Use of WARSSS in Stream Restoration and Watershed Planning. Michigan Aquatic Restoration Conference 2015

Size: px
Start display at page:

Download "Use of WARSSS in Stream Restoration and Watershed Planning. Michigan Aquatic Restoration Conference 2015"

Transcription

1 Use of WARSSS in Stream Restoration and Watershed Planning Michigan Aquatic Restoration Conference 2015 October 22, 2015

2 Use of WARSSS in Stream Restoration and Watershed Planning 1. Watershed Management Planning 2. Catchment-Scale Restoration Management Plans 3. Clean Sediment, Biota, and D.O. TMDLs 4. Reach-Scale Stream Restoration Design 5. Habitat and Biological Monitoring

3 Watershed Assessment of River Stability and Sediment Supply Geomorphology-based framework for evaluating river stability Disproportionate sediment/tp supply Assess instability causes Prioritize restoration efforts Developed with the USEPA

4 Rosgen, 2014

5 Sediment Supply Clean sediments (i.e., non-toxic) Sediment-starved reaches Sources of disproportionately high sediment loads

6 Departure Analysis

7 Watershed Scale Source: Center for Watershed Protection

8 Belle River Watershed Plan

9 Belle River Longitudinal Profile Adapted from Knutilla, 1969

10 Streambank Erosion Screening Stream Types Bank Height Ratio (>1.5 = High/VH) Radius of Curvature-to-Width (<2.25) Altered Riparian Vegetation (mowed turf grass, bare soil, or tilled areas)

11 Watershed Planning: In-Stream Pollutants, Sources, and Causes Source: MDEQ, 2000

12 Impervious Cover Model Belle R. Source: Center for Watershed Protection

13 River Instability Processes Over-widening Accelerated downstream meander migration Chute cutoffs Aggradation (excessive deposition) Degradation (downcutting or incision)

14 Signs of Excess Deposition Pool filling Most of bed exposed during low flow Slope reversals Coarse over-bank deposition Transverse bars; mid-channel bars; side bars

15 Signs of Degradation Exposed till river bed Nickpoints caused by headcutting Stream tributary rejuvenation Steep bars Leaning trees, vertical banks

16 Geomorphic Thresholds Bank height exceeds1.3 x bankfull depth Width-to-Depth Ratio exceeds 1.4 x reference W:d Shift in stream type >25% of banks or vegetation impacted >30% riffle embeddedness >20% pool filling with fine sediment

17 Historic Aerials Time Trend

18 Look for man-made impacts Channelization, dredging, relocation Bed lowering at road crossings Dams, weirs, rock dams, in-line ponds Altered riparian vegetation; cattle Floodplain encroachment; riprap Wood removal; clearing and snagging Excess sediment supply, construction Gravel mining

19 (Rosgen, 2007)

20 Belle River ICD

21 Belle R. IC Drain Departure Analysis Parameter Measure Reference (Richmond Twp) Impaired (ICD) Lateral Stability Width-to - Depth Ratio 18.8 Stable 12.0 Stable Vertical Stability D84 (or Di bar) 2 in. Gravel Stable Silt/clay Aggrading Vegetation Class Tree/Shrub/ Grass Stable Turf Grass Not Functioning Floodplain Connectivity Bank Ht Ratio 1.0 Functioning 2.3 Channelized Entrenchment Ratio 7.9 Functioning 1.5 No Floodplain Hydraulics Gradient 0.112% Functioning % Not Functioning Shear Stress 0.22 lb/ft 2 Sediment Competence 0.08 lb/ft 2 Depositional

22 Deposition, Excessive Wood Removal

23 Natural 2-Stage Ditch Analog

24 Hillslope Failures

25 Natural Toe Wood Analog

26 Subwatershed Restoration Master Plans

27 Subwatershed Master Planning Communicate with multiple landowners Cost savings Leverage infrastructure expenses Various restoration approaches which vary by site constraints

28 Level of Action Required 1. Protection and conservation 2. Riparian management 3. Empirical (adaptive) management approach 4. Active restoration (or combined approach)

29 Phasing by Focus Area Infiltration, tile control structures Water on the landscape Fish passage: culvert replacement, weirs Sediment regime: gravel augmentation, excessive fines Cattle or human access points Floodplain excavation Tree planting Instream habitat: wood

30 TMDLs

31 Dissolved Oxygen TMDLs SOD; algae decomposition >>> anoxic Sulfide and ammonia toxicity Source: G Fred Lee

32 Reach-Scale Restoration

33

34

35 Typical Channelized Stream

36 Floodplain Connectivity Restored

37

38 Microhabitat-Scale Assessments Limiting Factor Analysis Assess specific facets (ex. pools) Interpret biomonitoring results

39

40 Assessing Stream Functions Parameter Simple Measure Intensive Measure Floodplain connectivity Bank Height Ratio Entrenchment Ratio Stage vs. discharge Bedform diversity % Riffles and pools Max. pool depth Variable depth, velocity, Froude number Lateral stability Streambank erosion Replicate cross-sections Riparian vegetation Buffer density, width Vegetation plots Adapted from Harman, et al. 2012

41 Qualitative Habitat Assessment (ex. pools)

42 Ex. Quantitative Pool Assessment Pool type, pool dimensions, pool slope, point bar slope Pool Length to Riffle Width Dimensionless Ratios Pool Max. Depth to Riffle Mean Depth Pool Slope to Avg. Slope Lateral Scour Pool Mean Min. Max.

43 Interpreting Biomonitoring Results by Stream Type (Source: Friends of the Rouge, 2015)

44 Questions?

Watershed Hydrology: Go with the flow. Greg Jennings, PhD, PE

Watershed Hydrology: Go with the flow. Greg Jennings, PhD, PE Watershed Hydrology: Go with the flow Greg Jennings, PhD, PE jenningsenv@gmail.com Streams What are your CHALLENGES? Hydrology too much water Pollutants upstream and on-site Vegetation wrong plants, wrong

More information

Stream Restoration Raccoon Creek A Case Study

Stream Restoration Raccoon Creek A Case Study Stream Restoration Raccoon Creek A Case Study Restoration of a Degraded Stream System Steven Glickauf Presentation Overview Stream Restoration Raccoon Creek Restoration Site Case Study Existing Conditions

More information

IMPROVING OUTCOMES FOR STREAM ALTERATION PROJECTS

IMPROVING OUTCOMES FOR STREAM ALTERATION PROJECTS IMPROVING OUTCOMES FOR STREAM ALTERATION PROJECTS Bethany Matousek Inland Lakes and Streams Program Coordinator Wetlands, Lakes and Streams Unit DEQ Water Resources Division MatousekB@Michigan.gov 517-243-6421

More information

Old Mill School Stream Restoration

Old Mill School Stream Restoration Project Overview This conceptual plan restores and stabilizes two consecutive reaches of a highly incised and unstable stream and reconnects them with the floodplain. The restoration reaches are part of

More information

Mill Creek Restoration in Lower Merion Township. PH (610) ; FAX (610) ;

Mill Creek Restoration in Lower Merion Township. PH (610) ; FAX (610) ; Mill Creek Restoration in Lower Merion Township Vincent L. Sortman 1 and Robert M. Lambert 2 1 Biohabitats, Inc., 15 W. Aylesbury Road, Timonium, MD 21093; PH (410) 337-3659; FAX (410) 583-5678; email:

More information

Stream Assessment Form (Form 1) Unified Stream Methodology for use in Virginia

Stream Assessment Form (Form 1) Unified Stream Methodology for use in Virginia Stream Assessment Form (Form 1) Unified Stream Methodology for use in Virginia Project Name For use in wadeable channels classified as intermittent or perennial Cowardin HUC Date SAR # Class. Impact/SAR

More information

Introduction to stream assessment

Introduction to stream assessment Why do stream assessment? Introduction to stream assessment Given the current condition of rivers and the heightened public interest in them, there is a significant need for the ability to determine the

More information

LITTLE SHADES CREEK RESTORATION PROJECT CWA Section 319(h) Nonpoint Source Implementation Grant Project Workplan #17 ADEM Contract #C

LITTLE SHADES CREEK RESTORATION PROJECT CWA Section 319(h) Nonpoint Source Implementation Grant Project Workplan #17 ADEM Contract #C LITTLE SHADES CREEK RESTORATION PROJECT CWA Section 319(h) Nonpoint Source Implementation Grant Project Workplan #17 ADEM Contract #C90593066 PARTNERS Alabama Department of Environmental Management Cawaco

More information

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015 South St. Vrain / Hall Meadows Restoration Planning August 20, 2015 Agenda Introductions Purpose & Goals of Meeting Planning Area Master Plan Restoration Planning: Cost Estimates, Grants, Scope, Timeline

More information

PROJECT SCREENING MATRIX: A User s Guide

PROJECT SCREENING MATRIX: A User s Guide Version 2.0 Page 1 of 7 November 9, 2010 PROJECT SCREENING MATRIX: A User s Guide BACKGROUND The Project Screening Matrix (Screening Matrix) is one of several tools that comprise the River Restoration

More information

Ten Principles of River Restoration and Four River Project of Korea

Ten Principles of River Restoration and Four River Project of Korea Ten Principles of River Restoration and Four River Project of Korea Randolph T. Hester, G. Mathias Kondolf, Marcia McNally, Department of Landscape Architecture and Environmental Planning University of

More information

STREAM RESTORATION PURPOSE, PRACTICE, AND METHODS. By Marcus Rubenstein, CPESC

STREAM RESTORATION PURPOSE, PRACTICE, AND METHODS. By Marcus Rubenstein, CPESC STREAM RESTORATION PURPOSE, PRACTICE, AND METHODS By Marcus Rubenstein, CPESC WHAT IS STREAM RESTORATION? The return of a stream s lost natural functions, usually resulting from watershed alterations,

More information

Stream Restoration in the Urban Environment Concepts and Considerations

Stream Restoration in the Urban Environment Concepts and Considerations Stream Restoration in the Urban Environment Concepts and Considerations The Restoration of Our Rivers; October 5, 2012 Matthew A. Van Eps, PE & Sandi J. Formica: Watershed Conservation Resource Center

More information

Stream Condition Assessment 2013

Stream Condition Assessment 2013 US Army Corps of Engineers Galveston District Regulatory Branch P.O. Box 1229 2000 Ft Point RD Galveston, Texas 77553-1229 Phone: 409-766-3982 Fax: 409-766-3931 E-mail: ceswg-pe-r@usace.army.mil US Army

More information

Stream Restoration at Road Crossings in Northern Wisconsin. Dale Higgins, USDA Forest Service

Stream Restoration at Road Crossings in Northern Wisconsin. Dale Higgins, USDA Forest Service Stream Restoration at Road Crossings in Northern Wisconsin Dale Higgins, USDA Forest Service Key Points Large # of road and trail stream crossings on the landscape Many crossings adversely impact streams

More information

Background. AEM Tier 2 Worksheet Stream & Floodplain Management. Glossary

Background. AEM Tier 2 Worksheet Stream & Floodplain Management. Glossary AEM Tier 2 Worksheet Stream & Floodplain Management Glossary Bankfull Stage: The stage at which water starts to flow over the flood plain; the elevation of the water surface at bankfull discharge. (This

More information

* For applicants utilizing bank for compensatory mitigation requirements, information below is not applicable.

* For applicants utilizing bank for compensatory mitigation requirements, information below is not applicable. Mitigation Plan (33 CFR 332.4(c)/40 CFR 230.92.4(c)) A mitigation plan is required for all forms of compensatory mitigation, whether permittee-responsible mitigation, mitigation banks, or in-lieu fee mitigation

More information

3.0 Stream Assessment

3.0 Stream Assessment 3.0 Stream Assessment 3.1 Methods Stream aquatic integrity in urban settings is directly affected by the physical changes in the watershed, some of which result in the degradation of the chemical and/or

More information

FORM B: DAMMING AND DIVERSION OF WATER

FORM B: DAMMING AND DIVERSION OF WATER APPLICATION FOR RESOURCE CONSENT FORM B: DAMMING AND DIVERSION OF WATER NOTES Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan

More information

In re: Town of Norwich Pool Dam Reconstruction, Stream Alteration Permit Application

In re: Town of Norwich Pool Dam Reconstruction, Stream Alteration Permit Application Agency of Natural Resources October 20, 2015 Neil R. Fulton Town Manager Town of Norwich P.O. Box 376 Norwich, VT 05055 In re: Town of Norwich Pool Dam Reconstruction, Stream Alteration Permit Application

More information

4.1 Traditional Approach versus Geomorphic Approach

4.1 Traditional Approach versus Geomorphic Approach RESTORATION 4.0 Introduction As we discussed in the Watersheds and Streams Section, many streams have been severely impacted by urbanization as a result of changes in their hydrologic and sediment regimes,

More information

Application for resource consent Form B Damming and diversion of water

Application for resource consent Form B Damming and diversion of water Application for resource consent Form B Damming and diversion of water Notes Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan or

More information

NCS Design Approach. Biology/Ecology Primer. Presented by: Jack Imhof, National Biologist Trout Unlimited Canada

NCS Design Approach. Biology/Ecology Primer. Presented by: Jack Imhof, National Biologist Trout Unlimited Canada NCS Design Approach Biology/Ecology Primer Presented by: Jack Imhof, National Biologist Trout Unlimited Canada Biology/Ecology Key biological principles that are applied Need to speak the same language

More information

Stream Simulation in Very Low Gradient Channels

Stream Simulation in Very Low Gradient Channels University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

MONITORING RECOMMENDATIONS

MONITORING RECOMMENDATIONS MONITORING RECOMMENDATIONS 9 The purpose of this section is to provide general guidance on proposed monitoring activities to provide information for several of the recommended indicators and key uncertainties

More information

Assessing physical habitat condition using River MImAS

Assessing physical habitat condition using River MImAS Assessing physical habitat condition using River MImAS Why? What? How? Chris Bromley Ecology Partnership & Development Unit SEPA Overview Why did we chose the MImAS approach? What is MImAS? How does it

More information

May 15, Lower Squaw Creek Restoration Public Workshop. for The Friends of Squaw Creek Truckee River Watershed Council Sierra Nevada Conservancy

May 15, Lower Squaw Creek Restoration Public Workshop. for The Friends of Squaw Creek Truckee River Watershed Council Sierra Nevada Conservancy Lower Squaw Creek Restoration Public Workshop for The Friends of Squaw Creek Truckee River Watershed Council Sierra Nevada Conservancy Prepared by: Mike Liquori May 15, 2008 Funding for this project has

More information

WHY ARE STREAM IMPROVEMENTS NEEDED IN TENNESSEE? TENNESSEE STREAMS

WHY ARE STREAM IMPROVEMENTS NEEDED IN TENNESSEE? TENNESSEE STREAMS WHY ARE STREAM IMPROVEMENTS NEEDED IN TENNESSEE? TENNESSEE STREAMS Most diverse aquatic fauna in the country Majority of West TN streams are channelized 36,000 miles of degraded stream are in need of restoration

More information

Bluff Creek One Water

Bluff Creek One Water Bluff Creek One Water The Bluff Creek Watershed has no lakes within its boundaries. As the westernmost watershed within the District, land use changes from agricultural to residential have occurred relatively

More information

Table D1: WC-R1 to WC-R3 (Wilket Creek Park)

Table D1: WC-R1 to WC-R3 (Wilket Creek Park) APPENDIX D Table D1: WC-R1 to WC-R3 (Wilket Creek Park) Category of Consideration Criteria Alternative 1 Do Nothing Alternative 2 Local Improvements Alternative 3 Channel Realignment Natural Geomorphic

More information

UNIFIED STREAM METHODOLOGY

UNIFIED STREAM METHODOLOGY UNIFIED STREAM METHODOLOGY for use in Virginia U.S. Army Corps of Engineers, Norfolk District Virginia Department of Environmental Quality January 2007 Table of Contents Acronyms, Equations, Examples,

More information

FINAL REPORT. Dry Gulch Stream Restoration

FINAL REPORT. Dry Gulch Stream Restoration FINAL REPORT Dry Gulch Stream Restoration Biological and Agricultural Engineering Department North Carolina State University Raleigh, North Carolina Town of Carrboro Carrboro, North Carolina December 15,

More information

Western Strait Drainages. Watershed Summaries DRAINAGES EST WRIA 19 EST

Western Strait Drainages. Watershed Summaries DRAINAGES EST WRIA 19 EST Page 31 WESTERN STRAIT DRAINAGES EST WRIA 19 WEST EST Snow, Bullman, Jansen & Olsen Creeks Sekiu River Hoko & Little Hoko Rivers Clallam River & Estuary Pysht River & Estuary Green Creek Jim & Joe Creeks

More information

Habitat Grant Projects Clinton River Watershed

Habitat Grant Projects Clinton River Watershed Habitat Grant Projects Clinton River Watershed L Y N N E S E Y M O U R E N V I R O N M E N T A L E N G I N E E R O F F I C E O F T H E M A C O M B C O U N T Y P U B L I C W O R K S C O M M I S S I O N

More information

Beaver Creek Hydrology, LLC. Franklin, Tennessee

Beaver Creek Hydrology, LLC. Franklin, Tennessee Beaver Creek Hydrology, LLC. Franklin, Tennessee The Harpeth River Blueway Problems with Harpeth River EPA s 303(d) Listed for siltation, habitat alteration, nutrient enrichment and low dissolved oxygen

More information

Treatment Strategies based on Stream Stratification Methodology by W. Barry Southerland Fluvial Geomorphologist, WNTSC, USDA, NRCS

Treatment Strategies based on Stream Stratification Methodology by W. Barry Southerland Fluvial Geomorphologist, WNTSC, USDA, NRCS Treatment Strategies based on Stream Stratification Methodology by W. Barry Southerland Fluvial Geomorphologist, WNTSC, USDA, NRCS Cedar Creek, WA - 2005 Cedar Creek, WA - 2005 Asotin Creek, WA 2005: photo

More information

Hydrologic Regime; Past and Present and Water Quality Implications

Hydrologic Regime; Past and Present and Water Quality Implications Hydrologic Regime; Past and Present and Water Quality Implications Waseca County Water Plan Meeting Waseca County Courthouse Annex November 16, 2016 Dan Girolamo, Area Hydrologist, Waterville, MN Topics

More information

Quittapahilla Creek Watershed Implementation Plan

Quittapahilla Creek Watershed Implementation Plan Quittapahilla Creek Watershed Implementation Plan Introduction Founded in 1997, the Quittapahilla Creek Watershed Association has been working with landowners, private organizations and public agencies

More information

Griswold Creek Subwatershed

Griswold Creek Subwatershed Griswold Creek Subwatershed Griswold Creek is located in Chester and Russell Townships and flows into the Chagrin River in the Village of Hunting Valley. Since the forming of the Chagrin River Watershed

More information

7.0 WATER-BASED CONTROL MEASURES

7.0 WATER-BASED CONTROL MEASURES 7.0 WATER-BASED CONTROL MEASURES 7.1 IDENTIFICATION AND DESCRIPTION OF CONTROL MEASURES Table 7-1 lists the water-based options being considered for implementation in the initial screening stage. Descriptions

More information

Site Selection and Design for Stream Mitigation

Site Selection and Design for Stream Mitigation Site Selection and Design for Stream Mitigation Will Harman, PG Stream Mechanics The Association of State Wetland Managers State/Tribal/Federal Coordination Meeting March 19-21, 2013 NCTC Our Relationship

More information

Fish Passage and Abundance around Grade Control Structures on Incised Streams in Western Iowa

Fish Passage and Abundance around Grade Control Structures on Incised Streams in Western Iowa Fish Passage and Abundance around Grade Control Structures on Incised Streams in Western Iowa John Thomas Hungry Canyons Alliance Mary Culler Iowa State University / Missouri DNR Dimitri Dermisis IIHR

More information

Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018

Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018 Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018 Your comments are encouraged and appreciated, as this will provide us an opportunity to address project issues and

More information

DEVELOPING A WATERSHED IMPROVEMENT PLAN TO MEET MULTIPLE COMMUNITY OBJECTIVES IN GAINESVILLE AND HALL COUNTY, GEORGIA

DEVELOPING A WATERSHED IMPROVEMENT PLAN TO MEET MULTIPLE COMMUNITY OBJECTIVES IN GAINESVILLE AND HALL COUNTY, GEORGIA DEVELOPING A WATERSHED IMPROVEMENT PLAN TO MEET MULTIPLE COMMUNITY OBJECTIVES IN GAINESVILLE AND HALL COUNTY, GEORGIA Chrissy, Thom 1, David Dockery 2, Kevin McInturff 3, Betsy Massie 1, and Lauren Murphy

More information

County-wide Stream Inventory Data Analysis. Executive Summary August 2011

County-wide Stream Inventory Data Analysis. Executive Summary August 2011 Introduction County-wide Stream Inventory Data Analysis Executive Summary August 2011 Arlington County completed a County-wide assessment of streams to determine condition and restoration potential for

More information

Chapter Three: Discussion and Conclusion. 3.1 Introduction/Overview. 3.2 Countywide Stream Assessment

Chapter Three: Discussion and Conclusion. 3.1 Introduction/Overview. 3.2 Countywide Stream Assessment 3.1 Introduction/Overview The objective of this study was to develop a stream prioritization tool that evaluates stream reaches in terms of the potential water quality improvements that could be achieved

More information

Logan River at Rendezvous Park, Channel and Floodplain Restoration: Crack Willow (Salix fragilis) Issues and Management Strategies

Logan River at Rendezvous Park, Channel and Floodplain Restoration: Crack Willow (Salix fragilis) Issues and Management Strategies Logan River at Rendezvous Park, Channel and Floodplain Restoration: Crack Willow (Salix fragilis) Issues and Management Strategies Prepared May 2, 2017 by Darren Olsen, BIO-WEST, Inc. Issues Crack willow

More information

Restoration of Riparian Forests and Riparian Ecosystem Processes and Implications for Salmon Restoration. Katie Ross-Smith Jennifer Hammond

Restoration of Riparian Forests and Riparian Ecosystem Processes and Implications for Salmon Restoration. Katie Ross-Smith Jennifer Hammond Restoration of Riparian Forests and Riparian Ecosystem Processes and Implications for Salmon Restoration Katie Ross-Smith Jennifer Hammond Outline > Background California riparian communities Riparian

More information

Understanding and Restoring Natural Floodplain Function. Gary James CTUIR Fisheries Program Manager

Understanding and Restoring Natural Floodplain Function. Gary James CTUIR Fisheries Program Manager Understanding and Restoring Natural Floodplain Function Gary James Fisheries Program Manager Future of Our Salmon Technical Workshop on Healthy Floodplains Spokane, WA - August 16-18, 2016 Presentation

More information

FIGURE 12-1 FUNCTIONS AND BENEFITS OF HEALTHY STREAMS

FIGURE 12-1 FUNCTIONS AND BENEFITS OF HEALTHY STREAMS 12.0 Introduction This chapter summarizes the analysis and design methodology for drainageway improvements within the County. Definitions are provided for minor and major drainageways and design considerations

More information

Natural Channel Design and Dead River Case Study Stream Restoration in the Great Lakes Basin: Using In-stream Structures & Natural Channel Design

Natural Channel Design and Dead River Case Study Stream Restoration in the Great Lakes Basin: Using In-stream Structures & Natural Channel Design Natural Channel Design and Dead River Case Study Stream Restoration in the Great Lakes Basin: Using In-stream Structures & Natural Channel Design January 22, 2013 S. Paige Baker, PE, MLE Presentation Outline

More information

Stream Watch Visual Survey Instructions

Stream Watch Visual Survey Instructions Stream Watch Visual Survey Instructions The Stream Watch Visual Survey is based on assessment parameters from the EPA's Rapid Bioassessment Protocol Habitat Assessment, Georgia Adopt a Stream Visual Survey,

More information

Massachusetts River and Stream Crossing Standards: Technical Guidelines

Massachusetts River and Stream Crossing Standards: Technical Guidelines Massachusetts River and Stream Crossing Standards: Technical Guidelines August 6, 2004 INTRODUCTION As long and linear ecosystems, rivers and streams are very important for fish and other wildlife movements,

More information

Gwinnett County Dept. of Water Resources Watershed Improvement Program. Russell Manley, CFM, Gwinnett County DWR Kevin Middlebrooks, CH2M

Gwinnett County Dept. of Water Resources Watershed Improvement Program. Russell Manley, CFM, Gwinnett County DWR Kevin Middlebrooks, CH2M Gwinnett County Dept. of Water Resources Watershed Improvement Program Russell Manley, CFM, Gwinnett County DWR Kevin Middlebrooks, CH2M Gwinnett County: Population: 859,000 Area: 437 sq. miles 2,000 miles

More information

Jason R. Vogel, Ph.D., P.E. Biosystems and Agricultural Engineering Oklahoma State University

Jason R. Vogel, Ph.D., P.E. Biosystems and Agricultural Engineering Oklahoma State University Stormwater 101 OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering Department Jason R. Vogel, Ph.D., P.E. Biosystems and Agricultural Engineering Oklahoma State University Stormwater is excess

More information

Low Head Stone Weirs By: Jon Fripp 1, Dr. Craig Fischenich 2, and Dr. David Biedenharn 2

Low Head Stone Weirs By: Jon Fripp 1, Dr. Craig Fischenich 2, and Dr. David Biedenharn 2 Low Head Stone Weirs By: Jon Fripp 1, Dr. Craig Fischenich 2, and Dr. David Biedenharn 2 Complexity Low Moderate High Environmental Value Low Moderate High Cost Low Moderate High OVERVIEW Establishing

More information

STREAMBANK RESTORATION DESIGN

STREAMBANK RESTORATION DESIGN STREAMBANK RESTORATION DESIGN WITH VINYL SHEET PILE GRADE CONTROL STRUCTURES BRUCE M. PHILLIPS, M.S., P.E. ABSTRACT Grade control structures are an effective channel stabilization measure which can eliminate

More information

Restoring Ecological & Geomorphic Function on the Heartrock Ranch

Restoring Ecological & Geomorphic Function on the Heartrock Ranch Restoring Ecological & Geomorphic Function on the Heartrock Ranch DAVE ROSGEN BRANDON ROSGEN WILDLAND HYDROLOGY FORT COLLINS, COLORADO RIVER RESTORATION 2018, TWO HARBORS, MN OCTOBER 29 TH, 2018 Cooperators

More information

Hydrology Attribute 1/15/2016. California Rapid Assessment Method for Wetlands. Hydrology. Precipitation Increases the Extent of Wetlands

Hydrology Attribute 1/15/2016. California Rapid Assessment Method for Wetlands. Hydrology. Precipitation Increases the Extent of Wetlands California Rapid Assessment Method for Wetlands Hydrology Attribute Hydrology Determines existence of wetlands, drives primary physical and ecological processes: Establishment of reducing conditions Nutrient

More information

STREAM DISSOLVED OXYGEN IMPROVEMENT FEASIBILITY STUDY

STREAM DISSOLVED OXYGEN IMPROVEMENT FEASIBILITY STUDY DUPAGE RIVER SALT CREEK WORKGROUP STREAM DISSOLVED OXYGEN IMPROVEMENT FEASIBILITY STUDY FOR SALT CREEK FINAL REPORT SEPTMEBER 2009 Prepared by: HDR Engineering, Inc. 8550 W. Bryn Mawr Ave., Suite 900 Chicago,

More information

2012 Mill Creek Watershed Habitat Assessment Level 3 Project Study Plan Results

2012 Mill Creek Watershed Habitat Assessment Level 3 Project Study Plan Results 2012 Mill Creek Watershed Habitat Assessment Level 3 Project Study Plan Results Cranberry Run This project study plan was financed through a Sub-grant from the Ohio EPA with funds from the State of Ohio.

More information

Floodplain Restoration with Large Wood

Floodplain Restoration with Large Wood Floodplain Restoration with Large Wood Caitlin Alcott, CE, CFM ASFPM Conference June 21, 2016 Overview: 1. Functions of large wood in rivers and floodplains 2. Human impacts on large wood dynamics 3. Design

More information

CROSBY BROOK RESTORATION STUDY BRATTLEBORO, VT

CROSBY BROOK RESTORATION STUDY BRATTLEBORO, VT Key Stakeholders: CROSBY BROOK RESTORATION STUDY BRATTLEBORO, VT Funded By: VT Dept. of Environmental Conservation VT Agency of Transportation (VTrans) Town of Brattleboro NEWEA Spring Meeting Omni Mt.

More information

Urban and Suburban Stream Restoration Structures

Urban and Suburban Stream Restoration Structures Urban and Suburban Stream Restoration Structures Examples, guidance, construction and long-term performance 3 Rivers Wet Weather Stream Restoration Symposium June 22, 2018 Kelly Lennon, PE Vice President

More information

Galveston District Stream Condition Assessment June 2013

Galveston District Stream Condition Assessment June 2013 Determination of Compensation 5.0 Determination of Compensation Requirements (Credits) This section describes the methods and alternatives for fulfilling the Compensation Requirement (CR), representing

More information

FAIRFIELD COUNTY STREAM MANAGEMENT GUIDE

FAIRFIELD COUNTY STREAM MANAGEMENT GUIDE FAIRFIELD COUNTY STREAM MANAGEMENT GUIDE INTRODUCTION The Fairfield Soil and Water Conservation District (SWCD) has assembled this stream management guide to assist interested landowners in protecting

More information

INTERMEDIATE BMI ASSESSMENT TIER 2 FIELD SHEET

INTERMEDIATE BMI ASSESSMENT TIER 2 FIELD SHEET INTERMEDIATE BMI ASSESSMENT TIER 2 FIELD SHEET PHYSICAL PARAMETERS ASSESSMENT FIELD SHEET ALL TIERS NAME: DATE: TIME: STREAM OR RIVER NAME: WATERSHED NAME: TOWN: WEATHER PRESENT PAST 48 HOURS SITE DESCRIPTION

More information

Glossary of Terms. Aquifer A permeable body of rock capable of yielding quantities of groundwater to wells and springs.

Glossary of Terms. Aquifer A permeable body of rock capable of yielding quantities of groundwater to wells and springs. Glossary of Terms 100-year flood A large, but infrequent, flood event that has a 1% chance of occurring in any given year (occurs, on average, once every 100 years). 100-year floodplain Areas adjacent

More information

River Restoration in Iowa is there anything fishy going on here? or Fish Habitat in Iowa

River Restoration in Iowa is there anything fishy going on here? or Fish Habitat in Iowa River Restoration in Iowa is there anything fishy going on here? or Fish Habitat in Iowa Jeff Kopaska Iowa Water Conference Ames, IA March 22, 2018 Where did we start? Lea, 1836 In every part of this whole

More information

Department of the Army Corps of Engineers. State of Missouri Stream Mitigation Method

Department of the Army Corps of Engineers. State of Missouri Stream Mitigation Method Department of the Army Corps of Engineers State of Missouri Stream Mitigation Method Updated February 2007 A. GENERAL INFORMATION 1. Regulatory Authorities & Guidelines B. ADVERSE IMPACT FACTORS 1. Stream

More information

Restoration of Abandoned Channels. Prepared for KICT, South Korea. Pierre Y. Julien, Ph.D. Seema C. Shah-Fairbank Jaehoon Kim

Restoration of Abandoned Channels. Prepared for KICT, South Korea. Pierre Y. Julien, Ph.D. Seema C. Shah-Fairbank Jaehoon Kim Restoration of Abandoned Channels Prepared for KICT, South Korea by Pierre Y. Julien, Ph.D. Seema C. Shah-Fairbank Jaehoon Kim Colorado State University April 2008 Statement of Work 1. Classification and

More information

Appendix X: Non-Point Source Pollution

Appendix X: Non-Point Source Pollution Appendix X: Non-Point Source Pollution Sources Nonpoint source of pollution, unlike pollution from industrial and sewage treatment plants, comes from many different sources. Nonpoint source pollution is

More information

Ongoing and Completed Studies

Ongoing and Completed Studies Attachment 2 Ongoing and Completed Studies 2014 Monitoring and Analysis Plan November 2013 Attachment 2 Ongoing and Completed Studies 1 Introduction In 2013, the small interdisciplinary study groups for

More information

Natural flood management guidance:

Natural flood management guidance: Practical Guidence Natural flood management guidance: Woody dams, deflectors and diverters July 2016 Natural flood management guidance: Woody dams, deflectors and diverters July 2016 1 Introduction Large

More information

Developing Tools for Hydromodification Management and Assessment

Developing Tools for Hydromodification Management and Assessment Developing Tools for Hydromodification Management and Assessment Hydromodification: Channel Erosion Before Development After Development Increase in: - Imperviousness - Drainage Slope - Direct Runoff Decrease

More information

Bridge Planning Updates. Bridge Planning Practitioners Workshop April 2012

Bridge Planning Updates. Bridge Planning Practitioners Workshop April 2012 Bridge Planning Updates Bridge Planning Practitioners Workshop April 2012 Bridge Website Bridge Website Bridge Website Bridge Website BPG 11 Stormwater Management at Rural Bridges Released July 2010 Documents

More information

RIPARIAN CORRIDOR STUDY FINAL PARLEYS CREEK MANAGEMENT PLAN TABLE OF CONTENTS

RIPARIAN CORRIDOR STUDY FINAL PARLEYS CREEK MANAGEMENT PLAN TABLE OF CONTENTS TABLE OF CONTENTS 1.0 INTRODUCTION... 1-1 Riparian Corridor Study and Management Plan Goals... 1-1 Study Area... 1-2 Importance and Functions of Riparian Corridors... 1-2 Habitat for Mammals, Birds, and

More information

Ithaca Creek Habitat Monitoring

Ithaca Creek Habitat Monitoring Ithaca Creek Habitat Monitoring My name is: Class: Date: Ithaca Creek is part of the Catchment. Today when I was walking at the creek I decided that I wanted to investigate how healthy my waterway was.

More information

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future Lester McKee San Francisco Estuary Institute 5/24/2017 1 The importance of the natural water cycle of infiltration

More information

Voluntary Water Quality Conservation Plan

Voluntary Water Quality Conservation Plan Voluntary Water Quality Conservation Plan Plan Table of Contents A. Mid Coast Agricultural Water Quality Management Area Rules and Plan Overview B. Landowner Resource/Practice Inventory C. Recommended

More information

Case Study 19. Mill Creek Embedded Box Culvert Vented Ford

Case Study 19. Mill Creek Embedded Box Culvert Vented Ford Case Study. Mill Creek Embedded Box Culvert Vented Ford Location Southeast Missouri. Mark Twain National Forest; Houston-Rolla Ranger District. Southeast of Rolla, south of Interstate 44, off of State

More information

Boulder Elkhorn TMDL Project. TMDL Document Public Comment Meeting June 27, 2013

Boulder Elkhorn TMDL Project. TMDL Document Public Comment Meeting June 27, 2013 Boulder Elkhorn TMDL Project TMDL Document Public Comment Meeting June 27, 2013 Presentation Outline: What are TMDLs? Boulder Elkhorn TMDL Project Area What s in a TMDL document? Sediment Overview Temperature

More information

Monitoring Report #3 Kenston Lake Stream Restoration Bainbridge, Ohio

Monitoring Report #3 Kenston Lake Stream Restoration Bainbridge, Ohio Monitoring Report #3 Kenston Lake Stream Restoration Bainbridge, Ohio Prepared by: EnviroScience, Inc. 5070 Stow Rd Stow OH 44224 (330) 688-0111 Year Ending: December 31, 2013 I. Project Overview The following

More information

Water and Watersheds. Data Maps Action

Water and Watersheds. Data Maps Action Water and Watersheds Data Maps Action What is the Wildlife Action Plan? Restore rare wildlife and habitats. Keep common species common. 2015 Revision: Partners in Conservation Science 2015 Revision Data

More information

RED LAKE WATERSHED DISTRICT MONTHLY WATER QUALITY REPORT May 2014

RED LAKE WATERSHED DISTRICT MONTHLY WATER QUALITY REPORT May 2014 Long-Term Monitoring Program The first round of samples was completed and a second round was started for the Red Lake Watershed District long term monitoring program. We ve had plenty of runoff and high

More information

TEMPORARY STREAM DIVERSION

TEMPORARY STREAM DIVERSION ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM DIVERSION (ft,) CODE 976 (Source: Aukland Regional Council Stream Facts) DEFINITION A temporary channel or pipe used to convey stream flow around

More information

Temporary Watercourse Crossing: Fords

Temporary Watercourse Crossing: Fords Temporary Watercourse Crossing: Fords DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

U.S. EPA Presentation Stormwater Program Update

U.S. EPA Presentation Stormwater Program Update U.S. EPA Presentation Stormwater Program Update Prepared by: Bob Newport, NPDES Programs Branch, U.S. EPA Region 5 Presented by: Christe Alwin, MS4 Program Specialist, Lansing District Office, DEQ Stormwater

More information

CHAPTER 1 INTRODUCTION. Stream processes are strongly related to the physical conditions of the

CHAPTER 1 INTRODUCTION. Stream processes are strongly related to the physical conditions of the 1 CHAPTER 1 INTRODUCTION Stream processes are strongly related to the physical conditions of the watershed from which they flow. Alterations to physical conditions of a watershed manifest themselves through

More information

1/30/2014. SR-BOK Outcomes. Sue Niezgoda, Gonzaga University January 28, Depth. Breadth

1/30/2014. SR-BOK Outcomes. Sue Niezgoda, Gonzaga University January 28, Depth. Breadth SR-BOK Outcomes Sue Niezgoda, Gonzaga University January 28, 2014 Breadth Depth 1 Foundational Outcomes Hydrology Hydraulics Fluvial geomorphology Sediment Transport Stream Ecology Habitat Structure and

More information

WATERSHED AND STREAM MANAGEMENT GUIDELINES for Lands and Waters Managed by Missouri Department of Conservation

WATERSHED AND STREAM MANAGEMENT GUIDELINES for Lands and Waters Managed by Missouri Department of Conservation WATERSHED AND STREAM MANAGEMENT GUIDELINES for Lands and Waters Managed by Missouri Department of Conservation ii iii WATERSHED AND STREAM MANAGEMENT GUIDELINES Introduction...1 Key Assumptions and Facts..1

More information

Today s Webinar: Types of Monitoring and Assessment Data and What They Mean

Today s Webinar: Types of Monitoring and Assessment Data and What They Mean Welcome to the 1 st Webinar in the Series Monitoring & Assessment for Watershed Plans: Identifying, Accessing, and Using Data to Protect and Restore Indiana s Waters Each Monday in May at noon Today s

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

TRCA Natural Channel Design Monitoring Program. SOSMART Group Meeting December 7, 2010

TRCA Natural Channel Design Monitoring Program. SOSMART Group Meeting December 7, 2010 TRCA Natural Channel Design Monitoring Program SOSMART Group Meeting December 7, 2010 Natural Channel Design (NCD) Reconstruction of a stream channel and floodplain using techniques to restore or replicate

More information

The Streamkeepers Handbook

The Streamkeepers Handbook The Streamkeepers Handbook A Practical Guide To Stream And Wetland Care Appendix 1 COMMON HABITAT RESTORATION TECHNIQUES Check Table 3 for the references that provide detailed instructions for these projects.

More information

Crooked Creek Storm Water Master Plan

Crooked Creek Storm Water Master Plan Final Crooked Creek Storm Water Master Plan Submitted to Gwinnett County, Georgia July 2003 Contents Executive Summary...ES-1 Background... ES-1 Purpose of the Storm Water Master Plan... ES-2 Regulatory

More information

Stormwater Management Tools: Real-Life Solutions for a Resilient Community Riparian Corridor Protection

Stormwater Management Tools: Real-Life Solutions for a Resilient Community Riparian Corridor Protection Stormwater Management Tools: Real-Life Solutions for a Resilient Community Riparian Corridor Protection Montgomery County Planning Commission October 24, 2013 Eric Jarrell, Assistant Section Chief, Community

More information

4. Ponds and infiltration BMPs can achieve 60 to 100% removal efficiencies for sediment.

4. Ponds and infiltration BMPs can achieve 60 to 100% removal efficiencies for sediment. Landscape BMPs For the purposes of this project, preventive measures have been categorized into two categories: landscape BMPs and source prevention BMPs. Landscape BMPs includes both vegetative practices

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure