ACTIVITY: Infiltration Systems ST 03

Size: px
Start display at page:

Download "ACTIVITY: Infiltration Systems ST 03"

Transcription

1 Runoff Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients Toxic Materials Oil & Grease Bacteria & Viruses Construction Wastes Description Suitable Applications This BMP covers various methods, loosely grouped as infiltration systems, in which stormwater runoff is infiltrated into the ground rather than discharged to a surface channel. These systems include infiltration basins, infiltration trenches, drywells and vaults, and porous pavement. Infiltration rates in most of the Knoxville area are typically poor due to clay soils and bedrock. Areas containing karst topography and sinkholes may initially appear to have excellent infiltration, but should be considered as unreliable and will require very careful investigation and analysis. Infiltration basins and infiltration trenches may be used for stormwater quality and stormwater detention at small project sites only if soil, geologic and groundwater conditions are suitable. Soils must have adequate infiltration rates as measured or tested in the field. No unfavorable geologic conditions shall be present that would indicate sinkholes or underground passageways. Drywells and vaults are suitable for draining small impervious surfaces, such as parking lots or residential rooftops, for which the adjacent pervious area has soils with adequate infiltration rates. Porous pavements make a generally impervious surface into a semi-pervious surface, and do not usually function as a true infiltration system. There is a basic conflict for non-sandy soils to both support vehicle loads and allow water to infiltrate. Porous pavements should be restricted to light traffic conditions without heavy truck use, such as residential driveways and overflow parking lots. Natural sinkholes (or other evidences of karst topography and drainage) are not considered to be infiltration systems for use in treating stormwater quality or in providing stormwater detention. In general, stormwater drainage may continue to flow to a natural sinkhole at a rate that is representative of natural undeveloped conditions. No unusual or unfavorable geologic conditions shall be present near the sinkhole that indicates subsidence, piping, increased limestone dissolution, potential collapse or other safety concerns. Approach Infiltration can be a very desirable method of stormwater treatment for land uses which do not heavily pollute stormwater runoff. For instance, established residential areas typically have less pollution than industrial and commercial areas. The primary physical conditions necessary for infiltration are: 1) permeable soils which have not been compacted or graded, and 2) low groundwater tables. Stormwater runoff from parking Stormwater Treatment ST-03-1 May 2003

2 lots or buildings should be pretreated with a water quality inlet, oil/water separator, grass swale or other type of stormwater treatment BMPs. The measures listed in this BMP can be informally grouped into two categories: Larger amounts of stormwater runoff from a project site that are ponded and then forced to infiltrate (infiltration basin, infiltration trench). Smaller amounts of stormwater runoff from selected impervious areas that are given an opportunity to infiltrate (drywell, dry vault, porous pavement). It is very important to protect the natural infiltration rate of suitable soils by only using lightweight equipment and construction procedures that minimize or eliminate compaction. In addition, prevent erosion and sediment transport from occurring upstream of an infiltration basin or other infiltration system. Inspect frequently for clogged soils and for ineffective infiltration rates. Improperly functioning infiltration systems must be replaced by other stormwater treatment BMPs that are capable of providing water quality treatment. Maintenance can be difficult and costly for infiltration systems, with a potential for high maintenance costs due to clogging. Maintenance costs and site access should be carefully considered prior to design. Pretreatment of stormwater runoff may reduce maintenance costs by capturing coarse sediments and floatable materials in a smaller structure that can be more easily cleaned. All infiltration systems should be inspected several times the first year and at least twice a year thereafter. Maintain records of inspections and maintenance performed. Overview of Infiltration Theory The recommended minimum infiltration rate is at least 0.5 inches per hour, but may depend on type of infiltration system and the desired water quality treatment involved. Drawdown should occur within 72 hours using a safety factor of 2.0 to account for wetweather water table conditions. An infiltration basin or trench must have at least 3 feet separation from seasonal high groundwater and at least 4 feet separation from bedrock. Coarse soils are not as effective in filtering groundwater; therefore provide at least 6 to 8 feet separation from seasonal high groundwater for sand and gravel soils. The overall degree of water quality treatment achieved by infiltration is a function of the amount of stormwater that is captured and infiltrated over time. Minimum infiltration storage is generally required to be the first flush volume (the first 0.5 of stormwater runoff from the entire contributing area). Consideration may be given to the following formula for 85% volume capture for the average rainfall event volume, with a minimum drain time of 12 hours, if there are extenuating circumstances such as impervious runoff from an adjoining property. Longer drain times require a larger capture volume. V = (B) (C) (A) (P m / 12) V = stormwater runoff capture volume (acre-feet) B = regression constant from least-square analysis = (for 85% runoff volume capture ratio with a 12-hour drain time) C = watershed runoff coefficient (dimensionless) A = watershed area (acres) P m = mean storm precipitation volume = 0.53 inches for Knoxville as reported in reference 152 Stormwater Treatment ST-03-2 May 2003

3 Typical infiltration rates are shown in Table ST The USDA soil texture classification is based upon the triangle shown in Figure ST-03-1, with the following definitions: Approximate size Rough description Gravel > 2 mm > No. 8 sieve or so Sand 0.05 mm to 2 mm > No. 200 sieve Silt mm to 0.05 mm Little plasticity or cohesion Clay < mm Can be rolled and compressed For preliminary design, infiltration rates may be estimated using a published soil survey. However, final design must include soil gradation testing and measurement of unsaturated vertical infiltration rates in the field by the double-ring infiltrometer test. This test is not appropriate for clay soils or other soils which clearly appear to be unsuitable for infiltration methods. The allowable infiltration rate is 0.5 inches per hour, although an infiltration rate of 1 inch per hour is highly recommended. Table ST-03-1 shows that soils with a hydrologic soil group of C or D will not have sufficient infiltration rates. Another well-known method of categorizing soils and evaluating soil properties is by the Unified Soil Classification System (USCS). The following soil groups are generally acceptable as good soils for infiltration: SW SP SM Well-graded sands and gravelly sands, little or no fines Poorly graded sands and gravelly sands, little or no fines Silty sands, sand-silt mixtures Table ST-03-1 Typical infiltration Rates from USDA Soil Texture USDA Soil Texture Typical Water Capacity Typical Infiltration Rate (inches per inch of soil) (inches per hour) Hydrologic Soil Group * Sand A ** Loamy sand A ** Sandy loam B ** Loam B Silt loam C Sandy clay loam C Clay loam D Silty clay loam D Sandy clay D Silty clay D Clay D * - Suitable for infiltration with typical 6 to 8 separation from seasonal high groundwater ** - Suitable for infiltration with at least 3 separation from seasonal high groundwater Stormwater Treatment ST-03-3 May 2003

4 Clay Sandy Clay Loam Loam Loamy Sand Sandy Loam Figure ST-03-1 USDA Soils Triangle Design Guidelines Infiltration Basin Infiltration basins may be used for stormwater quality and stormwater detention at small project sites only if soil, geologic and groundwater conditions are suitable. Soils must have adequate infiltration rates as measured or tested in the field. No unfavorable geologic conditions shall be present that would indicate sinkholes or underground passageways. Unless adequate engineering documentation is submitted, an infiltration basin must be located at least 100 feet away from any drinking water well, septic tank or drainfield. It is also recommended that an infiltration basin should not be located near building foundations, buildings with basements, major roadways, wetlands, streams, or potentially unstable slopes and hillsides. In general, infiltration basins are not effective in the Knoxville area due to clay soils and shallow bedrock conditions. Smaller infiltration systems (trenches or drywells) may be applicable if local soil conditions allow. Avoid steep slopes or other geologic conditions that could potentially be made unstable by infiltrating water into the ground. Figure ST-03-2 shows a typical infiltration basin. Pretreatment is highly recommended for areas with fine-grained soils, dust, sediment, debris or other materials with the potential to clog the soils of an infiltration basin. Design an emergency overflow or a bypass for larger storms (using overland relief swales or possibly even street drainage in the case of 100-year floods). The criteria in Table ST-03-2 (taken from reference 32) can be used to make comparative evaluations if there is more than one potential site for an infiltration system. A score of Stormwater Treatment ST-03-4 May 2003

5 20 or below is definitely unsuitable for use as an infiltration basin. A score of 30 or more indicates an adequate site for an infiltration basin. Table ST-03-2 Comparative Evaluations of Potential Infiltration Sites A. Ratio of tributary connected impervious area (A IMP ) and the infiltration area (A INF ): A INF > 2 A IMP 20 points A IMP < A INF < 2 A IMP 10 points 0.5 A IMP < A INF < A IMP 5 points B. Nature of surface soil layer: Coarse soils with low ratio of organic material 7 points Normal humus soil 5 points Fine-grained soils (silt or clay) 0 points C. Underlying soil layer: If the underlying soils are coarser than surface soil, assign the same number of points as for the surface soil layer assigned under item 1 above. If the underlying soils are finer grained than the surface soils, then use: - Gravel, sand, or coarse glacial till 7 points - Silty sand or loam 5 points - Fine-grained soils (silt or clay) 0 points D. Slope of the infiltration surface: Slope < 7% 5 points 7% < slope < 20% 3 points Slope > 20% 0 points E. Vegetation cover: Healthy natural vegetation cover 5 points Lawn is well established 3 points Lawn is new 0 points No vegetation, bare ground -5 points F. Degree of traffic on infiltration surface: Little or no foot traffic 5 points Average foot traffic (park, lawn) 3 points Much foot traffic (playing fields) 0 points The infiltration basin volume should be sized to handle at least 85% of the average annual runoff, using the formula for volume capture (as discussed previously). The maximum allowable depth should be calculated using a safety factor of 2.0 to represent the uncertainty of infiltration due to construction methods and potential clogging: Maximum ponding depth = (24 hours) x (infiltration rate) / (factor of safety) Minimum surface area = (required volume) / (maximum ponding depth) An infiltration basin should be excavated by a backhoe or excavator with adequate reach to operate from outside the basin. Side slopes should typically have 5:1 side slopes or Stormwater Treatment ST-03-5 May 2003

6 flatter in order to minimize soil erosion. The bottom slopes should be as flat as possible. Sodding may help to quickly establish dense grass on the slopes, low-flow channels, basin entrance and emergency spillway. Do not plant trees or woody vegetation within the infiltration basin. An observation and sampling well (typically a perforated PVC pipe riser, 6 diameter, threaded cap) should be installed to allow for periodic monitoring and testing. Installation of a PVC riser may occur during the initial geotechnical investigation and then modified during the construction of the infiltration basin. Prevent surface water runoff from using the riser to gain direct access to the groundwater table, particularly in areas with high pollution potential such as industrial facilities, parking lots, roadways (due to truck spills or deicing salts), major utility lines, etc. For infiltration basins treating less than a few acres of pavement, pretreatment can usually be accomplished with a catch basin and a submerged outlet. The diameter and depth of the sump in the catch basin should be at least four times the diameter of the outlet pipe to the infiltration system (reference 66). Grass swales can also be used, although they may not be feasible in industrial sites, which tend to be fully utilized. Inspect and repair infiltration basins at least twice a year. Remove sediment and debris as necessary. Do not allow heavy equipment or vehicles within the infiltration basin by using physical restrictions such as a fence or gate. Do not allow heavy foot traffic (as would be typical for a soccer or football field) within the infiltration basin area. Maintenance must also include regular mowing and removal of trees. Natural Depressions, Sinkholes, and Karst Topography The City of Knoxville has gentle rolling hills and the usual topography for east Tennessee, ridges that run in a southwest-to-northeast direction at regular intervals. Most bedrock in the Knoxville area is composed of fractured limestone formations that are likely to contain unusual strike angles and/or nonconformities. Karst topography is defined as the presence of limestone or other soluble geology that is likely to form caverns, sinkholes, or other dissolved formations. A sinkhole is a surface depression, typically linked to an underground cavern system, which occurs primarily in limestone regions. See Figure ST-03-3 for a typical sketch of a sinkhole. For natural depressions and sinkholes, it is generally required that the postdeveloped peak flows and total stormwater runoff volume must be limited to the predeveloped values. In addition, the City of Knoxville also requires that any development near a sinkhole should include calculations demonstrating that no structures will be flooded from a 100-year storm assuming plugged conditions (zero outflow). It is greatly desired that runoff should be treated using one or more stormwater treatment BMPs, prior to discharging toward a sinkhole or other natural depression. Consideration may be given to recommendations that are based upon advanced subsurface testing or visual inspection by experts or professional engineers with demonstrated experience in hydrogeology. Tennessee Department of Environment and Conservation (TDEC) requires anyone who performs a dye trace study to obtain a TDEC registration for this activity (see TDEC website). Major sinkholes are considered to be waters of the state; filling or otherwise altering a large sinkhole requires an Aquatic Resource Alteration Permit from TDEC. Infiltration Trench An infiltration trench essentially has the same design characteristics as an infiltration basin, except that part of the stormwater runoff storage is located within a gravel trench. Stormwater Treatment ST-03-6 May 2003

7 The volume available for water storage is found by multiplying the total gravel volume by the porosity (η). Typical details for an infiltration trench are shown in Figure ST-03-4 (for surface drainage) and Figure ST-03-5 (for roof drainage). Bottom of the infiltration trench should be located at least 3 feet above the seasonal high groundwater table. There are provisions for emergency overflow in both details. At a minimum, the infiltration trench should have adequate volume to treat the first flush (which is the first 0.5 of stormwater runoff from the entire contributing area). Infiltration trenches may be used around the perimeter of parking lots, between subdivision lots, or along medians or roadside swales. An infiltration trench does not have organic soil layers or surface vegetation to trap some types of pollutants. A trench may be ineffective for soluble pollutants such as hydrocarbons, nitrates, salts or organic compounds. An infiltration trench should have an observation and sampling port, to assist in cleanout and to check water quality and groundwater levels. Geotextile fabric should be selected on the basis of durability, with an adequate opening size to resist clogging. Use clean washed aggregate (little or no fines). Do not compact the trench bottom or the aggregate; protect the area from heavy equipment and traffic by physical means. Maintenance considerations should include the possibility of replacing an infiltration trench every 5 years, as the gravel and geotextile fabric will eventually become clogged and cease to function. Clogging may also occur at the bottom of the trench, along the gravel / soil interface. Clogging will occur even faster if there are fine silts, oil and grease, fertilizers and other materials present in stormwater runoff. Do not allow trees or other woody vegetation to become rooted along an infiltration trench. Inspect operation and recovery of infiltration trench at least a few times a year. Drywell or Dry Vault A drywell or dry vault can be used to infiltrate stormwater runoff from small areas of impervious runoff, such as roofs or parking lots. The designer should be very careful to avoid adverse impacts to foundations, basements, unstable slopes or hillsides, septic tanks, utility lines, etc. A small pretreatment chamber with a screen is recommended in many instances to handle leaves (roofs) or trash and sediment (parking lots). A typical drywell adjacent to a house foundation is shown in Figure ST-03-6 (without a pretreatment chamber). A dry vault (larger than a drywell) can be constructed using masonry blocks and a poured concrete lid to hold a larger volume of stormwater runoff. Inspect the drywell or dry vault on a regular basis. Maintenance plans should include provisions to repair or replace this type of structure after 5 years or so. Porous Pavement Porous pavements are not actually considered as a true infiltration system unless there is a mechanism for ensuring that captured water is vertically transmitted through the soil into groundwater. Otherwise, porous pavements shall generally be analyzed as a gravel surface (road or parking lot) with normal runoff coefficients used for the Rational formula or for NRCS methods of drainage design. Porous pavement is usually a modular pavement grid, although pour-in-place concrete can be made into porous pavement also. See Figure ST-03-7 for a few types of porous pavement (taken from reference 45), for which grass is allowed to grow between the grids. A less durable variation can be made with bricks, placed on sand bedding and filled in with soil, with approximately 50% brick surface. Porous pavements have generally proven to be not durable under street traffic within the Knoxville area, and Stormwater Treatment ST-03-7 May 2003

8 should be restricted to light traffic conditions without heavy trucks. Porous pavements are particularly recommended for residential driveways or overflow parking lots. Porous pavements are likely to absorb large amounts of pollutants from automobiles, such as heavy metals and petroleum products. Porous pavements should be cleaned regularly using methods that will not dislodge the grass, sand or soil from between the concrete grids. Collect washwater and dispose properly to avoid washing pollutants downstream. Maintenance Inspect and observe the infiltration system several times during the first year, particularly after heavy rainfall events. Use observation wells and cleanout ports to monitor water levels and drawdown times. Record all observations and measurements taken. Perform any maintenance and repairs promptly. Inspect the infiltration system annually thereafter, and after extreme rainfall events. If stormwater does not infiltrate within 72 hours after a storm, it is generally time to clean, repair or replace the facility. Remove debris and sediment at least annually to avoid high concentrations of pollutants and loss of infiltration capacity. The primary objective of maintenance and inspection activities is to ensure that the infiltration facility continues to perform as designed. Regular inspection can substantially lengthen the required time interval between major rehabilitations. Prevent compaction of the infiltration surfaces by physical controls such as gates or fences. Maintain dense grass vegetation for infiltration basins. Use rotary tillers on infiltration surfaces when needed to restore infiltration capacity and to control weed growth. Sediment Removal A primary function of stormwater treatment BMPs is to collect and remove sediments. The sediment accumulation rate is dependent on a number of factors including watershed size, facility sizing, construction upstream, nearby industrial or commercial activities, etc. Sediments should be identified before sediment removal and disposal is performed. Special attention or sampling should be given to sediments accumulated from industrial or manufacturing facilities, heavy commercial sites, fueling centers or automotive maintenance areas, parking areas, or other areas where pollutants are suspected. Treat sediment as potentially hazardous soil until proven otherwise. Some sediment may contain contaminants for which TDEC requires special disposal procedures. Consult TDEC Division of Water Pollution Control ( ) if there is any uncertainty about what the sediment contains or if it is known to contain contaminants. Clean sediment may be used as fill material, hole filling, or land spreading. It is important that this material not be placed in a way that will promote or allow resuspension in stormwater runoff. Some demolition or sanitary landfill operators will allow the sediment to be disposed at their facility for use as cover. This generally requires that the sediment be tested to ensure that it is innocuous. Limitations The four major concerns with infiltration systems are clogging, potential impact on other structures and properties, accumulation of heavy metals, and the potential for groundwater contamination. Clogging and high maintenance costs are very likely to occur in fine soils that are marginally allowable for infiltration rates. Erosion control is extremely important to prevent clogging; infiltration systems fail if they receive high sediment loads. Perform regular maintenance and inspections to minimize the potential for clogging and loss of infiltration capacity. Pretreatment is highly recommended for stormwater Stormwater Treatment ST-03-8 May 2003

9 runoff from many land uses, prior to discharging to an infiltration system. Erosion of the side slopes is a major factor in clogged infiltration basins. Infiltration systems are not appropriate for areas with high groundwater tables, steep slopes, lots of underground infrastructure, and nearby buildings. Heavy metals are likely to settle in any of the stormwater treatment BMPs, but particularly for infiltration systems (which have the lowest velocity). High levels of heavy metals have been observed in other states where adequate maintenance was not performed. Toxic levels are not likely to be exceeded, but the sediments will need to be handled as hazardous waste after a few years of neglect. There is a higher risk of groundwater contamination in very coarse soils (references 2 and 79). It is highly recommended that a monitoring and inspection program should be used to verify that no contamination occurs. Infiltration systems may not be appropriate where there is significant potential for hazardous chemical spills. References 2, 3, 28, 31, 32, 33, 42, 44, 45, 49, 51, 56, 62, 66, 69, 71, 77, 79, 88, 101, 104, 109, 121, 130, 163, 166 (see BMP Manual Chapter 10 for list) Stormwater Treatment ST-03-9 May 2003

10 Pretreatment measures: Water quality inlet Oil / water separator Grass swales Check dams or riprap aprons Forebay Threaded cap to prevent direct flow into groundwater Establish dense grass without trees or woody vegetation NOT TO SCALE Emergency overflow: Riprap spillway Overland relief (swales) Outlet structure or riser Maximum ponded depth Seasonal high groundwater Observation and sampling well (perforated PVC riser) Figure ST-03-2 Typical Infiltration Basin Many sinkholes are located in existing neighborhoods. Entrance may or may not be visible Natural sinkhole or depression Limestone rock or other soluble formation Underground cave with potential of solution or collapse Increasing stormwater runoff to a natural depression may increase sinkhole formation by further dissolving limestone. Even if amount of stormwater runoff has not been increased, stormwater quality treatment is necessary to prevent pollutants from entering groundwater and to reduce potential ph changes and chemicals within stormwater runoff. NOT TO SCALE Figure ST-03-3 Typical Concerns of Sinkholes and Karst Areas Stormwater Treatment ST May 2003

11 Plan View Isometric View Grass filter strip Grass filter strip Trench 20 typical Screened overflow pipe at end of trench (optional) Outflow Manhole, elbow or cleanout for small diameter pipe Permeable geotextile filter fabric, wrapped around sides and bottom of trench, top ~ 12 below surface Clean washed aggregate or gravel (1 to 3 diameter size range) 6 to 12 sand layer Width computed to meet infiltration rate NOT TO SCALE Figure ST-03-4 Typical Infiltration Trench (With Surface Drainage) NOT TO SCALE Cleanout (optional) Observation port (optional) Geotextile fabric along top, sides, and bottom of trench Roof drain or gutter Overflow with splash block Access Level Clean washed aggregate or gravel (1 to 3 size) Perforated plastic pipe within infiltration trench Optional manhole or vault with solid lid for sediment cleanout Fine mesh screen Figure ST-03-5 Typical Infiltration Trench (With Rooftop Drainage) Stormwater Treatment ST May 2003

12 Roof drain or gutter Overflow and splash block Cap with lock Building foundation 12 typical depth to drywell Line top, sides and bottom of drywell with geotextile filter fabric Perforated pipe within drywell (typically PVC) NOT TO SCALE Clean washed aggregate or gravel (1 to 3 size) Observation well (perforated PVC pipe), anchor to bottom of trench with rebar Figure ST-03-6 Typical Drywell (With Rooftop Drainage) NOT TO SCALE Pour-in-Place Slab Castellated Unit Lattice Unit Figure ST-03-7 Examples of Porous Pavement Modular Unit Stormwater Treatment ST May 2003

ACTIVITY: Infiltration Systems and Methods ST 03

ACTIVITY: Infiltration Systems and Methods ST 03 Runoff Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients Toxic Materials Oil & Grease Bacteria

More information

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) Activity: Infiltration Systems PLANNING CONSIDERATIONS: Design Life: Short IS Acreage

More information

C-1. Infiltration System

C-1. Infiltration System C-1. Infiltration System Design Objective An infiltration system captures surface stormwater runoff and allows it to infiltrate into the soil. This SCM is typically the work horse of a runoff volume match

More information

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields 4.1-d SUBSURFACE INFILTRATION SYSTEM Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields BMP DESIGN APPROACH Pollutant Source Control Hydrologic Source Control Stormwater

More information

SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT

SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT All Best Management Practices (BMPs) are considered feasible until demonstrated otherwise.

More information

WQ-08 ENHANCED DRY SWALE

WQ-08 ENHANCED DRY SWALE Greenville County Technical Specification for: WQ-08 ENHANCED DRY SWALE 1.0 Enhanced Dry Swale 1.1 Description An Enhanced Dry Swale is a shallow open-channel drainage way stabilized with turf grass or

More information

Permeable Pavement Facilities and Surfaces

Permeable Pavement Facilities and Surfaces Permeable Pavement Facilities and Surfaces This checklist is intended to highlight items critical to the performance of permeable pavement facilities and surfaces that need to be addressed in the design

More information

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND BMP RAM BMP Type Definitions 1 CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND USES AND OWNERSHIP STRUCTURAL BMP TYPE OTHER NAMES

More information

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description Greenville County Technical Specification for: WQ-06 SAND FILTER 1.0 Sand Filter 1.1 Description Sand Filters remove pollutants through sedimentation and filtration within the sand. The primary components

More information

Chapter 6 Sand Filtration Treatment Facilities

Chapter 6 Sand Filtration Treatment Facilities Sand Filtration Treatment Facilities 6.1 Purpose This chapter presents criteria for the design, construction and maintenance of runoff treatment sand filters. Treatment sand filters are used to collect,

More information

3.2 INFILTRATION TRENCH

3.2 INFILTRATION TRENCH 3.2 INFILTRATION TRENCH Type of BMP Priority Level Treatment Mechanisms Infiltration Rate Range Maximum Drainage Area LID Infiltration Priority 1 Full Retention Infiltration, Evapotranspiration (when vegetated),

More information

Storm Water Standards 105

Storm Water Standards 105 Storm Water Standards 105 Schematic of Dry Swale 2006 S-13 (Source: Center for Watershed Protection, modified) 106 Edgewood - Public Works Schematic of Grass Channel 2006 S-13 Storm Water Standards 107

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of storm water as it infiltrates into the ground. Dry wells, infiltration

More information

ACTIVITY: Water Quality Inlets and Media Filtration Inlets ST 06

ACTIVITY: Water Quality Inlets and Media Filtration Inlets ST 06 Flow Sedimentation basin Sand filter Filtered runoff Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances

More information

4. Ponds and infiltration BMPs can achieve 60 to 100% removal efficiencies for sediment.

4. Ponds and infiltration BMPs can achieve 60 to 100% removal efficiencies for sediment. Landscape BMPs For the purposes of this project, preventive measures have been categorized into two categories: landscape BMPs and source prevention BMPs. Landscape BMPs includes both vegetative practices

More information

Practices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil.

Practices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil. Chapter 5: Acceptable Stormwater Management Practices (SMPs) This section presents a list of practices that are acceptable for water quality treatment. The practices on this list are selected based on

More information

Inlet Protection. Fe= (Depends on soil type)

Inlet Protection. Fe= (Depends on soil type) 3.4 DESIGN CRITERIA: KEY CONSIDERATIONS Evaluate drainage patterns to ensure inlet protection will not cause flooding of roadway, property or structures Never block entire inlet opening Size according

More information

Inflow pipe. Drain. Drain

Inflow pipe. Drain. Drain Inflow pipe Screened overflow Drain Foul flush diverter Screened intake Manhole cover Maximum water level Seal Inspection cover Possible local drainage through screen Drain Bottom sloped Screened outlet

More information

4.28 Underground Detention

4.28 Underground Detention 4.28 Underground Detention Detention Structural Stormwater Control Description: Detention storage located in underground tanks or vaults designed to provide water quantity control through detention and/or

More information

GENERAL INFILTRATION PRACTICES

GENERAL INFILTRATION PRACTICES MINIMUM STANDARD 3.10 GENERAL INFILTRATION PRACTICES 3.10A Infiltration Basin 3.10B Infiltration Trench 3.10C Roof Downspout System 3.10D Porous Pavement LIST OF ILLUSTRATIONS # FIGURE PAGE 3.10-1a Infiltration

More information

ACTIVITY: Dewatering Operations AM 12

ACTIVITY: Dewatering Operations AM 12 Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients Toxic Materials Oil & Grease Bacteria &

More information

4.4.6 Underground Detention

4.4.6 Underground Detention 4.4.6 Underground Detention Limited Application Water Quality BMP Description: Detention storage located in underground pipe systems or vaults designed to provide water quantity control through detention

More information

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) SMP-11 PLANNING CONSIDERATIONS: Design Life: 1 yr Acreage

More information

Permeable Pavement. Pavements constructed with these units create joints that are filled with permeable

Permeable Pavement. Pavements constructed with these units create joints that are filled with permeable Permeable Permeable pavement is a paving system which allows rainfall to percolate through the surface into the underlying soil or an aggregate bed, where stormwater is stored and infiltrated to underlying

More information

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

Chapter 2: Selecting Best Management Practices (BMPs)

Chapter 2: Selecting Best Management Practices (BMPs) Chapter 2: Selecting Best Management Practices (BMPs) 2.1 - Temporary versus Permanent BMPs The same level of care should be taken to select both temporary BMPs and permanent BMPs. The same level of care

More information

BMP 6.4.4: Infiltration Trench

BMP 6.4.4: Infiltration Trench BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a

More information

Chapter 5.5 Inlets, Outlets, and Flow Control

Chapter 5.5 Inlets, Outlets, and Flow Control Chapter 5.5 Inlets, Outlets, and Flow Control There are common structural elements of SCMs that are designed to safely route water. Engineered flow control devices are used to effectively route water at

More information

Background. AEM Tier 2 Worksheet Farmstead Water Supply Evaluation. AEM Principle: Glossary

Background. AEM Tier 2 Worksheet Farmstead Water Supply Evaluation. AEM Principle: Glossary AEM Tier 2 Worksheet Glossary Casing: Steel or plastic pipe installed while drilling a well, to prevent collapse of the well bore hole and the entrance of contaminants, and to allow placement of a pump

More information

TABLE B.3 - STORMWATER BMP POLLUTANT REMOVAL EFFICIENCIES

TABLE B.3 - STORMWATER BMP POLLUTANT REMOVAL EFFICIENCIES BMPS DESCRIPTION p p p p TSS TP Sol P TN Stormwater Ponds**, 8 Stormwater Wetland** and extended detention, and some elements of a shallow marsh equivalent capable of treating the full water quality volume.

More information

3.11 Sand Filter Basin

3.11 Sand Filter Basin 3.11 Sand Filter Basin Type of BMP Priority Level Treatment Mechanisms Maximum Drainage Area Flow-Through Treatment Priority 3 Treatment Control BMP Filtration 25 acres Description The Sand Filter Basin

More information

Chapter 3 Dispersion BMPs

Chapter 3 Dispersion BMPs Chapter 3 Dispersion BMPs 3.1 BMP L611 Concentrated Flow Dispersion 3.1.1 Purpose and Definition Dispersion of concentrated flows from driveways or other pavement through a vegetated pervious area attenuates

More information

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment

More information

A SunCam online continuing education course. Design of Drywells. David E. Fantina, PE

A SunCam online continuing education course. Design of Drywells. David E. Fantina, PE Design of Drywells by David E. Fantina, PE Introduction: This course is an overview of all of the features that go into properly designing a drywell for stormwater management. When you complete this course

More information

N.J.A.C. 7:8 Stormwater Management Rules - Design and Performance Standards. Nonstructural Strategies Assist with Strategy #2; See Page 3

N.J.A.C. 7:8 Stormwater Management Rules - Design and Performance Standards. Nonstructural Strategies Assist with Strategy #2; See Page 3 9.3 DRY WELLS Dry wells are subsurface stormwater facilities that are used to collect and temporarily store runoff from clean rooftops; runoff is discharged through infiltration into the subsoil. Dry wells

More information

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

LAKE COUNTY HYDROLOGY DESIGN STANDARDS LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide

More information

Appendix B.2. Construction Specifications for Infiltration Practices

Appendix B.2. Construction Specifications for Infiltration Practices Appendix B.2 Construction Specifications for Infiltration Practices B.2.A Infiltration Trench General Notes and Specifications An infiltration trench may not receive run-off until the entire contributing

More information

Infiltration Guidelines

Infiltration Guidelines Appendix E Infiltration Guidelines As a stormwater management method, infiltration means retaining or detaining water within soils to reduce runoff. Infiltration can be a cost-effective method to manage

More information

4.4.5 Grassed Swale (also known as Enhanced Swale or Biofiltration Swale)

4.4.5 Grassed Swale (also known as Enhanced Swale or Biofiltration Swale) Signs of trespass or unauthorized traffic Sediment buildup Additionally, a program of regular monitoring of the aquatic environment for a permanent wet detention basin should be established to allow for

More information

Stormwater Quality Review Checklist - General

Stormwater Quality Review Checklist - General Stormwater Quality Review Checklist - General General 1) Map of proposed subwatershed to each subbasin provided, including total area and CN 2) Drainage areas match topography 3) Drainage area estimates

More information

Infiltration Basin Description Applicability

Infiltration Basin Description Applicability Infiltration Basin Description An infiltration basin is a shallow impoundment which is designed to infiltrate storm water into the ground water. This practice is believed to have a high pollutant removal

More information

4.12. Detention Basins

4.12. Detention Basins 4.12. Detention Basins Detention Basins can be a cost effective method to provide temporary storage, conveyance, and treatment of runoff when used within the context of Low Impact Development (LID) strategies.

More information

MCM 5 - POST CONSTRUCTION STORM WATER MANAGEMENT

MCM 5 - POST CONSTRUCTION STORM WATER MANAGEMENT MCM 5 - POST CONSTRUCTION STORM WATER MANAGEMENT POST CONSTRUCTION STORM WATER MANAGEMENT Minimum Control Measure 5 5.1 INTRODUCTION Riverdale City has committed to Joint Permit with Weber County to meet

More information

Subsurface Infiltration SMP One-Sheet - download a summary of this tool, with quick reference facts for. clients and developers.

Subsurface Infiltration SMP One-Sheet - download a summary of this tool, with quick reference facts for. clients and developers. 4.4 Subsurface Infiltration Subsurface Infiltration SMP One-Sheet - download a summary of this tool, with quick reference facts for clients and developers. Chapter 4 - pg. 68 Philadelphia Water Stormwater

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability

More information

Diversion Dikes. Fe=0.95

Diversion Dikes. Fe=0.95 2.2 Diversion Dike Erosion Control Description: A diversion dike is a compacted soil mound, which redirects runoff to a desired location. The dike is typically stabilized with natural grass for low velocities

More information

GRASS-LINED CHANNEL (acre) CODE 840

GRASS-LINED CHANNEL (acre) CODE 840 NATURAL RESOURCES CONSERVATION SERVICE ILLINOIS URBAN MANUAL PRACTICE STANDARD GRASS-LINED CHANNEL (acre) CODE 840 (Source: NC Erosion and Sediment Control Field Manual) DEFINITION A natural or constructed

More information

Standard for Infiltration Basins

Standard for Infiltration Basins New Jersey Stormwater Best Management Practices Manual February 2004 Definition Purpose C H A P T E R 9. 5 Standard for Infiltration Basins An infiltration basin is a facility constructed within highly

More information

Best Management Practices for Stormwater Quality Treatment in Urban Settings. Lower Mississippi River WMO September 2017

Best Management Practices for Stormwater Quality Treatment in Urban Settings. Lower Mississippi River WMO September 2017 Best Management Practices for Stormwater Quality Treatment in Urban Settings Lower Mississippi River WMO September 2017 Stormwater 101 Impervious surfaces (pavement, parking lots, etc.): quickly produce

More information

Rock Sock (RS) Rock Sock height.

Rock Sock (RS) Rock Sock height. Rock Sock (RS) SC-5 Description A rock sock is constructed of gravel that has been wrapped by wire mesh or a geotextile to form an elongated cylindrical filter. Rock socks are typically used either as

More information

Intended users: City and County public works Young engineers Developers Public officials and other non-engineers

Intended users: City and County public works Young engineers Developers Public officials and other non-engineers 1 2 3 4 Intended users: City and County public works Young engineers Developers Public officials and other non-engineers The Decision Tree distills information from many manuals and sources into one spot,

More information

At least 2 feet above the seasonal high water table Overflow path or structure provided

At least 2 feet above the seasonal high water table Overflow path or structure provided General Conditions Map of proposed subwatershed to each subbasin, including total area and CN Design Flow or Design Volume to each STF, as appropriate Operation and Maintenance instructions for each STF

More information

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.) Module 2: Selection of Controls and Site Planning for Construction Site Erosion Prevention Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa,

More information

Maintain grass or vegetative cover as appropriate for the selected vegetation.

Maintain grass or vegetative cover as appropriate for the selected vegetation. Depending on the site geometry, the width or slope or density of grass (Manning s n value) might be adjusted to slow the velocity and shorten the channel in the next design iteration. For example, using

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

Chapter 3: Post Construction Water Quality Best Management Practices

Chapter 3: Post Construction Water Quality Best Management Practices Chapter 3: Post Construction Water Quality Best Management Practices 3.1 Introduction to Stormwater Quality Under the regulations governing the NPDES Stormwater Phase II program, Montgomery County is required

More information

Modular Porous Paver Systems

Modular Porous Paver Systems 4.3.11 Modular Porous Paver Systems General Application Water Quality BMP Description: A pavement surface composed of structural units with void areas that are filled with pervious materials such as sand

More information

Suggested Stormwater Management Practices For Individual House Lots

Suggested Stormwater Management Practices For Individual House Lots Suggested Stormwater Management Practices For Individual House Lots These practices are necessary to satisfy the water quantity and water quality criteria of the Rappahannock Stormwater Ordinance. These

More information

ACTIVITY: Silt Fence ES 14

ACTIVITY: Silt Fence ES 14 Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients Toxic Materials Oil & Grease Bacteria &

More information

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers 4.1-a PERVIOUS PAVEMENT Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers DESCRIPTION Pervious pavement is any system comprised of a load bearing surface that allows for movement of

More information

ORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements

ORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements ORDINANCE # 854 Stormwater Management / Operation and Maintenance Requirements Section 1. Purpose and Authority In accordance with the provisions of Chapters 98, 124, 126, 440, 444, and 446h of the General

More information

Appendix E. Coordinating Erosion and Sediment Control With Low-Impact Development Planning

Appendix E. Coordinating Erosion and Sediment Control With Low-Impact Development Planning Appendix E Appendix E. Coordinating Erosion and Sediment Control With Low-Impact Development Planning E.1 Introduction It is essential to coordinate post-construction stormwater planning with the design

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

Stormwater Management Fact Sheet: Porous Pavement

Stormwater Management Fact Sheet: Porous Pavement Stormwater Management Fact Sheet: Porous Pavement Description Porous pavement is a permeable pavement surface with an underlying stone reservoir that temporarily stores surface runoff before infiltrating

More information

Scheduling Maintenance for Dry Ponds

Scheduling Maintenance for Dry Ponds Visual Inspection for Sedimentation Practices Visual inspection is a rapid assessment procedure for qualitatively evaluating the functionality of a stormwater best management practice (BMP). Visual inspections

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

Block and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site.

Block and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site. INLET PROTECTION From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.state.ma.us/dep/brp/stormwtr/files/esfull.pdf Definition: A sediment filter or an excavated

More information

3.7 Guidance for Large Bioretention/Biofiltration BMP Facilities

3.7 Guidance for Large Bioretention/Biofiltration BMP Facilities 3.7 Guidance for Large Bioretention/Biofiltration BMP Facilities Applicability LID BMPs Large sites, multi-parcel sites, BMPs treating greater than 5 acres This fact sheet is intended to be used in combination

More information

Storm Drain Inlet Protection for Construction Sites (1060)

Storm Drain Inlet Protection for Construction Sites (1060) Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain

More information

Shelbyville, KY Stormwater Best Management Practices

Shelbyville, KY Stormwater Best Management Practices 5. Detention/retention volumes in the floodplain buffer shall count as fill if applied in a manner where off site floodplain storage volume is lost. 1.7 Residential and Home Owner Pollution Control Citizens

More information

Appendix B Construction SWPPP Short Form

Appendix B Construction SWPPP Short Form Appendix B Construction SWPPP Short Form Projects falling within the thresholds listed below may use this short form instead of preparing a formal Construction Stormwater Pollution Prevention Plan (SWPPP).

More information

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B. EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

Constructed Wetland Use in Nonpoint Source Control

Constructed Wetland Use in Nonpoint Source Control Constructed Wetland Use in Nonpoint Source Control Description Constructed wetlands are excavated basins with irregular perimeters and undulating bottom contours into which wetland vegetation is purposely

More information

Stormwater Management Criteria

Stormwater Management Criteria FOR OFFICE USE ONLY Stormwater Management Criteria Form #PWU005 (rev. 11/16) Approving Agency Performance Standards Applicability for Control of Stormwater Pollution Applicability for Control of Peak Runoff

More information

16. Infiltration Devices

16. Infiltration Devices 16. Infiltration Devices Description Infiltration devices are trenches or basins that fill with stormwater runoff and allow the water to exfiltrate, i.e., exit the device by infiltrating into the soil.

More information

Suitable Applications Where concentrated flow of surface runoff must be conveyed down a slope in order to prevent erosion.

Suitable Applications Where concentrated flow of surface runoff must be conveyed down a slope in order to prevent erosion. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators Page 1 of 5 STREAMLINES A Newsletter for North Carolina Water Supply Watershed Administrators Volume 2, Number 2 May 1997 Non-Point Source (NPS) Pollution This issue of Streamlines provides basic information

More information

BMP #: Infiltration Basin

BMP #: Infiltration Basin Structural BMP Criteria BMP #: Infiltration Basin An Infiltration Basin is a shallow impoundment that stores and infiltrates runoff over a level, subtle, uncompacted, (preferably undisturbed area) with

More information

Modular Porous Paver Systems

Modular Porous Paver Systems 4.3.11 Modular Porous Paver Systems General Application Stormwater BMP Description: A pavement surface composed of structural units with void areas that are filled with pervious materials such as sand

More information

ON-SITE SEWAGE CONTRACTOR EXAMINATION STUDY GUIDE

ON-SITE SEWAGE CONTRACTOR EXAMINATION STUDY GUIDE ON-SITE SEWAGE CONTRACTOR EXAMINATION STUDY GUIDE Table of Contents: Introduction...1 Application Process...2 Planning the Layout of the System...3 Setback Requirements...3 Septic Tank Specifications...4

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

Site Design Measures A-3

Site Design Measures A-3 A P P E N D I X 3 Site Design Measures A-3 Tree Planting and Preservation Trees intercept rain water on their leaves and branches, allowing water to evaporate or run down the branches and trunk where it

More information

Guidance Document for Storm Water Pollution Prevention Plan (SWPPP) Submittal. A2 Plat showing building lot numbers/boundaries and road layout/names:

Guidance Document for Storm Water Pollution Prevention Plan (SWPPP) Submittal. A2 Plat showing building lot numbers/boundaries and road layout/names: Exhibit SW12-3 Page 1 of 10 Guidance Document for Storm Water Pollution Prevention Plan SECTION A CONSTRUCTION PLAN ELEMENTS A1 Plan Index showing locations of required items: The plan index should include

More information

Tips with Creation of your Erosion and Sediment Control Plan

Tips with Creation of your Erosion and Sediment Control Plan Tips with Creation of your Erosion and Sediment Control Plan By Chris Droste, CESCO Senior Erosion Control Specialist Westmoreland Conservation District Forming Your Narrative Use the DEP checklist. Page

More information

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010.

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010. CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA Adopted March 29, 2010 Table of Contents Page Part 1 Introduction...3 4-1 Title..................3 4-2

More information

ACTIVITY: Wet Detention Basin ST 02

ACTIVITY: Wet Detention Basin ST 02 Pond surface Outlet Forebay Littoral zone Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients

More information

Dry Swale Wet Swale Grass Channel Dry Well Permeable Pavement Bioretention DESIGN ELEMENTS

Dry Swale Wet Swale Grass Channel Dry Well Permeable Pavement Bioretention DESIGN ELEMENTS FACILITY ID: DATE: / / ASSESSED BY: NAME: ADDRESS: PHOTO IDS: SECTION 1- BACKGROUND INFORMATION (GIS) BMP TYPE : Dry Detention Pond Extended Detention Pond Wet Pond Filter (specify: ) Infiltration (specify:

More information

Inspection and Maintenance of Stormwater Best Management Practices

Inspection and Maintenance of Stormwater Best Management Practices FAC T S H E E T Permeable Pavements Inspection and Maintenance of Stormwater Best Management Practices Permeable pavements contain many small openings (i.e., joints or pores) that allow rainfall and snowmelt

More information

Boise City Public Works General Drainage Plan Review Requirements Checklist

Boise City Public Works General Drainage Plan Review Requirements Checklist Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres

More information

Erosion Control Inspection Form

Erosion Control Inspection Form Project Name Address Inspection Date Time Name of Certified Erosion Sediment Lead (CESCL) or qualified inspector if less than one acre Print Name: Approximate rainfall amount since the last inspection

More information

APPENDIX D - TECHNICAL SPECIFICATIONS

APPENDIX D - TECHNICAL SPECIFICATIONS APPENDIX D - TECHNICAL SPECIFICATIONS : Construction Standards and Specifications C.I Pond Construction Standards/S ecifications These specifications are genera ap'p opriate to all earthen ponds, and

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual)

Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual) Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual) Should vs. Must In Chapter 4, should means should, and must means must. Poorly Drained Soils Well-Drained Soils Flat Terrain

More information