PORT SEVERN WASTEWATER TREATMENT 2016 SUMMARY REPORT

Size: px
Start display at page:

Download "PORT SEVERN WASTEWATER TREATMENT 2016 SUMMARY REPORT"

Transcription

1 PORT SEVERN WASTEWATER TREATMENT 2016 SUMMARY REPORT ENVIRONMENTAL COMPLIANCE APPROVAL: #

2 INTRODUCTION The Lone Pine Road Water Pollution Control Plant in Port Severn was a design / build project and is owned and operated by the District Municipality of Muskoka. The main treatment plant is located at 115 Lone Pine Road, Port Severn and serves a population of approximately 500 people. The water pollution control plant operates under MOE Environmental Compliance Approval (ECA) # (Sewage), Certificate # (Air). Under the terms of the ECA, the average daily design flow rate for the plant is 700 cubic meters (m 3 ) per day and the maximum design flow rate is 2,230 cubic meters (m 3 ) per day. The treatment plant began treating sewage from the Port Severn wastewater collection system on October The collection system includes three remote sewage lift stations and an influent pumping station. Located at the treatment plant site are 2 ICEAS Sequencing Batch Reactors, each with a rated design capacity of 1,115 m 3 /day, giving a total peak design flow rate of 2,230 m 3 /day. Additionally, effluent non-compliance criteria are as follows: Effluent Parameter Concentration Total Effluent Loading CBOD5 15 mg/l 10.5 kg/day Suspended Solids 15 mg/l 10.5 kg/day Ammonia/Ammonia Nitrogen 2.5 mg/l (May-October) 1.75 kg/day 15 mg/l (November-April) 2.7 kg/day Total Phosphorous 0.30 mg/l 0.2 kg/day (or 100 kg/year) ph inclusive at all times The treatment process is comprised of 2 sequencing batch reactors, phosphorous precipitation using aluminum sulphate, deep sand effluent filtration, and ultraviolet disinfection. Treated effluent from the plant is discharged through a FRP (Fiberglass Reinforced Plastic) diffuser, located downstream of Lock 45, in Severn Sound. Waste sludge from the plant process is digested aerobically at the plant, and is periodically hauled off site for disposal. All pumping stations and treatment control systems use SCADA (Supervisor Control And Data Acquisition), in combination with Data Highway Plus, and programmable logic controllers.

3 Executive Summary In all respects, test results of the treated effluent for the parameters of CBOD5, Suspended Solids, Ammonia, Total Phosphorous, and E. Coli are in compliance with the limits outlined in the ECA regarding monthly allowable concentrations and total effluent loading throughout the entire year. Overall, the plant treatment processes performed satisfactorily and are deemed to be adequate. All sample test results of the final effluent were within levels outlined in the plant ECA (# ). Quantity of Flow Summary The plant has a daily average flow design capacity of 700 m 3 /day. The actual m 3 average daily flow for the year was 194 m 3 /day, however, the 3-year average is 185 m 3 /day, which represents 26% of the plant capacity Plant Operational Upsets or Process Failures The Tertiary Filtration process was partially by-passed on June 5 th and June 14 th On both occasions high wastewater flows from the Equalization Pumps caused the effluent filter to partially bypass flow to the UV disinfection system. Details are provided later within this report. Interpretation of Final Effluent Analysis The information reported in the Final Effluent sample results summary table consists of test results of analysis conducted on final effluent composite samples. Bacteriological samples, however, consisted of grab samples. Weekly analysis has been performed and reported as specified under the terms outlined in the ECA. Raw Sewage The information reported in the Raw Sewage sample results summary table consists of test results of analysis conducted on composite samples of the plant influent flow. Samples are sent for analysis to Lakefield Research and weekly analysis has been performed and reported as specified under the terms outlined in the ECA. Final Effluent Analysis Summary Minimum 4 Week Annual Loading kg/day CBOD5 (mg/l) Suspended Solids (mg/l) Total Phosphorous (mg/l) Ammonia (mg/l) E. Coli (#/100 ml) <1 Not Applicable ph Min 6.95 Max Not Applicable

4 Efforts and Results towards meeting Effluent Objectives A review of the District of Muskoka s infrastructure needs is conducted annually by the Director of Water and Wastewater Operations, Area Manager and Chief Operator and recommendations for maintenance, rehabilitation and renewal programs are considered Efforts to eliminate the discharge of untreated or partially treated wastewater to receiving waters are being accomplished by a long term financial commitment to correct excessive infiltration into the wastewater collection system by means of sewer main rehabilitation / replacement, manhole rehabilitation and pumping station rehabilitation programmes. The treatment facility is capable of effective operation during emergencies, maintenance shut downs, and power failures. This is achieved through such measures as preventive maintenance of duty / standby units, the duplication of major treatment components, the provision of standby power sources and extensive use of the SCADA systems. All operators are qualified to operate the systems efficiently and effectively in order to achieve the highest level of treatment at all times; a commitment to provide Operator training and certification is being sustained. Regulatory sampling is carried out to meet the requirements outlined in the ECA. Additional in house operational sampling beyond these regulatory requirements is being performed on a routine basis, These efforts have resulted in an effective treatment process which ensures that effluent discharges consistently meet effluent objectives and are environmentally safe. Methods & Protocols for Sampling, Analysis & Recording Results All Sampling, analysis & recording of results for the Port Severn WPCP conforms, in order of precedence, to the following 3 standards: Ministry s Procedure F-10-1, Procedures for Sampling & Analysis Requirements for Municipal & Private Sewage Treatment Works, Ministry s publication Protocol for the Sampling & Analysis of Industrial/Municipal Wastewater and the AWWA/WEF publication Standard Methods for the Examination of Water & Wastewater. Evaluation of the Calibration and Maintenance Procedures on Monitoring Equipment Monitoring equipment includes flow measuring devices and various on-line parameter instrumentation devices (dissolved oxygen). The on-line instrumentation is maintained and calibrated in accordance with manufacturer s recommendations. All flow-measuring devices were calibrated in (Reports available upon request).

5 Summary of Maintenance and Major Infrastructure There were no significant plant upgrades on major infrastructure in All equipment information at the Port Severn Water Pollution Control Plant is entered into a computer database. From this information, a scheduled preventive maintenance programme has been established. The maintenance programme includes (and not limited to): Monthly testing of emergency testing (under load) of the standby generators. Annual servicing of emergency standby generators. Annual replacement of U.V. bulbs. Annual infrared inspection of Motor Control panels. Annual calibration of flow metering devices. Annual cleaning of all sewage pumping stations. Marine inspection of effluent outfall and diffuser completed in (5 year cycle). Evaluation of the Need for Improvement Works The treatment facility is operating at a plant capacity of 25% and is in compliance with specified effluent parameter criteria. In addition, there has been no significant treatment process upsets and plant bypasses. As a result, there is no need for improvements to the existing works. Summary of Proposed Works Requiring Approval under OWRA Since the treatment facility is operating satisfactorily there is no anticipated works requiring an ECA amendment for Treatment Unit Bypasses There was a treatment unit bypass event that took place on June 5 th 2016 and a second on June 14 th On both occasions high flows from the Equalization pumps resulted in portion of secondary treated effluent bypassing the tertiary filtration process. The total estimated volume of the by-passed secondary effluent on June 5 th was approximately 3.0 m3 and an estimated volume of by-passed secondary effluent on June 14 th was approximately 23 m3. At no time was the effluent disinfection process bypassed. Responses were carried out for these events by providing proper notifications and corrective actions. Control interlocks have also been implemented to mitigate further similar occurrences. Effluent Quality Assurance Measures In addition to the plant sampling and monitoring protocols required by the ECA, in-house plant-wide sampling and analysis is also conducted. This in-house sampling program provides assurance that the various treatment processes continue to operate at a high performance level.

6 Biosolids Generation The quality of biosolids is provided in the attached table and the volume of biosolids hauled from the facility for disposal is provided as well. Liquid biosolids from the plant were hauled to both the Gravenhurst Water Pollution Control Plant and Region of Huronia Environmental Services storage facilities for further treatment. Private contractors were used by the District of Muskoka to transfer all material in 2016, and will continue to do so in 2017 as well. It is not anticipated that there will be a significant increase in the total volume of biosolids produced in 2017.

7 Certification of Reports I certify that the information in this document and all attachments are correct, accurate and complete to the best of my knowledge. Marcus Firman, C.E.T. Director of Water and Wastewater Operations Lee Gillan Manager of Water and Wastewater Operations

8 Port Severn Wastewater Collection Summary 2016 New Sewer Mains No new sewer mains were installed in Port Severn in Sewer Main Replacement No sewer mains were replaced in New Services One new customer applied for a permit to connect to existing municipal services in Sewer Lateral Blockages No sewer lateral blockages occurred in Sewer Pump Stations Each of the four pump stations was cleaned by an outside contractor using high velocity water pressure and vacuum in All accumulated debris was hauled to the appropriate disposal site. Main Line Sewer Blockages No main line sewers backed up during Sewer Force Mains There were no sewer force main repairs required in Air Release Valves Five (5) air release valves were inspected and tested for proper operation Sewer Flushing and Video Inspections 837 meters of sanitary sewer mains were flushed in 2016 using high-pressure equipment. Closed circuit television inspections on 598 meters of the flushed mains ensured that the flushing met our specified contract requirements of having a minimum of 95% cleanliness. Sewer Rehabilitation No sewer rehabilitation work was undertaken in Locates Field staff addressed 75 locate requests in 2015.

9 TABLE 1: EFFLUENT FLOW SUMMARY District of Muskoka - Lone Pine Dr. WPCP - Port Severn Month Total Monthly (m 3 ) Day Flow (m 3 /d) Day Flow (m 3 /d) Minimum Day Flow (m 3 /d) Comments January 4, February 4, March 6, April 5, May 5, June 5, July 8, August 10, September 6, October 4, November 3, December 4, Total 70,833 Day 194 Day 631 Minimum Day 76

10 TABLE 3: INFLUENT QUARTERLY ANALYSIS SUMMARY District of Muskoka - Lone Pine Dr. WPCP - Port Severn Sample Identification Number Weekly 24 Hour Composite Sample Alkalinity (Total as CaCO3) ph Phosphate Sample Date Total BOD5 Phosphorus mg/l mg/l mg/l mg/l mg/l 16-Feb-16 PSRS 146 ~ ~ ~ May-16 PSRS 177 ~ ~ ~ Aug-16 PSRS 88 ~ ~ ~ Nov-16 PSRS 111 ~ ~ ~ Yearly Minimum Suspended Solids Weekly 24 Hour Composite Sample Total Ammonia Nitrogen Sample Date Total Kjeldahl Nitrate Nitrite Conductivity Nitrogen Nitrogen Nitrogen Chloride mg/l mg/l mg/l mg/l mg/l mg/l mg/l 16-Feb-16 ~ 23.2 ~ ~ 19.3 ~ ~ 16-May-16 ~ 29.7 ~ ~ 31 ~ ~ 15-Aug-16 ~ 20.5 ~ ~ 17.3 ~ ~ 14-Nov-16 ~ 16.3 ~ ~ 15.6 ~ ~ Yearly Minimum Un-Ionized Ammonia

11 TABLE 6: EFFLUENT QUARTERLY ANALYSIS SUMMARY District of Muskoka - Lone Pine Dr. WPCP - Port Severn Sample Identification Number Alkalinity (Total as CaCO3) ph Phosphate Sample Date Total CBOD5 Phosphorus mg/l mg/l mg/l mg/l mg/l 16-Feb-16 PSFE <2 ~ 7.46 ~ < May-16 PSFE <2 ~ 7.31 ~ <0.03 <2 15-Aug-16 PSFE <2 ~ 7.40 ~ 0.03 <2 14-Nov-16 PSFE <2 ~ 7.63 ~ < Yearly < <0.03 <2 < Minimum < <0.03 <2 Suspended Solids Total Sample Date Total Kjeldahl Nitrate Nitrite Ammonia Conductivity Nitrogen Nitrogen Nitrogen Nitrogen Chloride mg/l mg/l mg/l mg/l mg/l mg/l 16-Feb ~ ~ ~ <0.1 ~ 16-May ~ ~ ~ 0.3 ~ 15-Aug ~ ~ ~ <0.1 ~ 14-Nov ~ ~ ~ 0.1 ~ Yearly 551 < Minimum 451 <0.1

12 TABLE 4: CHEMICAL USAGE SUMMARY District of Muskoka - Lone Pine Dr. WPCP - Port Severn ALUM SODA ASH SODIUM HYPOCHLORITE POLYMER Dosage Dosage Dosage Dosage Month mg/l Total kg mg/l Total kg mg/l Total kg mg/l Total kg January February March April May June July ,097.2 August ,392.1 September October November December Monthly Unit Cost (see note 1) Total Yearly 9,

13 TABLE 7: EFFLUENT LOADING and CONCENTRATION SUMMARY District of Muskoka - Lone Pine Dr. WPCP - Port Severn MONTH CBOD 5 SUSPENDED SOLIDS TOTAL AMMONIA NITROGEN TKN E. COLI TOTAL PHOSPHOROUS Summer (May to Oct) Winter (Nov to Apr) Daily Daily Daily Daily Daily Daily Daily mg/l kg/d kg/d mg/l kg/d kg/d mg/l kg/d kg/d mg/l kg/d kg/d mg/l kg/d kg/d #/100 ml #/100 ml mg/l kg/d kg/d January ~ ~ ~ February ~ ~ ~ March ~ ~ ~ April ~ ~ ~ May ~ ~ ~ June ~ ~ ~ July ~ ~ ~ August ~ ~ ~ September ~ ~ ~ October ~ ~ ~ November ~ ~ ~ December ~ ~ ~ Monthly Yearly Effluent Objective Non- Compliance ~ ~ ~ < < < < ~ ~ ~ 200 < ~ ~ ~ Note: Bracketed and Bolded Values indicate non-compliance ( )

14 TABLE 9: LIQUID BIOSOLIDS PRODUCTION SUMMARY District of Muskoka - Lone Pine Dr. WPCP - Port Severn No. Date Hauler Shipped To Received From Comments Location Volume Location Volume 1 January 2 February 3 March 4 April 5 May 6 June 7 July AAAA GRAVENHURST PCP August AAAA GRAVENHURST PCP September 10 October ROHES ROHES YARD November 12 December Yearly Total Yearly Minimum

15 TABLE 10: BIOSOLIDS QUALITY ANALYSIS District of Muskoka - Lone Pine Dr. WPCP - Port Severn Quaterly Analysis Parameter Sampled Comments Date Feb 16/16 May 16/16 Aug 15/16 Nov 14/16 Sample ID Aerated Digester Aerated Digester Aerated Digester Aerated Digester Aerated Digester Nitrate mg/l Mercury mg/l Chromium mg/l Cobalt mg/l Copper mg/l Lead mg/l < Molybdenum mg/l 0.08 < Nickel mg/l Selenium mg/l <0.1 <0.1 < 0.10 <0.1 <0.10 Arsenic mg/l <0.1 <0.1 < 0.2 <0.1 <0.13 Zinc mg/l Cadmium mg/l Ammonia mg/l Total Kjeldahl Nitrogen mg/l Total Phosphorus mg/l Total Solids mg/l NO2 mg/l 1.5 < <0.2 <0.63 Chloride mg/l PO4(sol)(Dissolved Rea mg/l a <0.75 < <2.70 TSS mg/l BOD mg/l COD mg/l

16 BYPASS AND/OR OVERFLOW EVENT REPORT Date Event Start Event End Event Duration Total Volume (m3) Sampled Flow Level of Disinfection status Reason(s) Comments Reference Location Time Time (hours) Mes/Mod/Est Treatment Received Number Port Severn Lone Pine WPCP June 5/16 5:34:00 PM 5:38:00 PM 0.07 <3.0 No Est Sewage, Secondary treatment received Yes, UV 4 Partial teriary filter bypass. 7686AANTQV Port Severn Lone Pine WPCP June 14/16 6:10:00 AM 6:44:00 AM No Est Sewage, Secondary treatment received Yes, UV 4 Partial teriary filter bypass AWMHE Flow Level of Treatment Received Disinfection Reason Mod = Modelled Sewage, Raw No 1 = Precipitation Mes = Measured Sewage, Primary Treatment received Yes, Chlorinated 2 = Spring Thaw / Snow Melt Est = Estimated Sewage, Secondary treatment received Yes, UV 3 = Infiltration Sewage, Tertiary Yes, Ozone 4 = Mechanical/Equipment Failure Sewage, Final Effluent 5 = Pipe Failure (break/leak/plugged) 6 = Process Upsets 7 = Power Failure 8 = Planned Maintenance 9 = Exceed Design Capacity 10 = Other

MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT

MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT CERTIFICATE OF APPROVAL: # 7599-7PCKPU INTRODUCTION The Conger Marsh Water Pollution Control Plant (WPCP), which services the community of MacTier, is owned

More information

BRACEBRIDGE WASTEWATER TREATMENT

BRACEBRIDGE WASTEWATER TREATMENT 2014 BRACEBRIDGE WASTEWATER TREATMENT ENVIRONMENTAL COMPLIANCE APPROVAL: #6801-7VKNAQ INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District Municipality of Muskoka.

More information

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT ENVIRONMENTAL COMPLIANCE APPROVAL: 6801-7VKNAQ ENVIRONMENTAL COMPLIANCE APPROVAL: 6222-AFGSNY (Dec 16 2016) INTRODUCTION The Lagoon Lane Wastewater

More information

Bracebridge Wastewater Treatment 2017 Summary Report

Bracebridge Wastewater Treatment 2017 Summary Report Bracebridge Wastewater Treatment 2017 Summary Report Environmental Compliance Approval: 6222-AFGSNY (Dec 16 2016) INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District

More information

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System 14 th, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Wardsville Wastewater Treatment Plant and Collection System The Ontario Clean Water Agency

More information

Iroquois Wastewater Treatment Plant 2016 Annual Performance Report

Iroquois Wastewater Treatment Plant 2016 Annual Performance Report Iroquois Wastewater Treatment Plant 2016 Annual Performance Report The Iroquois WWTP is a Class II wastewater treatment facility owned and operated by the Municipality of South Dundas. Raw sewage is conveyed

More information

MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT

MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-442-9-938 Prepared by: Table of Contents Section 1: Overview...

More information

2017 Annual Performance Report

2017 Annual Performance Report Newcastle Water Pollution Control Plant The Regional Municipality of Durham Newcastle Water Pollution Control Plant Environmental Compliance Approval (ECA): 3-2189-87-946 Dated July 26, 1994 Amendments:

More information

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT Township of Bonnechere Valley Water and Sewage Department January 2014 Table of Contents Executive Summary... 3 Introduction... 4 Report Availability...

More information

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-871-88-949 Prepared by: Table of Contents Section 1: Overview...

More information

2017 Annual Performance Report

2017 Annual Performance Report 2017 Annual Performance Report Thornbury Wastewater Treatment Plant and Associated Collection System Prepared by: Wastewater Operations Staff Reporting Period: January 1 December 31, 2017 1 P age Executive

More information

2017 Performance Report for Bobcaygeon Waste Water Treatment Facility

2017 Performance Report for Bobcaygeon Waste Water Treatment Facility 2017 Performance Report for Bobcaygeon Waste Water Treatment Facility Amended Environmental Certificate of Approval (ECA) #3028-AEUKDQ Section 11(4) requires the Performance Reports to contain the following:

More information

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works This document can be made available in other accessible formats as soon as practicable and upon request Staff Report Infrastructure & Public Works Report To: Committee of the Whole Meeting Date: March

More information

Dundalk Wastewater Treatment Plant

Dundalk Wastewater Treatment Plant Township of Southgate Dundalk Wastewater Treatment Plant 2016 Annual Report Jim Ellis Public Works Manager Dundalk Wastewater Treatment Plant 2016 Annual Report Table of Contents Wastewater Treatment Plant

More information

Yours very truly, Municipality of West Perth. Environmental Services

Yours very truly, Municipality of West Perth. Environmental Services January 30, 2018 Municipality of West Perth 169 St. David Street Mitchell, Ontario N0K 1N0 ATTENTION: Mr. Jeff Brick CAO REFERENCE: Municipality of West Perth Annual Wastewater Report 2017 Please find

More information

CITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT

CITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT CITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT FEBRUARY 2014 Adelaide Wastewater Treatment Plant 2013

More information

Stonecrest Estates Sewage Treatment Plant 2017 Annual Report

Stonecrest Estates Sewage Treatment Plant 2017 Annual Report 2017 Stonecrest Estates Sewage Treatment Plant 2017 Annual Report The Corporation of the City of Quinte West 0 Contents Table of Figures... 1 Executive Summary... 3 Summary and Interpretation of Monitoring

More information

2014 Annual Wastewater Report

2014 Annual Wastewater Report 214 Annual Wastewater Report Mar 6, 215 v.1. 214 Annual Wastewater Report Table of Contents REPORTS PAGE Wastewater Capital Spending Overview 1 Wastewater North - 214 1 Wastewater South 214 2 Lift Stations

More information

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT FEBRUARY 2014 SUMMARY This annual report is in response

More information

The Corporation of the City of St. Thomas. Water Pollution Control Plant Annual Performance Report. Under Ontario Ministry of the Environment

The Corporation of the City of St. Thomas. Water Pollution Control Plant Annual Performance Report. Under Ontario Ministry of the Environment The Corporation of the City of St. Thomas Water Pollution Control Plant 2008 Annual Performance Report Under Ontario Ministry of the Environment Certificate of Approval 5276-5M9JW7 February 2009 John Mansell,

More information

Dundalk Wastewater Treatment Plant

Dundalk Wastewater Treatment Plant Township of Southgate Dundalk Wastewater Treatment Plant 2017 Annual Report Staff Report PW2018-010 - Dundalk Wastewater Treatment Plant 2017 Annual Report Moved by Councillor Pallister, Seconded by Councillor

More information

Feel free to contact me should you require any additional information regarding the report. I can be reached at

Feel free to contact me should you require any additional information regarding the report. I can be reached at February 28, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Glencoe Wastewater Treatment Plant The Ontario Clean Water Agency is the Operating

More information

Dundalk Wastewater Treatment Plant

Dundalk Wastewater Treatment Plant Township of Southgate Dundalk Wastewater Treatment Plant 2014 Annual Report Jim Ellis Public Works Manager Dundalk Wastewater Treatment Plant 2014 Annual Report Table of Contents Wastewater Treatment Plant

More information

Lagoons Operation and Management in New Brunswick

Lagoons Operation and Management in New Brunswick Lagoons Operation and Management in New Brunswick Lagoons Provide secondary treatment to domestic wastewater by the action of bacteria stabilizing the organic matter in the wastewater. Benefits of lagoons:

More information

February 16, Ministry of the Environment Southwestern Region 733 Exeter Road London, Ontario N6E 1L3. Attn.: Mr. Tom Clubb

February 16, Ministry of the Environment Southwestern Region 733 Exeter Road London, Ontario N6E 1L3. Attn.: Mr. Tom Clubb February 16, 2018 Ministry of the Environment Southwestern Region 733 Exeter Road London, Ontario N6E 1L3 Attn.: Mr. Tom Clubb Re: Listowel 2017 Annual Report Please find enclosed the 2017 Annual Report

More information

JEDDAH INDUSTRIAL CITY

JEDDAH INDUSTRIAL CITY JEDDAH INDUSTRIAL CITY WASTEWATER TREATMENT PLANT A Presentation by : Engr. Mowafaq Al-Sugeir Managing Director ICDOC SAWEA 2007 WORKSHOP, AL-KHOBER 4 December 2007 Built & Being Operated by : on Build-Operate-Transfer

More information

2017 ANNUAL WASTEWATER TREATMENT SYSTEM SUMMARY REPORT. Wastewater Treatment Plant:

2017 ANNUAL WASTEWATER TREATMENT SYSTEM SUMMARY REPORT. Wastewater Treatment Plant: 2017 ANNUAL WASTEWATER TREATMENT SYSTEM SUMMARY REPORT Drumbo Wastewater Treatment Plant 1. General Information Oxford County prepares individual annual reports summarizing each wastewater treatment plant

More information

Watertown Wastewater Facility Plan. August 11, 2015

Watertown Wastewater Facility Plan. August 11, 2015 Watertown Wastewater Facility Plan August 11, 2015 Watertown Wastewater Wastewater Treatment Facility History Comprehensive Planning Wastewater Concerns Capacity Condition Permitting Requirements Watertown

More information

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2012 ANNUAL REPORT

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2012 ANNUAL REPORT CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2012 ANNUAL REPORT FEBRUARY 2013 SUMMARY This annual report is in response

More information

Collingwood Wastewater Treatment Plant Annual Compliance Report

Collingwood Wastewater Treatment Plant Annual Compliance Report Collingwood Wastewater Treatment Plant 2017 Annual Compliance Report Table of Contents Definitions... 3 Wastewater System General Information... 4 Executive Summary... 5 Section 1.0 The Facility... 6 Section

More information

Communal Sewage Inspection Report

Communal Sewage Inspection Report Ministry of the Environment Ministère de l Environnement Communal Sewage Inspection Report Client: Inspection Site Address: City of Ottawa, Business/Facility Name: Robert O. Pickard Environmental Centre

More information

TABLE OF CONTENTS 1.0 INTRODUCTION 1. Classification and Control Document Information. 2.0 CONTACT INFORMATION 2

TABLE OF CONTENTS 1.0 INTRODUCTION 1. Classification and Control Document Information. 2.0 CONTACT INFORMATION 2 TABLE OF CONTENTS Page 1.0 INTRODUCTION 1 Classification and Control Document Information. 2.0 CONTACT INFORMATION 2 Owner/Operator contact information 3.0 WASTEWATER TREATMENT PLANT & TREATMENT PROCESS

More information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Facility / System: Town of Farmville Wastewater Collection System and Treatment Facilities Responsible Entity:

More information

RE: Year-End Report Woodstock Wastewater Treatment Plant (WWTP), 2012

RE: Year-End Report Woodstock Wastewater Treatment Plant (WWTP), 2012 Public Works P. O. Box 1614, 21 Reeve St.,, Woodstock Ontario N4S 7Y3 Phone: 519-539-9800 Fax: 519-421-4711 Website: www.oxfordcounty.ca March 15, 2013 District Manager Ministry of the Environment London

More information

Water Resources Director: Chris Graybeal

Water Resources Director: Chris Graybeal Water Resources Director: Chris Graybeal Our Mission To promote and protect the environment, preserve natural resources, and ensure the health and safety of our customers. Granite Falls Wastewater Treatment

More information

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be: Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.

More information

2014 Annual Compliance Report Operation & Maintenance Of Tara Wastewater System

2014 Annual Compliance Report Operation & Maintenance Of Tara Wastewater System 2014 Annual Compliance Report Operation & Maintenance Of Tara Wastewater System March 2015 Prepared for: Municipality of Arran-Elderslie 1925 Bruce Road 10 Box 70 Chesley, ON N0G 1L0 Prepared by: GSS Engineering

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 PREPARED: January 2013 2012 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

TABLE OF CONTENTS Page No. or Following HERITAGE SPRINGS WASTEWATER TREATMENT PLANT REVIEW Background... 1 Physical Condition... 2 Operating Condition

TABLE OF CONTENTS Page No. or Following HERITAGE SPRINGS WASTEWATER TREATMENT PLANT REVIEW Background... 1 Physical Condition... 2 Operating Condition TABLE OF CONTENTS Page No. or Following HERITAGE SPRINGS WASTEWATER TREATMENT PLANT REVIEW Background... 1 Physical Condition... 2 Operating Condition... 2 Permit Review... 3 Unit Process Sizing... 4 DMR

More information

Cannington Water Pollution Control Plant Annual Performance Report Annual Performance Report 2015

Cannington Water Pollution Control Plant Annual Performance Report Annual Performance Report 2015 Cannington Water Pollution Control Plant Cannington Water Pollution Control Plant Cannington Water Pollution Control Plant The Regional Municipality of Durham Cannington Water Pollution Control Plant 2015

More information

Bruce Mines Lagoon Annual Operating Report

Bruce Mines Lagoon Annual Operating Report Bruce Mines Lagoon Annual Operating Report January 1, 2010 to December 31, 2010 Prepared by Ontario Clean Water Agency March 04, 2011 Ministry of the Environment 289 Bay Street, 3 rd Floor Sault Ste. Marie,

More information

Water Quality Permitting Program Monitoring Matrix 1,2,3

Water Quality Permitting Program Monitoring Matrix 1,2,3 State of Oregon Department of Environmental Quality Water Quality Permitting Program Monitoring Matrix 1,2,3 ITEM OR PARAMETER Total Flow (influent and/or effluent) 4 Flow Meter Calibration 5 (influent

More information

CITY OF BROCKVILLE WATER POLLUTION CONTROL CENTRE

CITY OF BROCKVILLE WATER POLLUTION CONTROL CENTRE CITY OF BROCKVILLE WATER POLLUTION CONTROL CENTRE 2014 ANNUAL SUMMARY REPORT FOR COUNCIL Peter Raabe, P. Eng., Director of Environmental Services Ed Malcomnson, Supervisor Wastewater Systems Division DATE:

More information

Thames River Water Quality 2017

Thames River Water Quality 2017 Thames River Water Quality 2017 City Of London Environment and Engineering Services June 2018 Purpose: To present information on the water quality of the Thames River for 2017. Executive Summary Thames

More information

City of Leadwood Wastewater System Engineering Report

City of Leadwood Wastewater System Engineering Report City of Leadwood Wastewater System Engineering Report DRAFT H2O C Engneering www.h2oc.com 877-22-WATER Background The purpose of this report is to describe the City of Leadwood s wastewater system (System

More information

2017 Annual Compliance Report. Operation & Maintenance of Paisley Wastewater System. March

2017 Annual Compliance Report. Operation & Maintenance of Paisley Wastewater System. March 2017 Annual Compliance Report Operation & Maintenance of Paisley Wastewater System March 2018 13-028 Prepared for: Municipality of Arran-Elderslie 1925 Bruce Road 10 Box 70 Chesley, ON N0G 1L0 Prepared

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 PREPARED: January 2015 2014 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

International Joint Commission Water & Wastewater Treatment Best Management Practices Forum Monday, March 26, 2012 Wayne State University, Detroit MI

International Joint Commission Water & Wastewater Treatment Best Management Practices Forum Monday, March 26, 2012 Wayne State University, Detroit MI STARTUP AND OPERATION OF A BIOLOGICAL AERATED FILTER (BAF) FOR SIMULTANEOUS BOD REMOVAL AND NITRIFICATION AT THE LOU ROMANO WATER RECLAMATION PLANT WINDSOR ONTARIO CANADA International Joint Commission

More information

Iroquois Wastewater Treatment Plant 2017 Annual Performance Report

Iroquois Wastewater Treatment Plant 2017 Annual Performance Report Iroquois Wastewater Treatment Plant 2017 Annual Performance Report The Iroquois WWTP is a Class II wastewater treatment facility owned and operated by the Municipality of South Dundas. Raw sewage is conveyed

More information

This report documents the performance of the sewage works as specified in the Amended Environmental Compliance Approval AQP3C.

This report documents the performance of the sewage works as specified in the Amended Environmental Compliance Approval AQP3C. Executive Summary The Guelph Wastewater Treatment Plant (WWTP) Operating within the Wastewater Services Department provides treatment of domestic, commercial, institutional and industrial wastewater collected

More information

Communal Sewage Inspection Report

Communal Sewage Inspection Report Ministry of the Environment Ministère de l Environnement Communal Sewage Inspection Report Client: Inspection Site Address: City of Ottawa, Business/Facility Name: Robert O. Pickard Environmental Centre

More information

Need-to-Know Criteria Wastewater Treatment Operator Class I

Need-to-Know Criteria Wastewater Treatment Operator Class I 2017 Need-to-Know Criteria Wastewater Treatment Operator Class I A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class I Certification Exam Before You Dive In What is ABC

More information

This report documents the performance of the sewage works as specified in the Amended Environmental Compliance Approval QJKSD.

This report documents the performance of the sewage works as specified in the Amended Environmental Compliance Approval QJKSD. Executive Summary The Guelph Wastewater Treatment Plant (WWTP) Operating within the Wastewater Services Department provides treatment of domestic, commercial, institutional and industrial wastewater collected

More information

Application Form and Guide for an EPEA Registration Code of Practice for Wastewater Systems Using a Wastewater Lagoon

Application Form and Guide for an EPEA Registration Code of Practice for Wastewater Systems Using a Wastewater Lagoon Code of Practice for Wastewater Systems Using a Wastewater Lagoon Introduction The attached form and guidelines outline the information required for an application for a registration for wastewater systems

More information

Duffin Creek Water Pollution Control Plant Technical Information

Duffin Creek Water Pollution Control Plant Technical Information Duffin Creek Water Pollution Control Plant Technical Information Plant History The Duffin Creek Water Pollution Control Plant (WPCP) is located on the northern shore of Lake Ontario in the City of Pickering

More information

MISSISSIPPI MILLS WASTEWATER TREATMENT FACILITY 2012 ANNUAL REPORT. Prepared by Deborah Turner Process & Compliance Technician Ottawa Valley Hub

MISSISSIPPI MILLS WASTEWATER TREATMENT FACILITY 2012 ANNUAL REPORT. Prepared by Deborah Turner Process & Compliance Technician Ottawa Valley Hub MISSISSIPPI MILLS WASTEWATER TREATMENT FACILITY 2012 ANNUAL REPORT Prepared by Deborah Turner Process & Compliance Technician Ottawa Valley Hub Mississippi Mills Wastewater Treatment Plant Annual Report

More information

Renfrew Wastewater Treatment System

Renfrew Wastewater Treatment System Renfrew Wastewater Treatment System 2016 Annual Report January 1, 2016 December 31, 2016 Prepared By This report has been prepared to meet the requirements set out in the facility Environmental Compliance

More information

Wastewater Pretreatment Plant Special Waste Generator Application

Wastewater Pretreatment Plant Special Waste Generator Application New Renewal (Permit # ) EIN number All generators of Special Waste are required to apply for and receive a Special Waste Generator Permit from Lehigh County Authority (LCA) prior to discharging waste at

More information

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017 Georgia Power Plant Bowen NPDES Permit No. GA0001449 Revised December 2017 Purpose This (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures that Georgia Power

More information

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts: Mission: The mission of the Bentonville Wastewater Treatment Utility and staff is to protect public health and the environment through the effective treatment of wastewater. Effective wastewater treatment

More information

Wastewater Facility Plan City of Marshall, Minnesota

Wastewater Facility Plan City of Marshall, Minnesota Wastewater Facility Plan City of Marshall, Minnesota Public Hearing March 14, 2017 Bolton & Menk, Inc. Project No. T22.108560 Glossary of General Terms & Abbreviations MPCA - Minnesota Pollution Control

More information

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100 MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 PREPARED: January 2019 2018 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Need-to-Know Criteria Wastewater Treatment Operator Class III

Need-to-Know Criteria Wastewater Treatment Operator Class III 2017 Need-to-Know Criteria Wastewater Treatment Operator Class III A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class III Certification Exam Before You Dive In What is

More information

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals City of Elk River Wastewater Treatment Facility Improvements Achieving Wastewater Treatment Goals By Tejpal Bala, P.E. Bolton & Menk, Inc. The City of Elk River received a new NPDES permit and the existing

More information

The operator stated that the rollers in one of the drum filters was recently replaced.

The operator stated that the rollers in one of the drum filters was recently replaced. vember 30, 2017 Hon. Carolyn Price, Supervisor Town of Windsor 124 Main Street Windsor, NY 13865 Re: West Windsor Sewer District Dear Supervisor Price: On vember 17, 2017, Department staff inspected the

More information

Need-to-Know Criteria Wastewater Treatment Operator Class II

Need-to-Know Criteria Wastewater Treatment Operator Class II 2017 Need-to-Know Criteria Wastewater Treatment Operator Class II A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class II Certification Exam Before You Dive In What is ABC

More information

DERRY TOWNSHIP MUNICIPAL AUTHORITY RATE SCHEDULE

DERRY TOWNSHIP MUNICIPAL AUTHORITY RATE SCHEDULE I. INSPECTION FEES A. For Laterals - $100 DERRY TOWNSHIP MUNICIPAL AUTHORITY RATE SCHEDULE B. For Building Sewers 150 feet or less in length - $100. Fees for longer Building Sewers may be charged based

More information

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017 Dealing with Unexpected Wastewater Treatment Plant Disruptions February 16, 2017 Location Map WPCP History Original WPCP constructed on this site in 1928 consisting of primary treatment and chlorination;

More information

Collingwood Wastewater Treatment Plant 2016 Annual Compliance Report

Collingwood Wastewater Treatment Plant 2016 Annual Compliance Report Collingwood Wastewater Treatment Plant 2016 Annual Compliance Report Table of Contents Definitions...2 Wastewater System General Information...3 Executive Summary...4 Section 1.0 The Facility...5 Section

More information

Waste Discharge Permit Application

Waste Discharge Permit Application Greater Vancouver Sewerage & Drainage District Sewer Use Bylaw No. 299 (as amended), 2007 Apr 2018-26992661 GVS&DD This is an application for a Waste Discharge Permit under the Greater Vancouver Sewerage

More information

Georgia Power Plant McManus NPDES Permit No. GA Ash Pond Dewatering Plan. Revised April 2018

Georgia Power Plant McManus NPDES Permit No. GA Ash Pond Dewatering Plan. Revised April 2018 Georgia Power Plant McManus NPDES Permit No. GA0003794 Revised April 2018 Purpose This (Plan) describes the procedures, safeguards and enhanced wastewater treatment measures that Georgia Power Company

More information

Need-to-Know Criteria Wastewater Treatment Operator Class IV

Need-to-Know Criteria Wastewater Treatment Operator Class IV 2017 Need-to-Know Criteria Wastewater Treatment Operator Class IV A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class IV Certification Exam Before You Dive In What is ABC

More information

Director of Operations and Compliance Report. October 17, Biochemical Oxygen Demand, 5-Day (Avg lbs/day)

Director of Operations and Compliance Report. October 17, Biochemical Oxygen Demand, 5-Day (Avg lbs/day) Director of Operations and Compliance Report October 17, 218 Plant Loading, CSO Report, and Director s Notes Plant Loading Biochemical Oxygen Demand, 5-Day (Avg. 16475 lbs/day) Total Suspended Solids (Avg.

More information

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION Analytical Environmental Services 2-1 Jamul Indian Village Wastewater Treatment Plant Analytical Environmental Services 2-2 Jamul

More information

2017 Annual Performance Report

2017 Annual Performance Report Duffin Creek Water Pollution Control Plant Page 1 of 17 Duffin Creek Water Pollution Control Plant Environmental Compliance Approval (ECA): 5531-9FJJT5 Dated 3, 2014 Environmental Compliance Approval (Air):

More information

Combined Sewer Overflows July 2012-December 2013

Combined Sewer Overflows July 2012-December 2013 CSO Facilities Summary Report 213 Combined Sewer Overflows July 212-December 213 Overview MWRA monitored four CSO facilities in the North System during the period covered in this report (July 212 December

More information

WASTEWATER TREATMENT. Nelson Environmental Inc. Nelson Environmental Inc.

WASTEWATER TREATMENT. Nelson Environmental Inc. Nelson Environmental Inc. The OPTAER system provides reliable nutrient removal in pond based wastewater treatment plants combining cost-effective technologies and low maintenance requirements. WASTEWATER TREATMENT PrintStudioOne.com

More information

Mid-Halton Wastewater (Sewage) Treatment Plant Expansion And Effluent Sewer Public Information Centre # 1 May 14, 2009

Mid-Halton Wastewater (Sewage) Treatment Plant Expansion And Effluent Sewer Public Information Centre # 1 May 14, 2009 INFORMATION BRIEF MID-HALTON WASTEWATER (SEWAGE) TREATMENT PLANT EXPANSION AND EFFLUENT SEWER SCHEDULE C CLASS ENVIRONMENTAL ASSESSMENT PUBLIC INFORMATION CENTRE (PIC) # 1 1 Municipal Class Environmental

More information

Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018

Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018 Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA0001431 Revised May 2018 Purpose This updated (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures

More information

12.0 ASSESSMENT OF LEACHATE MANAGEMENT OPTIONS 12.1 Overview

12.0 ASSESSMENT OF LEACHATE MANAGEMENT OPTIONS 12.1 Overview ENVIRONMENTAL ASSESSMENT OF THE PROPOSED CAPITAL REGION 12.0 ASSESSMENT OF LEACHATE MANAGEMENT OPTIONS 12.1 Overview Leachate treatment is required for the organics processing and disposal components of

More information

2011 SEWAGE TREATMENT PLANT ANNUAL REPORT

2011 SEWAGE TREATMENT PLANT ANNUAL REPORT ENVIRONMENTAL DIAGNOSTICS INC. 2011 SEWAGE TREATMENT PLANT ANNUAL REPORT Prepared for: KICKING HORSE MOUNTAIN SANITARY SEWER SERVICES LTD. 1505-17 Avenue SE Calgary, Alberta T2T 0E2 Prepared by: ENVIRONMENTAL

More information

OPTIMIZATION STUDY OF THE ST. MARY'S WASTEWATER TREATMENT PLANT

OPTIMIZATION STUDY OF THE ST. MARY'S WASTEWATER TREATMENT PLANT XCG File No.: 3-167-09-02 October 26, 2016 OPTIMIZATION STUDY OF THE ST. MARY'S WASTEWATER TREATMENT PLANT Prepared for: B.M. ROSS & ASSOCIATES LIMITED 62 North Street Goderich, Ontario N7A 2T4 Prepared

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

Environmental Management System

Environmental Management System Environmental Management System Moreton Bay Research Station (MBRS) Water Management Program 1. Program Scope The Water Management Program incorporates all the water used throughout the Moreton Bay Research

More information

FURTHER EXPANDED FLOWS AND LOADS R3 INDUSTRIAL WWTP PROCESS ENGINEERING EVALUATION

FURTHER EXPANDED FLOWS AND LOADS R3 INDUSTRIAL WWTP PROCESS ENGINEERING EVALUATION FURTHER EXPANDED FLOWS AND LOADS R3 INDUSTRIAL WWTP PROCESS ENGINEERING EVALUATION Prepared For: HyLife Foods Neepawa, Manitoba, Canada Prepared By: Pharmer Engineering 1998 West Judith Lane Boise, ID

More information

Introduction. Background. Case Study: The Role of Optimization in Plant Re-rating Prepared by D.T. Chapman, CPO Inc.

Introduction. Background. Case Study: The Role of Optimization in Plant Re-rating Prepared by D.T. Chapman, CPO Inc. Prepared by D.T. Chapman, CPO Inc. Introduction The Grand River Conservation Authority (GRCA) initiated a program in 2010 to optimize wastewater treatment plants (WWTPs) in the watershed to improve water

More information

SPECIFICATION NO.1197S Addendum No.4 Attachment D. Appendix L- Ground Water Quality Data and Revised Construction Groundwater Discharge Plan

SPECIFICATION NO.1197S Addendum No.4 Attachment D. Appendix L- Ground Water Quality Data and Revised Construction Groundwater Discharge Plan SPECIFICATION NO.1197S Addendum No.4 Attachment D Appendix L- Ground Water Quality Data and Revised Construction Groundwater Discharge Plan Page 1 of 2 Specification No. 1197S Addendum No. 4 ATTACHMENT

More information

The Town of Petrolia Waste Management of Canada ENVIRONMENTAL STUDY REPORT EXECUTIVE SUMMARY

The Town of Petrolia Waste Management of Canada ENVIRONMENTAL STUDY REPORT EXECUTIVE SUMMARY The Town of Petrolia Waste Management of Canada CLASS ENVIRONMENTAL ASSESSMENT FOR WASTEWATER TREATMENT AND LANDFILL LEACHATE MANAGEMENT ENVIRONMENTAL STUDY REPORT EXECUTIVE SUMMARY 7880 Keele Street,

More information

2017 Annual Compliance Report. Operation & Maintenance Of Tara Wastewater System

2017 Annual Compliance Report. Operation & Maintenance Of Tara Wastewater System 2017 Annual Compliance Report Operation & Maintenance Of Tara Wastewater System March 2018 13-028 Prepared for: Municipality of Arran-Elderslie 1925 Bruce Road 10 Box 70 Chesley, ON N0G 1L0 Prepared by:

More information

Collingwood Wastewater Treatment Plant. Annual Compliance Report Collingwood Public Utilities

Collingwood Wastewater Treatment Plant. Annual Compliance Report Collingwood Public Utilities Collingwood Wastewater Treatment Plant Annual Compliance Report -2013- Collingwood Public Utilities Table of Contents Executive Summary. 3 General Information. 4 Section 1.0 The Facility.... 5 Section

More information

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION PREPARED BY: VICKIE GRAFF, CTPM, CPPB FAX: (512) 374-5480 E-MAIL: vgraff@dot.state.tx.us WASTEWATER TREATMENT PLANT OPERATIONS, TESTING, AND

More information

AL-KAWTHER INDUSTRIES LTD

AL-KAWTHER INDUSTRIES LTD AL-KAWTHER INDUSTRIES LTD 1 Presentation On Recycle Of Industrial Wastewater With Media Filtration And Reverse Osmosis By Al- Kawther Industries Ltd. March 2004 2 INTRODUCTION 3 EFFLUENT DISCHARGE STANDARDS

More information

W12A Landfill Groundwater, Leachate, Water Well, Landfill Gas and Surface Water Quality Monitoring Program

W12A Landfill Groundwater, Leachate, Water Well, Landfill Gas and Surface Water Quality Monitoring Program W12A Landfill Groundwater, Leachate, Water Well, Landfill Gas and Surface Water Quality Monitoring Program The groundwater, leachate, water well, landfill gas and surface water monitoring programs are

More information

Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters

Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters PROCEDURE F-5-1 (formerly referenced by 08-01) Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters PROCEDURE F-5-1 DETERMINATION OF TREATMENT

More information

Alexandria Sewage Lagoon Treatment Facility Municipal Class C Environmental Assessment Public Information Centre #2 Welcome!

Alexandria Sewage Lagoon Treatment Facility Municipal Class C Environmental Assessment Public Information Centre #2 Welcome! Alexandria Sewage Lagoon Treatment Facility Municipal Class C Environmental Assessment Public Information Centre #2 Welcome! Municipal Class Environmental Assessment Status We are Here Study Overview The

More information

2018 Schedule of Rates Fees and Charges City of Glens Falls, NY Water & Sewer Department Water Rates: $37.28 per Non-meter rate

2018 Schedule of Rates Fees and Charges City of Glens Falls, NY Water & Sewer Department Water Rates: $37.28 per Non-meter rate 2018 Schedule of Rates Fees and Charges City of Glens Falls, NY Water & Sewer Department Water Rates: $37.28 per Non-meter rate billing Meter Rate: $1.381 per 100 cubic feet Minimum Meter Rates Meter Size

More information

Water and Wastewater Technician POA (2011) Subtask to Unit Comparison

Water and Wastewater Technician POA (2011) Subtask to Unit Comparison Water and Wastewater Technician POA (2011) Subtask to Unit Comparison Task 1 Monitors control 1.01 Monitors electrical A1 Trade Safety Awareness. (A & C Board Standard) A4 Trade Science And Trade Electricity

More information

Wastewater Treatment Plant Compliance. Strategies for Surviving an NPDES Permit Inspection (National Pollutant Discharge Elimination System)

Wastewater Treatment Plant Compliance. Strategies for Surviving an NPDES Permit Inspection (National Pollutant Discharge Elimination System) Wastewater Treatment Plant Compliance Strategies for Surviving an NPDES Permit Inspection (National Pollutant Discharge Elimination System) Plus some general info about permits & reporting Eric Dunlavey

More information