1 TECHNICAL SPECIFICATIONS FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) STUDY FOR LARA SUPER THERMAL POWER PROJECT, STAGE-II (2X800MW) NTPC LIMITED (A Government of India Enterprise) Engineering Office Complex Sector - 24, NOIDA, U.P May, 2018

2 Page 1 of 13 TECHNICAL SPECIFICATIONS FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) STUDY FOR LARA SUPER THERMAL POWER PROJECT, STAGE-II (2X800 MW) SPECIFICATION NO.:9548/999/GOG/M/001 This is Technical Specification for conducting EIA study for Lara Super Thermal Power Project,. This document has a restricted distribution and may be used by the recipients only for the performance of official duties. Its contents shall not be disclosed/ loaned/ copied either in part or as whole without written permission of NTPC. May, 2018

3 Page 2 of 13 TABLE OF CONTENT 1. Introduction 1.1 Objectives 2. Scope of Services 2.1 Stage A Description of Site and Surrounding Description of the Proposed Project Description of Alternate Sites Establishment of Baseline Conditions 2.2 Stage B Prediction of Impacts Disaster Management and Occupational Health and Safety Plan Environmental Management Plan 2.3 Stage C 3. Time Schedule Preparation of EIA Report Annexures Annexure-I: Summary of Scope Annexure-II: Primary Data Collection/ Monitoring Schedule Exhibits Exhibit-I: Vicinity Map of Lara STPP Stage II (10 km radius)

4 Page 3 of INTRODUCTION A Memorandum of Understanding (MOU) was signed between NTPC Limited and Govt. of Chhattisgarh on to establish 4000 MW (5x800 MW) coal based power project near Lara village in Raigarh district of Chhattisgarh. Lara Super Thermal Power Project (STPP), Stage-I (2x800 MW) is under construction since 2012 and is in advanced stages of commissioning. The Present proposal is for Lara STPP,, planned as a regional power project for the benefit of States and UTs of Western Region. The project is envisaged to be commissioned during year The Lara STPP is located towards south-east of Raigarh town in Chhattisgarh consisting villages Armuda, Chhapora, Bodajharia, Devalpura, Mahloi, Riyapalli, Lara, Jhilgitar, Kandagarh. Gajmar and Hargan Reserved forest are situated at approx. 6.5 and 7.5 km, respectively in North-East direction from plant periphery. The project is located towards western direction from the Odisha state boundary which is about 1.5 km away. Nearby Railway station is at Raigarh located at a distance of about 30 km. Project site is approachable from NH-200 (Raigarh-Sarangarh) via Kondatarai through State PWD Road. The nearest rail head Raigarh Railway Station (on South East Central Railway, Howrah-Bilaspur Broad Gauge), is approximately 30 km from the project site. The nearest commercial airport, Raipur is about 250 km from the project site. Vicinity map of the project is shown in Exhibit-1. The major components of the project are located between the following longitudes and latitudes: Latitudes Longitudes Main Plant & Township 21 o N to 21 o N 83 o E to 83 o 27' 56 E Ash Disposal Area 21 o N to 21 o N 83 o E to 83 o 27'39 E The proposed units under Stage-II shall be established within the land already acquired during Stage-I of the Lara STPP. The water requirement for the proposed Stage-II project will be met from the Saradih Barrage on River Mahanadi. 1.1 OBJECTIVE: In order to identify the environmental impacts due to the construction and operation of the power plant and associated facilities (like township, ash disposal area etc) an Environmental Impact Assessment (EIA) study is proposed to be undertaken. The aim of the study is to establish the existing environmental conditions, predict cumulative impacts of the power plant and associated facilities (including Township) and formulate the Environmental Management Plan (EMP). The EIA report is required for seeking Environmental Clearance (EC) from the Ministry of Environment, Forest and Climate Change (MOEF&CC), Consent to Establish (CTE) from Chhattisgarh

5 Page 4 of 13 Environment Conservation Board (CECB) and clearance from funding agencies wherever applicable. 2.0 SCOPE OF SERVICES: The EIA study will be conducted through a NABET accredited consultant covering all the disciplines of environment (Land Use, Water Use, Demography & Socio-economics, Geology, Soils, Sediments, Hydrology, Water Quality, Meteorology, Air Quality, Terrestrial Ecology, Aquatic Ecology and Noise) and 12 (twelve) months field monitoring in relevant disciplines. The consultant will enable in presenting the findings of the EIA report before the Public Hearing Committee, CECB and Expert Appraisal Committee (EAC) of the MOEF&CC, and submit all clarifications/ replies to queries for obtaining CTE from the Chhattisgarh Environment Conservation Board and Environment Clearance (EC) from MOEF&CC. The EIA Report shall be framed in accordance with the EIA Notification of MOEF&CC dated and its subsequent amendments as applicable. The Scope of Services for the study will comprise of the following stages:- Stage 'A' Stage 'B Stage 'C' Description of Site and Surrounding Description of the Existing Units and Proposed Project Establish Baseline Conditions Impact Assessment Preparation of Environmental Management Plan, Risk Assessment and Disaster Management Plan, Occupational Health and Safety Plan, and Green Belt Development & Afforestation Plan Preparation of following Documents Draft EIA Report based on one season data for existing environmental baseline and Executive Summary of Draft EIA Report in English and Hindi language, Final EIA Report incorporating details of Public Consultation for submission to MOEF&CC for EC. The above mentioned documents shall be prepared based on TOR approved/ accorded by MOEF&CC and/ or Standard TOR and Additional Conditions (copy enclosed at Annexure-I). The EIA Study shall cover all the conditions stipulated in TOR accorded by MOEF&CC and/ or Standard TOR and Additional Conditions, as well as the scope of work described in the subsequent sections.

6 Page 5 of STAGE 'A': Description of Site and Surrounding The salient features in the core area which covers a radius of 10 km in and around the project site should be spelt out and highlighted on a colour map of appropriate scale. Ecologically sensitive areas as notified by MOEF&CC such as National Park, Tiger Reserve/ Elephant Reserve/ Turtle Nesting Ground, Core Zone of Biosphere Reserve, Habitat for Migratory Bird, Lakes/ Reservoir/ Dam, Streams/ Lakes, Estuary/ Sea, Mangroves, Mountains/ Hills, Notified/ other Archeological Sites, Industries/ Thermal Power Plants, Defense Installation, Airport etc need to be established, especially within 10 km radius of core area from the project boundary through primary and secondary data collection. Description of the Existing Units and Proposed Project Highlight the salient features of the project likely to affect the environment based on Feasibility Report of the project prepared by NTPC. Establishment of Baseline Conditions Baseline conditions in respect of Land Use, Water Use, Demography & Socioeconomics, Geology, Soils, Sediments, Hydrology, Water Quality, Meteorology, Air Quality, Terrestrial Ecology, Aquatic Ecology and Noise be established. Please refer Annexure-I and II for details on establishment of Baseline Conditions. Annexure-I: Summary of Scope of Work Annexure-II: Primary Data Collection/ Monitoring Schedule However, the details presented in Annexure-I and II are only indicative and not exclusive. All possible sources for data collection shall be explored and relevant data will be generated as required as per the EIA Notification dated and subsequent amendments as applicable. Further, the information available in publications (like District Census Handbook etc.) and unpublished data available with various Government, Educational and Other Institutions for each discipline, to characterize the environment of the area shall be reviewed and analyzed. All possible sources of secondary data, generate relevant primary data shall be explored for preparation of EIA Report to the satisfaction of NTPC, State Pollution Control Boards/ Ministry of Environment, Forest and Climate Change. 2.2 STAGE 'B': Prediction of Impacts The features of the power plant which are likely to have impact on the environment shall be discussed in detail covering gaseous emission, liquid effluents, particulates, solid wastes, noise, etc.

7 Page 6 of 13 The impacts will be assessed for both construction and operation phases. Both short term and long term impacts on sensitive areas if any such as habitat of endangered species of wildlife or plants, sites/ monuments of historical and cultural importance, centers with concentrated population in the core/ study area, will be established wherever applicable. The detailed methodologies of impact assessment for the different disciplines of study will be broadly defined by the consultant in his offer. Special reference should be made with respect to following impacts: Impacts on Air Quality: A computer based internationally recognized mathematical air quality model (e.g., ISC3) suitable for the region will be identified and run to predict the concentration of SO 2, NO x, PM 10 due to the operation of the power plant. Cumulative impact assessment on ambient air quality due to proposed expansion and others (including existing sources around the project as well as other proposed sources of emissions) to be carried out. The results will be presented for annual, seasonal and short term (24 hourly) concentrations over a radius of 10 km around the plant. The dispersion model results will be included in the report using isopleths or other graphical methods, overlaying a land use map of the surrounding area. The predicted air quality will be compared with existing regulations and mitigative measures, if any, will be identified. The impact at all the monitoring locations shall also be estimated. Impacts on Water Quality: The impact of liquid effluents on natural water bodies receiving the effluents shall be established and significant parameters, which are likely to change critically are to be clearly spelt out. Studies are to be conducted to understand the possibilities of contamination of ground water from the ash pond leachates, based on probable composition of leachate infiltration characteristics of soil and geological characteristics of the ash disposal area. If the possibility of significant ground water contamination is established, suitable techno-economically viable mitigation measures are to be suggested. Cumulative impact due to existing and other proposed projects on water quality (surface water and ground water) shall be assessed. Impacts on Land Use: The land requirement for the project including plant, township, ash disposal, corridors is to be spelt out. The classification of land with respect to agricultural/ forest/ waste land/ Govt. land/ Private land, Revenue land should also be indicated.

8 Page 7 of 13 The classification of land in study area with respect to agricultural/ forest/ waste/ Govt. / Private and Revenue should also be indicated. Satellite imagery (IRS/NRSA Satellite maps) and authenticated topo sheet indicating drainage, cropping pattern, water bodies (wetland, river system, stream, nallahs, ponds etc.), location of nearest habitations (villages), rivers, and reservoirs in the study area shall be provided. The direct and indirect impacts of construction of power project on the land use of the study area shall be assessed based on experience. Social Impacts: Impacts on demographic and socio-economic characteristics of the population shall be established qualitatively based on experiences in similar power projects. In addition, the impacts of displacements and needs for resettlement of people from whom the land is to be acquired for the project shall be covered, if applicable. In addition, the positive impacts like employment opportunities, life standard improvement etc. may be provided. Prediction of Noise Levels: The noise level at varying distances for multi-sources will be predicted using suitable noise model. A comparison of measured noise (Leq) at monitoring locations to that of predicted noise levels (Leq) should be made and mitigatory measures required, if any, be recommended to conform to regulatory ambient air noise standards. Impacts on Ecology: Impacts on terrestrial and aquatic ecosystems shall be established qualitatively based on predicted changes in the ambient air and water quality and experiences in similar power projects. Impact on aquatic ecosystem due to withdrawal of water from water source will be provided. Risk Assessment, Disaster Management Plan and Occupational Health and Safety Plan: Risk assessment will be carried out for fuel oil storage, transport and handling. Thermal radiation contours will be drawn and any mitigation measures required will be suggested. A Disaster Management Plan (DMP) for dealing with On-site and Off-site emergency situations arising due to fire, explosion, leakages of hazardous substances etc. in the project is to be prepared. Occupational risk involved during construction and operation of the plant should be assessed and necessary safety and protective measures should be spelt out. Ash Utilization Plan: Details of fly ash utilization plan as per the latest fly ash Utilization Notification of GOI along with firm agreements/ MoU with contracting parties including other usages etc. shall be submitted. The plan shall also include disposal method/ mechanism of bottom ash.

9 Page 8 of 13 Environmental Management Plan (EMP): An EMP identifying the measures to mitigate the adverse impacts of emissions and effluents will be prepared covering construction and operational phases. It will also include a green belt/ Afforestation plan. Role and capability of existing environmental units on site will be examined. Considering the requirements of Regulatory Agencies and identified critical parameters, the consultant will design a post study environmental monitoring program and identify all equipment and man power necessary for the implementation of this program and cost involved. 2.3 STAGE: 'C': Preparation of EIA Report Stage-C includes preparation of reports Draft EIA Report based on one season (non-monsoon) data and Executive Summary of Draft EIA Report in English and Local Language (Hindi) for Public Consultation process. Final EIA Report incorporating the issues raised during Public Consultation. Response to the issues raised during Public Hearing and the written representations (if any), along with a time bound Action Plan and budgetary allocations to address the same, shall be provided in a tabular form, against each action proposed. Comprehensive EIA Report based on 12 months data. The report will include all references and fulfill the requirements of MOEF&CC. The basic format of the EIA-EMP report will be as per MOEF&CC Gazette Notification dated and subsequent amendments.

10 Page 9 of 13 Annexure-I STAGE A: ESTABLISHMENT OF BASELINE CONDITIONS: SUMMARY OF SCOPE Discipline Scope General General description of the core study area within 10 km radius around project site. Highlight land, fuel and water requirements for the project and associated facilities as assessed by NTPC in Feasibility Report. Infrastructure facilities and amenities available within the study area. Land Use Procurement and analysis of current Satellite Imagery for core study area i.e. 10 km radius along with ground truth verification. Analysis of Census Data for various land uses within core study area. Classification of land use for the Main Plant and Ash Pond with latest satellite imagery along with ground truth verification. Water Use Assessment of water sources, current water use and identify conflicts, if any, for core study area based on secondary data. Demography & Establishment of demographic characteristics and occupational structure of population within core study Socio-economics area based on Census Data, Topography and Geology Description of the topography of the study area. Presentation of geological map, geological profile and brief geological description of the study area, especially with respect to ash disposal area, based on secondary data. Soil Establishment of physico-chemical characteristics and nutrient levels of soil in core study area based on primary data generation (Annexure-II). Establishment of infiltration characteristics of soil in and around the ash disposal area based on primary data generation (Annexure-II). Hydrology and Establishment of surface and ground water hydrology of core study area based on secondary data. Hydrogeology

11 Page 10 of 13 Water Quality Establishment of physico-chemical characteristics, pollution levels and bacteriological contamination of surface and ground water bodies in the core study area through primary data generation (Annexure-II). Sampling and monitoring to be done at the water intake source and outfall/ discharge point, if any. Meteorology Monitoring of On-site Meteorological Parameters by setting up an Automatic Meteorological Station at site (Annexure-II). Collection of climatological data from nearest IMD station for long term analysis of climatological parameters for a period not less than 10 years. Air quality Establishment of Ambient Air Quality in core study area through primary data generation (Annexure-II). At-least one monitoring station each in the upwind and in the pre-dominant down-wind direction to be selected for analyzing the likely maximum ground level concentration of pollutants. Cumulative impact assessment on ambient air quality due to proposed plant and others (including existing sources as well as other proposed source of emission) to Terrestrial Ecology Aquatic Ecology be carried out. General description of terrestrial ecosystems based on secondary data and seasonal field sampling. Identification of flora and fauna along with rare and endangered species present in the study area, if any. List of flora and fauna duly authenticated by DFO. General description of aquatic ecosystems in core study area based on secondary data and primary data generation through seasonal field sampling. Identification of flora and fauna and endangered species in the surface water body falling in the study area. Listing of fish in the receiving water body with special reference to spawning and breeding zone. Listing of other species in the water body. Noise Monitoring of noise at critical locations in and around the proposed project in core study area through primary data generation (Annexure-II). Notes: Any additional work deemed feel necessary for the project should be quoted separately along with the cost by the consultant. Action Plan along with locations of sampling sites will be finalized in consultation with the Engineer-in-Charge (EIC).

12 Page 11 of 13 ANNEXURE-II STAGE-A: ESTABLISHMENT OF BASELINE CONDITIONS: PRIMARY DATA COLLECTION/ MONITORING SCHEDULE Field/ Parameters Ambient Air Quality SO 2 NO X (NO 2) PM 10 PM 2.5 CO No. of Sampling Location Frequency Remark Ten Twice a week 24 hour sampling at each location using appropriate ambient air quality instruments. Consultant has to deploy 10 (ten) sets of instrument at site. Analysis of samples should be as per Gazette notification dated on AAQ. At-least one monitoring station each to be located in upwind and downwind directions from the proposed project. Ten Once a month 8 Hourly samples at each location using appropriate instruments O 3 & Hg Ten Meteorology Wind speed & direction 1 (One) Max. & Minimum Temp. (Wet & Dry bulb Temp.) Solar radiation Humidity Atmospheric pressure Rainfall Storm Temperature at 2 m and 10 m height Once a month Continuous (averaging time of 1 hour) Daily (at 8.30 & IST) Continuous (averaging time of 1 hour) Daily at 8.30 & IST Daily at 8.30 & IST Daily Daily Continuous (averaging time of 1 hour) Water Quality (Surface- 06 & Ground Water - 06) Physical parameters: Temp., TSS, etc. Chemical Parameters: ph, DO, TDS 8 Hourly samples at each location using appropriate instruments A permanent Automatic meteorological station is to be established at site for monitoring the meteorological parameters like wind speed & direction, temperature (at 2 m and 10 m height), solar radiation, humidity, atmospheric pressure, rainfall. Twelve Monthly Consultant has to set up site laboratory for these parameters during the period of study. Twelve Monthly Consultant has to specify the laboratory facilities for analysis of

13 Page 12 of 13 (Conductivity), these parameters. Alkalinity, Hardness, BOD, COD, NO 3, PO 4, Cl, F, SO 4, Na, K, Ca, Mg, Silica, Oil & Grease, Phenolic compounds. Bacteriological: Twelve Monthly As above MPN and Total coliform Heavy Metals (As, Hg, Twelve Quarterly As above Pb, Cd, Cr -6, Total Cr, Cu, Zn, Se, Fe). Soil Classification, Texture, Fifteen Once in Season As above ph, Conductivity, Cation Exchange Capacity (CEC), N, P, K, Mercury etc. Infiltration Tests Fifteen Once in Season In and around ash disposal area Noise L eq. Once in Season Fifteen (within and outside Plant Area) 24 hourly sampling at each location using an integrating sound level meter. Aquatic Ecology Phytoplankton, Four Zooplankton, Fishes Terrestrial Ecology Density, Diversity, Four Frequency, Abundance, Importance Value Index of species etc. Rain Water Analysis Quantity, ph, One Conductivity, SO 2-4, Cl -, 2- NO 3 Coal and Ash Analysis Heavy Metals (As, Hg, 2 (Two) Pb, Cd, Cr -6, total Cr, Cu, Zn, Se, Fe). Once in Season Once in Season Once in Season Once Coal Samples of coal source will be taken as grab sample. Radio Activity 2 (Two) Once Radio Activity sampling and analysis through an Institute/ Organization of repute. General: The Consultant's offer shall indicate detailed methodology (including sampling and analysis procedures wherever applicable and sampling frequency), The parameters to be analyzed and the number of sampling locations indicated under various disciplines are only indicative. Consultant will determine the actual plan of action in consultation with E-I-C.

14 Exhibit-I: Vicinity Map of Lara STPP Stage II (10 km radius)

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES Maton Rock Phosphate Mine of M/s HZL is proposing

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

APPENDIX I PROPOSED TERMS OF REFERENCE

APPENDIX I PROPOSED TERMS OF REFERENCE APPENDIX I PROPOSED TERMS OF REFERENCE 1. Environment Impact Assessment/Environment Management Plan document shall be in accordance with the provisions & generic structure stipulated in the EIA Notification

More information

PROPOSED TERMS OF REFERENCE (TOR) FOR

PROPOSED TERMS OF REFERENCE (TOR) FOR PROPOSED TERMS OF REFERENCE (TOR) FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR PROPOSED NEW NATIONAL HIGHWAY -NH-754K GREENFIELD ALIGNMENT SANCHORE-SANTALPUR SECTION

More information

DRAFT TERMS OF REFERENCE FOR EIA STUDY

DRAFT TERMS OF REFERENCE FOR EIA STUDY Four laning of Balaghat - Gondia Section of NH 54 from km 0.000 to km 48.070 (Package-1A & Package-1B) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra DRAFT TERMS OF REFERENCE

More information

ANNEXURE- II Proposed TOR

ANNEXURE- II Proposed TOR ANNEXURE- II Proposed TOR Annexure II Terms of Reference for EIA for Setting up of Ligno-Cellulosic Biomass based second generation (2G) Ethanol Bio-Refinery with capacity of 100 KLPD at village-sainjani,

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P SITUATED AT KAKKUR VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT KERALA STATE EXTENT: 2.0437 Ha STANDARD TERMS OF REFERENCE (TOR)

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

CONSTRUCTION OF 6 LANE KUNDLI MANESAR PALWAL EXPRESSWAY IN THE STATE OF HARYANA

CONSTRUCTION OF 6 LANE KUNDLI MANESAR PALWAL EXPRESSWAY IN THE STATE OF HARYANA (TOR) FOR THE PREPARATION OF ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR CONSTRUCTION OF 6 LANE KUNDLI MANESAR PALWAL EXPRESSWAY IN THE STATE OF HARYANA SUBMITTED

More information

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd 1. Executive Summary 2. Introduction STANDARD TERMS OF REFERENCE I. Details of the EIA Consultant including

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous chemicals may include, but not limited to the following

More information

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala-147001. No. SEAC/80/37967 Dated 15/10/2008 Speed Post To M/s Green Planet Energy Pvt.

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE 1 PROPOSED TOR FOR EIA STUDY Kottmeta Limestone Mine, ML Area 801.171 ha, is located in Village Katamater, Tehsil/District Malkangiri, Odisha. Dalmia Cement (Bharat) Limited,

More information

ENVIRONMENTAL MONITORING PROGRAMME

ENVIRONMENTAL MONITORING PROGRAMME Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802

More information

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE Terms of Reference (TOR) for preparation of Environmental Impact Assessment (EIA) and Environmental

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given. PROPOSED TERMS OF REFERENCES (A) Suggested by the Applicant 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

2 PROPOSED TERMS OF REFERENCE

2 PROPOSED TERMS OF REFERENCE 2 Proposed Terms of References (TORs) as prescribed in Chapter 4, Section 4(d), of Standard Terms of Reference for EIA/EMP Report for projects / activities requiring Environment Clearance under EIA Notification,

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

TERMS OF REFERENCE. Notes for NEPA for Generic Terms of Reference

TERMS OF REFERENCE. Notes for NEPA for Generic Terms of Reference TERMS OF REFERENCE INDUSTRIAL PROJECTS: MANUFACTURING & PROCESSING PAINT, TEXTILES, CEMENT & LIME, DETERGENTS, PESTICIDES & HAZARDOUS SUBSTANCES, PULP, PAPER & WOOD, BOTTLES, AND CANS. DRY CLEANING AND

More information

1.0 The Need for EIA. (a) the project proponent; (b) the regulatory agencies; and, (c) all stakeholders and interest groups.

1.0 The Need for EIA. (a) the project proponent; (b) the regulatory agencies; and, (c) all stakeholders and interest groups. 1.0 The Need for EIA Every anthropogenic activity has some impact on the environment. More often it is harmful to the environment than benign. However, mankind as it is developed today cannot live without

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE For PROPOSED RESIDENTIAL AND COMMERCIAL DEVELOPMENT AT Plot bearing survey no. 86/1, 86/2, 86/3 (pt), 86/4 (pt), 86/5 (pt), 115/1 (pt), 115/2 (pt), 115/3 (pt), 115/4 (pt), 115/5

More information

SLAUGHTERHOUSES AND ABATTOIRS

SLAUGHTERHOUSES AND ABATTOIRS TERMS OF REFERENCE SLAUGHTERHOUSES AND ABATTOIRS Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to Slaughterhouses and Abattoirs. The TOR outlines the

More information

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE Terms of Reference (TOR) for preparation of Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) for "Mining of Minerals" as per the EIA Notification, 2006 has been devised to

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

म झग व ड क शप ब डस ल मट ड (भ रत सरक र क उप म) र क प त नम त ड कय ड र ड, म झग व म बई ४०००१० भ रत

म झग व ड क शप ब डस ल मट ड (भ रत सरक र क उप म) र क प त नम त ड कय ड र ड, म झग व म बई ४०००१० भ रत म झग व ड क शप ब डस ल मट ड (भ रत सरक र क उप म) र क प त नम त ड कय ड र ड, म झग व म बई ४०००१० भ रत MAZAGON DOCK SHIPBUILDERS LIMITED (Formerly known as Mazagon Dock Ltd.) CIN : U35100MH1934GOI002079 (A Government

More information

A. Proposed TOR. April Vedanta Limited- Cairn Oil & Gas

A. Proposed TOR. April Vedanta Limited- Cairn Oil & Gas Proposed Terms of Reference for EIA Study of the Proposed Onshore Oil and Gas Exploration and Appraisal Project in AA-ONHP-2017/06 Hydro Carbon Block In West Tripura and Sepahijala Districts of Tripura

More information

PROPOSED TERMS OF REFERENCE (TOR)

PROPOSED TERMS OF REFERENCE (TOR) PROPOSED TERMS OF REFERENCE (TOR) 4(a):STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR PETROLEUM REFINING INDUSTRIES PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP

More information

A. Proposed TOR. April Vedanta Limited- Cairn Oil & Gas

A. Proposed TOR. April Vedanta Limited- Cairn Oil & Gas Proposed Terms of Reference for EIA Study of the Proposed Onshore Oil and Gas Exploration and Appraisal Project in AA-ONHP-2017/14 Hydro Carbon Block inkarimganj, Hailakandi, Cachar districts of Assam

More information

Standard TOR for Onshore Oil & Gas Exploration, Development & Production

Standard TOR for Onshore Oil & Gas Exploration, Development & Production Proposed Terms of Reference for EIA Study of the Proposed Onshore Oil and Gas Exploration and Appraisal Project in AA-ONHP-2017/15 in Lakhimpur, Dhemaji, Jorhat, Dibrugarh, Sibsagar Districts of Assam

More information

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI TERMS OF REFERENCE (TOR) FOR AN ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI AT PLOT NO.: 63, 67-70, 72-101 AND 105, MOUZA-JUNGLE MOHAL, JL. NO. 01,

More information

Mining of Minerals MINING LEASE of BAUXITE Mining Project for CARBORUNDUM UNIVERSAL LTD. S.No. 146/147 PAIKI

Mining of Minerals MINING LEASE of BAUXITE Mining Project for CARBORUNDUM UNIVERSAL LTD. S.No. 146/147 PAIKI Terms of Reference For Environmental Impact Assessment of Mining of Minerals MINING LEASE of BAUXITE Mining Project for CARBORUNDUM UNIVERSAL LTD. S.No. 146/147 PAIKI At- MEWASA, Taluka- KALYANPUR, Dist.

More information

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS TERMS OF REFERENCE ELECTRICAL TRANSMISSION LINES & SUBSTATIONS Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to development projects involving the construction

More information

MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA ORISSA MINING CORPORATION LIMITED BANGUR CHROMITE MINING PROJECT POST CLEARANCE ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF JULY 2011 MECON LIMITED RANCHI 834 002, INDIA 11.S2.2011 SEPTEMBER, 2011

More information

Annexure A. A. Proposed TOR

Annexure A. A. Proposed TOR Annexure A Proposed Terms of Reference for EIA Study of the Proposed Onshore Oil and Gas Exploration and Appraisal Project in RJ-ONHP-2017/1 Hydro Carbone Block in Barmer District Rajasthan Standard ToR

More information

Mining of Minerals MINING LEASE of LIME STONE Mining Project for GAYTRI MINERALS.

Mining of Minerals MINING LEASE of LIME STONE Mining Project for GAYTRI MINERALS. Terms of Reference For Environmental Impact Assessment of Mining of Minerals MINING LEASE of LIME STONE Mining Project for GAYTRI MINERALS. S.No. 160 PAIKI At- RAKKA, Taluka- LALPUR, Dist. JAMNAGAR. (Gujarat)

More information

Proposed TOR Calix Industries

Proposed TOR Calix Industries 1 A tabular with index for point-wise compliance of below mentioned TORs. 2 Executive summary of the project giving a prima facie idea of the objectives of the proposal, use of resources, justification,

More information

MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA ORISSA MINING CORPORATION LIMITED BANGUR CHROMITE MINING PROJECT POST CLEARANCE ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF SEPTEMBER 2011 MECON LIMITED RANCHI 834 002, INDIA 11.S2.2011 OCTOBER, 2011

More information

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE 5(b):STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR PESTICIDES INDUSTRY AND PESTICIDE SPECIFIC INTERMEDIATES (EXCLUDING FORMULATIONS)AND INFORMATION TO BE INCLUDED IN

More information

During the discussions, the Committee finalized the following additional TOR for further study:

During the discussions, the Committee finalized the following additional TOR for further study: Finalization of ToR for development of Visakhapatnam?Kakinada Corridor for the Establishment of Petroleum, Chemicals and Petrochemicals Investment Region (VK- PCPIR), Andhra Pradesh by M/s VK- PCPIR Special

More information

PANCHESHWAR MULTIPURPOSE PROJECT

PANCHESHWAR MULTIPURPOSE PROJECT ANNEXURE-VIII PROPOSED TERMS OF REFERENCE FOR CONDUCTING CEIA STUDY FOR PANCHESWAR MULTI-PURPOSE PROJECT 1. GENERAL The Environmental Impact Assessment of the proposed Pancheswar Multi-purpose project

More information

PROPOSED TERMS OF REFERENCES. Standard Terms of Reference for Pesticides Industry and pesticide specific intermediates (excluding formulations) 5(b):

PROPOSED TERMS OF REFERENCES. Standard Terms of Reference for Pesticides Industry and pesticide specific intermediates (excluding formulations) 5(b): PROPOSED TERMS OF REFERENCES Standard Terms of Reference for Pesticides Industry and pesticide specific intermediates (excluding formulations) 5(b): ToR Points Details Remarks STANDARAD TERMS OF REFERENCE

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

Questionnaire (Conventional Energy)

Questionnaire (Conventional Energy) Questionnaire (Conventional Energy) QUESTIONNAIRE FOR CONVENTIONAL ENERGY (SECTOR-RELATED QUESTIONS) The completion of this questionnaire is voluntary. However, replying to the relevant questions as completely

More information

ENVIRONMENTAL IMPACT ASSESSMENT IN INDIAN SCENARIO

ENVIRONMENTAL IMPACT ASSESSMENT IN INDIAN SCENARIO Review Paper (SS-3) ENVIRONMENTAL IMPACT ASSESSMENT IN INDIAN SCENARIO S.N. Ranshur*, P.H. Sawant and R.A. Hegde Civil (Env. Engg. Subjects), S.P. College of Engineering, Mumbai (INDIA) *E-mail : sandeepranshur@yahoo.com

More information

Mars Power & Steel Ltd.

Mars Power & Steel Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR RIVER VALLEY PROJECTS.

STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR RIVER VALLEY PROJECTS. Proposed terms of reference for EIA study The scope covers the following:- STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR RIVER VALLEY PROJECTS 1 Scope of EIA Study:

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

Table-1: Scoping Matrix adopted for CEIA study for Shivasamudram Run of the river power project, Karnataka

Table-1: Scoping Matrix adopted for CEIA study for Shivasamudram Run of the river power project, Karnataka TERMS OF REFERENCE FOR CONDUCTING COMPREHENSIVE EIA STUDY FOR SHIVASAMUDRAM RUN OFF THE RIVER POWER PROJECT (2X100MW) IN CHAMARAJANAGER DISTRICT, KARNATAKA. The major thrust of the study is to assess the

More information

Environmental Impact Assessment for Proposed Relocation and Installation of 1 x 100 Ton per day / 30,000 TPA Sponge Iron manufacturing industry from Village Nayapara-Bodri, PO- Chakrabhata Camp, Bilaspur

More information

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated 10.08.2009 Period : January 2018 to June 2018 Sl.No. CONDITIONS STIPULATED BY MoEF COMPLIENCE Specific Conditions

More information

Roquette Riddhi Siddhi Private Limited

Roquette Riddhi Siddhi Private Limited SUMMARY ON DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Roquette Riddhi Siddhi Private Limited (Expansion of co-generation power plant from 6MW to 18 MW) at Gokak Village & Taluk, Belagavi District,

More information

The EIA report would cover the following aspects. Page 1 of 10

The EIA report would cover the following aspects. Page 1 of 10 TERMS OF REFERENCE FOR CONDUCTING COMPREHENSIVE EIA STUDY FOR SHARAVATHY PUMPED STORAGE PROJECT (8 X 250 MW), SHIMOGA & UTTARA KANNADA DISTRICT, KARNATAKA The major thrust of the study is to assess the

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

4x150 MW Surguja Thermal Power Project Near Parsa Village, Udaypur Tehsil, Surguja Dist. Chhattisgarh By Surguja Power Private Limited.

4x150 MW Surguja Thermal Power Project Near Parsa Village, Udaypur Tehsil, Surguja Dist. Chhattisgarh By Surguja Power Private Limited. 4x150 MW Surguja Thermal Power Project Near Parsa Village, Udaypur Tehsil, Surguja Dist. Chhattisgarh By Surguja Power Private Limited. Project Category Project Proponent Location Proposed 600 (4x150)

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

The baseline studies shall consist of three season field data i.e. Pre-Monsoon, Monsoon and winter (lean) Season covering one calendar year.

The baseline studies shall consist of three season field data i.e. Pre-Monsoon, Monsoon and winter (lean) Season covering one calendar year. Proposed Terms of Reference for EIA/EMP studies for Kamala Hydroelectric Project in Arunachal Pradesh as per the Model Terms of Reference for projects approved by MoEF The terms of reference for preparation

More information

ANNEXURE-VII TERMS OF REFERENCE FOR CONDUCTING COMPREHENSIVE EIA STUDY FOR KURUNG HYDRO ELECTRIC PROJECT (330 MW), ARUNACHAL PRADESH

ANNEXURE-VII TERMS OF REFERENCE FOR CONDUCTING COMPREHENSIVE EIA STUDY FOR KURUNG HYDRO ELECTRIC PROJECT (330 MW), ARUNACHAL PRADESH ANNEXURE-VII TERMS OF REFERENCE FOR CONDUCTING COMPREHENSIVE EIA STUDY FOR KURUNG HYDRO ELECTRIC PROJECT (330 MW), ARUNACHAL PRADESH The major thrust of the study is to assess the impacts of the proposed

More information

Activities of Water Environment Management by Yangon Regional ECD. Daw Khin Thida Tin Director Environmental Conservation Department Yangon Region

Activities of Water Environment Management by Yangon Regional ECD. Daw Khin Thida Tin Director Environmental Conservation Department Yangon Region Activities of Water Environment Management by Yangon Regional ECD Daw Khin Thida Tin Director Environmental Conservation Department Yangon Region Outlines Background Environmental Policy and Legislation

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

No.J-11011/132/2010-IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11011/132/2010-IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11011/132/2010-IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

CMPDI. 4.6 Mine Closure Plan

CMPDI. 4.6 Mine Closure Plan 4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.

More information

KYNSHI-I HEP (270 MW), MEGHALAYA

KYNSHI-I HEP (270 MW), MEGHALAYA ANNEXURE-IV PROPOSED TERMS OF REFERENCE FOR EIA/EMP FOR KYNSHI (270 MW) HYDROELECTRIC PROJECT IN MEGHALAYA AS PER THE MODEL TERMS OF REFERENCE ISSUED BY MOEF & CC FOR NORTH-EAST PROJECTS I. SALIENT FEATURES

More information

No.J-11011/436/2005-IA II (I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11011/436/2005-IA II (I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11011/436/2005-IA II (I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

Terms of reference for Improving the capacity utilization of OR-I & OR-II berths at Visakhapatnam port trust (VPT), Andhra Pradesh, India.

Terms of reference for Improving the capacity utilization of OR-I & OR-II berths at Visakhapatnam port trust (VPT), Andhra Pradesh, India. Proposed Terms of Reference for EIA studies: Terms of reference for Improving the capacity utilization of OR-I & OR-II berths at Visakhapatnam port trust (VPT), Andhra Pradesh, India. 1.0 INTRODUCTION:

More information

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER 2011 1 CONTENTS 1.0 Project Description Page 3 2.0 Description

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity

More information

BRIGADE MIXED USE DEVELOPMENT

BRIGADE MIXED USE DEVELOPMENT BRIGADE MIXED USE DEVELOPMENT Terms of Reference (TOR) At Sy. No. 171/1, 171/2, 171/3, 171/4, 172, 173/1, 173/2, 173/3, 183/2, 183/3, 183/6A, 183/6B, 183/7, 183/8, 183/9, 183/11 and 184/1(P) Varthur Village,

More information

No.J-11015/307/2006-IA.II(M) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11015/307/2006-IA.II(M) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11015/307/2006-IA.II(M) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA OPERATING GUIDELINES FOR PROCESSING OF CONSENT TO ESTABLISH APPLICATION FOR ESTABLISHMENT OF COAL WASHERIES IN THE STATE OF ORISSA STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII,

More information

No.J-11011/177/2016- IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11011/177/2016- IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11011/177/2016- IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

IX: HAZARDOUS WASTE MANAGEMENT

IX: HAZARDOUS WASTE MANAGEMENT IX: HAZARDOUS WASTE MANAGEMENT 9.0 INTRODUCTION The Government of India has promulgated the Hazardous Waste (Management and Handling) Rules, 1989 and the aegis of Environment (Protection) Act, 1886 through

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

No.J-11011/60/2014-IA.II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11011/60/2014-IA.II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11011/60/2014-IA.II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New Delhi-110003

More information

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that

More information

Regulatory Requirements for Site Approval Permit of Nuclear Power Plants

Regulatory Requirements for Site Approval Permit of Nuclear Power Plants Regulatory Requirements for Site Approval Permit of Nuclear Power Plants By Prof. Dr. Abdel-Hamid Nada Chairman of Radiation Control Division NRRA-EGYPT National Center for Nuclear Safety and Radiation

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

Infrastructure Development and Environment

Infrastructure Development and Environment Infrastructure Development and Environment Few Stories Lift irrigation from Chambal River No Development Zone around Numaligarh Refinery NH - 31 C passing through Jaldapara, Mahananda and Buxa Nh-72 cutting

More information

PROPOSED TERMS OF REFERENCE FOR THE FOR EIA STUDIES

PROPOSED TERMS OF REFERENCE FOR THE FOR EIA STUDIES Project Category Project Proponent Location Expansion of Lucknow Airport in Respect of Construction of New Integrated Terminal Building at Amausi, Lucknow, Uttar Pradesh. A [7 (a): Development of an Airport]

More information

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29) 1 By: Speed-Post State Level Expert Appraisal Committee (Formed as per S.O. no. 1533 dated 14 th Sept 2006 of Government of India, Ministry of Environment & Forests) PARYAWARAN PARISAR, E-5, ARERA COLONY,

More information

PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD

PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD Presentation By N.K.Srivastava General Manager (Engg. Services & R&M) 20.04.2012 PROJECT DEVELOPMENT AT NTPC PROJECT IS DEVELOPED

More information

TERMS OF REFERENCE. Submitted to Ministry of Environment & Forests New Delhi. August 2014

TERMS OF REFERENCE. Submitted to Ministry of Environment & Forests New Delhi. August 2014 2014 TERMS OF REFERENCE PROPOSED EXPANSION OF PESTICIDE TECHNICAL PROJECT AT SP-9(D-1), RIICO INDUSTRIAL AREA VILLAGE: KHUSHKHERA, DISTRICT-ALWAR (RAJASTHAN) Submitted to Ministry of Environment & Forests

More information

PROPOSED TERMS OF REFERENCE FOR PHASE II EXPANSION OF DHAMRAPORT BHADRAK DISTRICT, ODISHA

PROPOSED TERMS OF REFERENCE FOR PHASE II EXPANSION OF DHAMRAPORT BHADRAK DISTRICT, ODISHA PROPOSED TERMS OF REFERENCE FOR PHASE II EXPANSION OF DHAMRAPORT BHADRAK DISTRICT, ODISHA TABLE OF CONTENTS i. Introduction 1 ii. Details of cargo proposed 2 iii. EIA Methodology 3 iv. Baseline Environmental

More information

EIA Study for Development of Industrial Model Township (IMT) at Faridabad

EIA Study for Development of Industrial Model Township (IMT) at Faridabad EIA Study for Development of Industrial Model Township (IMT) at Faridabad (FINAL REPORT) Project Proponent Haryana State Industrial & Infrastructure Development Corporation Limited (HSIIDC) C 13-14, Corporate

More information

BHUSHAN STEEL LIMITED

BHUSHAN STEEL LIMITED for the period October 2017 to March 2018 Environment Clearances of Jagannath Mine Void Letter no.: Z-11013/43/2011-I-A.II (M) dated 05 th Sept 2013 Letter no.: Z-11013/43/2011-I-A.II (M) dated 08 th April