Project Application. General Information ODOT PID. Primary County (3 char abrv) HAM/CLE HAM/CLE HAM ODOT. District. Project Manager (Contact Person)

Size: px
Start display at page:

Download "Project Application. General Information ODOT PID. Primary County (3 char abrv) HAM/CLE HAM/CLE HAM ODOT. District. Project Manager (Contact Person)"

Transcription

1 Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Tier 2 Tier 2 Project Application General Information ODOT PID Project Sponsoring Agency ODOT Project Manager (Contact Person) ODOT District 8 Primary County (3 char abrv) HAM/CLE HAM/CLE HAM Phone Number Andy Fluegemann Address andy.fluegemann@dot.state.oh.us Local Jurisdictions (i.e. list all cities, counties and townships) Project Description Facility Name (i.e. route, rail, terminal, or port name) SR 32F 2.50/0.00 Oasis Rail Corridor SR 32F 0.00 Hamilton County, City of Cincinnati, Village of Newtown, Village of Fairfax, Village of Mariemont, Anderson Township, Clermont County and Miami Township Description of Work

2 These PID# s have been split from the original PID# PID# was the Eastern Corridor in which a Tier 1 Final Environmental Impact Statement (FEIS) was completed and a Record of Decision (ROD) was obtained. The PID# s listed on this application have independent utility and thus are being forwarded through Tier II NEPA and Project Development. PID# : Perform Environmental analyses and Preliminary Engineering for the following: Consolidate and manage access points to establish relocated SR 32 a controlled access arterial roadway west of IR 275, including coordination for accommodation of multimodal components; Oasis rail corridor, bikeway corridor, a new interchange at US 50/Red Bank/SR 32 in Fairfax, a multi-modal clear span crossing of the Little Miami River and associated multi modal transit hubs (at US 50 and at Newtown Road). PID# : Perform Environmental analyses and Preliminary Engineering for the following rail segments: Oasis Segment 1-Riverfront Transit Center to Boathouse: Provide rail on a combination of new alignment and existing track along with rail stations for connections at riverfront locations. (1 mile) Oasis Segment 2-Boathouse to US 50 in the Village of Fairfax: Provide rail on existing rail R/W controlled by SORTA, Upgrade structures as necessary, establish rail stations for possible neighborhood connections and connections at Lunken Airport and Linwood area. (7 miles) Oasis Segment 3-Village of Fairfax to Village of Newtown: Establish a new rail corridor along shared new highway to coincide with Highway Segment II/III, establish 2 multimodal transit hubs at US 50 and Newtown Road. (4 miles) Oasis Segment 4-North of the Village of Newtown to City of Milford: Provide rail on or along existing rail corridor, establish a station at Ancor Industrial Complex and multi modal station at the City of Milford. (5 miles) PID# : Perform Environmental analyses and Preliminary Engineering for the following: Consolidate and manage access points along existing Red Bank Road and Red Bank Expressway to establish a controlled access arterial roadway, including coordination for accommodation of multi-modal components and tie in with a new interchange at US 50. Purpose and Need

3 Key transportation needs identified for the Eastern Corridor include: 1) existing transportation network deficiencies affecting capacity, safety, and accessibility, 2) limited available modal options, 3) inadequate regional linkage and mobility, and 4) anticipated continued inadequacies in the existing transportation network due to future economic and population growth. These corridor-level needs apply to all areas of the Eastern Corridor, including Segment II/III. The purpose of the Eastern Corridor project, as documented in the Tier 1 ROD, is to implement a multimodal transportation improvement program that increases capacity, reduces congestion and delay, improves safety, provides modal options, and connects the region s key transportation corridors and social and economic centers through the efficient movement of people, goods and services. The specific goal for Segment II/III, in support of the overall purpose and need for the Eastern Corridor, is to establish relocated SR 32 as a controlled-access arterial roadway west of I-275 with parallel rail transit that provides a new transportation alternative to driving. In the Segment II/III study area, SR 32 is primarily a commercial/industrial and residential corridor that experiences high volumes of commuter, freight, and residential traffic. The need for transportation improvements results from insufficient levels-of-service and high crash rates that are currently being experienced along existing SR 32 and are expected to worsen by 2030 (the project design year). As reported in the Tier 1 EIS Purpose and Need, traffic volumes on SR 32 in the Segment II/III study area are projected to increase by 21 to 37 percent by 2030, and levels-of-service (2020 No-Build) on the majority of SR 32 in the Segment II/III study area is projected at E or F, which indicates heavy congestion and delays. Additionally, the Tier 1 EIS reported that all of SR 32 in the Segment II/III study area has an annual accident rate that exceeds the statewide average. Associated with the existing transportation infrastructure, highway capacity and congestion problems occurring in the Eastern Corridor is the limited availability of alternative transportation options, including bus and rail transit. At this time, a large part of the Eastern Corridor study areais not served by bus and no rail transit exists. No rail transit is currently available in the Eastern Corridor study area or general project vicinity. The I-71 corridor study, which is also underway in the OKI region just west of the Eastern Corridor, is planned for light rail and currently in the preliminary engineering/environmental impact assessment phase. Implementation of rail transit in the Eastern Corridor provides opportunity to effectively interface with this proposed I-71 light rail transit route. In addition, the implementation of rail transit in the Eastern Corridor provides opportunity to interface with the Banks/Riverfront intermodal parking project - located along the riverfront in downtown Cincinnati - which has recently been awarded construction funding by the State of Ohio Transportation Review Advisory Council. Rail transit in the Eastern Corridor would provide an alternative to the automobile for job commutes and other types of trips. It would also offer a means by which corridor residents are more connected to the Cincinnati Business District and central area businesses, health care, education, arts, cultural, sports and entertainment opportunities. Additionally, in that a rail transit line could potentially involve the extensive use of existing right-of-way corridors, impact on the natural and man-made environment would be reduced and the land use/transportation relationship could be maximized. Community & Economic Growth and Development Factors Land Use Plan Exists Adopting Appropriate Land Use Measures Land Use Plan Zoning based on Coord. with T-Plan T-Plan Part of State/MPO Long Range Plan (Yes, No or N/A) (Yes, No or N/A) (Yes, No or N/A) (Yes, No or N/A) Yes Yes Yes Yes

4 Priority on County or MPO Long Range Plan PID# is in the OKI 2030 Regional Transportation Plan as Plan ID# 669. PID# PID# is in the OKI 2030 Regional Transportation Plan as Plan ID# 655. Percent of Land Being Redeveloped Improves Business Access Improves Invest & Employ * Sub-county 5 Yr Unemployment Rate * Sub-county 5 Yr Poverty Rate (%) (Yes or No) (Yes or No) (%) (%) 100 Yes * Optional. If omitted, the 5 year rates for the primary county will be obtained from the US Bureau of Labor Statistics ( and US Census Bureau (

5 Transportation Factors Reduces Fuel Consumption Reduces Ozone Precursors Connects Transportation Modes (Yes or No) (Yes or No) (Yes or No) Yes If project connects transportation modes, please explain how The Tier 1 ROD identified four implementation segments for new highway capacity and new rail transit in the Eastern Corridor. Segment II/III, which involves a shared highway/rail transit corridor, begins at the existing US 50/Red Bank Road interchange, which is also the convergence point for the existing Oasis, Wasson, and NS rail freight lines. At this location, the Tier 1 work established that a new US 50/Red Bank Road interchange and multi-modal transit station would be developed. ODOT NLFID Existing Road Facilities (If applicable) Begin End Location Termini Log Point Log Point Primary Road (or Cnty/Rte #) (x.xx) (x.xx) (i.e. from street 1 to street 2) (Yes or No) PID SHAMSR00032**FC SCLESR00032**FC Red Bank Rd. to HAM/CLE CL HAM/CLE CL to Bells Lane Yes PID US 50 to existing Red Bank CHAMCR00067**C Road/ IR 71 Interchange (Insert additional rows as needed one row for each existing roadway to be improved) Yes Name or Designation Beg Lat New Road Facilities (If applicable) Beg End End Location Termini Lon Lat Lon Primary Road (xx.xxxx) (xx.xxxx) (xx.xxxx) (xx.xxxx) (i.e. from street 1 to street 2) (Yes or No) (Insert additional rows as needed one row for each new roadway to be constructed) Element Name Oasis Rail Corridor Transit Facilities (If applicable) Peak Hour Ridership VMT Reduction Benefit/ Cost Ratio (Riders) (%) (x.xxx) TBD through this work (Insert additional rows as needed one row for each transit facility element) Freight Facilities (If applicable) Element Name Oasis Rail Corridor Freight Volume / Facility Capacity Ratio Truck Reduction Benefit/ Cost Ratio (x.xxx) (%) (x.xxx) TBD through this work

6 Wasson Rail Corridor Cincinnati Terminal Corridor TBD through this work TBD through this work (Insert additional rows as needed one row for each freight facility element)

7 Project Phase Project Development Completed By (Agency Name) Actual / Projected Completion Date (MM/DD/YYYY) Planning Study OKI/URS/Balke 4/2000 Interchange Modification Study (275/32 PID 76289) ODOT/Entran 7/15/09 ODOT/Entran (Tier 1 ROD) 6/2/06 Environmental (NEPA) Doc. Detailed Design Right of Way / Utilities PID ODOT/TBD PID ODOT/Entran PID ODOT/TBD PID ODOT/TBD PID ODOT/Entran PID ODOT/TBD PID ODOT/TBD PID ODOT/Entran PID ODOT/TBD 6/3/11 1/13/12 1/30/12 2/26/12 11/16/12 11/26/12 4/3/14 12/4/14 12/4/14 Sources of Other (Non-) Funding (If applicable) Project Phase Source Amount (PS, NEPA, DD, RW, CO) (Agency name) (In Millions) PS/NEPA HCTID/Local Funding Partners Tier 1 Expenditures $3.30 NEPA ODOT Tier 1 Expenditures $1.73 NEPA HCTID/Local Funding Partners Advanced Tier 2 Expenditures $3.09 NEPA HCTID/Local Funding Partners Tier 2 Expenditures PID $.54 NEPA HCTID/Local Funding Partners Tier 2 Expenditures PID $.71 Additional Explanation of Other Funding Funding was used on a corridor approach under PID s 2970 and for the entire Eastern Corridor. This shown amount will be listed under PID below. (Insert additional rows above Additional Explanation of Other Funding as needed one row for each combination of project phase and source) Note: Totals of Other funding entered above MUST MATCH totals in project funding table below by project phase. Project Sponsor Investment Factors Creation of TIF or Other Innovative Financing Tool Percentage of Sponsoring Agency Investment (Yes or No) (%)

8 Project Phase Planning Study (PS) Environmental Doc. (NEPA) Planning Study (PS) Environmental Doc. (NEPA) Detailed Design (DD) Right of Way /Utilities (RW) Construction (CO) Project Phase Planning Study (PS) Environmental Doc. (NEPA) Detailed Design (DD) Right of Way /Utilities (RW) Construction (CO) Fiscal Year Project Funding PID Other Funding Previous New Total (YYYY) (In Millions) (In Millions) (In Millions) (In Millions) Included in 2012 NEPA Total Fiscal Year Project Funding PID Other Funding Previous New Total (YYYY) (In Millions) (In Millions) (In Millions) (In Millions) Total Project Phase Fiscal Year Project Funding PID Other Funding Previous New Total (YYYY) (In Millions) (In Millions) (In Millions) (In Millions) Planning Study (PS) Environmental Doc. (NEPA) Detailed Design (DD) 2013 Right of Way 2014

9 /Utilities (RW) Construction (CO) 2014 Total 4.40

10 Applicant Information Remarks/Comments The Eastern Corridor project is following a tiered approach to comply with the requirements of the National Environmental Policy Act (NEPA) and related statutes. Tier 1, completed in 2006, assessed transportation needs in the Eastern Corridor and identified preliminary multi-modal alternatives to be further evaluated in Tier 2. Preliminary alternatives developed in Tier 1 were based on a multi-modal framework established by the Eastern Corridor Major Investment Study completed in 2000, as well as community and environmental protection issues identified in the Land Use Vision Plan (2002) and the Green Infrastructure Master Plan (2005). The Tier 1 ROD identified four implementation segments for new highway capacity and new rail transit in the Eastern Corridor. Segment II/III (PID 86462), which involves a shared highway/rail transit corridor, begins at the existing US 50/Red Bank Road interchange, which is also the convergence point for the existing Oasis, Wasson, and NS rail freight lines. At this location, the Tier 1 work established that a new US 50/Red Bank Road interchange and multi-modal transit station would be developed. From the proposed US 50/Red Bank Road interchange, new highway capacity Segment I (PID 86461) begins and extends north following the existing Red Bank Road corridor to I-71. New highway capacity Segment II/III (relocated SR 32) also begins at the proposed new US 50/Red Bank Road interchange (at the southern terminus of Segment I) and extends east across the Little Miami River to Newtown Road (Church Street), which is the proposed location of a second multi-modal transit station. New highway capacity Segment II/ III then extends east through the industrial Ancor area (east of Newtown), and follows the existing SR 32 corridor to approximately Bells Lane/Mount Carmel-Tobasco Road in the Eastgate area of Clermont County. Segment II/III also includes the establishment of a parallel rail transit corridor along relocated SR 32, consisting of Oasis rail transit (PID 86463) from US 50 to Ancor (where the Oasis line then diverges north along the existing NS corridor to Milford), as well as preservation of the future Wasson rail transit corridor to Eastgate. The east terminus of new highway capacity Segment II/III at Bells Lane/Mount Carmel-Tobasco Road represents the approximate west terminus of new highway capacity Segment IV. The Segment IV project involves improvement of the SR 32/I-275 interchange and the adjacent SR 32 corridor from Bells Lane/Mount Carmel-Tobasco Road to just east of Glen Este-Withamsville Road (PID 82370). With the issuance of the Tier 1 ROD, the Eastern Corridor is proceeding with a number of individual Tier 2 transportation projects, each with independent utility and appropriate NEPA documentation.

11 Name Title Phone Number Andrew J. Fluegemann Signature Acting Planning Administrator Date MPO Acknowledgement (If applicable) Name MPO Phone Number Signature Date ODOT District Acknowledgement Name District Phone Number Hans R. Jindal, P.E. District 8 Deputy Director Signature Date Rev

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv) Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District Primary County (3 char abrv) Facility Name (i.e. route, rail, terminal,

More information

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv) 1 Project Application Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) General Information ODOT PID ODOT District Primary County (3 char abrv) New Tier 2 N/A 8 HAM Project Sponsoring

More information

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District Primary County (3 char abrv) Facility Name (i.e. route, rail, terminal,

More information

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District Primary County (3 char abrv) Facility Name (i.e. route, rail, terminal,

More information

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv) Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID Southeast Ohio Plan Project Sponsoring Agency ODOT District 9 Project Manager

More information

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District Primary County (3 char abrv) Facility Name (i.e. route, rail, terminal,

More information

Project Application Guidelines. For the. Major New Capacity Program

Project Application Guidelines. For the. Major New Capacity Program Transportation Review Advisory Council Project Application Guidelines For the Major New Capacity Program June 2017 Frequently Asked Questions and Answers 1. What is the Transportation Review Advisory Council

More information

Presentation Six February 2012

Presentation Six February 2012 Presentation Six February 2012 Today s Presentation: Revenue Recap Project Prioritization Process DRAFT 2040 Project List Revenue Estimation Based on data provided by each state Includes transit formula

More information

INDIANA S INTERMODAL MANAGEMENT SYSTEM Stephen C. Smith Planning Manager, Transportation Planning Division Indiana Department of Transportation

INDIANA S INTERMODAL MANAGEMENT SYSTEM Stephen C. Smith Planning Manager, Transportation Planning Division Indiana Department of Transportation 96 INDIANA S INTERMODAL MANAGEMENT SYSTEM Stephen C. Smith Planning Manager, Transportation Planning Division Indiana Department of Transportation Indiana is in the process of developing an Intermodal

More information

12 Evaluation of Alternatives

12 Evaluation of Alternatives 12 Evaluation of Alternatives This chapter evaluates the effectiveness of the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project based on the information

More information

3.0 REVIEW OF PREVIOUS STUDIES

3.0 REVIEW OF PREVIOUS STUDIES 3.0 REVIEW OF PREVIOUS STUDIES This section of the highlights the significant features from previous plans and studies that could impact the development of the I-20 East Transit Initiative. Much of the

More information

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.1 MODEL RUN SUMMARY NOTEBOOK The Model Run Summary Notebook (under separate cover) provides documentation of the multiple

More information

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014 2040 Transportation Policy Plan Conversion to Performance Based Planning Basis 25 th Annual CTS Transportation Research Conference May 21, 2014 1 About the plan Long-range transportation plan for the Twin

More information

AIR QUALITY TECHNICAL MEMORANDUM

AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM GOLDEN GLADES INTERCHANGE PD&E STUDY Miami-Dade County, Florida Financial Management Number: 428358-1-22-01 Efficient Transportation Decision

More information

Chapter 2 Transportation Element Goals, Objectives and Policies

Chapter 2 Transportation Element Goals, Objectives and Policies Chapter 2 Transportation Element Goals, Objectives and Policies City of Belleview Comprehensive Plan Adopted by Ord 2016-10 on July 5, 2016 GOALS, OBJECTIVES AND POLICIES Goal 2 Transportation...1 Objective

More information

Chapter 6 Freight Plan

Chapter 6 Freight Plan Chapter 6 Freight Plan Overview This chapter presents a review and assessment of needs, deficiencies, policies and improvement options affecting the freight transportation system within the Medford Urban

More information

Mobility and System Reliability Goal

Mobility and System Reliability Goal Mobility and System Reliability Goal Provide surface transportation infrastructure and services that will advance the efficient and reliable movement of people and goods throughout the state. Background:

More information

ACTIVE TRANSPORTATION ADVISORY COMMITTEE. Memphis MPO March 30, 2015

ACTIVE TRANSPORTATION ADVISORY COMMITTEE. Memphis MPO March 30, 2015 ACTIVE TRANSPORTATION ADVISORY COMMITTEE Memphis MPO March 30, 2015 Agenda Welcome & Introductions Announcements and Briefings Livability 2040: Regional Transportation Plan Congestion Management Process

More information

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

SOUTHWEST LRT (METRO GREEN LINE EXTENSION) 8 Evaluation of Alternatives This chapter evaluates the effectiveness of the No Build Alternative and the Southwest Light Rail Transit (LRT) Project (the Project) based on the information contained in

More information

Chapter 4: Transportation and Land Use

Chapter 4: Transportation and Land Use Chapter 4: Transportation and Land Use Transportation and land use together make possible the wide range of destination opportunities in the region. Transportation provides the connections, and, in turn,

More information

Chapter 10. Intelligent Transportation Systems. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan

Chapter 10. Intelligent Transportation Systems. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan Chapter 10 Intelligent Transportation Systems Ohio Kentucky Indiana Regional Council of Governments 2030 Regional Transportation Plan Chapter 10 Intelligent Transportation Systems INTRODUCTION Intelligent

More information

Chapter 3 - Goals, Objectives, & Strategies

Chapter 3 - Goals, Objectives, & Strategies Chapter 3 - This chapter presents goals, objectives, and strategies that have been developed as part of the Richmond Area MPO 2026 Long-Range Transportation Plan (LRTP) update. Strategies have been developed

More information

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS). This document is scheduled to be published in the Federal Register on 11/18/2015 and available online at http://federalregister.gov/a/2015-29418, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Transit

More information

P4.0 Highway Quantitative Scoring Workgroup Recommendations

P4.0 Highway Quantitative Scoring Workgroup Recommendations P4.0 Highway Quantitative Scoring Workgroup Recommendations May 18, 2015 Highway Project Scoring Overview Insert Table of Eligibility Statewide Mobility Regional Impact Division Needs Eligible Projects:

More information

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment Western Mountain Corridor (L)

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment Western Mountain Corridor (L) VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment Western Mountain Corridor (L) 77 Table of Contents I. Corridor Overview Land Use and Demographics Corridor

More information

Contents i Contents Page 1 A New Transportation Plan Community Involvement Goals and Objectives... 11

Contents i Contents Page 1 A New Transportation Plan Community Involvement Goals and Objectives... 11 Contents i Contents 1 A New Transportation Plan... 1 Why develop a new plan?... 1 What area does the LRTP focus on?... 2 Why is this LRTP important?... 3 Meeting Requirements for Transportation Planning...

More information

ARC Freight Advisory Task Force Meeting. SOUTH FULTON COMMUNITY IMPROVEMENT DISTRICT Multi-Modal Study

ARC Freight Advisory Task Force Meeting. SOUTH FULTON COMMUNITY IMPROVEMENT DISTRICT Multi-Modal Study ARC Freight Advisory Task Force Meeting SOUTH FULTON COMMUNITY IMPROVEMENT DISTRICT Multi-Modal Study March 1, 2018 Outline Study Overview Scope of Work Key Investment Needs Draft Investment Recommendations

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL No. 2014-17 DATE: February, 2014 TO: FROM: PREPARED BY: SUBJECT: REQUESTED ACTION: T Bob Paddock Roadway

More information

OKI Board of Directors. Presentation Ten June 2012

OKI Board of Directors. Presentation Ten June 2012 OKI Board of Directors Presentation Ten June 2012 Today s Presentation: Public Comment Changes to the Draft Plan Summary Plan Adoption TIMELINE 2011 May Sept 2012 Jan Feb Mar Apr May June OKI staff initiate

More information

Winston-Salem Urban Area Metropolitan Planning Organization (WSUAMPO) Prioritization 3.0 Evaluation Criteria and Point Assignment Process

Winston-Salem Urban Area Metropolitan Planning Organization (WSUAMPO) Prioritization 3.0 Evaluation Criteria and Point Assignment Process The following methodology has been developed by the Winston-Salem Urban Area Metropolitan Planning Organization (WSUAMPO) for the purpose of determining priorities for transportation funding, as carried

More information

4: Transportation and Land Use

4: Transportation and Land Use Chapter Figure 4-1: Recent development has brought more housing and mixed use Downtown Minneapolis - looking north from E 15th Street at the Grant Street / 11th Street exit 4: Transportation and Land Use

More information

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\ 1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\ Executive Summary 3UHSDUHGýIRUã 3UHSDUHGýE\ã.DQVDVý'HSDUWPHQWýRI 7UDQVSRUWDWLRQ,QýDVVRFLDWLRQýZLWKã (DUWKý7HFKý,QFï EXECUTIVE SUMMARY Introduction This Northwest

More information

Northern Virginia Region Draft Needs Summary

Northern Virginia Region Draft Needs Summary Needs Map: Need A A DEMAND The ability of communities around transit stations (particularly the areas within 1-2 miles of the stations and other travel hubs) to attract skilled workers and grow businesses

More information

CHAPTER 2. VISION, GOALS AND MTP FRAMEWORK

CHAPTER 2. VISION, GOALS AND MTP FRAMEWORK CHAPTER 2. VISION, GOALS AND MTP FRAMEWORK MTP VISION In order to create a framework for the 2040 Metropolitan Transportation Plan (MTP), a vision statement was drafted by the Vision/Goals Committee and

More information

MPO/RPO Briefings. MPO/RPO Briefing. Briefing Topics Plan framework o NCDOT Policy to Projects process o Relationship to local/regional plans

MPO/RPO Briefings. MPO/RPO Briefing. Briefing Topics Plan framework o NCDOT Policy to Projects process o Relationship to local/regional plans 7/7/2011 MPO/RPO Briefings July 2011 MPO/RPO Briefing Briefing Topics 1. 2040 Plan framework o NCDOT Policy to Projects process o Relationship to local/regional plans 2. Study process o Schedule o Public

More information

FLORIDA DEPARTMENT OF TRANSPORTATION PROCEDURE DEVELOPMENT OF THE

FLORIDA DEPARTMENT OF TRANSPORTATION PROCEDURE DEVELOPMENT OF THE FLORIDA DEPARTMENT OF TRANSPORTATION PROCEDURE DEVELOPMENT OF THE FLORIDA INTRASTATE HIGHWAY SYSTEM Topic No.: 525-030-250-f Office: Systems Planning Effective Date: May 16, 2002 DEVELOPMENT OF THE FLORIDA

More information

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012 2030 Transportation Policy Plan SUMMARY PRESENTATION Land Use Advisory Committee November 15, 2012 Today s Topics Transportation Policy Plan (TPP) Requirements and Background Current TPP Policies, Issues

More information

Summary of transportation-related goals and objectives from existing regional plans

Summary of transportation-related goals and objectives from existing regional plans SMTC 2050 Long Range Transportation Plan Appendix A: Summary of transportation-related goals and objectives from existing regional plans SMTC 2050 Long Range Transportation Plan Summary of transportation-related

More information

Carolina Connector Intermodal Terminal (CCX)

Carolina Connector Intermodal Terminal (CCX) Joint Legislative Oversight Committee January 6, 2017 Carolina Connector Intermodal Terminal (CCX) Paul C. Worley, CPM, Rail Division Director CCX is a three legged stool: State, Community and Railroad

More information

1 I N T R O D U C T I O N

1 I N T R O D U C T I O N THE 2040 OKI REGIONAL TRANSPORTATION PLAN This is the metropolitan transportation plan for the Ohio-Kentucky-Indiana Regional Council of Governments (OKI). OKI is the federally designated regional transportation

More information

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009 POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report ADOPTED June 18, 2009 TABLE OF CONTENTS CHAPTER 1 Introduction and Prior Planning Effort...Page 1-1 CHAPTER 2 Population and Employment

More information

EXECUTIVE SUMMARY. The IP developed the following purpose and need statement for the Part B I-71 Access Improvement Study.

EXECUTIVE SUMMARY. The IP developed the following purpose and need statement for the Part B I-71 Access Improvement Study. EXECUTIVE SUMMARY The Ohio-Kentucky-Indiana Regional Council of Governments (OKI) has conducted the with the following purpose: Develop a comprehensive transportation plan for the Uptown area that serves

More information

Winston-Salem Urban Area Metropolitan Planning Organization (WSMPO) Prioritization 4.0 Evaluation Criteria and Point Assignment Process

Winston-Salem Urban Area Metropolitan Planning Organization (WSMPO) Prioritization 4.0 Evaluation Criteria and Point Assignment Process The following methodology was developed by the Winston-Salem Urban Area Metropolitan Planning Organization (WSMPO) for the purpose of determining priorities for transportation funding, as carried out through

More information

Final Land Use and Development Opportunities Report 5.0 Environmental Impact/Environmental Consequences

Final Land Use and Development Opportunities Report 5.0 Environmental Impact/Environmental Consequences Figure 5-6. Century City 1/4-Mile Station Area August 16, 2010 Page 5-14 Figure 5-7. Wilshire/Westwood 1/4-Mile Station Area August 16, 2010 Page 5-15 Alternative 1 would be constructed underneath existing

More information

Preparation of this Tier 1 DEIS is in accord with the National Environmental Policy Act (NEPA), as amended and implemented by:

Preparation of this Tier 1 DEIS is in accord with the National Environmental Policy Act (NEPA), as amended and implemented by: 1.0 PURPOSE AND NEED 1.1 Introduction The Federal Transit Administration (FTA), an administration of the U.S. Department of Transportation (USDOT), has prepared this Tier 1 Draft Environmental Impact Statement

More information

2. Goals and Objectives

2. Goals and Objectives Pedestrians in Charlotte s busy Uptown. CRTPO Mission The mission of the Charlotte Regional Transportation Planning Organization (CRTPO) is to plan for transportation options that ensure mobility, respect

More information

PROPOSED AMENDMENT OF THE I 76 INTEGRATED CORRIDOR MANAGEMENT PROJECT TO THE CONNECTIONS 2040 PLAN FOR GREATER PHILADELPHIA

PROPOSED AMENDMENT OF THE I 76 INTEGRATED CORRIDOR MANAGEMENT PROJECT TO THE CONNECTIONS 2040 PLAN FOR GREATER PHILADELPHIA PROPOSED AMENDMENT OF THE I 76 INTEGRATED CORRIDOR MANAGEMENT PROJECT TO THE CONNECTIONS 2040 PLAN FOR GREATER PHILADELPHIA Background and Project Description In July 2013, the Delaware Valley Regional

More information

Transportation Advisory Board May 21, 2014

Transportation Advisory Board May 21, 2014 Transportation Advisory Board May 21, 2014 1 2040 TPP Schedule April 2013 to May 2014: Policymaker Task Force, Partner Agency Work Group and other stakeholder discussions on preparation of draft 2040 TPP

More information

Appendix O Congestion Management Program REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY

Appendix O Congestion Management Program REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY Appendix O Congestion Management Program REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY 2014 REGIONAL CONGESTION MANAGEMENT PROGRAM 2014 RTP/SCS APPENDIX O SAN JOAQUIN COUNCIL OF GOVERNMENTS

More information

GUIDING PRINCIPLES MEMORANDUM

GUIDING PRINCIPLES MEMORANDUM M E T R O P O L I TAN TRA NS P O RTATI O N PLAN GUIDING PRINCIPLES MEMORANDUM El Paso Metropolitan Planning Organization INTRODUCTION The guiding principles for development of the El Paso MPO s Destino

More information

Bow Concord I-93 Improvements City of Concord Transportation Policy Advisory Committee

Bow Concord I-93 Improvements City of Concord Transportation Policy Advisory Committee Bow Concord I-93 Improvements City of Concord Transportation Policy Advisory Committee December 15, 2016 Agenda Project History / Project Development Process Traffic Modeling Alternatives Development o

More information

CHAPTER 8: I-71 ACCESS IMPROVEMNETS

CHAPTER 8: I-71 ACCESS IMPROVEMNETS CHAPTER 8: I-71 ACCESS IMPROVEMNETS I-71 Access Improvements were a separate and distinct part of the overall Uptown Transportation Study. This Part B work is fully documented in the Planning Study Report

More information

VDOT and DRPT MPO and PDC Winter Meeting Amy Inman Planning & Mobility Programs Administrator Virginia Department of Rail and Public Transportation

VDOT and DRPT MPO and PDC Winter Meeting Amy Inman Planning & Mobility Programs Administrator Virginia Department of Rail and Public Transportation VDOT and DRPT MPO and PDC Winter Meeting Amy Inman Planning & Mobility Programs Administrator Virginia Department of Rail and Public Transportation www.drpt.virginia.gov 1 DRPT Customers 54 Transit Systems

More information

Vanasse Hangen Brustlin, Inc. DRAFT. Appendices. MIS Appendices

Vanasse Hangen Brustlin, Inc. DRAFT. Appendices. MIS Appendices DRFT ppendices MIS 8-05 - ppendices ppendices ugust 005 [THIS PGE INTENTIONLLY LEFT BLNK] DRFT ppendix Tier Detailed Evaluation Tables MIS 8-05 - ppendix ppendix ugust 005 [THIS PGE INTENTIONLLY LEFT BLNK]

More information

Evaluation of Alternatives

Evaluation of Alternatives Chapter 9.0 Evaluation of Alternatives Chapter 9.0 provides a summary evaluation of the No Build Alternative and the Preferred Alternative. The evaluation contained within this chapter is an assessment

More information

SECTION 5. Existing Conditions TRANSPORTATION NETWORK TRANSPORTATION

SECTION 5. Existing Conditions TRANSPORTATION NETWORK TRANSPORTATION SECTION 5 TRANSPORTATION Transportation systems are vital for moving people and goods and serving existing businesses. They also play a major role in guiding the location and type of development. The following

More information

Sustainable Newark. Planning for Growth, Choice & Economic Sustainability

Sustainable Newark. Planning for Growth, Choice & Economic Sustainability Sustainable Newark Planning for Growth, Choice & Economic Sustainability Newark will set a national standard for urban transformation by marshalling its tremendous resources to achieve security, economic

More information

CHAPTER 5: TRANSPORTATION

CHAPTER 5: TRANSPORTATION CHAPTER 5: TRANSPORTATION GOAL 12: TRANSPORTATION BACKGROUND SUMMARY INTRODUCTION Albany s location and transportation facilities provide excellent advantages for commerce and economic development. Albany

More information

Transportation and Utilities

Transportation and Utilities 4 Section 4 Transportation and Utilities 4.0 Introduction Transportation and utility systems are essential to accommodate and support development proposed in the Future Land Use Map. The following pages

More information

Amendment 4 OKI 2040 REGIONAL TRANSPORTATION PLAN

Amendment 4 OKI 2040 REGIONAL TRANSPORTATION PLAN Amendment 4 OKI 2040 REGIONAL TRANSPORTATION PLAN June, 2015 Prepared by the Ohio Kentucky Indiana Regional Council of Governments Acknowledgments Title Amendment 4 OKI 2040 Regional Transportation Plan

More information

APPENDIX A: Transportation Planning Rule

APPENDIX A: Transportation Planning Rule A APPENDIX A: Transportation Planning Rule This appendix contains the full text of Oregon s Transportation Planning Rule (TPR). Transportation Planning Rule (TPR) NOTE: The official copy of an Oregon Administrative

More information

APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017

APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017 APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017 DENVERMOVES Transit Denver Moves: Transit APPENDIX A PLANS AND POLICY REVIEW 2035 Metro Vision Regional Transportation Plan (MVRTP) (2011) 2040 Fiscally

More information

NORTH I-75 MASTER PLAN Summary Report

NORTH I-75 MASTER PLAN Summary Report NORTH I-75 MASTER PLAN Summary Report Interstate 75 (SR 93) From the Florida s Turnpike Interchange to the I-10 Interchange Alachua, Bradford, Clay, Citrus, Columbia, Duval, Levy, Marion, and Sumter Counties,

More information

Phase 1, SR 509 Completion Project NEPA Re evaluation

Phase 1, SR 509 Completion Project NEPA Re evaluation Economics COPY TO: PREPARED BY: Project File DATE: November, 2017 SUBJECT 1. Introduction Puget Sound Gateway Program Team Phase 1, SR 509 Completion Project NEPA Re evaluation This memorandum was prepared

More information

CLA /10.54, PID Project Description:

CLA /10.54, PID Project Description: Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway

More information

GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL

GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL OCTOBER 2014 Cover photographs courtesy of Top left - Mike Bates TABLE OF CONTENTS MISSION... 1 INTRODUCTION... 1 VISION STATEMENT... 1 BACKGROUND... 2

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2018-12 RESOLUTION OF THE SOUTHEASTERN WISCONSIN REGIONAL PLANNING COMMISSION AMENDING THE TRANSPORTATION IMPROVEMENT PROGRAM FOR SOUTHEASTERN WISCONSIN: 2017-2020 WHEREAS, the Southeastern

More information

ATTACHMENT A. Detailed Study Scope. I-66 (Inside) Multi-modal Study Scope

ATTACHMENT A. Detailed Study Scope. I-66 (Inside) Multi-modal Study Scope ATTACHMENT A Detailed Study Scope I-66 (Inside) Multi-modal Study Scope EXECUTIVE SUMMARY The Virginia Department of Transportation (VDOT) seeks consultant assistance in identifying and evaluating a range

More information

What is the Transportation Policy Plan (TPP)?

What is the Transportation Policy Plan (TPP)? Summary What is the Transportation Policy Plan (TPP)? The region s long range transportation plan Includes all modes of transportation: highways, transit, airports, freight, biking, pedestrians Meets the

More information

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017 CITY OF SANjOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR, CITY COUNCIL SUBJECT: TRANSPORTATION POLICY UPDATE REQUIRED BY STATE LAW - LOS TO VMT Memorandum FROM: Jim Ortbal Rosalynn Hughey Barry Ng

More information

Peninsula Widening. Project Description. Overview of Project Status. Estimated Total Project Cost $4.7 - $7.3 Billion

Peninsula Widening. Project Description. Overview of Project Status. Estimated Total Project Cost $4.7 - $7.3 Billion Peninsula Widening SYSTEM: Interstate FROM: I-664 (Hampton Roads) TO: I-95 (Richmond) DESCRIPTION OF WORK: Provide for increased capacity, improve safety standards and minimize roadway geometric and structural

More information

TRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7

TRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7 TRANSPORTATION Like many growing western counties, Douglas County focuses on one of the most integral elements in land-use planning: transportation. The primary purpose of a transportation network is to

More information

2040 Long Range Transportation Plan

2040 Long Range Transportation Plan 2040 Long Range Transportation Plan Presented by Iowa Northland Regional Council of Governments October 22, 23, and 24, 2013 Liaison for federal transportation funding that goes to local cities and counties

More information

Ohio Department of. Transportation. Policy & Procedures

Ohio Department of. Transportation. Policy & Procedures Ohio Department of Transportation John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Policy & Procedures June 2, 2011 ODOT Transportation Review Advisory Council Policy & Procedures June 2, 2011

More information

Federal Fiscal Year Iowa Clean Air Attainment Program Pre- Applications

Federal Fiscal Year Iowa Clean Air Attainment Program Pre- Applications Federal Fiscal Year 2020 Iowa Clean Air Attainment Program Pre- Applications August 2018 TABLE OF CONTENTS Sponsor Project Title Page # Ankeny West 1 st Street Widening and Improvements 2 DART Euclid/Douglas

More information

Chapter 5 Transportation Draft

Chapter 5 Transportation Draft Chapter 5 Transportation Draft Discussion Similar to the other elements in the Comprehensive Plan, the transportation element impacts the quality of life, economic development and public safety of the

More information

Outer Loop/Rail Bypass Study

Outer Loop/Rail Bypass Study Outer Loop/Rail Bypass Study Outer Loop Stakeholder Roundtable Southwest Segment Joshua City Hall April 16, 2008 North Central Texas Council of Governments Transportation Department Stakeholder Roundtable

More information

TBARTA 2015 Regional Transportation Master Plan 2040 Regional Long Range Transportation Plan AUGUST 2015

TBARTA 2015 Regional Transportation Master Plan 2040 Regional Long Range Transportation Plan AUGUST 2015 TBARTA 2015 Regional Transportation Master Plan AUGUST 2015 Table of Contents 1.0 Introduction... 2 1.1 Updating the Master Plan... 2 1.2 About this Document... 2 2.0 Regional Long Range Transportation

More information

Cook County Long Range Transportation Plan MULTIMODAL ANALYSIS SUMMARY OF EXISTING CONDITIONS

Cook County Long Range Transportation Plan MULTIMODAL ANALYSIS SUMMARY OF EXISTING CONDITIONS MULTIMODAL ANALYSIS SUMMARY OF EXISTING CONDITIONS MAY 28, 2014 OVERVIEW is the second most populous county in the United States with over 5.2 million residents and contains more than half the Chicago

More information

Alternatives Identification and Evaluation

Alternatives Identification and Evaluation I-290 Environmental Impact Statement West of Mannheim Road to East of Cicero Avenue Alternatives Identification and Evaluation May 2012 Draft Interim Report: Initial Alternatives Identification and Round

More information

Governor s Transportation Task Force. MEGAPROJECT NEEDS RPC Freight Roundtable Executive Director: Walter Brooks

Governor s Transportation Task Force. MEGAPROJECT NEEDS RPC Freight Roundtable Executive Director: Walter Brooks Governor s Transportation Task Force MEGAPROJECT NEEDS RPC Freight Roundtable Executive Director: Walter Brooks April 26, 2017 RPC Transportation Investments 2010-2015 Transit, $253.6M (20.3%) Safety &

More information

Lubbock Outer Route Feasibility Study Report Executive Summary

Lubbock Outer Route Feasibility Study Report Executive Summary Lubbock Outer Route Feasibility Study Report Executive Summary Prepared for: Texas Department of Transportation Lubbock District Prepared by: MACTEC Engineering and Consulting, Inc. 6701 Aberdeen, Suite

More information

Highest Priority Performance Measures for the TPP

Highest Priority Performance Measures for the TPP Highest Priority Performance Measures for the TPP The following list of measures are the highest priority performance measures as identified by modal working groups. These groups consist of staff from

More information

Oasis Rail Transit PUBLIC COMMENT SUMMARY REPORT February 2016 Open House Meetings Public Input Railroad Input

Oasis Rail Transit PUBLIC COMMENT SUMMARY REPORT February 2016 Open House Meetings Public Input Railroad Input Oasis Rail Transit PUBLIC COMMENT SUMMARY REPORT February 2016 Open House Meetings Public Input Railroad Input Prepared by: Rasor Marketing Communications, LLC 7844 Remington Road Cincinnati, Ohio 45242

More information

TEXAS FREIGHT MOBILITY PLAN 2017

TEXAS FREIGHT MOBILITY PLAN 2017 TEXAS FREIGHT MOBILITY PLAN 2017 Texas Transportation Commission September 28, 2017 Overview of the Texas Freight Mobility Plan 2016 Plan First multimodal freight mobility plan Identified freight network,

More information

1.1 Purpose of the Project

1.1 Purpose of the Project Chapter 1 Purpose and Need for East Link Project 1.1 Purpose of the Project The purpose of the East Link Project is to expand the Sound Transit Link light rail system from Seattle to Mercer Island, Bellevue

More information

TRIP s Top 40 Transportation Projects to Support Economic Growth and Quality of Life in Maryland

TRIP s Top 40 Transportation Projects to Support Economic Growth and Quality of Life in Maryland TRIP s Top 40 Transportation Projects to Support Economic Growth and Quality of Life in Maryland APRIL 2012 Washington, DC 202-466-6706 Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Memphis Urban Area Metropolitan Planning Organization (MPO) Regional Freight Plan

Memphis Urban Area Metropolitan Planning Organization (MPO) Regional Freight Plan Memphis Urban Area Metropolitan Planning Organization (MPO) August 2017 Agenda Work Plan Overview Executive Summary Stakeholder Outreach and Surveys Freight Zones Regional Transportation Networks Technological

More information

North I-75 Master Plan Summary

North I-75 Master Plan Summary North I-75 Master Plan Summary Florida Section ITE Annual Meeting November 3, 2017 The I-75 Relief Task Force Established by Secretary Boxold in October 2015 with broad membership Overarching goals Provide

More information

MONITORING IMPLEMENTATION AND PERFORMANCE

MONITORING IMPLEMENTATION AND PERFORMANCE 12 MONITORING IMPLEMENTATION AND PERFORMANCE The FAST Act continues the legislation authorized under MAP-21, which created a data-driven, performance-based multimodal program to address the many challenges

More information

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff Quade & Douglas, Inc. FINAL March 2005 Foreword

More information

Congestion Management Process (CMP)

Congestion Management Process (CMP) Congestion Management Process (CMP) Introduction The Congestion Management Process (CMP) is a systematic, data-driven, and regionally accepted approach that aims to improve the performance of the transportation

More information

Moving Forward 2040 Long Range Transportation Plan Bicycle Mobility Master Plan Transit Master Plan

Moving Forward 2040 Long Range Transportation Plan Bicycle Mobility Master Plan Transit Master Plan Moving Forward 2040 Long Range Transportation Plan Bicycle Mobility Master Plan Transit Master Plan Paul DiGiuseppe Assistant Chief, Division of Planning Department of Administration (DOA) Needed to keep

More information

Chapter 10 Goals, Objectives + Policies

Chapter 10 Goals, Objectives + Policies Chapter 10 Goals, + Policies Warehouse on Nestle Way near I-78 114 115 10.1 ESTABLISHMENT OF CONSISTENT GOALS 10.2 NATIONAL FREIGHT GOALS The Lehigh Valley s freight transportation investment decisions

More information

South Bay Metro Green Line Extension

South Bay Metro Green Line Extension Meeting Agenda Project overview and update Recap of the Scoping Meetings Progress on the project alternative and proposed station locations Meeting Schedule 6:00 Open House 6:30 Presentation 7:15 Public

More information

Regional Performance Measures Annual Progress Report TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner

Regional Performance Measures Annual Progress Report TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner 2015 TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner Overview History and definition of performance-based planning & programming Review of 2015 TPO Board Action Requested 2 History

More information

Livability 2050 Regional Transportation Plan Update. Transportation Policy Board (TPB) August 23, 2018

Livability 2050 Regional Transportation Plan Update. Transportation Policy Board (TPB) August 23, 2018 Livability 2050 Regional Transportation Plan Update Transportation Policy Board (TPB) August 23, 2018 1 Oct. 2017 Plan Kick-Off Sept. 2019 Plan Adoption Timeline Livability 2050 Regional Transportation

More information

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee MEMORANDUM Date: July 14, 2006 Project #: 6389 To: US 97 & US 20 Refinement Plan Steering Committee From: Sonia Hennum, P.E., Andrew Cibor, E.I.T., & Julia Kuhn, P.E. Project: US 97 & US 20 Refinement

More information

Goal 1 Provide for a balanced and multimodal regional transportation system that meets existing and future needs.

Goal 1 Provide for a balanced and multimodal regional transportation system that meets existing and future needs. RTP GOALS REVIEW Goal 1 Provide for a balanced and multimodal regional transportation system that meets existing and future needs. Goal 1 Provide for a balanced and multimodal regional transportation system

More information