2 Overview Overview Fisheries Act and Fisheries Protection Program Review of Proposed Work in or Around Water Monitoring Projects Near Water Partnerships and Stakeholder Engagement
3 DFO s Mandate Lead federal role in managing Canada's fisheries and safeguarding its waters (marine and freshwater) The Department works towards three strategic outcomes: o economically prosperous maritime sectors and fisheries o sustainable aquatic ecosystems o safe and secure waters Guided by the 5 key pieces of legislation: Fisheries Act, Oceans Act Species at Risk Act, Coastal Fisheries Protection Act and Canada Shipping Act.
4 Fisheries Act The federal Fisheries Act applies to all Canadian waters Includes provisions for the protection fish and their habitat from harm from developments and work occurring in/around water Provisions have evolved, most recently changed in late 2013, From habitat protection to fisheries protection
5 Fisheries Protection Provisions Renewed focus of Fisheries Protection Provisions : focusing protection on addressing threats to fishery species (commercial, recreational and Aboriginal) provide more clarity, certainty and consistency of regulatory requirements, and better enable partnerships with other organizations
6 Fisheries Protection Provisions Key fisheries protection measures: Section 20 fishways and flows requires water flow at obstructions (for fish passage and to supply downstream areas) Section 35 serious harm to fish prohibits serious harm to fish that support a fishery either by killing of fish or permanent alteration/destruction of habitat Section 36 pollution prevention prohibits deposit of deleterious substances (*administered by Environment Canada)
7 Enhanced Compliance and Protection The Act provides for Inspector s Directions to address imminent or ongoing serious harm Failure to comply with ministerial requests, inspector directions or conditions of authorizations are now offences Maximum penalty for fisheries protection offences now $200,000 for 1 st offence
8 Duty to Notify There is now a duty to notify without delay for any occurrence that causes serious harm to fish or deposit of a deleterious substance (or is likely to do so) Duty falls on persons who are in charge, management or control of the work, or who cause the occurrence For serious harm, notify DFO (Fishery Officer or FPP ) For deleterious substances, notify Environment Canada
9 DFO Fisheries Protection Program Along with recent changes to the Fisheries Act, DFO delivery changes in Habitat Management Program to the Fisheries Protection Program Single point of delivery for NL in St. John s Now a greater role for proponents to assess and manage impacts Standard advice for many routine works around water is now provided via self-assessment website
10 Contact Information Fisheries Protection Program Fisheries and Oceans Canada P.O. Box 5667 St. John s NL A1C 5X1 Tel: Fax: FPP-NL@dfo-mpo.gc.ca
11 Fisheries Protection Program Two business lines: Regulatory Review Client Liaison, Partnerships, Standards & Guidelines 11
12 FISHERIES PROTECTION PROGRAM NL Region Regional Director Ecosystems Management Team Leader Client Liaison, Partnerships, Standards & Guidelines Manager Regulatory Reviews Senior Biologist Standards & Guidelines Coordinator Client Liaison & Partnerships Team Leader Triage & Planning Biologist Program Officer Coordinator Information Mgmt Biologist Fisheries Protection Senior Biologist Hydro, Flows & Linear Development Senior Biologist Marine & Coastal Development, Oil and Gas Senior Biologist Mining Biologist Fisheries Protection Biologist Fisheries Protection Biologist Fisheries Protection Biologist Fisheries Protection Biologist Fisheries Protection
13 Regulatory Review under the Fisheries Act There is no mandatory requirement for you to submit a project for review, to DFO, under the Fisheries Act HOWEVER Proponents working near water must comply with the prohibition against causing serious harm.
14 Review of Proposed Works in or Around Water Separate review processes Self Assessment Request for Review (sent to the DFO-FPP) Request for Authorization
15 Projects Near Water Self Assessment Self-assessment online tool is used to determine if your project meets DFO-recommended criteria and measures to avoid harm If project does not meet criteria or you cannot follow standard measures - you can apply to DFO for specific review (i.e. Request for Project Review)
16 Request for Project Review Completed through submission of an application available online DFO-FPP will review works and proponent identified mitigations Reviewed at Triage or a Regulatory Review level DFO-FPP may require/identify the following to avoid serious harm: additional information relocation and re-design of project to avoid impact extra protection measures or mitigations Measures are typically set out in an Advice Letter provided to the proponent.
17 Authorization of Projects A proponents self assessment or DFO s review may conclude that an Authorization is required - If serious harm cannot be avoided, a proponent may need to obtain an Authorization for a project to proceed. Authorization requires proponent to submit separate application, with significant additional information (e.g. regulated information requirements, timelines etc ) Also includes proposed offsetting measures (i.e. fish habitat compensation) and a letter of credit
18 Authorized Projects Authorizations typically contain many detailed requirements for mitigations, offsetting as well as monitoring and reporting by the proponent Conditions are enforceable and failure to uphold can lead to prosecution under the Fisheries Act.
19 Monitoring Types of Monitoring: FPP Biologist site visits C&P Fishery Officer site visits Proponent on-site monitoring and reporting Other monitoring Monitoring for compliance and effectiveness - Authorized Projects - Project Specific Letters of Advice - Non Review works and Activities (i.e. self assessed)
20 MONITORING TYPES QUESTION TO BE ANSWERED MONITORING EFFORT Overview (DESCRIBED of Fisheries IN ANNEX 1) Protection Monitoring Priorities REGULATORY INSTRUMENT BY MONITORING TARGET MONITORED BY Authorizations Primary Monitoring Activity: Field or Desk Audit Field Inspection When the risk-level warrants, or reports indicate potential problems -Are the Conditions of Authorizations implemented (for avoidance, mitigation and offsetting of impacts)? - Are the offsetting measures working as intended? Site Visits to 10 active authorizations per year. Review of all required reports submitted by proponents. Regulatory Review Units Project-Specific Letters of Advice) Primary Monitoring Activity: Field Inspection Desk Audit Where reports or information gathered by proponents, partners or interested third-parties are available -Are the recommended avoidance and mitigations measures put in place? -Is serious harm to fish avoided? 15%-25% of all projectspecific advice provided Regulatory Review Units Self- Assessment, Standards, Best-Placed Delivery Models Field Inspection As part of joint-monitoring with partner agencies, or as part of strategic, targeted monitoring plans Desk Audit Where information provided by partners and stakeholders allows for determination of effectiveness of streamlining systems -Are partnership arrangements, streamlining processes and standards functioning as intended (to support protection of fisheries)? Approximately 5% of projects that FPP is aware of Client Liaison, Partnerships, Standards and Guidelines Units 20
21 Occurrences An occurrence is a reported or observed incident which is a potential violation of any Act or Regulation that fall under the mandate of the Minister Occurrence reports are received by the FPP from the general public via telephone or , from Fishery Officers, and from other provincial or federal agencies/departments ( i.e. Provincial Department of Environment, Environment Canada) The FPP Triage &Planning unit determines the relative risk to cause serious harm posed by a given occurrence and coordinates DFO response. 21
22 Occurrences All are reviewed by FPP Notification/forwarding to other authorities (e.g. EC or Prov) Range of possible actions or responses (i.e. education, directives and enforcement action) Spills (e.g. oils, chemicals) should be report to the NL Spill Line ( )
23 February 26, 2015 Client Liaison and Stakeholder Engagement
24 February 26, 2015 Client Liaison and Stakeholder Engagement Engage all stakeholders to educate, assist and cooperate to protect our commercial, recreational and Aboriginal fisheries resource. in the form of habitat restoration design advice related to restoration project development funding sources (Funding Helper) coordinating the regional application of the Recreational Fisheries Conservation Partnerships Program (RFCPP)
25 February 26, 2015 Recreational Fisheries Conservation Partnerships Program (RFCPP) the program s objective is to restore, rebuild and rehabilitate recreational fisheries habitat. The program, through contribution funding, enables proponents to manage and execute projects that restore compromised and/or threatened recreational fisheries habitat Limited to recreational fishing/angling groups, and conservation groups. An eligible recipient must be a legal entity (i.e. must have a business or charity number).
26 February 26, 2015 Types of Projects Stream, Lake and Floodplain Habitat Restoration Fish Access Improvements Stream Channel and Erosion Control and Stabilization Ocean Habitat Restoration and Enhancement Chemical Manipulation (Aeration, Liming)
27 February 26, 2015 Contribution Amounts and Funding Duration Round 5 application window expected to open soon Preference will be given to funding requests in the $20,000 to $100,000 range (per year- up to 3 years in duration). Contact For additional information please contact Blair Thorne, Biologist at (709) ; Richard Van Ingen, Coordinator - Client Liaison & Partnerships (709) or via <RFCPP-PPCPR.NL@DFO-MPO.GC.CA>. Program website:
DFO Fisheries Protection Program
DFO Fisheries Protection Program Presenter: Brad Fanos Manager, Regulatory Reviews Fisheries Protection Program brad.fanos@dfo-mpo.gc.ca October 15, 2014 Outline What is the Fisheries Protection Program?
More informationFisheries Protection Program: an overview. WaterTech 2016, April 6-8, 2016, Banff
Fisheries Protection Program: an overview WaterTech 2016, April 6-8, 2016, Banff 1 Amendments to the Fisheries Act All amendments have been in effect as of November 25, 2013 Focus the Act s regulatory
More informationHydrology and Watershed Management
Hydrology and Watershed Management The summaries and their associated interpretations contained in this document are for general information only, not legal advice. To interpret or apply the law, you must
More informationFish Passage Decision Framework for BC Hydro Facilities
Note: this document was originally created in 2008 and signed off and endorsed by Fish, Wildlife and Hydro Policy Committee representatives. Subsequently in 2016, additional information was added to the
More informationAppendix D. Fisheries and Oceans Canada (DFO) Letter of Advice
The City of Winnipeg Bid Opportunity No. 851-2017 Template Version: C420170317 - RW Appendix D Fisheries and Oceans Canada (DFO) Letter of Advice Fisheries and Oceans Canada Pêches et Océans Canada 103-1800
More informationPêches et Océans Canada. October 11, 2017 Our file Notre référence 16-HCAA Your file Votre reference EA
Fisheries and Oceans Canada Pêches et Océans Canada Central & Arctic Region Région centrale et de l Arctique Fisheries Protection Program Programme de protection des pêches 867 Lakeshore Road 867 chemin
More informationChanges / Updates to DFO Regulations. September 16, 2014
Changes / Updates to DFO Regulations September 16, 2014 Changes / Updates to DFO Regulations Agenda and Purpose Understand the role of DFO and differentiate from other approval agencies Recognize our responsibilities
More informationTOWARDS SUSTAINABLE FISHERIES
03 3 TOWARDS SUSTAINABLE FISHERIES Recommendation Summary The Green Budget Coalition (GBC) commends the Government of Canada s commitment to amend the Fisheries Act and recommends that it complements this
More informationMagino Project Environmental Impact Statement. Technical Support Document Draft Fish Habitat Compensation Plan
Magino Project Environmental Impact Statement Technical Support Document 20-14 Rev. No. Revision Date Approved 0 Document issued for EIS Table of Contents SECTION 1.0 INTRODUCTION... 1 SECTION 2.0 BACKGROUND...
More informationTable of Contents. Species at Risk Act Habitat Management
The Practitioners Guide to the Species at Risk Act (SARA) for Habitat Management Staff is one in a series of Practitioners guides which are intended to provide clear and nationally consistent guidance
More informationChapter 4. Airport Authority Governance, Statutes and Policies
Chapter 4 Airport Authority Governance, Statutes and Policies Table of Contents 4. Airport Authority Governance, Statutes and Policies... 4-1 4.1 The Federal Government and Airport Authorities... 4-1 4.2
More informationDepartment of Environment and Conservation. NEIA newleef 2013 October 10, 2013
Department of Environment and Conservation NEIA newleef 2013 October 10, 2013 1 The Environmental Assessment Process in Newfoundland & Labrador 2 Overview Purpose of EA in Newfoundland & Labrador EA Goals
More informationGENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 APRIL 2017 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS
More informationRecommendations from ENGOs in Newfoundland and Labrador on the Fisheries Act
Newfoundland and Labrador Environment Network P.O. Box 5125, Stn. C St. John s, NL A1C 5V5 ph: 709-722-1925 fx: 709-726-2764 nlen.ed@gmail.com https://nlenvironmentnetwork.org 28 November 2016 To: Standing
More informationAnnual Report to Parliament
ANNUAL REPORT TO PARLIAMENT on the Administration and Enforcement of the Fish Habitat Protection and Pollution Prevention Provisions of the Fisheries Act April 1, 2012 To March 31, 2013 Published by: Communications
More informationStrengthening Management of Contaminated Sites in Canada: A Federal Perspective
www.ec.gc.ca Strengthening Management of Contaminated Sites in Canada: A Federal Perspective Environmental Stewardship Branch Environmental Protection Operations Directorate Contaminated Sites Division,
More informationCette publication est également disponible en français.
O N T A R I O P R O T O C O L F I S H H A B I T A T P R O T O C O L 2008 The Fish Habitat Referral Protocol was produced by the multi-agency Aquatic Resources Management Advisory Committee (ARMAC), more
More informationFisheries and Oceans Canada Species at Risk Act. Directive on the Identification of Critical Habitat for Aquatic Species at Risk
Fisheries and Oceans Canada Species at Risk Act Directive on the Identification of Critical Habitat for Aquatic Species at Risk January 2015 Species at Risk Program Programme d espèces en péril To be read
More informationDFO s Fish Habitat Management Program
DFO s Fish Habitat Management Program Overview Fish and Fish Habitat DFO Policy - Objectives and Goals How Do the Fisheries Act and Navigable Waters Protection Act Affect Cattle Producers Riparian Areas,
More informationCanadian Environmental Assessment Act, Newfoundland Environmental Industry Association November 21, 2012
Canadian Environmental Assessment Act, 2012 Newfoundland Environmental Industry Association November 21, 2012 Overview of Changes CEAA 2003 EA Process Driven by federal involvement in a project Applies
More informationEnvironmental Approvals and Guidelines for Renewable Energy Projects in Saskatchewan
Environmental Approvals and Guidelines for Renewable Energy Projects in Saskatchewan Alberta and Saskatchewan Renewable Energy Finance Summit June 3, 2016 Erika Ritchie, Assistant Deputy Minister Environmental
More informationSummary of Canada s response to the risk of invasive alien species. November 2007
Summary of Canada s response to the risk of invasive alien species November 2007 Contained in this document is a summary of past and current key achievements of Canadian federal departments in preventing,
More informationOccupational Health and Safety (OHS) Regulation and Code Amendments
Occupational Health and Safety (OHS) Regulation and Code Amendments Technical Briefing May 22, 2018 Agenda Occupational Health and Safety Act prompted changes Stakeholder consultation OHS Regulation amendments
More informationBeaver Dam Removal in the Omineca Region Ecosystem Standard Operating Procedures
Beaver Dam Removal in the Omineca Region Ecosystem Standard Operating Procedures Issue: The control of beavers and removal of beaver dams and has been a long-standing issue within the Omineca Region of
More informationDuty to Notify: How soon is as soon as reasonably practicable? ACLCA 4 August 2010 Andrew Pruszinski Principal Adviser Site Contamination
Duty to Notify: How soon is as soon as reasonably practicable? ACLCA 4 August 2010 Andrew Pruszinski Principal Adviser Site Contamination Summary Legislation Guideline Issues identified by the EPA Issues
More informationComprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:
Comprehensive Study Scoping Document for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: 07-03-26302 Prepared pursuant to Subsection 21(1) of the Canadian Environmental Assessment
More information4.05. Groundwater Program. Chapter 4 Section. Background. Follow-up to VFM Section 3.05, 2004 Annual Report. Ministry of the Environment
Chapter 4 Section 4.05 Ministry of the Environment Groundwater Program Follow-up to VFM Section 3.05, 2004 Annual Report Chapter 4 Follow-up Section 4.05 Background Groundwater is defined as water located
More informationI hope that this explanation suffices, Thx, Robert
From: Piccini, Robert FLNR:EX [ ] Sent: 2018, May 17 4:39 PM To: von Muehldorfer, Karen; Gray, Alex; McArthur, Michael Cc: Site C Compliance Reporting Subject: RE: PR bridge widening Change approval Importance:
More informationFISHERIES AND OCEANS CANADA
FISHERIES AND OCEANS CANADA Final Submission/Technical Report EA1415-01 Prairie Creek All Season Road Canadian Zinc Submitted to: Mackenzie Valley Environmental Impact Review Board (MVEIRB) March 10, 2017
More informationLNG Canada Development Inc.
LNG Canada Development Inc. Shell Centre 32 nd Floor 400 4 th Avenue SW PO Box 100, Station M Calgary AB T2P 2H5 Canada Submitted electronically to: compliance.conformite@ceaa-acee.gc.ca April 20, 2016
More informationCanadian Federal Legislation Pertinent to Contaminated Site Management
Canadian Federal Legislation Pertinent to Contaminated Site Management Remediation Technologies Workshop 2 Licence to Spill? Banff, AB Oct. 17, 2012 Murray Heap, Environment Canada 1 Federal Legislation
More informationIndian Oil and Gas Canada
Indian Oil and Gas Canada Indian Oil and Gas Canada s Environmental Regulatory and Policy Changes Watertech 2013 ESSA Conference Banff Springs, April 10-13, 2013 Elaine Blais, BSc. P.Ag. Environment Team
More informationEnvironmental Trail Screening Tool. Legislation & Guidelines. Legislation/Guidelines. Implications for Trail Development
This Legislation & Guidelines Matrix is a resource to accompany the developed by Recreation Sites and s BC. Legislation & Guidelines Legislation/Guidelines Assessment Act Applicability (Federal and Provincial)
More informationProvincial Railway Guides Section:
Safety management plans are intended to outline and document the safety policies and operating procedures put in place by a railway and establish a system for managing safety for all aspects of the railway
More informationLabour Evaluating Occupational Health and Safety Systems Follow-up
Labour Evaluating Occupational Health and Safety Systems Follow-up SUMMARY Virtually all occupational injuries, diseases and fatalities are preventable. The Occupational Health and Safety Act, Regulation
More informationENVIRONMENTAL IMPACT ASSESSMENT
ENVIRONMENTAL LAW ASSOCIATION ENVIRONMENTAL LAW FACT SHEET NO. 1 ENVIRONMENTAL IMPACT ASSESSMENT INTRODUCTION This fact sheet was produced by the Environmental Law Association to provide a plain language
More informationBritish Columbia s. VVater Act. Modernization. Policy Proposal on British Columbia s new Water Sustainability Act. December 2010
British Columbia s VVater Act Modernization Policy Proposal on British Columbia s new Water Sustainability Act December 2010 British Columbia has a rich heritage in our lakes, rivers and streams. Linked
More informationTHE proposed IMPACT ASSESSMENT SYSTEM. A Technical Guide
THE proposed IMPACT ASSESSMENT SYSTEM A Technical Guide 1 A GUIDE TO THE PROPOSED NEW IMPACT ASSESSMENT SYSTEM A clean environment and a strong economy go hand in hand. The Government of Canada is putting
More informationTHE proposed IMPACT ASSESSMENT SYSTEM
THE proposed IMPACT ASSESSMENT SYSTEM A Technical Guide Updated August 14, 2018 1 A GUIDE TO THE PROPOSED NEW IMPACT ASSESSMENT SYSTEM A clean environment and a strong economy go hand in hand. The Government
More informationChanges to Federal Environmental Assessment and Regulatory Legislation
Changes to Federal Environmental Assessment and Regulatory Legislation EnviroTech Regulatory Workshop April 3, 2018 Shailaz Dhalla BUSINESS LAW Why are we here today? February 6, 2018 - Bill C-68, An Act
More informationCanada s Invasive Alien Species Strategy
Canada s Invasive Alien Species Strategy Exotic and Invasive Species Workshop Corner Brook, Newfoundland January 22, 2008 Mark Richardson Invasive Species Policy Advisor Habitat Conservation and Protected
More informationOverview of Federal Water Law
Overview of Federal Water Law 2015 - Statutory and Case Law Update February 23, 2016 Jacqueline Wilson, Counsel OVERVIEW 1. Division of power to regulate water law 2. Overview of selected federal water
More informationReview of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION
Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION 1 Contents Introduction 3 Delegation to the NEB 3 Assessments and regulatory guidance 4 Provincial requirements
More informationThe Effluent Permitting Process under the Environmental Management Act. An Overview for Mine Project Applicants
The Effluent Permitting Process under the Environmental Management Act An Overview for Mine Project Applicants APRIL 2013 Disclaimer This document does not replace the Environmental Management Act or its
More informationItem No Halifax Regional Council September 27, 2011
Item No. 11.1.3 Halifax Regional Council September 27, 2011 TO: Mayor Kelly and Members of Halifax Regional Council SUBMITTED BY: Richard Butts, Chief Administrative Officer DATE: September 16, 2011 Mike
More informationEnvironmental Review Process. Presented by Environment and Natural Resource Unit, Lands and Economic Development, BC Region
Environmental Review Process Presented by Environment and Natural Resource Unit, Lands and Economic Development, BC Region Outline 1. Overview of the Canadian Environmental Assessment Act (CEAA) 2. Indigenous
More informationWorking Around Water?(Saskatchewan Fact Sheets)
1 of 5 25/02/2013 9:58 AM Home > Central and Arctic > Publications > Working Around Water? (Saskatchewan Fact Sheets) > What You Should Know About Fish Habitat and Building a Beach Working Around Water?(Saskatchewan
More informationNuclear Regulation in Canada
Nuclear Regulation in Canada The Michael Rinker Director General Directorate of Environmental and Radiation Protection and Assessment Presentation to Mandated Review EA Panel Ottawa, ON September 9, 2016
More informationEnvironmental Assessment Program
Environmental Assessment Program Frequently Asked Questions Updated February 2010 Introduction The following is a list of questions that are commonly asked by both project Proponents and the public regarding
More informationT F Airport Road Fort St John BC V1J 4M6
Environmental Specialist Permanent / Full Time Competition Number: 201854 BC Oil & Gas Commission, Fort St John or Victoria Grid 27- Victoria: $74,297 $84,856* Grid 27- Fort St John: $76,324 - $87,170**
More informationFacilitating Implementation of the Canada-Ontario Agreement on Environmental Assessment Cooperation
Federal/Provincial Environmental Assessment Coordination in Ontario A Guide for Proponents and the Public Facilitating Implementation of the Canada-Ontario Agreement on Environmental Assessment Cooperation
More informationCZC 2004 CONFERENCE STATEMENT
CZC 2004 CONFERENCE STATEMENT Preamble The Coastal Zone Canada Association held its sixth biennial Coastal Zone Canada Conference (CZC 2004) in St. John s, Newfoundland, June 25-30, 2004. The theme of
More informationTOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW
TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW Land development projects and other land use conversions, and their associated changes to land cover, permanently alter the hydrologic response of local watersheds
More informationIndigenous and Northern Affairs Canada (INAC) National On-reserve Emergency Management Plan
Indigenous and Northern Affairs Canada (INAC) National On-reserve Emergency Management Plan Contents INAC SECTION 1: INTRODUCTION... 3 1.1 Authorities and Legislation... 3 1.2 Whole-of-Government Approach
More informationGENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 NOVEMBER 2012 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS
More informationPipeline Associated Watercourse Crossings Fish and Fish Habitat Impacts Assessment Tool 5th Edition
Pipeline Associated Watercourse Crossings Fish and Fish Habitat Impacts Assessment Tool 5th Edition Prepared for: Canadian Energy Pipeline Association (CEPA), Canadian Association of Petroleum Producers
More informationSpecies at Risk Act Policies and Guideline Series
Species at Risk Act Policies and Guideline Series Addressing Species at Risk Act Considerations Under the Canadian Environmental Assessment Act for Species Under the Responsibility of the Minister responsible
More informationathabasca river water management framework ALBERTA S REGULATORY BACKSTOP TO PROTECT THE ATHABASCA RIVER
[ athabasca river ] water management framework ALBERTA S REGULATORY BACKSTOP TO PROTECT THE ATHABASCA RIVER The framework achieves a high level of protection while balancing the Athabasca River s needs
More informationLNG Canada submitted a formal update as per Condition 11.2 of the CEAA Decision Statement on June 30, 2017:
LNG Canada Development Inc. Shell Centre 32 nd Floor 400 4 th Avenue SW PO Box 100, Station M Calgary AB T2P 2H5 Canada Submitted electronically to: compliance.conformite@ceaa-acee.gc.ca July 4, 2018 Canadian
More informationThese potential changes and their implications are outlined in Annex 1.
Guidance Note Hydropower Guidance Note: This Guidance Note has been prepared by Natural Resources Wales (NRW) to provide applicants for abstraction and impoundment licences for hydropower schemes with
More informationREVIEW OF THE 2012 CHANGES TO THE FISHERIES ACT: Restoring Lost Protections and Incorporating Modern Safeguards
REVIEW OF THE 2012 CHANGES TO THE FISHERIES ACT: Restoring Lost Protections and Incorporating Modern Safeguards SUMMARY REPORT OF FISHERIES AND OCEANS CANADA PHASE 1 PUBLIC ENGAGEMENT (1 APRIL 2016 28
More informationReasons for Ministers Decision
In the matter of the Environmental Assessment Act S.B.C. 2002, c. 43 (Act) and In the matter of an Application for an Environmental Assessment Certificate (Application) by Teck Coal Limited (Proponent)
More informationOVERVIEW. What is the Great Lakes Water Quality Agreement?
What is the Great Lakes Water Quality Agreement? OVERVIEW The Great Lakes Water Quality Agreement (GLWQA) is an agreement between Canada and the United States, first signed in 1972. It contributes to the
More informationto Nemaska Lithium Inc. c/o Guy Bourassa President and Chief Operating Officer 450 De la Gare-du-Palais Street, 1 st Floor Quebec, Quebec G1K 3X2
Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Inc. c/o Guy Bourassa President and Chief Operating Officer 450 De la Gare-du-Palais Street,
More informationPROJECT BRIEF for the John Hart Generating Station Replacement Project
PROJECT BRIEF for the John Hart Generating Station Replacement Project Issue Date: March 13, 2012 TABLE OF CONTENTS John Hart Generating Station Replacement Project Page ii of 17 1. INTRODUCTION... 3 1.1
More informationA Proposed Regulation under The Water Rights Act
A Proposed Regulation under The Water Rights Act A streamlined and balanced approach to drainage and water retention in Manitoba Public Consultation Document November 2018 MINISTER S MESSAGE Dear Manitobans,
More informationNWT Climate Change Strategic Framework. Backgrounder
NWT Climate Change Strategic Framework Backgrounder INTRODUCTION Climate change is one of the most serious environmental, economic and political challenges of our time and is an important issue to NWT
More informationSalmon River Enhancement Society (SRES) September 15, 2016
Salmon River Enhancement Society (SRES) September 15, 2016 Overview The following provides an overview of the major points of the conversation relating to the SRES concerns associated with the Trans Mountain
More informationFinancial Resources Human Resources Assets
ENVIRONMENTAL RESPONSE ENVIRONMENTAL RESPONSE OVERVIEW LOGIC MODEL MISSION: To protect the marine environment and related interests through preparedness, prevention, monitoring and responding to marine
More informationAccountability Report
Accountability Report 2016 2017 Department of Environment July 2017 Table of Contents Accountability Statement... 2 Message from Minister... 3 Financial Results... 4 Measuring Our Performance... 5 Government
More informationFreshwater Pollution Response Implementation Plan
LOUGHS AGENCY OF THE FOYLE CARLINGFORD AND IRISH LIGHTS COMMISSION Freshwater Pollution Response Implementation Plan 2016-2017 COPYRIGHT 2015 LOUGHS AGENCY OF THE FOYLE CARLINGFORD AND IRISH LIGHTS COMMISSION
More informationColumbia River Treaty Frequently Asked Questions (FAQs)
Columbia River Treaty Frequently Asked Questions (FAQs) Spring 2012 Columbia River Treaty 1. What is the Columbia River Treaty? The Columbia River Treaty is a trans-boundary water management agreement
More informationBusiness Plan. Department of Environment
Business Plan Department of Environment Crown copyright, Province of Nova Scotia, 2018 Budget 2018 19: Business Plan March 2018 ISBN: 978-1-55457-821-4 Contents Message from the Minister... 2 Vision of
More informationSpecies at Risk Act Permitting Policy
PROPOSED Species at Risk Act Policies and Guidelines Series Species at Risk Act Policies Species at Risk Act Permitting Policy 2016 Recommended citation: Government of Canada. Species at Risk Act Permitting
More informationKey Components and Best Practices for Environmental Impact Assessments
Key Components and Best Practices for Environmental Impact Assessments Introduction 1 The immense technological advances since the adoption of UN Convention on the Law of the Sea (UNCLOS) have exponentially
More informationFish-Stream Crossing Guidebook Information Sheet
The mandate of the Environmental Management Section is to ensure that the Ministry of Transportation and Infrastructure (MOTI) develops and maintains the provincial transportation infrastructure in an
More informationRegulating Uranium Mines and Mills in Canada
Regulating Uranium Mines and Mills in Canada Canadian Nuclear Safety Commission suretenucleaire.gc.ca 12 September 2014 e-doc 4495707 Presentation Outline CNSC as Canada s Nuclear Regulator CNSC s Regulatory
More informationb. further OSPAR s work on marine protected areas with the view of achieving a network of marine protected areas which:
PART II THE THEMATIC STRATEGIES Biological Diversity and Ecosystems 1. Objectives 1.1 The OSPAR Commission s strategic objective with regard to biodiversity and ecosystems is to halt and prevent by 2020
More information2.20 Workplace Health and Safety Inspections. Introduction. Scope and Objectives
Introduction The Department of Labour is responsible for monitoring and improving conditions in the workplace through the development and application of various health and safety codes, practices and standards.
More informationDISCUSSION PAPER indigenousfisheries.ca
Aboriginal Aquatic Resource and Oceans Management DISCUSSION PAPER indigenousfisheries.ca Program Overview In 2002, a review of Fisheries and Oceans Canada s Aboriginal Fisheries Strategy found that some
More informationApproval and Permitting Requirements Document for Renewable Energy Projects
Approval and Permitting Requirements Document for Renewable Energy Projects Ministry of Natural Resources September 2009 Approval and Permitting Requirements Document for Renewable Energy Projects Ontario
More informationClass Environmental Assessment for Waterpower Projects
Class Environmental Assessment for Waterpower Projects November 2015 - Sixth Edition www.owa.ca Class Environmental Assessment for Waterpower Projects November 2015 Sixth Edition Prepared by: Ontario Waterpower
More informationProject & Environmental Review Aboriginal Consultation Information for Applicants. Vancouver Fraser Port Authority
Project & Environmental Review Aboriginal Consultation Information for Vancouver Fraser Port Authority July 2015 TABLE OF CONTENTS 1. Introduction... 3 2. Overview... 3 3. Principles/Objectives... 3 4.
More informationFish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory
Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining
More informationPrivate Managed Forest Land Act Presentation to: Association of Vancouver Island and Coastal Communities
Private Managed Forest Land Act Presentation to: Association of Vancouver Island and Coastal Communities April 12, 2014 1 Outline Brief history of the Private Managed Forest Land Act Private Managed Forest
More informationFisheries and Oceans Canada Update. Karen Ralph Partner Workshop January 23, 2007
Fisheries and Oceans Canada Update Karen Ralph Partner Workshop January 23, 2007 Organization Three Districts: Southern Ontario: Burlington, London Eastern Ontario: Prescott, Peterborough Northern Ontario:
More informationSTRATEGIC ENVIRONMENTAL ASSESSMENT POLICY INDUSTRY CANADA
STRATEGIC ENVIRONMENTAL ASSESSMENT POLICY INDUSTRY CANADA 1 1. Title: Industry Canada s Strategic Environmental Assessment Policy The policy will guide the department s implementation of the 2010 Cabinet
More informationKey Components and Best Practices for Environmental Impact Assessments
Key Components and Best Practices for Environmental Impact Assessments Submitted by the Natural Resources Defense Council (NRDC) on behalf of The High Seas Alliance Introduction 1 August 24, 2016 The immense
More informationArctic Council Secretariat. Kiruna Declaration. Kiruna, Sweden, 15 May 2013
Arctic Council Secretariat Kiruna Declaration Kiruna, Sweden, 15 May 2013 KIRUNA DECLARATION On the occasion of the Eighth Ministerial Meeting of the Arctic Council We, the Ministers representing the
More informationHealth, Safety & Environment. Federal Tank Registry Information for Sales & Delivery Operations
Health, Safety & Environment Federal Tank Registry Information for Sales & Delivery Operations On June 12, 2008 Environment Canada brought in new regulations governing storage tank systems for petroleum
More informationEMERGENCY DECLARATION GUIDELINES
EMERGENCY DECLARATION GUIDELINES References: A. Emergency Program Act (RSBC 1996) Chapter 111 B. Local Government Act (RSBC 1996) Chapter 323 Introduction The need to declare a state of local emergency
More informationUS Army Corp of Engineers
US Army Corp of Engineers Each year thousands of construction projects are undertaken in the United States that could potentially impact the nation s rivers, streams, wetlands and other aquatic resources.
More informationCABINET DIRECTIVE ON STREAMLINING REGULATION
CABINET DIRECTIVE ON STREAMLINING REGULATION Her Majesty the Queen in Right of Canada, 2007 Catalogue No. BT22-110/2007 ISBN 978-0-662-49149-1 Table of Contents Our Commitment to Canadians... 1 1.0 Introduction...
More informationMOL Inspection Process
MOL Inspection Process Canadian Manufacturers & Exporters, Health & Safety Symposium Mississauga Grand, 35 Brunel Road, Mississauga March 22, 2017 Presented by: Ronald Landry Acting Provincial Specialist
More informationNational System of Marine Protected Areas
Agenda Item F.1.a Supplemental NMPAC PowerPoint (Wenzel) September 2010 National System of Marine Protected Areas Lauren Wenzel National Marine Protected Areas Center Executive Order 13158: MPAs Develop
More informationPreface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)
Preface In 2008, the inter-agency Drainage Act & Section 28 Regulations Team (DART) was established by the Ministry of Natural Resources (MNR) and the Ministry of Agriculture, Food and Rural Affairs (OMAFRA)
More informationLow Impact Hydropower Institute 34 Providence Street Portland, ME Tel. (207) Fax (206)
Low Impact Hydropower Institute 34 Providence Street Portland, ME 04103 Tel. (207) 773-8190 Fax (206) 984-3086 www.lowimpacthydro.org LOW IMPACT HYDROPOWER QUESTIONNAIRE E. LOW IMPACT HYDROPOWER QUESTIONNAIRE
More informationRigorous, efficient and timely access to information is an important pillar of accountability for government.
Open and Accessible Government - Modernizing the Freedom of Information and Protection of Privacy Act Rigorous, efficient and timely access to information is an important pillar of accountability for government.
More informationSeptember 2016 ID Competency Statement Type
September 06 Ensures that the impact assessment scope, criteria and conditions (geographic, environmental, economic, social, and cultural) are defined adequately. Develops a project management plan for
More informationEnvironmental Regulation & Mine Permitting in Ontario
Environmental Regulation & Mine Permitting in Ontario A Presentation to the Ad Hoc Committee on Mining Lake Superior Work Group Mark O Brien, Mineral Development Consultant MNDMF, Thunder Bay Agenda Regulatory
More information