1 Modelling a Combined Sewage and Stormwater Flood Detention Basin A. Pugh B.E. (Hons), Member A.W.A. Sales and Support Manager, Wallingford Software Pty Ltd, Australia S. Ratcliffe B.Sc(Hons), Grad Dip App Comp, ME, MIE Aust, CP Eng, CEng MICE Launceston City Council, Australia Abstract: The Margaret Street detention basin for combined sewage and stormwater flows is a unique solution to provide storm flooding protection within urban Launceston. Using a part covered and part open basin of 7ML and 23ML respectively, the basin configuration and operation provides first flush capture, containment and discharge to Council WWTP. The structure designed by GHD, is scheduled for completion by March The purpose of this paper is to discuss the creation of the InfoWorks CS model; how the catchment model was built, calibration issues, how complex control structures were considered within the model. The model was developed to allow testing and refinement of the operation under proposed and alternative system control scenarios for the Council. The results of this testing will also be discussed. Keywords: Hydraulic modelling, Combined, Sewer, Stormwater, Detention Basin, InfoWorks CS, WWTP. 1. Introduction Dating from the 1840 s Launceston City Council s drainage system is one of the oldest in Australia. The system was designed using the English system of collecting both stormwater and sewage discharges in the one same pipes. As Launceston expanded demands on the system increased and as a result the system became grossly overloaded with the result being regular flooding of the CBD and low lying residential areas. In the 1980 s Council spent approximately $20M on upgrade works in the system. These works were part of a strategy proposed by Gutteridge, Haskins & Davey (GHD) which had been developed by undertaking flow monitoring and modelling of the catchment. The strategy has so far been successful, although a major element of this strategy had yet to be constructed. The complete strategy included a 1.1 km long pressure gravity pipeline of 2.7m diameter to collect water from South Launceston and discharge directly into the river. It is estimated that this would cost $12M to complete and is considered to be beyond Council s current resources.

2 As a result alternative solutions were developed for managing the flows from the catchment. The Margaret Street Detention Basin was determined to be the best alternative and is an innovative solution which, when constructed, will: achieve the flood protection objectives of Council s strategy; maximise the use of existing stormwater infrastructure, be significantly less expensive and within Council s capacity to fund, deliver a significant improvement in amenity, and provide environmental benefits of the project including capture and discharge to the Council wastewater treatment plant of the first flush of stormwater, grit and floatables. In 2002 a more comprehensive hydraulic modelling study of the Margaret Street catchment was undertaken by Earth Tech Engineering with the following aims: To calibrate the proposed detention basin site in dry and wet weather flow conditions, To model the Margaret Street Detention basin and assess its performance for selected design rainfall events. Figure 1 Historical Flooding Event. 2. Building the model The raw data was provided in GIS format (ESRI SHP1) files and these were imported directly into InfoWorks CS2. Validation of the data was undertaken using the inbuilt routines within InfoWorks and where necessary data was input and/or inferred. Data flags were used during the model build to trace the data source and confidence, as this was seen to be an important Quality Assurance step. The model was simplified to 1 Developed by the Environmental Systems Research Institute (ESRI) a shapefile (SHP) stores nontopological geometry and attribute information for the spatial features in a data set. 2 InfoWorks CS is a dynamic hydraulic modelling tool supplied by Wallingford Software. It uses a four-point implicit finite difference scheme (the Preissmann scheme) with a non-linear Newton- Raphson iteration and an adaptive time-stepping algorithm to solve the St Venant equations.

3 approximately 1900 manholes and the ancillary structures and control regimes were created. Sub-catchment Delineation InfoWorks CS uses subcatchments as the mechanism for generating both dry weather sewer flows and wet weather runoff and infiltration for routing in the model. As this model contained three different systems, sewerage, stormwater and combined, it was necessary to ensure that there was no double counting of either population generated flows (sewage) or area based flow calculations (runoff and infiltration). It was decided to use only two types of catchments a storm catchment and a sewer catchment. This made the modelling simpler as you could view each type of catchment separately to ensure there was no overlap. For the combined network two separate sub-catchments were created. One, the foul catchment, represents the dry weather sewerage flows, and the slower inflow and infiltration effects. The storm subcatchment represents the faster wet weather rainfall runoff which will account for the majority of the wet weather inflow into the manhole. When delineating sub-catchments, the following aspects were considered: The location, grade, and system type of pipes not modelled. These pipes were considered to determine the modelled manhole into which any given discharges flows. The locations of properties relative to the pipework, via the cadastral base. Sub-catchments were delineated in such a way that their area did not exceed 10 hectares. 3. Calibrating the model The model was calibrated using data collected at the proposed site of the Margaret Street Detention Basin. There was fifteen months of data available, with flow gauges being located in both of the major pipelines.

4 Figure 2 Map showing the extents of the Margaret Street Catchment Site of Detention Basin

5 Dry Weather Calibration Dry weather flow data was available for the Low Level Gravity Pipeline (LLGP) and from this a representative hydrograph was developed for weekdays and weekends. This data also allowed a per capita flow rate to be established for the lower half of the catchment this flow rate and hydrograph profile was assumed to apply to the northern section also. In addition to calculating the generation rate, tidal levels at the outfall were obtained to improve the accuracy of the calibration. The levels were applied at the outfall to simulate boundary conditions at the outlet of the catchment. Wet Weather Calibration Rainfall entering the sewerage system is modelled in InfoWorks by using runoff surfaces. These surfaces have different parameters relating to both speed of response and quantity of response. Typically runoff surfaces are developed to represent flow from impervious areas as having a fast response whilst flows from pervious areas were classified as slow response. For the Margaret St catchment the four main areas were classified. The key runoff characteristics of these surfaces are: Roof and Road are both impervious surfaces, Open Ground assumed to be predominantly a pervious surface, and Long term response is generated from pervious surface with very slow inflow characteristics. Ideally fast response inflow should be all directed into the stormwater or combined network, however experience indicates that a lesser percentage will also enter into the sewerage system via leakage from sealed areas such as roofs, driveways and roads, damaged manhole lids and illegal stormwater connections. Slow responses from open ground area enter the stormwater system, again with anecdotal evidence suggesting that some flow will enter the sewerage system. As there was no way of separating the wet weather inflow into the sewerage system and the inflow into the storm water system a base level of inflow into the sewerage system was assumed. This arbitrary amount was set at approximately 4 % of the rainfall. The total quantity of flow and shape of the predicted outflow was calibrated by adjusting the percentages of flow from the storm catchments. The inflow from the storm catchments was found to be approximately 47% of the rainfall in the urban areas, and 31% in the undeveloped catchments. The calibration of the model was determined to be successful with the predicted wet weather flow volume for the verification event being 93% of that observed at the monitoring points. Peak flows predicted by the model were slightly lower than those observed by the field monitors. Figure 3 shows a sample calibration plot.

6 It was noted that the flows predicted by InfoWorks were substantially less than those predicted by other modelling exercises. While it was assumed that these earlier predictions were probably over estimations we wanted to check the realism of the model. As it was considered that some of this may be due to extra flow reaching the detention basin from surface routing, overland flow paths were added into the model. It was interesting to note that this had very little impact on the total flows received at the detention basin. 4. Modelling the Detention Basin The construction of the detention tank in the model was initially substantially simplified. It was noted however that this was not accurately modelling the flow situation in the tank and a more detailed model of the detention tank was developed. Figure 3 - Sample Calibration Plot. Rainfall (mm) Observed Flow Predicted Flows The flow regime (refer Figure 4) is such that in dry situations the flows pass through the primary detention, first flush storage, into the polluted chamber of the Outlet Control Structure and into the LLGP. The tank is designed to store both sewerage and stormwater flows in a covered flow control facility with the cleaner water from extreme rainfall events being detained in an above ground storage basin. The flows out of the tanks and the above ground basin are controlled by two large radial gates which protect the downstream system from excessive surcharge and flooding. There is also a valve that shuts the flow from the covered storage thus storing the first flush for subsequent discharge and treatment. There are flap valves located throughout the structure to prevent back flow of polluted water into cleaner areas.

7 Figure 4 Schematic showing Hydraulic Flow Paths in the Detention Basin The modelling of the hydraulic elements was relatively straightforward with most elements being modelled as they would physically exist. It was necessary to create a Real Time Control (RTC) routine in the model to simulate the operation of the outlet valves, pumps and radial gates as the operation of these would be governed by conditions in the downstream pipe network. It was important that this detail was included as a key part of the project was going to be validating the set points of the telemetry for the basin. Figure 5 shows how the model displays the different elements in the model.

8 Figure 5 InfoWorks CS Model Figure 6 shows the difference in the flow through the radial gates by adding a new rule that controlled the flow passing through the radial gates. Originally the control on these gates was based on water level in the gate manhole. A rule was added to throttle the flows allowed out of the detention tank to reduce any downstream flooding. The rule stated that if the flow was greater than 3m³/s the radial gate should start to be closed if the flow was below 3m³/s the gate should be opened. This allowed the gates to operate as the hydraulic simulation was proceeding optimising the flows downstream. Figure 6 Comparison of Flows Exiting the Tank with the Control Rule Original Operation Controlled Operation Controlled Operation Original Operation The results in the model showed that downstream flooding was reduced by 75% by adding this rule to the model.

9 5. Outcomes Launceston is one of the few cities in Australia with a combined sewerage and drainage system. By using a dynamic hydrologic and hydraulic model that was able to consider all three different system types, sewerage, drainage and combined; it has been possible to develop a model that has been calibrated to the catchment and can be used for testing the theory of the detention tank. While the model build and calibration has been completed and a preliminary investigation of the detention tank operation has occurred it is already envisaged that the model will be used to verify the following Fine tuning the set levels of the radial gates to reduce flooding in the downstream catchment, The effect of tidal position on the storage basin, Volume of stormwater detained in open storage for different storm durations and frequencies, and Water Quality analysis. As discussed in this paper the model has already demonstrated that improvements in operation may be able to optimise the detention tank operations and reduce downstream flooding while minimising detention times. Acknowledgements The authors would like to thank both the organisations of GHD and Earth Tech Engineering for their work on this project, and their assistance in preparing this paper. References Earth Tech Engineering (2003), Margaret Street Catchment Model Build and Calibration Report, Earth Tech Engineering, Melbourne. Tabart, K and Brayford (2001), G, Unique City Detention Basin Solution for Combined Sewage and Stormwater Flood Control, 6 th Conference on Hydraulics in Civil Engineering, pp GHD (2002), Margaret Street Detention Basin Schedule of Drawings, CD InfoWorks CS Online Help.

Phase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility. Hydraulic Modeling Software Selection

Phase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility. Hydraulic Modeling Software Selection DRAFT Technical Memorandum Phase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility Hydraulic Modeling Software Selection Prepared for: City of Newport Public Works Department 70 Halsey Street Newport,

More information

Preliminary Rainfall Runoff Management for Developments EA/Defra Report Procedure W5-074/A Summary Guidance for Developers and Engineers

Preliminary Rainfall Runoff Management for Developments EA/Defra Report Procedure W5-074/A Summary Guidance for Developers and Engineers Preliminary Rainfall Runoff Management for Developments EA/Defra Report Procedure W5-074/A Summary Guidance for Developers and Engineers 1. Objective of this guidance and Procedure W5-074/A is to assist

More information

What s so hard about Stormwater Modelling?

What s so hard about Stormwater Modelling? What s so hard about Stormwater Modelling? A Pugh 1 1 Wallingford Software Pty Ltd, ann.pugh@wallingfordsoftware.com Abstract A common misconception of stormwater modelling is that it is simple. While

More information

Review & Design of the Apia Pressure Sewer System. Presented by Jammie Saena - Samoa Water Authority & Paul Edwards Urban Water Solutions

Review & Design of the Apia Pressure Sewer System. Presented by Jammie Saena - Samoa Water Authority & Paul Edwards Urban Water Solutions Review & Design of the Apia Pressure Sewer System Presented by Jammie Saena - Samoa Water Authority & Paul Edwards Urban Water Solutions 1 Contents Project Background Project Team Data Collection Physical

More information

Simplification of dynamic flow routing models using hybrid modelling approaches two case studies

Simplification of dynamic flow routing models using hybrid modelling approaches two case studies Simplification of dynamic flow routing models using hybrid modelling approaches two case studies P. Rouault 1 *, A. Fischer 2, K. Schroeder 1, E. Pawlowsky-Reusing 3, J. Van Assel 2 1 KompetenzZentrum

More information

Sustainability Criteria for the Design of Stormwater Drainage Systems for the 21 st Century

Sustainability Criteria for the Design of Stormwater Drainage Systems for the 21 st Century Sustainability Criteria for the Design of Stormwater Drainage Systems for the 21 st Century R. Kellagher 1 and H. Udale-Clarke 1 * 1 HR Wallingford Ltd., Howbery Park, Wallingford. Oxfordshire, OX10 8BA,

More information

Sewer Capacity Assessment

Sewer Capacity Assessment Sewer Capacity Assessment Wainlode Lane, Norton, Gloucestershire DE-1607-722 Version 2 Date: 10 th February 2017 Black & Veatch Ltd. 60 High Street Redhill Surrey RH1 1SH Sewer Capacity Assessment Summary

More information

Drainage Servicing Report - Terms of Reference

Drainage Servicing Report - Terms of Reference Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage

More information

The role of domestic rainwater harvesting systems in storm water runoff mitigation

The role of domestic rainwater harvesting systems in storm water runoff mitigation European Water 58: 497-53, 217. 217 E.W. Publications The role of domestic rainwater harvesting systems in storm water runoff mitigation I. Gnecco *, A. Palla and P. La Barbera Department of Civil, Chemical

More information

Integrated Catchment Modelling

Integrated Catchment Modelling Integrated Catchment Modelling Modelling the whole water cycle in one package Ann Pugh Integrated Water Planning Historically water, wastewater and stormwater modelling occurred in silos with little integration

More information

Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity

Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity 9th International Conference on Urban Drainage Modelling, Belgrade 2012 C4. Climate change impacts, pp.287-288 Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity

More information

Using Sanitary Sewer I/I Field Data to Calibrate a Storm Sewer Model

Using Sanitary Sewer I/I Field Data to Calibrate a Storm Sewer Model 15 Using Sanitary Sewer I/I Field Data to Calibrate a Storm Sewer Model Josh A. Reinicke, Marc A. Lehmann and C. Timothy Fallara Since 1992, the City of Columbus Division of Sewerage and Drainage (DOSD)

More information

Review & Design of the Apia Pressure Sewer System

Review & Design of the Apia Pressure Sewer System Review & Design of the Apia Pressure Sewer System Presented by Tainau Moefaauo Taputoa Titimaea - Samoa Water Authority & Paul Edwards Urban Water Solutions 1 Contents Project Background Project Team Data

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe:

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to describe: The different approaches for estimating peak runoff for urban drainage network

More information

Storm Water Management

Storm Water Management Storm Water Management Policy September 2014 2 Sustainable drainage feature designed to control and manage flows through a series of check dams 3 Document Name: Storm Water Management Controlled Copy No:

More information

EXPLICIT FUNCTIONS FOR IMPLICIT RESERVOIR ROUTING

EXPLICIT FUNCTIONS FOR IMPLICIT RESERVOIR ROUTING Guo, James C.Y. (2004). Hydrology-Based Approach to Storm Water Detention Design Using New Routing Schemes, ASCE J. of Hydrologic Engineering, Vol 9, No. 4, July/August Guo, James C.Y. (2000). Storm Hydrographs

More information

Section 7 Post Planning Study Issues

Section 7 Post Planning Study Issues Section 7 Post Planning Study Issues From Section 6, Testing Compliance Obtain Permit for Solution Post UPM procedures 7. POST PLANNING STUDY ISSUES This section includes all of the processes necessary

More information

Regional Hydraulic Model Plan

Regional Hydraulic Model Plan APPENDIX 3 Regional Hydraulic Model Plan November 17, 2008 Contents Section 1 Introduction Section 2 Model Objectives and Capabilities 2.1 Model Software Capabilities... 2-1 Section 3 Model Development

More information

OPERATIONAL CHALLENGES AT THE KOORLONG WASTEWATER TREATMENT PLANT. Derek de Waal Kevin Murphy

OPERATIONAL CHALLENGES AT THE KOORLONG WASTEWATER TREATMENT PLANT. Derek de Waal Kevin Murphy OPERATIONAL CHALLENGES AT THE KOORLONG WASTEWATER TREATMENT PLANT Paper Presented by : Derek de Waal Kevin Murphy Authors: Derek de Waal, Operations Manager, Gutteridge Haskins & Davey Pty Ltd Kevin Murphy,

More information

Whole of Water Cycle Modelling Pilot Study

Whole of Water Cycle Modelling Pilot Study Whole of Water Cycle Modelling Pilot Study Presentation Outline Background Model development Water and Sewer Stormwater Advantages of Integrated Modelling Challenges and Limitations Project Aims To investigate

More information

Insights from editing the ARR Urban Book. Peter J Coombes

Insights from editing the ARR Urban Book. Peter J Coombes Insights from editing the ARR Urban Book Peter J Coombes Motivation for revision of ARR Many practices and data in ARR 1987 are outdated More rainfall and streamflow data Improved understanding of climate

More information

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT THE GOVERNMENT OF MALAYSIA PRIME MINISTER S DEPARTMENT ECONOMIC PLANNING UNIT THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT VOL. 5: TECHNICAL

More information

System - Wide Hydraulic Model

System - Wide Hydraulic Model System - Wide Hydraulic Model Department of Watershed Management (DWM) Capacity, Management, Operations, and Maintenance (CMOM) Program January 2013 Version 1 Contents DEKALB COUNTY DWM Contents... i Acronyms...

More information

INTENSE STORM-RUNOFF ROUTING OF HATIRJHEEL-BEGUNBARI LAKE OF DHAKA CITY

INTENSE STORM-RUNOFF ROUTING OF HATIRJHEEL-BEGUNBARI LAKE OF DHAKA CITY Proceedings of the 3 rd International Conference on Civil Engineering for Sustainable Development (ICCESD 2016), 12~14 February 2016, KUET, Khulna, Bangladesh (ISBN: 978-984-34-0265-3) INTENSE STORM-RUNOFF

More information

Stormwater Management Plan - Phase 1

Stormwater Management Plan - Phase 1 Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Stormwater Management Plan - Phase 1 1a Ammonia Plant 103H Building Construction 1b Ammonia Plant General Construction March 2010 Revision 0 Document

More information

The SuDS Manual Frequently asked questions

The SuDS Manual Frequently asked questions The SuDS Manual Frequently asked questions 1. Is source control still a requirement of the new SuDS Manual? Yes. Source control components are fundamental elements of a SuDS scheme. The benefits of source

More information

Chapter 7 : Conclusions and recommendations

Chapter 7 : Conclusions and recommendations Chapter 7 : Conclusions and recommendations 7.1 Conclusions The main goal of this research was to investigate the modelling and rainfall data requirements for the design of combined sewer systems and the

More information

Training Course Brochure Building Capacity in Rural & Urban Water Management

Training Course Brochure Building Capacity in Rural & Urban Water Management Training Course Brochure 2015 Building Capacity in Rural & Urban Water Management Introduction The WastePro Academy seeks to encourage the use of desktop software applications in the water and environmental

More information

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013. Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions

More information

Flood hazard assessment in the Raval District of Barcelona using a 1D/2D coupled model

Flood hazard assessment in the Raval District of Barcelona using a 1D/2D coupled model 9 th International Conference on Urban Drainage Modelling Belgrade 2012 Flood hazard assessment in the Raval District of Barcelona using a 1D/2D coupled model Beniamino Russo, David Suñer, Marc Velasco,

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Learning objectives. Upon successful completion of this lecture, the participants will be able to: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design

More information

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons 2011-12 and 2012-13 Project Overview San Francisco State University (SFSU) has implemented several green

More information

HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY

HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY Fernando Gonzalez, Adel Hagekhalil, Bryan Trussell, City of Los Angeles Bureau of Sanitation

More information

THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED

THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED Mark Pennington, Engineer, Pattle Delamore Partners Ltd, Tauranga ABSTRACT The Rational Method has been in use in some form or another at least since

More information

Effective Impervious Area Lake Minnetonka

Effective Impervious Area Lake Minnetonka 1 Effective Impervious Area Lake Minnetonka Final Report Prepared by: Sarah Fitch Ryan Navis Sam Trebesch Stephen Borden Zeinab Takbiri University of Minnesota Civil Engineering Course: CE 5511 Spring

More information

City and County of San Francisco 2030 Sewer System Master Plan

City and County of San Francisco 2030 Sewer System Master Plan City and County of San Francisco Sewer System Master Plan TASK TECHNICAL MEMORANDUM NO. DETAILED DRAINAGE PLAN MODELING APPROACH FINAL DRAFT August 9 7 YGNACIO VALLEY ROAD SUITE WALNUT CREEK, CALIFORNIA

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Practical Hydraulics on a Large Wastewater Treatment Works

Practical Hydraulics on a Large Wastewater Treatment Works Practical Hydraulics on a Large Wastewater Treatment Works Rob Wilson Examples Flow distribution chambers with weirs Flow distribution without weirs Manifold distribution Flow distribution to inlet screens

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation Watershed MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1 A watershed is an area of land thaaptures rainfall and other precipitation and funnels it to a lake or stream or wetland. The area within the watershed

More information

Numerical Assessment of On-Site Storage Facilities to Mitigate Pluvial Inundation Damage in Urban Area

Numerical Assessment of On-Site Storage Facilities to Mitigate Pluvial Inundation Damage in Urban Area Numerical Assessment of On-Site Storage Facilities to Mitigate Pluvial Inundation Damage in Urban Area Kenji KAWAIKE* and Hajime NAKAGAWA* *Disaster Prevention Research Institute, Kyoto University (Received:

More information

Armstrong Creek West Precinct. Review of Stormwater Management Strategy

Armstrong Creek West Precinct. Review of Stormwater Management Strategy Armstrong Creek West Precinct Review of Stormwater Management Strategy 31 October 2011 Report by: Valerie Mag, B.E. Civil (Hons), M. Eng. Sci. Stormy Water Solutions stormywater@optusnet.com.au Ph 9511

More information

I/I Analysis & Water Balance Modelling. Presented by Paul Edwards

I/I Analysis & Water Balance Modelling. Presented by Paul Edwards I/I Analysis & Water Balance Modelling Presented by Paul Edwards Contents Background Wet Weather Model Calibration Inflow / Infiltration Assessment Flow Containment Options Water Balance Model 20 Year

More information

Controlling the Real World, Examples of Extreme RTC. Bradley Nissley Thursday 24 th November 2015

Controlling the Real World, Examples of Extreme RTC. Bradley Nissley Thursday 24 th November 2015 Controlling the Real World, Examples of Extreme RTC Bradley Nissley Thursday 24 th November 2015 Overview Introduction to Real Time Control (RTC) Extreme RTC examples Melbourne Water Whole of Water Cycle

More information

WASTEWATER PLANNING USERS GROUP GUIDE TO THE QUALITY MODELLING OF SEWER SYSTEMS

WASTEWATER PLANNING USERS GROUP GUIDE TO THE QUALITY MODELLING OF SEWER SYSTEMS WASTEWATER PLANNING USERS GROUP WASTEWATER PLANNING USERS GROUP GUIDE TO THE QUALITY MODELLING OF SEWER SYSTEMS Version 1.0 November 2006 WASTEWATER PLANNING USERS GROUP GUIDE TO THE QUALITY MODELLING

More information

WSUD On-site Detention in xprafts 2013

WSUD On-site Detention in xprafts 2013 WSUD On-site Detention in xprafts 2013 Content 1. Introduction of ODS 2. General a. Impervious Area b. Pervious Area Capture c. Average Allotment Density d. Developed Area/Total Area 3. On-site Detention

More information

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc.

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc. PRELIMINARY MUNICIPAL SERVICING REPORT SUBDIVISION Prepared for: North Grassie Properties Inc. Prepared by: Stantec Consulting Ltd. 905 Waverley St. Winnipeg, MB R3T 5P4 July 2012 File: 116808030 SUBDIVISION

More information

A Modeling Framework for Linking Urban Stormwater Load Allocation, Implementation Plan, and BMP Design. Sen Bai, PhD, PE Jon Ludwig

A Modeling Framework for Linking Urban Stormwater Load Allocation, Implementation Plan, and BMP Design. Sen Bai, PhD, PE Jon Ludwig A Modeling Framework for Linking Urban Stormwater Load Allocation, Implementation Plan, and BMP Design Sen Bai, PhD, PE Jon Ludwig Outline Background Modeling for non-point source management Modeling framework

More information

City of San Jose Storm Sewer Master Plan

City of San Jose Storm Sewer Master Plan City of San Jose Storm Sewer Master Plan Anne Symonds, PE and Mira Chokshi, PE 2016 Pacific Water Conference AWWA Hawaii Section HWEA February 4, 2016 Agenda Introduction and Goals of the Project Background

More information

Let Them Count An Argument for Inclusion of the Impact of. Household Rainwater Tanks When Designing an Urban Drainage. Network

Let Them Count An Argument for Inclusion of the Impact of. Household Rainwater Tanks When Designing an Urban Drainage. Network Let Them Count An Argument for Inclusion of the Impact of Household Rainwater Tanks When Designing an Urban Drainage Network L.Strauch* 1 *Presenting Author Household rainwater tanks are currently an optional

More information

CIE4491 Lecture. Quantifying stormwater flow Rational method

CIE4491 Lecture. Quantifying stormwater flow Rational method CIE4491 Lecture. Quantifying stormwater flow Rational method 27-5-2014 Marie-claire ten Veldhuis, Watermanagement Department Delft University of Technology Challenge the future Robust method stationary

More information

The Process for Designing for Shallow Groundwater. and Small Rainfall Event Management in Urban. Developments

The Process for Designing for Shallow Groundwater. and Small Rainfall Event Management in Urban. Developments The Process for Designing for Shallow Groundwater and Small Rainfall Event Management in Urban Developments Bill Till* and Emma Monk *Presenting Author The Decision process for stormwater management in

More information

Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River

Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River Sanitation District No. 1 of Northern Kentucky Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River Ohio WEA Collection Systems Workshop May 5, 2011 Sanitation District No. 1

More information

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Chapter 10 Design Examples Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Example 2: Filter Design in a commercial development

More information

Using SWMM 5 to Develop Wet Weather Operating Strategies in a Large Sewer System

Using SWMM 5 to Develop Wet Weather Operating Strategies in a Large Sewer System 15 Using SWMM 5 to Develop Wet Weather Operating Strategies in a Large Sewer System Mi Chen, Fang Cheng, Edward Burgess, Gregory Barden, Hunter Kelly and Timothy Fallara The City of Columbus wastewater

More information

Taking the pain out of the treatment train: continuous simulation modelling for integrated water management

Taking the pain out of the treatment train: continuous simulation modelling for integrated water management Engineers & Consultants Taking the pain out of the treatment train: continuous simulation modelling for integrated water management Stu Farrant & Reuben Ferguson, Morphum Environmental Limited Abstract

More information

Assessment of the Climate Change Impact on a Dry Detention Pond at Kota Damansara, Malaysia

Assessment of the Climate Change Impact on a Dry Detention Pond at Kota Damansara, Malaysia Assessment of the Climate Change Impact on a Dry Detention Pond at Kota Damansara, Malaysia Yuk San LIEW 1*, Fang Yenn TEO 1,2, Aminudin AB. GHANI 3 1 National Hydraulic Research Institute of Malaysia

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH-Y Regulation No. 1110-2-1464 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDROLOGIC ANALYSIS OF WATERSHED RUNOFF Distribution Restriction

More information

BEST PRACTICE FOR MODELLING SUSTAINABLE URBAN DRAINAGE SYSTEM STRUCTURES

BEST PRACTICE FOR MODELLING SUSTAINABLE URBAN DRAINAGE SYSTEM STRUCTURES BEST PRACTICE FOR MODELLING SUSTAINABLE URBAN DRAINAGE SYSTEM STRUCTURES R. Kirkham, 1 C. Rayner 2 1 Clear Environmental Consultants Ltd, Rhona.Kirkham@clearltd.com 2 Claire.Rayner@wallingfordsoftware.com

More information

Conservation Design Approach for New Development

Conservation Design Approach for New Development Effective Best Management Practices in Urban Areas Chad Christian City of Tuscaloosa, AL Robert Pitt University of Alabama Tuscaloosa, AL Energy Independence and Security Act of 2007 signed into Law on

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

Implementation of the methodology for climate change assessment for stormwater management in the Barcelona case study

Implementation of the methodology for climate change assessment for stormwater management in the Barcelona case study Implementation of the methodology for climate change assessment for stormwater management in the Barcelona case study Xavier Aldea, CETaqua Beniamino Russo, CLABSA Marc Velasco, CETaqua David Sunyer, CLABSA

More information

Integrated urban water systems modelling with a simplified surrogate modular approach

Integrated urban water systems modelling with a simplified surrogate modular approach Integrated urban water systems modelling with a simplified surrogate modular approach Z. Vojinovic 1 *, and S.D. Seyoum 2 Department of Hydroinformatics and Knowledge Management, UNESCO-IHE, Institute

More information

MSDGC MODELING GUIDELINES AND STANDARDS VOLUME I SYSTEM WIDE MODEL

MSDGC MODELING GUIDELINES AND STANDARDS VOLUME I SYSTEM WIDE MODEL MSDGC MODELING GUIDELINES AND STANDARDS VOLUME I SYSTEM WIDE MODEL REVISION 3 February 2013 Prepared for: METROPOLITAN SEWER DISTRICT OF GREATER CINCINNATI Project & Business Development Division 1600

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

Utilization of stormwater runoff models for flood control in Tokyo

Utilization of stormwater runoff models for flood control in Tokyo Utilization of stormwater runoff models for flood control in Tokyo Masayuki Sugai, Jun Okamoto Tokyo metropolitan government(tmg), Nishishinjuku 2-8-1, Shinjuku-ku, Tokyo 163-8001, Japan (E-mail: Jun_Okamoto@member.metro.tokyo.jp)

More information

Stormwater design considerations

Stormwater design considerations Stormwater design considerations Manage the small and frequent rainfall events first Bill Till Supervising Engineer Urban Water Management Stormwater management information Decision Process for Stormwater

More information

5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview

5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview WinTR-55 for Plan Reviews Small Watershed Hydrology Overview 1 Overview Course Outline Historical Background Program Description Model Capabilities and Limitations This is the Overview portion of the training.

More information

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges Detention Pond Design Considering Varying Design Storms Land Development Results in Increased Peak Flow Rates and Runoff Volumes Developed area Robert Pitt Department of Civil, Construction and Environmental

More information

Nuriootpa (Sturt Highway Service Centre) DPA The Barossa Council Appendices. Appendix C - Herriot Consulting Engineering Assessment

Nuriootpa (Sturt Highway Service Centre) DPA The Barossa Council Appendices. Appendix C - Herriot Consulting Engineering Assessment Nuriootpa (Sturt Highway Service Centre) DPA The Barossa Council Appendices Appendix C - Herriot Consulting Engineering Assessment 4th May 2018 C1803-002 Rocland Estate Lot 147 Sturt Highway, Nuriootpa

More information

PRESSURE SEWER SYSTEMS HYDRAULIC DESIGN GUIDELINE JUNE 2018 VERSION: 2.0

PRESSURE SEWER SYSTEMS HYDRAULIC DESIGN GUIDELINE JUNE 2018 VERSION: 2.0 PRESSURE SEWER SYSTEMS HYDRAULIC DESIGN GUIDELINE JUNE 2018 VERSION: 2.0 Contents 1 General... 5 1.1 Introduction... 5 1.2 Hydraulic analysis and design progression... 5 1.3 Requirements for hydraulic

More information

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model

More information

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond.

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond. Engineering Page 3-1 3.0 STORM DRAINAGE 3.1 GENERAL Good drainage is vital to flat urban areas such as Lulu Island. It is essential that every storm sewer must be designed accurately minimizing conflicts

More information

The effect of the raingauge distribution on stormwater models

The effect of the raingauge distribution on stormwater models 18 th World IMACS / MODSIM Congress, Cairns, Australia 13-17 July 2009 http://mssanz.org.au/modsim09 The effect of the raingauge distribution on stormwater models Cooper, M.R. 1 and D.A. K. Fernando 2

More information

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Attachment 1 Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Sanitary Sewer System Master Plan Summary Points - City s sanitary system

More information

Storm Water Management Pollution and Treatment

Storm Water Management Pollution and Treatment 7th EWA Bruxells Conference 25.10.2011 Effektive Urban Wastewater Treatment Theo G. Schmitt, University of Kaiserslautern Storm Water Management Pollution and Treatment 10.11.2011-2 Overview Major Storm

More information

RE: AGL Energy Limited Newcastle Gas Storage Facility Storm Water Management Peer Review Part 1: Design Modelling

RE: AGL Energy Limited Newcastle Gas Storage Facility Storm Water Management Peer Review Part 1: Design Modelling 30 th January 2011 Level 22, 101 Miller Street North Sydney, NSW 2060 Attn: Ms Arianna Henty/Alex Kennedy-Clark Dear Arianna/Alex, RE: AGL Energy Limited Newcastle Gas Storage Facility Storm Water Management

More information

Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand

Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand Tawatchai Tingsanchali* School of Civil Engineering, Asian Institute of Technology, P.O.Box

More information

The critical information from this document has been included in the ARD Pipe Help system.

The critical information from this document has been included in the ARD Pipe Help system. Introduction This command is used to set the way is treated with respect to Pipe flow. There are three (3) methods, along with the ability to change the method on existing networks. flows have always been

More information

Development of a Computer Model of a Drainage System with Uncertainties in External Inflow and Channel Cross-section

Development of a Computer Model of a Drainage System with Uncertainties in External Inflow and Channel Cross-section Development of a Computer Model of a Drainage System with Uncertainties in External Inflow and Channel Cross-section T.T. Vu 1*, T.S.W. Wong 2 and S.K. Tan 2 1 DHI-NTU Centre, Nanyang Environment and Water

More information

Hydraulic Modeling of Deep Tunnel Provides Cost Savings

Hydraulic Modeling of Deep Tunnel Provides Cost Savings 5 Hydraulic Modeling of Deep Tunnel Provides Cost Savings Taymour El-Hosseiny, Karen Reinhart and M. P. Cherian In 2005, the City of Columbus, Ohio submitted a plan to the Ohio Environmental Protection

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

Appendix F. Flow Duration Basin Design Guidance

Appendix F. Flow Duration Basin Design Guidance Appendix F Flow Duration Basin Design Guidance Appendix F FINAL REPORT F:\SC46\SC46.31\HMP Mar 05\Appendices\Appendix F FLY_HMP.doc MARCH 2005 Appendix F Flow Duration Basin Design Guidance Prepared by

More information

Drainage Simulation of Detention Pond with Tidal Effect at the Outfall during a Storm Period

Drainage Simulation of Detention Pond with Tidal Effect at the Outfall during a Storm Period Drainage Simulation of Detention Pond with Tidal Effect at the Outfall during a Storm Period TIENFUAN KERH, JASON J. D. YEI and YU-MIN WANG Department of Civil Engineering National Pingtung University

More information

Georgia s Unified Stormwater Sizing Criteria The Old, the New, and the Misunderstood

Georgia s Unified Stormwater Sizing Criteria The Old, the New, and the Misunderstood WATER RESOURCES Georgia s Unified Stormwater Sizing Criteria The Old, the New, and the Misunderstood Charles Crowell, PE Stormwater Section Manager October 2016 WATER RESOURCES The Old Traditional Stormwater

More information

Design of Sewerage System for Jaffarpur area in Southwest New Delhi

Design of Sewerage System for Jaffarpur area in Southwest New Delhi International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 1 (2014), pp. 29-34 Research India Publications http://www.ripublication.com/ijcer.htm Design of Sewerage System for

More information

HY-12 User Manual. Aquaveo. Contents

HY-12 User Manual. Aquaveo. Contents Y-12 User Manual Aquaveo Contents Overview...2 Watershed Parameters...3 Channel Parameters...3 Storm Drain Parameters...3 Design of new systems...4 Analysis of existing systems...4 Steady flow...4 ydrographic

More information

Impact of sewer condition on urban flooding: a comparison between simulated and measured system behaviour

Impact of sewer condition on urban flooding: a comparison between simulated and measured system behaviour 9th International Conference on Urban Drainage Modelling Belgrade 2012 Impact of sewer condition on urban flooding: a comparison between simulated and measured system behaviour Marco van Bijnen 1,2, Hans

More information

Section 600 Runoff Table of Contents

Section 600 Runoff Table of Contents Section 600 Runoff Table of Contents 601 INTRODUCTION...600-1 602 RATIONAL METHOD...600-1 602.1 Rational Method Formula...600-2 602.2 Time of Concentration...600-2 602.3 Intensity...600-4 602.4 Runoff

More information

OVERFLOW COMPLIANCE THROUGH REAL TIME CONTROL - SEWERFLEX SEWER NETWORK OPTIMISATION

OVERFLOW COMPLIANCE THROUGH REAL TIME CONTROL - SEWERFLEX SEWER NETWORK OPTIMISATION OVERFLOW COMPLIANCE THROUGH REAL TIME CONTROL - SEWERFLEX SEWER NETWORK OPTIMISATION Hestbæk, T. K. 1, Sørud, M. 1, Poulsen, T. S. 1, Grum, M. 1, Moelbye, N. and Joergensen, A. T. 1 1 Krüger A/S, Denmark

More information

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

Low Impact Development (LID) in a Combined Sewer Overflow (CSO) District:

Low Impact Development (LID) in a Combined Sewer Overflow (CSO) District: Low Impact Development (LID) in a Combined Sewer Overflow (CSO) District: Evaluating the Effectiveness of LID in Reducing CSOs Prepared for: DOW-PIRGM Saginaw Bay Watershed Initiative Network City of Saginaw

More information

Portsmouth Flood Alleviation Scheme part of Southern Water s 50m programme of improvements to the sewer network in Portsmouth

Portsmouth Flood Alleviation Scheme part of Southern Water s 50m programme of improvements to the sewer network in Portsmouth www.projectsonline.com water & Sewerage Portsmouth Flood Alleviation Scheme part of Southern s 50m programme of improvements to the sewer network in Portsmouth by Robert McTaggart BEng CEng CIWEM P ortsmouth

More information

SECTION IV WATERSHED TECHNICAL ANALYSIS

SECTION IV WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling SECTION IV WATERSHED TECHNICAL ANALYSIS An initial step in the preparation of this stormwater management plan was the selection of a stormwater simulation model to be utilized. It

More information

OLD DUNDAS ROAD SEWAGE PUMPING STATION (HC005) EMERGENCY OVERFLOW SCHEDULE C MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT (EA)

OLD DUNDAS ROAD SEWAGE PUMPING STATION (HC005) EMERGENCY OVERFLOW SCHEDULE C MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT (EA) OLD DUNDAS ROAD SEWAGE PUMPING STATION (HC005) EMERGENCY OVERFLOW SCHEDULE C MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT (EA) Agency Meeting #1 Meeting Minutes Location: 77 James Street North, Suite 400,

More information

COMPUTER APPLICATIONS HYDRAULIC ENGINEERING

COMPUTER APPLICATIONS HYDRAULIC ENGINEERING - 7535 COMPUTER APPLICATIONS IN HYDRAULIC ENGINEERING Connecting Theory to Practice Fifth Edition HAESTAD PRESS Table of Contents Revision History Foreword CHAPTER 1 BASIC HYDRAULIC PRINCIPLES 1 1.1 General

More information

Availability of CSO Control and Flood Control of Real-Time

Availability of CSO Control and Flood Control of Real-Time Availability of CSO Control and Flood Control of Real-Time Control System in Urban Pumping Station Kiyohito Kuno 1, Tadao Suzuki 1* 1 Bureau of Sewerage, Tokyo Metropolitan Government *To whom correspondence

More information

Water supply components

Water supply components Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution

More information

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed

More information