1 National Marine Fisheries Service ESA/MSA Restoration Project Consultations Ken Phippen Jeff Young Oregon State Habitat Office Oregon Coast Branch Roseburg, Oregon

2 NMFS Consultation Authorities Endangered Species Act (ESA) ESA-listed species Critical Habitat Magnuson-Stevens Fishery Conservation and Management Act (MSA) essential fish habitat (EFH)

3 Why consult with NMFS on habitat restoration actions? Restoration actions directly or indirectly affect ESA listed species. At a minimum, you will have beneficial effects. You may hear the term take when discussing actions with an action agency or NMFS. Take = harm, harass, injure, or kill ESA-listed species Without a consultation authorizing take, the Federal or non-federal action is in violation of Sec 9-ESA Sec 9 not to be confused with Sec 7 and the need for a Federal nexus (funding, permit, decision), Sec 9 applies to any U.S. citizen.

4 Take in ESA Terms Section 9 of the ESA prohibits take without an exemption. Consultation with NMFS provides take coverage and authorizes take for Federal and non-federal actions that result in take. Consultation provides a benefit by allowing the adverse effect and allowing the action to go forward.

5 Types of Take Coverage Section 7: Federal action agencies Section 10: Habitat Conservation Plan (HCP)- non-federal action Section 4(d) Limits: Non-Federal action programs

6 Determining if Sec. 7 Consultation Needed Proposed Action Federal nexus Federal Action Agency Effects Determination No Effect May Affect, Not Likely to Adversely Affect May Affect, Likely to Adversely Affect No Consultation Letter of Concurrence 30 days Biological Opinion 135 days

7 Federal nexus For a non-federal project proponent, NMFS will assist determining the Federal nexus before entering consultation. To determine Federal nexus we must ask: what Federal agency is permitting, funding, or making a decision (NEPA). Sometimes multiple Federal agencies involved funding partner and permitting agency.

8 Types of consultations There are two ways NMFS consults with Federal action agencies to provide ESA and MSA coverage: Programmatic a consultation between NMFS and a Federal action agency for categories of actions implemented on a project by project basis. Individual Consultation between NMFS and a Federal action agency that does not fall in a programmatic category or meet design criteria in programmatic biological opinion.

9 Programmatics

10 What is a programmatic consultation? A consultation between NMFS and a Federal action agency on categories of common actions that may affect ESA-listed species, critical habitat, or EFH. Programmatic consultations and categories of actions they cover have already been through NMFS reviews and approvals Significantly streamlined ESA and MSA regulatory process Significantly reduced procedural requirements and timelines

11 Why use a programmatic consultation for a restoration action? Project cost benefits Timelines for approvals and permit obtainment Last year the average time for restoration programmatic consultations was 14 days as compared to 160 days for individual consultations Greater certainty of expected conservation benefits of actions Minimize adverse effects from restoration actions to ESA-listed species, critical habitats, and EFH as much as possible.

12 How do I use a restoration programmatic consultation? Determine your Federal partners and include them in project design/planning AS SOON AS POSSIBLE to determine if your project fits or can be modified to fit under a restoration programmatic consultation Which restoration programmatic your project falls under is dictated by a myriad of elements including: Land ownership, permits required, source of funding, type of restoration action, location of action, etc.

13 What restoration programmatic consultations are available? Name Action Agency Action Area Restoration Categories Aquatic Restoration Biological Opinion (ARBO) CY2007 to CY2012 (Revision in process) USFS BLM BIA Streams, riparian areas, on USFS, BLM, and Coquille lands, or private lands (Wyden lands) where ESA species are present Riparian management, Improve stream complexity, Road treatments, Legacy structure removal, Aquatic restoration surveys Habitat Improvement Program CY2007 to CY2012 (Revision in process) BPA 59 Sub-basins in the Lower Columbia /Willamette and Interior Columbia Basin Recovery Domains Habitat protection actions, In-stream habitat actions, Projects to mitigate ag impacts, Road Actions, Native plant actions NOAA Restoration Ctr. Restoration Programmatic (PNW) (NOAARC) CY2009 CY2014 NOAA Fisheries Restoration Center Statewide in Oregon, Washington, and Idaho Fish passage; Invasive plant control; Improve stream complexity; Piling removal; berm, dike and levee setbacks; Water control structure removal; road erosion control

14 What restoration programmatic consultations are available? Name Action Agency Action Area Restoration Categories Partners for Fish and Wildlife Coastal and Recovery Programmatic (LAA) CY2009 CY 2014 USFWS Restoration program USFWS Oregon, excluding Klamath basin, and Washington (Pacific, Wahkiakum, Cowlitz, Skamania, Klickitat, and Benton Counties only) Riparian restoration, Stormwater mgmt, in-stream habitat restoration, upland habitat restoration, coastal and estuary restoration, road and trail improvements Revised Standard Local Operating Procedures for Endangered Species to Administer Restoration Activities Carried Out by the Department of the Army in the State of Oregon and on the North Shore of the Columbia River CY2008 CY2013 SLOPES IV Restoration USACE Oregon, SW Washington along the Columbia River. Includes all upland, riparian, and aquatic areas affected by site preparation, construction and site restoration design criteria at each site. Boulder placement; fish passage restoration; spawning gravel restoration; large wood restoration; offand side-channel habitat restoration; piling removal; set-back existing berms, dikes, and levees; streambank restoration; water control structure removal.

15 SLOPES IV Restoration Nine restoration category types Boulder placement Fish passage restoration Spawning gravel restoration Large wood restoration Off- and side-channel restoration Piling removal Set-back existing berm, dike, levee Streambank restoration Water control structure removal

16 SLOPES IV Restoration Type of Action: Actions Requiring No Approval from NMFS: Boulder Placement Spawning Gravel Restoration Large Wood Restoration Piling Removal Streambank Restoration Actions Requiring Approval from NMFS Fish Passage Restoration Off- and Side-Channel Habitat Restoration Set-back Berms, Dikes and Levees Water Control Structure Removal

17 SLOPES IV Restoration: Design Criteria General construction criteria apply to each action that involves a construction component when relevant to the proposed action Types of actions each type of restoration action has its own design criteria described in the SLOPES IV restoration programmatic biological opinion.

18 SLOPES IV Restoration: Design Criteria Criteria for actions that do not require approval by NMFS are specifically described in SLOPES IV Restoration programmatic biological opinion. For actions that require approval, close collaboration must occur between NMFS, the Corps, and other project partners to ensure project meets criteria for that action

19 SLOPES IV Restoration: Action Completion Corps requires applicants to submit an action completion report following completion of the restoration action SLOPES IV Restoration programmatic opinion describes specific requirements for this report

20 SLOPES IV Restoration: Show Stoppers What is Restoration? Different definitions among project partners often hold up project reviews Programmatic consultations returning degraded aquatic habitat to its pre-disturbance condition to reestablish the general structure, function, and dynamic but self sustaining behavior of an aquatic system.

21 SLOPES IV Restoration: Show Stoppers Not involving NMFS early enough in the process Some projects require additional review (fish passage, water control structure removal), which cannot be completed in the 30-day timeline. Concept is developed, but not sufficiently designed

22 SLOPES IV Restoration: Show Stoppers Projects that cannot answer the RiverRAT questions Large, complicated projects that exceed the scale of the programmatic consultation

23 Questions?

24 I N D I V I D U A L C O N S U L T S

25 Individual Consultations Section 7 of the ESA all Federal agencies must consider their actions and the effect that action may have on ESA listed species. Restoration actions that do not fit a category in an existing programmatic must go individually. Restoration actions that are large and complex or risky in terms of predictability, must go individual. Examples: large dam removal, large channel relocations, and baffled culverts.

26 5/10 7/10 9/10 9/11

27 Determining if Consultation Needed Proposed Action Federal nexus Federal Action Agency Effects Determination No Effect May Affect, Not Likely to Adversely Affect May Affect, Likely to Adversely Affect No Consultation Letter of Concurrence 30 days Biological Opinion 135 days

28 No Effect Action Agency makes this determination. No Effect means no effect does not matter whether short-term, long-term, or even beneficial. If a restoration project is a no effect it could not be a restoration project for ESAlisted species. Restoration for an ESA-listed species should, at the least, have a beneficial effect.

29 Informal Consultation Any action that has an effect without an adverse effect requires informal consultation. No adverse effect can occur, short-term or long-term. Includes beneficial effects.

30 Informal Consultation Any may affect action, including actions that are wholly beneficial, require consultation. All restoration projects, technically then, require consultation of some sort. No harm, injury, harassment to ESA listed species can occur. Strive to complete in 30-days from the time we have all of the information needed.

31 Formal Consultation Occurs when there is an adverse effect on ESAlisted species will hear a reference to take. Adverse effect may be direct such as handling fish during a fish salvage operation. Adverse effect may be indirect an action that will happen later in time or typically some effect on habitat. Restoration projects typically related to shortterm construction actions resulting in suspended sediment, fish salvage, contaminant risk, etc.

32 Formal Consultation Take caused by the action, both direct and indirect. Last resort for restoration projects we just can t fit into a programmatic. Significant time commitment for all involved.

33 Incidental Take Statement One product of a biological opinion is the incidental take statement (ITS). ITS authorizes take Provides the exemption to section 9 Also identifies thresholds for the take = amount and extent of take Reinitiation thresholds

34 Terms and Conditions Terms and Conditions (T&Cs) are nondiscretionary actions necessary to minimize take. Very important to pay attention to T&Cs. It s a violation of ESA if T&Cs are not followed, the take coverage is no longer valid.

35 Informal vs. Formal Snapshot Opinion must analyze and determine jeopardy and adverse modification of critical habitat. Also includes non-discretionary terms & conditions to minimize take harming, killing, injuring, harassing No take for an informal No term and conditions, but no take coverage for informal 30 days vs. 135 days

36 Questions?

37 Biological Assessment BAs are at the discretion of the action agency for many smaller projects, but there are potential downsides. Submitted information is usually more disorganized and the story isn t well told. Usually more back and forth discussions between the applicant, action agency, and NMFS due to inadequate information. Bottomline: without BA, likely to be a more difficult process and take longer.

38 Biological Assessment Components Proposed Action Baseline: Species and Habitat Information Effects of the Action Determination References Attachments

39

40

41

42 Biological Assessment Components Proposed Action -Need project s story. What Where When How

43 Biological Assessment Components Proposed Action Describe all the activities needed to implement. Construction work Work isolation Project dependent details, e.g. channel relocation specifics (sinuosity, gradient, substrate); culvert or bridge specifics; fish passage parameters Conservation measures proposed: in-water work timing; erosion and pollution control; work isolation and fish salvage; revegetation plan; etc.

44 Biological Assessment Components Proposed Action Baseline: Species and Habitat Information Effects of the Action Determination References Attachments

45 Biological Assessment Components Baseline Species Present Can start with a species list letter request to NMFS. Coordinate with ODFW. Watershed analysis. Key life history information You need to know when listed species are in the project area. Be aware of the in-water work window.

46 Biological Assessment Components Baseline Conditions Describe the immediate area of the project in terms of Water quality (is it water quality limited-deq listed) Fish habitat pool/riffle, large wood, any fish habitat surveys, etc. Fish presence ESA listed, EFH, streamnet data, fish survey results, etc. Critical habitat designated for an ESA listed species.

47 Biological Assessment Components Proposed Action Baseline: Species and Habitat Information Effects of the Action Determination References Attachments

48 Biological Assessment Components Effects Analysis Direct and Indirect Effects Organize by project activities E.g. channel construction, channel isolation, fish salvage, revegetation, fish passage (culvert specifics: size, channel size, gradient) Typically project activities affect: water quality, direct physical impact on fish, habitat changes, fish passage, spawning habitat, forage

49 Biological Assessment Components Proposed Action Baseline: Species and Habitat Information Effects of the Action Determination References Attachments

50 Biological Assessment Components ESA Determination No Effect May Affect, Not Likely to Adversely Affect May Affect, Likely to Adversely Affect

51 Biological Assessment Components Proposed Action Baseline: Species and Habitat Information Effects of the Action Determination References Attachments

52 Regulations provide six informational requirements that must be met to initiate a formal consultation. 1. DX of the action 2. DX of the specific area affected 3. DX of the listed species and CH affected 4. DX of the manner of effects on listed species and CH, including cumulative effects 5. Relevant reports including the BA 6. Other available relevant information Typically NMFS receives most of this information in a BA, but just as often the BA generates questions about projects that must be answered before NMFS can initiate.

53 O L D G O L D R A Y D A M Questions? S P R I N G

Agency Organization Organization Address Information. Name United States Department of Agriculture

Agency Organization Organization Address Information. Name United States Department of Agriculture Logo Department Name United States Department of Agriculture Agency Organization Organization Address Information Forest Service Pacific Northwest Region 1220 SW Third Avenue (97204) P.O. Box 3623 Portland,

More information

Biological Opinion. Morse Brothers Habitat Restoration Project. Endangered Species Act - Section 7 Consultation

Biological Opinion. Morse Brothers Habitat Restoration Project. Endangered Species Act - Section 7 Consultation Endangered Species Act - Section 7 Consultation Biological Opinion Morse Brothers Habitat Restoration Project Agency: Army Corps of Engineers, Portland District Consultation Conducted By: National Marine

More information

Projects must fall under one of the nine categories listed in Table 1.

Projects must fall under one of the nine categories listed in Table 1. UNITED STATES DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration NATIONAL MARINE FISHERIES SERVICE West Coast Region Snake Basin Office 800 Park Boulevard, Plaza IV, Suite 220 Boise,

More information

Portland District Regulatory Branch Permit Streamlining for Restoration Projects

Portland District Regulatory Branch Permit Streamlining for Restoration Projects Portland District Regulatory Branch Permit Streamlining for Restoration Projects Shawn Zinszer December 7, 2011 Carol Franson December 6, 2011 Regulatory Branch Portland District US Army Corps of Engineers

More information

Endangered Species Act. Section 7 Programmatic

Endangered Species Act. Section 7 Programmatic Endangered Species Act Section 7 Programmatic Endangered Species Act Purpose to provide a means to conserve ecosystems upon which endangered and threatened species depend Endangered Species Act Section

More information

9. Endangered Species Act and Marine Mammal Protection Act

9. Endangered Species Act and Marine Mammal Protection Act 9. Endangered Species Act and Marine Mammal Protection Act 9.1. Introduction 9.2. Identification of Protected Species and/or Habitat 9.3. Determinations of Effect under ESA 9.4. ESA Section 7 Consultation

More information

Oregon Department of State Lands. Protecting Natural and Fiscal Resources to Support Schools

Oregon Department of State Lands. Protecting Natural and Fiscal Resources to Support Schools Oregon Department of State Lands Protecting Natural and Fiscal Resources to Support Schools Heidi Hartman Jefferson, Hood River, Sherman, Wasco, Morrow, Gilliam, Union, Baker, Grant, Wallowa, Umatilla,

More information

Endangered Species Act

Endangered Species Act Endangered Species Act Name: Chris Allen Title: Project Manager Phone: 415-503-6774 e-mail: christopher.allen@usace.army.mil US Army San Francisco District As of 24-Nov-14 1 Introduction Endangered Species

More information

ESA INFORMATION GUIDELINES FOR THE REGULATORY PROGRAM

ESA INFORMATION GUIDELINES FOR THE REGULATORY PROGRAM ESA INFORMATION GUIDELINES FOR THE REGULATORY PROGRAM U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG March 2018 Section 7(a)(2) of the Endangered Species Act (ESA) requires Federal agencies, in consultation

More information

Decision Notice and Finding of No Significant Impact

Decision Notice and Finding of No Significant Impact Decision Notice and Finding of No Significant Impact Indigo and Middle Fork Willamette Enhancement Project USDA Forest Service Middle Fork Ranger District Willamette National Forest Lane County, Oregon

More information

Endangered Species Act: Federal Nexus and Consultations on Floodplain Mapping. Skagit River flood1995, Allen Kam, NOAA

Endangered Species Act: Federal Nexus and Consultations on Floodplain Mapping. Skagit River flood1995, Allen Kam, NOAA Endangered Species Act: Federal Nexus and Consultations on Floodplain Mapping Skagit River flood1995, Allen Kam, NOAA Presentation Overview Endangered Species Act; Purpose and Requirements for Consultation

More information

Regulatory Program Workshop 26 September 2013

Regulatory Program Workshop 26 September 2013 Regulatory Program Workshop 26 September 2013 Krystel Bell Senior Project Manager US Army Corps of Engineers, Sacrament District US Army Corps of Engineers Standard Permit Review Regulatory Authority Permit

More information

PUBLIC NOTICE US Army Corps of Engineers, Honolulu District

PUBLIC NOTICE US Army Corps of Engineers, Honolulu District PUBLIC NOTICE US Army Corps of Engineers, Honolulu District Regulatory Office (CEPOH-RO) Public Notice Date: March 16, 218 Building 23 Expiration Date: March 3, 218 Fort Shafter, Hawaii 9688-44 Permit

More information

Nationwide Permit 34 - Cranberry Production Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

Nationwide Permit 34 - Cranberry Production Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 34 - Cranberry Production Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 34 - Cranberry Production Activities.

More information

Public Notice. Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018

Public Notice. Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018 Public Notice Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018 Seattle, WA 98124-3755 Reference: PMP-18-15 ATTN: John Pell (OD-TS-NS) or Joanne Gardiner (PMP-E) US

More information

DECISION DOCUMENT NATIONWIDE PERMIT 27

DECISION DOCUMENT NATIONWIDE PERMIT 27 DECISION DOCUMENT NATIONWIDE PERMIT 27 This document discusses the factors considered by the Corps of Engineers (Corps) during the issuance process for this Nationwide Permit (NWP). This document contains:

More information

Nationwide Permit General Conditions

Nationwide Permit General Conditions Nationwide Permit General Conditions Note: To qualify for NWP authorization, the prospective permittee must comply with the following general conditions, as applicable, in addition to any regional or case-specific

More information

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT APPLICATION FOR PERMIT Goat Canyon Sedimentation and Basin Maintenance Dredging Project Public Notice/Application No.: SPL-2005-02068-RRS

More information

Cascades Resource Area Soil Rehabilitation

Cascades Resource Area Soil Rehabilitation Cascades Resource Area Soil Rehabilitation DECISION RECORD March 2007 United States Department of the Interior Bureau of Land Management Oregon State Office Salem District Cascades Resource Area Environmental

More information

APPLICANT: Decatur Head Beach Association 1327 Decatur Head Drive Decatur Island Anacortes, WA Telephone: (425)

APPLICANT: Decatur Head Beach Association 1327 Decatur Head Drive Decatur Island Anacortes, WA Telephone: (425) US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

Nationwide Permit General Conditions

Nationwide Permit General Conditions Nationwide Permit General Conditions 1. Navigation 2. Aquatic Life Movements 3. Spawning Areas 4. Migratory Bird Breeding Areas 5. Shellfish Beds 6. Suitable Material 7. Water Supply Intakes 8. Adverse

More information

PUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE

PUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE DEPARTMENT OF THE ARMY MOBILE DISTRICT, CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 REPLY TO ATTENTION OF: JOINT PUBLIC NOTICE U. S. ARMY CORPS OF ENGINEERS, MOBILE DISTRICT AND FLORIDA

More information

Matt Ihnken U.S. Fish & Wildlife Service Michigan Ecological Services Field Office

Matt Ihnken U.S. Fish & Wildlife Service Michigan Ecological Services Field Office Joel Trick, USFWS Matt Ihnken U.S. Fish & Wildlife Service Michigan Ecological Services Field Office photo courtesy of James Harding, MSU photo by Dick Dickinson Main Programs Ecological Services Endangered

More information

Key Facts about the SPGP

Key Facts about the SPGP Key Facts about the SPGP Division of State Lands Ann Hanus-Director State Land Board Ted Kulongoski-Governor Bill Bradbury-Secretary of State Randall Edwards-State Treasurer Department of State Lands The

More information

Nationwide Permit Summary

Nationwide Permit Summary Nationwide Permit Summary Albuquerque District NATIONWIDE PERMIT 15 U.S. Coast Guard Approved Bridges Effective Date: March 19, 2017 Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860, para.

More information

Joint Public Notice. PURPOSE: To restore navigation depths for vessels using the facility. DREDGED MATERIAL MANAGEMENT PROGRAM (DMMP):

Joint Public Notice. PURPOSE: To restore navigation depths for vessels using the facility. DREDGED MATERIAL MANAGEMENT PROGRAM (DMMP): US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 2, 2018

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 2, 2018 THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2015-1060-24 February 2, 2018 Application

More information

NATIONWIDE PERMIT 33 Temporary Construction, Access, and Dewatering Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 33 Temporary Construction, Access, and Dewatering Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 33 Temporary Construction, Access, and Dewatering Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 33. Temporary Construction, Access, and Dewatering. Temporary structures,

More information

NATIONWIDE PERMIT 33 Temporary Construction, Access, and Dewatering Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 33 Temporary Construction, Access, and Dewatering Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 33 Temporary Construction, Access, and Dewatering Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 33. Temporary Construction, Access, and Dewatering. Temporary structures,

More information

A. Nationwide Permit General Conditions

A. Nationwide Permit General Conditions Nationwide Permit 30 - Moist Soil Management for Wildlife Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 30 - Moist Soil Management for

More information

Nationwide Permit General Conditions

Nationwide Permit General Conditions Nationwide Permit General Conditions 1. Navigation 2. Aquatic Life Movements 3. Spawning Areas 4. Migratory Bird Breeding Areas 5. Shellfish Beds 6. Suitable Material 7. Water Supply Intakes 8. Adverse

More information

Nationwide Permit General Conditions

Nationwide Permit General Conditions Nationwide Permit General Conditions 1. Navigation 2. Aquatic Life Movements 3. Spawning Areas 4. Migratory Bird Breeding Areas 5. Shellfish Beds 6. Suitable Material 7. Water Supply Intakes 8. Adverse

More information

Public Notice: Application for Permit

Public Notice: Application for Permit US Army Corps Of Engineers Walla Walla District 201 North Third Avenue Walla Walla, WA 99362-1876 Public Notice: Application for Permit APPLICATION NO.: NWW-2012-127-I02 WATERWAY: Big Wood River APPLICANT:

More information

Nationwide Permit 40 - Agricultural Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

Nationwide Permit 40 - Agricultural Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 40 - Agricultural Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 40 - Agricultural Activities. Discharges

More information

NATIONWIDE PERMIT 24 Indian Tribe or State Administered Section 404 Programs Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 24 Indian Tribe or State Administered Section 404 Programs Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 24 Indian Tribe or State Administered Section 404 Programs Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 24. Indian Tribe or State Administered Section 404 Programs. Any

More information

Note 1: As of the date of the promulgation of this NWP, only New Jersey and Michigan administer their own Section 404 permit programs.

Note 1: As of the date of the promulgation of this NWP, only New Jersey and Michigan administer their own Section 404 permit programs. Nationwide Permit 24 - Indian Tribe or State Administered Section 404 Programs Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 24 - Indian

More information

LEGAL AUTHORITY AND JURISDICTIONS

LEGAL AUTHORITY AND JURISDICTIONS CALIFORNIA DEPARTMENT OF FISH AND GAME RIPARIAN RESOURCES AND REGULATORS: The DFG Lake and Streambed Alteration 1600 Process LEGAL AUTHORITY AND JURISDICTIONS Serge Glushkoff CENTRAL COAST REGION YOUNTVILLE

More information

NATIONWIDE PERMIT 18 Minor Discharges Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 18 Minor Discharges Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 18 Minor Discharges Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 18. Minor Discharges. Minor discharges of dredged or fill material into all waters of the United States,

More information

Nationwide Permit 44 - Mining Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

Nationwide Permit 44 - Mining Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 44 - Mining Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 44 - Mining Activities. Discharges of dredged or

More information

NATIONWIDE PERMIT 10 Mooring Buoys Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 10 Mooring Buoys Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 10 Mooring Buoys Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 10. Mooring Buoys. Non-commercial, single-boat, mooring buoys. (Authority: Section 10) Nationwide Permit General

More information

NATIONWIDE PERMIT 10 Mooring Buoys Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 10 Mooring Buoys Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 10 Mooring Buoys Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 10. Mooring Buoys. Non-commercial, single-boat, mooring buoys. (Authority: Section 10) Nationwide Permit General

More information

LAWSUIT TO PROTECT SALMON FROM PESTICIDES UNDER THE ENDANGERED SPECIES ACT

LAWSUIT TO PROTECT SALMON FROM PESTICIDES UNDER THE ENDANGERED SPECIES ACT LAWSUIT TO PROTECT SALMON FROM PESTICIDES UNDER THE ENDANGERED SPECIES ACT Background Information on Pesticides and Salmon Pesticides have profound effects on Northwest salmon and may be a serious factor

More information

NATIONWIDE PERMIT 7 Outfall Structures and Associated Intake Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 7 Outfall Structures and Associated Intake Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 7 Outfall Structures and Associated Intake Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 7. Outfall Structures and Associated Intake Structures. Activities related

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District ANCHORAGE Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898 Public Notice of Application for Permit PUBLIC NOTICE DATE: July 31,

More information

Nationwide Permit 2 - Structures in Artificial Canals Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

Nationwide Permit 2 - Structures in Artificial Canals Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 2 - Structures in Artificial Canals Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 2 - Structures in Artificial Canals.

More information

NATIONWIDE PERMIT 38 Cleanup of Hazardous and Toxic Waste Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 38 Cleanup of Hazardous and Toxic Waste Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 38 Cleanup of Hazardous and Toxic Waste Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 38. Cleanup of Hazardous and Toxic Waste. Specific activities required to effect the

More information

12504-SPD REGULATORY PROGRAM ESSENTIAL FISH HABITAT (EFH) PROCEDURES

12504-SPD REGULATORY PROGRAM ESSENTIAL FISH HABITAT (EFH) PROCEDURES 12504-SPD REGULATORY PROGRAM ESSENTIAL FISH HABITAT (EFH) PROCEDURES South Pacific Division Table of Contents 1.0 Purpose 2.0 Applicability 3.0 References 4.0 Related Procedures 5.0 Definitions 6.0 Responsibilities

More information

Endangered Species Act Section 7 Consultation Process Southeast Regional Office

Endangered Species Act Section 7 Consultation Process Southeast Regional Office Endangered Species Act Section 7 Consultation Process Kay Davy Fisheries Biologist NMFS Region Purpose of Endangered Species Act of 1973 to conserve endangered and threatened species and the ecosystems

More information

verification will be provided to the Department of Defense Siting Clearinghouse, which will evaluate potential effects on military activities.

verification will be provided to the Department of Defense Siting Clearinghouse, which will evaluate potential effects on military activities. NATIONWIDE PERMIT 51 DEPARTMENT OF THE ARMY CORPS OF ENGINEERS FINAL NOTICE OF ISSUANCE AND MODIFICATION OF NATIONWIDE PERMITS FEDERAL REGISTER AUTHORIZED MARCH 19, 2017 Land-Based Renewable Energy Generation

More information

NATIONWIDE PERMIT 11 Temporary Recreational Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 11 Temporary Recreational Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 11 Temporary Recreational Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 11. Temporary Recreational Structures. Temporary buoys, markers, small floating docks,

More information

NATIONWIDE PERMIT 11 Temporary Recreational Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 11 Temporary Recreational Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 11 Temporary Recreational Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 11. Temporary Recreational Structures. Temporary buoys, markers, small floating docks,

More information

NATIONWIDE PERMIT 11 Temporary Recreational Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 11 Temporary Recreational Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 11 Temporary Recreational Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 11. Temporary Recreational Structures. Temporary buoys, markers, small floating docks,

More information

Funding Guidelines State Fiscal Year 2016

Funding Guidelines State Fiscal Year 2016 State Fiscal Year 2016 Water Quality Financial Assistance Centennial Clean Water Program Clean Water Act Section 319 Program Stormwater Financial Assistance Program Washington State Water Pollution Control

More information

A. Nationwide Permit General Conditions

A. Nationwide Permit General Conditions Nationwide Permit 11 - Temporary Recreational Structures Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 11 - Temporary Recreational Structures.

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit Issue Date: March 4, 2016 Expiration Date: April 4, 2016 US Army Corps of Engineers No: NWP-2015-432 30-Day Notice Oregon Department of State Lands No: 58511 Interested

More information

WA Department of Ecology SEA Program Post Office Box Olympia, WA Telephone: (360) ATTN: Federal Permit Coordinator

WA Department of Ecology SEA Program Post Office Box Olympia, WA Telephone: (360) ATTN: Federal Permit Coordinator US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

Nationwide Permit 19 - Minor Dredging Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

Nationwide Permit 19 - Minor Dredging Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 19 - Minor Dredging Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 19 - Minor Dredging. Dredging of no more than 25 cubic

More information

Nationwide Permit 8 - Oil and Gas Structures on the Outer Continental Shelf

Nationwide Permit 8 - Oil and Gas Structures on the Outer Continental Shelf Nationwide Permit 8 - Oil and Gas Structures on the Outer Continental Shelf Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 8 - Oil and

More information

NATIONWIDE PERMIT 31 Maintenance of Existing Flood Control Facilities Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 31 Maintenance of Existing Flood Control Facilities Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 31 Maintenance of Existing Flood Control Facilities Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 31. Maintenance of Existing Flood Control Facilities. Discharges of dredged

More information

NATIONWIDE PERMIT 52 Water-Based Renewable Energy Generation Pilot Projects Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 52 Water-Based Renewable Energy Generation Pilot Projects Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 52 Water-Based Renewable Energy Generation Pilot Projects Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 52. Water-Based Renewable Energy Generation Pilot Projects. Structures

More information

General Construction

General Construction General Construction Terms and Conditions: 1. Flagging sensitive areas. The action area will be flagged to identify sensitive resource areas, such as the extent of herbicide buffers, areas below ordinary

More information

Lower Columbia River Pile Dike Assessment

Lower Columbia River Pile Dike Assessment Lower Columbia River Pile Dike Assessment David Gorman, PE August 2, 2011 Credits Hans R. Moritz, US Army Corps of Engineers Portland District Carl Kassebaum, AECOM Project Manager AECOM Coastal and Rivers

More information

ACTIVITIES AUTHORIZED BY 2017 NATIONWIDE PERMIT WITHIN THE STATE OF NEW YORK Expiration March 18, 2022

ACTIVITIES AUTHORIZED BY 2017 NATIONWIDE PERMIT WITHIN THE STATE OF NEW YORK Expiration March 18, 2022 ACTIVITIES AUTHORIZED BY 2017 NATIONWIDE PERMIT WITHIN THE STATE OF NEW YORK Expiration March 18, 2022 B. Nationwide Permits 36. Boat Ramps. Activities required for the construction of boat ramps, provided

More information

Public Notice. CENAB-OPR-P P24 (Lime Spring Run)

Public Notice. CENAB-OPR-P P24 (Lime Spring Run) U.S. Army Corps of Engineers Baltimore District Public Notice In Reply to Application Number CENAB-OPR-P-2016-00168-P24 (Lime Spring Run) PN-17-16 Comment Period: April 3, 2017 to May 3, 2017 THE PURPOSE

More information

NATIONWIDE PERMITS FOR THE STATE OF OHIO

NATIONWIDE PERMITS FOR THE STATE OF OHIO NATIONWIDE PERMITS FOR THE STATE OF OHIO U.S. ARMY CORPS OF ENGINEERS (CORPS) REGULATORY PROGRAM REISSUANCE AND ISSUANCE OF NATIONWIDE PERMITS WITH OHIO EPA 401 WATER QUALITY CERTIFICATION AND OHIO DEPARTMENT

More information

SHORELINE INVENTORY AND RESTORATION PLANNING

SHORELINE INVENTORY AND RESTORATION PLANNING CHAPTER 3 SHORELINE INVENTORY AND RESTORATION PLANNING A. PURPOSE OF THE SHORELINE INVENTORY AND CHARACTERIZATION A first step in the comprehensive Master Program update process is development of a shoreline

More information

NATIONWIDE PERMIT 39 Commercial and Institutional Developments Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 39 Commercial and Institutional Developments Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 39 Commercial and Institutional Developments Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 39. Commercial and Institutional Developments. Discharges of dredged or fill material

More information

NATIONWIDE PERMIT 39 Commercial and Institutional Developments Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 39 Commercial and Institutional Developments Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 39 Commercial and Institutional Developments Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 39. Commercial and Institutional Developments. Discharges of dredged or fill material

More information

P.O. Box 3623 P.O. Box 2965 Portland, Oregon Portland, Oregon 97208

P.O. Box 3623 P.O. Box 2965 Portland, Oregon Portland, Oregon 97208 UNITED STATES DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration NATIONAL MARINE FISHERIES SERVICE Northwest Region 7600 Sand Point Way N.E., Bldg. 1 Seattle, WA 98115 Refer to NMFS

More information

EFFECTIVE DATE: This permit becomes effective when the Federal official, designated to act for the Secretary of the Army, has signed below.

EFFECTIVE DATE: This permit becomes effective when the Federal official, designated to act for the Secretary of the Army, has signed below. DEPARTMENT OF THE ARMY PERMIT REGIONAL GENERAL PERMIT FOR U.S. Forest Service and Bureau of Land Management Aquatic Habitat Restoration Within the State of Oregon (RGP-4) PERMIT NO. NWP-2007-999/1 EFFECTIVE

More information

Environmental Conditions Baseline Report

Environmental Conditions Baseline Report Port of Portland Rail Plan Environmental Conditions Baseline Report August, 2011 Prepared for: Port of Portland 7200 NE Airport Way Portland, OR 97218 Prepared by: HDR Engineering 1001 SW 5 th Avenue Suite

More information

MUCKLESHOOT INDIAN TRIBE Fisheries Division nd Avenue SE Auburn, Washington

MUCKLESHOOT INDIAN TRIBE Fisheries Division nd Avenue SE Auburn, Washington MUCKLESHOOT INDIAN TRIBE Fisheries Division 39015-172 nd Avenue SE Auburn, Washington 98092-9763 Phone: (253) 939-3311 Fax: (253) 931-0752 Scott Sissons Pierce County Planning and Land Services 2401 South

More information

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 17, 2014 Comment Deadline: July 17, 2014 Corps Action ID#: SAW-2009-00655 NC DOT TIP: R-4903 The Wilmington District, Corps

More information

Chapter 5 Regulatory Coordination and Compliance

Chapter 5 Regulatory Coordination and Compliance Chapter 5 Regulatory Coordination and Compliance This chapter provides an update on the federal, state, and local laws and regulations that required the City to coordinate with regulatory agencies to obtain

More information

Nationwide Permit 29 - Residential Developments Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

Nationwide Permit 29 - Residential Developments Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 29 - Residential Developments Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 29 - Residential Developments. Discharges

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA 95814-2922 Operations and Readiness Branch PUBLIC NOTICE CATEGORICAL PERMISSION FOR SECTION 408 REQUESTS

More information

NATIONWIDE PERMIT 15

NATIONWIDE PERMIT 15 NATIONWIDE PERMIT 15 U.S. COAST GUARD APPROVED BRIDGES: Discharges of dredged or fill material incidental to the construction of a bridge across navigable waters of the United States, including cofferdams,

More information

Joint Public Notice. LOCATION: In Salmon Bay, Lake Washington Ship Canal, at Seattle, Washington.

Joint Public Notice. LOCATION: In Salmon Bay, Lake Washington Ship Canal, at Seattle, Washington. US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

NATIONWIDE PERMIT 3 Maintenance Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 3 Maintenance Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 3 Maintenance Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 3. Maintenance. (a) The repair, rehabilitation, or replacement of any previously authorized, currently serviceable

More information

Navigating the U.S. Army Corps of Engineers Regulatory Process

Navigating the U.S. Army Corps of Engineers Regulatory Process Navigating the U.S. Army Corps of Engineers Regulatory Process Angela Ryan Biologist Tampa Permits Section May 16, 2012 US Army Corps of Engineers JACKSONVILLE DISTRICT Regulatory Mission To protect the

More information

Decision Notice/Finding of No Significant Impact 1

Decision Notice/Finding of No Significant Impact 1 DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT BULL RUN CULVERT REPLACEMENTS U.S. FOREST SERVICE WHITMAN RANGER DISTRICT, WALLOWA-WHITMAN NATIONAL FOREST GRANT COUNTY, OREGON TOWNSHIP 9 SOUTH, RANGE

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 20, 2018

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 20, 2018 THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2007-1091-39 September 20, 2018 Application

More information

Habitat Improvement Program III funded by the Bonneville Power Administration in the Columbia River Basin in Oregon, Washington, and Idaho

Habitat Improvement Program III funded by the Bonneville Power Administration in the Columbia River Basin in Oregon, Washington, and Idaho Endangered Species Act Section 7 Formal Programmatic Opinion, Letter of Concurrence and Magnuson-Stevens Fishery Conservation and Management Act Essential Fish Habitat Conservation Recommendations Habitat

More information

Nationwide Permit 22 - Removal of Vessels Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

Nationwide Permit 22 - Removal of Vessels Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 22 - Removal of Vessels Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit 22 - Removal of Vessels. Temporary structures

More information

NATIONWIDE PERMIT 13 Bank Stabilization Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 13 Bank Stabilization Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) NATIONWIDE PERMIT 13 Bank Stabilization Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 13. Bank Stabilization. Bank stabilization activities necessary for erosion control or prevention, such

More information

SAN FRANCISCO DISTRICT PUBLIC NOTICE PROJECT: City of Eureka Maintenance Dredging

SAN FRANCISCO DISTRICT PUBLIC NOTICE PROJECT: City of Eureka Maintenance Dredging SAN FRANCISCO DISTRICT PUBLIC NOTICE PROJECT: City of Eureka Maintenance Dredging Regulatory Division 1455 Market Street, 16 th Floor San Francisco, CA 94103-1398 PUBLIC NOTICE NUMBER: 1996-222150 PUBLIC

More information

Carmel River Reroute & San Clemente Dam Removal Project (PLN110373) Monterey County Planning Commission Workshop July 25, 2012

Carmel River Reroute & San Clemente Dam Removal Project (PLN110373) Monterey County Planning Commission Workshop July 25, 2012 Carmel River Reroute & San Clemente Dam Removal Project (PLN110373) Monterey County Planning Commission Workshop July 25, 2012 URS1 Workshop Agenda 1. Background 2. Project Overview 3. Tree Removals/Mitigation

More information

Nationwide Permit 4 - Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities

Nationwide Permit 4 - Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities Nationwide Permit 4 - Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide

More information

ACTIVITIES AUTHORIZED BY 2017 NATIONWIDE PERMIT WITHIN THE STATE OF NEW YORK Expiration March 18, 2022

ACTIVITIES AUTHORIZED BY 2017 NATIONWIDE PERMIT WITHIN THE STATE OF NEW YORK Expiration March 18, 2022 ACTIVITIES AUTHORIZED BY 2017 NATIONWIDE PERMIT WITHIN THE STATE OF NEW YORK Expiration March 18, 2022 B. Nationwide Permits 27. Aquatic Habitat Restoration, Enhancement, and Establishment Activities.

More information

SAN FRANCISCO DISTRICT PUBLIC NOTICE. PROJECT: Eureka Forest Products Dock Maintenance Dredging

SAN FRANCISCO DISTRICT PUBLIC NOTICE. PROJECT: Eureka Forest Products Dock Maintenance Dredging SAN FRANCISCO DISTRICT PUBLIC NOTICE PROJECT: Eureka Forest Products Dock Maintenance Dredging Regulatory Division 1455 Market Street, 16 th Floor San Francisco, CA 94103-1398 PUBLIC NOTICE NUMBER: 2005-295360

More information

Nationwide Permit 27 - Aquatic Habitat Restoration, Enhancement, and Establishment Activities

Nationwide Permit 27 - Aquatic Habitat Restoration, Enhancement, and Establishment Activities Nationwide Permit 27 - Aquatic Habitat Restoration, Enhancement, and Establishment Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860) Nationwide Permit

More information

Public Notice. Public Notice No. Date: April 8, 2016 CENAP-PL-E Comment Period Closes: May 9, 2016

Public Notice. Public Notice No. Date: April 8, 2016 CENAP-PL-E Comment Period Closes: May 9, 2016 Public Notice Public Notice No. Date: April 8, 2016 CENAP-PL-E-16-02 Comment Period Closes: May 9, 2016 USACE Philadelphia District: http://www.nap.usace.army.mil COBBS CREEK FISH PASSAGE PROJECT SECTION

More information

NATIONWIDE PERMIT 27 Aquatic Habitat Restoration, Enhancement, and Establishment Activities

NATIONWIDE PERMIT 27 Aquatic Habitat Restoration, Enhancement, and Establishment Activities NATIONWIDE PERMIT 27 Aquatic Habitat Restoration, Enhancement, and Establishment Activities Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 27. Aquatic Habitat Restoration, Enhancement, and

More information

NATIONWIDE PERMIT 27 Aquatic Habitat Restoration, Enhancement, and Establishment Activities

NATIONWIDE PERMIT 27 Aquatic Habitat Restoration, Enhancement, and Establishment Activities NATIONWIDE PERMIT 27 Aquatic Habitat Restoration, Enhancement, and Establishment Activities Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 ) 27. Aquatic Habitat Restoration, Enhancement, and

More information

ENVIRONMENTAL AUTHORIZATIONS FOR FEDERAL NAVIGATION AND PROJECTS

ENVIRONMENTAL AUTHORIZATIONS FOR FEDERAL NAVIGATION AND PROJECTS 237 217 200 80 252 COASTAL 237 217 200 119 237 217 STORM 174 200 DAMAGE 27.59 REDUCTION 255 255 255 ENVIRONMENTAL AUTHORIZATIONS FOR FEDERAL NAVIGATION AND 0 0 0 163 163 163 131 132 122 PROJECTS 239 65

More information

(a) No material is placed in excess of the minimum needed for erosion protection;

(a) No material is placed in excess of the minimum needed for erosion protection; NATIONWIDE PERMIT 13 DEPARTMENT OF THE ARMY CORPS OF ENGINEERS FINAL NOTICE OF ISSUANCE AND MODIFICATION OF NATIONWIDE PERMITS FEDERAL REGISTER AUTHORIZED MARCH 19, 2017 Bank Stabilization. Bank stabilization

More information

One Water Framework Integrating Floodplain & Stormwater Management

One Water Framework Integrating Floodplain & Stormwater Management One Water Framework Integrating Floodplain & Stormwater Management Sara O Brien May 2017 4640 SW Macadam Ave., Suite 50, Portland, OR 97239 T: 503.946.8350 F: 971.229.1968 W: www.willamettepartnership.org

More information

Resource Management Plans for Western Oregon

Resource Management Plans for Western Oregon Resource Management Plans for Western Oregon Bureau of Land Management Includes: Background, Timeline and NEPA Planning Steps, and the full text of the. The proposed action is to revise the current resource

More information

Overview of Clean Water Act Section 404 Permitting

Overview of Clean Water Act Section 404 Permitting Overview of Clean Water Act Section 404 Permitting John A. Kolanz jkolanz@nocoattorneys.com 970-663-7300 Historical Perspective 1802 -- U.S. Army Corps of Engineers Created build forts. 1824 Corps authority

More information

Humboldt Working Group. Permitting Authority Subcommittee Meeting Humboldt Bay Aquatic Center Eureka, CA

Humboldt Working Group. Permitting Authority Subcommittee Meeting Humboldt Bay Aquatic Center Eureka, CA Permitting Authority Subcommittee Meeting Humboldt Bay Aquatic Center Eureka, CA October 5, 2009 Meeting Summary Introductions Roundtable introductions were led by Anna West, Kearns & West (K&W) Facilitator

More information