1 Lisbon Metro expansion and environmental follow-up COURSE: IMPACTES AMBIENTAIS / ENVIRONMENTAL IMPACTS Ana Cerdeira Lisbon, 13 April 2015

2 Outline 1. Definition of Environmental Follow-up 2. Environmental impacts of the Metro in urban areas 3. Environmental procedures in the Lisbon Metro 4. Case studies 0 A B C Environmental Impact Assessment Construction phase o Mitigation measures o Environmental monitoring o Residual impacts (unmitigating impacts) Operation phase o Environmental benefits o Environmental monitoring 5. Conclusions

3 1. Environmental Follow-up Concept: Follow-up - the phase that follows the approval or environmental assessment of a project. It covers the construction, operation and decommissioning phases of a project.

4 1. Environmental Follow-up International Best Practice Principles (IAIA)

5 1. Environmental Follow-up International Best Practice Principles (IAIA)

6 1. Environmental Follow-up Portugal: In Portugal, the expression Follow-up is not widely used. The more common expressions are: Environmental Monitoring and Environmental Management. However, the Decree-Law 151-B/2013, of 31 October, uses the word Audit:

7 1. Environmental Follow-up Portugal: The Environmental Follow-up is clearly part of the Pós-Avaliação phase, which is defined as follows in Decree-Law 151-B/ 2013 of 31 October:

8 2. Environmental impacts (METRO) The Metro mode is often considered an environment-friendly solution to urban transport problems. The construction and operation of this kind of transport infrastructure generates different types of environmental impacts.

9 2. Environmental impacts (METRO) CONSTRUCTION Has the most significant, direct and negative environmental impacts in comparison to operation. Works at Via Romana, started some years ago However, these are temporary impacts.

10 2. Environmental impacts (METRO) During the Metro construction there are several environmental impacts: temporary occupation of the surrounding areas; visual obstruction of the neighbourhood; effects on air quality; higher noise and vibration levels; production of waste and wastewaters; interference with road and foot traffic; impact on the population's quality of life;.

11 2. Environmental impacts (METRO) OPERATION Has the most significant, direct/indirect, but positive and permanent impacts. However, there are some negative impacts, such as noise and vibration disturbance.

12 3. Environmental procedures Over the last decade, environmental procedures were gradually implemented in Lisbon Metro s new projects: Project Stage: for each new project, Environmental Impact Studies were performed and, where legally required, Environmental Impact Assessments were carried out. Construction Stage: Environmental Follow-Up of new projects was implemented to ensure compliance with the measures to mitigate impacts and with the environmental monitoring required by the Environmental Impact Assessment Statements.

13 3. Environmental procedures Environmental requirements were drawn up and included in the Contract Specifications of Lisbon Metro s new projects: Environmental Follow-up Program; Environmental Officer; Environmental Follow-up Reports; Final Environmental Follow-up Report.

14 3. Environmental procedures Environmental Follow-up: started at the beginning of each construction; for each construction the following was required: Environmental Follow-up Plan before the start of the works; Reports during the construction phase and a Final Report upon completion; ensured implementation and compliance with mitigation measures, which were assessed and redefined as a function of environmental monitoring.

15 4. Case studies 0 YELLOW LINE Campo Grande / Odivelas - construction start stations m - 3 viaducts - opening date 2003

16 4. Case studies A RED LINE Alameda / São Sebastião - construction start stations m - Blue Line connection - opening date 2009

17 4. Case studies B RED LINE Oriente / Aeroporto - construction start stations m - opening date 2012

18 4. Case studies C BLUE LINE Amadora Este / Reboleira - construction start station m - opening date?

19 Environmental Impact Assessment These 3 projects were considered very delicate due to its integration in Lisbon s urban area and/or its vicinity to some architectural heritage. A B C Architectural heritage Densely populated urban area Architectural heritage

20 Environmental Impact Assessment Under the Portuguese law these projects were submitted to a lengthy and demanding procedure by the Ministry of Environment, just to guarantee its approval. A B C Started DETAILED DESIGN October 2002 DETAILED DESIGN June 2005 PRELIMINARY STUDY December 2006 Public Participation 18 November - 20 December August - 27 September April / 30 May 2007 Environmental Impact Assessment Statement March months until project approval December 2005 July DETAILED DESIGN 3 years for final project May & July 2009 approval

21 Environmental Impact Assessment Requirements of the Environmental Impact Assessment Statements: New solutions on detailed designs; Mitigation measures; Environmental monitoring; Report to the National Authority for Environmental Impact Assessment.

22 Construction phase

23 State of the art (20 years ago)

24 State of the art (20 years ago)

25 State of the art (20 years ago)

26 State of the art (20 years ago)

27 Embryonic stage: Noise 0 Monitoring program Acoustic barrier Acoustic barrier Painting of the acoustic barrier

28 Embryonic stage: Vibrations 0 Monitoring program for vibration levels Monitoring program for vibration levels

29 Embryonic stage: Air quality 0 Construction of wheel washing systems Detail of the wheel washing system Wheel washing system Regular and controlled irrigation

30 Embryonic stage: Wastewaters 0 Wastewater draining systems Wastewater sedimentation tanks

31 Embryonic stage: Soils 0 Storage of soils

32 Embryonic stage: Hydrogeology 0 Implementation of piezometers

33 Embryonic stage: Waste 0 Waste sorting and packaging

34 Embryonic stage: Land use 0 Reduction of the construction work area Sealing of the work area Changes in road and foot traffic

35 Embryonic stage: Flora & vegetation 0 Transplant, transport and replanting of important mature trees

36 Embryonic stage: Flora & vegetation 0 Preservation of trees

37 Embryonic stage: Landscape 0 Sealing of the work area aesthetic treatment, preservation status and cleaning of sidings

38 Embryonic stage: Archaeological heritage 0 LISBON METRO S LUMIAR STATION Date: 25 September 2001 Goal: The archaeological monitoring aims to safeguard any kind of historical and archaeological information that may arise during the construction of the future Metro station Lumiar. This monitoring is performed while the work in the Quaternary levels is carried out. Methodology: Monitoring consists of direct observation of the excavation, the slopes and removal of sediments. Work undertaken: The rotary machine is located in the second third where the removal of layers C2 A, B and the top of the layer C5 (photo 1) is carried out. I also followed the excavation of the ventilation shaft (photo 2). Conclusions: No archaeological remains were detected. Photo 1 Photo 2 Armando Sabrosa Archaeologist \\ Archaeological Monitoring

39 Embryonic stage: Socio-economic factors 0 Public information Parking for residents

40 Embryonic stage: Other aspects 0 Supervision support Supervision awareness

41 Mitigation measures Noise Use of specially silent and enclosed equipment A B C Noise barriers Site equipment far from noise-sensitive areas Enclosed work areas

42 Mitigation measures Vibrations Selected demolition and excavation methods with no impact A B C

43 Mitigation measures Air quality A B C Wheels washing Materials coverage

44 Mitigation measures Wastewater A B C Treatment systems - sedimentation tanks ph control system Oils remover

45 Mitigation measures Soils A B C Spill absorption Specific areas for hazardous materials Emergency kit

46 Mitigation measures Waste A B C On-site sorting of construction and demolition waste Big bags for hazardous waste Selection of licensed waste management operators

47 Mitigation measures Vegetation Tree protection A B C Transplant of trees

48 Mitigation measures Social aspects A B C Newsletters to the population Public information office Temporary urban signage

49 Environmental monitoring A B C Noise Vibrations Air quality Wastewater Soils Architectural heritage Archeology Noise Vibrations Air quality Wastewater Soils Architectural heritage Archeology Noise Vibrations Wastewater Soils Architectural heritage Archeology

50 Environmental monitoring Noise A B C

51 Environmental monitoring Vibrations A B C

52 Environmental monitoring Air quality A B

53 Environmental monitoring Wastewater A B C

54 Environmental monitoring Soils A B C

55 Environmental monitoring Architectural heritage A B C

56 Archaeology Initial archaeological assessment Monitoring of non-archaeological excavation works A B C Without artefacts With artefacts With artefacts

57 Residual impacts Impacts remaining after mitigation: A B C HUMAN DISTURBANCE - Noise - Vibrations - Air Quality (particles) - Social aspects HUMAN DISTURBANCE - Noise - Vibrations - Air Quality (particles) - Social aspects HUMAN DISTURBANCE - Noise - Social aspects ENVIRONMENTAL - Wastewater (ph, total suspended solids and oils) - Soils and waste (diversity and quantity) ENVIRONMENTAL - Wastewater (ph, total suspended solids and oils) - Soils and waste (diversity and quantity) ENVIRONMENTAL - Wastewater (ph, total suspended solid and oils) - Soils and waste ARCHITECTURAL HERITAGE ARCHITECTURAL HERITAGE ARCHAEOLOGY ARCHAEOLOGY

58 Operation phase

59 Environmental and social benefits A Landscaping

60 Environmental and social benefits B Landscaping

61 Environmental and social benefits B Landscaping

62 Environmental and social benefits B Landscaping

63 Environmental and social benefits B Landscaping

64 Environmental and social benefits A Architectural projects

65 Environmental and social benefits A Architectural projects

66 Environmental and social benefits A Art work

67 Environmental and social benefits A Art work

68 Environmental and social benefits B Art work

69 Environmental and social benefits B Art work

70 Environmental and social benefits After opening to operation: stations demand lower than expected. A But improved mobility and sustainability in Lisbon (environmental, social and economic benefits).

71 Environmental and social benefits High level of acceptance: Favorability rating of 98% in the Media. B 1st year after opening to operation: 6.8 million passengers; global demand lower than expected (-31%); Airport station attracts 21% more demand than estimated. Improved mobility and sustainability in Lisbon (environmental, social and economic benefits).

72 Environmental monitoring Noise and Vibration: B 4 Noise and 4 Vibration Campaigns on a quarterly basis in the first year of operation - Environmental Impact Assessment Statement requirement; the environmental monitoring was implemented between January and October 2013; there are no significant negative impacts in terms of noise and vibration disturbance (which would result mainly in socio-economic impacts).

73 Environmental monitoring Architectural heritage: B 5 areas identified as heritage buildings to visit after 6 months of operation - Environmental Impact Assessment Statement requirement; a sample of 120 places were visited between November 2014 and January 2015; in 4 places there are significant negative impacts in terms of structural pathologies related with the project.

74 Questions?

75 5. Conclusions These 4 case studies describe 17 years of experience on Environmental Follow-up at Lisbon Metro. They demonstrate how Environmental Follow-up was a crucial tool for the Lisbon Metro to report periodically on how the mitigation measures, the environmental monitoring and the Environmental Follow-up stipulated by the Ministry of Environment were implemented. The Environmental Follow-up was extremely important in order to identify the real impacts during the construction and operations phases and to find practical ways to solve or reduce them. It has been the result of great

76 Teamwork! Construction phase

77 Knowledge and proficiency... Operation phase

78 Dreams that become realities...

79 Dreams that become realities...

80 Thank you for your attention.

81

Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways. Environmental Measures for New Railway Projects

Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways. Environmental Measures for New Railway Projects LC Paper No. CB(1)1832/11-12(01) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Environmental Measures for New Railway Projects Introduction Railway is one of the most

More information

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation

More information

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E3072 v2 GEF Large City Congestion and Carbon Reduction Project Environment Management

More information

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL o PUBLIC WORKS DEPARTMENT PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL CIVIL ENGINEERING AND ARCHITECTURE 1. Offsite Improvements - Civil Engineering drawings may be required to show the following: Replacement

More information

Environmental Guidelines for Construction Sites

Environmental Guidelines for Construction Sites Inspection Items Guidelines Remarks 1) Air Pollution Control 1a) Notification to EPD before Work Commencement If the work is classified as notifiable work such as site formation, reclamation, building

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10.1 Objective The main objective is to confirm the implementation of mitigation measures recommended in

More information

Draft Environmental and Social Action Plan (ESAP) For M6-M60 Motorway, Sections between Szekszard-Boly, and Boly-Pecs

Draft Environmental and Social Action Plan (ESAP) For M6-M60 Motorway, Sections between Szekszard-Boly, and Boly-Pecs Draft Action (ESAP) For M6-M60 Motorway, Sections between Szekszard-Boly, and Boly-Pecs No Action Risks, Project preparation, permits and licences I.1 Preparation of Organization for, including inter alia:

More information

Forest Recreation Management

Forest Recreation Management Forest Recreation Management 1 Forest Recreation Management Introduction...3 CONTENTS The Benefits of Guidelines...3 Considerations...4 Planning...5 Construction of Recreation Areas...6 Protecting Cultural

More information

WHS RISK REGISTER FOR THE DESIGN OF BUILDINGS AND STRUCTURES

WHS RISK REGISTER FOR THE DESIGN OF BUILDINGS AND STRUCTURES WHS RISK REGISTER FOR THE DESIGN OF BUILDINGS AND STRUCTURES Project Name: Project Manager: Date Building of Hand Over: Design Consultants: Qualifications, skills, experience: Hazard Identified Risk Level

More information

South Landfill Annual Cover Rate Screening Criteria Checklist

South Landfill Annual Cover Rate Screening Criteria Checklist South Landfill Annual Cover Rate Screening Criteria Checklist The following checklist is taken from the Guide to Environmental Assessments for Waste Management Projects, Part B Environmental Screening

More information

Manningham Works Code of Practice

Manningham Works Code of Practice Manningham Works Code of Practice June 2017 Manningham City Council 699 Doncaster Road (PO Box 1) Doncaster Vic 3108 t 9840 9333 f 9848 3110 e manningham@manningham.vic.gov.au www.manningham.vic.gov.au

More information

Comparative Evaluation Option #1 & Option #2

Comparative Evaluation Option #1 & Option #2 Comparative Evaluation Option #1 & Option #2 Option #1 Existing Landfill Approx. 47 metres/14 stories Proposed Layout Approx. 31 metres/9.5 stories Option #2 Existing Landfill Approx. 47 metres/14 stories

More information

Works, services and infrastructure code

Works, services and infrastructure code 9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation Energy Resilience for Climate Adaptation Project (ERCAP) Environmental Code of Practice (ECOP) for COMPONENT 2: Demonstration Measures to Enhance Resilience of Energy Sector (Pilot for Strengthening Transmission

More information

EIA Screening. Proposed Mixed Use Development at Jacobs Island, Cork. Montip Horizon Limited

EIA Screening. Proposed Mixed Use Development at Jacobs Island, Cork. Montip Horizon Limited EIA Screening Proposed Mixed Use Development at Jacobs Island, Cork Montip Horizon Limited June 2018 1. Introduction This Environmental Impact Assessment Screening has been prepared to determine whether

More information

18 Cumulative Impacts and Interaction of Effects

18 Cumulative Impacts and Interaction of Effects 18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly

More information

Lands & Waters Aggregate & Petroleum Resources March 15, 2006

Lands & Waters Aggregate & Petroleum Resources March 15, 2006 Subject: Policy No.: New: Ministry of Natural Resources Ministère des Richesses naturelles Licence / Site Plan Notes A.R. 2.00.03 Yes Compiled by Branch: Section: Date Issued: Lands & Waters Aggregate

More information

Public Information Centre

Public Information Centre Vineland West Private Water System Municipal Class Environmental Assessment Public Information Centre Tuesday, July 12, 2016, 6 to 8 p.m. Vineland Research and Innovation Centre, Rittenhouse Hall Welcome!

More information

8.0 MITIGATION MONITORING AND REPORTING PROGRAM

8.0 MITIGATION MONITORING AND REPORTING PROGRAM 8.0 MITIGATION MONITORING AND REPORTING PROGRAM Public Resources Code, Section 21081.6 requires that mitigation measures identified in environmental review documents prepared in accordance with CEQA are

More information

Executive Summary 1. 1 Project Background 6

Executive Summary 1. 1 Project Background 6 Contents Executive Summary 1 1 Project Background 6 Page 1.1 Project Overview 6 1.2 Hotel Concept 6 1.3 Justification of the Project 8 1.3.1 Foreign Currency Earnings 8 1.3.2 Tourism Developments in Mauritius

More information

Charter Township of Garfield Grand Traverse County

Charter Township of Garfield Grand Traverse County Charter Township of Garfield Grand Traverse County 3848 VETERANS DRIVE TRAVERSE CITY, MICHIGAN 49684 PH: (231) 941-1620 FAX: (231) 941-1588 SPECIAL USE PERMIT APPLICATION APPLICANT INFORMATION Name: Address:

More information

IN THE KYRGYZ REPUBLIC

IN THE KYRGYZ REPUBLIC Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL ROAD REHABILITATION (OSH-ISFANA) PROJECT (NRRP)- WORLD BANK PPA Q 6240 CONSULTANCY

More information

Join the Conversation!

Join the Conversation! Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Transit Project Assessment(TPA) Process Public Consultation Centre (PCC) No.1 November 18, 2015 November 19, 2015 Join the Conversation!

More information

Environment Management A TENANT INFORMATION HANDBOOK

Environment Management A TENANT INFORMATION HANDBOOK Environment Management A TENANT INFORMATION HANDBOOK 3 Avro Street Bankstown Airport NSW 2200 T 02 9796-2300 F 02 9791-0230 www.sydneymetroairport.com.au SYDNEY METRO AIRPORTS E N V I R O N M E N T M A

More information

GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT

GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY DECEMBER 2013 EXECUTIVE SUMMARY 1. PROJECT BACKGROUND

More information

Mohawk College Hamilton, ON. Project Description Report. Fennell Campus Wind Project

Mohawk College Hamilton, ON. Project Description Report. Fennell Campus Wind Project Mohawk College Hamilton, ON Fennell Campus Wind Project H336493-0000-07-124-0001 Rev. C September 24, 2010 Project Report Mohawk College Fennell Campus Wind Project September 24, 2010 Table of Contents

More information

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017 WELCOME QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street Public Information Centre Round #1 October 2017 Please Sign In PURPOSE OF THIS MEETING The Ontario Ministry

More information

Georgetown Water Storage Class Environmental Assessment Study

Georgetown Water Storage Class Environmental Assessment Study Georgetown Water Storage Class Environmental Assessment Study Public Information Centre Cedarvale Community Centre 181-185 Main Street South Thursday, September 4th, 2008 6:30 p.m. 8:30 p.m. Why are we

More information

Washington Dulles International Airport EXECUTIVE SUMMARY

Washington Dulles International Airport EXECUTIVE SUMMARY EXECUTIVE SUMMARY The events of September 11, 2001 and the economic uncertainties facing commercial aviation have affected the timing of the Proposed Action. The Metropolitan Washington Airports Authority

More information

Mitigation Monitoring and Reporting Program

Mitigation Monitoring and Reporting Program Mitigation Monitoring and Reporting Program Mitigation Monitoring and Reporting Program The Infill Environmental Checklist identifies the applicable mitigation measures from the Downtown Area Plan Environmental

More information

LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT

LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT APPENDIX

More information

Murra Warra Wind Farm Project Environmental Management Plan

Murra Warra Wind Farm Project Environmental Management Plan 1. Introduction This (EMP) covers the pre-construction, construction, operation and decommissioning phases for the Murra Warra Wind Farm Project. RES Australia recognises the importance of reducing human

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s T a b l e o f C o n t e n t s Executive Summary English Executive Summary French page 1. Introduction and Background... 1-1 1.1 Introduction...1-1 1.2 The Proponent Waste Management of Canada Corporation...1-2

More information

Environmental Impact Statement. Avoca Tank Project

Environmental Impact Statement. Avoca Tank Project ABN 88 100 095 494 Environmental Impact Statement for the Avoca Tank Project Prepared by: R.W. CORKERY & CO. PTY. LIMITED July 2014 This page has intentionally been left blank ABN 88 100 095 494 Environmental

More information

Welcome To The Public Open House For The Wainfleet Wind Energy Project August 24, 2010

Welcome To The Public Open House For The Wainfleet Wind Energy Project August 24, 2010 Welcome To The Public Open House For The Wainfleet Wind Energy Project August 24, 2010 Objectives of Open House: Introduce Wainfleet Wind Energy Inc. and IPC Energy. Present an overview of Wainfleet Wind

More information

Erosion Control Inspection Form

Erosion Control Inspection Form Project Name Address Inspection Date Time Name of Certified Erosion Sediment Lead (CESCL) or qualified inspector if less than one acre Print Name: Approximate rainfall amount since the last inspection

More information

! Environmental Impact Assessment process!

! Environmental Impact Assessment process! Environmental Impacts"! Environmental Impact Assessment process! Prof. Doutora Maria do Rosário Partidário Environmental Impacts @ MRPartidário 1 EIA Started with NEPA (National Environmental Policy Act,

More information

QLDC PROPOSED DISTRICT PLAN [PART THREE] AUGUST 2015 BUSINESS MIXED USE

QLDC PROPOSED DISTRICT PLAN [PART THREE] AUGUST 2015 BUSINESS MIXED USE 16 QLDC PROPOSED DISTRICT PLAN [PART THREE] AUGUST 2015 16 b usiness mix ed use BUSINESS MIXED USE QLDC PROPOSED DISTRICT PLAN [PART THREE] AUGUST 2015 16 business mixed use 16.1 Purpose The intention

More information

Sustainability Statement

Sustainability Statement Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Sustainability Statement Doc Ref: 7.07 Appendix B.21 Greenwich Pumping Station

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

EIA Case Study of Implementing Mitigation Measures in Hong Kong

EIA Case Study of Implementing Mitigation Measures in Hong Kong EIA Case Study of Implementing Mitigation Measures in Hong Kong Mable M.H. CHAN Steve T.S. LI Metro Assessment Group, Environmental Protection Department, Hong Kong Special Administrative Region Government,

More information

5.8 LOW DENSITY RESIDENTIAL ZONE

5.8 LOW DENSITY RESIDENTIAL ZONE 5.8 LOW DENSITY RESIDENTIAL ZONE 5.8.1 ZONE PURPOSE (1) Low density residential development areas are designed to satisfy a particular demand from people wishing to live in a semi-rural setting, but to

More information

APPLICATION FOR CONSTRUCTION LETTER OF APPROVAL

APPLICATION FOR CONSTRUCTION LETTER OF APPROVAL APPLICATION FOR CONSTRUCTION LETTER OF APPROVAL DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL DIVISION OF SOIL AND WATER CONSERVATION SHORELINE AND WATERWAY MANAGEMENT SECTION Office of the

More information

HSE IN CONSTRUCTION SITES

HSE IN CONSTRUCTION SITES SECTOR / HEALTH AND SAFETY NON-TECHNICAL & CERTIFIED TRAINING COURSE Construction site Safety management mainly involves the rational layout of site facilities, optimum usage of space and dynamic Safety

More information

MAIN INDUSTRIAL ZONE RULES

MAIN INDUSTRIAL ZONE RULES Chapter 23 MAIN INDUSTRIAL ZONE RULES Introduction This chapter contains rules managing land uses in the. The boundaries of this zone are shown on the planning maps. All rules apply throughout the unless

More information

Environmental Management Plan Checklist and Format

Environmental Management Plan Checklist and Format Part II : Environmental Management Plan Checklist and Format EMP Checklist for Activities PART A: INSTITUTIONAL & ADMINISTRATIVE FOR THE AFRICA CENTERS OF EXCEL- LENCE PROJECT Country GHANA Project title

More information

DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION

DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION APPENDIX 4 Analysis Framework 4-1: CEQR Technical Area Guide DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION

More information

Chapter 2 Worksheets for Commercial and Industrial Activities

Chapter 2 Worksheets for Commercial and Industrial Activities Chapter 2 Worksheets for Commercial and Industrial Activities This worksheet is designed for use by business and industry operators. Complete the entire worksheet by checking the appropriate boxes for

More information

STATUS REPORT On the

STATUS REPORT On the STATUS REPORT On the Amended Programmatic Agreement among The Federal Transit Administration The Metropolitan Transportation Authority, AND The New York State Historic Preservation Office Regarding Implementation

More information

Archaeological Institute of America

Archaeological Institute of America On January 8th, 2004, Jane Waldbaum, AIA President, sent the following letter to officials at US AID and the US Army Corps of Engineers requesting that the Iraqi State Board of Antiquities and Heritage

More information

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction Section 1 Introduction Page Number 1.1 Introduction 2 1.2 Screening - Requirement for an EIA 5 1.3 Purpose of this EIA 6 1.4 Objectives of this EIA 6 1.5 Scoping 10 1.6 Format and Structure of this EIS

More information

Mecklenburg County Sustainable Facilities and Development Policy

Mecklenburg County Sustainable Facilities and Development Policy Mecklenburg County Sustainable Facilities and Development Policy The objective of this policy is to define goals, standards, and verification means for the design, construction, and future operation of

More information

5. ENVIRONMENTAL IMPACT ASSESSMENT

5. ENVIRONMENTAL IMPACT ASSESSMENT 5. ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION Environmental Impact Assessment (EIA) is a process that considers how a proposed development will change existing environmental conditions, and what

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Environmental

More information

Spectra Energy Midstream Canada Partner Corporation 2016 Application for Approval to Reactivate the Pesh Creek Pipeline and Pesh Creek Loop

Spectra Energy Midstream Canada Partner Corporation 2016 Application for Approval to Reactivate the Pesh Creek Pipeline and Pesh Creek Loop APPLICATION Spectra Energy Midstream Canada Partner Corporation 2016 Application for Approval to Reactivate the Pesh Creek Pipeline and Pesh Creek Loop Spectra Energy Midstream Canada Partner Corporation,

More information

6 Risk assessment methodology

6 Risk assessment methodology Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management

More information

CONCLUSIONS 14 CONTENTS

CONCLUSIONS 14 CONTENTS CONTENTS Introduction... 14-1 Traffic... 14-1 Air Quality... 14-1 Noise and Vibration... 14-2 Geology and Hydrology... 14-2 Landscape and Visual... 14-3 Ecology... 14-4 Cultural Heritage... 14-4 Population

More information

EXECUTIVE SUMMARY of the Environmental Impact Assessment Report

EXECUTIVE SUMMARY of the Environmental Impact Assessment Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Introduction Additional Financing for Third East West Highway Improvement Project EXECUTIVE

More information

Information Sheet - Mountain Highway Interchange Noise Assessment and Sound Mitigation

Information Sheet - Mountain Highway Interchange Noise Assessment and Sound Mitigation Information Sheet - Mountain Highway Interchange Noise Assessment and Sound Mitigation Why is the project needed? The new Mountain Highway Interchange will provide additional Highway 1 access to better

More information

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity)

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) [Vide Paragraph - 6 of Notification dated 14 th September 2006, only for construction projects listed under item 8 of the Schedule] (1) LAND ENVIRONMENT (Attach panoramic view of the project site and the

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

SUDAS Revision Submittal Form

SUDAS Revision Submittal Form SUDAS Revision Submittal Form Status Date: As of 3/15/2018 Topic: General Permit No. 2 updates Manual: Design Manual Location: Sections 7A-1 and 7B-1 Requested Revision: Section 7A-1 (General Information),

More information

Environmental Management Plan during Construction Phase

Environmental Management Plan during Construction Phase Management Plan during Phase Sr 1 Ambient Air Quity Negative inside site premises outside site 2 ise Negative near noise generation sources inside premises on ambient noise levels in the Surrounding area

More information

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI

More information

Some Sydney councils require 27 reports for a single house development application

Some Sydney councils require 27 reports for a single house development application Some Sydney councils require 27 reports for a single house development application Monday, 23 April 2018 Sydney councils are requiring an excessive number of specialist reports to submit a Development

More information

City of Glendale Stormwater Management Plan Checklist

City of Glendale Stormwater Management Plan Checklist City of Glendale Stormwater Management Plan Checklist Project: Title of Plan: Date: Date of Plan: Reviewer: Most Recent Revision: Criteria Yes No Identify a SWMP Administrator and an alternate - The SWMP

More information

ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES

ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES 5 Training materials produced in Turkey to aid reinstatement / biorestoration 5 5 ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES 5.1 PROJECT WIDE APPROACH Training

More information

LIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776]

LIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776] LIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776] 1. Notwithstanding all the other permits and clearances

More information

Technical Guidance Document for Operational Environmental Management Plan (OEMP)

Technical Guidance Document for Operational Environmental Management Plan (OEMP) Technical Guidance Document for Operational Environmental Management Plan (OEMP) EAD-EQ-PCE-TG-06 Signature on Original Environment Quality Sector * Corporate Management Representative Secretary General

More information

14.0 MONITORING AND CONTINGENCY 14.1 Effects Monitoring

14.0 MONITORING AND CONTINGENCY 14.1 Effects Monitoring 14.0 MONITORING AND CONTINGENCY 14.1 Effects Monitoring An effective monitoring program provides results to: indicate whether the facility is working as expected and that the assumptions used in the assessment

More information

Council Roadside Reserves Project. Site Management Checklists and Safeguards

Council Roadside Reserves Project. Site Management Checklists and Safeguards Council Roadside Reserves Project Site Management Checklists and Safeguards Introduction These slides cover An introduction to checklists and safeguards Example pre-construction checklist Practical safeguards

More information

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER FOR SPECIAL CONDITIONS AND PERMIT NUMBERING GENERAL NOTES: HOUSE GREEN HOUSE 1900 S. NORFOLK ST. SUITE 350 GARAGE GRADING

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

TERMS OF REFERENCE (TOR) FOR THE PROPOSED RESIDENTIAL APARTMENTS LOCATEDON PLOT L.R NO.

TERMS OF REFERENCE (TOR) FOR THE PROPOSED RESIDENTIAL APARTMENTS LOCATEDON PLOT L.R NO. TERMS OF REFERENCE (TOR) FOR THE PROPOSED RESIDENTIAL APARTMENTS LOCATEDON PLOT L.R NO. 1/95 ALONG ARGWINGS KODHEK ROAD, IN HURLINGHAM, NAIROBI CITY COUNTY. PROPONENT DOUBLE WIN COMPANY LIMITED P.O. BOX

More information

PERMIT APPLICATION FEES Fees must be paid at time of application

PERMIT APPLICATION FEES Fees must be paid at time of application Permits SEPA Checklist Permit # Staff use Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful

More information

SEPA Modification Application

SEPA Modification Application SEPA Modification Application 6000 Main St. SW, Lakewood, WA 98499 Phone: (253) 512-2261 Application Fee: $200.00 Technology Fee: $4.00 Number of Copies Required: Description of Required Documents: Required:

More information

Environmental impact assessment of council roadside activities

Environmental impact assessment of council roadside activities Environmental impact assessment of council roadside activities Developed on behalf of LGNSW for the Council Roadside Reserve Project 2016-2019 Introduction These slides cover legislative obligations in

More information

Fence and Wall Requirements

Fence and Wall Requirements Fence and Wall Requirements Definitions Decorative wall - A wall constructed of stone or other material erected for the sole purpose of providing a decorative and/or landscaped feature, and not to include

More information

ZONING CLEARANCE PLAN REVIEW CHECKLIST. Based on the Revised Town of Carefree Zoning Ordinance

ZONING CLEARANCE PLAN REVIEW CHECKLIST. Based on the Revised Town of Carefree Zoning Ordinance ZONING CLEARANCE PLAN REVIEW CHECKLIST Based on the Revised Town of Carefree Zoning Ordinance Date: Applicant: Permit Number: Reviewer: Address: Lot & Subdivision: Zoning District: New SRF: Addn/Remodel:

More information

This part of the Plan explains what a District Plan is and provides a user friendly guide.

This part of the Plan explains what a District Plan is and provides a user friendly guide. This part of the Plan explains what a District Plan is and provides a user friendly guide. If you have any questions about this Plan and how it might affect a project you are contemplating, then you are

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

URBAN SETTLEMENT ZONE - RULES

URBAN SETTLEMENT ZONE - RULES URBAN SETTLEMENT ZONE - RULES.1 Rule Statement The following rules, shall apply to all land shown as being within the Urban Settlement Zone in the District Plan Maps. These rules shall be read in conjunction

More information

APPENDIX 6 RECOMMENDED CONDITIONS SHOULD CONSENT BE GRANTED. RECOMMENDED CONDITIONS LAND USE [RM180023] General Conditions

APPENDIX 6 RECOMMENDED CONDITIONS SHOULD CONSENT BE GRANTED. RECOMMENDED CONDITIONS LAND USE [RM180023] General Conditions RECOMMENDED CONDITIONS LAND USE [RM180023] General Conditions No / Title 1 General Accordance Requirement The activity being the establishment and operation of a BP Service Station and Quick Service Restaurant

More information

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In WELCOME Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In PURPOSE OF THIS MEETING Rankin Construction Inc. (RCI) and their design consultant

More information

CITY OF FIREBAUGH Environmental Questionnaire

CITY OF FIREBAUGH Environmental Questionnaire CITY OF FIREBAUGH COMMUNITY DEVELOPMENT DEPARTMENT 1133 P STREET FIREBAUGH, CA 93622 (559) 659-2043 Please type or print clearly in ink. Incomplete applications will be returned. You may attach additional

More information

Page 1 of 6 770-54 Wind and solar energy systems. [Added 6-15-2009 by Ord. No. 2009-06] A. Purpose and intent. It is the general purpose and intent of the City to balance the need for clean, renewable

More information

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.) Module 2: Selection of Controls and Site Planning for Construction Site Erosion Prevention Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa,

More information

Environmental Guideline on Food Canning Industry

Environmental Guideline on Food Canning Industry 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull No. quote

More information

MITIGATION MONITORING & REPORTING PLAN

MITIGATION MONITORING & REPORTING PLAN MITIGATION MONITORING & REPORTING PLAN The following environmental mitigation measures shall be incorporated into the project development as Conditions of Approval (MND 2329). The project applicant shall

More information

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART 1 GENERAL 1.1 DESCRIPTION A. Temporary Utilities: Electricity, lighting, heating, cooling, ventilation, water, and sanitary facilities. B. Temporary Controls: Barriers, fencing, erosion control, exterior

More information

EXECUTIVE SUMMARY. Figure 1 - Rail Deck Park Study Area. Executive Summary Rail Deck Park Engineering & Costing Study Report Page 1 of 10

EXECUTIVE SUMMARY. Figure 1 - Rail Deck Park Study Area. Executive Summary Rail Deck Park Engineering & Costing Study Report Page 1 of 10 EXECUTIVE SUMMARY Background The proposal for Rail Deck Park (RDP) comprises the construction of a decking structure over the rail corridor in downtown Toronto between Blue Jays Way and Bathurst Street

More information

It was presented to the Minister of the Environment, Kingdom of Cambodia on May 5, 2000 Phnom Penh, Cambodia

It was presented to the Minister of the Environment, Kingdom of Cambodia on May 5, 2000 Phnom Penh, Cambodia The environmental impact assessment of hotel activity in Siem Reap was conducted by the Canadian Universities Consortium Urban Environmental Management Project at the Asian Institute of Technology, Bangkok.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the construction and

More information

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY Public Disclosure Authorized October 2015 Public Disclosure

More information

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Welcome Public Information Event Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Please sign in to be added to the study mailing list and receive

More information

Project Purpose. Federal Railroad Administration

Project Purpose. Federal Railroad Administration Project Purpose To preserve the current functionality of Amtrak s Northeast Corridor service and NJ TRANSIT s commuter rail service between New Jersey and Penn Station New York by repairing the deteriorating

More information

ATTACHMENT C MEASURES TO MINIMIZE HARM

ATTACHMENT C MEASURES TO MINIMIZE HARM ATTACHMENT C MEASURES TO MINIMIZE HARM ATTACHMENT C MEASURES TO MINIMIZE HARM The mitigation measures and other features of the Project that reduce adverse impacts, to which Federal Transit Administration

More information