1 1.0 INTRODUCTION NTPC Ltd is proposing to setup Khargone Super Thermal Power Project (2x660 MW) in Khargone district of Madhya Pradesh. The project is being implemented as regional Mega power project for meeting the power demand of Western Region Beneficiaries. The exact allocation of power from the project amongst the beneficiaries of the region or other states outside the region shall be subject to the approval of Ministry of Power, Govt. of India. The project is expected to start yielding benefits during the end of XII Plan Period. The Terms of Reference (TOR) for EIA study for Khargone STPP (2x660 MW) was accorded by MOEF on In accordance with the Term s of Reference (TOR) the draft EIA report is prepared by M/s Kirloskar Consultants Limited, Pune based on three months baseline data monitored during April 2011 to June PROJECT DESCRIPTION SITE AND SURROUNDINGS The proposed site is located at latitude N to N and longitude E to E near villages Selda & Dalchi in Khargone district, Madhya Pradesh. The site is about 30 Km away from Sanawad and is approachable from Sanawad on Indore Khandwa State Highway through PWD road. Nearest Railway Station is Sanawad on Northern Central Railway and is about 30 Km away from proposed site and the nearest commercial airport Indore is about 105 Km from the proposed site. The project site with study area within 7 Km radius is shown in Figure PROJECT FEATURES 2.1 Land About 1334 acres of land is being acquired for power plant and its associated facilities. Govt. of Madhya Pradesh vide letter dated have accorded in-principle land commitment of 1750 acres for the project. 2.2 WATER SOURCE AND REQUIREMENT Make up water requirement for the project would be about 46 cusecs which is proposed to be drawn from Omkareshwar dam on river Narmada at a distance of about 45 Km from proposed site. Govt. of Madhya Pradesh vide letter dated have accorded commitment for 55 Cusecs of water from Narmada river for the project.

2 Executive summary of Draft Environmental Impact Assessment Report for Khargone Super Thermal Power Project (2 X 660 MW) Doc No. 9578/999/GEG/S/002 Rev No. 0 Issue Date : Page 2 of 11 Figure 1

3 Power Project (2 X 660 MW) Page 3 of COAL AVAILABILITY AND TRANSPORTATION The coal requirement for 2 x 660 MW units shall be about 6.51 MTPA based on average gross calorific value of 3500 kcal/ kg. Coal from SECL to be transported through railway network (about 890 km) has been considered. 2.4 POWER EVACUATION SYSTEM Based on the beneficiary states/regions of the project, the Associated Transmission System (ATS) would be finalised by Power Grid Corporation of India Limited (PGCIL) \ CEA. 2.5 ENVIRONMENTAL IMPACT ASSESSMENT STUDY The draft EIA report has been prepared for submission to M.P Pollution Control Board for conducting Public Consultation process and obtaining Consent to Establishment. After Public hearing, Ministry of Environment & Forests shall be approached for obtaining Environmental Clearance (EC). This will be in accordance with the procedure laid down in the EIA Notification dated 14 th September, 2006 and further amendments dated BASELINE ENVIRONMENTAL STATUS 3.1 Meteorology Site specific meteorological data is analysed and presented for monthly maximum, minimum and average values for Temperature, Relative humidity, Solar radiation, Rainfall and Atmospheric pressure along with Wind speed and direction in TABLE 1.1. TABLE SITE SPECIFIC METEOROLOGICAL DATA SR. NO. PARAMETERS UNIT April May June 1 Wind speed Max m/s Wind Direction 3 Temperature 4 Relative Humidity 5 Atmospheric Pressure 6. Solar radiation Avg m/s Predominant W W WSW Max Min Avg 0 C 0 C 0 C Max % Min % hpa Max Max Wm -2

4 Power Project (2 X 660 MW) Page 4 of Air Quality Ambient air quality was monitored at four monitoring locations during the months of April to June 2011 in the study area. The results of ambient air quality monitoring are given in TABLE The results indicate that the background levels of all the parameters in the study area are within the permissible limit of National Ambient Air Quality Standards 2009 for Industrial, Rural, Residential and Other areas. DISCIPLINE TABLE BASELINE AIR QUALITY IN THE STUDY AREA MAIN PARAMETER RANGE MEASURED DURING THE STUDY PERIOD (µg/m 3 ) NAAQ STANDARDS (2009)* Ambient Air SPM Quality RPM (PM10) µg/m 3 PM µg/m 3 SO µg/m 3 NO X µg/m 3 OZONE µg/m 3 Hg BDL --- * 24 hourly average for Industrial, Rural, Residential and Other areas 3.3 Water Quality To assess the background water quality, Three (3) surface water locations and three (3) ground water locations were selected and samples were drawn and analysed on monthly basis during the study period. Analysis of all ground water samples reveal that the water quality conforms the IS: None of these samples contain heavy metals. Water quality of some of the important parameters are shown in TABLE- 1.3 TABLE -1.3 WATER QUALITY S.NO MAIN UNITS MIN-MAX LEVEL PARAMETERS IS:10500 OBSERVED DURING THE STUDY PERIOD Surface water quality IS ph Total Dissolved solids mg/l 3. Total Hardness mg/l B.O.D mg/l - BDL - 5 Ground water Quality IS ph Total Dissolved solids mg/l 3. Total Hardness mg/l B.O.D mg/l

5 Power Project (2 X 660 MW) Page 5 of Noise Noise levels were measured in and around the proposed site at ten (10) locations. The noise level in the residential area during daytime were in the range of 42.1 to 52.1 db(a) while during night time it was 38.2 to 43.2 db(a). The noise levels at all the monitoring locations in the study area during the day time and night time were found to be within the permissible limits as per ambient air quality standards with respect to noise. 3.5 Soil To assess the soil quality, soil samples from ten (10) different locations were collected and analysed in the laboratory. The soil in the study area is grey and brown in colour with ph varying from 7.37 to The EC is observed in the range of 83.8 to µs/cm. Nitrogen content and phosphorous content in the soil is found to be in the range of to kg / ha and 4.12 to 36.1 kg/ha respectively. 3.6 Ecology The study area has sparse vegetation mainly open scrub type. The land proposed for the project does not have densely vegetation cover. The area near project site is surrounded by various kinds of trees, herbs, shrubs, climbers and grasses. The study area was dominated by tree species like ficus bengalesis, Mangifera indica, ficus religiosa, Buchanania lanzan, Diospyrus melanoxylon, Termilania bellarica, Albizzia procera, Acacia catechu and Mangifera Indica. The number of herbivorous animals is definitely much less in the study area. However, some indirect evidence in some confined areas suggests the presence of some animals like Langur (Presbytis entellus), Jackal (Canis aurcus), Rhesus monkey mongoose etc., There are no ecologically sensitive areas like National Parks or Wildlife Sanctuaries, Tiger Reserves, Elephant Reserves, Turtle Nesting Ground and Core Zone Biosphere Reserve within the 10 km radius of proposed site. 3.7 Land Use The study area has varied land use pattern ranging from human settlements, agricultural fields to forest areas. As per census 2001, majority of the land is unirrigated land (36.36%) followed by irrigated land (27.04%) and forest land (17.26%). 3.8 Demography and Socio-Economic Status The demography and socio-economic profile of population in the study area has been studied based on Census Book, The salient features of the demography and socioeconomic profile are as follows: Number of villages and households are 43 and 8093 respectively Total population is The Sex Ratio (Female per 1000 Male) is 925 The Scheduled Castes (SC) is 16.56% and Scheduled Tribes (ST) is % Overall literacy rate in the study area according to 2001 Census is %., out of which male literacy is 34.6 % while female literacy is %. The percentage of main workers and marginal workers are 40.1% and 7.0% respectively.

6 Power Project (2 X 660 MW) Page 6 of ANTICIPATED ENVIRONMENTAL IMPACTS The impact of the project during construction and operation phase is described below: 4.1 Land Use The main power plant, ash disposal area, township, greenbelt and other facilities is proposed to be located within an area of 1334 acres. This will lead to changes in land-use pattern in and around the proposed project. The construction activity would bring immediate changes in the land use pattern of the proposed plant area as well as in the vicinity. The land required for the project will undergo a change due to cutting, stripping, excavation, levelling, landscaping, loss of vegetative cover and erection of structures of the proposed project. Greenbelt development and afforestation programmes shall be taken up to mitigate these impacts and overall improvement in the area with green cover. 4.2 Soil The impacts on soil during construction phase shall be mainly due to loss of top soil in the construction areas and contamination of the soil of surrounding area due to construction materials such as cement, sand, oils etc. Such disturbances will remain confined to the area of activity and will be temporary in nature. Appropriate soil conservation measures associated with improved construction techniques would minimize such impacts. The impact on the soil during operation of the project could result due to deposition of residual particulate matter and gaseous emissions. The impact on the soil due to operation of the power plant and gaseous emissions would be negligible. However, periodic monitoring of soil will be undertaken at the maximum impact zone of the pollutants mentioned above. 4.3 Hydrology and Water Use The water for the project will be drawn from Omkareshwar dam on river Narmada which is located at a distance of about 45kms. The entire water requirement for the project would be about 4735 m3/hr. The Narmada river is the largest west flowing river in India and hence drawal of water for the project may not have significant impact on water potential of the reservoir. 4.4 Air Quality Impact during Construction Phase The main sources of emission during the construction period are the movement of equipment at site and dust emitted during the levelling, grading, earthworks, foundation works and other construction related activities. The impact of construction activities would be temporary and restricted to the construction site. The impact will be confined within the project boundary and is expected to be negligible outside the plant boundaries.

7 Power Project (2 X 660 MW) Page 7 of Impact during Operation Phase Prediction of impacts on air environment has been carried out employing mathematical model based on a steady state Gaussian Plume Dispersion Model designed for multiple point sources for short term. In the present case, Industrial Source Complex (ISC-3) 1983 dispersion model based on Gaussian Plume dispersion, designed for multiple point sources for short term and developed by United States Environmental Protection Agency (USEPA). The maximum GLCs for SPM, SO 2 and NOx after implementation of the proposed project are likely to be within the prescribed standards for industrial areas. The maximum incremental GLCs due to the proposed project are superimposed on the 98 percentile of the baseline SPM, SO2 and NOx concentrations recorded at the monitoring locations during the study period. The cumulative concentrations after implementation of the project are given in TABLE 1.4 POLLUTANT TABLE RESULTANT CONCENTRATIONS FOR KHARGONE STPP 98%le AAQ Concentration recorded during study period Maximum incremental concentration due to the proposed project Resultant concentration (µg/m 3 ) SO NOx SPM Water Quality The impact on water quality during construction phase will be mainly due to run off from the construction area. Adequate arrangements for proper drainage and disposal of waste water and routing of the effluents from construction area through sedimentation basins and provision of proper sanitary facilities with treatment will eliminate problems of water pollution during construction phase. The impacts of the project during operation phase could result from discharge of hot cooling water, discharge of main plant effluents and sanitary effluents and discharge of ash pond overflow. These effluents will be treated adequately to conform to the regulatory standards to minimize the impacts. 4.6 Noise The resultant noise was predicted at 500 m and 1 km from the centre of the proposed site respectively. The maximum predicted noise level at 500 m from the centre of the proposed plant is db(a) & minimum predicted noise level 27.5 db(a). At 1km the minimum and maximum predicted noise levels are 21.4 db(a) and 41.4 db(a) respectively. As the ambient noise levels are higher than the predicted noise levels, due to masking effect no increase in ambient noise levels during construction and operation phase is envisaged.

8 4.7 Terrestrial Ecology Executive summary of Draft Doc No. 9578/999/GEG/S/002 Power Project (2 X 660 MW) Page 8 of 11 The initial construction works at the project site involving land clearance, cutting, filling and levelling will cause loss of potential agricultural productive land and loss of vegetation to some extent. The removal of herbaceous vegetation from the soil and loosening of the top soil generally causes fugitive emission. Control measures such as paving and surface treatment, water sprinkling and plantation would minimize these impacts. The increase in vehicular traffic due to construction coupled with higher noise level due to various constructional activities may drive away the local fauna from project site to neighbouring area. However, project site / area do not harbour fauna of significant importance. Hence, the impact on fauna is expected to be minimal. Combustion of coal produces gaseous and particulate pollutants. The gaseous pollutants like SO2 and NOx, at a very low dose act as atmospheric fertiliser for the vegetation. However, at higher doses, they are injurious to both vegetation as well as animals. However, since the predicted ambient ground level concentrations of pollutants are within the prescribed AAQ standard for industrial area, the impact during operation would be negligible. 4.8 Aquatic Ecology The treated effluents conforming to regulatory standards shall be discharged into natural drains. However, as the quantity is small and the effluents shall be fully treated, the water quality of the receiving water body may not change significantly. Therefore, no significant impact on the aquatic eco-system is expected. 5.0 ENVIRONMENTAL MANAGEMENT & MONITORING PLAN NTPC is already operating various coal based thermal power projects of various capacities all over India. Based on its vast experience, NTPC has envisaged various pollution control / environmental mitigative measures for the project. Following measures are recommended for implementation during construction and operation phases of the project. 5.1 Construction Phase During construction phase, water shall be sprinkled in the vulnerable areas to suppress the dust generated during excavation, levelling and other operations. The effluents from construction area shall be channelled through sedimentation tanks to remove suspended solids. Suitable water supply and sanitation facilities shall be provided to the labour colonies housing the construction work force. The sanitary waste from these areas shall be accorded suitable treatment measures such as septic tanks. Safety equipment such as earplugs and earmuffs, helmets, face shields, safety goggles etc shall be provided to workers engaged in high risk area. A first aid centre shall be established to provide immediate medical aid to the workers and their family members. An ambulance shall also be made available at site to transport injured workers to nearby hospitals.

9 5.2 Operation Phase Air Pollution Control System Executive summary of Draft Doc No. 9578/999/GEG/S/002 Power Project (2 X 660 MW) Page 9 of 11 High efficiency electrostatic precipitators (ESPs) will be installed to limit the particulate emission to 100 mg/nm 3. To facilitate wider dispersion of pollutants one stack with twin flue of height 275 m above plant grade level shall be provided. Space provision should be kept in the layout for retrofitting Flue Gas Desulphurisation (FGD) system, if required in future. For control of fugitive dust emissions within and around the coal handling plant and coal / stockyard dust extraction / suppression systems shall be provided Water Pollution Control System An effluent management scheme, consisting of collection, treatment, recirculation and disposal of effluents shall be implemented in order to optimize the make up water requirement as well as liquid effluent generation. The detail of water system for the project is described as follows: The liquid effluents shall be collected and treated/ recycled as per the following design philosophy: The filter backwash water of PT Plant shall be collected and recycled back to the inlet of clarifiers. The sludge from clarifiers of Water PT Plant shall be collected in a sump / pit and shall be pumped to bottom ash slurry sump for disposal to bottom ash dyke. The waste effluents from neutralization pits of DM Plant and Condensate Polishing Plant shall be collected in the respective neutralization pits and neutralized before pumping to the Central Monitoring Basin before final disposal. Re-Circulating type Cooling Water (C.W) system with cooling towers shall be provided. The C. W. blow down shall be from cold water side to ensure no thermal pollution CW system blow down would be used for service water system, fly ash handling, bottom ash handling and coal dust suppression. The unused blow down shall be led to Central Monitoring Basin after treating through clarifiers / tube settlers. A coal settling pond shall be provided to remove coal particles from coal handling plant waste. Decanted water shall be pumped back to the coal dust suppression system. Service water effluent collected from plant drains shall be led to a sump. From the sump the service water shall be pumped through tube settler / clarifier for treatment of suspended solids. Treated service water shall be sent back to service water tank to the extent possible for re-use. The sludge from clarifier/ tube settler shall be disposed off in bottom ash dyke along with bottom ash slurry.

10 Power Project (2 X 660 MW) Page 10 of 11 An independent plant effluent drainage system would be created so as to ensure that plant effluents do not mix with storm water drainage. Efficient operation of various treatment schemes shall be ensured so that the quality of treated effluent from CMB conforms to relevant standards, prescribed by regulatory agencies. The sewage from plant and township shall be treated in a sewage treatment plant. The treated effluent conforming to prescribed standards shall be utilized for plantation Noise Pollution The major noise generating sources are the turbines, turbo-generators, compressors, pumps, fans, coal handling plant etc. from where noise is continuously generated. Acoustic treatment shall be provided to control the noise level below 90 db (A). Wherever required, the workers shall be provided with protective equipment such as ear plugs/ ear muffs. 6.0 ASH UTILIZATION An ash utilization plan has been developed to utilize ash as per Ministry of Environment & Forests Notification on Ash Utilization dated Khargone STPP shall produce about 8,000 tonne of ash per day. The potential of ash utilization are in various areas including mine filling, cement plants, cement and concrete, bricks manufacturing, agriculture, wasteland development, road construction, low lying area filling etc. NTPC shall provide Dry Ash Extraction System (DAES) system for 100% extraction of dry fly ash along with suitable storage facilities. Provision shall also be kept for segregation of coarse and fine ash, loading this ash into closed / open trucks and also for loading rail wagons. 7.0 AFFORESTATION AND GREEN BELT DEVELOPMENT A green belt of 100 m width has been planned all around the main plant area except the switchyard side. In addition, large scale afforestation and green belt development activities shall be implemented in all available spaces within the main plant and township areas. Further, avenue plantation will be undertaken along road in Plant and Township area. 8.0 REHABILITATION & RESETTLEMENT Rehabilitation and Resettlement (R&R) plan will be framed in consultation with State Govt. and PAPs based upon R&R Policy, 2007 of Govt. of India, NTPC s R&R policy and State Govt s R& R policy. Further, Community Development will be undertaken during operation phase of the project as a part of Corporate Social Responsibility. SOCIO ECONOMIC SURVEY The socio economic study was awarded to Indian Institute of Social Welfare and Business Management (IISWMB) Calcutta in May the Socio Economic Survey is under progress.

11 Power Project (2 X 660 MW) Page 11 of POST OPERATIONAL MONITORING PROGRAMME Regular monitoring of pollutants in different environmental disciplines like ambient air, stack emission, treated waste water, etc. shall be conducted and the data shall be submitted to State Pollution Control Board regularly. The monitoring locations will be finalized in consultation with State Pollution Control Board. The plant will be equipped with all necessary equipment and manpower for ensuring effective monitoring INSTITUTIONAL SET- UP The post operational monitoring programme will be under the supervision of the Environmental Management Group (EMG) at the project site. The station will be equipped with all necessary instrumentation / equipment and manpower required for ensuring effective monitoring. The EMG at site will interact with State Pollution Control Board on all environmental issues during operation of the station CLEAN DEVELOPMENT MECHANISM (CDM) Sustainable power generation has been one of the prime objectives of NTPC since inception. Towards achieving this objective, various measures have been introduced to ensure minimum degradation of the environment due to the operation of the power stations. As a part of agreement under Kyoto Protocol the CDM has been introduced to enable trading of Certified Emission Reduction (CER) between the developed countries and the developing countries. It is envisaged to take up NTPC proposed 2x660 MW, coal based Khargone STPP having higher steam cycle supercritical parameters as a CDM project. Adoption of higher cycle parameters will improve power plant efficiency and thereby reduce coal consumption per unit of electricity generation with consequent reduction in CO2 emissions. CDM revenue is one of the prime considerations for the project. The project is an ideal case for CDM benefits, being environmentally benign with less emission of Green House Gases (GHG) ENVIRONMENTAL COST A cost provision of Rs Crores has been kept towards providing environmental measures.

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

Pre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh

Pre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh 1.0 Executive Summary Name of Project: Name of Project Proponent: Location of the Project: Capacity & Unit Configurations: Land Requirement, Current Land Use and Availability: Water Requirement and Availability:

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

Dheeru Powergen Private Limited.

Dheeru Powergen Private Limited. Executive Summary Of The Proposed 2 x 300 MW Dhanras Thermal Power Station At Dhanras Village Katgora Taluk, Korba District, Chhattisgarh. Implemented By Dheeru Powergen Private Limited. Submitted to CHHATTISGARH

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

Mars Power & Steel Ltd.

Mars Power & Steel Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) 1. PROJECT DESCRIPTION: Ambuja Cement Eastern Ltd. (ACEL) has the cement

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1. INTRODUCTION Executive Summary 1.1 Background: M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1.2 Proposed Project:

More information

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola 0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for

More information

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala-147001. No. SEAC/80/37967 Dated 15/10/2008 Speed Post To M/s Green Planet Energy Pvt.

More information

NLC INDIA LIMITED PRE FEASIBILITY REPORT

NLC INDIA LIMITED PRE FEASIBILITY REPORT NLC INDIA LIMITED PRE FEASIBILITY REPORT 2x660 MW SUPER-CRITICAL LIGNITE BASED POWER PLANT AT MUDANAI DISTT. CUDDALORE, TAMILNADU NOVEMBER 2016 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS DESEIN HOUSE,

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER 2011 1 CONTENTS 1.0 Project Description Page 3 2.0 Description

More information

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana 1 D.V.S. Praneeth, 2 Arghajeet Saha 1,2 M.Tech. Scholar 1 Environmental Engineering, Department

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

Roquette Riddhi Siddhi Private Limited

Roquette Riddhi Siddhi Private Limited SUMMARY ON DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Roquette Riddhi Siddhi Private Limited (Expansion of co-generation power plant from 6MW to 18 MW) at Gokak Village & Taluk, Belagavi District,

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment

More information

TECHNICAL SPECIFICATIONS NTPC LIMITED

TECHNICAL SPECIFICATIONS NTPC LIMITED TECHNICAL SPECIFICATIONS FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) STUDY FOR LARA SUPER THERMAL POWER PROJECT, STAGE-II (2X800MW) NTPC LIMITED (A Government of India Enterprise) Engineering Office Complex

More information

EXECUTIVE SUMMARY TABLE - 1

EXECUTIVE SUMMARY TABLE - 1 EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Dwarkesh Energy Limited (DEL) proposes to set up a 1320 MW (2 x 660 MW) Super Critical Coal Based Thermal Power Plant at Villages Torniya, Chhippipura

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

ENVIRONMENTAL MONITORING PROGRAMME

ENVIRONMENTAL MONITORING PROGRAMME Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.

More information

Simran Industries Pvt. Ltd.

Simran Industries Pvt. Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Patharra Village Bemetara Tehsil Durg District Chhattisgarh Submitted to: CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh 1.0 INTRODUCTION

More information

2 NECESSITY OF THE PROPOSED PROJECT

2 NECESSITY OF THE PROPOSED PROJECT Executive Summary 1 INTRODUCTION M/s. Prosperous Energy Private Limited (PEPL), a wholly owned subsidiary of Videocon Industries Limited has proposed the 2X660MW Coal based supercritical Thermal Power

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,

More information

INTRODUCTION ENVIRONMENTAL STATEMENT

INTRODUCTION ENVIRONMENTAL STATEMENT INTRODUCTION MB Power (Madhya Pradesh) Limited (MBPMPL) is a 100% owned subsidiary of Moser Baer Power & Infrastructure Limited (MBPIL). Moser Baer group headquartered in New Delhi, is leading global technology

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

The study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows:

The study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows: 1.0 EXECUTIVE SUMMARY 1.1 Introduction M/s Mahavir Benefication Pvt. Ltd. (MBPL) proposes expansion of its coal washery from 1.0 MTPA to 5.0 MTPA capacity at Dhiroul Village, Anuppur District, Madhya Pradesh

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10

More information

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES Maton Rock Phosphate Mine of M/s HZL is proposing

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE For PROPOSED RESIDENTIAL AND COMMERCIAL DEVELOPMENT AT Plot bearing survey no. 86/1, 86/2, 86/3 (pt), 86/4 (pt), 86/5 (pt), 115/1 (pt), 115/2 (pt), 115/3 (pt), 115/4 (pt), 115/5

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd 1. Executive Summary 2. Introduction STANDARD TERMS OF REFERENCE I. Details of the EIA Consultant including

More information

- 1 S. NO. PARTICULARS DETAILS

- 1 S. NO. PARTICULARS DETAILS 1.0 INTRODUCTION EXECUTIVE SUMMARY M/s. Lafarge India Private Ltd. (LIPL) is a subsidiary of French building materials major Lafarge. Lafarge entered in the Indian market in 1999 with acquisition of cement

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

Questionnaire (Conventional Energy)

Questionnaire (Conventional Energy) Questionnaire (Conventional Energy) QUESTIONNAIRE FOR CONVENTIONAL ENERGY (SECTOR-RELATED QUESTIONS) The completion of this questionnaire is voluntary. However, replying to the relevant questions as completely

More information

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity)

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) [Vide Paragraph - 6 of Notification dated 14 th September 2006, only for construction projects listed under item 8 of the Schedule] (1) LAND ENVIRONMENT (Attach panoramic view of the project site and the

More information

Executive Summary for R-EIA Report for 60

Executive Summary for R-EIA Report for 60 Executive Summary 1. INTRODUCTION Maihar Cement is a unit of M/s Century Textiles and Industries Ltd. located at Sarla Nagar near Maihar in district Satna (M.P). Maihar Cement Unit has come into operation

More information

Cement Manufacturing Company Ltd. Page 1

Cement Manufacturing Company Ltd. Page 1 Six Monthly Compliance status of Environment Clearance for Cement Plant (2400 TPD) at Village Lumshnong, Meghalaya July to December 2013 Ref.: Environmental Clearance no. SEIAA/Project-6/2008/23 dtd. 16.03.10.

More information

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R. WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey

More information

JAYPEE NIGRIE SUPER THERMAL POWER PLANT

JAYPEE NIGRIE SUPER THERMAL POWER PLANT JAYPEE NIGRIE SUPER THERMAL POWER PLANT (A Division of M/s Jaiprakash Power Ventures Limited) Village: Nigrie, Tehsil: Sarai District: Singrauli 2015 2016 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL

More information

Content Sheet NUMBER 1.0 INTRODUCTION E SCREENING CATEGORY PROJECT DETAILS 2.0 DETAILS OF PROCESS E PROCESS DESCRIPTION

Content Sheet NUMBER 1.0 INTRODUCTION E SCREENING CATEGORY PROJECT DETAILS 2.0 DETAILS OF PROCESS E PROCESS DESCRIPTION Content Sheet CONTENT DETAILS PAGE NUMBER NUMBER 1.0 INTRODUCTION E-1 1.1 SCREENING CATEGORY E-1 1.2 1.3 1.4 SCOPE OF THE REPORT ENVIRONMENTAL SETTING PROJECT DETAILS 2.0 DETAILS OF PROCESS E-2 2.1 PROCESS

More information

JANUARY Prepared by:

JANUARY Prepared by: ARYAN COAL BENEFICATION PVT. LTD. EXECUTIVE SUMMARY OF RAPID ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN FOR BINJHRI WASHERY EXPANSION PLANT AT KORBA, CHATTISGHARH (0.96 MTPA 4.8

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.

More information

EXECUTIVE SUMMARY 1. INTRODUCTION

EXECUTIVE SUMMARY 1. INTRODUCTION EXECUTIVE SUMMARY 1. INTRODUCTION M/s. Indsil Energy & Electro Chemical Ltd plant is situated in Urla Industrial Estate, Raipur, Chhattisgarh. The company is manufacturing Ferro Alloys. Due to massive

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous chemicals may include, but not limited to the following

More information

SIX MONTHLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE

SIX MONTHLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE SIX MONTHLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE 1320 (2 660) MW PENCH THERMAL POWER PLANT At CHAUSARA VILLAGE, CHAURAI TEHSIL, CHHINDWARA DISTRICT MADHYA PRADESH Submitted to: Western Regional

More information

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA OPERATING GUIDELINES FOR PROCESSING OF CONSENT TO ESTABLISH APPLICATION FOR ESTABLISHMENT OF COAL WASHERIES IN THE STATE OF ORISSA STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII,

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey

More information

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I DATA SHEET 01 Project type : Cement Date: 24.11.2015 02

More information

CLEARANCE LETTER NO.: 21/15/84-EN-I issued on PERIOD OF COMPLIANCE LETTER April -16 September -16

CLEARANCE LETTER NO.: 21/15/84-EN-I issued on PERIOD OF COMPLIANCE LETTER April -16 September -16 Project Code : UP-2-37-90 NAME OF PROJECT Indo Gulf Fertilisers (A Unit of Aditya Birla Nuvo Ltd) CLEARANCE LETTER NO.: 21/15/84-EN-I issued on 8.1.1985 PERIOD OF COMPLIANCE LETTER April -16 September

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

EXECUTIVE SUMMARY. (Approved Consultant)

EXECUTIVE SUMMARY. (Approved Consultant) ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CAPTIVE RESIN PLANT OF 100000 TPA PRODUCTION CAPACITY AT ROUTHUSURAMALA VILLAGE, THOTTAMBEDU MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT 1.0 INTRODUCTION: BRIEF SUMMARY OF THE PROJECT M/s General Mediterranean Holding through its subsidiary M/s. Chennai Power Generation Limited (CPGL) proposes to install a 2 x 515 MW Thermal Power plant

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Village : Taraimal, Tehsil : Gharghoda District : Raigarh

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Village : Taraimal, Tehsil : Gharghoda District : Raigarh SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Village : Taraimal, Tehsil : Gharghoda District : Raigarh Submitted to: CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh 1.0 INTRODUCTION

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI TERMS OF REFERENCE (TOR) FOR AN ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI AT PLOT NO.: 63, 67-70, 72-101 AND 105, MOUZA-JUNGLE MOHAL, JL. NO. 01,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,

More information

HALF YEARLY ENVIRONMENTAL MONITORING REPORT

HALF YEARLY ENVIRONMENTAL MONITORING REPORT HALF YEARLY ENVIRONMENTAL MONITORING REPORT COMPLIANCE STATUS OF ENVIRONMENTAL CLEARANCE CONDITIONS Vide Letter No. J- 13012/54/2010-IA. II (T) Dated 31 st March 2015 A Specific Conditions: Status as on

More information

HALF YEARLY ENVIRONMENTAL MONITORING REPORT

HALF YEARLY ENVIRONMENTAL MONITORING REPORT HALF YEARLY ENVIRONMENTAL MONITORING REPORT COMPLIANCE STATUS OF ENVIRONMENTAL CLEARANCE CONDITIONS Vide Letter No. J- 13012/54/2010-IA. II (T) Dated 31 st March 2015 A Specific Conditions: Status as on

More information

PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD

PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD Presentation By N.K.Srivastava General Manager (Engg. Services & R&M) 20.04.2012 PROJECT DEVELOPMENT AT NTPC PROJECT IS DEVELOPED

More information

The following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S.

The following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S. Proceeding of the Public Hearing conducted on 27.01.2009 for grant of environmental clearance to M/s Universal Bio-Mass Energy Pvt. Ltd. for setting up of 14.5 MW capacity Biomass based Independent power

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2017 March 2018 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

District: Chhindwara (MP)

District: Chhindwara (MP) Executive Summary 1. INTRODUCTION 1.1 Background: Pandhurna industrial area consist of nearly 34 small and large units which basically consist of Cotton ginning & Processing, Food Processing, Copper Wire,

More information

EIA STUDY for 2x600MW Coal Based Thermal Power Plant at Anuppur, Madhya Pradesh

EIA STUDY for 2x600MW Coal Based Thermal Power Plant at Anuppur, Madhya Pradesh INTRODUCTION Moser Baer Power & Infrastructures Ltd. (MBPIL) proposes to establish a 1200 MW (2 x 600 MW) coal fired thermal power plant in Anuppur district, Madhya Pradesh. MBPIL has appointed GIS Enabled

More information

Janki Corp. Ltd., Six Monthly Compliance Report

Janki Corp. Ltd., Six Monthly Compliance Report Janki Corp. Ltd., Six Monthly Compliance Report Period: October 2014 to March 2015 Project: Expansion of Sponge Iron Plant (1,80,000 to 4,00,000TPA) and Installation of Iron ore Beneficiation Plant (0.6

More information

COMPLIANCE TO EC CONDITIONS [1x 67.5 MW (UNIT # I)]

COMPLIANCE TO EC CONDITIONS [1x 67.5 MW (UNIT # I)] COMPLIANCE TO EC CONDITIONS [1x 67.5 MW (UNIT # I)] STATUS AS ON 30 th SEPTEMBER, 2015 ON COMPLIANCE OF CONDITIONS AND SAFE GUARDS LAID DOWN BY GOVT. OF INDIA, MINISTRY OF ENVIRONMENT OF FORESTS VIDE MEMORANDUM

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

Shri Girija Alloy & Power (I) Pvt. Ltd.

Shri Girija Alloy & Power (I) Pvt. Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Shri Girija Alloy & Power (I) Expansion of Ferro Alloys unit at Submitted to ANDHRA PRADESH POLLUTION CONTROL BOARD 0 1.0 PROJECT DESCRIPTION Shri Girija

More information

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated 10.08.2009 Period : January 2018 to June 2018 Sl.No. CONDITIONS STIPULATED BY MoEF COMPLIENCE Specific Conditions

More information

CCR Fugitive Dust Control Plan

CCR Fugitive Dust Control Plan CCR Fugitive Dust Control Plan Mill Creek Generating Station Louisville Gas & Electric Company Jefferson County, Kentucky October 2015 CCR Fugitive Dust Control Plan - Mill Creek Generating Station Page

More information

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE EC letter no. J-11011/79/2007-IA II (I) Dated 16.04.2009 A. Specific Conditions : SN Condition Compliance 1. Continuous stack monitoring facilities to monitor

More information

Calcom Cement India Limited

Calcom Cement India Limited Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam 782446 Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I)

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P SITUATED AT KAKKUR VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT KERALA STATE EXTENT: 2.0437 Ha STANDARD TERMS OF REFERENCE (TOR)

More information

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM CONFERENCE ON WATER OPTIMISATION IN THERMAL POWER PLANTS OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM S. K. Thakur, Dr. L. D. Papney, Chief Engineer (I/C), TE&TD

More information

DRAFT TERMS OF REFERENCE FOR EIA STUDY

DRAFT TERMS OF REFERENCE FOR EIA STUDY Four laning of Balaghat - Gondia Section of NH 54 from km 0.000 to km 48.070 (Package-1A & Package-1B) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra DRAFT TERMS OF REFERENCE

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

Environmental Assessment Report

Environmental Assessment Report TE-TO AD SKOPJE Combined Cycle Co-Generation Power Plant Project Skopje Environmental Assessment Report ENVIRONMENTAL MANAGEMENT PLAN Thermal Energy Plants Department Combined Cycle Co-Generation Power

More information

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Ref.: Environmental Clearance no. J-11011/754/2007-IA II

More information