1 Expansion of Tamar Bauxite Mine from 10,000 TPA to 40,000 TPA in Tamar & Kirkiran Villages, Majhgawan Tehsil, Satna District, Madhya Pradesh : The M.P. State Mining : GREENCINDIA Consulting Pvt. Limited January-2014
2 EXECUTIVE SUMMARY Introduction Environmental Impact Assessment (EIA) is a process, used to identify the environmental, social and economic impacts of a project prior to decision-making. It is a decision making tool, which guides the decision makers in taking appropriate decisions for proposed projects. EIA systematically examines both beneficial and adverse consequences of the proposed project and ensure that these impacts are taken into account during the project designing. Project Description The Project The project is for enhancement of production of bauxite from 10,000 TPA to 40,000 TPA. The mine lease area is 21.0 ha and the project cost is about Rupees One Crore. No forest land is involved. It has been considered as category A because of its location within 10 km of interstate boundary of Madhya Pradesh and Uttar Pradesh. The M.P. State mining corporation limited, a public limited company & wholly owned undertaking of the state of Madhya Pradesh registered under companies Act-1956 is the leaseholder, and has proposed bauxite mining project located in Tamar & Kirkiran Villages of Majhgawan Tehsil, Satna District and Madhya Pradesh State. Location of the Project The proposed bauxite mine is located in Tamar & Kirkiran villages, Majhgawan Tehsil, Satna District and Madhya Pradesh. The salient features of the project site are given in Table E.1. Table E-1: Silent Features of the Project Site Project Site Tamar & Kirkiran Villages, Majhgawan Tehsil, Satna District and Madhya Pradesh State A N N B N N Site Coordinate C N N (Refer Figure 1.2 for map of D N N coordinates superimposed E N N on topographical sheet) F N N G N N Elevation above MSL 365 m to 430 m AMSL Nearest Highway NH-75, about 36.0 km of south side Nearest Town/Village Birsinghpur, 9.5 km of SSW side Nearest Railway Line Manjhgawan Railway Station, about 21.0 km of west side Nearest Airport Varansi, about km of ENE side Nearest Reserve Forest Amua Protected Forest Area about 2.0 km in NE side 1
3 Ecological Sensitive Z`ones Amua Protected Forest, 1.7 km of NE side Seismicity Seismic Zone II Climatology Mean Max Temp: 41.9 C (May); Mean Min Temp: 8.7 C (January) Annual IMD Satna Mean Relative Humidity: 29% (may) to 86% (August) Maximum Wind Speed: 9.2 kmph (June) Annual Total Rainfall: mm Mean Max Temp: C On-site Data for Post Relative Humidity: 63.5 % Monsoon Season Wind Speed: 3.6 kmph Total Rainfall: 11.4 mm Topography The lease area is hilly having gentle slope towards North West and south. The highest elevation of the area is 430 m AMSL in west and north east direction and the lowest elevation is 365m AMSL in North West direction. Reserves The bauxite deposit of the area is good for abrasive grade bauxite, emery grade bauxite and cement grade bauxite material. The different grades are sorted manually vide its visual characteristics. In general it is a medium grade bauxite deposit. Different grades of bauxite are produced after manual sorting of mined out material. It is experienced that from this deposit, material for abrasive grains, emery grains, cement raw mix can be produced. The details of minerals reserves are described in below Table E.2. Table E-2:- Category-wise Updated Mineral Reserves as per UNFC Classification Classification as UNFC UNFC Code Bauxite Grade Probable Mineral Reserve 121 6,81,017 T The bauxite of the lease area is Probable Mineral Reserve 122 1,12,700 T of metal grade. Pre-Feasibility Mineral The Ore body of the lease area ,026 T Resources has following chemical Pre-Feasibility Mineral constituents ,812 T Resources Al 2 O 3 38% to 52 % Measured Mineral Resource SiO % to 8.0 % Indicated Mineral Resource Fe 2 O % to 17 % Inferred Mineral Resource Reconnaissance Mineral Resource Source:- Mining Plan for Tamar Bauxite Mine prepared by Balram Singh Associates Pvt. Ltd. 2
4 Mining Opencast manual method of mining has been adopted in the lease area. Development is carried out towards SW&SE and production is done from bottom of quarry. Production is done by manual means using hand tools like crowbars, sledge hammers, chisels & spade including loading of mineral in the dumpers. Haul has been extended to the floor of the quarry. No blasting will be done. Opencast manual method of mining without drilling and blasting was proposed in the approved Scheme of Mining and the same method has been adopted during past and will be continued in future also. There are two quarries and six pits throughout the lease area. The depth varies from 3.0 m to 10.0 m. The overburden, face clearing and removal of mine debris will be done manually. Winning of ore will be done manually with hand tools like sledge, hammers, chisels, spades and crowbars. The haul road has been extended up to the bottom of the quarries. Loading and unloading is done manually. Land Use Pattern The entire lease hold area of 21.0 hectare lies on in government wasteland. The breakup of the land use of mining area as given below in Table E.3. Table E-3:- Land Use Pattern of the Mining Area Type of Land (In Hects) Sl. No. Item Forest Land Agriculture Land Grazing Land Barren Land Any Other Type Total 1 A. Lease Area B. Mining & allied activities Pits Dumps Roads Site Services Greenbelt Undisturbed Area Total Source:- Mining Plan for Tamar Bauxite Mine prepared by Balram Singh Associates Pvt. Ltd. Analysis of Alternatives In the proposed project, an opencast mining will be carried out. For that, no other methodology is going to be changed, depending upon the geological set up, strata of the rock, boulders and 3
5 its structural behaviour. So, all the parameters of REIA/ EMP will be implemented as per the open cast mining. Description of Environment This section contains the description of baseline studies of the 10 km radius of the area surrounding Tamar Bauxite Mine. The data collected has been used to understand the existing environment scenario around the proposed mining project against which the potential impacts of the project can be assessed. Baseline data was generated for various environmental parameters including air, water (surface and ground water), land and soil, ecology and socio-economic status to determine quality of the prevailing environmental settings. The study was conducted during Post-monsoon (October to December, 2013) season. Meteorological Data This section makes a comparative analysis of the meteorological condition of the study area. The data used for the purpose are the last 20 years average IMD data, the recent IMD data of nearest meteorological observatory at Satna, and the on-site data recorded during the period October to December, The study area is part of tropical monsoon climate with long humid summer and short winters. The rainfall is heavy during S-W monsoon and light in pre monsoon season. In summer the region experience extremely hot weather with C and in winter the minimum temperature touches 3.160C. Annual rainfall is about 1168 mm and distributed mostly during the months of June to September. The wind generally blows from the west and average wind speed is 0.88kmph. The average maximum temperature recorded during study period was 30.6 C and the minimum was 10.4 C. The average maximum RH for the study area was 80.7% while the minimum average was 43.7%. The average wind speed recorded was 3.7kmph. Air Environment Ten Ambient Air Quality Monitoring (AAQM) Stations were selected. Criteria used for designing the network were principally governed by the wind rose pattern for winter seasons and the accessibility of the selected sites. Attempts were made to locate most of the AAQ stations in predominant downwind direction with respect to the project site. The tables show the highest P98 values of SPM, PM10, SO2 and NOX during the study periods. The value of parameters at all the location is found within the limits prescribed by Central Pollution Control Board (CPCB). Noise Environment 4
6 The result of Noise Quality at Night time Leq (Ln) varies from 34.3 to 35.6 db (A) and the daytime Leq (Ld) 50.0 to 60.1 db (A) within the study area. Low noise level is due to absence of any mining activity in the area. Water Environment The surface water quality of parameters meets well as per tolerance limit IS Class C considering the concentrations of relevant parameters. Total dissolve solids, hardness and alkality was found well within prescribed standards. Heavy metals such as aluminium, cadmium, chromium, lead, manganese, mercury was found below detectable limit. Water was found slightly polluted in terms of biological contamination and may be used by primary treatment for disinfections. All ground water sources monitored were open wells where water is being drawn through hand pum or manually by pulling a bucket tied with rope. Since the ground water is used without treatment by a large portion of population, the quality of ground water is of great concern. The water quality of the water samples collected were analysed and found well within the desirable limits as per IS 10500:2012. Soil Analysis Report To understand the soil quality in the proposed study area, 5 locations were selected for soil sampling. Composite sampling of soil up to root depth (10-15 cm) was carried out at each location. The important properties of soil are bulk density, porosity, infiltraton rate, ph, Organic matter, kjeldahl Nitrogen, Phosphorous and Potassium. Physical Parameters The important physical characteristics of soil are bulk density, moisture content, porosity and Texture. Colour: Colour of soil along the proposed study area varies from brown to pale brown. Moisture Content: Moisture content of soil along the proposed study area ranges from 3.8% to 5.1%. Texture: - Texture of soil along the proposed study area samples is clay loam. Bulk Density: Bulk Density of soil is found to be in the range from 1.32 to 1.53 g/cm3. Chemical Parameters A brief summary of chemical characteristics are given below: ph: ph is determined by taking (1:2.5) ratio of soil and distilled water. ph of soil in the proposed study area is found to be in the range of 7.2 to 7.8, The soil are, therefore, slightly alkaline. Conductivity: - Conductivity is determined by taking (1:2) ratios of soil and distilled water. Conductivity of soil in the proposed study area is found to be in the range of 89 to 137µs/cm. Kjeldahl Nitrogen: Kjeldahl nitrogen content in soil samples along the proposed study area is found in the range of 0.21% to 0.36% by weight. 5
7 Available Phosphorous: Available phosphorous of soil samples along the proposed study area ranges from 29 to 42 kg/ha. Potassium: Potassium content as K in soil samples along the proposed study area is found in the range of 103to 139 kg/ha. Total Organic Carbon: Total organic carbon content in soil samples along the proposed Study area is found to be fairly high ( %) and therefore the soil is fertile in terms of productivity. Ecological Environment The lease area as well as buffer zone area reveals no endangered and endemic species of flora and fauna in the area. Water Requirement The total water requirement iin the Tamar Bauxite Mine is about 10 kld. The water is used in the following purpose. For dust suppression; For domestic consumption; For greenbelt development; The above water will be met from ground water or nearby villages. Air Modelling In order to predict the particulate emissions, Gaussian s mathematical expression was used to predict changes in air quality i.e., maximum ground level concentration (GLC s) of particulate matter, due to the various mining activities of the proposed mine. Environment Management Plan The mining activities involve dozing, excavation, loading, haulage and transportation bauxite ore and over burden. These activities lead to generation of air borne dust, which can cause air pollution in and around the mining lease area, if appropriate control measures are not taken. Similarly mining causes Land Degradation, Noise and Water Pollution etc. in the area. In order to minimize impacts of mining on different environmental parameters and to keep air and water quality within prescribed limits of CPCB, a Environmental Management Plan (EMP) is prepared to strictly follow it. The environmental management plan includes all measures and safety precautions necessary for safe mining along with rehabilitation measures for mined out areas. It is necessary to include the environmental cost as a part of the budgetary cost component. The project authorities propose to undertake the following environmental works to achieve the environmental quality as desired. The budget for environmental protection has been formulated and given in Table E.5. 6
8 Table E-4:- Details of Capital Investment (Project Cost) Area of Investment Expenses (in Rs.) Land Nil Mining Cost for infrastructure, tools, equipments & Mining Plan etc. 75,00,000/- Environmental Protection 15,00,000/- Pollution Control (check dam, garland drain & protective bund etc.) 12,00,000/- Tarpaulin and cover for stack of ore 3,00,000/- Occupational Health & Safety 1,00,000/- Infrastructure & PPEs 1,00,000/- Socio-economic Development 9,00,000/- Total Capital Investment 1,00,00,000/- Source:- PFR for Tamar Bauxite Mine prepared by Balram Singh Associates Pvt. Ltd. Proposed Management Setup Environment management has to be executed by a multidisciplinary team headed by a senior executive reporting to head of the mines. The team should be responsible for planning, execution and monitoring of all aspects of the environment, starting from start to closure of mines. The organization chart is prepared with a core group only for environment management and a supporting group from allied disciplines and area of activities. This supporting group would consist of civil, mechanical, electrical, commercial/finance, while core group should have experts from mining, geology, horticulture/forestry and laboratory. The said team will be responsible for: Collecting water and air samples to monitor air and water quality Analyzing the water and air samples Implementing the control and protective measures Coordinating the environmental environment related activities within the project as well as with outside agencies Collecting statistics of health of workers Green belt development and inventory of flora Monitoring the progress of implementation of environmental management programme Ambient noise level monitoring Management of drainage system, dumps, reclamation & restoration etc. The laboratory will be suitably equipped for sampling/testing of various environmental pollutants. A well-defined environmental monitoring program would be emphasized with trained and qualified staff that would monitor the ambient air to ensure that the pollutants level is maintained always within the permissible levels. The locations will be finalized in consultation with SPCB. 7
9 Social Environment The mine area does not cover any habitation. Hence the mining activity does not involve any displacement of human settlement. No public buildings, religious places, monuments etc exist within the lease area or in the vicinity. The mining operation will not disturb/ relocate any village or need resettlement. Thus no adverse impact is anticipated. The impact of mining activity in the area is positive on the socio-economic environment of the region. The negative impact will be limited to some sporadic health problems, which may occur due to increase in fugitive emission in the vicinity of the mines. Tamar Bauxite Mine is providing employment to local population and it will be give preference to the local people whenever there is requirement of man power. Anticipated Impacts and Mitigation measures Environmental impact assessment (EIA) of the proposed project has been carried out with reference to soil, water, noise, flora, fauna and socio economic. Conclusion As discussed, it is safe to say that the proposed facilities are not likely to cause any significant impact to the ecology of the area, as adequate preventive measures will be adopted to keep the various pollutants within the permissible limits. Green belt development around the area will also be taken up as an effective pollution mitigative technique, as well as to serve as biological indicators for the pollutants released from the premises of Tamar Bauxite Mine. 8
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from
More informationM/s.NEERAJ KUMAR JAIN
EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND
More informationHINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES
HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES Maton Rock Phosphate Mine of M/s HZL is proposing
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR
More informationPiplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P
1. INTRODUCTION The project namely Piplyakamil Murrum Quarry having an area of 2.0 ha at Khasra No.- 90/2 near Village- Piplyakamil Tehsil- Dharampuri, District-Dhar, State-Madhya Pradesh belongs to Shree
More informationPre- Feasibility RepoRt
Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY
More information2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.
PROPOSED TERMS OF REFERENCES (A) Suggested by the Applicant 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : 10000 Cu.mt/year Stone APPLICANT
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Parsen : Gwalior : Gwalior (M.P.) : 3.345 Hectare : Stone KHASRA No : 4154 PRODUCTION CAP : 50,000 Cu.mt/year (avg.) Stone APPLICANT
More informationANNEXURE- II Proposed TOR
ANNEXURE- II Proposed TOR Annexure II Terms of Reference for EIA for Setting up of Ligno-Cellulosic Biomass based second generation (2G) Ethanol Bio-Refinery with capacity of 100 KLPD at village-sainjani,
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH
More informationV: PROJECT SCOPING & METHODOLOGY
V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities
More informationGRAVEL & ROUGH STONE QUARRY
ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760
More informationTable 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others
1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines
More informationPramod S. Kambli. Page 1
PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major
More informationENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.
ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920
More informationENVIRONMENT MANAGMENT PLAN
ENVIRONMENT MANAGMENT PLAN DETAIL OF MINE- NAME OF MINERAL SANDSTONE (FURSHI PATTHAR) MINING LEASE FOR FINISHED SANDSTONE VILLAGE PARASWAHA, TEHSEEL JABERA DISTRICT - DAMOH KHASRA NO. 22/1, AREA 1.0 HECTARE
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF Shri Krishna Construction Company AT Khasra No.1046 Vill.-Pipalya Hamir, Tehsil-Barod, District-Agar Malwa (M.P.) Production Capacity: 40000 Cu.mt Crusher Stone for 18 Months
More informationDHANWADA CRUSHER STONE QUARRY
ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-
More informationTable 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha
1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted
More informationPROPOSED TERM OF REFERENCE
PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0
More informationENVIRONMENTAL MONITORING REPORT
ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM APRIL 2018 SEPTEMBER 2018 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT
More informationPre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)
Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS
More informationTerms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P
Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P SITUATED AT KAKKUR VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT KERALA STATE EXTENT: 2.0437 Ha STANDARD TERMS OF REFERENCE (TOR)
More informationENVIRONMENT MANAGEMENT PLAN FOR STONE MINING
ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name
More informationEXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT
EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh
More informationDRAFT TERMS OF REFERENCE FOR EIA STUDY
Four laning of Balaghat - Gondia Section of NH 54 from km 0.000 to km 48.070 (Package-1A & Package-1B) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra DRAFT TERMS OF REFERENCE
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN BANKUCHIA STONE DEPOSIT VILLAGE POLICE STATION DISTRICT STATE AREA PRODUCTION RATE BANKUCHIA PATAMDA EAST SINGHBHUM JHARKHAND 29.00 ACRES (11.74 HA) 854755 TPA PROJECT PROPONENT
More informationSalient Features of Mining Mining is proposed by opencast manual method. Estimated Mineable Reserves: Hard/Lumps Iron ore = 5, 33,940 tonnes.
EXECUTIVE SUMMARY INTRODUCTION Agaria Iron Ore mine is situated in village Agaria, Tehsil- Sihora, District Jabalpur of Madhya Pradesh State. The mining lease period was for 20 years w.e.f 06.03.1987 to
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill.
More informationEIA-EMP REPORT GRAVEL QUARRY (Category-B2)
EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar
More informationExecutive Summary. District/State Taluka Village Khasara No. Area (Hectare) Katni (MP) Murwara Tikariya Part of
Executive Summary 1.0 Introduction Tikariya Laterite, Bauxite and Fireclay Mining Project is located near village Tikariya Tehsil Murwara, District Katni (M.P.) The total lease area is being 27.35 Hectare.
More informationPRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location
1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease
More informationENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM OCTOBER 2016 MARCH 2017 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT
More informationProposed Terms of Reference for EIA studies
Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10
More informationPROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE 1 PROPOSED TOR FOR EIA STUDY Kottmeta Limestone Mine, ML Area 801.171 ha, is located in Village Katamater, Tehsil/District Malkangiri, Odisha. Dalmia Cement (Bharat) Limited,
More informationPRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.
More informationMining of Minerals MINING LEASE of BAUXITE Mining Project for CARBORUNDUM UNIVERSAL LTD. S.No. 146/147 PAIKI
Terms of Reference For Environmental Impact Assessment of Mining of Minerals MINING LEASE of BAUXITE Mining Project for CARBORUNDUM UNIVERSAL LTD. S.No. 146/147 PAIKI At- MEWASA, Taluka- KALYANPUR, Dist.
More informationANACON LABORATORIES PVT. LTD. 1
1.1 HINDALCO INDUSTRIES LIMITED (Hindalco) is one among the flagship companies of the Aditya Birla Group of Industries and is one of the largest corporate groups in India. This group is a leading manufacturer
More informationPRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent
PRE FEASIBILITY REPORT PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent M/s Veet Rag Homes Pvt. Ltd. 267, Ganesh Phadnavis Bhavan,
More informationOverburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.
ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked
More informationPRE-FEASIBILTY REPORT
Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District
More informationEIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introductions The lease area is being hold by M/s KJS Cement Ltd, and Pawan Kumar Ahluwalia is the Managing Director and correspondence address is M/s KJS
More informationPRE FEASIBILITY REPORT
Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT
More informationEnvironment Management Plan
Environment Management Plan Environmental Impact Assessment Statement describing the impact of mining and beneficiation on environment on the following: i) Land area indicating the area likely to be degraded
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-
More informationEnvironment Management Plan
Environment Management Plan FOR Mining of Metal Stone Area 2.000 Hectare, Khasra No. 1127/1 Village Tehsil District State AT KHILCHIPUR KHILCHIPUR RAJGARH MADHYA PRADESH Proponent SHRI ALTAF KHA S/O SHRI
More informationSUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at
SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER 2011 1 CONTENTS 1.0 Project Description Page 3 2.0 Description
More informationAPPENDIX I PROPOSED TERMS OF REFERENCE
APPENDIX I PROPOSED TERMS OF REFERENCE 1. Environment Impact Assessment/Environment Management Plan document shall be in accordance with the provisions & generic structure stipulated in the EIA Notification
More informationEnvironmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,
Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Palakurthy Mandal, Peddapally District, Telangana State Applicant Sri
More informationENVIRONMENT MANAGEMENT PLAN
EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/
More informationMining of Minerals MINING LEASE of LIME STONE Mining Project for GAYTRI MINERALS.
Terms of Reference For Environmental Impact Assessment of Mining of Minerals MINING LEASE of LIME STONE Mining Project for GAYTRI MINERALS. S.No. 160 PAIKI At- RAKKA, Taluka- LALPUR, Dist. JAMNAGAR. (Gujarat)
More informationEXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,
More informationENVIRONMENTAL MANAGEMENT
ENVIRONMENTAL MANAGEMENT PLAN RAJBANDH STONE DEPOSIT VILLAGE Rajbandh POLICE STATION MALPAHARI DISTRICT PAKUR STATE JHARKHAND AREA 9.00 ACRES (3.64 HA) PRODUCTION RATE 338850 TPA PROJECT PROPONENT M/S
More informationM/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA
1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which
More informationExecutive Summary. 5. Area covered by existing mine road 963 sqm 8. Area covered by proposed mine waste 3269 sqm
Executive Summary 1.0 Introduction Tikariya Laterite, Bauxite and Fireclay Mining Project is located near village Tikariya Tehsil Murwara, District Katni (M.P.) This 17.33 Ha mining leas area is being
More informationPROPOSED TERMS OF REFERENCE
ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment
More informationEnvironmental Management Plan. For Mining of. Building Stone & Road Metal
Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 5.65 Ha at Survey No. 427,428 & 429 Alladurg Village, Alladurg Mandal, Medak District, Telangana State Lessee M/s
More informationSTONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)
Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to
More informationM/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola
0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for
More informationPROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.
PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.
More informationPREFEASIBILITY REPORT FOR BRICK EARTH MINE
Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email
More informationFor PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra
Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech
More informationENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT
ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL
More informationM/s Budwa Minerals, Village-Budwa, Tehsil-Beohari Dist. Shahdol (MP) Executive Summary ha Sathni Laterite, Ochre & White Clay Mine
EXECUTIVE SUMMARY 1. PREAMBLE Minerals are the chief source of present phase of industrialization, and play an important role in the present phase of the national economy and overall development of the
More informationMars Power & Steel Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive
More information(A govt. of Kerala Undertaking)
Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT FOR AMJHAR LATERITE DEPOSIT M. L. Area 4.897 ha. In Village - Amjhar Tehsil - Amarpatan, District- Satna State - Madhya Pradesh Proposed Capacity 32256 TPA Lessee - Shri Vikram Singh
More informationLimestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report
Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER
More informationEXECUTIVE SUMMARY. (Approved Consultant)
ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CAPTIVE RESIN PLANT OF 100000 TPA PRODUCTION CAPACITY AT ROUTHUSURAMALA VILLAGE, THOTTAMBEDU MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY
More informationTERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;
TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING
More informationTable 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.
1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra
More informationToR Letter No. SEIAA/AP/ANT/ Dated Monitoring Period : October 2016 to December Applicant
EXECUTIVE SUMMARY of Proposed Quartz Mine (30.667 Ha.) with a Production of 91,125 TPA at Sy. No. 410, D.Cherlopalli Village, Bathalapalli Mandal, Anantapur District, Andhra Pradesh. ToR Letter No. SEIAA/AP/ANT/2015-3568
More informationSTANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE
STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE Terms of Reference (TOR) for preparation of Environmental Impact Assessment (EIA) and Environmental
More informationPRE-FEASIBILITY REPORT
M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,
More informationWELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.
WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey
More informationPROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE For PROPOSED RESIDENTIAL AND COMMERCIAL DEVELOPMENT AT Plot bearing survey no. 86/1, 86/2, 86/3 (pt), 86/4 (pt), 86/5 (pt), 115/1 (pt), 115/2 (pt), 115/3 (pt), 115/4 (pt), 115/5
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN For BUILDING STONE AND M SAND QUARRY Sri. N.C. Prasanna Kumar #663, Somanahalli Maddur Taluk Mandya District - 571429 Prepared by SMS ENVOCARE LIMTED # 301, 3 RD FLOOR, SHRESHTA
More information2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,
More informationProject Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005
Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,
More informationExecutive Summary. Vizianagaram District, Andhra Pradesh. Season : December 2016 to February 2017 File no.: J-11011/1129/2007-IA-II(I)
Executive Summary Environmental Impact Assessment for Expansion of Ferro Alloys unit Production (Addition of 2 x 9 MVA Submerged Electric Arc Furnace) at Plot No.368, APIIC Growth Centre, Bobbili Village
More informationEXECUTIVE summary. Khasra No. Area Ownership/Occupancy Hects. Govt. Land
EXECUTIVE summary 11.1 PROJECT DESCRIPTION has been granted Mining lease over an extent of 8.09 Ha in village Tihai, District Satna, Madhya Pradesh for a period of 20 years with effect from 22.11.1995
More informationPre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]
Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure
More informationENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE
ENVIRONMENTAL MANAGEMENT REPORT Of COLOUR GRANITE MINE Sy. No.Old: 52/2B1 (New 52/2B1) of Peddavelagatur Village, Peddapanjani Mandal,Chittor District, Andhra Pradesh AREA OF MINING LEASE 5.70 Ha. For
More informationENVIRONMENTAL MONITORING REPORT
ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM APRIL 2014 SEPTEMBER 2014 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT
More informationEXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E
EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at
More informationSRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH
SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,
More informationSTANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE
Terms of Reference (TOR) for preparation of Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) for "Mining of Minerals" as per the EIA Notification, 2006 has been devised to
More informationEnvironment Management Plan For B 2 Category Project
Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.
More informationS. No Parameter Details 1 Name & Address of the Applicant
1. EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s AMULYA GRANITES Prop: Smt CH.SARALA H. No. FLAT NO.207 Roja Kishore Residency, Chenchupet, Tenali, AP-522 202 Guntur District,
More informationEXECUTIVE SUMMARY. Beldara, Girgita, Amilia Khurd, Village to to
EXECUTIVE SUMMARY INTRODUCTION M/s KJS Cement Limited, a group company of Kamal Sponge, Steel & Power Ltd. intends to mine out limestone from their Amilia Lime stone mine in village Amilia, Tehsil Maihar,
More informationPRE- FEASIBILITY REPORT
PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN A. Attach a note on the status of baseline information with regard to the following: To identify with the interrelationship between the eco-friendly quarry operations and
More informationEnvironment Management Plan For B 2 Category Project
Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey
More information