interchem
More informationENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT
ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL
More informationADDITIONAL DETAILS OF THE PROJECT
EXISTING CETP UNITS DETAIL ADDITIONAL DETAILS OF THE PROJECT SR.NO NAME OF THE AREA NOS. AREA (IN METER) 1. Equalization tanks I 01 15.00 x 10.00 x 3.00 + 0.50 FB 2. Equalization tanks II 01 9.00 x 10.00
More information(Period April 2017 ~ Sept. 2017)
CHAMBAL FERTILIZERS AND CHEMICALS LIMITED, GADEPAN MOEF ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT [PHASE- I] (Period April 2017 ~ Sept. 2017) Letter No.J-11011 / 8 / 87-IA DT.15.11.88 01. The Project Proponent
More informationPRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Shri Dudhganga Vedganga Sahakari Sakhar Karkhana Limited, (SDVSSKL) located at Bidri (Mouninagar), Tal.: Kagal, Dist.: Kolhapur,
More informationHALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS
HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private
More informationPRE FEASIBILITY REPORT
Apotex Pharmachem India Pvt Ltd, PLOT NO 1 A, 4 th PHASE, BOMMASANDRA INDUSTRIAL AREA, JIGINI LINK ROAD, ANEKAL TALUK, BANGALORE DISTRICT, KARNATAKA STATE PRE FEASIBILITY REPORT M/s Apotex Pharmachem India
More informationPre-Feasibility Report
Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &