1 DASAMI LAB PVT.LTD. (Formerly Known as Medchem Organics Pvt. Ltd.) SY.NO. 404, 405, 407, 408, 409 & 410, VELIMINEDU VILLAGE, CHITYAL MANDAL, NALGONDA DISTRICT, TELANGANA PRE FEASIBILITY REPORT M/s. Hazelo Lab Pvt. Ltd.. Plot No: 7 2 A2 Hetero Corp, Industrial Estate, Sanathnagar, Hyderabad Phone: / E mail: jagadeeshwar.v@heterodrugs.com SUBMITTED TO MINISTRY OF ENVIRONMENT, FORESTS AND CLIMATE CHANGE GOVERNMENT OF INDIA INDIRA PARYAVARAN BHAWAN, JOR BAGH ROAD, NEW DELHI

2 Pre Feasibility Report M/s. Dasami Lab Pvt.Ltd., Survey No.404, 405, 407,408, 409 & 410 Veliminedu Village, Chityal Mandal, Nalgonda District, Telangana. 1. Executive Summary M/s. Dasami Lab Pvt. Ltd., (formerly known as Medchem Organics Pvt.Ltd.) proposed to expand its Bulk Drug & Intermediates Manufacturing Unit at Sy.No. 404, 405, 407, 408, 409 & 410, Veliminedu Village, Chityal Mandal, Nalgonda District, Telangana. The total area acquired for proposed expansion in addition to existing areas is 51 acres. The site is having a longitude E and latitude N. Chinna Vagu is in SW direction at a distance of 7.1 Km from the site. There are two Reserve forests in the study area; Chityala RF at a distance of 6 Km in east direction, Shivanenigudem RF at a distance of 9 Km in NE direction of the site. 2. Introduction of the Project 2.1 Identification of Project and Project Proponent: The objective of this pre-feasibility study is to provide information for proposed expansion of Bulk Drug and Intermediates Manufacturing with Production Capacity from 15 TPM to 421 TPM at Sy.No. 404, 405, 407, 408, 409 & 410, Veliminedu Village, Chityal Mandal, Nalgonda District, Telangana. It is proposed to increase the manufacturing capacity from 15 TPM to 421 TPM by acquiring additional land of acres in addition to existing acres of land; total land area after expansion is 51 acres. Expansion includes addition of production blocks, facility for utility proposed and enhancement of ZLD system. 2.1 Brief Description of Nature of the Project: The Bulk Drug & Intermediates manufacturing will involve series of chemical reactions to get the final Product. The products of reaction are purified, filtered and dried before packing the final product. The Chemical reactions require various supporting services like Heating, Cooling and Agitation etc. 1 P age

3 2.2 Need for the project and its importance to the country and or region: World population is growing at an alarming rate. In the Indian sub continent population growth is more than that of developed countries. To meet the needs and comforts of ever-growing population industrialization became inevitable. For the growing population the needs of health care substitutes are also increasing. 2.3 Demands-Supply Gap: The project is envisaged to meet the demand supply gap in both domestic market and export market, as API demand is increasing day by day. 2.4 Imports Vs. Indigenous Production: The project shall meet the reduce imports in some of the intermediate products and also enhance the foreign exchange reserves in view of the proposed exports of few products. 2.5 Domestic/export Markets: The products shall cater to both domestic and export markets. 2.6 Employment Generation (Direct and Indirect) due to the project: The present project for manufacturing of Bulk Drugs & Intermediates requires substantial handling of raw materials, goods in process and finished goods. It is expected that the following employment will be generated by the project: 3. Project Description 3.1 Type of Project including interlinked and interdependent projects, if any: M/s.Dasami Lab Pvt.Ltd., (formerly known as Medchem Organics Pvt.Ltd.) proposes to expand the Manufacturing capacity from 15 TPM to 421 TPM by addition of production block, additional facility for utility proposed and enhancement of ZLD system at Sy.No. 404, 405, 407, 408, 409 & 410, Veliminedu Village, Chityal Mandal, Nalgonda District, Telangana. 3.2 Size or magnitude of operation: M/s. Dasami Lab Pvt.Ltd., (formerly known as Medchem Organics Pvt.Ltd.) Located at Sy. No. 404, 405, 407, 408, 409 & 410, Veliminedu Village, Chityal Mandal,, Nalgonda District, Telangana. Obtained consent and authorization (CFO) for manufacturing of 15 TPM of Drugs & Intermediates vide Letter No. TSPCB/256/RCP/NLG/HO/CFO/ dated It is proposed to expand the manufacturing capacity from 15 TPM to 421 TPM and expansion of existing 2 P age

4 land area to 51 acres by addition of production block, additional facility for utility proposed and enhancement of ZLD system. Capacity after proposed expansion is presented in Table A-1. Table A-1 Manufacturing Capacity After Expansion S.No Name of the Product Capacity TPM 1 Amlodipine Besylate 20 2 Aprimilast 3 3 Bocepravir 6 4 Bupropion Hcl 20 5 Carvedilol 30 6 Clopidogrel Hydrogen Bisulfate 10 7 Colisevelam 6 8 Dalfampridine 17 9 Dex lansoprazole 5 10 Divalproex Sodium Drotaverine Hcl 3 12 Duloxetine HCL Esli Carbazapine 2 14 Fexofenadine Hcl Glimepride 3 16 Lansoprazole 8 17 Lomitapide 2 18 Mesalamine 7 19 Nebumitone Omeprazole 5 21 Piperquine Phosphate 5 22 posacanazole 7 23 Ramipril 7 24 Ranolazine Sevelamir Hcl Sparfloxacin Telapravir 5 28 Ticagrelor 1 29 Tramadol Hcl Valacyclovir 6 31 Valagancyclovir Hcl 2 Oncology 32 Abiraterone Acetate 1 33 Anastrozole 2 34 Bendamustine Hydochloride Bexarotene 3 36 Bicalutamide 5 37 Bortezomib P age

5 38 Carboplatin 5 39 Capecitabine 2 40 Cisplatin 2 41 Cyclophosphamide 2 42 Dasatinib 2 43 Emtricitabine Erlotinib HCl 4 45 Gefitinib 2 46 Gemcitabine HCl 1 47 Imatinib Mesylate Irinotecan HCl Lapatinib Ditosylate Monohydrate 2 50 Letrozole Nilotinib HCl 2 52 Oxaliplatin 4 53 Pazopanib Hydrchloride 2 54 Pemetrexed Disodium Sorafenib Tosylate 6 56 Temozolomide 1 57 Sunitinib Malate 6 Total P age

6 3.3 Process Description with process details (a schematic diagram/flow chart) Process description is as in the Form I Annexures. 3.4 Raw material required along with estimated quantity likely source, marketing area of final product/s, mode of transport of raw material and finished product. All the raw materials required for manufacturing mostly available in India or from abroad. There are no banned chemicals or products which are proposed to be used. It is proposed to enter into long term arrangements with some of the raw material suppliers both in India and overseas to avoid shortages at any time. 3.5 Availability of water its source, energy/power requirement and source should be given The required water shall be drawn from ground water sources in addition to reuse of treated wastewater. The total water requirement after expansion is of 487.2KLD consisting of 292.2KLD fresh water and the remaining of recycled water. Total water balance is presented in Table below. Total Water Balance After Expansion Purpose INPUT (KLD) OUTPUT (KLD) Fresh Water Recycled Water Loss Effluent Process Washings Scrubber 5 5 Boiler Feed Cooling Tower RO/DM Plant Domestic Gardening Gross Total Total Electricity: The required energy shall be drawn from TSPDCL. DG set of 3 x 1000 KVA is proposed in addition to existing 380 KVA DG set. 5 P age

7 3.6 Quantity of wastes to be generated (liquid and solid) and Scheme for their Management/disposal: The sources of effluent generation from the plant are from the process, Floor & reactor washings, Utilities, QC, R&D, Scrubber and plant domestic waste. The Effluent Treatment details and the Solid Waste Management details are listed in the below tables. Quantity of Effluent Generated and Mode of Treatment Description Quantity (KLD) Mode of Treatment Permitted After Expansion HTDS Effluents Process Sent to Stripper. Stripper Washings 3 10 condensate shall dispose to cement Scrubber Effluent 5 industries for co-processing/tsdf. RO/DM Plant Rejects 24 Stripper bottom sent to MEE followed by AFTD. Condensate from MEE shall be sent to biological treatment plant followed by RO. RO rejects sent to MEE and permeate is reused in cooling towers and boiler make-up and scrubbers. Total I LTDS Effluents QC and R&D 1 Boiler Blow downs 3 10 Sent to Biological Treatment Cooling Tower Blow 36 System followed by RO. RO downs Domestic 3 20 permeate reused for cooling tower makeup and Scrubbers. RO rejects sent to MEE. Total II 7 66 Grand Total (I+II) P age

8 Total Solid Waste Generated and Mode of Disposal S.No Description Units Quantity Mode of Permitted After Expansion Treatment/Disposal 1 Ash from Boiler TPH Sold to Brick manufactures and cement plants 2 Organic residue+solvent Residue TPD Sent to TDSF, Dundigal, RR District or Coincineration/Cement Plants for Co-processing 3 Spent Carbon TPD Sent to TSDF/Cement Industries 4 Stripper Distillate KLD 5.6 Sent to TSDF/Cement Industries 5 Inorganic Residue TPD Sent to TDSF, Dundigal, 6 Evaporation salts TPD 9.23 RR District for secured land filling 7 ETP Sludge Kg/day Sent to TSDF 8 Detoxified containers & container liners No.s/Mo nth Sold to authorized vendors 9 Waste oil KLPA Sent to Authorized Recyclers 10 Used batteries No.s/Yr 3 10 Sent to Authorized Recyclers 4. Site Analysis 4.1 Plant Location M/s. Dasami Lab Pvt.Ltd., proposed to expand its Bulk Drug & Intermediates Manufacturing Unit at Sy.No. 404, 405, 407, 408, 409 & 410, Veliminedu Village, Chityal Mandal,Nalgonda District, Telangana. The total area acquired for proposed expansion in addition to existing areas is 51acres. The site is having a longitude E and latitude N. Chinna Vagu is in SW direction at a distance of 7.1 Km from the site. There are two reserve forests in the study area; Chityala RF at a distance of 6 Km in east direction, Shivanenigudem RF at a distance of 9 Km in NE direction of the site. 7 P age

9 5. Planning Brief: The project is envisages to be completed in Phase wise as it involves installation of higher capacity processing equipment s besides improving of yield and the production shall be initiated thereon. Consultants are identified for preparing the detailed project report. 6. Proposed Infrastructure: 6.1 Power Requirement and Supply/Source The required energy shall be drawn from TSPDCL. The power shall be drawn from existing DG sets during load shut downs. DG set of 3X1000 KVA is proposed in addition to existing 380 KVA DG set. It is proposed to establish 2 x 10 TPH coal fired boiler in addition to existing 5TPH coal fired boiler to meet the steam requirement both for process and ZLD system. 6.2 Utilities List of Utilities S.No Utility Permitted Proposed After Expansion 1 Coal Fired Boilers 5TPH 2 x 10 2 x 10 TPH 1 x 5TPH 2 DG Sets (KVA)* 1x x x x 380 * DG set will be used during load shut down. Equipments The basic technology involved in the manufacturing of Bulk drugs is the process Kettles, Heat Exchangers, Centrifuges, and Storage Tanks. To support the process equipment Boilers, Chilling plants, Cooling Towers Etc. are required. All the above equipment can be sourced indigenously and the lead time to supply the equipment will not exceed 20 weeks. 6.3 Waste management Liquid Effluents The main sources of effluent generation from the plant are process, washings, Scrubber, blow downs from utilities like cooling tower, boiler & domestic effluents. The process effluents are segregated on the basis on TDS and COD loads and treated in Effluent treatment system. The effluent generated from the domestic sent to 8 P age

10 biological treatment plant along with LTDS effluents. Treated effluent reused for cooling towers make-up. Air Pollution The sources of air pollution from the plant are from utilities existing and proposed. The emissions from the boilers are passed through bag filters before releasing into atmosphere through a chimney. Coal Ash will be collected in ash silo to dispose in closed condition. The stack heights are provided as per the guidelines of CPCB for effective stack heights. Solid waste Solid wastes are generated from the process, solvent distillation, collection/neutralization tank, waste oil from DG sets, used batteries from DG sets. The ash from boiler is sold to brick manufacturers. The solid wastes; evaporation salts, wastes from the process in inorganic form i.e., process salts and filtration aids shall be disposed to the TSDF, while the hazardous wastes of organic nature i.e., distillation residues shall be disposed to authorized cement units and other wastes like used oil and used batteries shall be sent to authorized recyclers. The other solid wastes expected from the unit are containers, empty drums which will be used for packing product, and or returned to the product seller or sold to authorized buyers after detoxification, while the sludge from treatment plant shall be sent to TSDF. 7. Rehabilitation and Resettlement (R&R) Plan Not applicable as the land area is in the existing plant premises. 8. Project Schedule & Cost Estimates 8.1 Likely date of start of construction and likely date of completion (Time schedule for the project to be given) October P age

11 8.2 Estimated project cost along with analysis in terms of economic viability of the project The estimated cost of the project is approximately Rs. 45 crores Project Cost Rs. In Crores Plant& machinery 22.0 Civil buildings 5.0 Structures 3.0 Total 30.0 Pipe lines & insulation 20% on plant & machinery 6.0 Electricals & instrumentation 10% on plant & machinery 3.0 Erection & commissioning & painting 8% on plant & machinery 2.4 and structures Land & development 0.4 Material handling equipment charges 0.3 Laboratory equipment 1.0 Safety eqpt 0.4 Furniture, fixtures, computers, lighting 0.4 etc Total 14.3 Contingencies & pre-operative expenses 5% on the above 0.7 Project Cost P age

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

B. Additional TOR. No ground water to be drawn for the proposed project.

B. Additional TOR. No ground water to be drawn for the proposed project. 10. Action plan to control ground water pollution. 11. Details of solid waste management including management of boiler ash, yeast, etc. Details of incinerated spent wash ash generation and its disposal.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED SY. NO. Part of 46,50,51,52,53, 54,55&56, ANANTHSAGAR VILLAGE, CHEGUNTA MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL PARK, ATTIVARAM VILLAGE, OZILI MANDAL, SPSR NELLORE DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL

More information

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA M/s. ARTEMIS BIO TECH LTD., (A Division of Themis Medicare Ltd.,) PLOT NO. 1 & 5, Phase I, IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA PRE FEASIBILITY REPORT Artemis Bio tech Ltd.,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ASTRIX LABORATORIES LIMITED SY. NO. 10 & 42, IDA, GADDAPOTHARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Sy. No. 10 & 42, IDA, Gaddapotharam (V), Jinnaram (M), Medak

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ESHWAR PHARMACEUTICALS (P) LTD. (Formerly known as Konar Organics Ltd.,) SY. NO. 180/2, IDA KHAZIPALLY, KHAZIPALLY VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Eshwar

More information

404, 405, 407, 408, 409 & 410, VELIMINEDU VILLAGE, CHITYAL MANDAL, NALGONDA DISTRICT, TELANGANA

404, 405, 407, 408, 409 & 410, VELIMINEDU VILLAGE, CHITYAL MANDAL, NALGONDA DISTRICT, TELANGANA DASAMI LAB PVT.LTD. (Formerly Known as Medchem Organics Pvt. Ltd.) SY.NO. 404, 405, 407, 408, 409 & 410, VELIMINEDU VILLAGE, CHITYAL MANDAL, NALGONDA DISTRICT, TELANGANA FORM I Project No. 0116 21 02 January

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS I PLOT NO.137, 138, 145 & 146, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT AGRSOL (NDA) PVT. LTD SY. NO. 163, 164 & 165, UDUMULAPADU VLLAGE, DHONE MANDAL, KURNOOL DSTRCT, ANDHRA PRADESH PRE FEASBLTY REPORT AGRSOL (NDA) PVT. LTD H.No. 10 2 289/87, 101 Fortune Heights, Shantinagar,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT GENSYNTH FINE CHEMICALS PVT. LTD. PLOT NO. 220, 239 & 248, PHASE II, IDA, PASHAMAILARAM VILLAGE, PATANCHERU MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Gensynth Fine Chemicals Pvt. Ltd.,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS II PLOT NO.75A, 75B, 1, 110,111 & 112, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

S.V.LABS PVT.LTD. SY.NO. 501,506 & 507, KOYYALAGUDEM VILLAGE, CHOUTUPPAL MANDAL, NALGONDA DISTRICT, TELANGANA

S.V.LABS PVT.LTD. SY.NO. 501,506 & 507, KOYYALAGUDEM VILLAGE, CHOUTUPPAL MANDAL, NALGONDA DISTRICT, TELANGANA S.V.LABS PVT.LTD. SY.NO. 501,506 & 507, KOYYALAGUDEM VILLAGE, CHOUTUPPAL MANDAL, NALGONDA DISTRICT, TELANGANA PRE FEASIBILITY REPORT S.V. Labs Pvt. Ltd. Plot No: 3,4&5, First Cross, Anrich Industrial Estate,

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUGS INTERMEDIATES MANUFACTURING UNIT at SY. NO: PARTS OF 318, 319 AND 321 LOCATED AT PALLEPAHAD VILLAGE, THURKAPALLY MANDAL, YADADRI - BHONGIR DISTRICT, TELANGANA

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PIRAMAL ENTERPRISES LIMITED SY. NO. 71, 77, 78, 79A to 80A, 81A & 82A, DIGWAL VILLAGE, KOHIR MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Piramal Enterprises Limited Digwal (V), Kohir

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Apotex Pharmachem India Pvt Ltd, PLOT NO 1 A, 4 th PHASE, BOMMASANDRA INDUSTRIAL AREA, JIGINI LINK ROAD, ANEKAL TALUK, BANGALORE DISTRICT, KARNATAKA STATE PRE FEASIBILITY REPORT M/s Apotex Pharmachem India

More information

BALAJI AMINES LIMITED

BALAJI AMINES LIMITED FOR EXPANSION OF EXISTING SYNTHETIC ORGANIC CHEMICALS MANUFACTURING UNIT BALAJI AMINES LIMITED At Plot No: 4 & 5, Beside Sub-Station-II, I.D.A, Bollaram, Jinnaram (M), Medak District, Telangana State -

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

SVL LIFE SCIENCE PVT. LTD. SY.NO

SVL LIFE SCIENCE PVT. LTD. SY.NO SVL LIFE SCIENCE PVT. LTD. SY.NO. 45/1 TO 45/54 AND 46/1 TO 46/22, KOVVADA AGRAHARAM VILLAGE, PUSAPATIREGA MANDAL, VIZIANAGARAM DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED TO ANDHRA PRADESH STATE

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

SRI KUSUMA HARANADHA AGRO FURAL LIMITED (UNIT II) SY. NO

SRI KUSUMA HARANADHA AGRO FURAL LIMITED (UNIT II) SY. NO SRI KUSUMA HARANADHA AGRO FURAL LIMITED (UNIT II) SY. NO. 116/1, 119/3, 120/7, 118/2, 119/3, 98/4, 117/2, 119/6,120/2 AND 120/5 ALLIVEDU REVENUE VILLAGE, PEDAVEGI MANDAL, WEST GODAVARI DISTRICT, ANDHRA

More information

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

M/S. HETERO INFRASTRUCTURE SEZ LIMITED ENVIRONMENTAL STATEMENT (FORM - V) FOR THE FINANCIAL YEAR ENDING MARCH-2016. M/S. HETERO INFRASTRUCTURE SEZ LIMITED N.NARASAPURAM(V),NAKKAPALLI(M) VISAKHAPATNAM DISTRICT. SUBMITTED TO : ANDHRA PRADESH

More information

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25 3 ANNEXURES Annexure 1: Production Details Name of Products Products Production Capacity in MT/Month 1 Metformin Hydrochloride 1000 2 Paracetamol 1200 3 Bronopol 25 By-Products Total 2225 1 Acetic acid

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.

More information

ENVIRONMENTAL STATEMENT-FORM-V

ENVIRONMENTAL STATEMENT-FORM-V ENVIRONMENTAL STATEMENT (FORM V) FOR THE FINANCIAL YEAR ENDING MARCH 2017 M/S. (Formerly CIREX PHARMACEUTICALS LTD) GUNDLAMACHNOOR- VILLAGE, HATHNORA - MANDAL, SANGAREDDY -DISTRICT TELANGANA - 502296 SUBMITTED

More information

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar March 18, 2019 BY HAND DELIVERY/RPAD To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar 382 010 SUB.: APPLICATION FOR SUBMISSION OF ESSENTIAL DETAIL SOUGHT

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report Essentials Pharma 1 1. Introduction M/s. Essentials Pharma is an new unit to be located at Plot 19, Survey 10/1, Rajkot-Ahmedabad National Highway 8-B, Village: Hirasar, Tal: Rajkot,

More information

GRANULES INDIA LIMITED SY. NO. 533, 535 & 536, BONTHAPALLY VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA FORM I

GRANULES INDIA LIMITED SY. NO. 533, 535 & 536, BONTHAPALLY VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA FORM I GRANULES INDIA LIMITED SY. NO. 533, 535 & 536, BONTHAPALLY VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA FORM I Project No. 0515 21 01 May 2015 Granules India Limited Plot No. 15A/1, Phase III, IDA,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

List of Annexures S. No Description Page No. Other Annexures

List of Annexures S. No Description Page No. Other Annexures List of Annexures S. No Description Page No. I Plant Layout 12 II Manufacturing Description & Flow Chart Details 13-25 III Effluent Treatment Plant Flow Chart & Solid Waste Handling Details 26 IV Water

More information

UNSATURATED POLYESTER RESIN

UNSATURATED POLYESTER RESIN PROJECT REPORT ON UNSATURATED POLYESTER RESIN BY AQUA CHEM INDUSTRIES Survey No. 50/2, Jodhpar (Nadi), Morbi - 363641, Gujarat. I N D E X Sr. No. Contents Page No. 1 Introduction 3 2 Project Description

More information

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600 Annexure A Product Profile Sr. No. 1 Product Crude OBA AND/ OR Standardized OBA liquid/ powder MT/ M Consented Ultimate 525 190 AND/ OR 2600-23 - Annexure - B Details of Raw Materials Qty (Kg/ Kg) Qty/

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

: Industrial Projects - 2. : 26th October, 2016

: Industrial Projects - 2. : 26th October, 2016 1. Proposal No. : IA/AP/IND/26243/2014, 2. MoEFCC File No. : J-11011/408/2014-IA II (I) 3. Category of the Proposal : Industrial Projects - 2 4. Name of the proposal : M/s Divis laboratories limited, Unit

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For EXPANSION IN EXISTING MANUFACTURING PLANT Of M/s. SHIVA DYE STUFF PVT. LTD Plot no. A2-11/6104,G.I.D.C. Industrial Estate, Ankleshwar-393002, Gujarat. 1 CONTENTS Sr. No. Description

More information

PRE FEASIBILTY REPORT

PRE FEASIBILTY REPORT PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST

More information

SARACA LABORATORIES LIMITED ENVIRONMENT CLEARANCE CONDITION WISE COMPLIANCE REPORT. No.: SEIAA/TS/MDK-38/ , dated: 20:05:2016.

SARACA LABORATORIES LIMITED ENVIRONMENT CLEARANCE CONDITION WISE COMPLIANCE REPORT. No.: SEIAA/TS/MDK-38/ , dated: 20:05:2016. SARACA LABORATORIES LIMITED ENIRONMENT CLEARANCE CONDITION WISE COMPLIANCE REPORT No.: SEIAA/TS/MDK-38/2015-501, dated: 20:05:2016. ( November-2017 - April-2018) S.NO CONDITION Status of Compliance A SPECIFIC

More information

ANNEXURE A DETAILS OF PRODUCTS

ANNEXURE A DETAILS OF PRODUCTS Annexures to Form 1 & Pre Feasibility Report Proposed Project for manufacturing of Dyes Intermediates of M/s Jay Dyechem, Narol-Vatva Road,Ta : City, District : Ahmedabad, Gujarat. ANNEXURE A DETAILS OF

More information

Amendment required in the existing EC

Amendment required in the existing EC Amendment required in the existing EC Change/Addition in Phase I; 250 KLPD Grain based Distillery with 20 MW Co-gen Power Plant / Molasses 160 KLPD based distillery with 12 MW Co-gen Power Plant in Environmental

More information

Table of Contents. Paint production process Raw material storage details Hazardous waste quantity and proposed details

Table of Contents. Paint production process Raw material storage details Hazardous waste quantity and proposed details Table of Contents Annexure No Annexure 1 Annexure 2 Annexure 3A Annexure 3B Annexure 3C Annexure 4 Annexure 5 Annexure 6 Annexure 7A Annexure 7B Annexure 7C Annexure 7D Annexure 8 Annexure 9 Annexure 10A

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

AGRISOL (INDIA) PVT. LTD SY. NO. 163, 164 & 165, UDUMULAPADU VILLAGE, DHONE MANDAL, KURNOOL DISTRICT, ANDHRA PRADESH FORM I

AGRISOL (INDIA) PVT. LTD SY. NO. 163, 164 & 165, UDUMULAPADU VILLAGE, DHONE MANDAL, KURNOOL DISTRICT, ANDHRA PRADESH FORM I AGRISOL (INDIA) PVT. LTD SY.. 163, 164 & 165, UDUMULAPADU VILLAGE, DHONE MANDAL, KUROL DISTRICT, ANDHRA PRADESH FORM I Project No. 3001 21 01 January 2015 AGRISOL (INDIA) PVT. LTD H.No. 10 2 289/87, 101

More information

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR Annexure A Product Profile Sr. No. 1 2 Product Crude OBA AND/OR Crude OBA-CBS-X Standardized OBA Solid AND/OR Standardized OBA Liquid Proposed Qty (MT/ M) 400 400 1600 Note : For making Standardized OBA

More information

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State.

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State. ON Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District 561 205, Karnataka State. Table of Contents 1. EXECUTIVE SUMMARY 2. INTRODUCTION OF THE PROJECT/

More information

Kana Aroma Industries. Pre-Feasibility Report

Kana Aroma Industries. Pre-Feasibility Report Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,

More information

LIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation

LIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation LIST OF ANNEXURE Annexure-1 Location of the project site Annexure-2 Layout plan Annexure-3 Break up of land area requirement Annexure-4 Details of products and raw materials and storage facility for the

More information

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II) BRIEF SUMMARY OF THE PROJECT for PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT of M/s. BASF INDIA LTD. (UNIT-II) PLOT NO. 8001 & 8001A, PHASE-VI, G.I.D.C., ANKLESHWAR, DIST: BHARUCH-393002,

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report M/s. Veer Poly Chem 0 1. Introduction M/s. Veer Polychem is an existing unit located at Plot 119 & 120, Ranpur road, GIDC Dhandhuka, Dist: Ahmedabad, Gujarat. Currently, unit is

More information

M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN:

M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN: Pre-feasibility Study Report For M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN: 401506 Prepared By: M/s SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited

More information

Annexure- I LIST OF PROPOSED PRODUCTS & THEIR PRODUCTION CAPACITY

Annexure- I LIST OF PROPOSED PRODUCTS & THEIR PRODUCTION CAPACITY Annexure- I LIST OF PROPOSED PRODUCTS & THEIR PRODUCTION CAPACITY S. No Product Name API in Kg/annum Intermediate in Total Kg/annum 1. CAPECITABINE 28500-28500 2. EFAVIRENZ 40000-40000 3. IMATINIB MESYLATE

More information

Annexure-I List of Products

Annexure-I List of Products Annexure-I List of Products Sr. No. Name of Products Quantity (MT/Month) 1. Mono Chloro Acetic Acid (MCA) 300 2. Chloro Acetyl Chloride (CAC) 150 3. Tri Chloro Acetyl Chloride (TCAC) 150 4. Aluminum Chloroide

More information

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF CARBON BLACK (10950 TPM TO 15750 TPM ) AND CO-GENERATION POWER PLANT (22 MW TO 32 MW) IN EXISTING PREMISES of M/s. PHILLIPS CARBON BLACK LTD. Survey No.

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

ASTRICA LABORATORIES PRIVATE LIMITED SY. NO. Part of 46,50,51,52,53,54,55&56 ANANTHSAGAR VILLAGE, CHEGUNTA MANDAL, MEDAK DISTRICT, TELANGANA FORM I

ASTRICA LABORATORIES PRIVATE LIMITED SY. NO. Part of 46,50,51,52,53,54,55&56 ANANTHSAGAR VILLAGE, CHEGUNTA MANDAL, MEDAK DISTRICT, TELANGANA FORM I ASTRICA LABORATORIES PRIVATE LIMITED SY. NO. Part of 46,50,51,52,53,54,55&56 ANANTHSAGAR VILLAGE, CHEGUNTA MANDAL, MEDAK DISTRICT, TELANGANA FORM I Project No. 0116 21 01 January 2016 ASTRICA LABORATORIES

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

NO. 276, PHASE II, IDA, PASHAMAILARAM VILLAGE, PATANCHERU MANDAL, MEDAK DISTRICT, ANDHRA PRADESH FORM I

NO. 276, PHASE II, IDA, PASHAMAILARAM VILLAGE, PATANCHERU MANDAL, MEDAK DISTRICT, ANDHRA PRADESH FORM I LAKSHMI SARAS CHEM TECH PVT. LTD., (Formerly known as Saras Chem Tech) PLOT.. 276, PHASE II, IDA, PASHAMAILARAM VILLAGE, PATANCHERU MANDAL, MEDAK DISTRICT, ANDHRA PRADESH FORM I Project No. 0114 21 01

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

SREE RAYALASEEMA ALKALIES AND ALLIED CHEMICALS LIMITED SY. NO

SREE RAYALASEEMA ALKALIES AND ALLIED CHEMICALS LIMITED SY. NO SREE RAYALASEEMA ALKALIES AND ALLIED CHEMICALS LIMITED SY. NO. 51/1, 2A, 2B, 2C1, 2C2, 2C3, 56/1, 58/1, 59/1, 60, 62/3/2D2, 2C1/A2, 2C1/A3, 2C2/C, 2G/1, 2E, 2F, 1A, 1B, 62A, 62 B, 63, 64, 70/C2, 72/P,

More information

SUSTAINABLE WASTE MANAGEMENT

SUSTAINABLE WASTE MANAGEMENT SUSTAINABLE WASTE MANAGEMENT,Nemam An ISO 9001:2008, ISO 14001:2004, OHSAS 18001:2007 and FSSC 22000:2011 Certified Unit PLANT PROFILE Started with one 600 BPM CSD RGB Line in March 1997. Added one more

More information

M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,ABU ROAD, DIST: SIROHI, RAJASTHAN FORM 1 ANNEXURES

M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,ABU ROAD, DIST: SIROHI, RAJASTHAN FORM 1 ANNEXURES M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,A FORM 1 ANNEXURES ANNEXURE NAME OF THE ANNEXURE PAGE NO. ANNEXURE I Detail of product 2 ANNEXURE II Detail of Raw Materials 3 ANNEXURE III ANNEXURE IV

More information

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

For TOR New Projects. Mo. no. : Contact no. and  ID of the Applicant SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

Project: Rama Phosphates Ltd., Udaipur Document: EES/RAMA/001/138-EC/ IND./2016. Executive Summery. Enkay Enviro Services PVT Ltd 28

Project: Rama Phosphates Ltd., Udaipur Document: EES/RAMA/001/138-EC/ IND./2016. Executive Summery. Enkay Enviro Services PVT Ltd 28 Executive Summary 28 INDEX S. No. CONTENTS PAGE No. 1.1 INTRODUCTION 30 1.2 SALIENT FEATURES OF THE PROJECT 32 1.3 RAW MATERIAL 34 1.4 PRODUCT 35 1.5 SOLID WASTE 35 1.6 FINANCIAL AND SOCIAL BENEFITS 35

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

DESI S LABS SY.NO. 221(PART), RAMANNAPALEM VILLAGE, TIRUVURU MANDAL, KRISHNA DISTRICT, ANDHRA PRADESH FORM I

DESI S LABS SY.NO. 221(PART), RAMANNAPALEM VILLAGE, TIRUVURU MANDAL, KRISHNA DISTRICT, ANDHRA PRADESH FORM I DESI S LABS SY.NO. 221(PART), RAMANNAPALEM VILLAGE, TIRUVURU MANDAL, KRISHNA DISTRICT, ANDHRA PRADESH FORM I Project No. 0218-21-03 February 2018 M/s. Desi s Labs Flat No. 204, Satya Sai Residency, Plot

More information

M/s Malur Effluent Treatment Plant., Malur, Kolar Karnataka

M/s Malur Effluent Treatment Plant., Malur, Kolar Karnataka M/s Malur Effluent Treatment Plant., Malur, Kolar Karnataka South Zonal Office, Bangalore 1 Name/ address of CETP/ company: M/s Malur CETP, Malur Industrial Estate, Malur Kolar, Karnataka 2 Area occupied

More information

REQUIREMENTS FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE JUSTIFICATION FOR MODIFICATION IN THE SCHEME FOR SPENT WASH HANDLING IN THE DISTILLERY PLANT

REQUIREMENTS FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE JUSTIFICATION FOR MODIFICATION IN THE SCHEME FOR SPENT WASH HANDLING IN THE DISTILLERY PLANT AMENDMENT IN ENVIRONMENTAL CLEARANCE GRANTED BY MINISTRY OF ENVONMENT AND FORESTS, NEW DELHI VIDE FILE NO. J-11011/773/2007 IA II (I) DATED 16 TH JANUARY, 2008 REQUIREMENTS FOR AMENDMENT IN ENVIRONMENTAL

More information

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION

More information

BRIEF DESCRIPTION OF THE PROJECT

BRIEF DESCRIPTION OF THE PROJECT BRIEF DESCRIPTION OF THE PROJECT. Introduction M/s Indorama Industries Limited is proposing to expand their project known as Indorama Spandex for manufacture of manmade textile fibre using petro chemical

More information

M/s. RAPID INTERMEDIATES

M/s. RAPID INTERMEDIATES BRIEF SUMMARY OF THE PROJECT for PROPOSED PESTICIDE SPECIFIC INTERMEDIATES AND SPECIALTY CHEMICALS PLANT of M/s. RAPID INTERMEDIATES PLOT NO. 2325, GIDC ESTATE-PANOLI, TALUKA: ANKLESHWAR, DIST: BHARUCH,

More information

ADDITIONAL DETAILS OF THE PROJECT

ADDITIONAL DETAILS OF THE PROJECT EXISTING CETP UNITS DETAIL ADDITIONAL DETAILS OF THE PROJECT SR.NO NAME OF THE AREA NOS. AREA (IN METER) 1. Equalization tanks I 01 15.00 x 10.00 x 3.00 + 0.50 FB 2. Equalization tanks II 01 9.00 x 10.00

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

Dated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana

Dated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana F.No.10-12/201S-IA.III Government of India Ministry of Environment, Forest & Climate Change (IA.IIISection) Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi - 110 003. To The Director, Mjs Vulcan Waste

More information

NATCO PHARMA LIMITED CHEMICAL DIVISION

NATCO PHARMA LIMITED CHEMICAL DIVISION Half yearly compliance report for the period - Oct 2016 to March 2017 on the conditions specified in Environmental Clearance issued by Ministry of Environment and Forests & Climate Change. Ref: Ministry

More information

Synthetic Organic Chemicals 5(f)

Synthetic Organic Chemicals 5(f) SEAC, Gujarat Page 1 of 14 Synthetic Organic Chemicals 5(f) For Terms of Reference [ToR] New Project 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot

More information

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA)

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) Email: sv.patil@vsisugar.org.in AIDA Technical Seminar www.vsisugar.com

More information

FORM-V (See Rule - 14) Part-A

FORM-V (See Rule - 14) Part-A FORM-V (See Rule - 14) Environmental Statement for the financial year ending 31 st March, 2016 Part-A Name and address of the owner / occupier : K. Rahul Raju of the Industry Managing Director Nagarjuna

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

NATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.)