1
2 Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I) dated: 26 th July Period of Compliance - April 2016 to September 2017 EC to Integrated Composite Cement Plant (17.50 Lakh TPA OPC & Lakh TPA PPC) at Pipalpukhuri, Lanka, Nagaon, Assam by Calcom Cement India Ltd. SN Environmental Stipulations Compliance Status Specific condition 1. The Gaseous and Particulate matter emission from various units should conform to the standards prescribed by the State Pollution Control Board. At no time the particulate emissions from the cement plant shall exceed 100 mg/nm 3. Continues on-line monitors for particulate emissions, SO 2 and NOx in Raw/Kiln mill, clinker cooler, coal mill, cement mill etc. shall be provided. Interlocking facility shall be provided between pollution control equipments and the process operation so that in the event of the pollution control equipment not working, the respective units(s) is shut down automatically 2. Ambient air quality shall be monitored at different locations in consultation with Assam Pollution Control Board (APCB) and must not exceed the standards stipulated under EPA or by the State Authorities and report submitted to the APCB quarterly and to the Ministry s Regional Office at Shillong Half-Yearly. 3. Electrostatic Precipitators (ESP) shall be provided to clinker cooler, reverse air bag house to raw mill and kiln, bag filters to crusher vent stack, blending/ storage sites, coal crusher, coal mill, cement mill and packing plant to control air emissions. The dust collected from the pollution control equipments shall be recycled back into the process. Storage of raw materials viz. lime stone, coal clinker shall be in closed roof sheds covered stockpiles. Page 1 of 4 The company strictly follows the standards of emissions, prescribed by the State Pollution Control Board/CPCB/ MoEF. We have installed online dust monitoring Equipments for both Mill # 1 & mill #2 and both the opacity meters have been connected with CBCP & APCB server. We have also done third Party Monitoring though M/s Green Tech Environmental Engineer & Consultants (Approved vendor by State Pollution Control Board, Assam) Monitoring Report annexed herewith as Annexure-I. Ambient Air Quality is being monitored at different locations in consultation with APCB. Ambient air quality has not exceeded the standards stipulated under EPA or state authorities. It is well under NAAQS Compliance report is being submitted regularly to APCB and MoEF Regional Office at Shillong. Monitoring Report of Ambient Air quality is annexed herewith as Annexure-II. The pollution control equipment is installed as prescribed for the operating units. During the operation, the dust collected in the pollution control equipments is recycled back into the process. Closed roof sheds provided for all Raw materials. 4. The company shall install adequate dust collection and Adequate dust collectors has been installed & in
3 extraction system to control fugitive dust emissions at various transfer points. Dust collectors shall be provided at material transfer points. All the roads shall be concreted. Atomized water spray system shall be installed with the reclaimer. Covered stockpile shall be provided for clinker storage and gypsum. 5. Total water requirement from ground water shall not exceed 2100 m 3 /day. No effluent shall be discharged from the process outside the premises and all the treated domestic waste water shall be utilized for green belt development and other plant related activities. Domestic Waste water generated shall be disposed off into soak pit via septic tank. 6. The Company must harvest surface as well as rainwater from the roof top of the building proposed in the expansion project and storm water drains to recharge the ground water and use the same water for the various activities of the project to conserve the fresh water 7. Greenbelt shall be developed in and around the expansion project in at least 33% of the area as per the CPCB guidelines in consultation with the local DFO. 8. Solid waste generated in the form of dust collected from various pollution control equipments shall be 100% recycled and reutilized in the process itself. Treated STP sludge shall be used for greenbelt development. Oil & oil emulsion will be sold to authorized dealers. 9. The company shall under-take ECO development measures including community welfare measures in the project area. 10. The company shall follow all the recommendations mentioned in the Charter on Corporate Responsibility Page 2 of 4 operation to control fugitive emission at various transfer points of the Plant. All roads have been completed (Plant Internal & External roads). We do not have any Stacker / Reclaimer at our plant premises. Covered clinker stock pile (CSP) was completed and clinker is keeping inside the CSP. Total water requirement is below 2100 m 3 /day. No waste water is being discharged outside the premises. Domestic wastewater generated is disposed of into soak pit via septic tank. Rain water harvesting plan is under preparation, it will be completed before end of the FY However, we have two ponds in which rainwater is collected and is used within the plant for various activities. Greenbelt is being developed as per CPCB norms. Plantation work is already under progress as. We shall cover at least 33% of the area under green belt as prescribed in a phase manner in consultation with local DFO. The dust collected from the varios pollution control equipments, is being recycled back into the process. As of now, we are not generating any wastewater. Our colony is also not located but we will place the STP for plant before end of the FY and treated wastewater shall be utilized for plantation and green belt development. Oil & oil emulsion will be sold to the authorized dealers. Eco-development measures and community welfare measures are being undertaken in phased manner. We have prepared 360 degree program. It is being implemented. Free Health camps would be organized in the month of Nov 2016 (PO attached). Recommendation for CREP is followed.
4 for Environment Protection(CREP) 11. Prior environmental clearance for limestone mine viz. AIDC and Salkia mines shall be obtained from the Ministry of Environment and Forests. B. General Conditions. 1. The project authority must adhere to the stipulations made by Assam Pollution Control Board (APCB) & State Government. 2. No further expansion or modification of the plant should be carried out without prior approval of this Ministry. 3. At least four ambient air quality monitoring stations should be established in the downward direction as well as where maximum ground level concentration of SPM, SO 2 and NO X are anticipated in consultation with APCB. Data on ambient air quality and stack emission should be regularly submitted to this Ministry including its regional office at Shilong once in six months. 4. Industrial waste water should be properly collected, treated so as to confirm to the standards prescribed under GSR 422 (E) dated 19 th May, 1993 and 31 st December, 1993 or as amended from time to time. The treated waste water should be utilized for plantation purpose. 5. The overall noise levels in and around the plant should be kept well within the standard (85 dba) by providing noise control measures including acoustic hoods, silencers, enclosures etc. on all sources of noise generation. The ambient noise level should conform to the standards prescribed under Environmental (Protection) Act, 1986 Rules, 1989 viz. 75 dba (day time and 70 dba (Night time). 6. Proper housekeeping and adequate occupational health program must be taken up. All the persons working in the sensational areas shall wear protective covers. Occupational health Surveillance Program shall be done on a regular basis and records maintained. The programme must include the lung function and sputum analysis tests once in sixth months. Environmental Clearance of AIDC mine is under process as TOR has been obtained from the MoEF vide letter no. J-11015/202/2011-IA.II (M) dated 28th Dec, 2011 and baseline study has been carried out for preparation of REIA/EMP. We are implementing all stipulations made by Assam pollution Control Board & State Government and committed to follow in future. No further expansion or modification of the plant beyond the capacity mentioned in EC will be carried out without prior approval of the MoEF. We have installed online ambient air quality monitoring stations at our plant premisses and it is under observation. Online data will be connected with CPCB & PCBA server very soon. Monitoring data is attached herewith as Annexure-I & II. Monitoring data of stack emissions are attached as Annexure-I and Ambient Air Quality attached as Annexure-II. Monitoring data of ambient air quality and stack emissions are being regularly submitted to Ministry and regional office at Shillong & APCB Nagoan office. As of now, we are not generating any wastewater, Once the full plant is commissioned, ETP/STP is proposed to treat the same and treated wastewater shall be utilized for plantation and green belt development. Various noise abatement devices such as acoustic hoods, silencers, enclosures etc. have been provided on all sources of noise generation to keep the noise level well within the standards prescribed under Environmental (Protection) Act, 1986 Rules, 1989 viz. 75 dba (day time) and 70 dba (Night time). Monitoring results of Noise levels in and around the plant is annexed herewith as Annexure-III. We are maintaining good housekeeping. Workers are provided with Personal protective Equipments and it is ensure that they wear the same. Occupational health Surveillance Program is being arranged as mention in REIA/EMP. Page 3 of 4
5 7. The project Proponent should also comply with all the environmental protection measures and safeguards recommended in the REIA/EMP. 8. A separate environmental management cell with full fledge laboratory facilities to carry out various management and monitoring functions should be set up under the control of Senior Executive. 9. As proposed in EIA/EMP, Rs cr and 3.50 crores earmarked towards the capital cost and recurring cost/ annum for environmental pollution control measures shall be judiciously utilized for the implementations of the conditions stipulated by Ministry of Environment & Forests as well as State Government. The funds so provided shall not be diverted for any other purposes. 10. The regional office of the Ministry at Shillong/Central Pollution Control Board/ Assam Pollution Control Board shall monitor the stipulated conditions. A six monthly compliance report and the monitored data along with statistical interpretation shall be submitted to them regularly. 11. The project authorities shall inform the Regional Office as well as Ministry, the date of financial closure and final approval of the project by the concerned authorities and the date of commencing the land development work. 12. The project proponent should inform the public that the project has been accorded environmental clearance by the Ministry and copies of the clearances letter are available with Assam Pollution Control board/ Committee and may also be seen at website of the Ministry of Environment & Forests at This should be advertise within seven days from the date of issue of the clearance at least two local newspapers that are widely circulated in the region of which one shall be in the vernacular language of the locality concerned and a copy of the same should be forwarded to the regional office Lung function and Sputum analysis tests will be conducting in forthcoming months. We are complying & will comply all the environmental protection measures and safeguards recommended in the REIA/EMP. To carry out various management and monitoring functions, setting up of a separate environmental management cell with full fledge laboratory facilities is under planning. An EHS officer is responsible to execute and implement the entire environmental management plan for the plant. The funds so provided are exclusively for the implementation of the Environment Management Plan and shall not be diverted for any other purpose. The monitoring is being undertaken regularly. A six monthly compliance report and the monitored data along with statistical interpretation are submitted to RO Shillong, CPCB/APCB. Half-yearly compliance is submitted regularly to regional office of MoEF and SPCB along with this compliance report. The date of commencing the land development work 21 st Feb 2009 The date of financial closure 30 th Jan Complied Public notice has been published in Dainik Jansadharan (Assamese) & Eastern Cronicle (English). Copies have been already submitted along with earlier compliance. Page 4 of 4
6
7
8
9
10
11
12
13
14
Environment protection measures / technology
Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,
More informationTHE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2
THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II
More information2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.
Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated
More informationJ-11011/45/2009- IA II (I)
SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm
More informationClearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004
Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2017 March 2018 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2017 - Sept 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationCompliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017
A. SPECIFIC CONDITIONS Sl. No. i ii Condition Continuous stack monitoring facilities for all stacks and adequate air pollution control systems e.g. electrostatic precipitators (ESP) to clinker cooler and
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2016 Sept. 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationM/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated
1 Status of Environmental Clearances received from MOEF vide MoEF No.J- 1101/572/2007-IA II(I) dated 27.12.2007- Cement Plant and CPP, April - 2017. i) Compliance report is enclosed herewith for all the
More informationName of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)
J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement
More information4. The ambient air quality monitoring stations We are monitoring the ambient air quality
GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions
More informationMangalam Cement Ltd. (Unit-II) Stack No.
Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to Sept. 2015 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationDESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT
DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,
More informationCOMPLIANCE STATUS REPORT
COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status
More informationCOMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I)
COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER-2016 F. No. J-11011/309/2011-IA-ll (I) SUBMITTED BY- M/S. GASGEN FERRO ALLOYS LLP LOHIA HOUSE, 2ND FLOOR M.G.ROAD,
More informationMangalam Cement Ltd.(Unit I)
Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd
More informationSix Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013
Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Ref.: Environmental Clearance no. J-11011/754/2007-IA II
More informationMangalam Cement Ltd.
Mangalam Cement Ltd. Name of the Project :- New Cement Plant Unit - III and 17.5 mw CPP-II Project Code :- Raj- 80-600 - 2008 Clearance Letter No. :-F NO. J - 11011 / 30/2006 - IA II (I), dtd 17/07/2007
More informationF. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)
To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)
More informationPROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.
STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA
More informationHALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS
HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private
More informationD:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx
COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE EC letter no. J-11011/79/2007-IA II (I) Dated 16.04.2009 A. Specific Conditions : SN Condition Compliance 1. Continuous stack monitoring facilities to monitor
More informationPROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.
STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY& 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007- IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA
More informationHigh efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.
Sl. No. CONDITIONS COMPLIANCE STATUS SPECIFIC CONDITIONS i The gaseous emissions (PM, SO 2, NO X, PAH, HC, VOCs and Fluoride) from various process units shall conform to the standards prescribed by the
More informationJanki Corp. Ltd., Six Monthly Compliance Report
Janki Corp. Ltd., Six Monthly Compliance Report Period: October 2014 to March 2015 Project: Expansion of Sponge Iron Plant (1,80,000 to 4,00,000TPA) and Installation of Iron ore Beneficiation Plant (0.6
More informationDESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT
DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,
More informationTHE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2
THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II
More informationSubject: Half yearly Report for the period of 1 st April 2013 to 30 th Sept., 2013 for Indmax Project
IOC/BGR/ENV/INDMAX/MoEF/2013-14/01 Date: 19.11.2013 To The Chief Conservator of Forests Regional Office, North East Region Ministry of Environment & Forests Law-U-SIB, Lumbatngen, Near M.T.C. Workshop,
More informationState Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests
State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us
More informationChambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)
Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Reference: Environment clearance to CFG3 Project vides MOEF letter.no. J-11011/664/2008-IAII
More informationPART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION
Page 1 of 8 Environmental Statement for Clinker Grinding Unit of M/s Bihar Cement Plant (A Unit of Shree Cement Ltd.), situated at Jasoia Mor, BIADA, Industrial Growth Centre, Aurangabad, Tehsil & Dist.
More informationEnvironmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated
Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers
More informationEnvironmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated
Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers
More informationShri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra
Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi - 416108, Taluka - Shirol, Dist Kolhapur, Maharashtra Compliance of Conditions Stipulated in environmental clearance granted
More informationTelefax: 011: Dated:10 th May, 2013
F. No. J-11011/41/2011-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax: 011:
More informationSreeJayajothi Cements Limited (100% Subsidiary of M/s. My Home Industries Private Limited), Srinagar, Yanakandla , Kurnool Dist, Andhra
1 Environmental Clearance Point Wise Half YearlyCompliance Report(April 2015 to September 2015) Cement Plant -EC No: F.No. J-11011/21/2014-IA-II (I) dated: 28 th April 2015. A. SPECIFIC CONDITIONS : S.NO.
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct 2016 to March 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/472/2010- IA II (I) dated 11 th September,
More informationV.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN
V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite
More informationCement Manufacturing Company Ltd. Page 1
Six Monthly Compliance status of Environment Clearance for Cement Plant (2400 TPD) at Village Lumshnong, Meghalaya July to December 2013 Ref.: Environmental Clearance no. SEIAA/Project-6/2008/23 dtd. 16.03.10.
More informationMangalam Cement Ltd. Clearance Letter No. :- F NO. J / 30/ IA II (I), dtd 17/07/2007
Mangalam Cement Ltd. Name of the Project :- New Cement Plant Unit - III and 17.5 mw CPP. Project Code :- Raj- 80-600 - 2008 Clearance Letter No. :- F NO. J - 11011 / 30/2006 - IA II (I), dtd 17/07/2007
More informationHALF YEARLY COMPLIANCE REPORT 14 15) ENVIRONMENTAL CLEARANCE (CLINKER 2.48 MTPA TO 2.78 MTPA AND CEMENT 3.30 MTPA TO 3.90 MTPA)
HALF YEARLY COMPLIANCE REPORT (Oct 14 Mar 15) ENVIRONMENTAL CLEARANCE (CLINKER 2.48 MTPA TO 2.78 MTPA AND CEMENT 3.30 MTPA TO 3.90 MTPA) Letter No. F. No. J-11011/1180/2007- IA II (I) dated 11 th June,
More informationMONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I
MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I DATA SHEET 01 Project type : Cement Date: 24.11.2015 02
More information(A) Specific Conditions
J.K. Cement WORKS, Mangrol (RAJ) Dated 01.06.2017 Six Monthly Compliance report of Environment Clearance for Mangrol Cement Plant Line-3 (For the Period from October 2016 to March 2017) Reference Letter
More informationBRGD Ingot Private Limited 4, D.L. Khan Road, Block-C, Flat No. 201, 2 nd Floor, P.S. Kalighat, P.O. Bhowanipur, Kolkata
SIX MONTHLY COMPLIANCE REPORT (Period: October, 2016 to March, 2017) Refer EC File No. J-11011/258/2012-IA II (I)) dated 27 th August, 2015 Proposed expansion of Steel Melting shop unit (50,400 TPA to
More informationPART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan
Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10
More informationMy Home Industries Private Limited Srinagar, Mellacheruvu (V & M) , Suryapet Dist., Telangana State
HALF YEARLY EC COMPLIANCE REPORT (OCT 16-MAR 17) (Clinker 2.48 to 2.78 MTPA and Cement 3.30 to 3.90 MTPA) EC: Letter No. F. No. J-11011/1014/2007- IA II (I) dated 11 th June, 2008 S. No. Condition Compliance
More informationMy Home Industries Private Limited Srinagar, Mellacheruvu (V & M) , Suryapet Dist., Telangana State
HALF YEARLY EC COMPLIANCE REPORT (APR 17-SEP 17) (Clinker 2.48 to 2.78 MTPA and Cement 3.30 to 3.90 MTPA) EC: Letter No. F. No. J-11011/1014/2007- IA II (I) dated 11 th June, 2008 S. No. Condition Compliance
More informationF. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road
F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail : pb.rastogi@nic.in Telefax
More information6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA
6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA As on 01.04.2014 General Condition: Sl No. CONDITIONS COMPLIANCE I. The project authorities must strictly adhere to the stipulations made by the
More informationScanned by CamScanner
Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021
More informationEXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT
EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh
More informationTelefax: 011: Dated: 8 th March, 2013
F. No. J-11011/321/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax:
More informationYour letter ref. no. J-11011/131/2005-IA.II (I) dated A. SPECIFIC CONDITIONS
The status of Environmental Clearance accorded by Ministry of Environment and Forests, I.A. Division, New Delhi to M/s HINDALCO INDUSTRIES LIMITED, CHOTAMURI, Jharkhand for expansion of Alumina Refinery
More informationSix Monthly Compliance Status Report
Six Monthly Compliance Status Report Annexure -1 Name of Project : Expansion of Multi-Purpose Fluorinated Specialty ( Organic) Chemicals Plant at Village- Jhiwana, Tehsil- Tijara, District- Alwar ( Rajasthan)
More informationName of the Project:- J&K Mineral Development Corporation Limited.
Name of the Project:- J&K Mineral Development Corporation Limited. Sub:- Six Monthly report of the status of the compliance of the stipulated environment condition of Environment clearance granted vide
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to
More informationHope you will find the same in order. Thanking You, For EMAMI PAPER MILLS LTD. Authorized Signatory
To 13 th August, 2018 The Director Government of India Ministry of Environment & Forest (I.A. Division) Paryavarn Bhavan, CGO COMPLEX, Lodhi Road New Delhi- 110 003 Sub: Compliance status of conditions
More informationM/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA
1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which
More informationENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A
ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A 1. Name and address of the Owner / Occupier of the Industry
More informationA. SPECIFIC CONDITION COMPLIANCE
Six monthly compliance report of conditions laid down vide letter no. J-11011/438/2007-IA II (I), Dtd.02.02.2009 of Ministry of Environment & Forest, Government of India in respect of Integrated Steel
More informationJ.K. Cement WORKS, NIMBAHERA (RAJ)
A. SPECIFIC CONDITIONS : J.K. Cement WORKS, NIMBAHERA (RAJ) Compliance report of Environment Clearance for Nimbahera - Ahirpura Lime Stone Mine (For the Period from April 2013 to September 2013) Reference
More information. 0.:'. e:. :'} BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA Jji'665~" 1tS8;0 b AiS77..c,b
CIN No. : L26943RJ1979PLC001935 Phone : 01462228101-6 Toll Free: 18001806003/6004 Fax: 0146222811'71228119 E-Mail: shreebwr@shreecementltd.com Website : www.shreecement.in,-:,0 900, ~s}.s18(),9>01400,
More informationManufacture of Products like Phthalic Anhydride, Benzoic Acid and Power.
Ref EC No. J-11013/14/2007-IAII (I) dated 12.06.2007. To For Status IG Petrochemicals Ltd, T-2, MIDC Taloja Manufacture of Products like Phthalic Anhydride, Benzoic Acid and Power. Project Implementation
More informationOverburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.
ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked
More informationNo. Specific Condition (A) Compliance status
1 Sonadih Cement Plant : Nuvoco Vistas Corporation Limited( Formerly Lafarge India Limited) COMPLIANCE OF PLANT MoEF ENVIRONMENTAL CLEARANCE CONDITIONS REF. LETTER NO. F. No. J-11011/386/2005-IA-II (I)
More informationRajasthan State Pollution Control Board
M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and
More informationMIEL/NP/EMD/ 303/2015 Date:
MIEL/NP/EMD/ 303/2015 Date: 08.07.2015 To The Aditional Director, Ministry of Environment and Forests, Regional Office, Western Region, Link Road No 3, E-5, Ravishankar Nagar,(Arera Colony), Bhopal (M.P.)
More informationMill Expansion Cum Augmentation Project Compliance
Mill Expansion Cum Augmentation Project Compliance S No Description Remarks i. The company shall comply with the conditions Steps have already been taken to comply with all stipulated for the existing
More informationEnvironmental Clearance Compliance Report
Environmental Clearance Compliance Report Half Yearly Compliance Report- October 2016 March 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/417/2008- IA II (I) Dated 25 th August, 2009.
More informationName of Project: Panchagavi Laterite Mine, M/s J.K. Cement Works, Muddapur (Karnataka)
Panchagavi Laterite Mine, Village- Panchagavi, Taluka-Ramdurg, District- Belgaum, Karnataka Ref: - MoEF Letter No. SEIAA 107 MIN 2014 dtd. 24th December 2014 Compliance Report for the period from October
More information::-.~:t,::". 15{~~\t~:::~ ) \, "".<q.,.~../ ',<~,:~?>:-,-.-
.,vedanta - transforming elements ;,"-'-~-;--, 8:.~;":-~':_~2:' (-:>--...~ /"",...,:::-'.~ '..;_.j / (DiS,)'! '~" b bus: -, \\'t \. ::-.~:t,::". 15{~~\t~:::~ ) \, "".
More informationRef: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011
Ref.No:POL/U-II/EC/12-13/176 Date : 23.11.2012 To, Dr. A. Mehrotra, Director (S) Ministry of Environment & Forests, Regional Office, Western Region, Kendriya Paryavaran Bhavan Link Road No.3, E-5, Ravi
More informationM/s Balasore Alloys Ltd
M/s Balasore Alloys Ltd At Balgoplapur, Balasore, Odisha Period: October 2017 To March 2018 Submitted to: Regional office, MoEF & CC, Bhubaneswar 1 Specific Conditions & Status Sl.No. Conditions Status
More informationTNPL Mini Cement Plant (LSFM) EC Compliance Status Report as of 30/09/2015
TNPL Mini Cement Plant (LSFM) EC Compliance Status Report as of 30/09/2015 State Environment Impact Assessment Authority, Tamil Nadu vide Order No. SEIAA TN/ F 3082/KAR/ 3(b)/EXP/EC 8/2014 dated 12.03.2015
More informationHINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED
HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY
More information; Fax No. :
F. No. J-11011/281/2007- IA \I (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi - 110 003 To, Mis Jindal Stainless Ltd. Jindal
More informationSix Monthly Compliance Status Report
Six Monthly Compliance Status Report Name of Project : Expansion of Multi-Purpose Fluorinated Specialty ( Organic) Chemicals Plant at Village- Jhiwana, Tehsil- Tijara, District- Alwar ( Rajasthan) Project
More informationAgreed. 8 The project proponent shall ensure that no natural watercourse and/or water resources shall Shall be complied with.
Compliance Report for the period June 2012 - November 2012, to the conditions specified in the Environmental Clearance (EC), granted by MOEF, vide letter No. J-11015/889/2007 - IA.II (M) dated 22nd Feb,
More informationCOMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE
COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE PREAMBLE: EIA follow up commonly referred to as Compliance reporting is the process of monitoring, evaluation and validation of the
More informationSHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66
CIN No. : L26943RJ1979PLC001935 Phone : 01462228101-6 Toll Free : 18001806003/6004 Fax: 01462228117/228119 E-Mail: shreebwr@shreecementltd.com (I." Website : www.shreecement.in SHREE CEMENT LTD..~..~..~
More informationNATCO PHARMA LIMITED CHEMICAL DIVISION
Half yearly compliance report for the period - Oct 2016 to March 2017 on the conditions specified in Environmental Clearance issued by Ministry of Environment and Forests & Climate Change. Ref: Ministry
More informationBHILAI JAYPEE CEMENT LIMITED
BHILAI JAYPEE CEMENT LIMITED BABUPUR (SATNA) MP-485112 Environmental Compliance Half yearly report for the period October-2013 to March -2014 Compliance report for the period Oct-2013 to March-2014 to
More informationNMDC Iron and Steel Plant, Nagarnar, Dist-Bastar, (C.G.) Six Monthly Progress Report
NMDC Iron and Steel Plant, Nagarnar, Dist-Bastar, (C.G.) Six Monthly Progress Report (April 2017 to September 2017) Compliance Report of Environment Clearance issued vide- 1)Letter No- F.No. J-11011/681/2008-I.A.11(J)
More informationMonitoring the Implementation of Environmental Safeguards
Monitoring the Implementation of Environmental Safeguards Ministry of Environment & Forest Western Region, Regional Office, Bhopal MONITORING REPORT PART I DATA SHEET RASHTRIYA CHEMICAS AND FERTILISERS
More informationProject Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005
Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,
More informationCOSMOS CEMENTS LIMITED
Environmental Clearance Compliance Report Half Yearly Compliance Report- April 2015 Sept. 2015 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/417/2008- IA II (I) Dated 25 th August, 2009. Extension
More informationTHE RAMCO CEMENTS LIMITED
1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II
More informationNATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.)
Half yearly compliance report for the period July 2016 to Dec 2016 on the conditions specified in Environmental Clearance issued by Ministry of Environment and Forests & Climate Change. Ref: Ministry s
More informationCOMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated
COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated 10.08.2009 Period : January 2018 to June 2018 Sl.No. CONDITIONS STIPULATED BY MoEF COMPLIENCE Specific Conditions
More informationSIX MONTHLY COMPLIANCE REPORT OF BORHAT-TITLAGARH AREA
SIX MONTHLY COMPLIANCE REPORT OF BORHAT-TITLAGARH AREA General Conditions: (For the period from 1 st October, 2016 to 31 st March, 2017) Sl No. CONDITIONS COMPLIANCE I. The project authorities must strictly
More informationSHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan)
(i) (ii) (iii) (iv) (v) SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan) ENVIRONMENT CLEARANCE LETTER
More informationNMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P.
NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P. Sub: Ref: Period: Six Monthly Environmental Progress Report Environmental clearance no: No.J-11015/82/2009-IA.II(M),
More informationNorth East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial
More informationFORM V (See rule 14) Environmental Statement for the financial year ending the 31 st March 2017
FORM V (See rule 14) Environmental Statement for the ending the 31 st March 2017 1. Name and address of the Owner/Occupier of the Industry, operation or process 2. Industry Category: Primary (STC Code);