1 PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT The Proposed Th Proposed Food Colours and Lake Colours Manufacturing Unit will be established on Plot 22/1 - B, Dhatav, MIDC Roha Tal.: Roha, Dist.: Raigad, (Maharashtra). The location of the Industry is towards west side and at a distance of about 3.5 Km from Roha City. 1.1 Need of the Project The basic application of synthetic food colours or artificial food colours include colouring of food items, pharmaceutical and cosmetic industries, personal care products, dairy products, confectionary, bakery, sweet meats etc. Addition of a suitable colour enhanced the appearance of fresh and process foods. Presently, there is global trend towards the more usage of natural colours in food, pharmaceutical and personal care industries. Due to adverse effect of synthetic dyes, all countries have made strict regulations about the permitted colours to be used as food additives. Most of the countries have prohibited the use of several synthetic dyes as food colouring agents and permitted a limited number of synthetic colours under specified maximum limits. The ever-increasing demand for food colours as well as lake colours in India and abroad has encouraged the promoters to go for food colours and lake colours manufacturing unit. 2.0 PROJECT DESCRIPTION 2.1 Location Site selection for setting up a project is governed by some criteria which includes certain conditions. The same are proximity to sources, proximity to end users, and availability of infrastructure like land free of encumbrance, railway, road, power, water and manpower. The proposed site is well connected by roads. The site is 3.5 Km from the city Roha. The Roha Railway Station is 3.61 Km and Mumbai Airport is Km from proposed project site. 2.2 Alternative Site No any alternative sites were examined since the proposed site is located in Dhatav area, Roha MIDC at Raigad and plot was allotted for same by the Govt. 2.4 The Products The different products considered for manufacture & its maximum production quantities are as under.. Table 1 List of Products 1. Food Colours: 9.5 MT/Day Quantity Name of Product a. Carmoisine 2000 Kg/Batch b. Ponceau 4R 2020 Kg/Batch 1

2 Quantity Name of Product C. Sunset Yellow FCF 2300 Kg/Batch d. Tartrazine 1800 Kg/Batch e. Green 2000 Kg/ Batch Solvent Green 7(Green 8) f. Red Pigment Red 57 (Red 6) 1100 Kg/Batch Red Kg/Batch Solvent Red 43(Red 21) 900 Kg/Batch Acid Phloxine B (Red 27) 770 Kg/Batch Acid Red 92(Red 28) Acid Red 33 (Red 33) g. Violet Acid Violet 49(Violet 2) h. Yellow C.I.Solvent Yellow 172(Yellow172) 480 Kg/Batch 1350 Kg/Batch 1470 Kg/Batch 2250 Kg/Batch Note: Total 9.5 MT/Day of Food Colours shall be manufactured. Thereunder, daily one batch each from above products from (a) to (h) shall be carried out. 2. Lake Colours: 2.5 MT/Day Name of Product 1. Lake Colours 2. Ponceau 4R Aluminium 3. Sunset yellow Aluminium 4. Tartrazine Aluminium 5. Red Pigment Red 57(Red 6 Barium Lake) Red 7 calcium lake Acid Phloxine B (Red 27 Aluminium) Acid Red 92(Red 28 Aluminium) Acid Red 33(Red 33 Aluminium) 6. Yellow yellow 6 Aluminium Quantity 2010 Kg/ Batch 192 Kg/ Batch 165 Kg/ Batch 500 Kg/ Batch 592 Kg/ Batch 610 Kg/ Batch 600 Kg/ Batch 3. Intermediates: 7 MT/Day Quantity Name of Product Intermediates a. Sulphanilic Acid 1750 Kg/Batch 2

3 2.5 Investment The expected cost of the proposed project will be around Rs. 8.5 Crores. 2.6 Process Details The manufacturing of food colours and lake colours comprises of a number of operations and processes involving various chemical reactions of basic raw materials. Eventually, the desired products are formed which are refined and separated. Water The daily water requirement for various process operations in proposed project activity would be to the tune of 375 M 3 /Day Out of which 227 M 3 /Day would be Fresh Water & 148 M 3 /day recycle condensate water. Fuel In the proposed project, Coal, Furnace Oil and Diesel would be used as fuel for Boiler, Thermic Fluid Heaters and D.G Set respectively. Coal Diesel Fuel Table 2 Fuel Consumption Total Quantity 28.5 MT/Day 60 Lit./Hr Manpower In the proposed project about 50 skilled and 25 unskilled workers would be appointed. Preference shall be given to persons from local area thereby creating better employment opportunities. 2.7 Environmental Aspects under the Project A) The Effluents i) Domestic Effluent - Domestic effluent to be generated from proposed activity would be 10 M 3 /Day and same shall be treated in proposed Sewage Treatment Plant (STP) i) Industrial Effluent - The effluent generated from the proposed activity would be segregated in two different Streams viz. Stream I and Stream II. Further, the effluent from above streams would be treated in Effluent Treatment Plant comprising of Multiple Effect Evaporator Systems. The details w.r.t effluents considered under Stream I and Stream II are as follows: Stream I Comprises of Process Effluent 70 M 3 / Day and Washing would be evaporated in Multiple Effect Evaporator (MEE) Systems installed to process plant. Stream II Comprises of lake colours 86 M 3 /Day, and Washing of equipments and floors- 10 M 3 /Day (Total 96 M 3 /Day). This effluent would be given primary treatment of Neutralization and Settling. 3

4 The details of wastewater generation under proposed operations is as follows- Table 3 Details of Effluent Generation Description 1. Domestic 2. Industrial Effluent Generation (M 3 /Day) Losses (M 3 /Day) 8 2 a) Process b) Washing of 70 M 3 /Day Equipment 10 (Strong Stream i.e Filtrate from Nil s & Floors Food Colour & Intermediates c) Cooling Industrial Total (a+b+c) 3. Gardening & others 5 96 M 3 /Day + Weak Stream i.e Filtrate 120 from Lake & Washing Nil 50 In proposed STP In proposed ETP Installation of Multiple Effect Evaporation System for evaporating the trade effluent generated from proposed activities would result in ZERO DISCHARGE of effluent as per the CREP Norms. B) The Emissions In the proposed Food and Lake Colourant Manufacturing Unit, main source of emissions would be the boiler house from where steam for operations in the plant would be taken. A boiler of 3 TPH capacity will be installed in the proposed project. Imported Coal to the tune of 20 MT/Day would be used as fuel for boiler. The boiler stack emissions would mainly contain SPM/TPM and SO 2. APC equipment in the form of pulse jet bag filter will be provided for the 3 TPH boiler. One DG sets of capacity 500 KVA and two thermic fluid heaters of 10 Lakh Kcal/Kg and 4 lakh Kcal/ Kg respectively will be installed onsite. Diesel to the tune of 60 Lit/ day will be used as fuel for D.G set and Coal will be used for Thermic Fluid Heater. DG set will be used only during power failure. Table 4 Details of Stack Description Details 1. Stack number (s) Thermic Thermic D.G.Set Attached to Boiler Fluid Heater Fluid Heater Lakh 4 Lakh 500 KVA Capacity 3 TPH Kcal/Kg Kcal/Kg 4. Fuel type Imported Imported Imported HSD 4

5 Description Details Coal Coal Coal 5. Fuel Quantity 20 MT/Day 6 MT/ Day 2.5 MT/Day 60 lit/hr 6. Material of construction M.S. M.S. M.S Shape -- Round Round Round (round/rectangular) 8. Height, m (above ground level) 33 M 35 M 30 M 5 M ARL 9. Diameter/size, in meters 0.5 M 0.5 M 0.5 M Internal Diameter of the 0.45 M 0.45 M 0.45 M -- stack at the top in meters 11. Gas flow rate in Nm 3 /Hour Nm 3 /Hour Nm 3 /Hour Nm 3 /Hour 12. Stack diameter at 0.45 M 0.45 M 0.45 M -- sampling port in meters 13. Calorific value 7000 kcal/ kg / kcal/ kg 7000 kcal/ kg / kcal/ kg 7000 kcal kg / kcal kg 14. Ash content 10% 10% 10% Sulphur content 0.5%/4.5% 0.5%/ 4.5% 0.5%/4.5% Control Equipment Pulse Jet type Bag Filter Pulse Jet type Bag Filter -- C) Fugitive Emissions There would be chances of fugitive emissions due to handling of process emissions, chemicals as well as solvents. However to prevent and control same, adequate and efficient systems shall be provided. The same would comprises of scrubbing arrangements to absorb the process gases, carrying out entire process in the closed reactors, handling of solvents in close circuits etc. D) Noise Pollution Aspect There would be no major noise generating sources in the proposed project. The probable sources shall be Boiler, Thermic Fluid Heaters, Reactors, Compressors and D.G.Set. The same would be kept in isolated areas. Further, proper acoustic treatments wherever required would also be provided to have the ambient noise levels as per CPCB standards. The workers would be provided with earmuffs and other Personal Protective Equipments (PPE) which would give the reduction of 30 db (A). The D.G. set would not be a continuous source of noise as it would be operated only during power failure. As per the Noise Pollution Regulation and Control Amendment Rules; 2010, the DG set would be properly and adequately provided with acoustic enclosures E) Solid Wastes Solid wastes generated from the proposed project are categorized as Hazardous and Non-Hazardous Wastes. Solid waste generated would be in the form of Boiler Ash of imported coal to the tune of 1.5 MT / Day and same would be forwarded to brick manufacturers. -- 5

6 The entire quantity of hazardous waste will be handled and disposed as per Hazardous Waste (Management, Handling and Trans boundary Movement) Rules Hazardous Waste in the form of Process Residue, ETP Sludge and Discarded Containers and Drums will be generated. The unit would provide dedicated and isolated storage arrangement for the hazardous wastes. The area shall have leachate collection system, impervious floor and covered roof. Trained and experienced staff shall be employed for collection and handling of the wastes. Category Table 5 List of Hazardous Waste Generation Type of hazardous waste/ By Product Quantity (Kg/M) Process Residues and wastes 2 MT/M Chemical sludge from waste water treatment 150 MT/M Disposal Would be forwarded to CHWTSDF Discarded Drums / Containers 2200 / M Would be sale to Authorized re-processor Table 6 List of Solid Waste Generation Solid waste Type of Waste Disposal generation 1. Boiler Ash 1.5 MT/Day Sold to brick manufacturers for secondary use 3.0 SITE ANALYSIS 3.1 Connectivity The proposed activity is scheduled to commence at a site in Roha MIDC, Dist.: Raigad. The site is located at a rural surrounding and its nearest railway station is Roha railway station, located at about 3.61 Km and nearest airport is Mumbai airport, located at about Km from the proposed site. 3.2 Land Form, Land Use and Ownership: The premises have a gentle terrain. Soil is mostly, Yellowish Red colour and loamy in texture. Land use is industrial as the area has been developed by MIDC for industrial activity 3.3 Topography Raigad is a coastal district situated on the west coast of India. It is slightly elongated in the North - South direction and has a long indented coastline. The length of the coasts is about 160 Km and the length of the coast line is about 240 Km with a number of creeks and inlets. 3.4 Existing Land Use Pattern The total geographical area of Raigad district is about Sq. Km. It can be visualized that about 30.1 % is cultivable area of total land area. 6

7 3.5 Existing Infrastructure MIDC has acquired Hectares of land for the development of industrial belt. Basic infrastructure viz. good roads, water supply, storm water system, street lights, common facility centers, recreation, communication facilities, bank, post office, telephone exchange etc. are available in this area. 3.6 Soil Classification The soil found in the district is forest soil, varkas soil, rice soil, khar or salt soil, coastal alluvium and laterite soil. A thin layer of soil containing humus and organic materials are found in the deep-forested area, which yields valuable forest products and are not used for agriculture. These soils are heavily eroded due to grazing and cutting of forest trees. 3.7 Climate The climate of the district is typical of that on the west coast of India, with plentiful, regular and seasonal rainfall during the monsoon season. The year may be divided into four seasons; the summer season from March to May, the rainy season from June to September, the post-monsoon season in October and November, and the winter season from December to February. The average annual rainfall for the district as a whole is mm. The air is humid throughout the year. Winds are very strong during the monsoon season and blow from west or south-west. 3.8 Social Infrastructure Available The area is well served with infrastructural facilities such as road, rail, power station, and telecommunications. Fire Station: - MIDC has developed a Fire Station which is run by Roha Manufacturers Association. Truck Terminus and Bus Stop: - A truck terminus is available in the region to be developed. Common Facility Centre: - This facility centre houses includes post office and rest house. Many other facilities are planned to develop in the centre. Connectivity:- MIDC has developed a telephone exchange building in this area. Power Supply: MIDC has developed MSEB. This ensures the supply of electricity to the region. 4.0 PLANNING BRIEF 4.1 Planning Concept There are about 915 Nos. of industries in Raigad Region. Out of which 336 Nos. falls under red category, 202 orange category & remaining falls under green category. Availability of amenities like education, medical, water supply, communication, road network, electricity etc. significantly reflects the level of development of the area. 7

8 4.2 Population Projection According to Census 2001, district Raigad has a total population 2,207,929, comprising of 1,117,628 males and 1,090,301 females. The population of the district in Census 2001 is 21% higher than the district population of 1,824,816 in 1991 Census. The average growth rates for the rural and urban areas of the district are 11.8 % and 62.7 % respectively. The proportion of urban to total population in Raigad district stands at 24.2 % in 2001 as it was 18 % in 1991 indicating a slow pace of urbanization in the district. 5.0 PROPOSED INFRASTRUCTURE 5.1 Industrial Area As mentioned above, MIDC has acquired Ha of land for the development of industrial belt. The total land acquired by the project proponent in MIDC is 1.7 Ha. Under the proposed activity a systemic green belt would be developed in consultation with the district forest officer. The detailed area statement for the proposed project is as follows- 5.2 Greenbelt & Rain water Harvesting A plot admeasuring of 17,990 Sq.M. i.e. 1.7 Ha is been allotted to M/s. Arjun Food Colourant Mfg. Pvt. Ltd. by MIDC. As per MoEF norms, an area of about Sq. M. would be developed under the green belt which accounts 33% of the open area of the industry. 5.3 Social Infrastructure MIDC has developed internal roads, as well as it is provided with good connectivity facilities. 5.4 Connectivity The proposed activity is scheduled to commence at a site in MIDC Roha, Dist.: Raigad. The site is located at a rural surrounding and nearest railway station is Roha, located at about 3.66 Km and nearest Airport is Mumbai, located at about Km. 5.5 Drinking Water Management The main source of the water for processing as well as domestic purpose in proposed unit will be water supply scheme of MIDC. 5.6 Sewerage System The domestic effluent would be treated separately in proposed STP Plant. 5.7 Industrial Waste Management Industrial Effluent Industrial Effluent The trade effluent generated from the industry would passes through the physicochemical treatment, biological Treatment and tertiary treatment. Further, the treated effluent would be recycled for various in plant purposes. 8

9 Emissions - The unit proposes to install Pulse Jet Type Bag Filters as an Air Pollution Control Equipment. Hazardous Waste - The quantity of hazardous waste generated would be forwarded to CHWTSDF. Solid Waste - Solid waste generated in proposed unit would be sold to brick Manufacturer. 5.8 Solid Waste Management Solid waste in the form of boiler ash would be generated and the same would be given to brick manufacturer. 5.9 Power Requirement & Supply / Source The power requirement would be fulfil through MSEB. In case of a power failure, DG set would used to provide and uninterrupted power supply to emergency facilities provided. 6.0 REHABILITATION & RESETTLEMENT (R& R) PLAN 6.1 Policy to Be Adopted As the project site is located in approved industrial area developed by MIDC, there are no rehabilitation & resettlement issues involved 7.0 PROJECT SCHEDULE & COST ESTIMATES 7.1 Date of Start The construction work w.r.t. proposed project would be initiated after grant of Environmental Clearance. 7.2 Estimated Project Cost The expected cost of the proposed project will be around Rs. 8.5 Crores. The capital as well as O & M Costs towards Environmental aspects in the industry is as follows Table - 7 Operation & Maintenance Costs Description Cost Component Capital (Rs. Lakhs) O & M per Year (Rs. Lakhs) 1. Capital Cost of the ETP Cost towards APC Equipment in the form of 30 5 Pulse Jet type Bag Filter and stack 3. Cost incurred on the Green Belt Development Environmental Management Plan and -- 5 Monitoring 5. Cost towards Noise Pollution Control CSR Activities for next Three years

10 Description Cost Component Capital (Rs. Lakhs) O & M per Year (Rs. Lakhs) Total ANALYSIS OF PROPOSAL The proposed food colours and lake colours manufacturing unit has low pollution potential. Water use will be minimized to improve the process. Water pollution potential of the project will be mitigated by treatment of effluent in Effluent Treatment Plant and thereafter it will be recycled for in plant process. The air pollution potential of the project will be mitigated by providing Pulse Jet Type Bag Filter as air pollution control system. For minimization/prevention of the fugitive emission, regular maintenance of valves, pumps and other equipments will be done. To prevent leakage entire process will be carried out in the closed vessel as well as would provide with adequate scrubbing system for efficient absorption of process gas. Adequate arrangement for handling and disposal of Hazardous Solid waste will be made. Fire protection and safety measures would be provided to take care of fire and explosion hazard. Direct and indirect employment opportunities would be extended to the nearby resident. The proposed project would be implemented by adopting latest technologies and equipments thereby minimizing the pollution load in Environment. 10

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Pannageshwar Sugar Mills Ltd. (PSML), At: Pangaon, Tal.: Renapur, Dist.: Latur, Maharashtra was registered vide registration no. 11-130803 dated 01.01.2001.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Shivneri Sugars Ltd., A/p. - Ganesh tekadi, Nhavi (Bk.), Tal.: Koregaon, Dist.: Satara, Maharashtra State was registered vide

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT

PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Shri Dudhganga Vedganga Sahakari Sakhar Karkhana Limited, (SDVSSKL) located at Bidri (Mouninagar), Tal.: Kagal, Dist.: Kolhapur,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

PREFEASIBILITY REPORT. Jakraya Sugar Ltd. (JSL), Watwate, Tal.: Mohol, Dist.: Solapur was registered vide registration no.u15421pn2007plc

PREFEASIBILITY REPORT. Jakraya Sugar Ltd. (JSL), Watwate, Tal.: Mohol, Dist.: Solapur was registered vide registration no.u15421pn2007plc PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Jakraya Sugar Ltd. (JSL), Watwate, Tal.: Mohol, Dist.: Solapur was registered vide registration no.u15421pn2007plc130078. As per the provision of EIA

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Deshbhakt Ratnappa Kumbhar Panchganga Sahakari Sakhar Karkhana Ltd. (D.B.R.K. Panchganga S.S.K.L.) leased unit of Shree Renuka Sugars Ltd. is located

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Padmashree Dr. D. Y. Patil Sahakari Sakhar Karkhana Ltd. (PDDPSSKL), Dnyanshantinagar, Vesaraf - Palsambe, Tal: Gaganbavda, Dist.: Kolhapur was registered

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.

More information

UNSATURATED POLYESTER RESIN

UNSATURATED POLYESTER RESIN PROJECT REPORT ON UNSATURATED POLYESTER RESIN BY AQUA CHEM INDUSTRIES Survey No. 50/2, Jodhpar (Nadi), Morbi - 363641, Gujarat. I N D E X Sr. No. Contents Page No. 1 Introduction 3 2 Project Description

More information

Application of Low and Non Waste Technology in the production process;

Application of Low and Non Waste Technology in the production process; 9.0 ENVIRONMENT MANAGEMENT PLAN (EMP) 9.1 INTRODUCTION Environment Management Plan is required for ensuring sustainable development. It should not affect the surrounding environment adversely. The management

More information

PRODUCT, BY-PRODUCT, RAW MATERIAL

PRODUCT, BY-PRODUCT, RAW MATERIAL PRODUCT, BY-PRODUCT, RAW MATERIAL Sr. No. Name of Product Existing Quantity (30 KLPD) Expansion Quantity (30 KLPD) Total (60 KLPD) 1. Ethanol 8100 KL/Annum 8100 KL/Annum 16200 KL/Annum 2. Rectified Spirit

More information

Sub: - An application for obtaining Environment Clearance for New Unit.

Sub: - An application for obtaining Environment Clearance for New Unit. Brief Note: Sub: - An application for obtaining Environment Clearance for New Unit. We M/s. Nemi Chem Industries Unit-2 are planning to manufacturing activity following products at Plot 1, Survey 316,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report M/s. Veer Poly Chem 0 1. Introduction M/s. Veer Polychem is an existing unit located at Plot 119 & 120, Ranpur road, GIDC Dhandhuka, Dist: Ahmedabad, Gujarat. Currently, unit is

More information

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant

More information

PRE FEASIBILTY REPORT MANUFACTURING OF ORGANIC PIGMENT M/S PRINCE CHEMICALS

PRE FEASIBILTY REPORT MANUFACTURING OF ORGANIC PIGMENT M/S PRINCE CHEMICALS PRE FEASIBILTY REPORT ON PROPOSED PROJECT FOR MANUFACTURING OF ORGANIC PIGMENT OF M/S PRINCE CHEMICALS AT PLOT NO: 9111/3,9111/2/1 GIDC ESTATE, ANKLESHWAR, DIST: BHARUCH, STATE: GUJARAT 1 Index Sr no.

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY M/s Merino Industries Limited has proposed for manufacturing Phenol Formaldehyde Resin, Melamine Formaldehyde Resin at Plot No D2 CH 36, Dahej Phase II, Dist. Bharuch, Gujarat. The

More information

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

For TOR New Projects. Mo. no. : Contact no. and  ID of the Applicant SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries

More information

PRE FEASIBILTY REPORT

PRE FEASIBILTY REPORT PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For EXPANSION IN EXISTING MANUFACTURING PLANT Of M/s. SHIVA DYE STUFF PVT. LTD Plot no. A2-11/6104,G.I.D.C. Industrial Estate, Ankleshwar-393002, Gujarat. 1 CONTENTS Sr. No. Description

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

5. ENVIRONMENT MANAGEMENT PLAN

5. ENVIRONMENT MANAGEMENT PLAN 5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath Pre-Feasibility Report for Educational Institute Allen Career Institute-Supath at Plot No. 1, Educational Scheme, Naya Nohra & Hanuwantkhera, Kota, Rajasthan-324001 By M/s. Allen Career Institute Registered

More information

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR Annexure A Product Profile Sr. No. 1 2 Product Crude OBA AND/OR Crude OBA-CBS-X Standardized OBA Solid AND/OR Standardized OBA Liquid Proposed Qty (MT/ M) 400 400 1600 Note : For making Standardized OBA

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

Synthetic Organic Chemicals 5(f)

Synthetic Organic Chemicals 5(f) SEAC, Gujarat Page 1 of 14 Synthetic Organic Chemicals 5(f) For Terms of Reference [ToR] New Project 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

Mars Power & Steel Ltd.

Mars Power & Steel Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive

More information

M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN:

M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN: Pre-feasibility Study Report For M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN: 401506 Prepared By: M/s SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed

More information

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. FOR THE PROPOSED EXPANSION PROJECT FOR THE MANUFACTURING OF KETONIC RESINS Category: 5(f) OF RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. Located at: Plot No. C-1/46, 100 SHED AREA, GIDC, Vapi,

More information

PROJECT PRE-FEASIBILITY REPORT. For

PROJECT PRE-FEASIBILITY REPORT. For PROJECT PRE-FEASIBILITY REPORT For THE PROPOSED ORGANIC CHEMICALS MANUFACTURING IN EXISTING IN FORMULATION OF PESTICIDE, AGROCHEMICAL AND BIO FERTILIZERS MANUFACTURING UNIT AT M/S. SULPHUR MILLS LTD. PLOT

More information

Prasol Chemicals Ltd., Add. Mahad MIDC BRIEF SUMMARY

Prasol Chemicals Ltd., Add. Mahad MIDC BRIEF SUMMARY 1. INTRODUCTION BRIEF SUMMARY Prasol Chemicals Limited (Prasol), form an integral part of the global chemical industry. Prasol is an ISO 9001: 2008, ISO 14001: 2004 and an OHSAS 18001:2007 certified company

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar March 18, 2019 BY HAND DELIVERY/RPAD To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar 382 010 SUB.: APPLICATION FOR SUBMISSION OF ESSENTIAL DETAIL SOUGHT

More information

Pre-feasibility report for. Proposed establishment of synthetic organic chemical manufacturing unit. M/s. Elppe Chemicals Private Limited

Pre-feasibility report for. Proposed establishment of synthetic organic chemical manufacturing unit. M/s. Elppe Chemicals Private Limited Pre-feasibility report for Proposed establishment of synthetic organic chemical manufacturing unit By M/s. Elppe Chemicals Private Limited PROJECT TERMED UNDER SCHEDULE 5 (f) (SYNTHETIC ORGANIC CHEMICALS)

More information

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA M/s. ARTEMIS BIO TECH LTD., (A Division of Themis Medicare Ltd.,) PLOT NO. 1 & 5, Phase I, IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA PRE FEASIBILITY REPORT Artemis Bio tech Ltd.,

More information

ANNEXURE A DETAILS OF PRODUCTS

ANNEXURE A DETAILS OF PRODUCTS Annexures to Form 1 & Pre Feasibility Report Proposed Project for manufacturing of Dyes Intermediates of M/s Jay Dyechem, Narol-Vatva Road,Ta : City, District : Ahmedabad, Gujarat. ANNEXURE A DETAILS OF

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

Annexure-I List of Products

Annexure-I List of Products Annexure-I List of Products Sr. No. Name of Products Quantity (MT/Month) 1. Mono Chloro Acetic Acid (MCA) 300 2. Chloro Acetyl Chloride (CAC) 150 3. Tri Chloro Acetyl Chloride (TCAC) 150 4. Aluminum Chloroide

More information

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report Essentials Pharma 1 1. Introduction M/s. Essentials Pharma is an new unit to be located at Plot 19, Survey 10/1, Rajkot-Ahmedabad National Highway 8-B, Village: Hirasar, Tal: Rajkot,

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

M/S. HETERO INFRASTRUCTURE SEZ LIMITED ENVIRONMENTAL STATEMENT (FORM - V) FOR THE FINANCIAL YEAR ENDING MARCH-2016. M/S. HETERO INFRASTRUCTURE SEZ LIMITED N.NARASAPURAM(V),NAKKAPALLI(M) VISAKHAPATNAM DISTRICT. SUBMITTED TO : ANDHRA PRADESH

More information

COMPLIANCE STATUS REPORT

COMPLIANCE STATUS REPORT COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status

More information

PRE-FEASIBILITY REPORT PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES. OF M/s. UMIYA CHEM INTERMEDIATES

PRE-FEASIBILITY REPORT PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES. OF M/s. UMIYA CHEM INTERMEDIATES PRE-FEASIBILITY REPORT ON PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES OF M/s. UMIYA CHEM INTERMEDIATES AT PLOT NO: 4705/1/1, GIDC ESTATE,ANKLESHWAR, DIST:BHARUCH STATE:-GUJARAT 1 1.0 EXECUTIVE

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016 CONECPTUAL PLAN w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire at of J.V.P.D scheme of Vile Parle (W), by December, 2016 GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA OPERATING GUIDELINES FOR PROCESSING OF CONSENT TO ESTABLISH APPLICATION FOR ESTABLISHMENT OF COAL WASHERIES IN THE STATE OF ORISSA STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL PARK, ATTIVARAM VILLAGE, OZILI MANDAL, SPSR NELLORE DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ASTRIX LABORATORIES LIMITED SY. NO. 10 & 42, IDA, GADDAPOTHARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Sy. No. 10 & 42, IDA, Gaddapotharam (V), Jinnaram (M), Medak

More information

Conceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: -

Conceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Conceptual plan Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Area of plot= 5293SQM, Sanctioned FAR = 10586SQM as per earlier sanctioned.(2) Sanctioned Built up Area=19480.63

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

(Pollution Control Consultant & Engineers)

(Pollution Control Consultant & Engineers) (Pollution Control Consultant & Engineers) VISION To improvise and utilize cutting edge technologies and to excel in prevalent technologies for pollution control in India to support development without

More information

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600 Annexure A Product Profile Sr. No. 1 Product Crude OBA AND/ OR Standardized OBA liquid/ powder MT/ M Consented Ultimate 525 190 AND/ OR 2600-23 - Annexure - B Details of Raw Materials Qty (Kg/ Kg) Qty/

More information

EXECUTIVE SUMMARY. (Approved Consultant)

EXECUTIVE SUMMARY. (Approved Consultant) ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CAPTIVE RESIN PLANT OF 100000 TPA PRODUCTION CAPACITY AT ROUTHUSURAMALA VILLAGE, THOTTAMBEDU MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

Damodhar Cement Works

Damodhar Cement Works Excellence Through Teamwork Water conservation through recycle and reuse Presented By ACC Limited Damodhar at a glance. DCSL commenced commercial production in October 199 as a joint venture project of

More information

Product Profile. Quantity in MT/Month CAS Solvent Dark Violet R Solvent Black

Product Profile. Quantity in MT/Month CAS Solvent Dark Violet R Solvent Black Annexure - A Product Profile Sr. No. Product Name Quantity in MT/Month CAS Existing Proposed Ultimate Number End Users 1 Acid Dyes 5.000-5.000 0.000 -- -- Solvent Yellow 82 12227-67-7 Solvent Dark Violet

More information

Amendment required in the existing EC

Amendment required in the existing EC Amendment required in the existing EC Change/Addition in Phase I; 250 KLPD Grain based Distillery with 20 MW Co-gen Power Plant / Molasses 160 KLPD based distillery with 12 MW Co-gen Power Plant in Environmental

More information

Wastewater Recycling Plants with Zero Effluent Discharge. Water Recycling Plants

Wastewater Recycling Plants with Zero Effluent Discharge. Water Recycling Plants Wastewater Recycling Plants with Zero Effluent Discharge By Transparent Technologies Private Limited Business Groups Co-generation systems Absorption Cooling Systems Water Recycling Plants Heat recovery

More information

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25 3 ANNEXURES Annexure 1: Production Details Name of Products Products Production Capacity in MT/Month 1 Metformin Hydrochloride 1000 2 Paracetamol 1200 3 Bronopol 25 By-Products Total 2225 1 Acetic acid

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUGS INTERMEDIATES MANUFACTURING UNIT at SY. NO: PARTS OF 318, 319 AND 321 LOCATED AT PALLEPAHAD VILLAGE, THURKAPALLY MANDAL, YADADRI - BHONGIR DISTRICT, TELANGANA

More information

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II) BRIEF SUMMARY OF THE PROJECT for PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT of M/s. BASF INDIA LTD. (UNIT-II) PLOT NO. 8001 & 8001A, PHASE-VI, G.I.D.C., ANKLESHWAR, DIST: BHARUCH-393002,

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment

More information

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Reference: Environment clearance to CFG3 Project vides MOEF letter.no. J-11011/664/2008-IAII

More information

CHAPTER REHABILITATION AND RESETTLEMENT (R&R) PLAN (I) POLICY TO BE ADOPTED (CENTRAL / STATE)... 32

CHAPTER REHABILITATION AND RESETTLEMENT (R&R) PLAN (I) POLICY TO BE ADOPTED (CENTRAL / STATE)... 32 CONTENTS CHAPTER 1... 1 1.0 PROJECT SUMMARY... 1 CHAPTER 2... 2 2.0 INTRODUCTION... 2 (I) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 2 (II) BRIEF DESCRIPTION OF NATURE OF THE PROJECT... 2 (III)

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) 1. PROJECT DESCRIPTION: Ambuja Cement Eastern Ltd. (ACEL) has the cement

More information

Shilpa Sathi COMMON APPLICATION FORM FOR SETTING UP AN INDUSTRY IN WEST BENGAL

Shilpa Sathi COMMON APPLICATION FORM FOR SETTING UP AN INDUSTRY IN WEST BENGAL COMMON APPLICATION FORM FOR SETTING UP AN INDUSTRY IN WEST BENGAL 1. of the Applicant: SWS IDENTIFICATION NUMBER General Information [Please see Instructions before filling up the Application] Residential

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Contd7. Theft of water by using pumps on water lines from dam to TPS. 8. Plant premise is not compact hence piping's are long.

Contd7. Theft of water by using pumps on water lines from dam to TPS. 8. Plant premise is not compact hence piping's are long. Contd7. Theft of water by using pumps on water lines from dam to TPS. 8. Plant premise is not compact hence piping's are long. 9. Most of the pipes are underground, Hence identification and attending leakage

More information