1 Investors Guide Re-invest 2015 January 2015

2 Table of contents Renewable Energy Scenario 3 RE potential and growth in India 3 Enabling framework for growth of Renewable Energy sector in India 5 Incentives available to Renewable Energy Projects in India 7 Investment Opportunities 8 Financing Renewable Energy in India 11 Land Availability for Renewable Energy Projects 12 Clearances required for setting RE projects 13 Power Sale Options 15 Manpower Availability 17 India as favorable Renewable Energy Destination 17 Annexure I- MNRE Schemes on Renewable Energy 18 Grid Connected Power 18 Off-Grid Power 19 MNRE RD&D support 20 Annexure II- State wise Feed-In Tariffs as per State Regulations 21 Annexure III: Renewable purchase obligation for all the States 23 Photo Gallery 27

3 Renewable Energy Scenario Renewable energy is one of the cleanest sources of energy options with almost no pollution or carbon emissions and has the potential to significantly reduce reliance on coal and other fossil fuels. By expanding renewable energy, world can improve air quality, reduce global warming emissions, create new industries and jobs, and move world towards a cleaner, safer, and affordable energy future. The quest for energy independence, economic growth, and environmental sustainability increasingly suggests the importance of renewable energy sources across the globe. Renewables are seen not only as sources of energy, but also as tools to address many other pressing needs, including: improving energy security and access; reducing the health and environmental impacts associated with fossil and nuclear energy and mitigating greenhouse gas emissions. In 2013, renewables accounted for 10 percent of the world s global energy consumption and around 19 percent of global electricity needs were satisfied by renewable sources 1. India s substantial and sustained growth has placed enormous demand on the country s natural resources. Today, India imports substantial quantities of gas, oil and coal in order to meet its growing energy demand. The increasing dependence on imported fuels may create a serious threat to the future fuel security of the country. In addition, the country s 254 GW 2 of power generation capacity based mainly on conventional sources has further strained the natural resources. Around 60% 2 of India s current power generation capacity is based on coal which is expected to remain the dominant power source in the future. However, the coal sector is facing many challenges and India is increasingly relying on coal & oil imports to meet its requirements of energy, thereby exhibiting a lot of pressure on Indian economy from these high import factors. RE potential and growth in India India meets close to 65% of its electricity needs from fossil fuels and is expected to continue doing so in the foreseeable future. This poses questions on cost of electricity supply in future, environmental impacts and energy security. At this juncture, Renewable Energy (RE) is being seen as one of the important means to meet the growing power needs of the economy while enhancing energy security through diversification of fuel sources and providing opportunities for mitigating greenhouse gas emissions. India has vast renewable energy potential through wind, solar, biomass, small hydro etc. The potential is concentrated in certain parts of India. The wind and solar potential is mainly in the southern and western States viz. Tamil Nadu, Karnataka, Andhra Pradesh, Maharashtra, Gujarat and Rajasthan, however the exercise on mapping of potential is continuing in several other areas in the country. Technology Potential (MW) Wind 102,800(80m hub height) Small Hydro (up to 25MW) 19,700 Biomass including bagasse cogeneration (including waste to energy) 22,500 Solar 50MWp/km 2 Source: Ministry of New & Renewable Energy (MNRE) India s Renewable Energy Potential 1 REN 21 Global Status Report 2014: 2 CEA Executive Power Summary September2014: PwC 3

4 The renewable power generation portfolio stands at GW out of the total 254 GW in the country, as of December India is already the world s fifth largest producer of wind power. Other renewable energy sources like solar, small hydro, biomass power and bio-fuels are also being increasingly tapped. As per the present estimates, India has an estimated renewable energy potential of about 895 GW from commercially exploitable sources with 750 GW solar power potential assuming only 3% wasteland is made available. Further, there exists significant potential from decentralized distributed applications for meeting hot water requirement for residential, 12% 13% Wind 22, MW commercial and industrial sector through solar energy and also meeting cooking energy needs in the rural areas through biogas. Renewable energy has great capacity to usher in universal energy access. In a decentralized or standalone way renewable energy is quite appropriate, scalable and viable solution for providing power to un-electrified or power deficient villages and hamlets. Around 1.1 million households are using solar energy to meet their lighting energy needs and almost similar number of the households meets cooking energy needs from biogas plants. Solar Photovoltaic (PV) power systems are being used for a variety of applications such as rural electrification, railway signalling, microwave repeaters, TV transmission and reception and for providing power to border outposts. Over remote and inaccessible villages and hamlets have been provided with basic electricity services through distributed renewable power systems. Historic Trends and Growth Enablers of RE SHP MW Biomass MW Solar MW Installed Renewable Energy Capacity in India Total MW The Renewable Energy source based power generation capacity was 18 MW in 1990 with a slow rate of growth till 2008, however, 2008 onwards the progress in the made in the sector has been considerable. This can be attributed to numerous factors which have led to this impressive growth. The driving factors for the renewable energy projects in India include demand/supply (low per capita consumption, large unelectrified areas; technology improvements and cost reduction in renewable technologies, entry of large number of players), policy (targets set under the NAPCC, JNNSM, fiscal and other incentives) and other issues (fuel challenges, and significant potential for renewable energy capacity addition) affecting conventional power generation. Against this backdrop the renewable technologies are maturing in India and their growth in India in the last decade has been commendable.the Indian growth story can be seen from the fact in the period from FY07 onwards the capacity addition from Renewable Energy based sources in India has seen a CAGR of 18.41%. 9% 66% Wind Power Small Hydro Biomass Solar 3 Biomass shown includes Bagasse cogeneration and Waste to Power generation capacity PwC 4

5 RE Policy Enabler and Growth Timelines Enabling framework for growth of Renewable Energy sector in India Existing policy and regulatory support Electricity Act 2003: Launched in June 2003, this is the most important piece of legislation for the sector and nullifies all earlier enactments that governed the electricity businesses. EA 2003 provides for policy formulation by the Government of India and mandates State Electricity Regulatory Commissions (SERCs) to take steps to promote renewable and non-conventional sources of energy within their area of jurisdiction. It calls to promote cogeneration and generation of electricity from renewable sources of energy by providing suitable measures for connectivity with grid and sale of electricity to any person, and also specify, for purchase of electricity from such sources, a percentage of total consumption of electricity in the area of distribution licensee. Further, EA 2003 has explicitly stated the formulation of National Electricity Policy (NEP), National Tariff Policy and plan thereof for development of power systems to ensure optimal utilization of all resources including renewable sources of energy. National Electricity Policy 2005: Aims to exploit feasible potential of renewable energy resources, reduce capital costs, promote competition and private sector participation. The percentage for purchase of power from non-conventional sources should be made applicable for the tariffs to be determined by the SERCs. Progressively the share of electricity from non-conventional sources would need to be increased as prescribed by SERCs. Such purchase by distribution companies shall be through competitive bidding process. It essentially reemphasised the need of harnessing RE generation. National Tarriff Policy 2006: Formulates that a minimum percentage of RE procurement should be made applicable. Also, a preferential tariff should be determined by SERC s to enable RETs to compete and procurement of RE should be through competitive bidding. NAPCC 2008: The National Action Plan of Climate Change by the Government of India identifies 8 core national missions running through 2017, envisaging several measures to address global warming. One of the missions states that a dynamic minimum renewable purchase standard (DMRPS) be set, with escalation each year till a pre-defined level is reached. It set targets of 5% RE purchase for FY PwC 5

6 , with an increase of 1% in target each year to reach 15% renewable energy penetration by SERCs may however set higher percentages than this minimum at each point in time. Renewable Purchase Obligation (RPO): SERCs set targets for distribution companies to purchase certain percentage of their total power requirement from renewable energy sources known as RPO. The states have already specified their RPOs ranging from 2% to 14% of their total energy demand to be met by renewable energy. In order to address the mismatch between availability of RE sources and the requirement of the obligated entities to meet their RPO across States, the REC mechanism was introduced in 2010 to enable and recognize interstate RE transactions. The REC mechanism facilitates emergence of large number of cross-border RE transactions based on non-firm RE sources, while at the same time, enhancing the volume of cross-border RE transactions based on firm RE sources as well. RECs serve as a motive for high RE potential states to further develop their RE potential and for lesser potential states to develop maximum RE as they can. Other planned initiatives Solar park scheme: Solar parks are concentrated zones of development for solar power generation projects, demarcating an area that is well characterized, properly infra-structure and where the project risks are minimized & clearances are facilitated. As per the National Schemeon Draft Solar parks, MNRE will setup 25 solar parks of capacity sizes between 500 MW to 1000 MW. It will provide support of INR 20,00,000/MW to the park development agencies. National offshore wind policy: Preliminary assessments suggest intersting prospects of development of offshore wind energy in India. The MNRE in order to tap this potential is currently working on a policy for deployment of offshore wind energy projects in the Exclusive Economic Zone (EEZ) of the country. The policy proposes to address issues such as resource assessment & surveys, seabed allocation & lease arrangement, facilitation in clearances and approvals and evacuation of power generated from offshore wind power projects. As a first step towards development of offshore wind sector in India a MoU was signed on 1 st October 2014 for setting up of a Joint Venture Company (JVC) towards undertaking the First Demonstration Offshore Wind Power Project in the country. The MoU was signed by MNRE, National Institute of Wind Energy (NIWE), and consortium of partners consisting of National Thermal Power Corporation (NTPC), Power Grid Corporation of India Ltd (PGCIL), Indian Renewable Energy Development Agency (IREDA), Power Finance Corporation (PFC), Power Trading Corporation (PTC), and Gujarat Power Corporation Ltd (GPCL). Transmission infrastructure: This involves development of a network specifically for wheeling of RE power. The proposed evacuation infrastructure will be capable of evacuating power from proposed capacity additions such as UMPPs in Leh. It proposes a high capacity transmission system (Green energy corridor) that will evacuate renewable power from RE rich states to load centres and make make pockets of RE generation grid interactive. It will be integrated with the existing grid and foster reliable forecasting of RE based generation and reduce evacuation losses. Green energy transmission corridor: In 2012, Powergrid has planned high capacity transmission systems (green energy corridors) for evacuation of renewable power from RE rich states to load centres with an aggregate capital outlay of around INR 425 billion (EUR 5 billion). With the implementation of the Green corridor, the pockets of the RE generation would get grid interactive and thereby the restrictions on RE evacuation, losses (as RE would be connected at EHV than HV level) would reduce. RE resource assessment databases: To locate potential RE rich sites in the country through field measurements, India has developed data bases for renewable energy resource assessment. This has been done in a bid to promote development of utilization of RE in the country. The National Institute of wind energy(niwe) has developed the wind atlas of India. NIWE also collects data from Solar Radiation Resource Assessment (SRRA) stations to assess and quantify solar radiation availability, quality of data assessment, processing, modeling and to make solar atlas of the country. PwC 6

7 Incentives available to Renewable Energy Projects in India Government of India provides a mix of tax and non-tax benefits to promote these technologies, so as to create an enabling investment climate where these projects are taken up by market forces. The different incentives offered by central and state governments can be broadly illustrated as under: Tax Incentives Income tax Holiday Accelerated depreciation Deemed export benefits Service tax based on negative list Customs and Excise Laws Reduced VAT Additional one-time allowance Tax-free Grants Non-Tax Incentives Details 100% for 10 consecutive years - 20% to apply Accelerated 80% on solar & wind assets Additional 20% on new plant/machinery in the 1 st year Available to specified goods manufactured and not actually exported Advance authorization from Directorate General of Foreign Trade Deemed export drawbacks Exemption/return of Terminal Excise Duty Certain services are exempted from service tax Services of transmission or distribution of electricity by an electricity utility Various duty concessions and exemptions to RE Sector Certain States allow reduced VAT rates (5%) on RE projects in Budget 2014 on new plant and machinery Grants received from the holding company engaged in generation, distribution or transmission of power Details PwC 7

8 Feed-in-tariffs Rebates Favorable land policies Government R&D programs When renewable generators sell to state utilities under the MoU route Rates decided by the CERC and the SERC Available on the manufacturing of solar and wind components Targeted at specific types of renewable energy technology Include subsidies and rebates on capital expenditures By various state governments for renewable development Reduce capital costs and favors ease of land allocation Improve renewable energy technologies Lead to growing performance, importance and reducing costs Incentives offered Investment Opportunities The renewable energy sector in India is full of opportunities and merits careful consideration by market participants. The Indian renewable energy market is highly attractive as it has the potential to reduce India s rising demand supply gap, hence becoming a key cog in the wheel for India s energy security strategy. The government in India has placed and encouraging policy & regulatory framework with a combination of feed-in tariffs, renewable procurement obligations, and Renewable Energy Certificates. The most dominant asset classes, wind and solar, have attracted considerable supplier interest and hence equipment and EPC is available at increasing competitive rates thus boosting margins. The Jawahar Lal Nehru National Solar Mission (JNNSM) and several state-level solar policies are helping develop solar energy market. Recent budgetary allocation for generation based incentives and reintroduction for accelerated depreciation for wind power will spur investments in wind energy. The size of the renewable energy market will see further growth as the application of Renewable Purchase Obligation expands to cover open access and captive consumers. Stipulated Renewable Energy targets to attract investment in RE space Existing targets JNNSM: The JNNSM was launched in January 2010 by the Government of India under the National Action Plan of Climate Change (NAPCC). It is envisaged that as a result of rapid scale up as well as technological developments, the price of solar power will attain parity with grid power by the end of the Mission period, enabling accelerated and large-scale expansion thereafter. The mission includes a major initiative for promoting solar photovoltaic (PV) applications. It had three phases out of which the first phase finished in 2013, and subsequent phases are under way which target a capacity addition of 20,000 MW in India via grid connected solar power plants. Apart from grid connected targets, JNNSM also set up targets for off grid applications and Solar Thermal in India. Application Segment Target for Phase I ( ) Cumulative Target for Phase 2 ( ) Cumulative Target for Phase 3 ( ) Grid solar power (large plants, roof top & distribution grid plants) 1,100 MW 10,000 MW (3000 MW with Central Support, 6000 MW under State Initiatives) 20,000 MW PwC 8

9 Off-grid solar applications 200 MW 1,000 MW 2,000 MW Solar Thermal Collectors (SWHs, solar cooking/ cooling, industrial process heat applications etc.) 7 million sq. meters 15 million sq. meters 20** million sq meters JNNSM Targets MNRE strategic plan till 2017: This aims that renewable energy source based generation will make up a significant part of India s installed power capacity (targets 82 GW of installed capacity via renewable energy sources by 2020). MNRE has also been continuously revising targets corresponding to the market factors such as reducing prices of renewable source based generation including solar and the MNRE is committed to achieve these targets much in advance of the set time limits. State targets: Apart from the national renewable energy targets, individual states have their own specific renewable energy policy targets as per their feasibility and potential. Wind and solar dominate the following table lists select states with solar policies and their planned solar targets: State Solar targets Target MW for FY 15 Andhra Pradesh Andhra Pradesh Solar Policy Target of 1000 MW by Gujarat GEDA Planned Capacity; targets: FY MW, FY MW, FY MW 400 Karnataka KREDL Solar Policy 2014; targets: FY MW, FY MW, FY MW, FY MW, 1400 FY MW, FY MW, FY MW Maharashtra Targets from MEDA Plan: FY MW, FY16-75 MW, FY17-75 MW 275 Madhya Pradesh Targets in policy are to match RPO 1036 Rajasthan Targets from RREC Solar Policy 2011: 400 MW from Tamil Nadu Solar Policy 2012: Total solar target of 3000 MW by 2015, with 200 MW of utility scale solar in FY Select States Solar Policy Targets The following table lists down select states with wind power policies and their planned wind power targets: State Total MW for FY15 Rajasthan 600 Madhya Pradesh 700 Gujarat 400 Maharashtra 800 Andhra Pradesh 500 Karnataka 400 Tamil Nadu 400 Telangana 200 Select States Wind Power Targets Expansion of targets In order to accelerate the deployment of renewable energy in India, the Government is currently planning to scale up the existing targets for all renewable energy technologies. Further, Government is also PwC 9

10 planning to achieve the new targets at a much faster rate and earlier than the timelines set under the existing targets. Solar Scale up Vision 4 : Loking beyond JNNSM, the Government plans to scale up solar to a cumulative 100GW by This would include large scale deployment of rooftop projects under both net metering and feed in metering to achieve 40GW of capacity till 2022; increased pace of grid connected projects so as to achieve 40GW by 2022, for this Solar parks have been set up in Charanka (Gujarat, 500 MW) and Bhadla (Rajasthan, 1500 MW) and others have been planned in over 15 states; thirdly through laying thrust on large scale projects (100 MW min.) to generate the remaining 20GW capacity. National Wind Energy Mission: In order to exploit the available wind potential in the country expeditiously, there is a need to address the issues and barriers in a focused manner. The Government therefore proposes to launch the National Wind Energy Mission which aims to achieve 60,000 MW 5 of utility scale wind installations in the country by the end of 13th five year plan (end of 2022) 6. Wind power category Utility scale on-shore wind 58,000 MW Off-shore wind 1,500 MW Distributed power 500 MW National Wind Energy Mission Targets Bio-Energy: The biomass atlas estimates surplus biomass availability at about 150 million metric tonnes per annum with a potential of over MW power generation capacity. Besides this, over 60 million tonnes per annum of municipal solid wastes with a potential of over 2300 MW and bagasse from sugar mills with a potential of over 5000 MW respectively are also available. Thus, the potential for installation of bioenergy projects including energy from biomass, municipal solid wastes and sugarcane bagasse is are estimated to be over MW. While a target of about 2700 MW by 2017 is envisaged, this sector could get enlarged with availability of increased investments in this sector. Besides, a thrust is also being given to the production of gaseous and liquid fuels from biomass and wastes / residues. Manufacturing outlook Apart from investment in generating assets, investment in manufacturing in the renewable energy sector will also grow to support the targets and plans of the government. With the new government supporting manufacturing in India through its Make in India initiative, we can envisage incentives and policies conducive to support manufacturing of renewable energy equipment in India in the long run. Solar Power: With JNNSM targets of 20 GW by FY 22 and proposals to increase this target to 100GW provides a huge investment potential for solar manufacturing in India. For solar PV, currently as of August 2014, the cumulative installed capacity of Indian solar PV manufacturers is about 1,200 MW of cells and 2,500 MW of modules 7. Most power producers are importing cells/ modules due to various factors including cost. Higher investment and R&D in solar manufacturing will help India in competing with imported solar modules on both cost and technology in the long run. Solar manufacturing in India is in a nascent stage and requires a nurturing environment if it is to compete with international players in this rapidly evolving sector. Wind Power: The global wind generation capacity is expected to increase to 1,149 GW by 2020 and 2,500 GW by , India s proposed National Wind Energy Mission also targets 60 GW generation 4 Discussions with MNRE 5 This includes existing installed capacity htm 7 MNRE: 8 GWEO Advanced scenario estimates PwC 10

11 capacity in India by India s wind manufacturing capacity has an annual capacity of 10 GW 9, cater to the global market owing to lower manufacturing costs. Considering this immense potential in both domestic and global demand, the manufacturing sector is set to achieve new heights. Further government initiatives in promoting offshore wind energy and improving technology in the wind generation avenue have strengthened India s manufacturing sector and will continue to do so. As a result, leading manufacturers like Suzlon, Vestas, Enercon, GE and Siemens have already set up operations in India, and are further increasingly announcing new investments 10. Bio-energy and WtE: Equipment manufacturing in these renewable energy technologies is dominated by small to mid-sized companies. WtE sector particularly is at an early stage of development in India and has potential due to increased urbanization and waste management issues. Bio-energy also has a huge untapped potential that provides a positive outlook for manufacturing ramp-up in India. This sector will provide immense opportunities to project developers for captive projects for production of gaseous and liquid fuels besides power generation and co-generation. Small Hydro Power: India has only around 25 equipment manufacturers listed as per the MNRE website, who fabricate almost the entire range of small hydro power equipment. As of now, India has an estimated potential of about 20,000 MW, about 80% of which is untapped. Further, up gradation of water mills and micro hydel projects is also being undertaken throughout the sector. Both these factors depict promising potential for an increase in domestic manufacturing. Financing Renewable Energy in India Immense potential for Renewable Energy source based electricity generation coupled with policies and plans for harnessing it has opened up vast opportunities for this sector in India. India witnessed globally the third highest investments in solar water heating capacity and the fourth highest investments in CSP and wind power in Also, India saw record small-scale project investment of USD 0.4 billion 12. FDI in the renewable energy sector 100% Foreign Direct Investment (FDI) in renewable energy is permitted. FDI inflows in renewable energy industry from April 2000 February 2013 were about USD 2.5 billion 13 During , India s annual total renewable energy investment remained between USD 4 billion and USD 5 billion. Investment has risen rapidly since then, from USD 4.2 billion in 2009 to USD 12.3 billion in Higher rate of investments in these years corresponds to incentivization schemes by Government of India such as GBI and accelerated depreciation in wind sector. While wind continues to receive the majority of investment, solar has seen the highest growth, and the gap between the two is falling rapidly. Financing Cost for RE projects in India Entity Rate of Interest Scheduled Commercial banks >12% US Exim Banks ~ (10-12%) NBFC s ~ ( %) Multilaterals & Bilateral (ADB, IFC >11% etc.) Financing Cost for RE projects in India GE announces earlier in 2014 plans to invest USD 200 million in a manufacturing unit in Pune 11 Global Trends in RE investment 2014 by Bloomberg 12 Ren21 Renewables Global Status Report(GSR) 2014: 13 Facts on FDI by DIPP: 14 CPI report on Meeting India s Renewable Energy Targets: The Financing Challenge: Challenge.pdf PwC 11

12 In view of recent development in solar technology, government of India plans to hasten the growth and looking at steep fall in the solar prices there could be possible addition of 1 lakh MW solar capacity in next 5 years and also in other renewables. If it is so, investment requirement for solar itself will be nearly 100 billion USD in next 5 years. To meet the financing requirement, more and more foreign investors are being attracted owing to potent natural resources, large-scale investment opportunities, and attractive Government incentives. Wind and solar sectors are expected to garner massive overseas investments in the coming years. All efforts are being made to attract FDI from investors and autonomous power producers internationally. A variety of investors finance renewable energy projects in India, including institutions, banks, and registered companies. Institutional investors are either state-owned or bilateral and multilateral institutions. Among banks, both private sector and public sector banks are involved. In addition to registered companies, venture capital and private equity investors contribute equity investment. Development Banks-IREDA, continue to represent a key source of funds for RE investments, particularly in project finance, over the medium term. Potential Sources of Financing Land Availability for Renewable Energy Projects Land is a vital component of the total capital expenditure of renewable projects. In order to develop renewable installations particularly, wind and solar projects, land requirements are quite significant. Various state governments in India have announced favorable land policies that have been instrumental in reducing the capital cost for the renewable projects. For instance, Rajasthan under its Solar Policy has announced availability of land to the developers at low cost. Madhya Pradesh has announced investor friendly government land allocation measures which have resulted in the increase of solar installations. Renewable power projects are established on private, revenue or forest land. Different states have different policies for land purchase/allotment. Further these policies and the clearances required differ depending on the type of land. Private land PwC 12

13 Most of the acquisition of private land for renewable energy projects occurs through mediations directly with the land owners. 1. Certain states allow purchase of land without any conditions. Tamil Nadu has the most investor friendly policy, wherein agricultural land can be directly purchased for the setting up renewable energy projects. In Rajasthan also as per their recently announced solar policy, land owners are permitted to set up solar power projects on their land, or sub-let his land for establishment of such projects without any land conversion requirements. 2. Other states require that private/agricultural land be converted to non-agriculture land for industries to purchase this land. States have a set procedure for this conversion. In Karnataka this requires an amendment in the Karnataka Land Reforms Act Sections 79 A and 79 B. In Maharashtra, before purchasing private land, Dept of Industries and Commerce (DIC) permission has to be obtained for which the survey/gut numbers of the locations have to be submitted. These procedures take up additional time in the gestation periods of the projects. Revenue land 1. Certain states such as Gujarat and Rajasthan have developer friendly procedures in acquiring revenue land. Revenue land files in Gujarat are cleared at DC level, whereas in Rajasthan, government land is allotted by the District Collector, on recommendations of RRECL (Rajasthan Renewable Energy Corporation Limited), at a concessional rate. 2. Certain other States require clearances by higher authorities to acquire revenue land, which involves additional time. 3. Other states such as Maharashtra do not have any clear cut policies for execution of renewable energy projects on revenue land. Forest land India s Land acquisition Act, 1894 (as amended in 1985) allows forest land for developmental purposes. However, this land can be acquired only on lease basis and is subject to clearances from the forest department. Further, India s Resettlement and Rehabilitation (R&R) Policy, 2007 ensures that minimum displacement occurs in large scale projects. Of all the project options, the one with least displacement is selected and adequate resettlement package is decided to compensate the displaced communities. Forest areas are identified using forest atlas and GIS maps and alternatives have to be considered to minimize forest land use during this process. Allocation of this on lease for RE projects happens through a detailed two stage process by the MoEF (Ministry of Environment, Forest & Climate Change). Stage-I: The Divisional Forest Officer (DFO) assesses the Net Present Value (NPV) of the current forested area to make recommendations for forest land diversion and determine areas for compensatory afforestation. Stage-II: MoEF or its regional office reviews the document and gives a go ahead for the project. Further as per MoEF rules, the developer has to identify land contiguous to forest land for afforestation and undertake compensatory afforestation. Clearances required for setting RE projects India s regulatory system and implementing agencies ensure that environmental quality and social concerns are not compromised and any arising concerns are addressed while implementing renewable energy projects. In order to be compliant with these, projects have to get appropriate clearances. Environmental clearances: PwC 13

14 During project initiation, the Environmental Impact Assessment (EIA) Notification, 2006 (as amended in 2009) needs to be considered to assess if Environmental Clearance (EC) is required or not. EIA notification categorizes various projects under A, B or B1 categories based on the capacity of the project and subscribes different processes for EC. Category A projects are screened, scoped and appraised at the central level by MoEF s Expert Appraisal Committee (EAC) and Category B projects are evaluated by State Environmental Impact Assessment Authority (SEIAA). Specific to the energy sector, environmental regulations for governing projects vary depending on the electricity generation capacities of the plants. Some of the major clearances required for RE plants include: All hydroelectric power projects have to get environmental clearance. These clearances fall under two categories; category A if the projects are of capacity >=50 MW; category B if capacity of projects is between 50 to 25 MW. Biomass or non-hazardous solid waste based projects, with capacity more than 15MW, require environmental clearance. The following RE projects are exempt from EIA: Solar Photo Voltaic (SPV) projects up to a plant size of 50 hectares. Small Hydro Projects (SHPs) up to a capacity of 25 MW. However, project proponents have to approach State Pollution Control Board (SPCB) for clearance under Air and Water Act. Wind projects Consent Process State Pollution Control Boards (SPCBs) grant Consent to Establish (CTE) and Consent to Operate (CTO) to projects, including solar and wind projects. CTE is issued to projects after evaluating the potential environmental impacts and the design of pollution control installations and upon verification of compliance with these conditions. A CTO is issued with emission and effluent limits based on industrial sector-specific standards. Some states like Gujarat issue consolidated consents for air and water pollution and hazardous waste based on Common Consent Applications (CCA). Others states like Chhattisgarh, issue water and air consents as well as waste management authorizations separately. Coastal Regulation Zone Clearance Coastal Regulation Zone (CRZ) clearance regulates development in areas located along the Indian coast. Coastal areas are considered sensitive zones and classified by the MoEF as Coastal Regulation Zone (CRZ) I, II, III and IV for regulating development activities in the coastal stretches within 500 meter of High Tide Line (HTL). Various activities are allowed in the different zones and rapid EIA is used as a tool for CRZ clearance. Project proponent has to ensure that CRZ clearance has been obtained and the project is not located in environmentally sensitive zones as notified under the CRZ classification. Forest Clearance RE projects are being set up on forested land have to obtain a two-stage approval by the MoEF. This twostage process involves approval by the Divisional Forest Officer and subsequently by the MoEF or its regional office. Also, as per the MoEF Rules, the developers have to identify land contiguous to forest land for afforestation. This compensatory afforestation activity is also permitted in private land. Environmental Assessment for externally funded projects PwC 14

15 RE projects that are funded by bilateral and multilateral agencies have to meet additional environmental and social performance standards prescribed by the respective funding agency International Acts and Treaties RE projects should not violate any regional/ multilateral treaty India is signatory to. Project proponents and regulators have to ensure that environmental conservation and biodiversity preservation is not compromised due to project activities. These treaties include UN s Convention on Biodiversity, Convention on International Trade of Endangered Species and Convention on Conservation of Migratory Species. Social Governance Clearances Projects have to comply with acts addressing social concerns such as Panchayat Act, 73rd Constitutional Amendment, Tribal Rights Act and Forest Act, India s Resettlement & Rehabilitation (R&R) Policy 2007, Land Acquisition Act, 1894 and others. Further, these should be compliant with local laws and get approvals from the local bodies/institutions. Two major clearances in this regard are: o Local Governments Projects are subject to local laws and have to get approvals from local bodies. As per the 73rd constitutional amendment, rural local bodies or Pancahyati Raj Institutions (PRIs) decide on clearing developmental projects by providing them legal status. Under the Panchayat Act, the PRIs or Gram Sabha at the village level has to be consulted by the project proponent before establishing a project in areas falling under its jurisdiction. This gives villagers/ locals the right to raise their project development linked concerns. o Land Acquisition RE projects are established on private, revenue or forest land, for which different states have different policies for land purchase/allotment. These have been discussed in the land facilitation section, and involve clearances such as changing land use status non-agricultural land, etc. Apart from these major clearances, there are other clearances such as obtaining a No Objection Certificate (NOC) from the energy department, a NOC from the district collector etc. Power Sale Options The renewable energy sector has witnessed evolution of several market models pursuant to the timely Policy and Regulatory framework formulated at the central and State Level. A relook on the past scenario shows that, while wheeling renewable power, particularly wind power for third party use or captive use was a popular market model in the initial years, the provisions of National Electricity Policy and National Tariff Policy on preferential Tariff and preferential treatment of Nonconventional sources of energy has led to a feed-in-tariff regime which marked significant RE capacity addition in the Country in the later years. Moving forward, the current policy and Regulatory framework offers the promising market model of REC based off-take models which provides a pan-nation market for renewable energy. Sale to third party under Open Access Regime The model involves sale of energy to an Open Access consumer of the same DISCOM area within which the generator is located or to a different DISCOM within the State, using the network of the Discoms or PwC 15

16 Transmission Companies in order to wheel the power from the point of injection to point of usage. Such a market model of third party sale is largely made feasible with the introduction of the provisions for Open Access transactions specified in the Electricity Act 2003 and through the subsequent Regulations framed by the State Electricity Regulatory Commission. The Electricity Act 2003 defines Open Access vide Section 2(47), reproduced as under. Open access means the non-discriminatory provision for the use of transmission lines or distribution system or associated facilities with such lines or system by any licensee or consumer or a person engaged in generation in accordance with the regulations specified by the Appropriate Commission; Open Access allows a bulk consumer, according to the framework developed by the appropriate Commission, to contract directly with the generation company or with any other source of supply (other than the incumbent distribution licensee in whose area the consumer is situated). The open access framework also offers such freedom to generating company to supply power to such consumers who are eligible to avail open access. Sale through Group Captive under Open Access Regime This model is very similar to that of the third party sale model discussed in detail in the above section. However, in this model the consumers need to have a minimum level of stake holding in the renewable power plant set up. Hence, in case a developer wants to set up power projects and sell power through a Group Captive route, then the shareholding/capital structure of the power plant should be such that the power plant gets qualified as a Captive generation plant. In accordance with the Captive Power Policy notified by the Government of India, for any power plant to qualify as a captive power plant, they need to abide by two major conditions which are as follows: Not less than twenty six percent of the ownership is held by the captive user(s), and Not less than fifty one percent of the aggregate electricity generated in such plant determined on an annual basis, is consumed for the captive use: Provided that in case of power plant set up by registered cooperative society, the conditions mentioned under paragraphs at (i) and (ii) above shall be satisfied collectively by the members of the cooperative society. As regards the structure of this power sale option, the developer/captive users may wheel the power generated to the point of consumption through a dedicated lines or through the network of the transmission and/or the Distribution licensee after paying necessary transmission and wheeling charges. Sale to Distribution Licensee under Feed-in-Tariff Regime The model essentially involves sale of power generated by a renewable power plant to the distribution Utility at a rate approved by the State Electricity Regulatory Commission. Under this power off-take Option, the Utility will have to enter into a Power Purchase Agreement (PPA) with the purchaser or the Distribution utility. Such a model is a time tested and comparatively less complex one. However, the lesser complexity of this power sale model comes at a price of the model s dependency on the willingness of the Utilities to procure RE power and the creditworthiness of the Utilities to pay for the power purchase. Sale under the REC Mechanism Under the REC mechanism, one REC will be issued to the RE generator for generating one MWh of electrical energy fed into the grid. The RE generator may sell electricity to the distribution company at the regulated price equivalent to average pooled cost of power purchase by Utility from all sources excluding RE sources and its RECs to Obligated Entities at market price through exchange mechanism in a transparent manner. The RE generator may sell the certificates only through power exchange to such Obligated Entities who have to meet with their RPO target. The purchase of RECs will be deemed as a PwC 16

17 purchase of power generated from renewable sources and accordingly will be allowed for compliance with the RPO target. The REC mechanism will enable obligated entities in a State to procure RECs generated from any of the States in India and surrender the same to fulfil its RPO target. Manpower Availability The Renewable Energy sector in India employs sizeable manpower both in the organized as well as unorganized sector, in manufacturing of equipment, their installation, operation, maintenance, transmission and distribution of energy generated from renewable energy sources. The MNRE has been supporting skill development activities in renewable energy by way of supporting various educational and training organizations including NGOs/private organizations to conduct training courses in specific job roles required by renewable energy industry. In addition, renewable energy as a subject has also been incorporated in regular syllabus of the two year certificate course of Industrial Training Institutes of seven trades (electronics, electricians, welder, fitter, turner, sheet metal work and machinist). MNRE has in the past also been supporting Electronics Sector Skill Council and Power Sector Skill Councils and is currently working on creating a separate Renewable Energy (Green Energy) Skill Council in collaboration with Ministry of Skill Development and Entrepreneurship. The MNREW intends to create an army of Urja Mitra by way of roping in educational and training institutions in next five years. These Urja Mitra will act as independent entrepreneurs at local level for promotion propagation and deployment including servicing and maintenance of the renewable energy systems in their respective areas. Skill development is a focus area of the government and the Skilling India mission plans to train 500 million people by 2022 that the government believes would provide a jobready workforce to several industries. India as favorable Renewable Energy Destination India is fast emerging as a country with a vibrant renewable energy ecosystem that is expanding rapidly. Some of the major immediate plans are as follows:- Scale up renewable energy deployment plans to reach a cumulative installed capacity of around 165 GW by 2020 that include 100 GW solar power capacity; Establish National University for Renewable Energy. The University will focus on research in cutting edge renewable energy technologies including on developing countries specific issues, skill development, climate studies, and would produce the professionals to cater to increasing manpower requirement; Organize the first Renewable Energy Global Investors Meet & Expo (RE-INVEST) on February 2015 in New Delhi, as a follow-up to the Make in India initiative launched by the Prime Minister of India. The central theme of RE-INVEST is to attract large scale investments for the renewable energy sector in India. It will be the first major platform for investment promotion in this sector at Government of India level to signal India s commitment to the development and scaling up of renewable energy to meet its energy requirement in a sustainable manner. This will enable the global investment community to connect with renewable energy stakeholders in India. The event is expected be attended by over 300 investors and over 1000 delegates, both domestic and international. Besides, representatives from State Government, Public Sector Enterprises, renewable power developers and manufacturers, state renewable energy nodal agencies, and other related stakeholders will play important roles. PwC 17

18 Annexure I- MNRE Schemes on Renewable Energy Grid Connected Power Wind Energy Scheme for Promotion of Grid Interactive Power Generation Projects based on Renewable Energy Technologies for wind power projects: Implemented during , the Ministry of New and Renewable Energy provides financial support for carrying out Wind Resource Assessment, organization of seminars/symposiums/workshops/training programs, strengthening of technical institutions, testing facilities, engaging consultants and undertaking studies on a case-by-case basis. The total CFA under this scheme is INR 70 million for wind power and INR 85 million for C-WET. Scheme for Generation Based Incentives (GBI) for Grid Interactive Wind Power Projects: Implemented for the 12 th Plan period, i.e. till 2017, Generation Based Incentives per unit of electricity fed into the grid for a period of not less than four years and up to ten years with a cap of INR 10 million/mw will be provided. The GBI will be implemented through the Indian Renewable Energy Development Agency (IREDA). The total expected liability for this scheme is estimated at INR 163,640 million over the entire scheme duration spreading till Biomass Power/Cogen Promotion of Grid Interactive Biomass Power and Bagasse Cogeneration in Sugar Mills: Implemented for the 12 th Plan period, i.e. till 2017, Central Financial Assistance (CFA) for all projects implemented post 1 st April 2013 will be provided. The Ministry of New and Renewable Energy will also provide financial support for R&D activities, organizing seminars/symposiums/workshops/training programs, strengthening of technical institutions, testing facilities, engaging consultants and undertaking studies on a case-by-case basis. The total CFA under this scheme is INR 300 million for biomass and bagasse projects. Biomass Gasification Programme on Biomass Gasifier for industries: CFA is provided in the form of Capital Subsidy for Biomass Gasifiers used for Thermal, Electrical Applications and also for biomass gasifiers with 100% producer gas engines in Institutions for captive use. CFA is provided to a maximum capacity of 5 MW irrespective of the total installed capacity of the project. Biomass Gasifier based Programmes: CFA is provided for Biomass Gasifier based Grid Connected Power systems of up to 2 MW capacity. These should either be 100% supported by producer gas engines or be biomass based grid connected Boiler-Turbine-Generator (BTG) projects. A total subsidy of INR 60 million for will be provided for such projects. Solar Scheme for Development of Solar Parks and Ultra Mega Solar Power Projects in the country commencing from to : CFA of INR 2.5 million for parks for preparation of DPR, conducting surveys, etc. Also, a CFA of up to INR 2 million/mw will be provided. The total estimated CFA under this scheme is INR 40,500 million. Scheme for Pilot-cum-Demonstration Projects for development of Grid Connected Solar PV Plants on Canal Banks and Canal Tops: CFA is provided on a per MW basis to canal top SPV projects and canal bank SPV projects. The total CFA disbursed will be upto INR 2.25 billion over a period of two years. Financial Support for grid connected to solar roof top projects: Objective of the scheme is to promote the grid connected SPV rooftop and small SPV power plants in the residential, community, institutional, industrial and commercial establishments. MNRE has set target of achieving 300 MW through this scheme by PwC 18

19 Sanction of Funds for Research Design and Development of Solar Photovoltaic Technology. The total fund allocation is INR 595 million. Small Hydro Power Small Hydro Power Programme (up to 25 MW Capacity): Central Financial Assistance (CFA)/Financial Support is provided in the form of Grants/Assistance/Subsidy for the following activities: Biogas Resource Assessment and Support for Identification of new sites Setting up new SHP projects in the private/co-operative/joint sector etc. Setting up new SHP projects in the Government sector Renovation and Modernization of existing SHP projects in the Government sector Development/Upgradation of water mills and setting up Micro Hydel Projects Research and Development and Human Resource Development Biogas based Distributed / Grid Power Generation Programme: Subsidy for setting up Biogas based Power Generation Systems and support for a variety of workshops, seminars, meetings, training programs to the implementing agencies /Biogas Development & Training Centers (BDTCs) among others. The total outlay for this scheme is INR 50 million. Off-Grid Power Aerogenerators/wind hybrid Scheme on Small Wind Energy and Hybrid systems (SWES) Biomass Gasification Biomass Gasifier based Programmes: Central Financial Assistance (CFA) is provided for: Biogas Biomass Gasifier based Distributed/Off-grid power programme for Rural Areas. Biomass Gasifier based programmes in Rice Mills National Biogas and Manure Management Programme (NBMMP) Biogas Power (Off-grid) Programme Small Hydro Power Subsidy scheme for watermills and Micro Hydel Projects (up to 100 kw) Solar Capital Subsidy Scheme of Government of India for promoting Solar Photovoltaic (SPV) Water Pumping Systems for Irrigation purpose Off-grid and Decentralized Solar Applications Programme Off-grid and Decentralized Solar Cooker Programme Capital subsidy scheme for installation of solar thermal systems PwC 19

20 Capital subsidy Scheme for providing basic lighting needs through solar charging stations with Lanterns Remote Village Electrification Remote Village Electrification Programme: The Ministry is implementing a programme for providing financial support for electrification of those remote unelectrified census villages and unelectrified hamlets of electrified census villages where grid-extension is either not feasible or not cost effective and are not covered under Rajiv Gandhi Grameen Vidyutikaran Yojana. Such villages are provided basic facilities for electricity/lighting through various renewable energy sources. Waste to Energy Programme on Energy from Urban, Industrial and Agricultural Wastes/Residues: The main objectives of the programme are: To promote setting up of projects for recovery of energy from urban, industrial and agricultural wastes; Create conducive conditions and environment, with fiscal and financial regime, to develop, demonstrate and disseminate utilization of wastes and residues for recovery of energy. MNRE RD&D support The Ministry has been supporting Research, Design & Development (RD&D) in new and renewable energy since MNRE has been under this scheme, supporting the RD&D projects based on prototype/pilot plant development, demonstration, and commercialization. As part of the support scheme research can also be supported in the areas of policy, resource assessment and regulatory issues. The scheme has in the past supported RD&D projects carried out by industry. The scheme provides guidelines for project identification, formulation appraisal, approval and financial support. The aim of the RD&D scheme is to make the country a net foreign exchange earner in the New and Renewable Energy Sector. A Research, Design & Development Project Appraisal Committee (RDPAC) under the chairmanship of Secretary, MNRE provides guidance to the overall direction of RD&D effort in new and renewable energy. This Committee also elicits RD&D proposals, appraises them, and recommends financial support wherever required. The focus areas under the Ministry s RD&D program are: Alternate Fuels (hydrogen, bio & synthetic) to supplement and eventually substitute liquid hydrocarbons Green Initiative for Future Transport (GIFT) based on Alternate Fuels for land, air & sea applications to supplement and eventually substitute fossil-fuel systems Green Initiative for Power Generation (GIPS) based on Alternate Fuels for stationary & portable power generation applications to supplement and eventually substitute fossil-fuel systems Standalone new and renewable energy products to provide cost-effective energy for cooking, lighting and motive power Distributed new and renewable energy systems to provide cost-competitive energy supply options for cooking, lighting and motive power New and renewable energy products for urban, industrial and commercial applications, including energy recovery from urban and industrial wastes and effluents MW scale grid interactive renewable electricity systems to contribute towards supplement and eventually substitute fossil-fuel based electricity generation PwC 20

21 Annexure II- State wise Feed-In Tariffs as per State Regulations State-wise Feed-In-Tariffs State Wind Biomass Andhra Pradesh Bihar - Chhattisgarh Gujarat Haryana Jammu and Kashmir 4.7 Wind density >200 = = = = 4.17 >400 = 3.91 Net Tariff = 4.15 AD benefit = 0.37 Wind density = = = 4.31 >400 = 3.88 CUF 20% = 5.80 CUF 22% = 5.27 CUF 25% = 4.64 CUF 30% = 3.87 CUF 32% = 3.62 Bagasse Cogeneration FC = FC = (1 st 10 th yr.) (1 st 10 th yr.) VC = 3.09 VC = 2.04 FC = 2.90 VC = 4.08 FC = 3.57 VC = 2.16 Aircooled = 5.27 Watercool ed = 5.04 Aircooled = 8.62 Watercool ed = 8.52 FC = 2.47 VC = 3.06 FC = 3.54 VC = 3.02 Based Small Hydro (1 st 10 th yr.) - - >2 MW = MW = MW = Karnataka Kerala <5 MW = MW=4.16 Municipal Solid Waste - - PwC 21

22 Madhya Pradesh Maharashtra Wind density = = = 4.18 >400 = Orissa Punjab Rajasthan Jodhpur, Barmer = 5.12 Others = 5.38 Jaisalmer, Aircooled = 5.67 Watercool ed = 5.23 <5 MW = MW=6.25 >500kW= MW= MW = MW=3.76 <5 MW = MW=3.09 <5 MW = MW=4.02 Suo-moto petition Suo-moto petition - Tamil Nadu Wind density Uttarakhand >200 = 5.00 FC = 2.10 <5 MW = = 4.45 VC = 2.48; FC = MW= = 3.80 escalation VC = 2.45; escalation of 5% p.a MW= = 3.05 of 5% p.a. - >400 = 2.80 Uttar 3.21; escalation of 5.72% Pradesh p.a West Bengal Tariff cap of 5.71 for 10 years Tariff cap of 5.1 till 2022 FC Fixed Cost; VC Variable Cost; CUF Capacity Utilisation Factor Source:IREED State-wise Feed-In-Tariffs PwC 22

23 Annexure III: Renewable purchase obligation for all the States State RE Technology Andhra Pradesh Non-Solar 4.75% 4.75% 4.75% 4.75% 4.75% 4.75% Solar 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% Total 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% Arunachal Pradesh Non-Solar 4.10% 5.45% 6.80% Solar 0.10% 0.15% 0.20% Total 4.20% 5.60% 7.00% Assam Non-Solar 2.70% 4.05% 5.40% 6.75% Solar 0.10% 0.15% 0.20% 0.25% Total 2.80% 4.20% 5.60% 7.00% Bihar Non-Solar 2.25% 3.75% 4.00% 4.25% Solar 0.25% 0.25% 0.50% 0.75% 1.00% 1.25% 1.50% 1.75% 2.00% 2.50% 3.00% Total 2.50% 4.00% 4.50% 5.00% Chhattisgarh Non-Solar 5.00% 5.25% Solar 0.25% 0.50% Total 5.25% 5.75% Delhi Non-Solar 1.90% 3.25% 4.60% 5.95% 7.30% 8.65% Solar 0.10% 0.15% 0.20% 0.25% 0.30% 0.35% Total 2.00% 3.40% 4.80% 6.20% 7.60% 9.00% JERC (Goa & UT) Non-Solar 1.70% 2.60% Solar 0.30% 0.40% PwC 23

24 Total 2.00% 3.00% Gujarat Non-Solar 5.50% 6.00% Solar 0.50% 1.00% Total 6.00% 7.00% Haryana Non-Solar 1.50% 2.00% 3.00% Solar 0.00% 0.05% 0.10% Total 1.50% 2.05% 3.10% Himachal Pradesh Non-Solar 10.00% 10.00% 10.00% 10.00% 11.00% 12.00% 13.00% 14.00% 15.00% 15.50% 16.00% Jammu Kashmir and Solar 0.01% 0.25% 0.25% 0.25% 0.25% 0.25% 0.50% 0.75% 1.00% 2.00% 3.00% Total 10.01% 10.25% 10.25% 10.25% 11.25% 12.25% 13.50% 14.75% 16% 17.50% 19.00% Non-Solar 2.90% 4.75% Solar 0.10% 0.25% Total 3.00% 5.00% Jharkhand Non-Solar 2.50% 3.00% Solar 0.50% 1.00% Total 3.00% 4.00% Karnataka Non-Solar 10% and 7% Solar 0.25% Total (Discoms only) 10.25% & 7.25% Kerala Non-Solar 3.35% 3.65% 3.95% 4.25% 4.55% 4.85% 5.15% 5.45% 5.75% 6.05% 6.35% Solar 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% Total 3.60% 3.90% 4.20% 4.50% 4.80% 5.10% 5.40% 5.70% 6.00% 6.30% 6.60% Madhya Pradesh Non-Solar 2.10% 3.40% 4.70% 6.00% Solar 0.40% 0.60% 0.80% 1.00% PwC 24

25 Total 2.50% 4.00% 5.50% 7.00% Maharashtra Non-Solar 6.75% 7.75% 8.50% 8.50% 8.50% Solar 0.25% 0.25% 0.50% 0.50% 0.50% Total 7.00% 8.00% 9.00% 9.00% 9.00% Manipur Non-Solar 2.75% 4.75% Solar 0.25% 0.25% Total 3.00% 5.00% &Mizoram Non-Solar 5.75% 6.75% Solar 0.25% 0.25% Total 6.00% 7.00% Meghalaya Non-Solar 0.45% 0.60% Solar 0.30% 0.40% Total 0.75% 1.00% Nagaland Non-Solar 6.75% 7.75% Solar 0.25% 0.25% Total 7.00% 8.00% Orissa Non-Solar 4.90% 5.35% 5.80% 6.25% 6.70% Solar 0.10% 0.15% 0.20% 0.25% 0.30% Total 5.00% 5.50% 6.00% 6.50% 7.00% Punjab Non-Solar 2.37% 2.83% 3.37% 3.81% Solar 0.03% 0.07% 0.13% 0.19% Total 2.40% 2.90% 3.50% 4.00% Rajasthan Non-Solar 5.50% 6.35% 7.00% Solar 0.50% 0.75% 1.00% Sikkim Total 6.00% 7.10% 8.20% PwC 25

26 Tamil Nadu Non-Solar 8.95% Solar 0.05% Total 9.00% Tripura Non-Solar 0.90% 1.90% Solar 0.10% 0.10% Total 1.00% 2.00% Uttarakhand Non-Solar 4.50% 5.00% Solar 0.03% 0.05% Total 4.53% 5.05% Uttar Pradesh Non-Solar 4.50% 5.00% Solar 0.50% 1.00% Total 5.00% 6.00% West Bengal Non-Solar 3.75% 4.70% 5.60% 6.50% 7.40% Solar 0.25% 0.30% 0.40% 0.50% 0.60% Total 3.00% 4.00% 4.00% 5.00% 6.00% 7.00% 8.00% State-wise RPO targets PwC 26

27 Photo Gallery PwC 27

28 PwC 28

29 PwC 29

30 PwC 30

Development and Financing of Renewable Energy Projects in India

Development and Financing of Renewable Energy Projects in India Development and Financing of Renewable Energy Projects in India A Perspective By K.S. Popli Director (Technical) Indian Renewable Energy Development Agency Limited New Delhi ( India ) World primary energy

More information

Renewable Energy Market Potential and Policy Overview in India

Renewable Energy Market Potential and Policy Overview in India Renewable Energy Market Potential and Policy Overview in India Ministry of New and Renewable Energy Government of India Hannover, 14 th April,2015 Webpage: www.mnre.nic.in 1 Structure Renewable Energy

More information

Renewable Energy Programmes in India

Renewable Energy Programmes in India Renewable Energy Programmes in India Amit Kumar TERI, India Outline Indian Energy Scenario Renewable Energy in India Grid connected power Distributed generation Sustainable buildings Bio-energy Policy

More information

SECTOR OVERVIEW. be restructured with commercial banks. In turn, the utilities commit to implement annual tariff increases. 8

SECTOR OVERVIEW. be restructured with commercial banks. In turn, the utilities commit to implement annual tariff increases. 8 Solar and Wind Power Development Project (RRP IND 47920) SECTOR OVERVIEW A. The Energy Sector in India 1. India remains in chronic need of additional power generation capacity. Although, the electrification

More information

RE Tariff Setting Approach

RE Tariff Setting Approach Satadru Chakraborty Sr Research Associate, WISE Training Programme on the Regulatory and Policy Framework for Market Development for Renewable Energy in India Presentation Outline Policy & Regulatory provisions

More information

Renewable Energy Sector Profile

Renewable Energy Sector Profile Renewable Energy Sector Profile India Scenario India s Renewable Energy Basket Break up of the 72 GW Installed Renewable Power (GW, % Share) India is giving a strong push to renewable energy in line with

More information

The Potential for Renewable Energy in India

The Potential for Renewable Energy in India The Potential for Renewable Energy in India - 2012 Disclaimer: All information contained in this report has been obtained from sources believed to be accurate by Gyan Research and Analytics (Gyan). While

More information

New Business Opportunities. Repowering, Offshore, MW scale Wind-Solar hybrids and Small Wind Turbines

New Business Opportunities. Repowering, Offshore, MW scale Wind-Solar hybrids and Small Wind Turbines New Business Opportunities Repowering, Offshore, MW scale Wind-Solar hybrids and Small Wind Turbines 1 Coverage Need for new business models for wind Potential in India Repowering Offshore MW scale Wind-Solar

More information

IMPERATIVE FOR RENEWABLE ENERGY SOURCES AN INSIGHT INTO THE REGULATORY AND POLICY FRAMEWORK

IMPERATIVE FOR RENEWABLE ENERGY SOURCES AN INSIGHT INTO THE REGULATORY AND POLICY FRAMEWORK 2011 International Conference on Environment and BioScience IPCBEE vol.21 (2011) (2011) IACSIT Press, Singapore IMPERATIVE FOR RENEWABLE ENERGY SOURCES AN INSIGHT INTO THE REGULATORY AND POLICY FRAMEWORK

More information

Sanjay Upadhyay Advocate Supreme Court of India Enviro Legal Defence Firm April 2012

Sanjay Upadhyay Advocate Supreme Court of India Enviro Legal Defence Firm April 2012 Sanjay Upadhyay Advocate Supreme Court of India Enviro Legal Defence Firm April 2012 1 Current Legal and Policy Environment- The need for a new RE law in India Electricity Act Provisions- under Ministry

More information

SMALL HYDRO PROGRAMME IN INDIA. Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy

SMALL HYDRO PROGRAMME IN INDIA. Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy SMALL HYDRO PROGRAMME IN INDIA Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy e-mail : bhattbk88@gmail.com; bkbhatt@nic.in MILESTONES IN RENEWABLE ENERGY DEVELOPMENT IN INDIA 1980s - Setting

More information

SMALL HYDRO PROGRAMME IN INDIA

SMALL HYDRO PROGRAMME IN INDIA SMALL HYDRO PROGRAMME IN INDIA Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy Hydropower represents use of water resources towards inflation free energy due to absence of fuel cost with mature

More information

Renewable Policy Framework and Wind Energy Programme in India

Renewable Policy Framework and Wind Energy Programme in India Renewable Policy Framework and Wind Energy Programme in India J. K. Jethani Principal Scientific Officer Ministry of New and Renewable Energy Government of India 22 August 2016 In this Presentation Energy

More information

November Explanatory memorandum for CERC Regulations for implementation of REC mechanism in India

November Explanatory memorandum for CERC Regulations for implementation of REC mechanism in India Explanatory Memorandum for Central Electricity Regulatory Commission Regulations on Recognition and Issuance of Renewable Energy Certificate (REC) for Renewable Energy Generation November 2009 Explanatory

More information

Jawaharlal Nehru National Solar Mission Building Solar India Ministry of New and Renewable Energy Government of India

Jawaharlal Nehru National Solar Mission Building Solar India Ministry of New and Renewable Energy Government of India Jawaharlal Nehru National Solar Mission Building Solar India Ministry of New and Renewable Energy Government of India 1 st Concentrated Solar Thermal Power Summit New Delhi, September 2010 Under the National

More information

HARTEK POWER PVT LTD SOLAR BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd)

HARTEK POWER PVT LTD SOLAR BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd) (Formerly known as Amtek Energy & Power Pvt Ltd) SOLAR BUSINESS CATALOGUE 2015-16 2 P a g e Contents 1. Introduction 2. Mission SOLAR 3. Why us? 4. Engineering Procurement Construction Services 4.1 Process

More information

WELLSPUN RENEWABLES Metamorphosis competition Metamorphosis Vista The Metamorphosis challenge: Metamorphosis Disclaimer: Metamorphosis

WELLSPUN RENEWABLES Metamorphosis competition Metamorphosis Vista The Metamorphosis challenge: Metamorphosis Disclaimer: Metamorphosis WELLSPUN RENEWABLES This report shows how Government incentives for 'Make in India' can boost the renewable energy sector. It proposes an expansion strategy for Welspun Renewables towards achieving economic

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR)

SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR) Installed capacity (GW) Solar Rooftop Investment Program (RRP IND 49419) Sector Road Map SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR) 1. Sector Performance, Problems, and Opportunities

More information

Session 2: Theme Presentation On Issues in Scaling-Up of RE Deployment

Session 2: Theme Presentation On Issues in Scaling-Up of RE Deployment Organised by Supported by Workshop on Addressing Barriers to Scaling-Up Renewable Energy Session 2: Theme Presentation On Issues in Scaling-Up of RE Deployment 9 May, 2017 Mumbai 1 Outline of the Theme

More information

Amar Variawa Director - Marketing & Public Affairs Vestas India and SE 16th June 2016

Amar Variawa Director - Marketing & Public Affairs Vestas India and SE 16th June 2016 Wind Energy Overview Amar Variawa Director - Marketing & Public Affairs Vestas India and SE 16th June 2016 Wind in a nutshell 2 2015 was a record year for RE! 286 110 147 63.5 173 146 3 Source : http://resourceirena.irena.org/gateway/dashboard/?topic=6&subtopic=11

More information

Renewable Energy: Changing the Energy Scenario and Achieving Sustainable Growth

Renewable Energy: Changing the Energy Scenario and Achieving Sustainable Growth Renewable Energy: Changing the Energy Scenario and Achieving Sustainable Growth Vivek Sharma Practice Leader & Director Energy & Natural Resources August 21, 2014 1 CRISIL Risk & Infrastructure Solutions

More information

State wise analysis of RPO Regulation for Captive users

State wise analysis of RPO Regulation for Captive users State Regulation for Captive Users Definition of renewable Energy as per the commission order Remarks Andhra Pradesh Every consumer owning a captive generating plant of installed capacity of one (1) MW

More information

A Multi Stakeholder Perspective

A Multi Stakeholder Perspective A Multi Stakeholder Perspective 1 Agenda Wind Vision Initiative Setting up of Wind Vision : 200 GW by 2032 Recommendations Wind Project Development Regulatory Incentives Financing Wind Vision 2032 Grid

More information

(Draft Captive and Renewable Energy Generating Plants) Regulations

(Draft Captive and Renewable Energy Generating Plants) Regulations 307 Sl. No. UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Description (Draft Captive and ) Regulations - 2014 1. Short title, extent and commencement. 2. Scope and extent of application Summary (i) Uttar

More information

Jammu and Kashmir State Electricity Regulatory Commission

Jammu and Kashmir State Electricity Regulatory Commission DRAFT NOTIFICATION INVITING OBJECTIONS / COMMENTS /SUGGESTIONS Jammu and Kashmir State Electricity Regulatory Commission NOTIFICATION (Draft) No: JKSERC/ Dated: Jammu, In exercise of the power conferred

More information

Abhilakh Singh General Manager 12th April, 2016

Abhilakh Singh General Manager 12th April, 2016 Presentation on solar rooftop Abhilakh Singh General Manager 12th April, 2016 Power Scenario India, energy demand which was nearly 700 mtoe in 2010 is expected to cross 1500 mtoe by 2030. Dependence on

More information

Chhattisgarh State Electricity Regulatory Commission

Chhattisgarh State Electricity Regulatory Commission Chhattisgarh State Electricity Regulatory Commission Irrigation Colony, Shanti Nagar, Raipur Raipur, Dated September 18, 2013 No. 48/CSERC/2013 - Section 86(1)(e) of the Electricity Act, 2003 (the Act)

More information

Hydro & Small Hydro Outlook in India 2017

Hydro & Small Hydro Outlook in India 2017 Hydro & Small Hydro Outlook in India 217 Evaluating Business Case & Future Scenario of Large & Small Hydro Power Plants in India Report Summary enincon consulting llp, 217, New Delhi, India Enincon s Key

More information

Energy scenario in Himachal Pradesh and make in India vision 2030

Energy scenario in Himachal Pradesh and make in India vision 2030 International Journal of Commerce and Management Research ISSN: 2455-1627, Impact Factor: RJIF 5.22 www.managejournal.com Volume 2; Issue 12; December 2016; Page No. 25-29 Energy scenario in Himachal Pradesh

More information

P.C.Pant Ministry of New and Renewable Energy Trade Union Workshop on Climate Change

P.C.Pant Ministry of New and Renewable Energy Trade Union Workshop on Climate Change RENEWABLE ENERGY SECTOR IN INDIA P.C.Pant Ministry of New and Renewable Energy pcpant@nic.in 3/9/2012 1 Relevance of Renewable Energy Energy Resources availability Increasing world population and increased

More information

MADHU SHARMA University of Petroleum and Energy Studies, Dehradun, India

MADHU SHARMA University of Petroleum and Energy Studies, Dehradun, India ASSESSMENT OF EXISTING RENEWABLE ENERGY REGULATIONS OF UTTARAKHAND AND FINDING OUT THE LOOPHOLES IN THE REGULATIONS ABHISHEK PANDEY, abhilal26@gmail.com MADHU SHARMA madhusharma@ddn.upes.ac.in KN DINESH

More information

Renewable Energy. These Slides Accompany the YouTube Video Tutorial: https://www.youtube.com/watch?v=u-h7eqmc9rq&t=41s

Renewable Energy. These Slides Accompany the YouTube Video Tutorial: https://www.youtube.com/watch?v=u-h7eqmc9rq&t=41s Renewable Energy Indian Scenario 11 th Largest Economy & 4 th Largest in Purchasing Power Potential Ahead Power Scenario in India (Installed 263.66 GW & Renewable Energy 34.35 GW) Ministry of Non-Conventional

More information

Renewable Energy Technologies - Present and Future Prospects in Indian Economy

Renewable Energy Technologies - Present and Future Prospects in Indian Economy Renewable Energy Technologies - Present and Future Prospects in Indian Economy Dr. Sukhvinder Kaur Department of Zoology, Guru Nanak College for Girls (India) ABSTRACT Energy is the most essential component

More information

Paper Presented on Renewable Energy Sources Policies of India. Author- Rucha Korhale

Paper Presented on Renewable Energy Sources Policies of India. Author- Rucha Korhale Paper Presented on Renewable Energy Sources Policies of India Author- Rucha Korhale BE-Instrumentation Lecturer, VPM s Polytechnic, Thane 1 Renewable Energy Sources Policies of India Abstract:- In today

More information

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India 347 NAGALAND ELECTRICITY REGULATORY COMMISSION Terms and Conditions for Determination of

More information

RENEWABLE ENERGY IN INDIA SECTOR FOCUS: WIND AND BIOMASS

RENEWABLE ENERGY IN INDIA SECTOR FOCUS: WIND AND BIOMASS RENEWABLE ENERGY IN INDIA SECTOR FOCUS: WIND AND BIOMASS RENEWABLE ENERGY IN INDIA India has 5 th largest power generation portfolio in the world. Current renewable energy contribution: 44.8 GW (As on

More information

Overview of the Legal Framework. New Policy Initiatives. Renewable Energy Certificate Mechanism

Overview of the Legal Framework. New Policy Initiatives. Renewable Energy Certificate Mechanism 1 Overview of the Legal Framework New Policy Initiatives Renewable Energy Certificate Mechanism 2 3 Tariff regulations of the Regulatory Commissions to be guided by promotion of generation of electricity

More information

Market Mechanisms in India s Clean Energy Efforts

Market Mechanisms in India s Clean Energy Efforts Market Mechanisms in India s Clean Energy Efforts Renewable Energy Certificate Mechanism Balawant Joshi Director, ABPS Infrastructure Advisory Pvt. Ltd. ABPS Infrastructure Advisory Advisory Pvt. Ltd October,

More information

The power situation in India is precarious with

The power situation in India is precarious with The Big Picture: Making Grid Scale Renewables Work SUMANT SINHA The power situation in India is precarious with over half of the Indian population lacking access to modern forms of energy. A significant

More information

450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India 450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India WEST BENGAL ELECTRICITY REGULATORY COMMISSION Cogeneration and Generation of Electricity

More information

Section 86(1)(e): Specify Renewable Purchase Obligation. (RPO), grid connectivity. Section 61(h): Tariff regulations to be guided by promotion

Section 86(1)(e): Specify Renewable Purchase Obligation. (RPO), grid connectivity. Section 61(h): Tariff regulations to be guided by promotion Section 86(1)(e): Specify Renewable Purchase Obligation (RPO), grid connectivity Section 61(h): Tariff regulations to be guided by promotion of renewable energy sources Section 3: National Electricity

More information

With the support of the PV Market Alliance. APVIA Q Market Report

With the support of the PV Market Alliance. APVIA Q Market Report With the support of the PV Market Alliance APVIA Q2 2017 Market Report Introduction Launched in 2017, this 2 nd edition of APVIA s quarterly PV market report focus on India, anticipated to witness the

More information

Government of Gujarat Energy and Petrochemicals Department G.R. No.EDA B Sachivalaya, Gandhinagar. Dated the 25 July, 2013.

Government of Gujarat Energy and Petrochemicals Department G.R. No.EDA B Sachivalaya, Gandhinagar. Dated the 25 July, 2013. Wind Power Policy 2013 Government of Gujarat Energy and Petrochemicals Department G.R. No.EDA-102001-3054-B Sachivalaya, Gandhinagar. Dated the 25 July, 2013. Preamble Wind Power as an energy source is

More information

POWER SECTOR A STUDY OF INDIA

POWER SECTOR A STUDY OF INDIA POWER SECTOR A STUDY OF INDIA Dr. Farah Naaz Gauri* Dr. Riyazuddin Qureshi** Dr. Hares Ahmed Qureshi*** Associate Professor, Dept. of Management Science, Jazan University, Jazan, K.S.A.* Assistant Professor,

More information

Ministry of Non- Conventional Energy Sources (MNES) Statement of Outlays and Outcomes / Targets: Annual Plan Target (MW)

Ministry of Non- Conventional Energy Sources (MNES) Statement of Outlays and Outcomes / Targets: Annual Plan Target (MW) Sl. No. Name of the Scheme/ Programme Statement of Outlays and Outcomes / Targets: Annual Plan Objective / Outcome Outlay Target (MW) (MW / Rs.1 cr.) Processes/ Timelines (Rs.in crore) Remarks / Risk Factors

More information

Jawaharlal Nehru National Solar Mission

Jawaharlal Nehru National Solar Mission Jawaharlal Nehru National Solar Mission Deepak Gupta Secretary Ministry of New and Renewable Energy Government of India 8 th June, 2011 Jawaharlal Nehru National Solar Mission (JNNSM) India has set up

More information

UTTARAKHAND STATE GOVT. POLICY FOR HARNESSING RENEWABLE ENERGY SOURCES

UTTARAKHAND STATE GOVT. POLICY FOR HARNESSING RENEWABLE ENERGY SOURCES UTTARAKHAND STATE GOVT. POLICY FOR HARNESSING RENEWABLE ENERGY SOURCES (Annexure ofg.o.no.263 /I (2) / 2008-04 (8)-96/2001, dated 20-1-2008) 1. Preamble Uttarakhand is richly endowed with natural renewable

More information

Gujarat Electricity Regulatory Commission

Gujarat Electricity Regulatory Commission Discussion Paper DETERMINATION OF TARIFF FOR PROCUREMENT OF POWER BY DISTRIBUTION LICENSEES AND OTHERS FROM BIOMASS BASED POWER PROJECTS AND BAGASSE BASED CO-GENERATION PROJECTS FOR THE STATE OF GUJARAT

More information

Transmission Policy and Wind Energy

Transmission Policy and Wind Energy Transmission Policy and Wind Energy Grid Operational Challenges and Regulatory Measures V Subramanian, CEO and Secretary General Indian Wind Energy Association (InWEA) Present Status and Enabling Provisions/Framework

More information

Comparative study on power situation in the Northern and Central states of India

Comparative study on power situation in the Northern and Central states of India Comparative study on power situation in the Northern and Central states of India PHD Research Bureau September 2011 PHD Chamber of Commerce and Industry PHD House, August Kranti Marg, New Delhi 110016

More information

GREEN NORMS FOR WIND POWER. Potential Impacts and the Need for Green Norms

GREEN NORMS FOR WIND POWER. Potential Impacts and the Need for Green Norms GREEN NORMS FOR WIND POWER Potential Impacts and the Need for Green Norms INDIA WORLD RE: 1% Hydro 2% Biomass 34% Oil: 8% Coal, 43% Nuclear 6% Natural Gas: 21% Hydro 2% Biomass 10% RE 1% Oil: 32% Coal

More information

RENEWABLE ENERGY POLICY OF BANGLADESH

RENEWABLE ENERGY POLICY OF BANGLADESH Final RENEWABLE ENERGY POLICY OF BANGLADESH POWER DIVISION MINISTRY OF POWER, ENERGY AND MINERAL RESOURCES GOVERNMENT OF THE PEOPLE S REPUBLIC OF BANGLADESH 6 NOVEMBER 2008 DHAKA CONTENTS 1 INTRODUCTION...

More information

Director, U.P. New and Renewable Energy Development Agency, Vibhuti Khand, Gomtinagar, Lucknow

Director, U.P. New and Renewable Energy Development Agency, Vibhuti Khand, Gomtinagar, Lucknow The previous Solar Power Policy-2013 and Solar Rooftop PV Plant Policy-2014 is hereby being presented as Draft U.P. Solar Power Policy-2017 Comments/Suggestions are invited till 15-07-2017 on draft Uttar

More information

Solar Power in India 2011

Solar Power in India 2011 Report on Solar Power in India 2011 Solar PV CSP/Solar Thermal Sector Overview Recent Developments & Trends Update on JNNSM Policy/Regulation State Initiatives Financing Technology Options Key Projects

More information

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR In the matter of: Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (First Amendment) Regulations,

More information

Regulatory Framework for Storage Microgrids

Regulatory Framework for Storage Microgrids Regulatory Framework for Storage Microgrids Presented by :- Balawant Joshi Managing Director, Idam Infrastructure Advisory Pvt. Ltd. International Conference & Exhibition on Energy Storage & Microgrids

More information

Fact Track-Power Distribution Sector in India

Fact Track-Power Distribution Sector in India June 2013 Fact Factor Report Series Copyright 2013, All rights reserved Fact Track-Power Distribution Sector in India 2 Power Distribution Sector in India- An Overview Research Base AT&C Losses Over the

More information

BHARAT FORGE LIMITED (BFL)

BHARAT FORGE LIMITED (BFL) BHARAT FORGE LIMITED (BFL) This report proposes the diversification strategy for Bharat Forge Ltd. to enter into India s solar power sector. 1 st Position Metamorphosis competition Vista Business Fest

More information

SOLAR ENERGY OPPORTUNITIES

SOLAR ENERGY OPPORTUNITIES SOLAR ENERGY OPPORTUNITIES Levine Lawrence Ecoideaz.com Green Innovations Green Products Green Services INSTALLED POWER CAPACITY IN INDIA Year-on-year data on the share of various power sources in India

More information

Public Private Partnership in Wind Power in India

Public Private Partnership in Wind Power in India Public Private Partnership in Wind Power in India Introduction India is the one of the fastest growing economies in the world. In the last five years, India has averaged a phenomenal 8.775% growth, as

More information

Significance of Grid Connected Rooftop Solar Photo Voltaic in Kolkata and other Urban Spaces of West Bengal

Significance of Grid Connected Rooftop Solar Photo Voltaic in Kolkata and other Urban Spaces of West Bengal Significance of Grid Connected Rooftop Solar Photo Voltaic in Kolkata and other Urban Spaces of West Bengal No. 4/2016 Sayantan Sengupta* The threat of climate change has been a matter of concern, globally.

More information

National Power Summit Hyderabad. 9 th February 2018

National Power Summit Hyderabad. 9 th February 2018 National Power Summit Hyderabad 9 th February 2018 Renewable Energy Capacity in India Non-RE Capacity 270GW [81%] Renewable Energy Installed Capacity RE Capacity 63 GW [19 %] (Sep, 2017) Wind 33GW [52%]

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION

CENTRAL ELECTRICITY REGULATORY COMMISSION 106 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India CENTRAL ELECTRICITY REGULATORY COMMISSION (Terms and Conditions for Tariff determination

More information

Role of Renewable Energy in Combating Climate Change by

Role of Renewable Energy in Combating Climate Change by Role of Renewable Energy in Combating Climate Change by Ramesh Kumar Jalan, Ph.D. Resource Person & Moderator Climate Change Community, Solution Exchange, United Nations Development Programme 55, Lodhi

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission UPERC draft CRE Regulations, 2019 Uttar Pradesh Electricity Regulatory Commission Notification No.: UPERC/Secretary/CRE Regulations/ 2019/ Dated: 04/04/2019 In exercise of powers conferred under section

More information

Rooftop Technology for Power Generation in India Issues and Challenges

Rooftop Technology for Power Generation in India Issues and Challenges 5/2014 Rooftop Technology for Power Generation in India Issues and Challenges India faces acute shortage of energy, with a proportion living without any access to electricity. The bulk of the responsibility

More information

Uttar Pradesh Solar Energy Policy-2017

Uttar Pradesh Solar Energy Policy-2017 Uttar Pradesh Solar Energy Policy-2017 1 Table of Contents 1. Preamble... 3 2. Title... 4 3. Objectives... 4 4. Operative Period... 5 5. Applicability of the Policy... 5 6. Regulatory Framework... 6 7.

More information

COMPENDIUM REGULATIONS & TARIFF ORDERS ISSUED BY REGULATORY COMMISSIONS FOR RENEWABLE ENERGY SOURCES IN INDIA

COMPENDIUM REGULATIONS & TARIFF ORDERS ISSUED BY REGULATORY COMMISSIONS FOR RENEWABLE ENERGY SOURCES IN INDIA COMPENDIUM OF REGULATIONS & TARIFF ORDERS ISSUED BY REGULATORY COMMISSIONS FOR RENEWABLE ENERGY SOURCES IN INDIA IREDA MINISTRY OF NEW AND RENEWABLE ENERGY INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY LTD.

More information

DECEMBER Renewable Energy

DECEMBER Renewable Energy DECEMBER 2016 Renewable Energy law EMPOWERING ASEAN One of the fastest growing energy markets in the world lies in Southeast Asia. By 2040, regional demand for energy may grow by 80% and electricity demand

More information

Gandhi Nagar 5 MW Solar Distributed/ Rooftop PPP Project

Gandhi Nagar 5 MW Solar Distributed/ Rooftop PPP Project Gandhi Nagar 5 MW Solar Distributed/ Rooftop PPP Project Sharing experience on doing an innovative Solar PPP Project Renewable Energy Workshop 1 st Feb. 2012 1 Agenda Overview of the Solar Programme in

More information

PROJECT TECHNICAL DESCRIPTION

PROJECT TECHNICAL DESCRIPTION Green Energy Corridor and Grid Strengthening Project (RRP IND 44426) PROJECT TECHNICAL DESCRIPTION A. Introduction 1. Power Grid Corporation of India Limited (POWERGRID) is India s national power transmission

More information

Regional Consultation on Climate Services for the 3 rd Pole and other High Mountain Areas

Regional Consultation on Climate Services for the 3 rd Pole and other High Mountain Areas Regional Consultation on Climate Services for the 3 rd Pole and other High Mountain Areas - Energy Sector WMO Consultative Meeting Jaipur, 9-11 March, 2016 B. Mukhopadhyay IMD Pune Scope of Climate Services

More information

Disclaimer: 2 P a g e

Disclaimer: 2 P a g e Disclaimer: This document has been supported by Shakti Sustainable Energy Foundation, and prepared by Idam Infrastructure Advisory Pvt. Ltd., (Idam Infra). The views/analysis expressed in this document

More information

In 2003, the Parliament enacted The

In 2003, the Parliament enacted The Renewable sources of energy and open access under the Electricity Act, 2003 Anuj Berry & Dushyant Manocha, amarchand & mangaldas & suresh a. shroff & co. Electricity generation from renewable energy sources

More information

M.P. Electricity Regulatory Commission

M.P. Electricity Regulatory Commission M.P. Electricity Regulatory Commission Approach paper on Fixation of norms for determination of tariff for procurement of power from Small Hydro Power Projects (SMP- 18 /2018) LEGISLATIVE PROVISIONS 1.1

More information

India Solar Market Update Q Executive Summary.

India Solar Market Update Q Executive Summary. India Solar Market Update Q3 2017 Executive Summary India Solar Demand Forecast Annual Installations (MW) India Solar Demand Forecast (MW) 12,000 Annual Rooftop Solar Installations (MW) Annual Utility-scale

More information

Address for Correspondence

Address for Correspondence Research Paper RECENT TRENDS IN WIND POWER GENERATION: INDIAN SCENARIO G.C. Biswal, S.P. Shukla Address for Correspondence Department of Electrical Engineering, BIT, Durg, CG, India ABSTRACT: In India,

More information

Presentation on Renewable Energy Sources & Storage. By Sachin Shridhar, MD, Starlit Group

Presentation on Renewable Energy Sources & Storage. By Sachin Shridhar, MD, Starlit Group Presentation on Renewable Energy Sources & Storage By Sachin Shridhar, MD, Starlit Group PRESENTATION FLOW Review of Renewable Energy proposals around the world: Where are the most exciting markets? What

More information

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Comprehensive Tariff Order for Biomass based Power Plants

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Comprehensive Tariff Order for Biomass based Power Plants TAMIL NADU ELECTRICITY REGULATORY COMMISSION ---------------------------------------------- Comprehensive Tariff Order for Biomass based Power Plants --------------------------------------- Order No.3

More information

Renewable Energy Tariffs, RPO and REC Mechanism

Renewable Energy Tariffs, RPO and REC Mechanism Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 4 th Forum of Regulators Capacity Building Programme for Officers of Electricity Regulatory Commissions 18 23 July,

More information

Solar Power Policy Uttar Pradesh 2013

Solar Power Policy Uttar Pradesh 2013 Solar Power Policy Uttar Pradesh 2013 1 Table of Contents 1 PREAMBLE 3 2 OBJECTIVES 3 3 OPERATIVE PERIOD 3 4 GRID CONNECTED SOLAR POWER 4 4.1 PROJECT SIZE... 4 4.2 SALE OF ENERGY... 4 4.3 SALE OF ENERGY

More information

Overview of Indian Power Sector & Opportunities for for promoting Social Inclusion in Indian power sector

Overview of Indian Power Sector & Opportunities for for promoting Social Inclusion in Indian power sector Overview of Indian Power Sector & Opportunities for for promoting Social Inclusion in Indian power sector Dr. Pradeep Perera Head Energy ( India) Principal Energy Specialist Asian Development Bank Generation

More information

SECTOR ASSESSMENT (SUMMARY): RAJASTHAN POWER SECTOR. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): RAJASTHAN POWER SECTOR. 1. Sector Performance, Problems, and Opportunities Rajasthan Renewable Energy Transmission Investment Program (RRP IND 45224) Sector Road Map SECTOR ASSESSMENT (SUMMARY): RAJASTHAN POWER SECTOR 1. Sector Performance, Problems, and Opportunities 1. The

More information

Executive Engineer (Electrical) Damodar Valley Corporation (DVC), West Bengal, India India DOI: /ijarcsse/SV7I5/0112

Executive Engineer (Electrical) Damodar Valley Corporation (DVC), West Bengal, India India DOI: /ijarcsse/SV7I5/0112 Volume 7, Issue 5, May 2017 ISSN: 2277 128X International Journal of Advanced Research in Computer Science and Software Engineering Research Paper Available online at: www.ijarcsse.com Techno Economic

More information

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India 391 RAJASTHAN ELECTRICITY REGULATORY COMMISSION (Terms and Conditions for Determination of Tariff for Renewable Energy Sources Biomass, Biogas and Biomass Gasifier Energy) Regulations- 2015 Notification

More information

Accelerating Adoption of Rooftop Solar PV in India Through Project Aggregation and Financing

Accelerating Adoption of Rooftop Solar PV in India Through Project Aggregation and Financing www.mynergy.in Accelerating Adoption of Rooftop Solar PV in India Through Project Aggregation and Financing Bhaskar Deol Chief Executive Officer, Mynergy Renewables India June 9, 2016, Asia Clean Energy

More information

Impact of Renewable Energy Certificate (REC) Mechanism in India

Impact of Renewable Energy Certificate (REC) Mechanism in India Impact of Renewable Energy Certificate (REC) Mechanism in India Authors: S. K. Soonee, K. V. S. Baba, U. K. Verma, Minaxi Garg, Shailendra Kr. Verma and K. C. Saini Power System Operation Corporation Ltd.

More information

Evolution of RPO and REC Mechanisms : Indian Experience

Evolution of RPO and REC Mechanisms : Indian Experience Session-5, Day 2 Evolution of RPO and REC Mechanisms : Indian Experience SAARC Knowledge Sharing Workshop on Modern Techniques including Renewable Energy Auctions for Economizing Renewable Energy Tariff

More information

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs)

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) Policy Resolution for Promotion of Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) POLICY OBJECTIVES 1. The Petroleum, Chemicals and Petrochemical industry in India is well established

More information

ESCOs to drive energy efficiency in India

ESCOs to drive energy efficiency in India ESCOs to drive energy efficiency in India Ratings June 20, 2016 Summary An Energy Service Company (ESCO) is a company that provides energy-efficiency related services. ESCO enters into a performance contract

More information

Comm/CP/NCE/Tariff/28362 Date: COMMERCIAL CIRCULAR No. 228

Comm/CP/NCE/Tariff/28362 Date: COMMERCIAL CIRCULAR No. 228 (A Govt. of Maharashtra Undertaking) CIN: U40109MH2005SGC153645 Maharashtra State Electricity Distribution Co. Ltd. Office of the Chief Engineer (Commercial) Prakashgad, 5th Floor, Station Road, Bandra

More information

Content Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems

Content Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems A COUNTRY REPORT OF NEPAL Presented by: Pralhad Prasad Sapkota Under Scretary Government of Nepal,Ministry of Energy, Kathmandu, Nepal Content Introduction Institutional Arrangement Energy Policy Documents

More information

Exploratory Trends in Renewable Energy in India

Exploratory Trends in Renewable Energy in India Exploratory Trends in Renewable Energy in India Dr. (Mrs.) Asha Sharma Post Doctoral Fellow, UGC, Project work at Department of Commerce, Mahila P.G. Mahavidhalaya Jai Narain Vyas University, Jodhpur,

More information

Ministry of New and Renewable Energy UNDP/GEF Global Solar Water Heating Project **** Background Paper on Status of Solar Water Heating in India ****

Ministry of New and Renewable Energy UNDP/GEF Global Solar Water Heating Project **** Background Paper on Status of Solar Water Heating in India **** Ministry of New and Renewable Energy UNDP/GEF Global Solar Water Heating Project **** Background Paper on Status of Solar Water Heating in India **** The gross potential for solar water heating systems

More information

India s Grid Transmission Infrastructure Needs Further Modernisation, Urgently

India s Grid Transmission Infrastructure Needs Further Modernisation, Urgently India s Grid Transmission Infrastructure Needs Further Modernisation, Urgently Growth in Renewable Energy Investment Slowing Due to Grid Limitations By Tim Buckley and Kashish Shah January 22, 2019 (IEEFA

More information

Streamlining and simplification of the administrative procedures for renewable energy projects

Streamlining and simplification of the administrative procedures for renewable energy projects Renewable Energy Coordination Group 2 nd Meeting, Vienna 10-11 November 2016 Streamlining and simplification of the administrative procedures for renewable energy projects Biljana Trivanović Ministry of

More information

Discussion Paper. Development of Renewable Energy Framework for Maharashtra For New Control Period (FY to FY )

Discussion Paper. Development of Renewable Energy Framework for Maharashtra For New Control Period (FY to FY ) Discussion Paper On Development of Renewable Energy Framework for Maharashtra For New Control Period (FY 2010-11 to FY 2015-16) Maharashtra Electricity Regulatory Commission March 2010 Table of Contents

More information

1 POLICY STATEMENT ON ENVIRONMENTAL CLEARANCE

1 POLICY STATEMENT ON ENVIRONMENTAL CLEARANCE 1 POLICY STATEMENT ON ENVIRONMENTAL CLEARANCE The Indian experience with Environmental Impact Assessment is just over 20 years old. Till 1994, Environmental Clearance from the central government was an

More information

ADB Support for Solar Power In India

ADB Support for Solar Power In India ADB Support for Solar Power In India Don Purka, Sr. Investment Specialist Private Sector Operations Department Clean Energy Expo Asia Singapore, November 2010 ADB Windows of Operations 1. Sovereign operations

More information

Ministry s Strategic Plan for Growth of Renewable Energy in India

Ministry s Strategic Plan for Growth of Renewable Energy in India Ministry s Strategic Plan for Growth of Renewable Energy in India Bharat Vasandani and Blessymol Thomas, Energetica India Energetica India studies Ministry of New and Renewable Energy s Strategic Plan

More information