1 SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Shri Girija Alloy & Power (I) Expansion of Ferro Alloys unit at Submitted to ANDHRA PRADESH POLLUTION CONTROL BOARD 0
2 1.0 PROJECT DESCRIPTION Shri Girija Alloy & Power (I) Shri Girija Alloy & Power (I) is an existing Ferro alloy & Power plant situated at Sy. Numbers 148 P, 149 P, 151, 152 P, 153 P, 162 P, 164, 355 P, 397 P, 400 P, 428 P, Peddapuram Village, Peddapuram Mandal,. Now we propose to enhance the production of existing ferro alloy products and produce other ferro alloy products, noble ferro alloys and calcium aluminate based synthetic slag by proposing 6 x 9 MVA, 8 x 400 Kg Crucibles & 3 x 500 KVA Submerged Electric Arc Furnace. Proposed expansion will be taken up in the existing plant premises of 150 acres only. As per the Ministry of Environment, Forest & Climate Change (MOEF & CC), New Delhi notification, dated 14 th September, 2006 and its subsequent amendments, all Primary metallurgical processing industries are classified under Category A. The Ministry of Environment, Forest & Climate Change, New Delhi has accorded Terms of Reference (TOR) for the proposed expansion project vide letter no. J-11011/679/2009- IA II (I) dated 20 th March, The EIA Report has been prepared by incorporating the TOR stipulated by the Expert Appraisal Committee of MoEF & CC. Pioneer Enviro Laboratories & Consultants Private Limited, Hyderabad, which is accredited by NABET, Quality Council of India, vide certificate No. NABET/ EIA/ 1619/ RA 026, for preparing EIA report for Metallurgical Unit, have prepared Draft Environmental Impact Assessment (EIA) report for the proposed expansion project by incorporating the TOR approved by Ministry of Environment, Forest & Climate Change, New Delhi. The report contains detailed description of the following: Characterization of status of environment with in an area of 10 km radius from the plant site for major environmental components including air, water, noise, soil, flora, fauna and socio-economic environment. Assessment of air emissions, liquid waste and solid waste from the proposed expansion project along with the noise level assessment. Environmental Management Plan comprising of emission control measures proposed to be adopted in the expansion project, solid waste management, Greenbelt development. Post Project Environmental Monitoring & Budget for Environmental Protection Measures. 1
3 2.0 Plant Configuration and Production Capacity S.No The following table furnishes the existing and proposed units along with production capacities Unit Unit 1. Ferro Manganese (High carbon / medium carbon / low carbon) SEAF - 2. Silico Manganese (High carbon / medium carbon / low carbon) 5 X 9 & 1 X 5.4 MVA Existing Proposed Production Capacity Production Production After proposed Unit capacity capacity expansion 1,20,000 TPA 1,56,000 TPA 36,000 TPA (400 TPD) (520 TPD) (120 TPD) (or) 72,000 TPA (240 TPD SEAF - 4 x 9 MVA 85,000 TPA (283 TPD (or) 1,57,000 TPA (523 TPD) 3. Ferro Chrome (High carbon / medium carbon / low carbon) 85,000 TPA (283 TPD) 85,000 TPA (283 TPD) 4. Ferro Silicon (High carbon / medium carbon / low carbon) SEAF 2 x 9 MVA 25,000 TPA (83 TPD) 25,000 TPA (83 TPD) 5. Low carbon Ferro chrome ,600 TPA 3,600 TPA 6. Ferro Molybdenum Crucibles 3,600 TPA 3,600 TPA 7. Ferro Titanium x 400 Kg 3,600 TPA 3,600 TPA 8. Ferro Vanadium ,600 TPA 3,600 TPA 9. Calcium Aluminate based Synthetic slag SEAF 3 x 500 KVA 15,000 TPA (50 TPD) 15,000 TPA (50 TPD) 10. Power generation MW MW 2
4 1.2 Raw Materials The following will be the raw material requirement for the proposed expansion project: Raw Material Quantity (TPA) Sources Mode of Transport Ferro alloys Manganese Ore 4,41,000 Imported / indigenous from Sea, rail, road Chrome Ore 1,95,500 Karnataka / Orissa / Madhya Pradesh / Sea, rail, road Coke 1,14,320 Imported / Indigenous / Coal 1,59,975 Sea, road Singareni Colleries / imported Charcoal 40,000 Quartz 1,05,250 Rail, road Dolomite 82,000 Rail, road Mill Scales 10,000 Rail, road EC paste 7,815 Rail, road Magnesite 5100 Rail, road Ferro manganese slag 34,000 In plant generation conveyor Noble Ferro alloys Chrome Ore 7,059 Import & Indigenous Orissa Sea, rail, road Aluminimum Telic 5,690 Import -Dubai Sea, Road Flourspar 630 Import China Sea, Road Ferrosilicon 1,525 Captive Ilmenite 3,727 Indigenous - Orissa / Kerala Road Iron Nails 1,680 Indigenous Road lime 784 Indigenous Gujarat Road mill scale 5,690 Indigenous Road Sodium Nitrate 530 Indigenous Gujarat Road rutile 508 Import & Indigenous Orissa / Kerala Sea, Road V 2 O 5 4,000 Import Sea, Road MO 3 (Moly Oxide) 3,600 Import Sea, Road Calcium aluminate based Synthetic slag Hydrated Lime 9,000 Indigenous Rajasthan Road Indigenous - Chhattisgarh / Road Bauxite 4,500 Orissa Aluminium telic 900 Import Sea Aluminium catalyst 600 Indigenous / Gujarat Road 3
5 1.3 Manufacturing Process Ferro alloys Shri Girija Alloy & Power (I) Ferro manganese or silicon-manganese will be produced using manganese ore as main raw material in a sub-merged arc furnace using reducer (Coke) under high voltage. Similarly Ferro silicon will be produced using Quartz as main raw material and Ferro chrome using Chrome ore as raw material. Ferro Chrome Recovery unit The slag generated during Ferro chrome manufacturing will be sent to Ferro chrome recovery unit. Ferro chrome will be recovered through process of crushing, screening and jigging. Noble Ferro alloys Noble Ferro alloys are manufactured through Alumino Thermit Process. Alumino thermic process aims at the production of Ferro Alloys from the oxides of elements by reduction with Aluminum powder using exothermic heat of the reaction for smelting purpose. Calcium Aluminate based Synthetic slag Calcium Aluminate based Synthetic Slag is made of select raw material of Calcium and Aluminium, blended at a proper proportion, ground to powder, pelletized after churning, sintered or melted in kiln. 1.4 Water Requirement Total water requirement after expansion will be 1400 m 3 /day. Water required for the expansion project will be sourced from Samalkot canal. Approval from the Irrigation department for drawing 1400 m 3 /day of water has already been obtained. 4
6 The following is the break-up of the water requirement for proposed expansion project. WATER REQUIREMENT (For Expansion) S.No. Details of water requirement Quantity in (m 3 /day) 1. Make-up water for cooling Domestic Waste Water Generation Total 106 There will be not be any effluent generation from the proposed expansion as closed circuit system will be followed in the Ferro alloy unit. The only source of effluent generation will be sanitary waste water of 8 KLD will be treated in septic tank followed by sub-surface dispersion trench. In the existing plan also zero effluent discharge is being maintained. The following will be the total wastewater & it s break-up. WASTE WATER GENERATION (Expansion) S.No. Source Generation (m 3 /day) 1. Sanitary Wastewater 8 Total Wastewater Characteristics PARAMETER Sanitary waste water ph BOD (mg/l) COD (mg/l) TDS (mg/l) DESCRIPTION OF ENVIRONMENT Base line data has been collected on ambient air quality, water quality, noise levels, flora and fauna and socio economic details of people within 10 km radius of the plant. 5
7 2.1 Ambient air quality Ambient air quality was monitored for PM 2.5, PM 10, SO 2, NOx & CO at 8 stations including plant site during October 2016 to December The following are the concentrations of various parameters at the monitoring stations: Parameter Concentration PM 2.5 : 18.9 to 36.4 g/m 3 PM 10 * : 32.4 to 65.8 g/m 3 SO 2 : 9.8 to 16.3 g/m 3 NO X : 11.7 to 20.4 g/m 3 CO : 360 to 680 g/m Water Quality Surface Water Quality Samalkot canal (5.2 Kms.) is flowing within 10 Km. radius of the plant site. Two nos. of Surface water samples have been collected, one from upstream & other on downstream of Samalkot canal w.r.t the plant site to assess surface water quality. The analysis of samples shows that all the parameters are in accordance with BIS-2296 specifications Ground Water Quality 8 No. of ground water samples from open wells / bore wells have been collected from the nearby villages to assess ground water quality impacts and analyzed for various Physico- Chemical parameters. The analysis of samples shows that all the parameters are in accordance with BIS: specifications. 2.3 Noise Levels Noise levels were measured at 8 locations during day time & Night time. The noise levels at the monitoring stations are ranging from 46 dba to 64.6 dba. 6
8 3.0 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 3.1 Prediction of impacts on air quality The likely emissions from the proposed project are PM 10, NOx & CO. The predictions of Ground level concentrations have been carried out using Industrial Source Complex (ISC-3) model. Meteorological data such as wind direction, wind speed, max. and min. temperatures collected at the site have been used as input data to run the model. Net Resultant maximum ground level concentrations during operation of expansion project Item PM 10 NO X CO ( g/m 3 ) ( g/m 3 ) ( g/m 3 ) Maximum baseline conc. in the study area Maximum predicted incremental rise in concentration due to emission from proposed expansion project Maximum predicted incremental rise in concentration due to vehicular emissions Net resultant concentrations during operation of the plant National Ambient Air Quality Standards The predicted results show that the net resultant concentration (max. baseline conc. + max. incremental rise in conc.) of PM 10, NOx and CO are well within the National Ambient Air Quality Standards after commissioning of proposed expansion project. Hence there will not be any adverse impact on air environment due to the proposed expansion project. 3.2 Prediction of impacts on noise quality The major sources of noise generation in the proposed expansion project will be DG sets. The ambient noise levels will be within the standards prescribed by MoEF i.e. the noise levels will be less than 75 dba during day time and less than 70 dba during night time acres (inclusive of existing) of extensive greenbelt already developed which helps to further attenuate the noise levels. Hence there will not be any adverse impact due to noise on population in surrounding areas due to the proposed expansion project. 7
9 3.3 Prediction of impacts on Water Environment Water drawl permission already obtained for entire quantity from State Irrigation Department. There will be not be any effluent generation from the proposed expansion as closed circuit system will be followed in the Ferro alloy unit. The only source of effluent generation will be sanitary waste water which will be treated in septic tank followed by sub-surface dispersion. In the existing plant, zero discharge is being maintained and will be continued even after expansion. Hence there will not be any adverse impact on water environment due to the proposed expansion project. 3.4 Prediction of Impacts on Land Environment There will not be any effluent generation from the proposed expansion as closed circuit system will be adopted in the ferro alloy unit. Sanitary waste water generated will be treated in septic tank followed by subsurface dispersion. All the required air pollution control systems will be provided to comply with CPCB / APPCB norms. All solid wastes will be disposed / utilized as per CPCB / APPCB norms Acres (inclusive of existing) of greenbelt has already been developed as per guidelines. Hence there will not be any adverse impact on land environment due to the proposed expansion project. 3.5 Socio - Economic Environment There will be lot of opportunities in employment to local people during construction as well as in operation phase. There will be further upliftment in Socio Economic status of the people in the area. 2.5% of expansion project cost will be allocated for CSR activities. Hence there will be further development of the area due to the proposed expansion project. 8
10 4.0 ENVIRONMENTAL MONITORING PROGRAMME In the existing plant online stack monitoring has been provided. Ambient Air Quality, Sack monitoring & effluent analysis will be carried out regularly as per CPCB norms and the analysis reports will be submitted to Ministry of Environment & Forest, Chennai & APPCB regularly. Online stack monitoring facility will be provided o furnace stacks. 5.0 ADDITIONAL STUDIES No Rehabilitation and Resettlement is involved in the proposed project. Hence no R & R study has been carried out. 6.0 PROJECT BENEFITS With the establishment of the proposed expansion project employment potential will increase. Land prices in the area will further increase. The economic status of the people in the area will improve due to the proposed expansion project. CSR activities will be taken up as per norms. Periodic medical checkups will be carried out. Top priority will be given to locals in employment. 7.0 ENVIRONMENT MANAGEMENT PLAN 7.1 Air Environment The following are air emission control systems proposed in the proposed expansion project: S.No. Source Control Equipment Maximum Particulate emission at the outlet Submerged Electric Arc Fume extraction & cleaning 1. Furnace (6 x 9 MVA) system With bagfilters 50 mg/nm Crucibles (8 x 400 Kg) Submerged Electric Arc Furnace (3 x 500 KVA) Fume extraction & cleaning system With bagfilters Fume extraction & cleaning system With bagfilters 50 mg/nm 3 50 mg/nm 3 The following air pollution control systems/ measures are proposed in the Plant: All conveyors will be completely covered with G.I. sheets to control fugitive dust. 9
11 All bins will be totally packed and covered so that there will not be any chance for dust leakage. All the dust prone points material handling systems will be connected with de-dusting system with bag filters. All discharge points and feed points, wherever the possibility of dust generation is there a de-dusting suction point will be provided to collect the dust. Raw material unloading areas will be provided with dust suppression system Greenbelt developed will help in attenuating air emissions further 7.2 Water Environment There will be not be any effluent generation from the proposed expansion as closed circuit system will be followed in the Ferro alloy unit. The only source of effluent generation will be sanitary waste water which will be treated in septic tank followed by sub-surface dispersion. 7.3 Noise Environment The major sources of noise generation in the proposed project will be DG sets. Acoustic enclosure will be provided to the DG set. All the machinery will be manufactured in accordance with MoEF&CC norms on Noise levels. The employees working near the noise generating sources will be provided with earplugs. The extensive greenbelt developed within the plant premises will help in attenuating the noise levels further. 7.4 Land Environment There will be not be any effluent generation from the proposed expansion as closed circuit system will be followed in the Ferro alloy unit. The only source of effluent generation will be sanitary waste water which will be treated in septic tank followed by sub-surface dispersion. All the required Air emission control systems will be installed and operated to comply with MOEF&CC / CPCB / APPCB norms. Solid wastes will be disposed off as per norms. Extensive greenbelt has been developed in the plant premises. Hence there will not be any impact on land environment due to the proposed expansion project. 10
12 Solid waste generation and disposal S.No Waste / By product Quantity (TPA) Method of disposal 1. Ferro Manganese slag 96,000 Will be used in manufacture of Silico manganese as it contains high MnO Silico Manganese slag 1,02,000 Will be utilized in road construction / land filled 3. 1,02,000 Will be utilized in road construction / land Ferro Chrome slag filled 4. 10,000 Will be utilized in road construction / land Ferro Silicon slag filled 5. Low carbon Ferro chrome slag 6,426 Once the product is manufactured, TCLP test will be conducted for the slag and will be used 6. Ferro Molybdenum slag 3, Ferro Titanium slag 3, Ferro Vanadium slag 3,960 for landfill / as per outcome of TCLP test sent to TSDF. 7.5 Greenbelt Development Greenbelt of 50.0 acres (inclusive of existing) has already been developed in the site premises. Capital cost for environment protection for the proposed expansion project will be Rs Crores. ********* 11
EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT
EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged
More informationM/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola
0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to
More informationMars Power & Steel Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive
More informationM/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA
1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which
More informationSimran Industries Pvt. Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Patharra Village Bemetara Tehsil Durg District Chhattisgarh Submitted to: CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh 1.0 INTRODUCTION
More informationSUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam
More informationExecutive Summary. Vizianagaram District, Andhra Pradesh. Season : December 2016 to February 2017 File no.: J-11011/1129/2007-IA-II(I)
Executive Summary Environmental Impact Assessment for Expansion of Ferro Alloys unit Production (Addition of 2 x 9 MVA Submerged Electric Arc Furnace) at Plot No.368, APIIC Growth Centre, Bobbili Village
More informationSUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Village : Taraimal, Tehsil : Gharghoda District : Raigarh
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Village : Taraimal, Tehsil : Gharghoda District : Raigarh Submitted to: CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh 1.0 INTRODUCTION
More informationTIRUMALA BALAJI ALLOYS PVT. LTD.
ANNEXURE - 1 SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Expansion of Ferro Alloys unit at OP Jindal industrial Park, Sector -B, Punjipathra Village, Gharghoda Tehsil, Raigarh District, Chhattisgarh
More informationNorth East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial
More informationRoquette Riddhi Siddhi Private Limited
SUMMARY ON DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Roquette Riddhi Siddhi Private Limited (Expansion of co-generation power plant from 6MW to 18 MW) at Gokak Village & Taluk, Belagavi District,
More informationSUMMARY. for New Standalone Cement Grinding Unit. proposed at
SUMMARY of ENVIRONMENT IMPACT ASSESSMENT REPORT for New Standalone Cement Grinding Unit ( 2 x 1.0 million tons per annum) proposed at Gaithulapalem, Tallapalem & Narasapuram Villages, Kasimkota Mandal,
More informationCHAPTER-10 SUMMARY AND CONCLUSION
CHAPTER-10 SUMMARY AND CONCLUSION 10.1 INTRODUCTION M/s. Shree Warad Alloys (P) Ltd., Nagpur a private limited company having its registered office at Plot No. C-1, Sharvari Apartments, 8/B, Trimurty Nagar,
More informationEXECUTIVE SUMMARY 1. INTRODUCTION
EXECUTIVE SUMMARY 1. INTRODUCTION M/s. Indsil Energy & Electro Chemical Ltd plant is situated in Urla Industrial Estate, Raipur, Chhattisgarh. The company is manufacturing Ferro Alloys. Due to massive
More informationat Sarora Village, Tilda Tehsil, Raipur District, Chhattisgarh in 64 acres of land. Now
1.0 INTRODUCTION M/s Khetan Sponge & Infrastructure Pvt. Ltd. is and existing sponge iron plant at Sarora Village, Tilda Tehsil, Raipur District, Chhattisgarh in 64 acres of land. Now it has been proposed
More informationCapacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB)
Brief Note Prakash Industries Limited (PIL) is existing Integrated Steel Plant located at Hathneora, Champa Villages, Janjgir-Champa District, Chhattisgarh. Existing plant has obtained Environment Clearance
More informationCOMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I)
COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER-2016 F. No. J-11011/309/2011-IA-ll (I) SUBMITTED BY- M/S. GASGEN FERRO ALLOYS LLP LOHIA HOUSE, 2ND FLOOR M.G.ROAD,
More informationCOMPLIANCE STATUS REPORT
COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status
More informationTHE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2
THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II
More informationANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI
M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement
More informationJ-11011/45/2009- IA II (I)
SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm
More informationSeason : December 2016 to February 2017 File no.: J-11011/1129/2007-IA-II(I) Environment Consultant:
Environmental Impact Assessment for Expansion of Ferro Alloys unit Production (Addition of 2 x 9 MVA Submerged Electric Arc Furnace) at Plot No.368, APIIC Growth Centre, Bobbili Village & Mandal, Vizianagaram
More informationEXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,
More informationTelefax: 011: Dated: 8 th March, 2013
F. No. J-11011/321/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax:
More informationM/s. SHREE SHYAMJEE METALLICS
PRE-FEASIBILITY REPORT FOR PRPOSED UNIT OF Manufacturing Of Manganese Dioxide, Manganese Oxide, Ferro Alloy Unit (By Thermite Process) And Manganese /Iron Ore Beneficiation From ROM At Survey No. 165 &
More informationM/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh
M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25
More informationPRE- FEASIBILITY REPORT
PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified
More informationSINGHAL ENTERPRISES PRIVATE LIMITED
SINGHAL ENTERPRISES PRIVATE LIMITED (INTEGRATED MINI STEEL & POWER PLANTS) Taraimal Village, Gharghoda Mandal, Raigarh District, Chattisgarh State. 1.0 INTRODUCTION SINGHAL ENTERPRISES PRIVATE LIMITED
More informationDESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT
DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,
More informationAccord Energy Corporation India Pvt. Ltd.
Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II
More informationRajasthan State Pollution Control Board
M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and
More informationEXECUTIVE SUMMARY. Study Period: Summer Season (1 st March to 31 st May 2018)
EXECUTIVE SUMMARY For CAPACITY EXPANSION FROM 31,320 TO 1,30,320 TPA FERRO ALLOYS PRODUCTION BY INSTALLATION OF ADDITIONAL 3X9 MVA & 1X24 MVA SUBMERGED ARC FURNACE ALONG WITH 1,50,000 TPA BRIQUETTING PLANT
More information2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.
Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.
More informationPre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]
Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated
More informationJanki Corp. Ltd., Six Monthly Compliance Report
Janki Corp. Ltd., Six Monthly Compliance Report Period: October 2014 to March 2015 Project: Expansion of Sponge Iron Plant (1,80,000 to 4,00,000TPA) and Installation of Iron ore Beneficiation Plant (0.6
More informationTelefax: 011: Dated:10 th May, 2013
F. No. J-11011/41/2011-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax: 011:
More informationD:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx
COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE EC letter no. J-11011/79/2007-IA II (I) Dated 16.04.2009 A. Specific Conditions : SN Condition Compliance 1. Continuous stack monitoring facilities to monitor
More informationCalcom Cement India Limited
Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam 782446 Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I)
More informationF. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road
F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail : pb.rastogi@nic.in Telefax
More information4. The ambient air quality monitoring stations We are monitoring the ambient air quality
GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions
More informationDate: 20 th April, 2018
Date: 20 th April, 2018 To, The Director & Member Secretary (Industry-1) Ministry of Environment, Forest & Climate Change, Govt. of India, Indira Paryavaran Bhawan, Ali Ganj, Jor Bagh Road, New Delhi 110
More informationM/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.
1. INTRODUCTION Executive Summary 1.1 Background: M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1.2 Proposed Project:
More informationF. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)
To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)
More informationSUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Village Tehsil District : Saraipalli : Tamnar : Raigarh SUBMITTED TO CHHATTISGARH ENVIRONMENT CONSERVATION BOARD, RAIPUR, CHHATTISGARH 1.0 INTRODUCTION
More informationTHE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2
THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II
More informationM/s Balasore Alloys Ltd
M/s Balasore Alloys Ltd At Balgoplapur, Balasore, Odisha Period: October 2017 To March 2018 Submitted to: Regional office, MoEF & CC, Bhubaneswar 1 Specific Conditions & Status Sl.No. Conditions Status
More informationEnvironment Consultant:
MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village
More informationN.H. 6 is 50 km away from the proposed plant boundary; in N direction;
1.1 INTRODUCTION Godawari Power & Ispat Limited (GPIL) has an existing Iron Ore Crushing plant of 12,00,000 MTPA capacity at Gidhali, Village Kusumkasa, Tehsil - Balod, District - Durg (Chhattisgarh) and
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2017 March 2018 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationState Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests
State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us
More informationA. SPECIFIC CONDITION COMPLIANCE
Six monthly compliance report of conditions laid down vide letter no. J-11011/438/2007-IA II (I), Dtd.02.02.2009 of Ministry of Environment & Forest, Government of India in respect of Integrated Steel
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT By Sugna Metals Limited [Expansion of Steel Plant] At Sy. Nos. 142 & 143 of NarayanpurVillage, Pargi Mandal, Vikarabad District (formerly Ranga Reddy), Telangana INDEX S.No Item
More informationMANGANESE ORE, CHROME ORE, FERRO ALLOYS
MANGANESE ORE, CHROME ORE, FERRO ALLOYS GLOBAL STEEL PRODUCTION In 2011 World Crude Steel Production reached 1527 million tonnes and showed a growth of 6.8% over 2010 and China remained the World s largest
More informationPRE-FEASIBILITY REPORT
01-07-2018/R3 PRE-FEASIBILITY REPORT FOR EXPANSION OF STEEL MANUFACTURING UNIT BY REPLACING EXISTING INDUCTION FURNACE CAPACITY Steel Billets/ Ingots- 28,800 TPA to 75,240 TPA By M/S TRISHALA ALLOYS PVT.
More informationPRE FEASIBILITY REPORT
VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,
More informationEXECUTIVE SUMMARY. (Approved Consultant)
ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CAPTIVE RESIN PLANT OF 100000 TPA PRODUCTION CAPACITY AT ROUTHUSURAMALA VILLAGE, THOTTAMBEDU MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY
More informationThe below is a detailed evaluation of the EIA report, based on a community request from Ekta Parishad, a local NGO in Chhattisgarh.
EIA Review of Nalwa integrated steel plant (NSPL) Background Nalwa integrated steel plant (0.198 MTPA sponge iron), located near village Taraimal, Raigarh district, Chhattisgarh proposes to expand its
More informationProposed Terms of Reference for EIA studies
Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10
More informationRajasthan State Pollution Control Board
M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2017 - Sept 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationMangalam Cement Ltd. (Unit-II) Stack No.
Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd
More informationINSPIRE INDUSTRIES PVT. LTD.
For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory
More informationSix Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013
Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Ref.: Environmental Clearance no. J-11011/754/2007-IA II
More informationDESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT
DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,
More informationEnvironment protection measures / technology
Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,
More informationMONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I
MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I DATA SHEET 01 Project type : Cement Date: 24.11.2015 02
More informationM/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated
1 Status of Environmental Clearances received from MOEF vide MoEF No.J- 1101/572/2007-IA II(I) dated 27.12.2007- Cement Plant and CPP, April - 2017. i) Compliance report is enclosed herewith for all the
More informationClearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004
Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:
More informationPRE-FEASIBILITY REPORT. NR TMT (India) Private Limited
SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, CHHATTISGARH By NR TMT (India) Private Limited at Plot No.: 211, 213 (Part) & 212 (Part), Sector L, O.P. Jindal Industrial Park, Village Punjipathra,
More informationRED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE
ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION
More information; Fax No. :
F. No. J-11011/281/2007- IA \I (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi - 110 003 To, Mis Jindal Stainless Ltd. Jindal
More information~he Director Mis Nixon Steel & Power Ltd. 54, LSC LU Block Pitampura, Delhi
F. No. J-11 011/520/2008- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi - 110 003 To, ~he Director Mis Nixon Steel
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT By Agrawal Iron & Industries (Unit # 2) [Regularisation of Pellet plant 90,000 MTPA along with Coal Gasifier 5000 Nm3/Hr] at Kh.No.219, 220, 221, P.H.No.54, Village Billory, Tehsil
More informationUPDATED Form I For Extension of E.C. validity. (E.C. issued vide order No. J / 1149 / 2007 IA II (I) dated 2 nd January 2009)
UPDATED Form I For Extension of E.C. validity (E.C. issued vide order. J-11011 / 1149 / 2007 IA II (I) dated 2 nd January 2009) Submitted to MoEF, New Delhi for at Sy.. 158, 159, 160, 163-168 & 171 at
More informationENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT
ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL
More informationPRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationANNEXURE-II CONSENT TO OPERATE AND ITS COMPLIANCE
AII-1 AII-2 AII-3 AII-4 FERRO MANGANESE PLANT, JODA CONSENT FOR EXISTING/NEW OPERATION OF THE PLANT (Under Sec.21 of the Air (Prevention and Control of Pollution) Act, 1981 Consent Details of the Consent
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2016 Sept. 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationPROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.
STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA
More information.in Dated 9th August, Sharma ;
F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in
More informationHigh efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.
Sl. No. CONDITIONS COMPLIANCE STATUS SPECIFIC CONDITIONS i The gaseous emissions (PM, SO 2, NO X, PAH, HC, VOCs and Fluoride) from various process units shall conform to the standards prescribed by the
More informationDiscipline Chemical Testing Issue Date Certificate Number T-3553 Valid Until Last Amended on - Page 1 of 9
Last Amended on - Page 1 of 9 I. ORES & MINERALS 1. Iron Ore Total Iron IS 1493: 1981 (RA 2006) 10 % to 70 % Silicon IS 1493: 1981 (RA 2006) 0.5 % to 25 % Aluminum IS 1493: 1981 (RA 2006) 0.5 % to 20 %
More informationThe study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows:
1.0 EXECUTIVE SUMMARY 1.1 Introduction M/s Mahavir Benefication Pvt. Ltd. (MBPL) proposes expansion of its coal washery from 1.0 MTPA to 5.0 MTPA capacity at Dhiroul Village, Anuppur District, Madhya Pradesh
More informationName of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)
J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement
More informationM/S. HETERO INFRASTRUCTURE SEZ LIMITED
ENVIRONMENTAL STATEMENT (FORM - V) FOR THE FINANCIAL YEAR ENDING MARCH-2016. M/S. HETERO INFRASTRUCTURE SEZ LIMITED N.NARASAPURAM(V),NAKKAPALLI(M) VISAKHAPATNAM DISTRICT. SUBMITTED TO : ANDHRA PRADESH
More informationDated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana
F.No.10-12/201S-IA.III Government of India Ministry of Environment, Forest & Climate Change (IA.IIISection) Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi - 110 003. To The Director, Mjs Vulcan Waste
More informationUPDATED Form I For Extension of E.C. validity. (E.C. issued vide order No. J / 1040 / 2007 IA II (I) dated 27/01/2010 & 06/08/2015)
UPDATED Form I For Extension of E.C. validity (E.C. issued vide order. J-11011 / 1040 / 2007 IA II (I) dated 27/01/2010 & 06/08/2015) Submitted to MoEF, New Delhi for Raigarh Ispat & Power Pvt. Ltd. at
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to Sept. 2015 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationEIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)
EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) 1. PROJECT DESCRIPTION: Ambuja Cement Eastern Ltd. (ACEL) has the cement
More informationMangalam Cement Ltd.(Unit I)
Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd
More informationBRGD Ingot Private Limited 4, D.L. Khan Road, Block-C, Flat No. 201, 2 nd Floor, P.S. Kalighat, P.O. Bhowanipur, Kolkata
SIX MONTHLY COMPLIANCE REPORT (Period: October, 2016 to March, 2017) Refer EC File No. J-11011/258/2012-IA II (I)) dated 27 th August, 2015 Proposed expansion of Steel Melting shop unit (50,400 TPA to
More informationSUMMARY ENVIRONMENT IMPACT ASSESSMENT REPORT
SUMMARY ENVIRONMENT IMPACT ASSESSMENT REPORT Expansion of Steel Plant village Taraimal, Tehsil Ghargoda District Raigarh (Chhattisgarh) PROJECT PROMOTER NALWA STEEL & POWER LIMITED RAIGARH, CHHATTISGARH
More informationENVIRONMENTAL STATEMENT FOR THE YEAR
ENVIRONMENTAL STATEMENT FOR THE YEAR 2016-17 6 MTPA STEEL PLANT OF TATA STEEL AT KLAINGANAGAR INDUSTRIAL COMPLEX, ODISHA ENVIRONMENTAL DEPARTMENT TATA STEEL KALINGANAGAR Kalinga Nagar Industrial Complex,
More informationMIEL/NP/EMD/ 303/2015 Date:
MIEL/NP/EMD/ 303/2015 Date: 08.07.2015 To The Aditional Director, Ministry of Environment and Forests, Regional Office, Western Region, Link Road No 3, E-5, Ravishankar Nagar,(Arera Colony), Bhopal (M.P.)
More informationApplication of Low and Non Waste Technology in the production process;
9.0 ENVIRONMENT MANAGEMENT PLAN (EMP) 9.1 INTRODUCTION Environment Management Plan is required for ensuring sustainable development. It should not affect the surrounding environment adversely. The management
More information