1 Executive Summary 1. INTRODUCTION 1.1 Background: Pandhurna industrial area consist of nearly 34 small and large units which basically consist of Cotton ginning & Processing, Food Processing, Copper Wire, Stone & Gitti etc., providing direct and indirect employment to nearly 5000 people. Pandhurna has good potential for industrial operations such as Ginning, Cotton Seed Oil, manufacturing of food, copper wire etc. Cotton cultivation potential is higher in the area leading to availability of raw material for textile industries. The Department of Industrial Policy and Promotion (DIPP), Ministry of Commerce & Industries (MoCI), Government of India (GoI) has introduced the Industrial Infrastructure Upgradation Scheme (IIUS) with an objective to enhance international competitiveness of domestic industry by providing quality infrastructure through Public Private Partnership (PPP) in the cluster which have greater potential to become globally competitive. The scheme provides for a financial assistance in the form of a grant up to 75% of the project cost, with a ceiling of Rs.50 Crores. The GoI contribution under this scheme is for creation of durable assets. The scheme requires remaining 25% of the project cost to be financed through other sources including contribution from Industries. CLC Textile Park Private Ltd. (Special Purpose Vehicle (SPV) incorporated under the companies Act 1956) has come forward to implement industrial infrastructure under IIUS. Since, the scope of IIUS is limited to physical infrastructure, the gap assessment and project identification for Pandhurna cluster was therefore focused on physical infrastructure. The interventions were identified to meet the requirements of a model industrial cluster/park through field visits, stakeholder consultations, collection and analysis of data, interactions with government agencies and institutions and benchmarking with well developed clusters. 1.2 Proposed Project: The present trend in process industries which consume large quantum of process steam and electric power is to establish co-generation facility which can simultaneously meet M/s Creative Enviro Services, Bhopal ES: 1

2 the process steam as well as the electrical energy requirements of the plant. However for supplying steam it is preferred that consuming process industries are located in close proximity to the steam turbine. Considering the scattered arrangement of consuming process industries in the proposed textile park it is very difficult to run steam piping all round. Due to this reason it is proposed to install a captive thermal power plant which can generate and supply power to the industries situated in the textile park. The captive power plant will go a long way in improving the overall energy balance of the plant which will in turn improve the economy of operation. Own thermal power generation is most reliable one compared to other type of power plants. In line with the present trend, establishing a captive power generation facility in M/s. CLC TEXTILE PARK PRIVATE LIMITED is expected to substantially improve the overall energy economy. Moreover power tariff of state electricity board is high and is expected to increase further in the years to come; M/s. CLC TEXTILE PARK PRIVATE LIMITED will have to pay a very high cost if the plant power requirements are to be met from the electricity board grid. On the other hand, if power requirements are to be met through the diesel generator sets using Diesel, the prevailing uncertainty with regards to the price of oil due to changing global scenario, and the cost of oil at the present level makes the DG sets based plant power generation also unattractive. In order to reduce the costs of production to sustain the operation in the globally competitive environment, it is essential for M/s. CLC TEXTILE PARK PRIVATE LIMITED to install their own power plant. The plant will be located at Village: Hirawa, Tehsil: Pandurana, District: Chhindwara in the state of Madhya Pradesh. 1.3 Objective of the study: This Environmental Impact Assessment (EIA) study is prepared for obtaining the Environmental Clearance (EC) from Ministry of Environment and Forests (MoEF), Government of India, New Delhi, for the proposed 10 MW Coal based Power Plant. Considering the above points, Environmental Impact Assessment report has been prepared along with Environment Management Plan (EMP) for various environmental components, which may be affected due to the proposed Power Plant. The Risk Assessment and Disaster Management Plan have also been prepared to meet the M/s Creative Enviro Services, Bhopal ES: 2

3 eventualities during operation of the plant. This EIA Report covers the primary data collected during the period Oct to December 2009 covering Post monsoon season. M/s Creative Enviro Services, Bhopal have prepared Rapid Environmental Impact Assessment (REIA) report for the proposed 10 MW Coal based Power Plant at Village: Bihajhar, Tehsil: Bagbahera, District: Mahasamund in the state of Chhattisgarh by incorporating Terms of References (TORs) approved by Ministry of Environment & Forest (MoEF) New Delhi. The report contains detailed description of the following, a. Detailed characterization of status of environment with in an area of 10 km radius from the proposed plant site for major environmental components including air, water, noise, soil, flora, fauna and socio-economic environment. b. Assessment of air emissions, liquid waste and solid waste from the proposed project along with the noise level assessment. c. Pollution control measures proposed to be adopted. 1.4 Environmental Setting: The environmental setting of the proposed plant is given in Table-1. Table-1 - Environmental Setting of the proposed site SL.NO PARTICULARS DETAILS 1 Location Hiwara 2 Latitude (N) Longitude (E) Nature of Terrain Plain 5 Mean sea level 480m 6 Nearest Town Pandhurna 7 Nearest City Nagpur 8. Nearest Highway N.H.-69, Bhopal-Nagpur Road-0.5 km 8 Distt. Head quarter Chhindwara 9 Nearest Airport Nagpur 9 Total Area i) Built up area TPP ii) Area of Green Belt iii) Open area sqm sq. m sq. m sqm 10 Nearest River Jam-8.5km-NNE 11 Surface water Chiklajodi Nalla-1.0km-W Ambaghat Nalla-2.0km-ES Dantpali Nalla 8.0km-E 11 Climatic Condition - (i) Average Rainfall (ii) Maximum Temp to 1800mm 40 0 C M/s Creative Enviro Services, Bhopal ES: 3

4 (iii) Minimum Temp (iv) Average relative Humidity (v) Wind Direction 09 0 C 19 to 86% NNE, N and NE, ESE 2. DETAILS ABOUT THE PROJECT SITE 1. The plant site is located at Tehsil: Pandurana, District: Chhindwara in the state of MP. 2. The nearest railway facility is available at Pandurana, which is about 15.0 Km. from the proposed project site. The nearest airport is Nagpur, which is about 70 km from the proposed project site. 3. Rajana, Hirwa Sendwara, Temni Sani, Meharakhapa, Ghogri shahani, wada, & Chicholi etc., are the near by habitations to the proposed plant. 4. Total land is sufficient for installation is about 9acre 5. The average annual rainfall in the area is 1300 mm. 6. The major crops in the study area are Kappas etc. 2.1 RAW MATERIALS The following will be the raw material requirement for the proposed power plant. Calorific Value of Coal 4214 kcal/kg Heat rate 3485 KCal/Unit (KWatt/Hr) Total Fuel Requirement 3485X10= M KCal/hour Coal Consumption 175 TPD Ash Contents in Coal 36.3% Ash Generation (TPD) 65 TPD All the raw materials will be transported through Road under covered trucks only. 2.2 Process Flow of the Power Plant The plant under reference is captive thermal power plant based on co generation cycle catering to the heat and power requirement of the CLC Textile Park. The power plant uses coal as fuel and fluidized bed combustion system of firing coal. The coal is fed mechanically to the boiler bunkers having a storage capacity of 16 hours consumption of coal for the full load boiler output. The coal is then fed to the boiler furnace in the fluidized state with the support of combustion air fed by the forced M/s Creative Enviro Services, Bhopal ES: 4

5 draught fan (FD Fan). The flue gas thus formed as a result of combustion is led over the heating surfaces and heat recovery surfaces (convection & radiant). The gases are finally evacuated from the boiler to atmosphere through one 63 meter high chimney by the induced draught fan (ID Fan). In the process, the Electrostatic Precipitator (ESP) is interposed in the flue gas path before it escapes through the chimney. The dust in the flue gas is separated in the ESP hoppers and disposed off pneumatically. The emission level through the chimney is maintained at less than 50 mgm/nm 3 level at all times. As a result of heat exchange in the boiler between flue gas and water, the steam is formed and the same is evaporated at 68 ata and 490 deg C. The high pressure high temperature steam from the boiler is sent to one 10.0 MW Steam Turbo generator Set (TG Set) where the heat energy is converted in mechanical energy which in turn gets converted to electrical power by driving the generator. The electric power is generated at 11 KV at generator terminals The turbine is a condensing turbine having one controlled extraction of steam at 65 ata to cater to the steam requirement of the process. A part of this steam is also used for feed water heating to achieve higher cycle efficiency. In order to increase the overall efficiency further, the turbine is provided with an additional bleed point to supply steam for deaeration and feed water heating. The above process meets with the objective of catering the needs of heat and power for the process operations. To keep the various equipment scale and corrosion free, water is treated in the DM Plant and then fed to the power plant as make up water. The feed water is then deaerated and the boiler water concentration maintained within limits by resorting to adequate blow down. The fly ash produced is carried along with the flue gases. ESP is interposed in the flue gas path where the fly ash is separated from flue gases, collected in ESP hoppers and then pneumatically transported to Fly ash storage silo. M/s Creative Enviro Services, Bhopal ES: 5

6 The steam passed through the turbine is partly extracted at 65 ata to be fed to the process and to HP feed water heater. The steam is then further expanded in the turbine till the bleed point for use in deaeration and feed water heating. The balance steam is finally expanded further to the condenser where it is condensed by circulating cooling water. The cooling water gets heated through 8-10 deg C. This is cooled in the Induced draught cooling tower for reuse as cooling water in the condenser. 2.3 Water and Waste Water: Water Requirement and Source Total raw water requirement for the plant has been estimated at 1200 M 3 /day including Domestic consumption. This includes water for Make-up water for Cooling tower Makeup for Boiler water, Resin Regeneration water, dust suppression, and domestic water. Water requirement for the proposed project will be met from the water reservoir made by project proponent. Table-2 -Water Consumption S. NO DESCRIPTION UNIT PARAMETERS BOILER MAKE UP WATER 1) Boiler blow down m 3 /hr =(47000 x 2.5%)/1000 = ) Treatment plant regeneration m 3 /Day 30.0 Total water requirement for boiler m 3 /Day 58.2 COOLING TOWER MAKE UP WATER 3) Cooling Tower make up m 3 /hr = 2100 x 1.8% =37.8 4) Treatment plant regeneration m 3 /Day 90 Total water requirement for cooling tower m 3 /Day ) Service water requirement m 3 /Day 75 Total water requirement for boiler and cooling tower make up together m 3 /Day Waste Water Generation: Sr. No. The total quantity of effluents generated from the proposed project will be 308 M 3 /day. The following is the break-up of the wastewater generation from the proposed project. Item Effluent Generation (M 3 / Day) Table-3- Effluent Generation: Treatment and disposal M/s Creative Enviro Services, Bhopal ES: 6

7 A. Domestic 5 Treated through Septic Tanks & Soak pits B. Boiler 13 Will be neutralized through neutralization tanks and mixed with Cooling tower Blowdown and recycles to D.M Plant C. Cooling 280 Neutralized in neutralization pit and afterward passed through pressure filters and go to D.M. plant for mixing with raw water D. Other 10 - E. Horticulture F. Dust suppression/ Spraying G. Total Ash Handling & Disposal Collection/ Transportation: The Ash collected in Hoppers of ESP is pneumatically conveyed to Silo Area for temporary storage. Storage: Ash is pneumatically conveyed to Silos. Silos (2 nos.) 138 cum of capacity are provided for storage of ash. Disposal: It is proposed to use the ash profitably by selling the same for brick manufacturing units & Cement plant. 3.0 SOURCE OF POLLUTION & CONTROL MEASURES 3.1 AIR POLLUTION The flue gases coming from Boilers will pass through state-of-the art Electro Static Precipitator. The particulate matter at the outlet of all the Electro Static Precipitators will be less than 50 mg/nm 3 as per CREP recommendations. These treated gases will be let out into the atmosphere through stack of 63 m height for effective dispersion of pollutants into the atmosphere. The following measures will be taken for control of fugitive emissions Dust extraction system with bag filters & Water Sprinkling system will be provided at material handling & raw material storage areas. All Conveyors will be totally covered with GI sheets to prevent the fugitive emissions. M/s Creative Enviro Services, Bhopal ES: 7

8 3.2 Water Pollution The total wastewater generated will be 308 M 3 /day. The generated effluent will be treated in well-designed treatment system and treated effluent will be fully recycled within plant premises. No effluent will be discharged outside the plant premises. Effluent Treatment Scheme The effluent generated from the proposed project will be treated in the following manner. The Cooling Tower Blowdown is neutralized in another neutralization pit and afterward passed through pressure filters and go to a Central Monitoring Basin (CMB) from where it will mix with raw water and goes to D.M. Plant. ph of the boiler blowdown will be between 9.5 to Hence a neutralization tank of size 3m x 2m x 3 m will be constructed for neutralizing the boiler blow down. The treated Boiler blowdown will be mixed with Cooling tower Blowdown and mixed with treated cooling blowdown in Central Monitoring Basin (CMB) and goes to D.M. Plant. DM plant regeneration water will also be neutralized in the neutralization tank of 2m x 2m x 3m afterward treated effluent will be used for dust suppression and ash conditioning. The domestic effluent is passed through Septic Tanks and Soak pits for the treatment and effluent remains after Soak Pits (if any) will be utilized for Green belt development within the premises. No effluent will be let out of the plant premises. Hence Zero discharge concept will be implemented. A dedicated pipe distribution network will be provided for using the treated effluent for ash conditioning, dust suppression & green belt development. The characteristics of the treated effluent will be in accordance with the CECB Standards for land irrigation. Hence there will not be any impact on ground water quality / surface water due to the proposed Project. 3.3 Solid Waste Management Ash will be generated as the results of operation of proposed power plant. The following table depicted the total quantity of the ash generation: Table- 5 Calorific Value of Coal 4214 kcal/kg Heat rate 3485 KCal/Unit (KWatt/Hr) Total Fuel Requirement 3485X10= M KCal/hour Coal Consumption 175 TPD Ash Contents in Coal 36.3% Ash Generation (TPD) 65 TPD M/s Creative Enviro Services, Bhopal ES: 8

9 3.0 BASELINE DATA 3.1 Ambient air quality Ambient air quality was monitored for RPM, SPM, SO2 & NOx at 08 stations including project site for one season as per MOEF guidelines. The following are the concentrations of various parameters at the monitoring stations. RPM to µg/m 3 SPM to µg/m 3 SO to µg/m 3 NOx to µg/m Water quality Ground water samples were collected at 7 stations along with 4 surface water samples and analysed for various Pysico-Chemical parameters. The water samples are shows that they are suitable for potable purposes. 3.3 Noise levels Noise levels were measured at 8 locations during daytime & Nighttime. The ambient noise level at rural area varied from 35 dba to 65 dba. 4.0 PREDICTION OF IMPACTS 4.1 Prediction of impacts on Air Environment: The proposed emission from proposed project has been considered for prediction of GLC s. The predicted maximum incremental rise in SPM concentrations (24 hourly) will be 22.7 µg/m 3 which occur at a distance of m from the origin stack in the down wind direction over the baseline concentrations. The net resultant Ground Level Concentrations of avg. SPM during operation will be to µg/m 3. The net resultant concentrations of SPM, SO2 and NOX are well within the National Ambient Air Quality Standards (NAAQS) after project commences the operation. Thus, it can be safely stated that due to the proposed plant there will be no adverse impact on the existing ambient air quality. 4.2 Impact on Reserved Forests / Protected Forests Net resultant GLC s are computed for SPM, SO2 and NOx at all the sensitive receptors such as Reserved Forests/Protected Forests. This net resultant GLC s are within the National Ambient Air Quality Standards (NAAQS) for sensitive zones. Hence there will M/s Creative Enviro Services, Bhopal ES: 9

10 not be any impact on Reserved Forests/Protected Forests, human beings, flora & fauna and animal life due to the proposed expansion. 4.3 Prediction of impacts on water quality The effluent generated from the proposed project will be treated in well-designed effluent treatment scheme and will be used for dust suppression, ash conditioning & green belt development after ensuring the compliance of CECB standards. Hence there will not be any adverse impact on ground water/ surface water due the proposed expansion project. 4.4 Prediction of impacts on noise quality The major noise generating sources in the plant are STG, CFBC Boilers, compressors, etc. All this machinery will be manufactured keeping in view the MoEF/ International Standards on noise levels. 4.5 Prediction of Impacts on Land Environment Quality The effluent will be treated to achieve CECB stipulated standards for on land for irrigation. All the required air pollution control systems will be provided to meet CECB norms. All solid wastes will be disposed / utilized as per CECB norms. Hence there will not be any adverse impact on land environment due to the proposed project. 4.6 Biological Environment All the required Air pollution control facilities for efficient treatment will be provided to comply with CECB norms. Solid wastes will be disposed off as per guidelines. Hence there will not be any adverse impact on flora and fauna due to the proposed project 4.7 Socio - Economic Environment Certainly there will be a scope for employment to local people during construction as well as in operation phase. Hence there will be an all round development of the area. 5.0 ENVIRONMENT MANAGEMENT PLAN 5.1 Environment Management during Construction Phase: During construction, some of the vegetation in the plant premises is required to be cleared. The measures required to be undertaken to minimize the impact on the ecology are: The felling of trees will be kept at minimum; The greenbelt having vegetation density of 2000 trees/ha shall be developed; Construction is restricted to day time only 5.2 Environment Management during Operation Phase: M/s Creative Enviro Services, Bhopal ES: 10

11 5.2.1 Air Pollution Management Air Pollution Control Equipment - Proposed Power Plant It is proposed to installed an electrostatic precipitator (ESP) having efficiency to reduce particulate emission below 50 mg/ NM 3 Fugitive Emissions To control the fugitive emissions, the following measures are proposed: All the conveyors will be provided with conveyer covers and hoods to offset any trapping of material in wind stream. The height of the chutes at each of the transfer points and the slope of chutes to be considered to avoid dust generation; High efficiency reverse air jet type bag filters are considered to arrest the air borne dust at all the locations where transfer of material from one conveyor to other takes place; Unloading of coal from trucks will be carried out with proper care avoiding dropping of the materials from height. It is advisable to moist the material by sprinkling water while unloading; The sprinkling of water will be done along the internal roads in the plant in order to control the dust arising due to the movement of vehicular traffic; All the workers and officers working inside the plant will be provided with disposable dust masks; Thick greenbelt will be developed around the plant to arrest the fugitive emissions. Air Pollution Control Schemes Adequate and efficient control equipment will be installed in the proposed plant to keep the dust emission at a minimum. The following measures shall be taken: Advance type of Boiler will be installed for the generation of Power, which will control the emissions of SO2. Low NOx burners will be installed to control the NOx emissions below 50 ppm. Further, chimney of 63m height is proposed for adequate dispersion of pollutants. Since, the Coal to be used in the plant, lime injection system will be provided to reduce SO2 pollution. Generation of NOx gases depends to a great extent on the combustion temperature. A well-designed burner system will be installed which limits the temperature to a reasonably low value of NOx generation Noise Pollution Management M/s Creative Enviro Services, Bhopal ES: 11

12 The extensive greenbelt proposed around the boundary of the plant will attenuate the noise emitted by the various sources in the plant. Earplugs will be provided for the personnel working close to the noise generating units as a part of the safety policy. Apart from this, some of the design features provided to ensure low noise levels are as follows: All rotating machinery will be well lubricated and provided with enclosures as far as possible to reduce noise transmission; Provision of silencers will be made wherever possible; The insulation provided for prevention of loss of heat and personnel safety will also act as noise reducers; Necessary enclosures will also be provided on the working platforms/areas to provide local protection in high noise level areas; The workers will be provided with ear plugs; and Plantation in the zone between plant and township would attenuate noise in the residential area Water Pollution Management The blow down from the boiler section which is about 2 cum per day will be neutralized through neutralization tanks and mixed with Cooling tower Blowdown and recycles to D.M Plant and the Cooling Tower Blow Down (100 cum per day) will be Neutralized in neutralization pit and afterward passed through pressure filters and go to D.M. plant for mixing with raw water whereas the waste water from resin regeneration which is about 08 cum per day will be Neutralized in neutralization pit and afterward passed through pressure filters and go to D.M. plant for mixing with raw water. Thus the effluent would get finally dispersed into the soil and no further treatment would be necessary. It is thus presented that instead of any additional negative impact on water quality; there will be a positive impact in the water table due to proposed water harvesting techniques Solid Waste Management Only ash will be generated from the proposed power plant as a solid waste. Ash handling and storage system is total enclosed and ash will be collected from the ESP of material from One rotary air lock pocket feeder is provided below the ash for every hopper. The ash collected at ESP hoppers is continuously discharged through the rotary feeders to a screw feeder, which is located underneath the rotary feeders. Water will be sprinkled through a water spray nozzle, which is provided in the screw feeders. Water M/s Creative Enviro Services, Bhopal ES: 12

13 will be sprinkled through a water spray nozzle, which is provided in the screw feeder. Then wet ash will be discharged to trucks for disposal. It is proposed to use the ash profitably by selling the same for brick manufacturing units. The ash is stocked in silo, which has a capacity to store 1-week generation of ash Greenbelt Development Due care will be taken to ensure that a greenbelt is developed in and around the plant. All areas devoid of vegetation and having low density will be systematically and scientifically afforested. Proponent has proposed to develop greenbelt on more than 33% of Total area that is as per guideline of CPCB Health and Safety Occupation safety and health is very closely related to productivity and good employeremployee relationship. The main factors of occupational health in plant are fugitive dust and noise. Safety of employee during operation and maintenance of equipment and handling of materials are proposed to be taken care of as per regulations. To avoid any adverse affects on the health of workers due to dust, heat, and noise sufficient measures have been provided in the project. The CLC Textile Park (P) Ltd. is conscious of its moral and legal obligation to prevent hazards and to provide healthy working environments. They are proposed to do the following activities: Provision of rest shelters for workers/staff with amenities like drinking water, fans, toilets etc. Provision of personal protection devices to the workers; Rotation of workers exposed to noise premises; Dust suppression of road; and First-aid facilities in the plant area. The management should make annual budget for the safety and health of their employees and provide sufficient facilities in order to effectively implement the health and safety measures. The management shall carry out periodical audit of safety and health with view to ascertaining the effective implementation of policy. M/s Creative Enviro Services, Bhopal ES: 13

14 Regular medical examination shall be conducted for the employees. The Medical Officers renders timely advice to the Management on preventive measures and safe guards. A safety Committee under MP Factory Rule 1962, under the chairmanship of the Vice President (Mech.) shall be constituted. Emergency Plan duly approved by the Director, Industrial Health and Safety shall be prepared and will be updated periodically Institutional Arrangement for Pollution control Environment cell is formed for overall activities for implementation of Environment Management Plan, compliance of statutory requirements as well as interaction with regulatory bodies viz. Chhattisgarh Environment Conservation Board, etc. Table-6 - SUMMARY OF ENVIRONMENTAL MANAGEMENT PLAN AIR Periodical maintenance of pollution control equipments, regular Ambient Air Quality, Stack Monitoring and well developed green belt. WATER Proper sanitary facilities present in the plant to inhibit ground water pollution, oxidation ponds are provided for domestic wastewater management. NOISE Regular Maintenance of machinery & well developed green belt. Provision to provide sound protective devices. SOLID WASTE To take the material in process. BIO-MONITORING Annual medical check up of all employees and various safety measures for employees has been taken. M/s Creative Enviro Services, Bhopal ES: 14

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1. INTRODUCTION Executive Summary 1.1 Background: M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1.2 Proposed Project:

More information

Executive Summary for R-EIA Report for 60

Executive Summary for R-EIA Report for 60 Executive Summary 1. INTRODUCTION Maihar Cement is a unit of M/s Century Textiles and Industries Ltd. located at Sarla Nagar near Maihar in district Satna (M.P). Maihar Cement Unit has come into operation

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

Mars Power & Steel Ltd.

Mars Power & Steel Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Simran Industries Pvt. Ltd.

Simran Industries Pvt. Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Patharra Village Bemetara Tehsil Durg District Chhattisgarh Submitted to: CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh 1.0 INTRODUCTION

More information

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola 0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) 1. PROJECT DESCRIPTION: Ambuja Cement Eastern Ltd. (ACEL) has the cement

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Village : Taraimal, Tehsil : Gharghoda District : Raigarh

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Village : Taraimal, Tehsil : Gharghoda District : Raigarh SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Village : Taraimal, Tehsil : Gharghoda District : Raigarh Submitted to: CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh 1.0 INTRODUCTION

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

Dheeru Powergen Private Limited.

Dheeru Powergen Private Limited. Executive Summary Of The Proposed 2 x 300 MW Dhanras Thermal Power Station At Dhanras Village Katgora Taluk, Korba District, Chhattisgarh. Implemented By Dheeru Powergen Private Limited. Submitted to CHHATTISGARH

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

Roquette Riddhi Siddhi Private Limited

Roquette Riddhi Siddhi Private Limited SUMMARY ON DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Roquette Riddhi Siddhi Private Limited (Expansion of co-generation power plant from 6MW to 18 MW) at Gokak Village & Taluk, Belagavi District,

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam

More information

The following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S.

The following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S. Proceeding of the Public Hearing conducted on 27.01.2009 for grant of environmental clearance to M/s Universal Bio-Mass Energy Pvt. Ltd. for setting up of 14.5 MW capacity Biomass based Independent power

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION Page 1 of 8 Environmental Statement for Clinker Grinding Unit of M/s Bihar Cement Plant (A Unit of Shree Cement Ltd.), situated at Jasoia Mor, BIADA, Industrial Growth Centre, Aurangabad, Tehsil & Dist.

More information

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE EC letter no. J-11011/79/2007-IA II (I) Dated 16.04.2009 A. Specific Conditions : SN Condition Compliance 1. Continuous stack monitoring facilities to monitor

More information

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER 2011 1 CONTENTS 1.0 Project Description Page 3 2.0 Description

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA OPERATING GUIDELINES FOR PROCESSING OF CONSENT TO ESTABLISH APPLICATION FOR ESTABLISHMENT OF COAL WASHERIES IN THE STATE OF ORISSA STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII,

More information

EXECUTIVE SUMMARY 1. INTRODUCTION

EXECUTIVE SUMMARY 1. INTRODUCTION EXECUTIVE SUMMARY 1. INTRODUCTION M/s. Indsil Energy & Electro Chemical Ltd plant is situated in Urla Industrial Estate, Raipur, Chhattisgarh. The company is manufacturing Ferro Alloys. Due to massive

More information

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Ref.: Environmental Clearance no. J-11011/754/2007-IA II

More information

JAYPEE NIGRIE SUPER THERMAL POWER PLANT

JAYPEE NIGRIE SUPER THERMAL POWER PLANT JAYPEE NIGRIE SUPER THERMAL POWER PLANT (A Division of M/s Jaiprakash Power Ventures Limited) Village: Nigrie, Tehsil: Sarai District: Singrauli 2015 2016 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2017 March 2018 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,

More information

SUMMARY. for New Standalone Cement Grinding Unit. proposed at

SUMMARY. for New Standalone Cement Grinding Unit. proposed at SUMMARY of ENVIRONMENT IMPACT ASSESSMENT REPORT for New Standalone Cement Grinding Unit ( 2 x 1.0 million tons per annum) proposed at Gaithulapalem, Tallapalem & Narasapuram Villages, Kasimkota Mandal,

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

2 NECESSITY OF THE PROPOSED PROJECT

2 NECESSITY OF THE PROPOSED PROJECT Executive Summary 1 INTRODUCTION M/s. Prosperous Energy Private Limited (PEPL), a wholly owned subsidiary of Videocon Industries Limited has proposed the 2X660MW Coal based supercritical Thermal Power

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

SINGHAL ENTERPRISES PRIVATE LIMITED

SINGHAL ENTERPRISES PRIVATE LIMITED SINGHAL ENTERPRISES PRIVATE LIMITED (INTEGRATED MINI STEEL & POWER PLANTS) Taraimal Village, Gharghoda Mandal, Raigarh District, Chattisgarh State. 1.0 INTRODUCTION SINGHAL ENTERPRISES PRIVATE LIMITED

More information

Shri Girija Alloy & Power (I) Pvt. Ltd.

Shri Girija Alloy & Power (I) Pvt. Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Shri Girija Alloy & Power (I) Expansion of Ferro Alloys unit at Submitted to ANDHRA PRADESH POLLUTION CONTROL BOARD 0 1.0 PROJECT DESCRIPTION Shri Girija

More information

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement

More information

Mangalam Cement Ltd.(Unit I)

Mangalam Cement Ltd.(Unit I) Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd

More information

Application of Low and Non Waste Technology in the production process;

Application of Low and Non Waste Technology in the production process; 9.0 ENVIRONMENT MANAGEMENT PLAN (EMP) 9.1 INTRODUCTION Environment Management Plan is required for ensuring sustainable development. It should not affect the surrounding environment adversely. The management

More information

Janki Corp. Ltd., Six Monthly Compliance Report

Janki Corp. Ltd., Six Monthly Compliance Report Janki Corp. Ltd., Six Monthly Compliance Report Period: October 2014 to March 2015 Project: Expansion of Sponge Iron Plant (1,80,000 to 4,00,000TPA) and Installation of Iron ore Beneficiation Plant (0.6

More information

COMPLIANCE STATUS REPORT

COMPLIANCE STATUS REPORT COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status

More information

Telefax: 011: Dated:10 th May, 2013

Telefax: 011: Dated:10 th May, 2013 F. No. J-11011/41/2011-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax: 011:

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2017 - Sept 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

EXECUTIVE SUMMARY. (Approved Consultant)

EXECUTIVE SUMMARY. (Approved Consultant) ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CAPTIVE RESIN PLANT OF 100000 TPA PRODUCTION CAPACITY AT ROUTHUSURAMALA VILLAGE, THOTTAMBEDU MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY& 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007- IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

Calcom Cement India Limited

Calcom Cement India Limited Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam 782446 Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I)

More information

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala-147001. No. SEAC/80/37967 Dated 15/10/2008 Speed Post To M/s Green Planet Energy Pvt.

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

A. SPECIFIC CONDITION COMPLIANCE

A. SPECIFIC CONDITION COMPLIANCE Six monthly compliance report of conditions laid down vide letter no. J-11011/438/2007-IA II (I), Dtd.02.02.2009 of Ministry of Environment & Forest, Government of India in respect of Integrated Steel

More information

INTRODUCTION ENVIRONMENTAL STATEMENT

INTRODUCTION ENVIRONMENTAL STATEMENT INTRODUCTION MB Power (Madhya Pradesh) Limited (MBPMPL) is a 100% owned subsidiary of Moser Baer Power & Infrastructure Limited (MBPIL). Moser Baer group headquartered in New Delhi, is leading global technology

More information

CHAPTER-10 SUMMARY AND CONCLUSION

CHAPTER-10 SUMMARY AND CONCLUSION CHAPTER-10 SUMMARY AND CONCLUSION 10.1 INTRODUCTION M/s. Shree Warad Alloys (P) Ltd., Nagpur a private limited company having its registered office at Plot No. C-1, Sharvari Apartments, 8/B, Trimurty Nagar,

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd

Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd MADHYA PRADESH POWER GENERATING Co. Ltd. INTRODUCTION Satpura Thermal Power Station is an oldest running plant

More information

Borregaard Case Study. Sarpsborg I & II

Borregaard Case Study. Sarpsborg I & II Borregaard Case Study Sarpsborg I & II Borregaard Case Study Sarpsborg I & II Situation Borregaard Industries is a major supplier of wood-based chemicals. The company owns and operates one of the world

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated 1 Status of Environmental Clearances received from MOEF vide MoEF No.J- 1101/572/2007-IA II(I) dated 27.12.2007- Cement Plant and CPP, April - 2017. i) Compliance report is enclosed herewith for all the

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB)

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB) Brief Note Prakash Industries Limited (PIL) is existing Integrated Steel Plant located at Hathneora, Champa Villages, Janjgir-Champa District, Chhattisgarh. Existing plant has obtained Environment Clearance

More information

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and. Sl. No. CONDITIONS COMPLIANCE STATUS SPECIFIC CONDITIONS i The gaseous emissions (PM, SO 2, NO X, PAH, HC, VOCs and Fluoride) from various process units shall conform to the standards prescribed by the

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2016 Sept. 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I)

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I) COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER-2016 F. No. J-11011/309/2011-IA-ll (I) SUBMITTED BY- M/S. GASGEN FERRO ALLOYS LLP LOHIA HOUSE, 2ND FLOOR M.G.ROAD,

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802

More information

a long-term sustainable solution for waste

a long-term sustainable solution for waste g wa p o d fo h y gy Rising waste production, diminishing landfill capacity and increasing regulation are issues which affect everyone. In a city the size of London, logistical problems of moving waste

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10

More information

Date: M/S Desh Bhakt Ratnappa Kumbhar Panchaganga SSK Ltd, Inchalkaranji, Kolhapur.

Date: M/S Desh Bhakt Ratnappa Kumbhar Panchaganga SSK Ltd, Inchalkaranji, Kolhapur. Date: 04.06.2018 M/S Desh Bhakt Ratnappa Kumbhar Panchaganga SSK Ltd, Inchalkaraji, Kolhapur. Compliance to the Environmental Clearance for Co-generation Plant 30 MW. Ref: SEAC 2009/CR16/TC2, Dated: 18

More information

MIEL/NP/EMD/ 303/2015 Date:

MIEL/NP/EMD/ 303/2015 Date: MIEL/NP/EMD/ 303/2015 Date: 08.07.2015 To The Aditional Director, Ministry of Environment and Forests, Regional Office, Western Region, Link Road No 3, E-5, Ravishankar Nagar,(Arera Colony), Bhopal (M.P.)

More information

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi - 416108, Taluka - Shirol, Dist Kolhapur, Maharashtra Compliance of Conditions Stipulated in environmental clearance granted

More information

1. EXECUTIVE SUMMARY

1. EXECUTIVE SUMMARY 1. EXECUTIVE SUMMARY 1.1 Introduction This feasibility report presents a brief summary of the proposed Greenfield integrated cement Project in villages: Hardua Ken, Puraina, Sotipura, Devra, Madaiyan,

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to Sept. 2015 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017 A. SPECIFIC CONDITIONS Sl. No. i ii Condition Continuous stack monitoring facilities for all stacks and adequate air pollution control systems e.g. electrostatic precipitators (ESP) to clinker cooler and

More information

Cement Manufacturing Company Ltd. Page 1

Cement Manufacturing Company Ltd. Page 1 Six Monthly Compliance status of Environment Clearance for Cement Plant (2400 TPD) at Village Lumshnong, Meghalaya July to December 2013 Ref.: Environmental Clearance no. SEIAA/Project-6/2008/23 dtd. 16.03.10.

More information

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM CONFERENCE ON WATER OPTIMISATION IN THERMAL POWER PLANTS OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM S. K. Thakur, Dr. L. D. Papney, Chief Engineer (I/C), TE&TD

More information

F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road

F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail : pb.rastogi@nic.in Telefax

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

ENVIRONMENTAL STATEMENT FOR THE YEAR

ENVIRONMENTAL STATEMENT FOR THE YEAR ENVIRONMENTAL STATEMENT FOR THE YEAR 2016-17 6 MTPA STEEL PLANT OF TATA STEEL AT KLAINGANAGAR INDUSTRIAL COMPLEX, ODISHA ENVIRONMENTAL DEPARTMENT TATA STEEL KALINGANAGAR Kalinga Nagar Industrial Complex,

More information

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division) To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

More information

J.K. Cement WORKS, MANGROL (RAJ) 25 MW Captive Power Plant & 10 MW Waste Heat Recovery Boiler

J.K. Cement WORKS, MANGROL (RAJ) 25 MW Captive Power Plant & 10 MW Waste Heat Recovery Boiler J.K. Cement WORKS, MANGROL (RAJ) 25 MW Captive Power Plant & 10 MW Waste Heat Recovery Boiler Compliance report of Environment Clearance from SEIAA, Rajasthan, Letter No. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project/Cat8(b)B1/(484)/12-12

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Village Tehsil District : Saraipalli : Tamnar : Raigarh SUBMITTED TO CHHATTISGARH ENVIRONMENT CONSERVATION BOARD, RAIPUR, CHHATTISGARH 1.0 INTRODUCTION

More information

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and

More information

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Reference: Environment clearance to CFG3 Project vides MOEF letter.no. J-11011/664/2008-IAII

More information