SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT

Size: px
Start display at page:

Download "SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT June

2 Table of Contents Objectives... 3 Project description... 3 Environmental and Social Screening and Assessment Framework (ESSAF)... 5 General Principles... 5 Relevant World Bank Policies... 5 Safeguard Screening and Mitigation... 6 Responsibilities for Safeguard Screening, Mitigation and Clearance... 7 Disclosure... 7 ANNEXES... 9 ANNEX 1: Due Diligence Guidelines... 9 ANNEX 2: List of Ineligible Activities ANNEX 3: Chance Find Procedures: Protection of Cultural Property ANNEX 4: Community Consultation Framework

3 Objectives 1. The Environmental and Social Screening and Assessment Framework (ESSAF) details general policies, guidelines, and procedures to be integrated into the implementation of the IDA supported Post-Tsunami Recovery Project in Samoa. The project aims to support the efforts of the Government of Samoa (GOS) to address immediate post-tsunami needs and to start the reconstruction process. 2. The project has been prepared in accordance with the World Bank s OP 8.00, Rapid Responses to Crises and Emergencies, to expedite processing and provide immediate support. 3. The ESSAF has been developed to ensure compliance with the World Bank s safeguard policies and the Samoa Codes of Environmental Practice (COEP) and is applicable to all subprojects funded under the project. The objective of the ESSAF is to ensure that activities under the proposed operation will: Enhance positive and sustainable environmental and social outcomes. Mitigate potential negative impacts on the environment and communities. Support the integration of environmental and social aspects of subprojects into the decision making process. Ensure environmentally and sustainable development by supporting the protection, conservation, maintenance and rehabilitation of natural habitats and their functions. Minimize environmental degradation as a result of either individual subprojects or their cumulative effects. Protect human health. Minimize impacts on cultural property. Assist displaced people in improving or at least restoring their livelihoods and standards of living to pre-displacement levels. Project description 4. The project s development objective is to provide appropriate transport access to areas and communities affected by the tsunami of September This proposed project is a US$9.0 million IDA Emergency Recovery Credit (ERC) with additional grant co-financing of AUS$2 million from the Pacific Region Infrastructure Facility to support the transport sector post-tsunami recovery plan of the GOS. The ERC will be implemented through the Land Transport Authority (LTA) and Ministry of Natural Resources and Environment (MNRE), with overall coordination by the Ministry of Finance (MoF). 6. The project incorporates five project components: (a) Component 1. Upgrading of existing access tracks and seawalls US$5.6 million. This component will provide partial retroactive financing for urgent works by LTA to: provide 3

4 improved road access to relocation areas; construct a new link road that will provide an alternative route along the south coast above the natural disaster risk zone; and reinstate damaged seawalls to protect the east and south coast roads. (i) Lepa/Lalomanu link road US$1.1 million. This sub-component responds to the need to provide improved road access to relocation areas and for an alternative route along the south coast above the natural disaster risk zone. (ii) Upgrading of access tracks US$2.8 million. This sub-component responds to requests from village mayors to upgrade existing tracks from the east coast road to areas where residents are relocating after the tsunami. (iii) Sea wall repair and reconstruction US$1.6 million. This sub-component will restore and upgrade seawalls along critical lengths of the coastal roads. (iv) Salani Bailey Bridge repair US$0.04 million. This sub-component will repair damage caused by the tsunami. (v) Technical assistance US$0.06 million. This sub-component will finance specialist technical assistance for storm-water drainage design along all the upgraded routes. (b) Component 2. Community Coastal Infrastructure Management Plans US$0.2 million. This component will update the mapping of the affected and relocation areas, and revise the community level Coastal Infrastructure Management (CIM) Plans for these areas to assist with infrastructure planning and monitoring, and disaster risk reduction. (c) Component 3. East Coast Inland Route (Samusu-Lalomanu) US$4.6 million. This component will provide a new road link along the east coast above the natural disaster risk zone to improve access to and for communities relocating inland from the east coast, and provide a secure transport link between Samusu and Lalomanu. (i) Route alignment study, design & supervision US$0.5 million (ii) Environmental Impact Assessment US$0.1 million (iii) Compensation cost To be determined (iv) Road construction US$4.0 million (d) Component 4. Dual-purpose pedestrian access routes US$0.6 million. This component will provide new and improved pedestrian access routes to relocation areas above the south east escarpment area, both to facilitate access for resettled families between their new homes and the coast, and to serve as evacuation routes in the event of a tsunami or cyclone. (i) Feasibility study, design and supervision US$0.1 million (ii) Construction of pedestrian access routes US$0.5 million (e) Component 5. Project Management and Support US$0.3 million. This component will support contracted consultant services, and staffing plus operating costs for in-house project management, administration, and monitoring and evaluation activities by LTA and MNRE. (i) Project Management US$0.23 million. Support for in-house project management, administration, training, and monitoring activities by MoF, LTA and MNRE. (ii) Monitoring & Evaluation US$0.07 million. This sub-component will support TA to establish the project evaluation framework and conduct before-and-after analysis to evaluate the impact of the project. 4

5 Environmental and Social Screening and Assessment Framework (ESSAF) General Principles 7. The ESSAF has been prepared in recognition of the emergency nature of the relief and reconstruction operation and the related need for providing immediate assistance, while at the same time ensuring due diligence in managing potential environmental and social risks. The operation will finance a number of subprojects, the detailed designs of which will not be known prior to approval, and it will also provide retro-financing to a number of sub-projects that have already been undertaken. 8. The ESSAF is to be used by the Project Implementing Agencies to screen all sub-project activities for their likely social and environmental impacts and to develop necessary documentation. It is also to be used to guide the due diligence process for sub-projects that are being provided with retroactive financing. 9. Subprojects with the potential for significant environment and/or social impacts will be identified through the subproject screening mechanism and the, subproject-specific environmental and/or social assessment will be prepared and will be the subject of review and approval by the World Bank. 10. Project implementation will also be guided by community consultations which will be undertaken as part of a social assessment. The consultations will be aimed at: a. Eliciting input from community members and other stakeholders into the design of project components, specifically the alignment of the Samusu-Lalmanu road and the dual-purpose pedestrian access routes. b. Increasing awareness of the potential impacts of sub-projects to be undertaken under the project and the measures which will be put in place to mitigate the impacts (in particular where the implementation of subprojects may require land acquisition and/or resettlement). c. Soliciting feedback from potential project affected people on the mitigation measures. d. Identifying individuals and/or groups of individuals that may be vulnerable to project impacts. Consultations will include a broad section of community members including women, youth, and any identified vulnerable populations and will follow the process laid out in the Samoa Code of Environmental Practice (COEP 3). 11. The ESSAF will be publicly disclosed at the Project Management Unit s offices, public places in Apia, and in the World Bank s InfoShop. In addition, it will be shared widely with affected community members and other stakeholders during the consultations. Relevant World Bank Policies OP 4.01 Environmental Assessment. 12. OP 4.01 is triggered because of the anticipated impacts from civil works related to the rehabilitation and construction of access roads as well as the construction of sea walls. The impacts, however, are assessed to be localized and manageable because civil works would take place in already existing roads and, where new construction takes place, the size of the activities is limited. 5

6 13. Samoa has well-developed and modern environmental assessment and monitoring procedures for road works, coastal protection, drainage, quarry development and operations and construction of communications facilities, among others. The COEP were developed with the assistance of consultants and have been adopted by Samoa under the Bank s SIAM-2 covering: Road Planning, Design and Construction (COEP 2); Consultation (COEP 3); Construction Camps (COEP 5); Road Construction Erosion Control (COEP 6); Slope Stability (COEP 7); Quarry Development and Operations (COEP 8); Gravel Extraction (COEP 9); Coastal Protection (COEP 10); Drainage (COEP 11); Traffic Control During Construction (COEP 12); Earthworks (COEP 13). 14. OP 4.12 Involuntary Resettlement. Subprojects will be screened for applicability of the resettlement policy. In the event that people are physically or economically displaced by Bank funded sub-projects, the procedures detailed in the Land Acquisition and Resettlement Framework (LARF) will be followed. Safeguard Screening and Mitigation 15. The sub-projects under the following components will be subject to screening for social and environmental impacts and mitigation measures: a. Component 3: The Samusu-Lalomanu road (East Coast Inland Route, Component 3) b. Component 4: The dual purpose pedestrian access routes (Component 4). 16. Ineligible activities. The screening for ineligible expenses (see Annex 2) lists attributes of sub-projects which cannot be financed by the project. 17. Protection of physical and cultural resources. Sub-projects that impact archaeological, heritage, historical, traditional, and cultural sites will not be financed under this project. Should these sites be found during implementation procedures will be followed to ensure that these resources are protected. (See Annex 3) 18. Procedures for land acquisition and resettlement. Sub-projects that will result in involuntary land acquisition and/or resettlement will be avoided, however in the case that they cannot be avoided the Land Acquisition and Resettlement Framework provide guidance on procedures to be undertaken. (See Land Acquisition and Resettlement Framework) 19. Guidelines for due diligence. The sub-projects which received retroactive financing (see list below) will be reviewed by the project team to ensure that their implementation complied with the laws of Samoa. (See Annex 1) The Bank will review the due diligence report prior to releasing the financing. a. Lepa/Lalomanu link road (Component 1a) b. Upgrading of access tracks (Component 1b) c. Sea wall repair and reconstruction (Component 1c) d. Salani Bailey Bridge repair (Component 1d) 20. Samoa Codes of Environmental Practice: Annex 5 6

7 Responsibilities for Safeguard Screening, Mitigation and Clearance 21. The Ministry of Natural Resources and the Environment is a well-established entity with adequate professional staff and systems in place to manage land and environmental issues in Samoa. The MNRE and its Planning and Urban Management Agency (PUMA) have incorporated several of the elements of strengthening environmental practices introduced in Samoa under the SIAM-1 as well as the ongoing SIAM- 2 projects into their normal sector operations, building on these in several ways. In the ongoing works done so far, all major works of the MWTI/LTA have undergone a Preliminary Environment Assessment Report (PEAR) while general maintenance and small works are following the National COEP. 22. The Land Transport Authority will be charged with implementing the project. The agency will ensure that all project activities adhere to the requirements of the ESSAF, and that designated environment and social development specialists are appointed for overseeing the implementation and monitoring of the Framework. A focal person will be appointed for oversight on required environmental clearances and approval of required environment and social studies and instruments. 23. The World Bank s task team will include environmental and social specialists who will: provide necessary support during the implementation of the ESSAF, provide approval of environmental and social assessment/studies requiring Bank clearance, clear the Land Acquisition and Resettlement Action Plans. Disclosure 24. This ESSAF will be shared with concerned communities, nongovernmental organizations and development partners. It will be disclosed by the Land Transport Authority and will also be made available at the World Bank s InfoShop. Relevant subproject specific safeguard documents/mitigation plans prepared subsequently will also be disclosed. 25. Any feasibility and detailed design studies financed by this operation will also adhere to World Bank safeguard policies relating to consultation and disclosure. In addition, any Land Acquisition and Resettlement Action Plans will also adhere to World Bank safeguard policies regarding disclosure. I. Guidelines for preparation of Environmental Environmental Impact Assessment and Environmental Management Plans 14. In the preparation of designs as prescribed in the Request for Proposals for all works, an environmental assessment either in the form of a Preliminary Environmental Assessment Review or full EIA (whichever is applicable) is required and this is integrated in the design. An Environment Management Plan (EMP) is also prepared as the main documentation to be attached to the Development Consent (DC) Application from MWTI to the PUMA of MNRE. MNRE also seeks DC from the Planning and Urban Management Agency for works implemented as part of the former's Small Grants Scheme. 15. The PUMA evaluates DC applications for construction works through the consideration of findings of the required PEAR or full EIA (whichever is applicable). Safeguards requirements for this project remain the same as those originally stipulated under the existing Environment Management Plan under SIAM-2 which sets out the approaches proposed by the selected design 7

8 and supervision consultants on behalf of the MWTI, to mitigate or avoid adverse environment impacts. 16. Among other things, design and supervision tenders as well as contractors are required to clearly indicate how they will complete fulfill their respective obligations. An appropriate Development Consent (DC) is then issued by PUMA. During construction, the PUMA officers conduct at least two monitoring evaluations to ensure that the Development Consent requirements (and any conditions that have been attached) are strictly adhered to. 17. PUMA has the powers under its Act to stop the construction at any time where DC conditions are not being met by the Contractor and it has in the past invoked this provision to achieve contractor compliance. The construction supervisors are also required to follow the EMP requirements and DC conditions during the monitoring of specific project activities. For the Samoan Airport Authority, MWTI and MNREM, their compliance history in relation to these environmental requirements is highly satisfactory, with all project activities going through the Development Consent process. 18. The environmental issues that will be monitored under the project include: (a) adequate storm water and run-off disposal and management along the alignment; (b) public road safety; and (c) traffic noise and control. Construction impact includes: (a) quarrying and sand mining, material preparation and storage, equipment maintenance and disposal sites; (b) transport, soil erosion, and sedimentation control and management of impact on water quality of surface watercourses, (c) dust and noise control during construction period, (d) soil disposal and management; and (e) waste management, for both solid waste and hazardous liquid waste and used lubricants. Since most of the construction works are relatively small and the system in place for monitoring compliance is working well, there have been very few problems so far and this is expected to continue. 8

9 ANNEXES ANNEX 1: Due Diligence Guidelines 1. The Project will retroactively finance four activities: construction of a new main road Lepa/Lalomanu, upgrading of short length access tracks, sea wall repair and construction, and bridge repair (Salani Bailey Bridge). 2. In an effort to ensure that these activities were undertaken in compliance with national law a review of the implementation of these sub-projects, specifically vis-à-vis land use, social impacts, and environmental impacts will be carried out. This due diligence will determine whether or not land use occurred within the confines of the Samoan law and if not what measures need to be taken to ensure compliance. 3. In regards to this, a due diligence report will be prepared by the Project team. The due diligence report will include: (i) Summaries of the relevant legislation. (ii) Summaries of the sub-projects location, scope, and previous use (including previous land use, occupants, etc.). (iii) A description of the sub-projects on the environment, on land use (i.e. temporary land use, permanent land acquisition), and on communities. (iv) A description of the scope and magnitude of adverse impacts. This will include information on previous occupants (legal and illegal, owners and lessees, temporary and permanent), the number of people and businesses displaced, the impact of displacement on livelihoods, the scope of destruction of assets. (v) Details on compensation and assistance arrangements and the extent to which this fulfilled national law. Dimensions to be explored here include the amount of compensation, the types of assistance offered to affected people, and the timing and fulfillment of compensation and assistance payment. (vi) Details on the consultations that were conducted with project affected people as part of the land acquisition process. 4. As part of due diligence, interviews with affected community members may be undertaken to obtain feedback on the impacts of the sub-projects. 5. The due diligence report will be a signed by recognized representatives of the affected communities. 6. Based on the above the report will provide conclusions as to whether or not the actions that led to the securing of the site were in compliance with national law and if not, it will identify gaps and recommendations for filling those gaps. 9

10 ANNEX 2: List of Ineligible Activities Subprojects with any of the attributes listed below will be ineligible for support under the Project. Attributes of Ineligible Subprojects GENERAL CHARACTERISTICS Concerning significant conversion or degradation of critical natural habitats. Including, but not limited to, any activity within: Wildlife reserves Sensitive marine ecosystems Parks or sanctuaries Damages cultural property, including but not limited to, any activities that affect the following sites: Archaeological or historical sites Religious monuments or structures Works of art Sites of significance points of view Natural sites with cultural values including cemeteries, graveyards, and graves 10

11 ANNEX 3: Chance Find Procedures: Protection of Cultural Property 1. Cultural property include monuments, structures, works of art, or sites of significance points of view, and are defined as sites and structures having archaeological, historical, architectural, or religious significance, and natural sites with cultural values. This includes cemeteries, graveyards and graves. 2. The list of negative subproject attributes which would make a subproject ineligible for support (Attachment 1) includes any activity that would adversely impact cultural property. In the event that during reconstruction or construction sites of cultural value are found, the following procedures for identification, protection from theft, and treatment of discovered artifacts should be followed and included in standard bidding documents. 3. Chance find procedures will be used as follows: (a) Stop the construction activities in the area of the chance find; (b) Delineate the discovered site or area; (c) Secure the site to prevent any damage or loss of removable objects. (d) Notify the supervisory Engineer who in turn will notify the responsible local authorities; (e) Responsible local authorities and the relevant Ministry would be in charge of protecting and preserving the site before deciding on subsequent appropriate procedures. (f) Decisions on how to handle the finding shall be taken by the responsible authorities and the relevant Ministry. This could include changes in the layout (such as when finding an irremovable remain of cultural or archeological importance) conservation, preservation, restoration and salvage. (g) Implementation for the authority decision concerning the management of the finding shall be communicated in writing by the relevant Ministry. (h) Construction work could resume only after permission is given from the responsible local authorities and the relevant Ministry concerning safeguard of the heritage. 4. These procedures must be referred to as standard provisions in construction contracts. During project supervision, the Site Engineer shall monitor the above regulations relating to the treatment of any chance find encountered are observed. 5. Relevant findings will be recorded in World Bank Supervision Reports and Implementation Completion Reports will assess the overall effectiveness of the project s cultural property mitigation, management, and activities, as appropriate. 11

12 ANNEX 4: Community Consultation Framework Project implementation will be guided by community consultations which will be undertaken as part of a social assessment. The Community Consultations will follow the procedures laid out in the Samoa Code of Environmental Practice (COEP). The principles of consultation as laid out under the chapter on consultation in the COEP (COEP- 3) include: At the earliest opportunity, a community should be advised of potential projects and how the community can receive information about, and become involved with, such projects. The intentions/objectives of the consultation should be clearly and openly stated. Stakeholders and affected communities should have timely and meaningful inputs to, and participation in, any phases or aspects of projects that directly affect them and all inputs should be treated equitably and with respect. Consultation should be a two-way process, there should be an exchange of information where both the proponent and the affected communities should put forward their points of view and to consider other perspectives. Consultation is best undertaken at early stages in and throughout the decision making process or at least ongoing communication after a decision has been made. All parties do not have to agree to a proposal, however as a result of undertaking consultation at least points of difference will become clearer or more specific. 12

13 ANNEX 5: Samoa Codes of Environmental Practice Refer to Samoa Codes of Environmental Practice, by Ministry of Natural Resources and Environment, Planning and Urban Management Agency, Approved by Planning and Urban Management Board 04 April

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA3140

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA3140 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET Date ISDS Prepared/Updated: July 30, 2013 I. BASIC INFORMATION

More information

E767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives

E767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives Objectives ENVIRONMlENT AND SOCIAL SAFEGUARD FRAMEWORK ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT E767 May 2003 The environmental and social safeguards framework provides general policies,

More information

TERMS OF REFERENCE FOR CONSULTANTS. Preparing the Central Cross Island Road Upgrading Project in Samoa

TERMS OF REFERENCE FOR CONSULTANTS. Preparing the Central Cross Island Road Upgrading Project in Samoa A. Consulting Firm TERMS OF REFERENCE FOR CONSULTANTS Preparing the Central Cross Island Road Upgrading Project in Samoa 1. Project Background 1. Samoa s land transport depends on key arterial roads that

More information

ECONOMIC TRANSFORMATION AND INSTITUTIONAL CAPACITY BUILDING ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK

ECONOMIC TRANSFORMATION AND INSTITUTIONAL CAPACITY BUILDING ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CHINA ECONOMIC TRANSFORMATION AND INSTITUTIONAL CAPACITY BUILDING ENVIRONMENTAL AND SOCIAL

More information

Samoa Codes of Environmental Practice

Samoa Codes of Environmental Practice Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF NATURAL RESOURCES AND ENVIRONMENT PLANNING AND URBAN MANAGEMENT AGENCY Samoa

More information

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles Operational Manual - Table A1 - Environmental and Social Safeguard Policies Policy and Staff Connections- World Bank Intranet WB External Site WBG Directory Help Site Map Feedback Home News & Events Countries

More information

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP)

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Executive Summary Sri Lanka Strategic Cities Development Project (SCDP) Executive Summary

More information

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process 10 January 2018 Introduction 1. Environmental and social screening is an essential and

More information

DRAFT FOR CONSULTATION OCTOBER 7, 2014

DRAFT FOR CONSULTATION OCTOBER 7, 2014 The Board has authorized the release of this document for consultation purposes to seek feedback on its content. It has not endorsed the content of the draft, and the Committee on Development Effectiveness

More information

Public Disclosure Authorized EXECUTIVE SUMMARY

Public Disclosure Authorized EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized EXECUTIVE SUMMARY Introduction Georgia is an important transport corridor connecting

More information

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Environmental and Social Action Plan August 2016 Project: Bosnia and Herzegovina

More information

1 Environmental and Social Action Plan

1 Environmental and Social Action Plan 1 and Social Plan The table below constitutes the ESAP. It identifies the required actions during pre-construction, construction and operation of the project. of the actions is the responsibility of Koridori

More information

Doc. No H1 Rev. 0 - July 2011 APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN

Doc. No H1 Rev. 0 - July 2011 APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN Taking into account the findings of the ESDD, an Environmental and Social Plan (ESAP) has been developed

More information

Europe and Central Asia Region Capacity Development Trust Fund

Europe and Central Asia Region Capacity Development Trust Fund Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Europe and Central Asia Region Capacity Development Trust Fund RP1439 Draft Terms of

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Generic Terms of Reference (ToR) for Consulting Services for Environmental Impact Assessment (EIA) and Preparation of Environmental Management Plans (EMPs) for Transport Sector (Bridge and/or Road) Projects

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized o Date ISDS Prepared/Updated: 19-Jan-2016 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country?

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country? Checklist: 16. Power Transmission and Distribution Lines(1) Confirmation of and Social (1) ESIA and Permits 1 Have ESIA reports been officially completed? Have ESIA reports been written in the official

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA569

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA569 PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No: PIDA569 Project Name Region Country Sector(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Enhancing

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/09/2011 1. Basic Project Data Original

More information

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES EMIOLA ABASS June 13, 2017 COURSE OBJECTIVE This course has been designed to provide guidance to

More information

Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY PROJECT Rehabilitation works on the big arch of Krk Bridge

Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY PROJECT Rehabilitation works on the big arch of Krk Bridge Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY

More information

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES SAND AND GRAVEL PERMIT APPROVING WORK SYSTEM AND RECLAMATION PROGRAM (Issued pursuant to Section 10 of the Mines Act R.S.B.C. 1996, C.293) Permit:

More information

Title Reducing the Vulnerability of Coastal Communities in Samoa: A Partnership Approach

Title Reducing the Vulnerability of Coastal Communities in Samoa: A Partnership Approach Title Reducing the Vulnerability of Coastal Communities in Samoa: A Partnership Approach Abstract Many Pacific Island coastal communities are highly vulnerable to coastal hazards such as cyclones, tsunami

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

DRAFT ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK EXECUTIVE SUMMARY

DRAFT ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK EXECUTIVE SUMMARY 107232 Madhya Pradesh Urban Development Corporation DRAFT ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK EXECUTIVE SUMMARY OF MADHYA PRADESH URBAN DEVELOPMENT PROJECT July 2016 1. Project Overview Executive

More information

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT 1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT This Environmental Impact Assessment Report (EIA Report) has been prepared by Environmental Resources Management Ltd

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

Performance Requirements

Performance Requirements Environmental and Social Policy 15 Performance Requirements PR 1: Environmental and Social Appraisal and Management Introduction 1. The EBRD considers it important that all companies receiving EBRD financing

More information

The Northern Delta Transport Development Project (NDTDP) Environmental Management Process Framework For Phase 2 Investments

The Northern Delta Transport Development Project (NDTDP) Environmental Management Process Framework For Phase 2 Investments Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Northern Delta Transport Development Project (NDTDP) Environmental Management Process

More information

EBRD Environmental and Social Action Plan

EBRD Environmental and Social Action Plan PR 1 Assessment and Management of Environmental and Social Impacts and Issues 1.1 to establish PIU and dedicate a responsible person (head of PIU) for coordination between the various departments so as

More information

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation Energy Resilience for Climate Adaptation Project (ERCAP) Environmental Code of Practice (ECOP) for COMPONENT 2: Demonstration Measures to Enhance Resilience of Energy Sector (Pilot for Strengthening Transmission

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02-Nov-2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

Principles for environmental and social responsibility

Principles for environmental and social responsibility issued by: Principles for environmental and social responsibility Sustainable development is dependent on a balance between economic considerations, social responsibility and environmental protection.

More information

Summary of Preliminary Study Result for Technical Cooperation Project

Summary of Preliminary Study Result for Technical Cooperation Project Summary of Preliminary Study Result for Technical Cooperation Project 1. Title of the Cooperation Project, Relevant Project Report The Project for Bridge Construction in Southeast Sulawesi Province Project

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 03/08/2012 INTEGRATED SAFEGUARDS DATASHEET

More information

The World Bank Washington, D.C USA. REVISED DRAFT OPERATIONAL POLICYBANK PROCEDURE 4.11 PHYSICAL CULTURAL RESOURCES

The World Bank Washington, D.C USA. REVISED DRAFT OPERATIONAL POLICYBANK PROCEDURE 4.11 PHYSICAL CULTURAL RESOURCES Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Office of the President The World Bank Washington, D.C. 2433 USA. March 24,26 MEMORANDUM

More information

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify) PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:

More information

Adapting Road Infrastructure to Climate Extremes and Change

Adapting Road Infrastructure to Climate Extremes and Change Adapting Road Infrastructure to Climate Extremes and Change Experience from Small Pacific Island States September 2015 Pacific Island Countries (PICs) - - geographically dispersed, remote with small populations

More information

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous chemicals may include, but not limited to the following

More information

LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA

LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA Additional Financing of Local Government Enhancement Sector Project (RRP SRI 42759) LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA A. Eligible Local Authority and Subprojects 1. Unless otherwise agreed

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014

More information

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item. Checklist: 26. Forestry Projects(1) 1. Permits and Approvals, Explanations 2. Antipollution Measures (1) ESIA and Permits (2) Explanations to the Public (1) Air Quality (2) Water Quality (3) Waste (4)

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE . Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic

More information

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10.1 Objective The main objective is to confirm the implementation of mitigation measures recommended in

More information

Corporate Policy and Procedure

Corporate Policy and Procedure Corporate Policy and Procedure POLICY CATEGORY AUTHORITY RELATED POLICIES APPROVED BY Safety Management When Outside Contractors are Retained (Contractor Safety Management Program) (the Policy ) Health

More information

Building from the ground up in West Africa. The Hatch approach to projects in a developing country

Building from the ground up in West Africa. The Hatch approach to projects in a developing country Building from the ground up in West Africa The Hatch approach to projects in a developing country 2 Agenda 1. Hatch Contribution to West Africa Development 2. Three Recent Projects on Which We Worked 3.

More information

RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014. A. Background

RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014. A. Background Terms of Reference for a Cumulative Impacts Assessment in Baganuur Coal Mine in Mongolia to be financed by Mining Infrastructure Investment Support Project (MINIS) RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014

More information

Vulnerability Reduction of Coastal Communities (VRCC) Government of Tamil Nadu July Environment and Social Management Framework

Vulnerability Reduction of Coastal Communities (VRCC) Government of Tamil Nadu July Environment and Social Management Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Vulnerability Reduction of Coastal Communities (VRCC) Government of Tamil Nadu July 2007

More information

Safeguard Requirements And the Framework Process

Safeguard Requirements And the Framework Process Safeguard Requirements And the Framework Process The World Bank Europe & Central Asia Region Biskek,Tblisi March/April 2008 1 Role of Bank and Borrower Bank Screens and Sets EA Category Advises Borrower

More information

SNTGN TRANSGAZ SA MEDIAS. ESAP BRUA Version 3 1

SNTGN TRANSGAZ SA MEDIAS. ESAP BRUA Version 3 1 SNTGN TRANSGAZ SA MEDIAS ROMANIAN SECTION OF THE BULGARIA-ROMANIA-HUNGARY-AUSTRIA NATURAL GAS TRANSMISSION CORRIDOR (BRUA PIPELINE PROJECT) DRAFT ENVIRONMENTAL AND SOCIAL ACTION PLAN No. (Liab/Benefits)

More information

Project: Category A Road Project, Kazakhstan Kurty Buribaytal 62 km Road Project

Project: Category A Road Project, Kazakhstan Kurty Buribaytal 62 km Road Project Project: Category A Road Project, Kazakhstan Kurty Buribaytal 62 km Road Project Date: May 2015 Version: Final Version Appendix D: Environmental and Social Plan (ESAP) No. PR1 Assessment and Management

More information

ENVIRONMENTAL AND SOCIAL ACTION PLAN ÖKSÜT GOLD MINE, TURKEY (THE 'PROJECT')

ENVIRONMENTAL AND SOCIAL ACTION PLAN ÖKSÜT GOLD MINE, TURKEY (THE 'PROJECT') ENVIRONMENTAL AND SOCIAL ACTION PLAN ÖKSÜT GOLD MINE, TURKEY (THE 'PROJECT') DRAFT FOR DISCLOSURE PURPOSES. FINAL ESAP TO BE AGREED POST DISCLOSURE AND PRIOR TO FINANCING DECISION PR1 Assessment and of

More information

220 KV TRANSMISSION LINE AKHALTSIKHE-BATUMI

220 KV TRANSMISSION LINE AKHALTSIKHE-BATUMI 220 KV TRANSMISSION LINE AKHALTSIKHE-BATUMI ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT TERMS OF REFERENCE Transmission line Akhalsikhe-Batumi Georgia Terms of Reference for Tender docs and ESIA 2 1 PROJECT

More information

REVIEW OF THE POLICIES and A NEW POLICY FRAMEWORK

REVIEW OF THE POLICIES and A NEW POLICY FRAMEWORK Review and Update of the World Bank s Environmental and Social Safeguard Policies Consultation Meeting with Government Representatives and Implementing Agencies New Delhi, April 4, 2013 Feedback Summary

More information

URBAN DEVELOPMENT SUPPORT PROJECT

URBAN DEVELOPMENT SUPPORT PROJECT SFG3167 URBAN DEVELOPMENT SUPPORT PROJECT Environmental and Social Management Framework (ESMF) & Resettlement Policy Framework (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

Comparative Analysis of Cambodia Legal Framework and ADB Safeguard Policy Statement: ENVIRONMENT

Comparative Analysis of Cambodia Legal Framework and ADB Safeguard Policy Statement: ENVIRONMENT Comparative Analysis of Cambodia Legal Framework and : ENVIRONMENT Policy Principle 1: Use a screening process for each proposed project, as early as possible, to determine the appropriate extent and type

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 27-Oct-2016

More information

EXECUTIVE SUMMARY of the Environmental Impact Assessment Report

EXECUTIVE SUMMARY of the Environmental Impact Assessment Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Introduction Additional Financing for Third East West Highway Improvement Project EXECUTIVE

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: ISDSC13230 Date ISDS Prepared/Updated: 13-Jul-2015 Date ISDS Approved/Disclosed: 14-Jul-2015 I. BASIC INFORMATION A. Basic Project Data Country:

More information

TERMS OF REFERENCE FOR CONSULTING SERVICES FOR ENGINEERING AND CONSTRUCTION SUPERVISION CONSULTANT

TERMS OF REFERENCE FOR CONSULTING SERVICES FOR ENGINEERING AND CONSTRUCTION SUPERVISION CONSULTANT TERMS OF REFERENCE FOR CONSULTING SERVICES FOR ENGINEERING AND CONSTRUCTION SUPERVISION CONSULTANT 1. Background The Asian Development Bank (ADB) has assisted the Kyrgyz Republic in the rehabilitation

More information

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1 AMDAL Procedure (This is only indicative and for reference purposes. This is not exhaustive and therefore, the Consultants are requested to familiarize themselves with all the laws, rules, regulations,

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I Basic Information Date ISDS Prepared/Updated:

More information

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ENVIRONMENTAL MANAGEMENT PLAN (EMP) BUILDING DISASTER/CLIMATE RESILIENCE IN COMMUNITIES

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/14/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

Global Sustainable Tourism Criteria for Destinations (GSTC-D) version November Preamble

Global Sustainable Tourism Criteria for Destinations (GSTC-D) version November Preamble (GSTC-D) version 1.0 1 November 2013 Preamble Sustainable tourism is on the rise: consumer demand is growing, travel industry suppliers are developing new green programs, governments and international

More information

Samoa Coastal Infrastructure Management Plans and their Application in Tsunami Recovery Planning

Samoa Coastal Infrastructure Management Plans and their Application in Tsunami Recovery Planning Samoa Coastal Infrastructure Management Plans and their Application in Tsunami Recovery Planning DevNet 2010, Massey University, December 2010 Michele Daly, Graeme Roberts, Beca International Key Themes

More information

ENVIRONMENTAL & SOCIAL ACTION PLAN

ENVIRONMENTAL & SOCIAL ACTION PLAN APPENDIX A: ENVIRONMENTAL & SOCIAL ACTION PLAN No 1. PROJECT PLANNING & PROCUREMENT PHASE (some actions will carry forward into Stage) 1.1 PR1: Environmental Commitments Register: Develop a Commitments

More information

Environmental and Social Safeguards Framework

Environmental and Social Safeguards Framework Laos People s Democratic Republic Peace Independence Democracy Unity and Prosperity ************************ Environment Protection Fund Lao Environment and Social Project: Additional Financing Environmental

More information

1. BACKGROUND. D10: TFSU Technical Adviser Pavement Engineer Version: 21 July 2015 sub NOL 1

1. BACKGROUND. D10: TFSU Technical Adviser Pavement Engineer Version: 21 July 2015 sub NOL 1 PACIFIC AVIATION INVESTMENT PROGRAM (PAIP) Consulting Services TERMS OF REFERENCE AND SCOPE OF SERVICES TFSU TECHNICAL ADVISER PAVEMENT ENGINEER (TFSU/IC/D10) 1. BACKGROUND 1.1 The Government of Tonga

More information

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations al Checklist: 5. Non-Ferrous Metals Smelting and Refining(1) (1) ESIA and al Permits 1 Have ESIA reports been officially completed? Have ESIA reports been written in the official language or a language

More information

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK FOR THE OPERATIONAL MANUAL

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK FOR THE OPERATIONAL MANUAL Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ARMENIA SOCIAL INVESTMENT AND LOCAL DEVELOPMENT PROJECT ENVIRONMENTAL AND SOCIAL MANAGEMENT

More information

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d) Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water

More information

Setting Standards for Sustainable Development. Update and Review of the World Bank s Safeguard Policies

Setting Standards for Sustainable Development. Update and Review of the World Bank s Safeguard Policies Setting Standards for Sustainable Development Update and Review of the World Bank s Safeguard Policies Why the Review? World Bank Group Commitment The World Bank Group is committed to supporting countries

More information

Resettlement Action Plan

Resettlement Action Plan 2017 DECEMBER Trans Anadolu Doğal Gaz Boru Hattı Projesi (TANAP) Resettlement Action Plan Second External Monitoring and Evaluation Report Summary TANAP PROJECT Second Semi-Annual External RAP Monitoring

More information

Environmental and Social Policy

Environmental and Social Policy Environmental and Social Policy Contents Foreword 2 Purpose 2 Commitments 2 Environmental and Social Assessment 3 Operations financed directly 4 Operations financed through Financial Intermediaries 4 Environmental

More information

TERMS OF REFERENCE FOR CONSULTANTS I. CONSULTING FIRM

TERMS OF REFERENCE FOR CONSULTANTS I. CONSULTING FIRM Civil Aviation Investment Program (KSTA PNG 52201) TERMS OF REFERENCE FOR CONSULTANTS I. CONSULTING FIRM A. Introduction 1. A consulting firm (the Consultant) will be recruited to help the Government of

More information

Financing (In USD Million) Financing Source

Financing (In USD Million) Financing Source Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 05-Aug-2012 I. BASIC INFORMATION 1. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 14-Apr-2014

More information

E810 October 2002 ISLAMIC REPUBLIC OF IRAN. Urban Upgrading and Housing Reform Program. Environmental Management Plan (EMP) A.

E810 October 2002 ISLAMIC REPUBLIC OF IRAN. Urban Upgrading and Housing Reform Program. Environmental Management Plan (EMP) A. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized A. BACKGROUND 1. Introduction ISLAMIC REPUBLIC OF IRAN Urban Upgrading and Housing Reform

More information

ARMENIA SOCIAL INVESTMENT FUND PROJECT III

ARMENIA SOCIAL INVESTMENT FUND PROJECT III Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ARMENIA SOCIAL INVESTMENT FUND PROJECT III GUIDELINES FOR ENVIRONMENTAL PROCEDURES FOR

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 07-Feb-2014 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

More information

Review & Update of World Bank s Environmental & Social Safeguard Policies Phase 3 Consultation Meetings. Turkey Municipal Services Project

Review & Update of World Bank s Environmental & Social Safeguard Policies Phase 3 Consultation Meetings. Turkey Municipal Services Project Review & Update of World Bank s Environmental & Social Safeguard Policies Phase 3 Consultation Meetings Turkey Municipal Services Project Review & Update of World Bank s Environmental & Social Safeguard

More information

Chapter 13 Management and Monitoring

Chapter 13 Management and Monitoring Chapter 13 Management and Monitoring TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Construction Phase Roles and Responsibilities... 13-1 13.2.1 BP... 13-1 13.2.2

More information

COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II PONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM

COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II PONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM AGRICULTURAL PROJECT IMPLEMENTATION UNIT COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II PONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT PLAN

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized b Date ISDS Prepared/Updated: 13-Feb-212 1. BASIC INFORMATION INTEGRATED SAFEGUARDS DATA

More information

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY Public Disclosure Authorized October 2015 Public Disclosure

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Background Information on Inter-American Development Bank Environmental and Social Safeguards Policies and Procedures 3 June 2011

Background Information on Inter-American Development Bank Environmental and Social Safeguards Policies and Procedures 3 June 2011 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment A. ENVIRONMENTAL ASSESSMENT OP-703 Environment and Safeguards Compliance Policy; Guidelines; Safeguard Screening Form World Bank Policies & Procedures

More information

Environmental and Social Review for GDF Projects

Environmental and Social Review for GDF Projects Environmental and Social Review for GDF Projects Laurie Hietter Sacramento, California October 24, 2016 Introduction 1 Importance of Environmental and Social Assessment 2 Regulations and Overview of Environmental

More information

7. NATURAL HAZARDS 7.1 SECTION INTRODUCTION

7. NATURAL HAZARDS 7.1 SECTION INTRODUCTION 7. NATURAL HAZARDS 7.1 SECTION INTRODUCTION 7.1.1 The Resource Management Act empowers Council to control any actual or potential effects of the use, development, or protection of land for the purpose

More information

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Date: January 28, 2016 Location (City, Country): Jakarta, Indonesia Audience: Civil Society Organizations

More information

PHILIPPINES: SOCIAL INCLUSION AND ALTERNATIVE LIVELIHOOD FOR THE INFORMAL WASTE SECTOR

PHILIPPINES: SOCIAL INCLUSION AND ALTERNATIVE LIVELIHOOD FOR THE INFORMAL WASTE SECTOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PHILIPPINES: SOCIAL INCLUSION AND ALTERNATIVE LIVELIHOOD FOR THE INFORMAL WASTE SECTOR

More information

Code of Environmental Practices (COEP) Slaughterhouse Development

Code of Environmental Practices (COEP) Slaughterhouse Development Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Code of Environmental Practices (COEP) Slaughterhouse Development April 2011 1 COEP Slaughterhouse

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 30-May-2013

More information

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK Public Disclosure Authorized Ukrainian Social Investment Fund Public Disclosure Authorized Public Disclosure Authorized COMMUNITY-BASED SOCIAL SERVICE DELIVERY PROJECT ENVIRONMENTAL AND SOCIAL MANAGEMENT

More information

(1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options)

(1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options) Sub-sector Guideline: (1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options) Basic Concept A. General Concept Climate change will increase

More information

LIFELINE ROAD NETWORK IMPROVEMENT PROJECT (Including the Additional Financing)

LIFELINE ROAD NETWORK IMPROVEMENT PROJECT (Including the Additional Financing) REPUBLIC OF ARMENIA MINISTRY OF TRANSPORT AND COMMUNICATION TRANSPORT PIU STATE INSTITUTION Public Disclosure Authorized Public Disclosure Authorized LIFELINE ROAD NETWORK IMPROVEMENT PROJECT (Including

More information