1 Revised Draft Environmental Impact Report San Francisquito Creek Flood Protection, Ecosystem Restoration, and Recreation Project Upstream of Highway 101 This notice announces that a Draft Environmental Impact Report (EIR) will be prepared for the San Francisquito Creek Flood Protection, Ecosystem Restoration, and Recreation Project, Upstream of Highway 101 (Project) to identify, evaluate, and disclose possible environmental impacts, and to develop strategies to avoid, reduce, or compensate for any significant impacts. As the lead agency responsible for compliance with the California Environmental Quality Act (CEQA), the San Francisquito Creek Joint Powers Authority (SFCJPA) has determined that the Project may have a significant impact on the physical environment, and it will prepare an EIR to provide opportunities for public disclosure and public participation in the planning and decision making process. The purpose of the Draft EIR process is to develop and assess a recommended plan, evaluate feasible alternatives for the Project, and propose measures that avoid or mitigate significant adverse effects on environmental resources. This document, which updates the (NOP) released in May 2013, serves as a Revised NOP required by CEQA and the State s CEQA Guidelines (14 CCR 15082), and contains a description of the Project, including the Project s goals and objectives, possible environmental impacts, and the resulting need for an EIR. It also discusses the process that will be used to determine the scope of analysis in the EIR, describes opportunities for public review of the EIR, and lists the best way to contact the SFCJPA during the EIR process. On this Project, the SFCJPA is partnering with the U.S. Army Corps of Engineers, which has certified the Project hydrology and will prepare an Environmental Impact Statement (EIS) for the Project to fulfill federal requirements under the National Environmental Quality Act (NEPA). The SFCJPA EIR and Corps of Engineers EIS are assessing similar alternatives and will conduct joint meetings when appropriate, but will follow different evaluation criteria based on the specific obligations of CEQA and NEPA. Project Overview Background The San Francisquito Creek watershed encompasses the cities of East Palo Alto, Palo Alto, and Menlo Park, among others. The SFCJPA, a regional government agency, was founded by these three cities, the Santa Clara Valley Water District (SCVWD), and San Mateo County Flood Control District (SMCFCD) in 1999 following a major flood the preceding year. Flooding caused by San Francisquito Creek has been a common occurrence. The most recent flood occurred on December 23, 2012, when the Creek overtopped its banks in several areas during a peak flow of 5,400 cubic feet per second (cfs), which is considered a 20-year event that has a
2 Page 2 5% chance of occurring in any given year. In February 1998, a 7,200 cfs event (considered almost a 60-year event with slightly less than a 2% chance of occurring in any year) affected approximately 1,700 residential and commercial properties and caused $28 million in property damage. It is predicted that a 100-year flood event with a 1% annual chance of occurring would damage over 5,500 properties. A primary objective of the Project described in the previous NOP from May 2013 was to protect areas upstream (west) of Highway 101 against the 100-year flow event. Yet, based on that Project s anticipated impacts and uncertainties, and insufficient funding to construct it, the SFCJPA has determined that it is more feasible to move forward with a Project that may provide less than 100- year protection but would protect against the 1998 Flood of Record. This NOP announces the preparation of an EIR with revised objectives that are both meaningful and achievable. In the future, the SFCJPA intends to conduct further evaluations of alternatives that provide 100-year protection and, should a preferred alternative be acceptable to the community and regulatory agencies, it may pursue the funding to implement such a project, which would be subject to supplemental environmental review. The Project discussed in this NOP is a key part of the SFCJPA s overall capital project plan. In June 2016, the SFCJPA and its member agencies initiated construction of the first project in its program for Flood Protection, Ecosystem Restoration, and Recreation, which will reduce flood risk and establish new marshland within a widened creek from S.F. Bay to Highway 101. In 2017, the California Department of Transportation will complete a complementary project to increase creek flow capacity of San Francisquito Creek bridges at Highway 101 and its frontage roads. Also, the City of Palo Alto is considering options to replace the 105-year old Newell Road Bridge; the new bridge may have a larger opening beneath the roadway to allow a greater creek flow at that location. These three independent projects will accommodate larger flows from areas upstream of Highway 101 and thus make possible the Project to be analyzed by this EIR. Project Objectives The SFCJPA plans, designs and implements capital projects that are comprehensive in both geography and function because they cross jurisdictional boundaries and they protect vulnerable populations against flooding, including flooding from projected sea level rise, foster and restore healthy ecosystems, and connect communities by enhancing trails. This Project supports this effort by taking an integrated watershed approach, with the following objectives: protect property and infrastructure from floodwaters exiting the creek, while minimizing impacts to adjacent communities and the environment; enhance habitat within the Project area, particularly interconnected habitat for threatened and endangered species; create new recreational opportunities and connect to existing bike and pedestrian corridors; minimize operational and maintenance requirements; and identify alternatives that would not preclude future actions to bring cumulative flood protection up to a 100-year flow event.
3 San Francisquito Creek Joint Powers Authority Page 3 Project Setting San Francisquito Creek is a perennial stream that originates in the Santa Cruz Mountains and drains a 45-square-mile watershed extending from Skyline Boulevard to San Francisco Bay. The watershed contains three reservoirs (Searsville, Lagunita, and Felt); its major tributary creeks are Los Trancos, West Union, Alambique, Bear, and Corte Madera, and many smaller tributaries drain into these creeks. San Francisquito Creek begins at the confluence of Corte Madera Creek and Bear Creek just downstream of Stanford University s Searsville Dam. San Francisquito Creek represents the boundary between Santa Clara and San Mateo counties and between the City of Palo Alto and its neighboring cities, Menlo Park and East Palo Alto. Its 5-square-mile floodplain is primarily located within these cities. Land uses adjacent to San Francisquito Creek in the Project area are predominantly residential, commercial, or open space, in the form of dedicated park lands. Residential neighborhoods include the Woodland neighborhood in East Palo Alto; the Crescent Park, Duveneck/St. Francis, and Downtown North neighborhoods in Palo Alto; and the Willows and Linfield Oaks neighborhoods in Menlo Park. Nearby commercial or office land uses are near the bridges at University Avenue and Middlefield Road. Open space is present between bridges at Middlefield Road and El Camino Real, where the City of Palo Alto operates and maintains two creekside neighborhood parks: the 12.4-acre Timothy Hopkins Creekside Park and the 0.5-acre El Palo Alto Park. Further upstream between El Camino Real and Sand Hill Road, on Stanford property is the Stanford Shopping Center, Stanford Medical Center, as well as housing and professional buildings. Upstream (west) is the Stanford Golf Course and to the west of Highway 280 is the Stanford Linear Accelerator Center (SLAC) research facility, Jasper Ridge biological preserve, agriculture and equestrian activities, all on Stanford land. Path: K:\Projects_1\JointPowersAuthority\00712_12_Upper_SF_Creek\mapdoc\Fig_1_Env_Plan_Services_for_SF_Creek_NOP.mxd; User: 19402; Date: 5/20/2013 Figure 1 below depicts the San Francisquito Creek watershed and areas of potential Project work. US 101 El C Lake Lagunita am in o Re al Study Area Area of potential work in or adjacent to the creek Searsville Lake Potential floodwater detention sites San Francisquito Creek watershed INTERSTATE CALIF ORNIA 280 FEMA-Designated 100-Year floodplain Felt Lake Miles Figure 1 Draft Environmental Impact December 21,Report 2016 San Francisquito CreekProject, Flood Protection, Ecosystem Restoration, and Recreation Project Draft EIR: Flood Protection, Ecosystem Restoration & Recreation Upstream of Highway 101 Upstream of Highway 101
4 Page 4 Project Description The SFCJPA and its member agencies have conducted a preliminary analysis to determine Project alternatives for the creek reach upstream of Highway 101 that can be completed locally, while preserving compliance with federal standards and potential federal support for construction. When implemented, the Project would maximize flood protection, including protection against a storm event similar to the one that occurred in 1998, and enhance ecosystems and recreation. The Project would also minimize adverse impacts to adjacent communities and the environment, seek to minimize requirements for new land easements, and, where possible, incorporate green infrastructure. Project Alternatives Consistent with the requirements of CEQA and State CEQA Guidelines, the SFCJPA has developed several Project alternatives to be analyzed and compared to determine which actions would best meet the Project s objectives and minimize significant impacts. In its Draft EIR, the SFCJPA will evaluate the No Action alternative and four other alternatives, each of which could be implemented as a stand-alone project to meet the objectives listed above. Following the implementation of the selected Project, a subsequent project utilizing these alternatives may be considered to provide greater flood protection. That subsequent project would require additional analysis, documentation, and public review beyond this EIR. Alternative 1: No Action. As required by CEQA, through the EIR the SFCJPA will analyze the impact of not taking action and compare it to the alternatives listed below. Alternative 2: Modify Pope-Chaucer Bridge and widen creek channel bottlenecks. This alternative would provide flood protection upstream of Highway 101 for creek flows approximately equal to the 1998 event by implementing in-stream work that generally matches the channel s capacity in this area. Under this alternative, specific channel constrictions or bottlenecks immediately upstream of the West Bayshore Road Bridge and between Newell Road Bridge and Euclid Avenue that cause creek flows to back up and rise during high flow events would be widened to increase channel conveyance and thus reduce water surface elevation. The bridge at Pope-Chaucer Streets would be replaced to convey the flow that can be contained by the surrounding channel at that location. Alternative 3: Construct one or more upstream detention basins. This alternative would provide flood protection upstream of Highway 101 against a storm event similar to 1998 by building or modifying one or more facilities in the upstream (west) areas of the San Francisquito Creek watershed to detain water and reduce peak flows during large storm events from entering the floodplain area. Alternative 4: Construct an underground bypass culvert. This alternative would provide flood protection upstream of Highway 101 against a storm event similar to 1998 by constructing a new creek bank structure that would divert high flows into a culvert beneath city streets, thus allowing these flows to bypass the floodplain area. Alternative 5: Construct floodwalls along the channel. This alternative would provide flood protection upstream of Highway 101 against a storm event similar to 1998 by modifying or constructing floodwalls roughly between Highway 101 and the Pope-Chaucer Streets Bridge, thus allowing these flows to be contained within the channel in the floodplain area.
5 Page 5 Possible Environmental Impacts and Need for an EIR Because of the potential for significant impacts to the environment, the SFCJPA has decided to prepare an EIR. The purpose of an EIR is to inform decision-makers and the general public of the environmental effects of a proposed project. The EIR process is intended to provide information sufficient to evaluate a proposed project and its potential to cause significant effects on the environment; examine methods of reducing adverse environmental impacts; and identify and evaluate alternatives to the proposed project. Based on a preliminary review performed by the SFCJPA, the following environmental resources could be affected by construction of the Project: Aesthetics Air Quality Biological Resources and Jurisdictional Habitat Climate Change Geology, Soils, and Minerals Hazards and Hazardous Materials Hydrology and Water Quality Land Use and Planning Noise and Vibration Paleontological, Archaeological, and Historic Architectural Resources Recreation Traffic and Transportation Utilities and Public Services The Draft EIR will analyze the topics identified above in detail, and any others for which potentially significant impacts are identified. The Draft EIR will propose measures to mitigate (avoid, reduce, or compensate) for any impacts that are determined to be significant. EIR Scoping Process This NOP initiates the CEQA scoping process through which the SFCJPA will refine the range of issues and alternatives to be addressed in the Draft EIR. The public is invited to comment on the proposal to prepare the EIR and on the scope of issues to be included in it. The SFCJPA will host Scoping Meetings with similar presentation in three cities on: January 18, 2017 at 6:30 p.m. at the Laurel School Upper Campus, 275 Elliott Drive in Menlo Park, CA. This will be a joint Scoping Meeting with the Corps of Engineers. January 26, 2017 at 7:00 p.m. at the East Palo Alto City Hall Community Room, 2415 University Avenue in East Palo Alto, CA. January 31, 2017 at 7:00 p.m. at the Palo Alto Art Center Auditorium, 1313 Newell Road, Palo Alto, CA. * Please note: this date has changed from the NOP filed on 12/21/16. These meetings are part of the EIR scoping process during which the general public, public agencies, and private sector entities can provide input on specific topics that they believe should be addressed in the environmental analysis.
6 Page 6 Written comments may be mailed to: Kevin Murray, Senior Project Manager San Francisquito Creek Joint Powers Authority 615-B Menlo Avenue Menlo Park, CA or sent by to: comments@sfcjpa.org Comments must be received no later than 5:00 p.m. on Tuesday, February 21, Public Participation in EIR Review All interested persons and organizations wishing to be notified when the Draft EIR is available for review should respond to this notice and provide a current address. The SFCJPA will compile a list of interested parties and will provide notice when the Draft EIR is available. When completed, the Draft EIR will undergo a 60-day public review and comment period. Information about availability of the Draft EIR will also be posted on the SFCJPA s website (
7/11/2018. Floodplain Management Association - June 14, 2018 luncheon
7/11/2018 Floodplain Management Association - June 14, 2018 luncheon Len Materman Executive Director San Francisquito Creek Joint Powers Authority len@sfcjpa.org 650-324-1972 San Francisquito Creek 1998
More informationSubject: Notice of Preparation of a Draft Environmental Impact Report
NOTICE OF PREPARATION From: Santa Clara Valley Water District 5750 Almaden Expressway San Jose, CA 95118 Subject: Notice of Preparation of a Draft Environmental Impact Report Project Title: Guadalupe Dam
More informationSubject: Notice of Preparation of a Draft Environmental Impact Report
NOTICE OF PREPARATION From: Santa Clara Valley Water District 5750 Almaden Expressway San Jose, CA 95118 Subject: Notice of Preparation of a Draft Environmental Impact Report Project Title: Calero Dam
More informationCity of Palo Alto (ID # 7047) City Council Staff Report
City of Palo Alto (ID # 7047) City Council Staff Report Report Type: Consent Calendar Meeting Date: 6/13/2016 Summary Title: East Palo Alto Comment Letter Title: Approval and Authorization for the City
More informationAPPENDIX A. Project Scoping
APPENDIX A Project Scoping Notice of Preparation To: From: Agencies and Interested Parties Paul Brunner, Executive Director, Three Rivers Levee Improvement Authority Date: June 13, 2006 Subject: Notice
More informationNotice of Preparation for the Copeland Creek Stormwater Detention Basin (CIP Project )
Copeland Creek Stormwater Detention Basin (CIP Project 2006-04) Date: December 20, 2017 To: Public Agencies and Interested Persons From: Mary Grace Pawson, Director of Development Services, City of Rohnert
More informationSacramento Area Flood Control Agency. May State Clearinghouse No Prepared for: Prepared by: Consulting Engineers and Scientists
Addendum No. 3 (North Sacramento Streams) to the Environmental Impact Report on the North Sacramento Streams, Sacramento River East Levee, Lower American River, and Related Flood Improvements Project Prepared
More informationEnvironmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).
This document is scheduled to be published in the Federal Register on 11/18/2015 and available online at http://federalregister.gov/a/2015-29418, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Transit
More informationNOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES
NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN To: Responsible Agencies, Trustee Agencies, Organizations, and Interested Parties From: Erika
More informationNotice of Preparation of Environmental Impact Report
Notice of Preparation of Environmental Impact Report September 29, 2010 TO: State Clearinghouse Responsible and Trustee Agencies Interested Agencies and Parties FROM: Sonoma County Water Agency 404 Aviation
More informationCounty of San Diego DEPARTMENT OF PARKS AND RECREATION. Administrative Office: (858) Fax: (858) Reservations: (858)
BRIAN ALBRIGHT DIRECTOR County of San Diego DEPARTMENT OF PARKS AND RECREATION Administrative Office: (858) 694-3030 Fax: (858) 495-5841 Reservations: (858) 565-3600 www.sdparks.org NOTICE OF PREPARATION
More informationNotice of Intent to Prepare a Draft Environmental Impact Statement for the
BILLING CODE: 3720-58 This document is scheduled to be published in the Federal Register on 02/10/2017 and available online at https://federalregister.gov/d/2017-02779, and on FDsys.gov DEPARTMENT OF DEFENSE
More informationSOAP LAKE FLOODPLAIN PRESERVATION PROJECT
SOAP LAKE FLOODPLAIN PRESERVATION PROJECT Draft Initial Study and Negative Declaration Prepared for: Pajaro River Watershed Flood Prevention Authority A joint powers authority with representation from:
More informationPreliminary Feasibility Study for South San Francisco Bay Shoreline Economic Impact Areas 1-10 Executive Summary
Economic Impact Areas 1-10 Executive Summary Prepared For: Department of Water Resource Division of Flood Management State Of California Prepared By: Santa Clara Valley Water District February 2017 A preliminary
More informationSan Francisquito Creek Flood Protection, Ecosystem Restoration and Recreation Project, Upstream of Highway 101 Summary of Two Public Workshops
2017 California State University, Sacramento Center for Collaborative Policy San Francisquito Creek Flood Protection, Ecosystem Restoration and Recreation Project, Upstream of Highway 101 Summary of Two
More informationNotice of Preparation
Notice of Preparation Date April 23, 2015 To: Subject: Project: Lead Agency: California Office of Planning and Research, Responsible and Trustee Agencies and Interested Parties Notice of Preparation of
More informationProject Scoping Meeting Thousand Palms Flood Control Project EIR/EIS
Project Scoping Meeting Thousand Palms Flood Control Project EIR/EIS Thousand Palms Community Center December 6, 2016 6:00 p.m. Coachella Valley Water District Meeting Agenda Introductions CEQA Lead Agency:
More informationCommunity Development Department Telephone: (650)
Community Development Department Telephone: (650) 780-7234 Planning & Housing Services Facsimile: (650) 780-0128 1017 Middlefield Road TDD: (650) 780-0129 P.O. Box 391 Redwood City, CA 94064 Website: www.redwoodcity.org
More informationCORTE MADERA CREEK FLOOD RISK MANAGEMENT PROJECT
1 CORTE MADERA CREEK FLOOD RISK MANAGEMENT PROJECT DRAFT EIS/EIR 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 MARIN COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT BOARD OF SUPERVISORS PUBLIC
More information6. Cumulative Impacts
6.1 OVERVIEW Section 15355 of the California Environmental Quality Act (CEQA) Guidelines defines cumulative impacts as: "...two or more individual effects which when considered together, are considerable
More informationNotice of Preparation of a Draft Environmental Impact Report Vallco Special Area Specific Plan
COMMUNITY DEVELOPMENT DEPARTMENT CITY HALL 10300 TORRE AVENUE CUPERTINO, CA 95014-3255 (408) 777-3308 FAX (408) 777-3333 of a Draft Environmental Impact Report File Number EA-2017-05 February 9, 2018 To:
More informationFlood Prevention Authority. Agency Presentation. Gilroy Meeting. June 3, Pajaro River Watershed. Flood Prevention Authority
Pajaro River Watershed Flood Prevention Authority Agency Presentation Gilroy Meeting June 3, 2009 Pajaro River Watershed Flood Prevention Authority Presentation Outline Formation and Purpose of the Pajaro
More informationDrainage Criteria Manual Review
City of Colorado Springs Stormwater Management Assessment and Standards Development Drainage Criteria Manual Review March 8, 2013 Springsgov.com/City Agencies/Stormwater/Stormwater Engineering/ Stormwater
More informationNotice of Intent to Prepare an Environmental Impact Statement for the Denver
This document is scheduled to be published in the Federal Register on 01/11/2016 and available online at http://federalregister.gov/a/2016-00204, and on FDsys.gov BILLING CODE: 3720-58 DEPARTMENT OF DEFENSE
More information3 PROJECT DESCRIPTION
3.1 PROJECT OVERVIEW 3 PROJECT DESCRIPTION The Rocklin 60 project (proposed project) includes the subdivision of 56.9 acres of land, construction of 179 single-family, detached dwelling units, and installation
More informationCity and County of San Francisco San Francisco Planning Department. Summary Presentation on
City and County of San Francisco San Francisco Planning Department Summary Presentation on Draft Program Environmental Impact Report for the San Francisco Public Utilities Commission s Water System Improvement
More informationCITY OF MOUNTAIN VIEW
CITY OF MOUNTAIN VIEW Incorporate Climate Change Adaptation in Municipal Scale, Urban Watershed Planning at the City of Mountain View Raymond Wong, PhD, PE, LEED AP Lisa Au, PE Floodplain Management Association
More informationSECTION 6.0 Alternatives to the Proposed Project
SECTION 6.0 Alternatives to the Proposed Project 6.0 ALTERNATIVES TO THE PROPOSED PROJECT CEQA requires that an EIR include an analysis of a range of project alternatives that could feasibly attain most
More informationacquiring, managing, and disposing of federal lands and facilities;
2.2.1 HYDROLOGY AND FLOODPLAIN This section discusses and analyzes the surface hydrology and water quality characteristics of the project. The information provided in this section is based on the Preliminary
More informationSECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT
SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT 5.1 - Introduction In accordance with CEQA Guidelines Section 15126.6, this Draft Subsequent Environmental Impact Report (DSEIR) contains a comparative impact
More informationIII. BASIS FOR CUMULATIVE ANALYSIS
III. BASIS FOR CUMULATIVE ANALYSIS III. BASIS FOR CUMULATIVE ANALYSIS The California Environmental Quality Act (CEQA) requires that Environmental Impact Reports (EIRs) analyze cumulative impacts. As defined
More informationTechnical Memorandum No Basis of Comparison
Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.1 Basis of Comparison Task: Basis of Comparison To: PRWFPA Staff Working Group Prepared by: J. Schaaf Reviewed by: R. Raines
More informationSilicon Valley Rapid Transit Corridor Final Supplemental EIR
3-5 3-6 3-7 3-8 3-9 RESPONSE TO COMMENT LETTER S-1 California Regional Water Quality Control Board S-1.1 The clear span bridge for the existing UPRR freight and future BART tracks was a design developed
More informationThe Nature Conservancy Cosumnes River Preserve Franklin Boulevard Galt CA 95632
Study Partners The Nature Conservancy Cosumnes River Preserve 13501 Franklin Boulevard Galt CA 95632 East Bay Municipal Utility District 1 Winemaker Way, Unit K Lodi CA 95240 Sacramento County Water Agency
More informationScoping Study for Upper Petaluma River Watershed Flood Control Project. Frequently Asked Questions
Scoping Study for Upper Petaluma River Watershed Flood Control Project Frequently Asked Questions December 8, 2011 1. Why was the public not notified of the April 28 meeting? The April 28 meeting was intended
More informationLower Penitencia Creek Improvements Project. Community Update & Draft Environmental Impact Report Meeting May 22, 2017
Lower Penitencia Creek Improvements Project Community Update & Draft Environmental Impact Report Meeting May 22, 2017 Agenda 1. Meeting Purpose 2. Santa Clara Valley Water District Mission 3. Project Background
More informationROSS VALLEY FLOOD PROTECTION & WATERSHED PROGRAM U.S. ARMY CORPS OF ENGINEERS CORTE MADERA CREEK PROJECT. Community Meeting.
ROSS VALLEY FLOOD PROTECTION & WATERSHED PROGRAM U.S. ARMY CORPS OF ENGINEERS CORTE MADERA CREEK PROJECT ROSS SCHOOL 9 LAGUNITAS ROAD, ROSS Community Meeting Photo: Flooding along College Ave. in Kentfield
More information3.3 Acceptable Downstream Conditions
iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and
More informationBUS RAPID TRANSIT. El Camino Real Bus Rapid Transit Project. Environmental Scoping Meetings February 21 and 28
El Camino Real Bus Rapid Transit Project Environmental Scoping Meetings February 21 and 28 Project Staff Meeting Host Project Manager Environmental Planning Eileen Goodwin, Apex Strategies Steve Fisher,
More informationProject Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that
US ARMY Corps Of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: 2014-00083-1 Date: December 22, 2014 Comments Due: January 16, 2015 TO WHOM
More informationCEQA Scoping Meeting. West Desert Hot Springs Master Drainage Plan Program Environmental Impact Report
CEQA Scoping Meeting West Desert Hot Springs Master Drainage Plan Program Environmental Impact Report CEQA Lead Agency: City of Desert Hot Springs January 8, 2014 Scoping Meeting Agenda 1. Welcome and
More informationSection 1 Introduction
Introduction 1.0 INTRODUCTION A Habitat Conservation Plan (HCP) is part of a process outlined by 0 of the federal Endangered Species Act (ESA) that involves cooperation between the federal government
More informationPlanning at Stanford University: The General Use Permit
Practicing Planner Summer 2014 Planning Practice Special Feature Planning at Stanford University: The General Use Permit by Scott Lefaver, AICP The year is 2000 and Stanford University is feeling the pressures
More information1.0 INTRODUCTION 1.1 PROJECT OVERVIEW
1.0 INTRODUCTION This Environmental Impact Report (EIR) evaluates the potential for the San Joaquin Apartments and Precinct Improvements Project (the project or San Joaquin Apartments project to result
More informationNOTICE OF PREPARATION
NOTICE OF PREPARATION Date: June 12, 2014 To: From: Subject: Governor s Office of Planning and Research/State Clearinghouse Unit, Responsible Agencies, Trustee Agencies, and Interested Parties Announcement
More informationWATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999
WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999 The following table indicates the draft goals and objectives for the Santa Clara Basin WMI process. The overall objectives
More informationAppendix M. Summary of Local Sea Level Rise Planning Efforts. Draft
Appendix M Summary of Local Sea Level Rise Planning Efforts Appendix M: Summary of Local Sea Level Rise Planning Efforts Summary of Local Sea Level Rise Planning Efforts Half Moon Bay SLR Planning Efforts
More informationLos Angeles River Master Plan Update DRAFT Vision, Goals, and Actions
Los Angeles River Master Plan Update DRAFT Vision, Goals, and Actions 1996: Los Angeles River Master Plan Mission Statement: The Los Angeles River Master Plan provides for the optimization and enhancement
More information1.0 Introduction. 1.1 Project Background
Gaviota Coast Plan Final EIR This chapter provides an overview of the Environmental Impact Report (EIR) for the proposed Gaviota Coast Plan (proposed Plan). The proposed Plan is described in detail in
More informationCHAPTER 4 Master Responses
CHAPTER 4 Master Responses 4.1 Introduction This section presents master responses addressing a number of similar or recurring topics in the comments received on the Draft EIR and Recirculated Portions
More informationAPPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports
APPENDIX N N.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan
More informationCHAPTER 7. San Dieguito River Flooding Adaptation
CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,
More informationProject Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that
US ARMY Corps Of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF MISSOURI Application Number: SWL 2013-00260 Date: April 15, 2014 Comments Due: May 6, 2014 TO WHOM IT MAY
More informationCity of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017
City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 Phasing of Meetings April Meeting May Meeting October Review of Tax Day Storm Event and Immediate Actions Taken By City Review of Coordination
More informationREQUEST FOR PROPOSALS for A Groundwater Management Plan. CITY OF EAST PALO ALTO Project No. WS /14
REQUEST FOR PROPOSALS for A Groundwater Management Plan CITY OF EAST PALO ALTO Project No. WS-05-2013/14 Release Date: April 28, 2014 Proposals due Date: Wednesday, May 28, 2014 at 2:00 PM Community Development
More information5.0 PRELIMINARY ENVIRONMENTAL REVIEW
5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors
More informationNotice of Preparation of an Environmental Impact Report and Scoping Meeting
Notice of Preparation of an Environmental Impact Report and Scoping Meeting Date: August 15, 2017 To: Project Sponsor and Lead Agency: Staff Contact: Project Title: Location: General Plan Designation:
More informationSUPPLEMENTAL NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT. ACEforward Notice of Additional Project Element Niles Junction Connections
SUPPLEMENTAL NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT DATE: May 9, 2016 FROM: TO: SUBJECT: San Joaquin Regional Rail Commission Agencies, Organizations, and Interested Parties ACEforward
More informationU.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT
PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT APPLICATION FOR PERMIT Deer Valley Road, El Mirage Road to 109 th Avenue Public Notice/Application No.: SPL-2010-00884-AP
More informationSan Ramon City Center Draft Subsequent EIR
San Ramon City Center State Clearinghouse Number 2007042022 Prepared for: City of San Ramon Planning/Community Development Department Planning Services Division 2222 Camino Ramon San Ramon, CA 94583 Prepared
More informationLynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 275
C-034-001 Thank you for your comments describing the cultural importance of the Latvian Evangelical Lutheran Church. See Section 2.5.1 for a description of the refined Segment A alternatives that avoid
More informationCHAPTER 7. San Dieguito River Flooding Adaptation
CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,
More informationSEWRPC Staff Memorandum
SEWRPC Staff Memorandum EVALUATION OF PROPOSED STORMWATER QUANTITY MANAGEMENT FOR THE DES PLAINES RIVER WATERSHED PORTION OF THE PROPOSED FOXCONN DEVELOPMENT IN THE VILLAGE OF MOUNT PLEASANT June, 2018
More information3.3 FLOOD CONTROL AND HYDROLOGY
3.3 FLOOD CONTROL AND HYDROLOGY 3.3.1 AFFECTED ENVIRONMENT The sublease boundary is located approximately 0.25-miles north of the San Gabriel River. The San Gabriel River flows from the San Gabriel Mountains
More informationFrequently Asked Questions Connecting Palo Alto
Frequently Asked Questions Connecting Palo Alto www.cityofpaloalto.org/connectingpaloalto General Project Questions Q1: What is Connecting Palo Alto? A1: Connecting Palo Alto (formerly the Palo Alto Rail
More informationPUBLIC WORKS DEPARTMENT Council Meeting Date: November 15, 2011 Staff Report #:
PUBLIC WORKS DEPARTMENT Council Meeting Date: November 15, 2011 Agenda Item #: F3 REGULAR BUSINESS: Authorize the City Manager to Amend the Agreement with Infrastructure Engineering Corporation to Complete
More informationPUBLIC NOTICE PROJECT: The San Francisquito Creek Flood Reduction, Ecosystem Restoration, and Recreation Project
Regulatory Division 1455 Market Street, 16 th Floor San Francisco, CA 94103-1398 SAN FRANCISCO DISTRICT PUBLIC NOTICE PROJECT: The San Francisquito Creek Flood Reduction, Ecosystem Restoration, and Recreation
More informationSanta Clara River Watershed Feasibility Study. Information Meeting City of Santa Clarita August 16, 2007
Santa Clara River Watershed Feasibility Study Information Meeting City of Santa Clarita August 16, 2007 Darrell Buxton Los Angeles District U.S. Army Corps of Engineers Public Issues and Concerns Balance
More informationNOTICE OF PREPARATION. Notice of Preparation of an Environmental Impact Report for the Kern Water Bank Conservation and Storage Project
NOTICE OF PREPARATION To: Responsible, Federal and Trustee Agencies (Agency) From: Kern Water Bank Authority 1620 Mill Rock Way, Suite 500 Bakersfield, California 93311 (Address) Subject: Notice of Preparation
More informationCoyote/Berryessa Creek Flood Protection Project
CB Coyote/Berryessa Creek Flood Protection Project Fiscal Year 2017 and Fiscal Year 2018 Request: The project received $20 million in U.S. Army Corps of Engineers (USACE) work plan funding for Fiscal Year
More informationPUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303)
PUBLIC NOTICE US Army Corps of Engineers Omaha District Application No: NWO-2017-01366-DEN Project: Douglas Lane Tributary Stabilization Project Applicant: Town of Castle Rock Waterway: Douglas Lane Tributary
More informationSECTION 9.0 Effects Found Not To Be Significant
SECTION 9.0 Effects Found Not To Be Significant 9.0 EFFECTS FOUND NOT TO BE SIGNIFICANT The City of Santa Clarita conducted an Initial Study in April 2006 to determine significant effects of the proposed
More information3.0 CUMULATIVE PROJECTS SCENARIO
3.0 CUMULATIVE PROJECTS SCENARIO The CEQA Guidelines define cumulative impacts as two or more individual effects that, when considered together, are considerable or which compound or increase other environmental
More informationCarpinteria Valley Water District Carpinteria Advanced Purification Project
NOTICE OF PREPARATION AND SCOPING MEETING Carpinteria Valley Water District Carpinteria Advanced Purification Project TO: Agencies, Organizations, and Interested Parties DATE: January 7, 2019 SUBJECT:
More informationTechnical Memorandum No River Geometry
Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.5 River Geometry Task: Collection and Analysis of River Geometry Data To: PRWFPA Staff Working Group Prepared by: J. Schaaf
More information6 ALTERNATIVES 6.1 INTRODUCTION
6 ALTERNATIVES 6.1 INTRODUCTION Environmental impact reports (EIRs) are required to consider alternatives to the project that are capable of reducing or avoiding significant environmental impacts. Section
More informationPublic Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:
Public Notice Applicant: City of Dallas Project No.: SWF- 2014-00151 Date: April 18, 2014 The purpose of this public notice is to inform you of a proposal for work in which you might be interested. It
More informationSubject: Comments of Friends of the Los Angeles River on the Draft Environmental Impact Report for the Grayson Repowering Project (DEIR)
Mr. Erik Krause, Interim Deputy Director of Community Development, City of Glendale, Community Development Department, 633 East Broadway, Room 103, Glendale, California 91026-4386; Email: ekrause@glendaleca.gov
More information16.1 Significant and Unavoidable Impacts
Chapter 16 NEPA requires an EIS and CEQA requires an EIR to evaluate a number of other types of environmental impacts in addition to those already addressed in the resource chapters. The analysis required
More information6.13 Utilities and Service Systems
6.13 6.13.1 Introduction This section describes impacts for utilities and service systems that would result from construction and operation of the CEQA Alternatives. 6.13.2 Regulatory Setting There are
More informationCITY OF TEHACHAPI GENERAL PLAN Draft Environmental Impact Report
City of Tehachapi CITY OF TEHACHAPI GENERAL PLAN Draft Environmental Impact Report SCH No. 2009101084 Prepared for: City of Tehachapi Community Development Department 115 South Robinson Street Tehachapi,
More informationAppendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South
Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Fork Dead Horse Slough in the, California Draft Location
More informationNotice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report
Notice of Preparation For Link Union Station (Link US) Project Joint Environmental Impact Statement and Environmental Impact Report Date: May 27, 2016 To: Subject: Project Title: From: All Interested Agencies,
More informationAppendix G Preliminary Hydrology Study
Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014
More informationAvailability of Draft Environmental Impact Statement for the Dallas. Floodway Project, in the City of Dallas, Dallas County, TX
This document is scheduled to be published in the Federal Register on 04/18/2014 and available online at http://federalregister.gov/a/2014-08795, and on FDsys.gov BILLING CODE: 3720-58 DEPARTMENT OF DEFENSE
More informationAPPENDIX H JOINT PUBLIC NOTICE
APPENDIX H JOINT PUBLIC NOTICE DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 August 17, 2016 JOINT PUBLIC NOTICE U.S. Army Corps of
More information3.3 FLOOD CONTROL AND HYDROLOGY
3.3 FLOOD CONTROL AND HYDROLOGY 3.3.1 AFFECTED ENVIRONMENT The sublease boundary is located approximately 0.25-miles north of the San Gabriel River. The San Gabriel River flows from the San Gabriel Mountains
More informationRevised Final Environmental Impact Report/ Environmental Assessment for the Wilshire Bus Rapid Transit Project
Revised Final Environmental Impact Report/ Environmental Assessment for the Wilshire Bus Rapid Transit Project State Clearinghouse No. 2009091094 Los Angeles County Metropolitan Transportation Authority
More informationNotice of Preparation of Draft EIR Notice of Public Scoping Meeting ARB Southern California Consolidation Project
Date: August 1, 2016 To: Subject: Contact: State Clearinghouse, Responsible Agencies, Trustee Agencies, Federal Agencies, Interested Parties, and Organizations of a Draft Environmental Impact Report and
More informationVenice Pumping Plant Dual Force Main Project Draft EIR 1.0 I NTRODUCTION
1.0 I NTRODUCTION 1.1 PURPOSE OF THE EIR The purpose of an Environmental Impact Report (EIR), as defined in Section 15121(a) of the State Guidelines for the implementation of the California Environmental
More informationNOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT
Date: September 18, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS H201 Sacramento,
More informationSECONDARY WETLAND IMPACTS ANALYSIS
SECONDARY WETLAND IMPACTS ANALYSIS USACE File. SWG-2012-00153 During the development of the Grand Parkway (State Highway 99) Segments H and I-1 from United States Highway 59/Interstate Highway 69 N to
More informationRESOLUTION NO:
RESOLUTION NO: 11-031 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PASO ROBLES CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 2011 CIRCULATION ELEMENT OF THE GENERAL PLAN AND ADOPTING FINDINGS,
More informationINDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY
INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY The Indian Creek Watershed covers a 38 square mile area in southern Lake County, Illinois that drains 24,116 acres before discharging into the Des Plaines
More informationCONTENTS LIST OF TABLES LIST OF FIGURES
CONTENTS 1.0 PURPOSE OF ACTION AND NEED FOR POWER... 1-1 1.1 PURPOSE OF THE ACTION... 1-1 1.2 NEED FOR PROJECTS... 1-3 1.2.1 PacifiCorp Operations... 1-3 1.2.2 Cowlitz PUD Operations... 1-5 1.2.3 Regional
More informationCapital Facilities Element
Capital Facilities Element Purpose The Growth Management Act requires cities to prepare a capital facilities element consisting of: 1. An inventory of current capital facilities owned by public entities,
More informationCHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION
CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION Sections 4.1 through 4.14 of Chapter 4.0 of this EIR contain a discussion of the potential environmental effects from implementation of the proposed
More informationPrior Lake Stormwater Management & Flood Mitigation Study
Prior Lake Stormwater Management & Flood Mitigation Study Prepared for Prior Lake-Spring Lake Watershed District and the City of Prior Lake September, 2016 4300 MarketPointe Drive, Suite 200 Minneapolis,
More informationCITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California
CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California Prepared for City of Redlands 35 Cajon Street Redlands, California 92373 Prepared by 14725 Alton Parkway Irvine, CA 92618 Contact
More informationCarmel River Reroute & San Clemente Dam Removal Project (PLN110373) Monterey County Planning Commission Workshop July 25, 2012
Carmel River Reroute & San Clemente Dam Removal Project (PLN110373) Monterey County Planning Commission Workshop July 25, 2012 URS1 Workshop Agenda 1. Background 2. Project Overview 3. Tree Removals/Mitigation
More information